Electricity storage system and vehicle

By using a combined control of multiple electric heaters in the power storage system, the problem of difficulty in quickly heating up at the start of charging is solved, efficient temperature heating and energy management are achieved, and charging efficiency and energy utilization are improved.

CN119017998APending Publication Date: 2024-11-26TOYOTA JIDOSHA KK
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410196970.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2023-05-23
Filing Date
2024-02-22
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing power storage system is difficult to quickly heat up to a sufficient temperature at the start of charging, resulting in a longer charging time and low energy efficiency.

Method used

Using a combination of multiple electric heaters, the control device prioritizes the use of a first heater away from the battery at the start of charging, and switches to a nearby second heater for efficient insulation after reaching sufficient temperature, reducing energy Consumption.

Benefits of technology

It is achieved quickly heating to a full temperature at the start of charging, while suppressing the decrease in energy efficiency, improving the charging efficiency and the energy utilization rate of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119017998A_ABST
    Figure CN119017998A_ABST
Patent Text Reader

Abstract

The invention relates to a power storage system and a vehicle. A power storage system includes a power storage device, a first heater, a second heater, and a control device. The first heater is disposed farther from the electricity storage device than the second heater. The control device is configured so as to be able to execute first heating control for heating the electricity storage device using both the first heater and the second heater, and second heating control for heating the electricity storage device using only the second heater among the first heater and the second heater. The control device executes the first heating control when a predetermined heating condition is satisfied at the start of charging of the electricity storage device. Furthermore, when a predetermined switching condition is satisfied during the charging of the electricity storage device and during the execution of the first heating control, the control device executes the second heating control in place of the first heating control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to a power storage system and a vehicle equipped with the power storage system. Background Art

[0002] Japanese Patent Application Laid-Open No. 2020-113383 discloses a power storage system (more specifically, a battery charging system) that heats a battery using an electric heater disposed around the battery. In this power storage system, the charger disposed around the battery generates heat due to power-on, and the battery is heated not only by the electric heater but also by the charger. In the power storage system described in Japanese Patent Application Laid-Open No. 2020-113383, the battery is heated when the electric vehicle is started or charged in order to increase the effective capacity of the battery of the electric vehicle. Summary of the invention

[0003] In the technology described in Japanese Patent Application Laid-Open No. 2020-113383, the heat (heating amount) used to heat the power storage device is increased by utilizing the heat generated by the charger without increasing the number of electric heaters used to heat the power storage device. In such a technology, since the power storage device is heated using an electric heater and a charger disposed around the power storage device, energy loss may be small. However, the heating amount of the charger is smaller than that of the electric heater. Therefore, sufficient heating may not be obtained.

[0004] For example, if the storage device is in a low-temperature state when charging of the storage device begins, the charging power is limited due to the decrease in the current that the storage device can accept, which may cause the charging time of the storage device (i.e., the time it takes to complete the charging of the storage device) to be longer. In order to shorten the charging time of the storage device, it is required to heat the storage device in a low-temperature state to a sufficient temperature at the beginning of charging of the storage device. It is difficult to heat the storage device in a low-temperature state to a sufficient temperature at the beginning of charging of the storage device using the technology described in Japanese Patent Application Laid-Open No. 2020-113383.

[0005] The present disclosure has been made to solve the above-mentioned problems, and an object of the present disclosure is to raise the temperature of an electric storage device to a sufficient temperature at an early stage when charging of the electric storage device is started while suppressing a decrease in energy efficiency.

[0006] The power storage system according to the present disclosure comprises:

[0007] Power storage device;

[0008] The first heater and the second heater are configured to heat the power storage device using electric power; and

[0009] Control device.

[0010] The first heater is disposed farther from the power storage device than the second heater.

[0011] The control device is configured to be capable of executing a first heating control for heating the power storage device using both the first heater and the second heater and a second heating control for heating the power storage device using only the second heater of the first heater and the second heater.

[0012] The control device executes the first heating control when a predetermined heating condition is satisfied at the start of charging of the power storage device.

[0013] Then, if a predetermined switching condition is satisfied during the charging of the power storage device and the execution of the first heating control, the control device executes the second heating control instead of the first heating control.

[0014] In a power storage system, it is rare to configure multiple electric heaters around the power storage device. However, there are many power storage systems in which one electric heater is configured near the power storage device and another electric heater is configured at a position away from the power storage device. Therefore, in the above structure, multiple electric heaters (first and second heaters) are used to heat the power storage device. However, with respect to the energy consumed to heat up the power storage device, there is a tendency that the electric heater (first heater) located at a position away from the power storage device is more than the electric heater (second heater) located near the power storage device. A portion of the energy (heat) generated at a position away from the power storage device is lost before being transmitted to the power storage device. Therefore, it can be considered that the heating of the power storage device by the second heater is more energy efficient than the heating of the power storage device by the first heater.

[0015] In this regard, the control device performs the first heating control when the predetermined heating condition is satisfied at the start of charging of the power storage device. According to such control, the first heating control can be performed as needed at the start of charging of the power storage device, and the power storage device can be heated to a sufficient temperature early by using the first and second heaters. The predetermined heating condition can be satisfied when the heating amount is insufficient by the second heater alone.

[0016] Moreover, if the prescribed switching condition is satisfied, the control device switches from the first heating control to the second heating control. According to such control, after the storage device is heated to a sufficient temperature by the first heating control, the temperature of the storage device can be adjusted (for example, heat preservation) by the second heating control. The prescribed switching condition can be satisfied when it becomes possible to ensure a sufficient amount of heating by the second heater alone. By switching from the first heating control to the second heating control, the heating of the storage device by the first heater with relatively low energy efficiency is stopped, and only the heating of the storage device by the second heater with relatively high energy efficiency continues. Thereby, the decrease in energy efficiency is suppressed.

[0017] According to the present disclosure, it is possible to raise the temperature of the power storage device to a sufficient temperature at an early stage when charging of the power storage device is started while suppressing a decrease in energy efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Features, advantages and technical and industrial significance of exemplary embodiments of the present invention will be described below with reference to the accompanying drawings, in which like numerals represent like elements, and in which:

[0019] Figure 1 is a diagram showing a schematic structure of a vehicle according to an embodiment of the present disclosure;

[0020] Figure 2 It is shown Figure 1 A diagram showing a structure of the periphery of the power storage device shown;

[0021] Figure 3 is a flowchart showing charging control according to an embodiment of the present disclosure;

[0022] Figure 4 is a diagram for explaining first and second heater controls and a first operation example of the power storage system according to the embodiment of the present disclosure;

[0023] Figure 5 is a diagram showing a second operation example of the power storage system according to the embodiment of the present disclosure;

[0024] Figure 6 It is shown Figure 4 A diagram showing a variation of the process shown and a third operation example. DETAILED DESCRIPTION

[0025] Regarding the embodiments of the present disclosure, Figure 1 In the drawings, the same or corresponding parts are denoted by the same reference numerals, and their description will not be repeated.

[0026] Figure 1 FIG. 2 is a diagram showing a schematic structure of a vehicle according to the embodiment. Figure 1 As shown, vehicle 1 is an electric vehicle (xEV) equipped with a power storage system according to the embodiment. Vehicle 1 is, for example, a 4-wheeled BEV (battery electric vehicle). However, vehicle 1 may also be another electric vehicle such as a plug-in hybrid electric vehicle. In addition, vehicle 1 may also be configured to be capable of contactless charging. The number of wheels is also arbitrary, and may be 3 wheels, or may be 5 wheels or more.

[0027] The vehicle 1 includes a thermal management circuit 100 and an electronic control unit (ECU) 500. The ECU 500 includes a processor 501, a random access memory (RAM) 502, and a storage device 503. As the processor 501, for example, a central processing unit (CPU) can be used. The storage device 503 is configured to store stored information. In addition to the program, the storage device 503 also stores information used by the program (mapping, mathematical formulas, various parameters, etc.). In this embodiment, the processor 501 executes the program stored in the storage device 503 to execute various controls in the ECU 500 (for example, referring to Figure 3 , Figure 4 However, various controls in ECU 500 may be executed by hardware (electronic circuit) instead of software.

[0028] The heat management circuit 100 is configured to perform heat management of the vehicle 1 using a heat medium. The heat management circuit 100 includes a first circuit 110, a second circuit 120, and a third circuit 130. In addition, the heat management circuit 100 includes a condenser 140, a refrigeration cycle 150, a cooler 160, a five-way valve 310, and a liquid storage tank (R / T) 320. The five-way valve 310 and the liquid storage tank 320 are shared by the second circuit 120 and the third circuit 130. In addition, the condenser 140, the refrigeration cycle 150, and the cooler 160 are arranged between the first circuit 110 and the second circuit 120, and function as an example of the "heat transfer mechanism" involved in the present disclosure.

[0029] The first circuit 110 includes a first flow path for the first heat medium to flow. The first circuit 110 includes a pump 111, an electric heater 112 (first heater), a three-way valve 113, a heater core 114, a reservoir (R / T) 115, and a radiator 118. The three-way valve 113 switches the path of the first heat medium. The pump 111 circulates the first heat medium in the first circuit 110. Specifically, the pump 111 allows the first heat medium sucked from the reservoir 115 to pass through the condenser 140, the electric heater 112, the heater core 114 or the radiator 118 connected through the three-way valve 113 in sequence and then return to the reservoir 115. The first heat medium exchanges heat with each device while passing through. The pump 111, the electric heater 112, and the three-way valve 113 are controlled by the ECU 500. The radiator 118 functions as a heat exchanger. Through the radiator 118, the first heat medium flowing in the first circuit 110 exchanges heat with the external air.

[0030] The five-way valve 310 switches the path of the second heat medium. The five-way valve 310 has five orifices P1 to P5. The ECU 500 controls the five-way valve 310 in a manner that becomes any one of the first to fifth connection modes described below. Hereinafter, the orifices P1, P2, P3, P4, and P5 are sometimes abbreviated as "P1", "P2", "P3", "P4", and "P5", respectively.

[0031] In the first connection mode, P1 and P2 are connected, and P3 and P4 are connected, and P5 is in a non-connected state. In the second connection mode, P1 and P2 are connected, and P4 and P5 are connected, and P3 is in a non-connected state. In the third connection mode, P1 and P5 are connected, and P3 and P4 are connected, and P2 is in a non-connected state. In the fourth connection mode, P2 and P4 are connected, and P1 and P3 are connected, and P5 is in a non-connected state. In the fifth connection mode, P2 and P4 are connected, and P1 and P5 are connected, and P3 is in a non-connected state.

[0032] The flow paths 120a and 120b are connected to the ports P1 and P2 of the five-way valve 310, respectively. The flow path 120a is a flow path connecting the port P1 and the liquid storage tank 320. The flow path 120b is a flow path connecting the port P2 and the liquid storage tank 320. By connecting P1 and P2 of the five-way valve 310 (for example, the first and second connection modes), the second circuit 120 including the flow paths 120a and 120b is formed.

[0033] A pump 121 and a cooler 160 described later are disposed in the flow path 120a. A battery 200 and an electric heater 220 (second heater) are disposed in the flow path 120b. The pump 121 circulates the second heat medium in the second circuit 120. Specifically, the pump 121 causes the second heat medium sucked from the liquid storage tank 320 to pass through the cooler 160, the five-way valve 310, the electric heater 220, and the battery 200 in sequence and then return to the liquid storage tank 320. The second heat medium exchanges heat with each device while passing through. The second heat medium that exchanges heat with the battery 200 flows in the flow path 120b. The pump 121 and the electric heater 220 are controlled by the ECU 500. A battery management system (BMS) 210 that monitors the state of the battery 200 is provided in the battery 200.

[0034] The flow paths 130b and 130a are connected to the ports P3 and P4 of the five-way valve 310, respectively. The flow paths 130b and 130a are flow paths that connect the ports P3 and P4 to the liquid storage tank 320, respectively. By connecting P3 and P4 of the five-way valve 310 (for example, the first and third connection modes), the third circuit 130 including the flow paths 130a and 130b is formed.

[0035] In this embodiment, a heat medium (second heat medium) of the same type as the heat medium circulating in the second circuit 120 circulates in the third circuit 130. It should be noted that the first heat medium circulating in the first circuit 110 is a heat medium of a different type from the second heat medium. In addition, the third heat medium used in the refrigeration cycle 150 described later is also a heat medium of a different type from the first and second heat media. For example, the first heat medium may be a well-known heat medium for heating. The second heat medium may be insulating oil or antifreeze. The third heat medium may be a well-known heat medium for refrigeration cycles. However, it is not limited thereto, and the first to third heat media may be appropriately changed.

[0036] A pump 131, a smart power unit (SPU) 132, a PCU for the front motor (Fr-PCU) 133, a PCU for the rear motor (Rr-PCU) 134, and oil coolers (O / C) 135 and 136 are arranged in the flow path 130a. The pump 131 circulates the second heat medium in the third circuit 130. Specifically, the pump 131 allows the second heat medium sucked from the tank 320 to pass through the SPU 132, the Fr-PCU 133, the Rr-PCU 134, the oil cooler 135, the oil cooler 136, and the five-way valve 310 in sequence and then return to the tank 320. The second heat medium exchanges heat with each device while passing through. The SPU 132 functions as an on-board charger and discharger (charger and discharger) of the battery 200. However, the vehicle 1 does not necessarily have an external power supply function (such as a V2H function). The SPU 132 includes, for example, a power conversion circuit. PCU means "power control unit". Fr-PCU 133 and Rr-PCU 134 use the power supplied from battery 200 to drive MG (motor generator) not shown. The torque output by MG rotates the drive wheels of vehicle 1 via a variable speed drive axle (T / A). Battery 200 functions as a power storage device for driving. Each PCU may also include a bidirectional converter. SPU 132 and each PCU are controlled by ECU 500. T / A functions as a power transmission mechanism. Oil coolers 135 and 136 cool the oil supplied to T / A of vehicle 1 by an electric oil pump (EOP), respectively. The second heat medium flowing in oil coolers 135 and 136 performs heat exchange with the oil for T / A. One or more temperature sensors for detecting the temperature of the second heat medium flowing in flow path 130a may be provided at a predetermined location (for example, near each PCU).

[0037] The flow path 170a is connected to the port P5 of the five-way valve 310. The flow path 170a is a flow path connecting the port P5 and the reservoir tank 320. The radiator 170 is provided in the flow path 170a. The radiator 170 functions as a heat exchanger. The heat medium flowing in the flow path 170a exchanges heat with the external air through the radiator 170. The ECU 500 can cool the second heat medium through the heat exchange in the radiator 170 by connecting the flow path 120a or 130a to the flow path 170a using the five-way valve 310.

[0038] In the refrigeration cycle 150, the third heat medium circulates. The refrigeration cycle 150 includes a compressor 151, an electric expansion valve 152, an evaporator 153, an evaporative pressure regulator (EPR) 154, and an electric expansion valve 155. The condenser 140 is connected to both the first circuit 110 and the refrigeration cycle 150, and functions as a heat exchanger. Through the condenser 140, the first heat medium flowing in the first circuit 110 and the third heat medium circulating in the refrigeration cycle 150 exchange heat. The cooler 160 is connected to both the refrigeration cycle 150 and the flow path 120a, and functions as a heat exchanger. When the five-way valve 310 is in the first or second connection mode, through the cooler 160, the third heat medium circulating in the refrigeration cycle 150 and the second heat medium flowing in the second circuit 120 exchange heat. In this way, the condenser 140, the refrigeration cycle 150, and the cooler 160 are configured to perform heat transfer between the first heat medium flowing in the first circuit 110 and the second heat medium flowing in the second circuit 120. The refrigeration cycle 150 (including the compressor 151 and various valves) is controlled by the ECU 500. One or more pressure sensors and one or more temperature sensors for detecting the pressure and temperature of the third heat medium flowing in the refrigeration cycle 150, respectively, may be provided at predetermined locations.

[0039] Figure 2 2 is a diagram showing the structure of the storage battery 200 and the BMS 210. Figure 2 The battery 200 is a battery pack composed of N single cells 2-1 to 2-N connected. N is a natural number greater than 2, and can be greater than 2 and less than 100, or greater than 100. The single cells 2-1 to 2-N are connected in series. However, the connection method of the single cells in the battery pack is not limited to series connection, and can also include parallel connection. The electric heater 220 is arranged near the battery 200 and is configured to heat the second heat medium flowing in the flow path 120b.

[0040] The BMS 210 includes a current sensor 211 for detecting current flowing through the battery 200 (battery pack), voltage sensors 212-1 to 212-N and temperature sensors 213-1 to 213-N corresponding to the cells 2-1 to 2-N, respectively, and a temperature sensor 215 for detecting the ambient temperature of the battery 200. The temperature sensor 215 detects the temperature of the second heat medium flowing through the flow path 120b near the battery 200. The detection results of each sensor are input to the ECU 500.

[0041] ECU 500 can obtain the current of battery 200, the ambient temperature of battery 200, and the voltage and temperature of each cell of battery 200 based on the signals from each sensor. In addition, ECU 500 can calculate the state of charge (SOC) of each cell based on the detection results of each sensor. SOC represents the ratio of the current storage capacity to the storage capacity in the fully charged state, for example, in the range of 0 to 100%. It should be noted that the structure of BMS210 can be appropriately changed.

[0042] The vehicle 1 has a socket 250. The socket 250 functions as a charging port. The electric vehicle supply equipment (EVSE) 800 has a charging cable 810 extending outward from the main body of the EVSE 800. The socket 250 is configured to allow the connector 820 (top end) of the charging cable 810 to be loaded and unloaded. By connecting the connector 820 of the charging cable 810 connected to the main body of the EVSE 800 to the socket 250 of the vehicle 1 in the parked state, the vehicle 1 is electrically connected to the EVSE 800 (plugged in state). The EVSE 800 is electrically connected to the power system PG. Therefore, the vehicle 1 in the plugged in state is electrically connected to the power system PG. The power system PG is a power grid constructed by power transmission and distribution equipment. A plurality of power plants are connected to the power system PG.

[0043] When the vehicle 1 in the plugged-in state is externally charged (charging the battery 200 with power from outside the vehicle), the power supplied from the power system PG is input to the socket 250 via the EVSE 800. The SPU 132 uses the power input to the socket 250 to generate charging power according to the instruction from the ECU 500, and inputs the generated charging power to the battery 200. The EVSE 800 supplies, for example, AC power to the socket 250. The SPU 132 also performs AC / DC conversion and voltage transformation to generate charging power. However, the power supply method of the EVSE 800 is not limited to the AC method, and may also be a DC method.

[0044] The air conditioning device 2 mounted on the vehicle 1 uses the first circuit 110 and the refrigeration cycle 150 to perform air conditioning (heating and cooling) inside the vehicle 1. The electric heater 112 heats the first heat medium in the first circuit 110 according to the instruction from the ECU 500. The heater core 114 heats the air in the vehicle cabin by heat exchange with the first heat medium. In addition, the evaporator 153 of the refrigeration cycle 150 cools the air in the vehicle cabin.

[0045] Battery 200 Figure 1 The various devices included in the thermal management circuit 100 shown are supplied with electric power. The battery 200 can supply electric power to the electric heater 112 via a first power conversion circuit (e.g., a DC / DC converter) not shown in the figure. The battery 200 can supply electric power to the electric heater 220 via a second power conversion circuit (e.g., a DC / DC converter) not shown in the figure. In this embodiment, the driving voltage of the electric heater 112 is higher than the driving voltage of the electric heater 220. The electric heater 112 has a larger maximum heating value than the electric heater 220. The electric heater 112 has a larger energy consumption at maximum heating than the electric heater 220. It should be noted that at least one of the various devices included in the thermal management circuit 100 can also receive power supply from a vehicle-mounted battery other than the battery 200 (e.g., an auxiliary battery not shown in the figure).

[0046] Figure 3 1 is a flowchart showing the processing related to the charging control executed by ECU 500. Each step in the flowchart is denoted by "S". The processing shown in the flowchart is started, for example, when the start condition of the above-mentioned external charging (plug-in charging) is met. Specifically, it can be that when the vehicle 1 becomes the plug-in state (refer to Figure 2 ), the start condition of external charging is satisfied, and the following processing flow (S11 to S19) is started. However, if the result of the fault diagnosis of ECU 500 is that a fault of heat management circuit 100 is found, the start condition of external charging may be not satisfied.

[0047] Reference Figure 3In S11, the ECU 500 obtains EVSE information indicating the specifications of the power supply device (e.g., EVSE 800) connected to the vehicle 1 and battery temperature information indicating the current temperature of the battery 200. The EVSE information includes information indicating the output performance (e.g., rated output) of the power supply device. The rated output is equivalent to the maximum power value (kW) that the power supply device can output as determined by the specifications. The ECU 500 can receive EVSE information from the power supply device by communicating with the power supply device connected to the vehicle 1. The battery temperature information includes the ambient temperature of the battery 200 (the temperature of the second heat medium) detected by the BMS 210. Hereinafter, the rated output of the power supply device obtained in S11 will also be referred to as "EVSE output". In addition, the ambient temperature of the battery 200 obtained in S11 will also be referred to as "battery temperature".

[0048] In S12, ECU 500 determines the initial heater control condition based on the information obtained in S11. Specifically, the storage device 503 stores a map M1 in advance. If the EVSE output and the battery temperature are input to the map M1, the map M1 outputs the heater control condition corresponding to the input value. The heater control condition includes the identification information of the driven heater, the driving amount (heating amount) of the heater, and the target temperature used in the heater control. The heater driven in the external charging of the battery 200 is at least one of the electric heaters 112 and 220. Specifically, the ECU 500 performs, as needed, in the external charging of the battery 200, either a first heating control (recorded as "heating A" in the map M1) for heating the battery 200 using both the electric heaters 112 and 220 or a second heating control (recorded as "heating B" in the map M1) for heating the battery 200 using only the electric heater 220 of the electric heaters 112 and 220. ECU 500 may also adopt "no heater drive" (ie, neither electric heater 112 nor 220 is driven) (denoted as "-" in map M1) during external charging of battery 200. Hereinafter, the initial heater control condition may be simply referred to as "initial condition".

[0049] Figure 3The map M1 shown defines initial conditions suitable for the cases where the EVSE output is 3.3 kW, 7 kW, and 11 kW, respectively. For the EVSE outputs of 11 kW and 7 kW, "no heater drive" is determined as the initial condition when the battery temperature is above the first threshold, the second heating control is determined as the initial condition when the battery temperature is above the second threshold and below the first threshold, and the first heating control is determined as the initial condition when the battery temperature is below the second threshold. However, the first threshold (e.g., 5°C) and the second threshold (e.g., -10°C) for the EVSE output of 11 kW are higher than the first threshold (e.g., 0°C) and the second threshold (e.g., -15°C) for the EVSE output of 7 kW, respectively. In addition, for the rated output of 3.3 kW, "no heater drive" is determined as the initial condition when the battery temperature is above a specified value (e.g., -5°C), and the second heating control is determined as the initial condition when the battery temperature is below the specified value.

[0050] The heating value of the electric heater 220 in the initial condition is the same (e.g., 700 W) regardless of the EVSE output of 11 kW, 7 kW, or 3.3 kW. Regarding the heating value of the electric heater 112 in the initial condition, the value of the EVSE output of 11 kW (e.g., 7000 W) is higher than the value of the EVSE output of 7 kW (e.g., 5000 W). Regarding the first heating control, the heating value of the electric heater 112 can be set to be more than 5 times the heating value of the electric heater 220.

[0051] The larger the EVSE output, the higher the target temperature in the heater control. The first target temperature for the first heating control is, for example, 10°C and 5°C for EVSE outputs of 11kW and 7kW, respectively. The second target temperature for the second heating control is, for example, 5°C, 0°C, and -5°C for EVSE outputs of 11kW, 7kW, and 3.3kW, respectively. Each target temperature may also be predetermined based on the temperature characteristics of the rechargeable power of the battery 200. In a low temperature region below 0°C, the higher the temperature of the battery 200, the greater the rechargeable power of the battery 200. In this embodiment, the second target temperature is lower than the first target temperature.

[0052] As mentioned above, according to Figure 3 In the map M1 shown, the larger the EVSE output, the more heaters are driven, the larger the heater driving amount, and the higher the target temperature. In S12, ECU 500 uses such a map M1 to determine the initial conditions corresponding to the EVSE output and battery temperature obtained in S11. In the case where the rated output of the power supply equipment connected to the vehicle 1 is not consistent with 3.3kW, 7kW, or 11kW, ECU 500 may also adopt the initial conditions corresponding to the closest rated output (any one of 3.3kW, 7kW, or 11kW).

[0053] In the next S13, ECU 500 performs external charging of battery 200 while executing thermal management (first heating control, second heating control, or heater-less driving) of battery 200 according to the initial conditions determined in S12. In this embodiment, ECU 500 sets five-way valve 310 to the first connection mode (for example, see Figure 5 ) and controls the electric heaters 112 and 220 under the conditions determined in S12. For example, in the first heating control, the heat generated by the electric heater 112 is transferred to the battery 200 via the first heat medium, the condenser 140, the third heat medium (refrigeration cycle 150), the cooler 160, and the second heat medium, and the heat generated by the electric heater 220 is transferred to the battery 200 via the second heat medium. As a result, the temperature of the battery 200 rises. In addition, the ECU 500 controls the SPU 132 in such a manner that the battery 200 is charged by the power supplied from the power supply device outside the vehicle. As a result, the SOC of the battery 200 rises.

[0054] In the next S14, the ECU 500 obtains the current SOC of the battery 200 detected by the BMS 210. Next, the ECU 500 determines whether to terminate the charging based on whether the charging termination condition is satisfied in S15. The charging termination condition is satisfied, for example, when the SOC of the battery 200 reaches the target value. The target value may be 100% (indicating a fully charged SOC value). It should be noted that the charging termination condition can be appropriately changed.

[0055] If the charging end condition is not satisfied (No in S15), the process proceeds to S16. In S16, ECU 500 obtains the current temperature of each cell of battery 200 detected by BMS 210. Hereinafter, the highest cell temperature among the temperatures of each cell obtained in S16 is referred to as the "highest cell temperature", and the lowest cell temperature is referred to as the "lowest cell temperature".

[0056] In the next S17, ECU 500 determines whether electric heater 112 is in operation. If the first heating control is being executed in S13, S17 determines YES and the process proceeds to S18. On the other hand, if the first heating control is not being executed in S13, S17 determines NO and the process proceeds to S19. Figure 4 This is a diagram for explaining S18 and S19. The first heater control (S18) includes S181 to S184. The second heater control (S19) includes S191 to S193.

[0057] Reference Figure 4In the first heater control (S18), in S181, the ECU 500 determines the minimum cell temperature ( Figure 3 In S16 of the present invention, the ECU 500 determines whether the temperature of the electric heater 112 is higher than the first target temperature (initial condition). In the case where the lowest battery cell temperature is lower than the first target temperature (No in S181), the process enters S19 while the electric heater 112 is operating under the initial condition. In this case, the first heating control continues. On the other hand, in the case where the lowest battery cell temperature is higher than the first target temperature (Yes in S181), in S182, the ECU 500 controls the electric heater 112 so that the electric heater 112 operates at a smaller heating value than the initial condition (weak operation). Thereafter, the process enters S183.

[0058] In S183, the ECU 500 determines whether the operating time of the electric heater 112 (the elapsed time from the start of operation) exceeds a prescribed threshold value. The threshold value may be a limit value (allowable operating time) determined based on the durability of the components of the electric heater 112. When the operating time of the electric heater 112 does not exceed the above threshold value (No in S183), the process enters S19 in a state where the electric heater 112 is weakly operating (S182). In this case, the first heating control continues. On the other hand, when the operating time of the electric heater 112 exceeds the above threshold value (Yes in S183), the ECU 500 stops the electric heater 112 in S184. Thus, the first heating control is switched to the second heating control. Thereafter, the process enters S19.

[0059] In the second heater control (S19), the ECU 500 determines in S191 whether the heat management is being performed by the first heating control, the second heating control, or the non-heater driving. If it is determined in S191 that "the heater is not driven" (initial condition), the process returns to Figure 3 If it is determined in S191 that the first heating control is in progress, the ECU 500 controls the electric heater 220 at the initial heating value (fixed condition) in S192. Then, the process returns to Figure 3 In S13, ECU 500 performs the first heating control according to the conditions determined in S18 and S19 and performs external charging of battery 200. In the case where it is determined in S191 that the second heating control is performed, ECU 500 performs the external charging of battery 200 based on the maximum cell temperature ( Figure 3 The electric heater 220 is controlled by using the second target temperature (initial condition) of S16. Then, the process returns to Figure 3 In S13 , ECU 500 executes the second heating control according to the condition determined in S193 and performs external charging of battery 200 .

[0060] exist Figure 4 In the time diagram Ex1, the state transition (first action example) when the above-mentioned first and second heater controls are executed under the initial conditions corresponding to the EVSE output "7kW" and the battery temperature "-30°C". In the time diagram Ex1, lines L1, L2, L11, L12, L13, and L20 respectively represent the first target temperature, the second target temperature, the battery temperature, the maximum single cell temperature, the minimum single cell temperature, and the SOC. In addition, areas E1, E2, E3, and E4 represent the amount of electricity supplied from the power supply equipment to the vehicle 1, which is consumed by the drive of the electric heater 112, the drive of the electric heater 220, the charging of the battery 200, and the energy loss (heat dissipation, etc.). "t" in the time diagram means timing.

[0061] In the time diagram Ex1, the first heating control is performed according to the initial conditions. Then, at t11, the lowest cell temperature (line L13) reaches the first target temperature (line L1), and the electric heater 112 is in a weak operating state. At t12, the operating time of the electric heater 112 exceeds the threshold value, and the electric heater 112 stops. Thus, the second heating control is performed instead of the first heating control. In addition, since the highest cell temperature (line L12) is higher than the second target temperature (line L2), the ECU 500 puts the electric heater 220 into a dormant state (approximately stopped state). Then, at t13, the ECU 500 operates the electric heater 220 again in order to keep the highest cell temperature at the second target temperature.

[0062] Refer again Figure 3 In S13, thermal management and external charging of the battery 200 are performed. And if the charging end condition is met (Yes in S15), then Figure 3 The series of processing shown ends. Figure 5 2 is a diagram showing a second operation example of the power storage system according to the present embodiment. The timing diagram Ex2 shows that the operation is performed under the initial conditions corresponding to the EVSE output "11 kW" and the battery temperature "-20°C". Figure 3 and Figure 4 The state transition during the control of the first and second heaters shown (second operation example). Figure 5 The lines and areas in the time diagram Ex2 shown are based on Figure 4 In the time chart Ex1 shown in FIG. 2, the first heating control is performed according to the initial conditions. Figure 5 As shown in FIG. 5 , ECU 500 performs thermal management of battery 200 and external charging with five-way valve 310 in the first connection mode ( Figure 3 In addition, during the execution of the first heating control, the switching condition is not satisfied and the charging end condition is satisfied. Thus, the thermal management of the battery 200 and the external charging are terminated.

[0063] As described above, the thermal management method according to this embodiment includes: Figure 3 and Figure 4 The power storage system according to the embodiment includes a power storage device (battery 200), a first heater (electric heater 112) and a second heater (electric heater 220) configured to heat the power storage device using electric power, and a control device (ECU 500). The electric heater 112 is arranged in a manner farther from the battery 200 than the electric heater 220. The ECU 500 executes the first heating control when a heating condition specified at the start of charging of the battery 200 is satisfied. If a switching condition specified during the charging of the battery 200 and during the execution of the first heating control is satisfied, the ECU 500 replaces the first heating control and executes the second heating control.

[0064] The heating of the battery 200 by the electric heater 220 is more energy efficient than the heating of the battery 200 by the electric heater 112. According to the above control, the first heating control can be performed as needed when charging of the battery 200 starts, and the battery 200 can be heated to a sufficient temperature at an early stage by the electric heaters 112 and 220. Moreover, according to the above control, after the battery 200 is heated to a sufficient temperature by the first heating control, the electric heater 112 can be stopped, and the temperature of the battery 200 can be adjusted (for example, kept warm) by the second heating control. Thus, a decrease in energy efficiency is suppressed.

[0065] In this embodiment, the ECU 500 controls the heating amount ( ) of the electric heater 112 based on the temperature of the battery 200 during the execution of the first heating control. Figure 4 Then, when a predetermined time has passed since the start of the first heating control (at Figure 4 The switching condition specified above is satisfied if the control condition is YES in S183 of FIG. 184 . According to such a structure, it is easy to control the heating amount of the electric heater 112 to an appropriate amount (a necessary and sufficient amount for heating the battery 200) during the execution of the first heating control. In addition, if the first heating control is continued for a long time, the energy efficiency may deteriorate. In this regard, in the above structure, the ECU 500 switches from the first heating control to the second heating control at a timing when a specified time has passed since the start of the first heating control. Thereby, the decrease in energy efficiency is suppressed.

[0066] Figure 1 and Figure 2The vehicle 1 shown has a first flow path (first circuit 110) for a first heat medium to flow, an air conditioner 2 for performing air conditioning inside the vehicle 1 by heat exchange with the first heat medium, a second flow path (flow path 120b) for a second heat medium to flow for heat exchange with the battery 200, and a heat transfer mechanism (condenser 140, refrigeration cycle 150, cooler 160) for performing heat transfer between the first heat medium and the second heat medium. The electric heater 112 is provided in the first flow path. The electric heater 220 is provided in the second flow path. In such a structure, the thermal management of the vehicle 1 can be appropriately performed by using the first flow path (first heat medium), the second flow path (second heat medium) and the heat transfer mechanism. In addition, since the electric heater 112 for the air conditioner 2 is used for heating the battery 200, it is not necessary to add a dedicated electric heater for heating the battery 200.

[0067] Furthermore, when charging of the battery 200 using the power supply device (e.g., EVSE 800) starts, the ECU 500 of the vehicle 1 determines whether the above-mentioned predetermined heating condition is satisfied using the output performance (e.g., rated output) of the power supply device and the temperature of the second heat medium. Figure 3 The map M1 shown defines the heating condition. According to such a structure, when charging of the battery 200 starts, it is easy to accurately determine whether it is necessary to execute the first heating control that consumes more energy than the second heating control. The temperature of the second heat medium is equivalent to the ambient temperature of the battery 200. In the case where the output performance of the power supply equipment decreases compared to the rated output due to a disaster (e.g., thunder) or an abnormality of the generator, the ECU 500 may obtain the latest output performance (e.g., maximum output value) of the power supply equipment and use the latest output performance instead of the rated output.

[0068] The above-mentioned heating conditions and switching conditions can be changed appropriately. Figure 3 , Figure 4 The processing flow shown can be changed appropriately. For example, the order of processing can be changed according to the purpose, and unnecessary steps can be omitted. In addition, the content of any processing can be changed.

[0069] Figure 6 It is shown Figure 4 FIG. 5 is a diagram showing a variation of the process shown. Figure 6 The lines and areas in the timing diagram Ex3 (third operation example) shown in FIG. Figure 4 The timing diagram Ex1 is shown. Figure 6 In the S18A shown, the Figure 4S182 and S183 in the process shown. In the time chart Ex3, the first heating control is executed according to the initial conditions, and at t30, the lowest battery cell temperature (line L13) reaches the first target temperature (line L1) (Yes in S181). As a result, the switching condition is met, and the electric heater 112 is stopped in S184. In the second heating control, the ECU 500 controls the electric heater 220 in such a way that the highest battery cell temperature (line L12) approaches the second target temperature (line L2) (S193).

[0070] The power storage system according to the above-mentioned modification example includes a cell temperature sensor ( Figure 2 Furthermore, if the lowest cell temperature in the battery 200 becomes higher than a predetermined temperature during the charging of the battery 200 and the execution of the first heating control (Yes in S181), the aforementioned switching condition is satisfied. Thus, the temperature of all cells included in the battery pack can be raised to a predetermined temperature (for example, a temperature suitable for charging the cells) at an early stage.

[0071] The embodiments disclosed this time should be considered as illustrative in all aspects and not restrictive. The scope of the present disclosure is indicated by the claims rather than the description of the embodiments described above, and is intended to include all modifications within the meaning and scope equivalent to the claims.

Claims

1. A power storage system comprising: Electricity storage device; A first heater and a second heater are configured to heat the power storage device using electric power; and Control device, in, The first heater is arranged farther from the power storage device than the second heater. The control device is configured to execute: a first heating control for heating the power storage device using both the first heater and the second heater; and a second heating control for heating the power storage device using only the second heater of the first heater and the second heater; The control device executes the first heating control when a predetermined heating condition is satisfied when charging of the power storage device starts, and executes the second heating control instead of the first heating control when a predetermined switching condition is satisfied during charging of the power storage device and during execution of the first heating control.

2. The power storage system according to claim 1, The control device controls the heating amount of the first heater based on the temperature of the power storage device during execution of the first heating control, The predetermined switching condition is satisfied when a predetermined time has elapsed from the start of the first heating control.

3. The power storage system according to claim 1, The power storage device is a battery pack composed of a plurality of connected single cells. The power storage system further includes a cell temperature sensor for detecting a cell temperature of each of the plurality of cells included in the battery pack. If the lowest cell temperature in the battery pack becomes equal to or higher than a predetermined temperature while the power storage device is being charged and the first heating control is being executed, the predetermined switching condition is satisfied.

4. A vehicle comprising the power storage system according to any one of claims 1 to 3, wherein: The vehicle also features: A first flow path for a first heat medium to flow; an air conditioning device for performing air conditioning inside the vehicle by exchanging heat with the first heat medium; a second flow path through which a second heat medium for heat exchange with the power storage device flows; and a heat transfer mechanism for transferring heat between the first heat medium and the second heat medium, The first heater is disposed in the first flow path, The second heater is provided in the second flow path.

5. The vehicle according to claim 4, The power storage device is charged with electric power supplied from a power supply device outside the vehicle. The control device determines whether the predetermined heating condition is satisfied using the output performance of the power supply facility and the temperature of the second heat medium when charging of the power storage device using the power supply facility is started.