Fully-fabricated anti-pulling and anti-shearing type steel-concrete composite beam
By using arrow embedding head and embedding groove structure in steel-concrete composite beam bridge, combined with ultra-high performance concrete, the problem of insufficient shear resistance is solved, and an efficient and stable composite beam bridge structure is achieved, extending service life and reducing maintenance costs.
Patent Information
- Application Number
- CN202411443952.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-16
- Publication Date
- 2024-11-26
AI Technical Summary
The existing steel-concrete composite beam bridges have insufficient shear resistance, resulting in the structure that may fail under a large pulling force, affecting stability and bonding strength, and the construction process is complex and low efficiency.
The fully-assembled anti-pull-resistant shear-shaped steel-concrete composite beam is used to form an arrow structure by setting up an embedded head and elastic side plate on the top of the steel beam and the prefabricated concrete bridge slab. The embedding relationship of the ultra-high performance concrete is poured into a spatial frame structure, avoiding the generation of shear force and improving the pull-up resistance.
It realizes that in a complete, simple and efficient on-site assembly and installation, the compressive properties of concrete are fully utilized, the structural stability and bond strength are enhanced, the service life is extended, the construction and maintenance costs are reduced, and the assembly efficiency is improved.
Smart Images

Figure CN119021087A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of building structure and bridge engineering, and particularly relates to a fully assembled pull-out and shear-resistant steel-concrete composite beam. Background Art
[0002] Steel-concrete composite beam bridges can give full play to the performance advantages of both steel and concrete materials, avoid the hidden dangers of structural cracking, and have a series of advantages such as factory production, prefabricated erection, rapid construction, uninterrupted traffic, and high material utilization. The common construction method of existing steel-concrete composite beam bridges is to install the steel beam in place on the bridge pier, hoist the prefabricated concrete bridge slab in place on the steel beam, and then cast concrete in place and weld and bolt at the joint to form an integral steel-concrete composite beam.
[0003] With the development of steel-concrete composite beam bridge technology, there is an increasing trend towards direct factory prefabrication and on-site casting into an integrated assembled structure, eliminating on-site welding or bolt connection processes to further improve work efficiency.
[0004] For example, the Chinese patent application "Assembled steel-concrete composite beam bridge with nested cast-in-place connections of perforated plates" (invention patent application number: 202310861574.7) discloses an assembled structure. The assembly can be completed by directly pouring the binder in place as a whole. The shear plate is embedded in the wedge-shaped groove and the binder is poured therein. The wedge-shaped binder filled in the shear plate and the wedge-shaped groove is used to achieve pull-out resistance and shear resistance. At the same time, the through holes of the perforated plate are used to make the cast binder form a spatial frame, which further resists pull-out and ensures the bonding strength.
[0005] Those skilled in the art should know that the cast binder itself has excellent compressive properties, but has insufficient shear and tensile properties. For the above patent, the wedge-shaped castable casted between the shear plate and the side wall of the wedge-shaped groove will decompose the pull-out force into the pressure against the inclined surface due to the wedge shape, but it will also decompose into the shear force along the inclined surface and vertically. The shear resistance is the weak point of the castable, so the stability and bonding strength of the structure are not ideal. In the case of a large pull-out force, the castable between the shear plate and the groove wall of the wedge-shaped groove may fail, resulting in structural damage.
[0006] Therefore, it is necessary to improve the connection structure of the existing steel-concrete structure bridge, so as to give full play to the structural advantages of the steel-concrete composite beam bridge, and to assemble and install it on site completely, simply, efficiently and reliably, so as to fully meet the precision requirements of the on-site assembly of the composite bridge, simplify the overall structure and construction process of the composite beam, and greatly improve the assembly efficiency. At the same time, it is necessary to make full use of the compressive properties of the combined materials, eliminate the negative problems of structural stability and bonding strength caused by shear force, extend the service life of the main body, reduce construction and maintenance costs, and try to minimize the interference of repairs and replacements on bridge operations. Contents of the invention
[0007] In view of this, the purpose of the present invention is to provide a fully assembled pull-out and shear-resistant steel-concrete composite beam, which can give full play to the structural advantages of steel-concrete composite beam bridges, and can be assembled and installed on site in a complete, simple, efficient and reliable manner. It can fully meet the precision requirements of on-site assembly of composite bridges, simplify the overall structure and construction process of composite beams, and greatly improve assembly efficiency. At the same time, it can make full use of the compressive properties of the bonding materials, eliminate the negative problems of structural stability and bonding strength caused by shear force, extend the service life of the main body, reduce construction and maintenance costs, and try to minimize the interference of maintenance and replacement on bridge operations.
[0008] The fully assembled pull-out and shear-resistant steel-concrete composite beam of the present invention comprises a steel beam and a prefabricated concrete bridge slab;
[0009] The lower part of the precast concrete bridge slab is pre-embedded with a pre-embedded connector, and the pre-embedded connector includes a plurality of transverse vertical plates arranged in parallel along the longitudinal direction, and the transverse vertical plates are provided with an embedded head extending downward, and the longitudinal section of the embedded head is a V-shaped arrow structure that can be forced to deform;
[0010] A pouring cofferdam is formed on the top of the steel beam, and a plurality of embedding grooves with upper openings are arranged in parallel along the longitudinal direction at the top of the steel beam in the pouring cofferdam, and the embedding grooves are composed of elastic side plates arranged transversely, and the upper openings are smaller than the widest part of the V-shaped arrow structure of the embedding head;
[0011] After the prefabricated concrete bridge slab is in place, the embedding head is embedded downward into the embedding groove by utilizing the elastic deformation of the embedding head and the elastic side plate, and the bonding slurry is poured into the cofferdam and solidified to connect the prefabricated bridge slab with the top of the steel beam into a whole.
[0012] Furthermore, the transverse vertical plate is provided with a plurality of vertical plate through holes in the longitudinal direction; and the elastic side plates are arranged in sections and at intervals in the transverse direction.
[0013] Furthermore, the embedded connector also includes a first longitudinal rib and a second longitudinal rib, and the first longitudinal rib and the second longitudinal rib are longitudinally extended and fixed to both ends of the transverse vertical plate;
[0014] It also includes a bottom template, which is fixedly arranged between the first longitudinal rib plate and the second longitudinal rib plate, and is also fixed to the transverse vertical plate.
[0015] Furthermore, after the prefabricated bridge deck is located on the top of the steel beam, there is a spacing between the first longitudinal rib and the second longitudinal rib and the edge of the cast cofferdam, and the first longitudinal rib and the second longitudinal rib are respectively provided with a plurality of rib through holes distributed in parallel along the longitudinal direction.
[0016] Furthermore, the bonding slurry is ultra-high performance concrete. During pouring, the ultra-high performance concrete flows through the rib through holes. After solidification, the ultra-high performance concrete in the rib through holes and the ultra-high performance concrete in the vertical plate through holes are integrated to form a frame-type spatial pull-out resistant structure.
[0017] Furthermore, the embedding head is arranged at several intervals in the horizontal direction and is composed of a vertical middle plate and two arrow side plates, and the vertical middle plate is integrally formed with the horizontal vertical plate;
[0018] The two arrow side plates are fixed to the lower end of the vertical middle plate with set elasticity and are respectively inclined upward and outward so that the embedded head forms a V-shaped arrow structure;
[0019] Alternatively, the two arrow side panels are respectively inclined upward and outward so that the embedded head forms a V-shaped arrow structure, and at least one of the two arrow side panels is hinged to the lower end of the vertical middle plate to form a structure that can swing inward and limit outward.
[0020] Furthermore, a guide portion is provided at the notch of the embedding groove formed by the elastic side plate, and the guide portion is a trapezoidal structure that is larger at the top and smaller at the bottom; the inner width of the embedding groove is greater than the widest part of the V-shaped arrow structure of the embedding head.
[0021] Furthermore, the portion of the vertical plate embedded in the precast concrete bridge slab is provided with a plurality of steel bar holes arranged in the transverse direction, and longitudinal steel bars are passed through the steel bar holes.
[0022] Furthermore, the cast-in-place cofferdam is surrounded by a first longitudinal side plate, a second longitudinal side plate and two compartment partitions; the first longitudinal side plate and the second longitudinal side plate are in an inverted L-shape with the wing plates facing outward, and a waterproof sealing strip is provided between the upper surface of the wing plate and the precast concrete bridge slab; and vertical reinforcing ribs are fixed between the web and the wing plates of the L-shaped first longitudinal side plate and the second longitudinal side plate.
[0023] Further, the bottom template is located slightly lower than the top edges of the first longitudinal rib and the second longitudinal rib;
[0024] The prefabricated bridge slab is provided with a pouring hole for pouring bonding slurry into the pouring cofferdam; the first longitudinal rib plate and the second longitudinal rib plate are provided with a plurality of exhaust holes arranged in the longitudinal direction at a position close to the bottom template upward;
[0025] The transverse joints between adjacent precast concrete bridge slabs are poured with special concrete.
[0026] The beneficial effects of the present invention are as follows: the fully assembled pull-out and shear-resistant steel-concrete composite beam of the present invention is improved on the basis of the "assembled steel-concrete composite beam bridge with nested perforated plate pouring connection" (invention patent application number: 202310861574.7), and adopts the embedding form of an arrow-shaped embedding head and a shrinking-shaped embedding groove, so that the projection of the shear head structure and the embedding groove on the plane overlaps. During the pull-out process, the castable between the arrow and the side wall of the embedding groove forms extrusion to avoid shear force on the pull-out performance, so that all forces are converted into pressure on the casting binder, which can give full play to the advantages of the casting binder, making the better assembly structure of the aforementioned patent more excellent, and can give full play to the structural advantages of the steel-concrete composite beam bridge. It can be assembled and installed on site in a complete, simple, efficient and reliable manner, which can fully meet the precision requirements of the on-site assembly of the composite bridge, simplify the overall structure and construction process of the composite beam, and greatly improve the assembly efficiency. At the same time, it makes full use of the compressive properties of the bonding material, eliminates the negative problems of structural stability and bonding strength caused by shear force, extends the service life of the main body, and reduces construction and maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0028] Figure 1 It is a longitudinal cross-sectional view of the present invention;
[0029] Figure 2 for Figure 1 Section view along AA direction;
[0030] Figure 3 for Figure 1 Section view along BB;
[0031] Figure 4 for Figure 2 Enlarged view of point C;
[0032] Figure 5 for Figure 3 The enlarged view of point E;
[0033] Figure 6 It is a partial longitudinal sectional view of the embedded connecting piece;
[0034] Figure 7 It is a transverse view of the embedded connector;
[0035] Figure 8 It is the transverse section of the steel beam;
[0036] Fig. 9 is a longitudinal cross-sectional view of the embedded groove;
[0037] Fig.10 A schematic diagram of an embedded head with an articulated structure;
[0038] Fig.11 This is a diagram of the process of prefabricated concrete bridge slab in place;
[0039] Fig.12 This is a schematic diagram of the precast concrete bridge slab in place and after the binder is poured. DETAILED DESCRIPTION
[0040] As shown in the figure, the present invention adopts a composite beam formed by a fully assembled pull-out and shear-resistant steel-concrete composite beam, including a steel beam 2 and a prefabricated concrete bridge slab 1;
[0041] The precast concrete bridge slab 1 is pre-embedded with a pre-embedded connector 3 at the bottom, and the pre-embedded connector 3 includes a plurality of transverse vertical plates 301 arranged in parallel along the longitudinal direction, and the transverse vertical plates refer to the plates arranged in the transverse direction and standing upright, which will not be described in detail here; the transverse vertical plates are provided with an embedded head 3013 extending downward, and the longitudinal section of the embedded head 3013 is an elastic V-shaped arrow structure; the V-shaped arrow is a structure as shown in the figure, that is, the overall shape is an inverted triangle structure with a sharp corner at the lower end and an open upper end, and the structure is generally made of steel plate unless otherwise specified, which will not be described in detail here;
[0042] A pouring cofferdam is formed on the top of the steel beam 2. The formation method and shape of the pouring cofferdam are not limited. It can be formed by welding steel plates around it. It is generally adapted to the shape of the contact surface between the precast concrete bridge slab 1 and the steel beam 2, that is, a rectangle, which will not be repeated here. In the pouring cofferdam, a plurality of embedding grooves 4 with upper openings are arranged in parallel along the longitudinal direction at the top of the steel beam. The embedding grooves 4 are composed of elastic side plates 401 and 402 arranged laterally, and the upper openings and the width of the openings are smaller than the widest part of the V-shaped arrow structure of the embedding head 3013. As shown in the figure, there are two elastic side plates and they are symmetrically arranged to form the embedding groove 4 between the two elastic side plates 401 and 402. They are generally made of steel, and the thickness is determined by the required elasticity. It will not be repeated here.
[0043] As shown in the figure, the length direction of the horizontal vertical plate 301 (the width direction of the beam, which may also be slightly inclined) is consistent with the length direction of the nesting groove; after the precast concrete bridge slab 1 is in place, the embedding head 3013 is embedded downward into the embedding groove 4 by utilizing the elastic deformation of the embedding head and the elastic side plate, and the bonding slurry is poured into the cofferdam and solidified, so that the precast bridge slab 1 is connected to the top of the steel beam 2 as a whole;
[0044] The prefabricated bridge deck 1 is put in place on the top of the steel beam 2, and the self-weight of the prefabricated concrete bridge deck 1 is used (it can also be applied additionally) to make the arrow of the embedding head elastically deform, and the elastic side plates 401 and 401a of the embedding groove 4 can be elastically separated to both sides, so that the embedding head can enter the embedding groove. After entering, the embedding head and the elastic side plates are elastically reset to form a snap-in structure; of course, the elasticity of the embedding head and the elastic side plates can be set as needed, and the elastic force can be achieved by using steel plates of different thicknesses and lengths (along the width direction of the beam) After the slurry is in place, the bonding slurry is poured into the cofferdam and solidified to connect the precast bridge slab 1 and the top of the steel beam 2 into a whole; in this structure, since the width of the embedding head of the arrow structure is larger than the opening of the embedding groove, the pulling force formed by pulling up is converted into the pressure of the pouring binder between the embedding head and the elastic side plate, and the force transmitted outward is also converted into the pressure of the pouring binder, so that the excellent characteristics of the pouring binder can be fully utilized, the bonding strength between the precast concrete bridge slab and the steel beam is guaranteed, and a stable assembly can be achieved without any additional fixed connection;
[0045] In this embodiment, the transverse vertical plate is provided with a plurality of vertical plate through holes in the longitudinal direction, that is, the vertical plate through holes are through in the longitudinal direction; the elastic side plates are arranged in sections and intervals in the transverse direction, as shown in the figure, the elastic side plates are arranged in sections and intervals in the transverse direction of the beam, that is, they form spacing-type separation sections in the transverse direction to ensure the set elasticity, and at the same time, the spacing is conducive to the passability of the later poured binder; the upper part of the transverse vertical plate is embedded in the precast concrete bridge slab 1, and the lower part extends downward and is provided with an embedded head. The transverse vertical plate is generally a steel plate, and the vertical plate through holes are arranged in a plurality of parallel rows along the length direction of the transverse vertical plate to ensure the passability of the slurry poured later; the transverse vertical plate itself is generally extended in the transverse direction, and can also be slightly inclined; in the present invention, unless otherwise specified, the transverse direction refers to the transverse direction of the bridge, and the longitudinal direction refers to the longitudinal direction of the bridge, which will not be repeated here;
[0046] The bonding slurry is ultra-high performance concrete (UHPC). During pouring, the ultra-high performance concrete flows through the vertical plate through holes and the horizontal spacing of the elastic side plates, and fills the pouring cofferdam. After solidification, the ultra-high performance concrete in the vertical plate through holes 301a and the horizontal spacing of the elastic side plates is solidified and combined into one body to form a spatial pull-out structure. As shown in the figure, in space, after solidification, the ultra-high performance concrete can form an invisible concrete column based on the through holes of the horizontal connecting plates, and the concrete column is solidified in the ultra-high performance concrete to form a whole. Similarly, an invisible ultra-high performance concrete column based on the through holes of the shear plate is also formed, which together constitute the concrete column pull-out structure in space, so that after the precast concrete bridge slab is in place and the bonding slurry is poured, there is no need to set up additional pull-out structures such as pull-out bolts. The overall structure is simple and the construction is convenient and quick.
[0047] In this embodiment, the embedded connector 3 further includes a first longitudinal rib plate 303 and a second longitudinal rib plate 303a, which are generally made of steel plates; the transverse vertical plate 301 is arranged transversely, and the first longitudinal rib plate 303 and the second longitudinal rib plate 303a are respectively fixed to the two ends of the transverse vertical plate 301 along the longitudinal extension; the fixing method is generally welding, which is not repeated here; the arrangement of the first longitudinal rib plate and the second longitudinal rib plate, combined with the arrangement of the transverse vertical plate, forms a space frame structure, which increases the overall bearing capacity of the embedded connector, and after being in place and installed on the steel beam, the bonding strength is increased;
[0048] It also includes a bottom template 302, which is fixedly arranged between the first longitudinal rib 303 and the second longitudinal rib 303a, and is also fixed to the transverse vertical plate 301; as shown in the figure, the bottom template 302 is generally made of steel plate and is fixed to the first longitudinal rib 303 and the second longitudinal rib 303a by welding, and is used to strengthen the structural strength and is used for casting the bottom template of the precast concrete bridge slab 1, saving construction costs while ensuring the overall strength of the embedded connecting parts structure; there are many ways to connect the bottom template and the transverse vertical plate, and the bottom template can be split to avoid the transverse vertical plate, or the transverse vertical plate 301 can be split to avoid the bottom template and then welded. Preferably, the bottom template split structure avoids the transverse vertical plate and is welded to ensure structural strength while reducing construction costs.
[0049] In this embodiment, after the prefabricated bridge slab 1 is located on the top of the steel beam 2, there is a spacing between the first longitudinal rib 303 and the second longitudinal rib 303a and the edge of the cast cofferdam, and the first longitudinal rib 303 and the second longitudinal rib 303a are respectively provided with a plurality of rib through holes 3031 and rib through holes 303a1 distributed in parallel along the longitudinal direction; a spacing is set between the first longitudinal rib 303 and the second longitudinal rib 303a and the edge of the cast cofferdam to ensure that high-performance concrete is poured between the two, thereby ensuring the overall bonding strength. At the same time, the setting of the rib through holes can ensure the smooth passage of concrete and ensure the casting quality.
[0050] In this embodiment, during pouring, the ultra-high performance concrete flows through the rib through holes 3031 and the rib through holes 303a1. After solidification, the ultra-high performance concrete in the rib through holes 3031 and the rib through holes 303a1 is combined with the ultra-high performance concrete in the vertical plate through holes 3011 and the elastic side plates in the lateral spacing to form a frame-type spatial pull-out structure; after the ultra-high performance concrete is solidified, the ultra-high performance concrete can form an invisible ultra-high performance concrete column based on the rib through holes, and the concrete column is solidified in the ultra-high performance concrete to form a whole, and forms a concrete column and a block frame in space with the invisible ultra-high performance concrete column formed by the aforementioned cross-connecting plate through holes and the shear plate through holes, which is hidden in the ultra-high performance concrete to form a whole, thereby ensuring the bonding strength between the precast concrete bridge slab and the steel beam, and forming a spatial pull-out frame to ensure the pull-out strength.
[0051] In this embodiment, the embedding head 3013 is arranged at several intervals along the horizontal direction, corresponding to the segmented elastic side panels, so as to ensure that it can be inserted into the embedding groove 4 accordingly; and the embedding head 3013 is composed of a vertical middle plate and two arrow side panels, and the two arrow side panels have a set elasticity and are fixed to the lower end of the vertical middle plate and are respectively inclined upward and outward so that the embedding head forms a V-shaped arrow structure; the vertical middle plate is formed integrally with the horizontal vertical plate; as shown in the figure, the two arrow side panels are both slightly convex arcs outward to ensure that interference is reduced when they are inserted into the notch of the embedding groove; the embedding head is arranged at several intervals along the horizontal direction, and is composed of a vertical middle plate and two arrow side panels, and the vertical middle plate is formed integrally with the horizontal vertical plate;
[0052] Alternatively, the two arrow side panels are respectively inclined upward and outward so that the embedded head forms a V-shaped arrow structure, and at least one of the two arrow side panels is hinged to the lower end of the vertical middle plate to form a structure that can swing inward and limit outward; Fig.10 As shown, in this structure, a hinge shaft is provided at the lower end of the vertical middle plate, and the lower ends of the two arrow side plates are hinged by the hinge shaft and limited outwardly to form an arrow structure. The limiting structure can be a fulcrum formed at the lower ends of the two arrow side plates to avoid swinging outward, which will not be repeated here; when the precast concrete bridge slab is put into place downward, due to the constraint of the embedding groove notch, the two arrow side plates swing inwardly and smoothly enter the embedding groove. Since the internal space of the embedding groove is larger than the notch, after the embedding head enters, the two arrow side plates swing outwardly under the action of gravity to re-form the arrow structure, thereby smoothly forming a snap-in embedding structure; the outside and inside here refer to the two arrow side plates relative to the vertical middle plate, which will not be repeated here;
[0053] In this embodiment, a guide portion is provided in the notch of the embedding groove formed by the elastic side plate, and the guide portion is a trapezoidal structure that is larger at the top and smaller at the bottom, and the trapezoidal structure has a set angle to ensure that the V-shaped shear head structure can be guided to smoothly enter the notch of the embedding groove; the internal width of the embedding groove is larger than the widest part of the V-shaped arrow structure of the embedding head to ensure sufficient margin, so that there is no need to ensure manufacturing accuracy, saving manufacturing costs; as shown in the figure, the guide portion is formed by directly bending the elastic side plate, and the bending portion has an arc-shaped transition to ensure that interference is reduced when the embedding head enters, and the entry is smooth.
[0054] In this embodiment, the part of the horizontal vertical plate 301 embedded in the precast concrete bridge slab 1 is provided with a plurality of steel bar holes 3012 arranged along the transverse direction, and longitudinal steel bars 6 are passed through the steel bar holes. The provision of the longitudinal steel bars 6 further improves the bonding strength between the embedded connecting parts and the precast concrete bridge slab.
[0055] In this embodiment, the cast cofferdam is surrounded by the first longitudinal side plate 7, the second longitudinal side plate 7a and the two compartment partitions 5. As shown in the figure, the first longitudinal side plate 7 and the second longitudinal side plate 7a are arranged on the transverse sides of the top of the steel beam 2, and the two compartment partitions 5 are arranged at the two ends of the first longitudinal side plate 7 and the second longitudinal side plate 7a to form a cast cofferdam; the first longitudinal side plate 7 and the second longitudinal side plate 7a are inverted L-shaped with the wing plate outward, and waterproof sealing strips 8 and 8a are provided between the upper surface of the wing plate and the precast concrete bridge slab 1. The waterproof sealing strips 8 and 8a are placed on the upper surface of the wing plate. After being in place, they are deformed under the action of gravity of the precast concrete bridge slab 1 and form a seal (generally, the longitudinal ribs of the precast concrete bridge slab are pressed on the sealing strips, and the sealing strips are generally made of rubber); and vertical reinforcing ribs are fixed between the web and the wing plate of the L-shaped first longitudinal side plate 7 and between the web and the wing plate of the second longitudinal side plate 7a. As shown in the figure, the first longitudinal side plate 7 and the second longitudinal side plate 7a are both L-shaped and are provided with vertical reinforcing ribs, which generally improve the overall strength.
[0056] In this embodiment, the embedded connector 3 is embedded in the longitudinal rib of the precast concrete bridge slab 1 at a portion located above the bottom template 302;
[0057] The position of the bottom template 302 is slightly lower than the top edges of the first longitudinal rib 303 and the second longitudinal rib 303a to ensure the overall bonding strength.
[0058] The prefabricated bridge slab 1 is provided with a pouring hole 101 for pouring bonding slurry into the pouring cofferdam. As shown in the figure, the pouring hole 101 is generally arranged vertically, so as to better utilize the higher pouring pressure and gravity to complete the pouring; the first longitudinal rib 303 and the second longitudinal rib 303a are provided with a plurality of exhaust holes arranged in the longitudinal direction at a position close to the bottom formwork upward to ensure that the pouring can be fully completed. At the same time, after curing, the cured ultra-high performance concrete in the exhaust hole also improves the overall bonding strength. Of course, exhaust holes can also be provided on the prefabricated concrete bridge slab to further ensure the density of the pouring;
[0059] Special concrete is poured into the transverse joints between adjacent precast concrete bridge slabs 1 to ensure the integrity of the bridge, which will not be elaborated here.
[0060] The construction process of the present invention is as follows Fig.10 and 11 As shown, a. a waterproof sealing strip is pasted on the side baffle plate on the top surface of the steel beam to ensure the sealing of the bonding cavity; b. the precast concrete bridge slab is hoisted and the elastic force of the embedding head and the elastic side plate is overcome so that the embedding head is squeezed into the embedding groove, and it is positioned on the steel beam with pre-arch, and the bonding slurry is poured under high pressure through the pouring hole to fill it densely; c. after the installation of the full-span bridge slab is completed, the transverse joints of the adjacent precast concrete bridge slabs are poured with special concrete to ensure dense filling.
[0061] The present invention is an improvement on the "assembled steel-concrete composite beam bridge with nested cast-in-place connection of perforated plates" (invention patent application number: 202310861574.7), retaining the technical structure with better effects, and combining the snap-in nested structure of the present invention to make full use of the structural improvements, eliminate the tension and the shear force generated by the tension inside the cast-in binder, give full play to the advantages of the cast-in binder, thereby reducing construction costs and ensuring the service life of the bridge.
[0062] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.
Claims
1. A fully assembled pull-out and shear-resistant steel-concrete composite beam, characterized in that: Includes steel beams and precast concrete bridge slabs; The lower part of the precast concrete bridge slab is pre-embedded with a pre-embedded connector, and the pre-embedded connector includes a plurality of transverse vertical plates arranged in parallel along the longitudinal direction, and the transverse vertical plates are provided with an embedded head extending downward, and the longitudinal section of the embedded head is a V-shaped arrow structure that can be forced to deform; A pouring cofferdam is formed on the top of the steel beam, and a plurality of embedding grooves with upper openings are arranged in parallel along the longitudinal direction at the top of the steel beam in the pouring cofferdam, and the embedding grooves are composed of elastic side plates arranged transversely, and the upper openings are smaller than the widest part of the V-shaped arrow structure of the embedding head; After the prefabricated concrete bridge slab is in place, the embedding head is embedded downward into the embedding groove by utilizing the elastic deformation of the embedding head and the elastic side plate, and the bonding slurry is poured into the cofferdam and solidified to connect the prefabricated bridge slab with the top of the steel beam into a whole.
2. The fully assembled pull-out and shear-resistant steel-concrete composite beam according to claim 1 is characterized in that: The transverse vertical plate is provided with a plurality of vertical plate through holes in the longitudinal direction; and the elastic side plates are arranged in sections and at intervals in the transverse direction.
3. The fully assembled pull-out and shear-resistant steel-concrete composite beam according to claim 2 is characterized in that: The embedded connector also includes a first longitudinal rib and a second longitudinal rib, which are longitudinally extended and fixed to both ends of the transverse vertical plate; It also includes a bottom template, which is fixedly arranged between the first longitudinal rib plate and the second longitudinal rib plate, and is also fixed to the transverse vertical plate.
4. The fully assembled pull-out and shear-resistant steel-concrete composite beam according to claim 3 is characterized in that: After the prefabricated bridge deck is located on the top of the steel beam, there is a spacing between the first longitudinal rib plate and the second longitudinal rib plate and the edge of the cast cofferdam, and the first longitudinal rib plate and the second longitudinal rib plate are respectively provided with a plurality of rib through holes distributed in parallel along the longitudinal direction.
5. The fully assembled pull-out and shear-resistant steel-concrete composite beam according to claim 4 is characterized in that: The bonding slurry is ultra-high performance concrete. During pouring, the ultra-high performance concrete flows through the rib through holes. After solidification, the ultra-high performance concrete in the rib through holes and the ultra-high performance concrete in the vertical plate through holes are integrated into a frame-type spatial pull-out resistant structure.
6. The fully assembled pull-out and shear-resistant steel-concrete composite beam according to claim 5 is characterized in that: The embedding head is arranged at several intervals in the horizontal direction and is composed of a vertical middle plate and two arrow side plates, and the vertical middle plate is integrally formed with the horizontal vertical plate; The two arrow side plates are fixed to the lower end of the vertical middle plate with set elasticity and are respectively inclined upward and outward so that the embedded head forms a V-shaped arrow structure; Alternatively, the two arrow side panels are respectively inclined upward and outward so that the embedded head forms a V-shaped arrow structure, and at least one of the two arrow side panels is hinged to the lower end of the vertical middle plate to form a structure that can swing inward and limit outward.
7. The fully assembled pull-out and shear-resistant steel-concrete composite beam according to claim 5 is characterized in that: The notch of the embedding groove formed by the elastic side plate is provided with a guiding part, and the guiding part is a trapezoidal structure with a larger upper part and a smaller lower part; the inner width of the embedding groove is greater than the widest part of the V-shaped arrow structure of the embedding head.
8. The fully assembled pull-out and shear-resistant steel-concrete composite beam according to claim 6 is characterized in that: The portion of the vertical plate embedded in the precast concrete bridge slab is provided with a plurality of steel bar holes arranged in the transverse direction, and longitudinal steel bars are passed through the steel bar holes.
9. The fully assembled pull-out and shear-resistant steel-concrete composite beam according to claim 4 is characterized in that: The cast-in-place cofferdam is surrounded by a first longitudinal side plate, a second longitudinal side plate and two compartment partitions; the first longitudinal side plate and the second longitudinal side plate are in an inverted L-shape with the wing plates facing outward, and a waterproof sealing strip is provided between the upper surface of the wing plate and the precast concrete bridge slab; and vertical reinforcing ribs are fixed between the web and the wing plates of the L-shaped first longitudinal side plate and the second longitudinal side plate.
10. The fully assembled pull-out and shear-resistant steel-concrete composite beam according to claim 4 is characterized in that: The position of the bottom template is slightly lower than the top edges of the first longitudinal rib and the second longitudinal rib; The prefabricated bridge slab is provided with a pouring hole for pouring bonding slurry into the pouring cofferdam; the first longitudinal rib plate and the second longitudinal rib plate are provided with a plurality of exhaust holes arranged in the longitudinal direction at a position close to the bottom template upward; The transverse joints between adjacent precast concrete bridge slabs are poured with special concrete.