Staged water storage structure and staged water storage method for dam water storage in advance
By setting up spillways and overflow weirs on the side of the dam body, using the notch section and arc-shaped overflow surface design of the overflow weir, the tight construction period of the shutter and water storage during the dam construction period is solved, and the construction process is realized It does not affect the phased water storage of dam top construction, ensures that the water level is lower than the normal water storage level, and reduces the requirements for the construction surface at the time of shuttering.
Patent Information
- Application Number
- CN202411171322.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-26
AI Technical Summary
In dam projects, the construction period requires that the dam and spillways be completed in accordance with the design requirements before all construction is completed, resulting in a tight construction period and affecting the project's shutdown needs and power generation benefits.
Spillway is set up on at least one side of the dam body, and an overflow weir is set up at the upstream end of the spillway, and a gap section is reserved on the overflow weir, allowing the gate to be lowered to store water after the construction of the dam body is completed, and overflow can be carried out and overflowed. The elevation of the notch bottom of the weir is the same height as the bottom plate of the upstream end of the spillway. The overflow surface of the overflow weir is arranged in an arc shape to smooth the water flow and weaken the erosion. The width of the notch section of the overflow weir is determined according to the maximum discharge demand during the construction period.
It is possible to lower the gate and store water when the dam top construction is not completed to avoid affecting the overall project. It also drains water through the spillway when the water level on the upstream side of the dam is higher than the spillway, reducing the requirements for the construction surface at the time of the gate and ensuring that The operating water level of the dam is below the normal storage level to avoid the impact on the construction of the dam top.
Smart Images

Figure CN119021157A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a staged water storage structure and a staged water storage method for storing water in advance in a dam, and is applicable to the technical field of dam engineering. Background Art
[0002] The water conservancy and hydropower industries need to build dams and reservoirs according to the topographic and geological conditions, intercept natural runoff, and collect them into reservoirs. In order to meet the needs of flood control during the operation period, reservoirs usually need spillways to discharge flood water. A spillway is excavated on the geology beside the dam, and an overflow weir is set at the entrance of the spillway to enable water to flow over the overflow weir into the spillway and be discharged from the spillway when the water level in the reservoir on the upstream side of the dam is high.
[0003] For projects with earth-rock dams, the construction period requires that the dam and spillway be completed as designed before the gates can be lowered to store water. The dam top is equipped with wave-breaking walls, cable trenches, and pavement, with a complex structure and a tight construction period. Usually, at the scheduled gate closing time, the dam top structure has not been completed and cannot meet the gate closing requirements, affecting the project's gate closing and water storage and the overall construction period, directly leading to an increase in the project's construction period and investment and damage to power generation benefits. Summary of the invention
[0004] The technical problem to be solved by the present invention is: In order to solve the above technical problem, the present invention provides a staged water storage structure and a staged water storage method for dam water storage in advance.
[0005] The technical solution adopted by the present invention is: a staged water storage structure for pre-storing water in a dam, characterized in that: a spillway is arranged on at least one side of the dam body, the upstream end of the spillway is located upstream of the dam body and the bottom plate of the upstream end is lower than the normal water storage level of the reservoir, and the downstream end of the spillway is located downstream of the dam body;
[0006] An overflow weir is provided at the upstream end of the spillway, and the top of the overflow weir is at the same height as the normal water level of the reservoir, and a gap section is reserved on the overflow weir. In this way, after the construction of the dam body is completed, the dam can be closed and water can be stored, so that the dam can be closed and water can be stored before the dam top construction is completed, avoiding affecting the overall project. The dam top construction can still be continued after the established gate closing time node, and the dam top construction will not affect the water storage of the dam. During the dam top construction process, when the water volume on the upstream side of the dam is large, the water storage on the upstream side of the dam will discharge the excess water storage in the upstream section of the dam to the downstream section of the dam under the action of the gap section of the overflow weir, avoiding the water level on the upstream side of the dam from rising to the dam top position, which affects the dam top construction.
[0007] The elevation of the notch bottom of the notch section is the same as the bottom plate of the upstream end of the spillway. In this way, when the water level in the upstream section of the dam is higher than the spillway, the water can flow out from the notch of the spillway, so that the reservoir water level during the construction period is lower than the normal water storage level, thereby reducing the construction requirements of the dam at the time of closing the gate and storing water.
[0008] The flow surface of the overflow weir is arranged in an arc shape. Thus, when water flows toward the overflow weir, the arc-shaped flow surface can smooth the water flow and reduce the scouring of the overflow weir.
[0009] According to the top elevation of the dam to be completed initially, the upper limit of the reservoir water level during the construction period is taken as the upper limit of the reservoir water level during the construction period, and the width of the overflow weir gap is determined according to the maximum discharge demand during the construction period. In this way, the excess water on the upstream side of the dam can be discharged through the overflow weir during the maximum discharge during the construction period, avoiding the water level on the upstream side of the dam rising and affecting the dam top construction due to the inability to discharge the excess water on the upstream side of the dam from the overflow weir.
[0010] A phased water storage method for early water storage in a dam, applied to the above-mentioned phased water storage structure for early water storage in a dam, is characterized by:
[0011] Determine the flood control standards of the dam and the water storage capacity of the reservoir on the upstream side of the dam;
[0012] The top elevation of the proposed dam project, based on the top elevation, dam flood control standards and reservoir water storage capacity, determines the maximum discharge of water to be discharged through the overflow weir next to the dam;
[0013] According to the top elevation and the maximum discharge at the overflow weir, calculate the width of the overflow weir beside the dam and the width of the overflow weir at the spillway entrance;
[0014] Determine the top elevation of the dam project and the width of the gap section on the overflow weir;
[0015] During the construction of the dam body, the spillway is constructed on the geology beside the dam body, and the overflow weir is constructed at the spillway entrance according to the determined gap width;
[0016] After the dam body construction is completed, the dam top construction will be carried out;
[0017] After the construction of the dam body, spillway and overflow weir is completed, the sluice gates are closed and water is stored according to the set sluice gate closing time node. At this time, the water storage elevation of the dam is the gap bottom elevation of the gap section on the overflow weir;
[0018] When the construction of the dam crest is completed and the overflow weir is completed during the dry season, water can be stored at the dam crest elevation. In this way, when the dam body is completed and a gap section is made on the overflow weir on the spillway, the dam can be closed to store water. At this time, the water storage elevation of the dam is the gap bottom elevation of the gap section on the overflow weir, and the water storage on the upstream side of the dam will not affect the construction of the dam crest; when the construction of the dam crest is completed and the overflow weir is completed during the dry season, water can be stored at the dam crest elevation, thereby realizing phased water storage.
[0019] The method for determining the top elevation at which the dam project needs to be completed is as follows: initially plan the top elevation at which the dam project needs to be completed, use the initially planned top elevation at which the dam needs to be completed as the upper limit elevation of the reservoir water level during the construction period, plan the width of the gap section of the overflow weir based on the maximum discharge demand during the construction period, calculate the reservoir water level during the construction period and adjust the width of the gap section of the overflow weir until the width of the reserved gap in the overflow weir is less than the total width of the overflow weir and the upper limit elevation of the reservoir water level during the construction period is lower than the top elevation at which the dam needs to be completed, then the width of the reserved gap section of the overflow weir and the top elevation at which the dam needs to be completed can be finally determined.
[0020] The beneficial effects of the present invention are as follows: during the construction of the dam body, the present invention sets a spillway beside the dam body, sets an overflow weir at the upstream end of the spillway, and sets a gap on the overflow weir to meet the maximum discharge volume during the construction period, so that after the construction of the dam body and the spillway is completed, the dam can be closed for water storage, thus avoiding the slow construction of the entire dam project due to the complicated construction of the dam crest, which leads to the closing of the sluice for water storage and the overall construction period. During the process of closing the sluice for water storage and carrying out the dam crest construction, when the water storage on the upstream side of the dam increases and the water level rises, the operating water level of the reservoir on the upstream side of the dam is lower than the permanent normal water storage level due to the action of the gap section of the overflow weir, and the excess water storage on the upstream side of the dam can be discharged. Water is discharged through the spillway to prevent the water level on the upstream side of the dam from rising to the dam crest and affecting the dam crest construction; after the dam crest construction is completed, the overflow weir is filled so that the operating water level of the reservoir on the upstream side of the dam can reach the normal water storage level to ensure the operation of the dam. When the dam body is completed and a gap section is made on the overflow weir on the spillway, the dam can be closed to store water. At this time, the water storage elevation of the dam is the gap bottom elevation of the gap section on the overflow weir, and the water storage on the upstream side of the dam will not affect the dam crest construction project; when the dam crest construction is completed and the overflow weir is filled during the dry season, the dam crest elevation can be stored, thereby realizing phased water storage. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 : Schematic diagram of the dam crest construction structure in the background technology of the present invention.
[0022] Figure 2 : Schematic diagram of the structure of the dam body, spillway and overflow weir in the present invention.
[0023] Figure 3 : A structural cross-sectional view of the spillway and overflow weir in the present invention.
[0024] Figure 4 : A schematic diagram of a gap reserved when constructing an overflow weir in a spillway according to the present invention.
[0025] In the figure: 1. Reservoir; 2. Dam body; 3. Spillway; 4. Overflow weir; 5. Gap section. DETAILED DESCRIPTION
[0026] The present invention will be further described in detail below with reference to the accompanying drawings and by way of examples. The following examples are intended to explain the present invention, but the present invention is not limited to the following examples.
[0027] This embodiment is a staged water storage structure for storing water in advance in a dam. The dam has a dam body 2 and a dam top. The dam top is arranged with a wave-breaking wall, a cable trench, and a road surface.
[0028] In this embodiment, during the dam construction process, a spillway 3 is set on at least one side of the dam body 2, the upstream end of the spillway 3 is located upstream of the dam body 2 and the bottom plate of the upstream end is lower than the normal water level of the reservoir 1, the downstream end of the spillway 3 is located downstream of the dam body 2, the top of the overflow weir 4 of the spillway 3 is at the same height as the normal water level of the reservoir 1, and when the reservoir water level is higher than the normal water level, the flood can be discharged by gravity through the spillway 3 without gate control. The upstream end of the spillway 3 is provided with an overflow weir 4, the top of the overflow weir 4 is at the same height as the normal water level of the reservoir 1, and the width of the spillway 3 is determined according to the permanent flood control needs during the operation period.
[0029] In this embodiment, a notch section 5 is provided on the overflow weir 4 of the spillway 3 according to the maximum discharge demand during the construction period. After the construction of the dam body 2 and the spillway 3 is completed, the notch section 5 is retained on the overflow weir 4 on the spillway 3. At this time, after the dam is closed to store water, the water level on the upstream side of the dam begins to rise. When the water storage on the upstream side of the dam increases and causes the water level on the upstream side of the dam to rise, when the water level rises to the position of the notch section 5 on the spillway 3, the water storage on the upstream side of the dam will be discharged to the downstream section of the dam through the spillway 3, preventing the water level in the upstream section of the dam from continuing to rise to the construction position of the dam crest and thus affecting the construction of the dam crest. Under the action of the notch section 5 on the overflow weir 4, the operating water level of the reservoir 1 during the construction period is lower than the permanent normal water storage level.
[0030] In this embodiment, the flow surface of the overflow weir 4 is arranged in an arc shape. In this way, when the water flows toward the overflow weir 4, the arc-shaped flow surface can smooth the water flow and weaken the scouring of the overflow weir 4.
[0031] In this embodiment, the top elevation of the initially planned dam to be completed is used as the upper limit elevation of the reservoir water level during the construction period. According to the maximum discharge demand during the construction period, the width of the notch section 5 of the overflow weir 4 is determined so that the excess water on the upstream side of the dam can be discharged through the overflow weir 4 during the maximum discharge during the construction period, thereby avoiding the water level on the upstream side of the dam from rising and affecting the dam top construction due to the inability to discharge the excess water on the upstream side of the dam from the overflow weir 4.
[0032] In this embodiment, the notch bottom elevation of the notch section 5 on the overflow weir 4 is the same height as the bottom plate at the upstream end of the spillway 3. In this way, during the construction of the dam crest, when the water level on the upstream side of the dam is higher than the bottom elevation of the notch section 5 on the overflow weir 4, the excess water storage on the upstream side of the dam can overflow the notch section 5 on the overflow weir 4 and be discharged from the spillway 3 to the downstream side of the dam.
[0033] In this embodiment, after the dam top construction is completed, the gap section 5 on the overflow weir 4 is completed according to the design requirements during the dry season when the overflow weir 4 does not discharge flood water.
[0034] In this embodiment, the staged water storage method for the dam to store water in advance is:
[0035] 1. Determine the flood control standard of the dam according to the scale of the project and calculate the water storage capacity of the reservoir 1 on the upstream side of the dam at the planned water storage time point;
[0036] 2. The top elevation of the dam project that needs to be constructed at the time of initial sluice closing and water storage. The maximum discharge of water that needs to be discharged through the four overflow weirs beside the dam during the construction period is determined based on the top elevation, dam flood control standards and reservoir 1 water storage capacity;
[0037] 3. According to the maximum discharge at the overflow weir 4 during the construction period, determine the width of the notch section 5 on the overflow weir 4 beside the dam;
[0038] 4. The overflow weir gap section 5 and the completed overflow weir section 4 have different shapes and heads, and the calculation methods and single-width flow rates are also different. The flood discharge capacity needs to be calculated separately. The sum of the discharges of the two sections is the temporary flood discharge capacity of spillway 3 during the construction period.
[0039] 5. If the entire width of the overflow weir 4 is reserved according to the gap section 5, and the reservoir water level calculated by flood control still exceeds the top elevation of the dam project that needs to be constructed at the initial time of closing the gates and storing water, it is necessary to increase resource investment and increase the top elevation of the dam that needs to be completed, that is, to re-plan the top elevation of the dam project that needs to be constructed at the time of closing the gates and storing water.
[0040] 6. Repeat the above steps 2 to 5 until the reservoir water level calculated by flood control is lower than the top elevation of the dam project that needs to be constructed at the initial time of closing the gate and impounding the water. At this point, the top elevation of the dam 2 that needs to be completed at the time of closing the gate and impounding the water and the width of the gap section 5 reserved on the overflow weir 4 are finally determined.
[0041] 7. The overflow weir gap section 5 is reserved in full height as a whole, the overflow weir 4 of the gap section is not constructed as a whole, and the other sections are constructed according to the design drawings.
[0042] 8. After the dam top structure is completed, the reserved gap section 5 of the overflow weir is completed in the dry season according to the design requirements when the overflow weir 4 does not discharge floodwater. The gap section 5 is reserved as a whole at full height, and the same template and construction process can be used. During the construction of the reserved gap section 5 of the overflow weir 4, the reservoir water level must be controlled not to exceed the gap bottom elevation, and an appropriate reserve must be left to ensure dry land construction and construction safety.
[0043] 9. Due to the reserved gap section 5, and the gap can discharge flood water by gravity, the reservoir operating water level during the construction period is about one overflow weir 4 lower than the permanent normal water level, usually about 6 to 8 meters. Therefore, the gate can be closed in advance to store water when the 6 to 8 meter section above the dam 2 is not completed.
[0044] 10. Before the construction of the gap section 5 of the overflow weir 4, the operating water level of the lower reservoir cannot reach the normal water storage level originally designed, and the water level is usually at or below the bottom elevation of the gap section 5; after the construction of the gap section 5 is completed, the operating water level of the reservoir can reach the normal water storage level originally designed, which is the so-called staged water storage. Staged water storage is the water storage process formed by the gap section 5 reserved in the overflow weir. The main purpose of opening the gate in advance and saving construction time is to reserve the gap section 5 of the overflow weir.
[0045] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A staged water storage structure for early water storage in a dam, characterized by: A spillway (3) is arranged on at least one side of the dam body (2), the upstream end of the spillway (3) is located upstream of the dam body (2) and the bottom plate of the upstream end is lower than the normal water storage level of the reservoir (1), and the downstream end of the spillway (3) is located downstream of the dam body (2); An overflow weir (4) is provided at the upstream end of the spillway (3), the top of the overflow weir (4) is at the same height as the normal water level of the reservoir (1), and a notch section (5) is reserved on the overflow weir (4).
2. The staged water storage structure for dam water storage in advance according to claim 1 is characterized in that: The notch bottom elevation of the notch section (5) is the same as the bottom plate at the upstream end of the spillway (3).
3. The staged water storage structure for dam water storage in advance according to claim 1 is characterized in that: The flow surface of the overflow weir (4) is arranged in an arc shape.
4. The staged water storage structure for dam water storage in advance according to claim 1 is characterized in that: The top elevation of the dam to be constructed is initially planned to be the upper limit elevation of the reservoir water level during the construction period, and the width of the notch section (5) on the overflow weir (4) is determined according to the maximum discharge demand during the construction period.
5. A staged water storage method for dam water storage in advance, applied to the staged water storage structure for dam water storage in advance as claimed in any one of claims 1 to 4, characterized in that: Determine the flood control standards of the dam and the water storage capacity of the reservoir (1) on the upstream side of the dam; The top elevation of the proposed dam project, based on the top elevation, the dam flood control standard and the water storage capacity of the reservoir (1), determines the maximum discharge of water to be discharged through the overflow weir (4) next to the dam; Calculate the width of the overflow weir (4) beside the dam and the width of the overflow weir (4) at the entrance of the spillway (3) based on the top elevation and the maximum discharge at the overflow weir (4); Determine the top elevation of the dam project and the width of the notch section (5) on the overflow weir (4); During the construction of the dam body (2), a spillway (3) is constructed on the geology beside the dam body (2), and an overflow weir (4) is constructed at the entrance of the spillway (3) according to the determined width of the notch section (5); After the construction of the dam body (2) is completed, the dam top construction will be carried out; After the construction of the dam body (2), spillway (3) and overflow weir (4) is completed, the sluice gate is closed to store water according to the set sluice gate closing time node. At this time, the water storage elevation of the dam is the elevation of the gap bottom of the gap section (5) on the overflow weir (4); When the dam top construction is completed and the overflow weir (4) is completed during the dry season, water can be stored at the dam top elevation.
6. The phased water storage method for dam water storage in advance according to claim 5, characterized in that: The method for determining the top elevation of the dam project and the width of the gap section (5) on the overflow weir (4) is as follows: based on the top elevation of the dam that needs to be completed initially, take this as the upper limit elevation of the reservoir water level during the construction period, and according to the maximum discharge demand during the construction period, plan the width of the gap section (5) of the overflow weir (4), calculate the reservoir water level during the construction period and adjust the width of the gap section (5) of the overflow weir (4) until it is obtained that the width of the reserved gap of the overflow weir (4) is less than the total width of the overflow weir (4) and the upper limit elevation of the reservoir water level during the construction period is lower than the top elevation of the dam that needs to be completed, so that the width of the reserved gap section (5) of the overflow weir (4) and the top elevation of the dam that needs to be completed can be finally determined.
Citation Information
Patent Citations
High-water-level water storage method for high dam reservoir in construction period and initial operation period
CN113481928A
Bank spillway water inlet guide wall structure
CN206428677U
Drainage tunnel, spillway and diversion tunnel combined arrangement structure
CN220099835U
Staged water storage structure for dam water storage in advance
CN222990672U
Muddy water treatment facility for dam
JP1997143961A