Ecological secant pile construction method
Through the use of spaced holes and fluid soil, drilling slag and slag are converted into casting materials, solving the problems of environmental pollution and resource waste in the construction of bite piles, and achieving the effects of green and low-carbon construction and solid waste utilization.
Patent Information
- Application Number
- CN202411435280.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-15
- Publication Date
- 2024-11-26
AI Technical Summary
During the construction of existing bite piles, a large amount of drilling slag and construction waste are generated, resulting in environmental pollution and requires high-energy-consuming concrete materials.
Using the methods of spaced holes, plain piles, bite and solid piles to make piles, use fluid soil to make drilling slag and slag, and stir with water and add curing agent to form mud. As a casting material, the steel is inserted And recycle the gaps when pulled out to reduce resource waste.
Effective utilization of urban solid waste has been reduced, environmental pollution and production costs, while improving solid waste utilization, and achieving green and low-carbon construction.
Smart Images

Figure CN119021200A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to an ecological interlocking pile construction method. Background Art
[0002] Interlocking piles are a type of foundation pit retaining structure in which adjacent rows of concrete piles are partially embedded in a circle, and steel cages or steel sections are inserted into the piles that are constructed alternately in a subsequent sequence, so that the piles are interlocked and arranged.
[0003] In the process of modernization, construction projects are facing increasingly complex challenges. In the existing interlocking pile construction process, a large amount of drilling slag and various pieces of construction waste will be generated. At the same time, a large amount of high-energy-consuming building materials such as concrete are required in the process of manufacturing interlocking piles, which causes serious pollution to the environment. Summary of the invention
[0004] (1) The present invention provides an ecological interlocking pile construction method to alleviate the technical problem of environmental pollution caused by interlocking pile construction in the prior art.
[0005] (II) Technical solution
[0006] In order to solve the above technical problems, an embodiment of the present invention provides an ecological interlocking pile construction method, comprising the following steps:
[0007] Step 1, forming holes at intervals, burying casings at intervals, and drilling along the extending direction of the casings to form holes;
[0008] Step 2, forming the plain pile by pouring fluidized soil into the plain hole to form the plain pile;
[0009] Step 3, biting operation, hard cutting the adjacent plain piles and surrounding soil to form a meat hole;
[0010] Step 4, forming a solid pile, inserting a steel section into the hole, and pouring the fluidized soil into the hole to form the solid pile;
[0011] The fluidized soil is made from the drill cuttings and slag produced by drilling and cutting in step 1 and step 3.
[0012] Furthermore, the fluidized soil is prepared by uniformly mixing drill cuttings, waste soil and water to form slurry, and then adding a curing agent and stirring.
[0013] Furthermore, the mixing ratio of the curing agent to the mud is 1:5.
[0014] Furthermore, the curing agent comprises components of cement, fly ash and mineral powder.
[0015] Furthermore, in step 4, the portion of the steel section inserted into the hole is coated with a friction reducer.
[0016] Furthermore, after the solid piles are formed, the steel sections are pulled out and recovered, and the fluidized soil with the same strength is used to fill the voids generated after the pulling out.
[0017] Furthermore, hanger bars are welded on the outer side of the web of the steel section.
[0018] Furthermore, in step 1 and step 3, the plain holes and the non-vegetarian holes need to be cleaned and inspected after they are formed.
[0019] Furthermore, in step 1, the bottom and outer sides of the buried casing are backfilled with clay soil and compacted in layers.
[0020] Furthermore, the slump of the fluidized soil pouring is in the range of 160mm-200mm.
[0021] Beneficial effects of the present invention:
[0022] The present invention provides an ecological interlocking pile construction method, comprising the following steps: step 1, forming holes at intervals; step 2, forming plain piles; step 3, interlocking operation; step 4, forming solid piles. The construction method forms ecological interlocking piles by interlocking with each other and inserting steel sections in an alternate manner, which can make them have both soil retaining and bearing capacity and groundwater barrier effects. At the same time, the interlocking piles are poured using fluidized soil, and the fluidized soil is made of drill slag and slag produced by drilling and cutting in steps 1 and 3. The local solid waste is utilized, and drill slag and slag are selected as raw materials, which solves the problem of urban solid waste, improves the utilization rate of solid waste, effectively alleviates the pollution to the environment during the construction of interlocking piles, and can also reduce production costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 A schematic diagram of an ecological interlocking pile for an ecological interlocking pile construction method provided by an embodiment of the present invention;
[0025] Figure 2 A construction flow chart of a plain pile 100 of an ecological interlocking pile construction method provided by an embodiment of the present invention;
[0026] Figure 3 A flow chart of the construction of a solid pile 200 of an ecological interlocking pile construction method provided in an embodiment of the present invention.
[0027] icon:
[0028] 100-plain pile;
[0029] 200-Solid pile. DETAILED DESCRIPTION
[0030] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] In the description of the present invention, it should be noted that the terms "upper", "lower", etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0032] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the inside of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. In addition, in the description of the present invention, unless otherwise specified, "plurality" means two or more.
[0033] like Figures 1 to 3 As shown, the present invention provides an ecological interlocking pile construction method, comprising the following steps:
[0034] Step 1, forming holes at intervals, burying casings at intervals, and drilling along the extending direction of the casings to form holes;
[0035] Step 2, forming the plain pile 100, pouring fluidized soil into the plain hole to form the plain pile 100;
[0036] Step 3, biting operation, hard cutting adjacent plain piles 100 and surrounding soil to form a meat hole;
[0037] Step 4, forming the solid pile 200, inserting a steel section into the hole, and pouring fluidized soil into the hole to form the solid pile 200;
[0038] The fluidized soil is made of the drill cuttings and slag produced by drilling and cutting in step 1 and step 3.
[0039] In this embodiment, the construction method includes the following steps: step 1, forming holes at intervals; step 2, forming the plain piles 100; step 3, interlocking operation; step 4, forming the solid piles 200. This construction method forms ecological interlocking piles by interlocking and inserting steel sections in an interlocking manner, which can make them have both soil retaining and bearing capacity and groundwater barrier effects. At the same time, the fluidized soil is used for pouring, and the fluidized soil is made of drill slag and slag produced by drilling and cutting in steps 1 and 3. The local solid waste is utilized, and drill slag and slag are selected as raw materials, which solves the problem of urban solid waste, improves the utilization rate of solid waste, effectively alleviates the pollution to the environment during the construction of interlocking piles, and can also reduce production costs.
[0040] Before the construction of plain piles 100 and solid piles 200, it is necessary to ensure that the construction site is flat before the pile position is marked and subsequent construction is carried out.
[0041] In this embodiment, the casing is rolled with steel plates, and each time it is used, after the pile is formed, the casing can be pulled out and reused, which improves resource recyclability and effectively saves production costs. During construction, it is necessary to ensure that each drilling rig is equipped with at least 6 casings on its working surface to ensure construction efficiency, and to perform manual and mechanical drilling according to the on-site conditions, bury the casing to fix the hole position, improve construction accuracy, and then use the cross method to check the center of the pile position to ensure that the error meets the actual use requirements. Casings are also needed to fix the hole position when the hole is formed.
[0042] In step 1, the drilling sequence is consistent with the construction sequence of interval piling, that is, all the plain piles 100 are bored first and then poured with fluidized soil. The safety distance between the pile that has just been poured and the adjacent pile must not be less than 4 times the pile diameter and the pouring interval must not be less than 3 days, so as to ensure the stability and safety of the construction and prevent damage to the stabilized piles.
[0043] Among them, optionally, fluidized soil can also use engineering slag, shield slag, construction waste, industrial solid waste, etc. as raw materials, which can solve the problem of urban solid waste, improve the utilization rate of solid waste, achieve the reduction and resource utilization of solid waste, and reduce the demand for high-energy consumption building materials such as concrete in engineering construction, and ultimately achieve green and low-carbon.
[0044] According to an embodiment provided by the present invention, Figure 2 and Figure 3 As shown, the fluidized soil is made by mixing drill cuttings, waste soil and water evenly to form mud, and then adding a curing agent and mixing.
[0045] In this embodiment, the fluidized soil first mixes the drill cuttings, waste soil and water in a first mixing tank to form a homogeneous mud, and then the mud specific gravity of the homogeneous mud is sampled, that is, the wet density is sampled, and the test data is registered and properly kept to ensure the stability of the construction.
[0046] According to an embodiment provided by the present invention, the mixing ratio of the curing agent to the mud is 1:5.
[0047] In this embodiment, when the mud specific gravity test is qualified, it is pumped into the second mixing tank to add the curing agent and stir again. Preferably, the amount of curing agent added is 20% of the mud weight, that is, the mixing ratio of curing agent to mud is 1:5. At the same time, the stirring time shall not be less than 90S to ensure sufficient stirring. After the stirring is completed, the specific gravity (wet density) of the fluidized soil is tested. After the test is qualified, it can be used for pouring.
[0048] Preferably, the fluidized soil prepared by mixing is transported to the construction site using a closed tank truck for direct pouring.
[0049] According to one embodiment provided by the present invention, the curing agent comprises components of cement, fly ash and mineral powder.
[0050] In this embodiment, in order to form hard and stable interlocking piles after pouring, a curing agent is added to the mud to make fluidized soil, replacing the existing concrete pouring. The curing agent contains components of cement, fly ash and mineral powder, and may also include components such as a water reducer.
[0051] According to an embodiment provided by the present invention, in step 4, the portion of the steel section inserted into the hole is coated with a friction reducing agent.
[0052] In this embodiment, the portion of the steel section inserted into the fluidized soil is evenly coated with the friction reducer, that is, the portion inserted into the hole is coated with the friction reducer, so that it can be easily pulled out after use.
[0053] Among them, preferably, a central circular hole is opened not far from the top of the steel section before use, and reinforcement plates are welded on both sides of the steel section. The central opening is aligned with the hole on the steel section. If the required length of the steel section is insufficient, it can be lengthened by welding. The welds are all full-groove welds, and after welding, the welds are polished with a grinding wheel until they are as smooth as the surface of the steel section to ensure construction efficiency and construction accuracy.
[0054] According to an embodiment provided by the present invention, Figure 1 As shown, after the solid pile 200 is formed, the steel sections are pulled out and recovered, and the voids generated after the pulling out are filled with fluidized soil of the same strength.
[0055] In this embodiment, after the foundation pit backfill construction is completed, a hydraulic steel section plug-in machine is used to pull out the steel section, and the gap after the steel section is pulled out is filled with fluidized soil with the same strength as during pouring to ensure the quality of the solid pile 200 finally manufactured.
[0056] Among them, preferably, when the unconfined compressive strength is formed to be ≤8.4Mpa, the steel section can be pulled out.
[0057] According to an embodiment provided by the present invention, hanger bars are welded on the outer side of the web of the steel section.
[0058] In this embodiment, the elevation point is placed on the positioning steel using a level, the length of the hanger is determined based on the height difference between the positioning steel and the elevation of the top, and the hanger is welded on the outside of the two webs of the steel to facilitate the subsequent pulling out of the steel.
[0059] According to an embodiment provided by the present invention, Figure 2 and Figure 3 As shown, in step 1 and step 3, the plain holes and the non-vegetarian holes need to be cleaned and inspected after they are formed.
[0060] In this embodiment, hole cleaning is carried out immediately after hole inspection. After the rotary drilling rig is used to drill to a predetermined hole depth, the drill bit of the drilling rig is replaced with a slag bucket for slag cleaning. The slag cleaning process requires idling and cleaning the soil at the original depth, and then the rotation is stopped and the drill rod is lifted. The drilling shall not be deepened during idling and cleaning, and the unloaded slag shall be transported out to make fluid soil. The drill rod shall not be rotated when lifting the drill. After cleaning the hole, the hole depth is detected with a measuring rope.
[0061] After the hole is cleaned, the thickness of the sediment at the bottom of the hole needs to be tested to see if it meets the design requirements.
[0062] According to an embodiment provided by the present invention, Figure 2 and Figure 3 As shown, in step 1, the bottom and outer sides of the buried casing are backfilled with clay soil and compacted in layers.
[0063] In this embodiment, during construction, after a hole that meets the requirements is excavated on dry land, the casing is buried therein, and clay soil is backfilled along the bottom and outer sides of the casing and compacted in layers to ensure the stability of the casing, thereby improving the accuracy of construction.
[0064] According to an embodiment provided by the present invention, the slump of fluidized soil pouring ranges from 160mm to 200mm.
[0065] In this embodiment, the slump of the fluidized soil poured on site is controlled at 160mm-200mm, and the dry drilling and pouring needs to exceed the tank by 10cm to ensure the fluidity, cohesiveness and water retention of the fluidized soil.
[0066] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An ecological interlocking pile construction method, characterized in that: The steps include: Step 1, forming holes at intervals, burying casings at intervals, and drilling along the extending direction of the casings to form holes; Step 2, forming the plain pile (100), pouring fluidized soil into the plain hole to form the plain pile (100); Step 3, biting operation, hard cutting the adjacent plain piles (100) and surrounding soil to form a meat hole; Step 4, forming a solid pile (200), inserting a steel section into the hole, and pouring the fluidized soil into the hole to form the solid pile (200); The fluidized soil is made from the drill cuttings and slag produced by drilling and cutting in step 1 and step 3.
2. The ecological interlocking pile construction method according to claim 1, characterized in that: The fluidized soil is prepared by uniformly mixing drill cuttings, waste soil and water to form slurry, and then adding a curing agent and stirring.
3. The ecological interlocking pile construction method according to claim 2 is characterized in that: The mixing ratio of the curing agent to the mud is 1:
5.
4. The ecological interlocking pile construction method according to claim 2, characterized in that: The curing agent comprises the components of cement, fly ash and mineral powder.
5. The ecological interlocking pile construction method according to claim 1, characterized in that: In the step 4, the portion of the steel section inserted into the hole is coated with a friction reducer.
6. The ecological interlocking pile construction method according to claim 5, characterized in that: After the solid pile (200) is formed, the steel section is pulled out and recovered, and the fluidized soil with the same strength is used to fill the voids generated after the pulling out.
7. The ecological interlocking pile construction method according to claim 6, characterized in that: A hanger bar is welded on the outer side of the web of the steel section.
8. The ecological interlocking pile construction method according to claim 1, characterized in that: In step 1 and step 3, the plain holes and the non-vegetarian holes need to be cleaned and inspected after they are formed.
9. The ecological interlocking pile construction method according to claim 1, characterized in that: In the step 1, the bottom and outer sides of the buried casing are backfilled with clay soil and compacted in layers.
10. The ecological interlocking pile construction method according to any one of claims 1 to 9, characterized in that: The slump range of the fluidized soil pouring is 160mm-200mm.