Retaining wall structure in rainfall area and construction method
By setting up spaced drainage tanks and multi-stage step structures on the top of the retaining wall, combining the slope slope and geotechnical structure, the drainage function of the retaining wall is optimized, and the traditional retaining wall fails due to water erosion in heavy rainfall areas. Problem, improving structural stability and service life.
Patent Information
- Application Number
- CN202310607139.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-26
- Publication Date
- 2024-11-26
AI Technical Summary
In heavy rainfall areas, traditional retaining walls are prone to failure due to rear water erosion, resulting in risk of structural dumping. It is difficult for the prior art to optimize the retaining wall structure to achieve good drainage and anti-shrinkage without changing the total project volume. .
Design a retaining wall including the main body of the retaining wall and a step structure. A spaced drainage groove is set on the top of the retaining wall. By adjusting the number and height of the steps, combining the slope slope and geotechnical structure, the drainage groove of the retaining wall is optimized and Step structure to form grooved water outlets to reduce the risk of catchment erosion.
It effectively reduces the risk of retaining wall failure caused by catchment erosion, improves structural stability, extends service life, and reduces the excavation earth volume by optimizing the step structure, and reduces the risk of earth collapse.
Smart Images

Figure CN119021266A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of water conservancy projects, and in particular relates to a retaining wall structure in rainfall areas and a construction method thereof. Background Art
[0002] Continuous heavy rainfall often occurs in tropical, subtropical or southern China in the summer. In order to protect the safety of field facility foundations (including the slopes of oil and gas pipeline operation zones), gravity retaining walls are generally set up to prevent local soil erosion.
[0003] like Figure 1 As shown in the figure, a traditional retaining wall with a flat, straight top achieves good results when the slopes on both sides are shallow or the area has low annual rainfall. When the slope is steep or the area has high annual rainfall, the left and right end faces of the retaining wall are generally embedded in the slope surface by about 1 meter. However, due to differences in geotechnical structures in different regions, the slopes on both sides of the retaining wall are not all ideally hard and stable rocks. During heavy rainfall, a large amount of water from behind the retaining wall will scour the slopes on both sides of the top of the retaining wall, easily washing out the embedded section. Continued scouring will cut down from both sides of the retaining wall and gradually hollow out the retaining wall foundation. The retaining wall will be at risk of collapse and failure after long-term use.
[0004] Therefore, without changing the total amount of the retaining wall project, by optimizing the structural shape of the retaining wall, the finished retaining wall can be made convenient for slope drainage and effectively prevent the risk of retaining wall failure caused by a large amount of water collected behind the retaining wall and continuously eroding the junction between the left and right ends of the wall top and the slope. Summary of the Invention
[0005] In response to the above problems, the present invention provides a retaining wall structure for rainfall areas, including a retaining wall main body, a first step on the left side of the top of the retaining wall, and a first step on the right side of the top of the retaining wall. The bottom and left and right end faces of the retaining wall main body are embedded in the slope, the first step on the left side of the top of the retaining wall is fixedly connected to the left side of the top of the retaining wall main body, the first step on the right side of the top of the retaining wall is fixedly connected to the right side of the top of the retaining wall main body, and there is a gap between the first step on the left side of the top of the retaining wall and the first step on the right side of the top of the retaining wall to form a drainage trough.
[0006] A further preferred technical solution is: the upper surface area of the retaining wall body is smaller than the lower surface area of the retaining wall body, the lower surface width of the retaining wall body is W, and the cross section of the retaining wall body is a right-angled trapezoid, narrow at the top and wide at the bottom.
[0007] Its further preferred technical solution is: it also includes multiple steps on the left side of the top of the retaining wall, and the multiple steps on the left side of the top of the retaining wall are fixedly connected to the first step on the left side of the top of the retaining wall and the retaining wall body.
[0008] Its further preferred technical solution is: it also includes multiple steps on the right side of the top of the retaining wall, and the multiple steps on the right side of the top of the retaining wall are fixedly connected to the first step on the right side of the top of the retaining wall and the retaining wall body.
[0009] A further preferred technical solution is that a hydrophobic step is provided on the top of the retaining wall body, and the thickness of the top of the retaining wall increases as the height of the hydrophobic step increases.
[0010] A further preferred technical solution is that the height of the hydrophobic step is less than the total height of the multiple steps on the right side of the top of the retaining wall or the multiple steps on the left side of the top of the retaining wall.
[0011] A further preferred technical solution is: a method for constructing a retaining wall structure in a rainfall area, comprising:
[0012] Get historical rainfall information for rainfall areas;
[0013] Based on historical rainfall information, the rainfall areas are divided into heavy rainfall areas and normal rainfall areas, and the original slope inclination angle and soil texture of the normal rainfall areas are obtained;
[0014] In areas with heavy rainfall, the multiple steps on the right side of the top of the retaining wall or the multiple steps on the left side of the top of the retaining wall shall be two or more steps;
[0015] Calculate the number of steps on the right side of the top of the retaining wall or on the left side of the top of the retaining wall in areas with normal rainfall based on the original slope inclination angle and soil texture.
[0016] A further preferred technical solution is: a method for calculating the number of steps on the right side of the top of the retaining wall or the number of steps on the left side of the top of the retaining wall in normal rainfall areas is as follows:
[0017] When the slope of the original slope rock and soil is greater than 45°, the multi-step steps on the right side of the top of the retaining wall or the multi-step steps on the left side of the top of the retaining wall shall be two or more steps. When the slope of the original slope rock and soil is less than 45°, the multi-step steps on the right side of the top of the retaining wall or the multi-step steps on the left side of the top of the retaining wall shall be one level and a single-layer step shall be sufficient.
[0018] When the rock content in the soil texture is greater than 50%, the multiple steps on the right side of the top of the retaining wall or the multiple steps on the left side of the top of the retaining wall can be set as a single step at one level; when the rock content in the soil texture is less than 50%, the multiple steps on the right side of the top of the retaining wall or the multiple steps on the left side of the top of the retaining wall can be set as two or more levels.
[0019] A further preferred technical solution is: the value of the retaining wall drainage groove width C is: After optimization, the topmost step is embedded 1 meter into the slopes on both sides.
[0020] A further preferred technical solution is that the single-layer height of the multiple steps on the right side of the retaining wall top or the multiple steps on the left side of the retaining wall top is the same as the height of the first step on the left side of the retaining wall top or the first step on the right side of the retaining wall top.
[0021] Beneficial effects of the present invention:
[0022] (1) Since retaining walls are generally set at the foot of the gully, which is generally low in the middle and high on both sides, when excavating the foundation trench of a traditional retaining wall, the excavation depth at both ends is large, which easily forms a higher free surface. However, by appropriately lifting the bottom of both ends of the foundation upward, the depth of the foundation trench is correspondingly reduced, which reduces the amount of excavated earthwork and reduces the risk of earthwork collapse caused by excavating the foundation trench.
[0023] (2) As the two ends of the retaining wall are raised, a groove is formed in the middle of the top of the retaining wall, which naturally forms an overflow outlet, which is conducive to the collection and discharge of water from the middle part of the retaining wall;
[0024] (3) After the two ends of the retaining wall are raised, the silt and sand returned at the rear can stabilize the slope toes on both sides, making it difficult for the water on the rear slope to erode the two ends of the retaining wall. This reduces the possibility of the retaining wall failing due to long-term erosion of the two ends by the water, improves the stability of the retaining wall, and can extend its service life;
[0025] (4) The best optimization method can be flexibly determined based on the slope gradient and slope stability (whether it is hard rock) at both ends of the retaining wall at the construction site: mainly including 8 types of retaining wall anti-scour combination optimization structural forms, including one step on one side, one step on both sides, two steps on one side, two steps on both sides, one step on one side and two steps on one side.
[0026] Other features and advantages of the present invention will be described in the following description, and in part will become apparent from the description, or will be understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0028] Figure 1 shows a side view of a conventional retaining wall structure according to the prior art;
[0029] Figure 2Shows a side view of the optimized structure of single-layer steps on the left and right sides of the top of the retaining wall according to the present invention;
[0030] Figure 3 A side view of the optimized structure of multiple steps on the left and right sides of the top of the retaining wall according to the present invention is shown;
[0031] Figure 4 It shows a side view of a multi-level step optimization structure on the right and a single-level step optimization structure on the left according to an embodiment of the present invention;
[0032] Figure 5 A side view of the optimized structure of multiple steps on the left and right sides according to an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0033] To make the objectives, technical solutions, and advantages of the embodiments of the present invention more clear, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts shall fall within the scope of protection of the present invention.
[0034] Example 1
[0035] Step 1: Designers conduct on-site surveys and gather information on the hydrogeology surrounding the proposed retaining wall area, including the slope and water catchment behind the wall, the slope and lithology of the slopes on both sides, and the width of the main waterway. The height and width of the retaining wall are then determined based on the intended area. The retaining wall foundation is generally required to be buried at a depth of 1 to 2 meters, which designers can determine based on the rock properties of the on-site foundation. Referring to Table 1, once the retaining wall height is determined, the top and bottom thicknesses (pre-optimization recommended values) and the total volume of the retaining wall can be determined.
[0036] Table 1: Retaining wall structural parameters and engineering quantities per meter
[0037] Wall height H(m) Wall top thickness A(m) Wall bottom thickness B(m) <![CDATA[Total volume (m 3 )]]> 2.5 0.5 1.3 2.2 3.0 0.6 1.5 3.2 3.5 0.6 1.7 4.0 4.0 0.8 2.0 5.6 4.5 0.8 2.2 6.7 5.0 1.0 2.5 8.7 5.5 1.0 2.5 10.0 6.0 1.0 2.5 11.4
[0038] Step 2: Refer to Table 2 and determine the optimal method for retaining walls according to different slope gradients and rock properties. Note that after optimization, the center of the middle gap C (0.5 m ≤ C ≤ 1 / 3W) at the top of the retaining wall needs to be aligned with the middle of the main waterway in the direction of water outlet to determine the length and height of each step.
[0039] Table 2: Recommended practices for optimizing retaining wall structures under different slope gradients and lithology
[0040]
[0041] Step 3: If Figure 2or Figure 3 As mentioned above, the engineering volume that needs to be adjusted from the foundation can be calculated based on the optimized step size, and then the foundation shallow excavation amount or foundation step size can be determined based on the foundation rock properties and slope gradient on both sides of the retaining wall, ultimately ensuring that the total engineering volume does not increase.
[0042] Step 4: Considering that the top center of the optimized retaining wall serves as a water collection area, both the water outflow and the impact of scouring will increase. Therefore, it is necessary to install gabions below the outer water outlet of the retaining wall to stabilize the retaining wall foundation. The layout and arrangement of the outer gabions can be determined on-site based on the height of the retaining wall and the amount of water collected. For taller retaining walls with large water collection volumes, two layers of gabions can be placed close to the slopes, with a single layer in the center, forming a drainage channel to collect incoming water. The length of the gabions should be determined based on the amount of water on site.
[0043] Step 5: Carry out retaining wall construction according to the optimized plan. After the retaining wall is completed and put into use, it is necessary to strengthen observation during the rainy season. If there are signs of water scouring the junction of the slope and the end face of the retaining wall on one side of the top of the retaining wall, immediately take the method of temporarily adding a layer of optimized steps at the junction (which can be concrete or sacked soil for reinforcement) to promptly change the direction of the water flow on the top of the retaining wall to ensure that the retaining wall's anti-scouring structure is safe, efficient and practical.
[0044] The construction site is located in an area of heavy rainfall, posing a risk of landslides along the working slope. Excavation of the foundation trench revealed that the retaining wall's base is composed of solid rock, with the left side also primarily rock, with a slope greater than 45°. The right side consists of loose clastic rock, also with a slope greater than 45°. If a traditional retaining wall with a flat top were constructed, subsequent runoff from the slope would inevitably scour the clastic rock on the right side. Continued scouring could even expose the embedded section on the right side. The main channel of the original drainage ditch at the toe of the slope has a good foundation and is constructed of solid rock. The retaining wall to be constructed at this location is 4 meters high and 16 meters long. Table 1 specifies a top thickness of 0.8 meters and a base thickness of 2 meters. Based on the recommended practices in Table 2, the top of the retaining wall should have a single step on the left and two steps on the right.
[0045] like Figure 4First, in the rocky area to the left of the retaining wall foundation trench, excavation was reduced by approximately 4 cubic meters, saving 4 cubic meters of concrete, which could be used to construct an optimized step at the top later. Secondly, a 4-meter-wide drainage trough was installed on the right side of the retaining wall, directly facing the outer main waterway. This would collect rainwater from the slope behind the retaining wall and drain it into the trough, preventing it from eroding the slopes on both sides, particularly the unstable right side. Finally, to ensure that the 4-meter-long catchment area at the top of the retaining wall faces the drainage trough, two optimized steps were added on the right side. The first step on the right side of the retaining wall is 4 meters long and 0.3 meters high. The second step on the right side of the retaining wall is 2 meters long and 0.3 meters high, overlapping the first step by 1 meter and recessed 1 meter into the right side of the slope. A single optimized step was also added on the left side. This single step on the left side of the retaining wall is 9 meters long and 0.3 meters high, recessed 1 meter into the left side of the slope. This creates a right-slanted groove at the top of the retaining wall, with its outlet facing the main waterway.
[0046] Example 2
[0047] The construction site is located in an area with heavy rainfall, and the slopes in the working area are at risk of landslides. Excavation of the foundation trench revealed that the bottom of the retaining wall foundation trench is solid rock. The slopes on both sides are greater than 45°, and the soil is soft (less than 50% of the soil is rock). The main waterway of the original drainage ditch at the foot of the slope is centered and has a good foundation, consisting of a solid rock structure, and the slopes on both sides of the ditch are relatively stable. The retaining wall to be built here is 4 meters high and 24 meters long. According to Table 1, the wall top thickness is 0.8 meters and the wall bottom thickness is 2 meters. According to the recommended practices in Table 2, the top shape of the retaining wall should be: two steps on the left and two steps on the right.
[0048] like Figure 5 As shown, first, the excavation volume on both sides of the retaining wall foundation trench was appropriately reduced by approximately 5 cubic meters, saving 5 cubic meters of concrete, which could be used to later construct optimized steps on the left and right sides of the top. Second, an 8-meter-wide drainage trough was installed in the center of the top of the retaining wall, facing the outer main waterway. This would collect rainwater from the slope behind the retaining wall and drain it into the retaining wall drainage trough, preventing rainwater from eroding the slopes on both sides. Finally, to ensure that the 8-meter-long water collection surface at the top of the retaining wall faces the drainage trough, two layers of optimized steps were installed on both sides of the top of the retaining wall. The first layer was 8 meters long and 0.3 meters high, and the second layer was 2 meters long and 0.3 meters high. The second layer was embedded 1 meter into the left and right slopes. This created a groove in the center of the top of the retaining wall, with the groove outlet facing the main waterway.
[0049] It should be noted that the terms "first", "second" etc. in this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the application described herein. In this application, the directions or positional relationships indicated by the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inside", "outside", "center", "vertical", "horizontal", "lateral", "longitudinal" etc. are based on the directions or positional relationships shown in the accompanying drawings.
[0050] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein; and these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A retaining wall structure for rainfall areas, characterized in that: It includes a retaining wall main body, a first step on the left side of the top of the retaining wall, and a first step on the right side of the top of the retaining wall. The bottom and left and right end faces of the retaining wall main body are embedded in the slope. The first step on the left side of the top of the retaining wall is fixedly connected to the left side of the top of the retaining wall main body, and the first step on the right side of the top of the retaining wall is fixedly connected to the right side of the top of the retaining wall main body. There is a gap between the first step on the left side of the top of the retaining wall and the first step on the right side of the top of the retaining wall to form a drainage ditch.
2. A retaining wall structure for rainy areas according to claim 1, characterized in that: The top thickness of the upper surface area of the retaining wall body is smaller than the bottom thickness of the lower surface area of the retaining wall body. The front width of the retaining wall body is W. The cross section of the retaining wall body is a right-angled trapezoid, which is narrow at the top and wide at the bottom.
3. The retaining wall structure for rainy areas according to claim 1, characterized in that: It also includes a plurality of steps on the left side of the top of the retaining wall, and the plurality of steps on the left side of the top of the retaining wall are fixedly connected to the first step on the left side of the top of the retaining wall and the retaining wall body.
4. The retaining wall structure for rainy areas according to claim 1, characterized in that: It also includes a plurality of steps on the right side of the top of the retaining wall, and the plurality of steps on the right side of the top of the retaining wall are fixedly connected to the first step on the right side of the top of the retaining wall and the retaining wall body.
5. The retaining wall structure for rainy areas according to claim 1, characterized in that: A drainage step is arranged on the top of the retaining wall body, and the thickness of the top of the retaining wall increases as the height of the drainage step increases.
6. The retaining wall structure for rainy areas according to claim 1, characterized in that: The height of the hydrophobic step is less than the total height of the multiple steps on the right side of the top of the retaining wall or the multiple steps on the left side of the top of the retaining wall.
7. A method for constructing a retaining wall structure in a rainfall area according to any one of claims 1 to 6, characterized in that: include: Get historical rainfall information in rainfall areas; Based on the historical rainfall information, the rainfall area is divided into a heavy rainfall area and a normal rainfall area, and the original slope inclination angle and soil texture of the normal rainfall area are obtained; The multiple steps on the right side of the top of the retaining wall or the multiple steps on the left side of the top of the retaining wall in the heavy rainfall area are two or more steps; The number of the multiple steps on the right side of the top of the retaining wall or the number of the multiple steps on the left side of the top of the retaining wall in the normal rainfall area is calculated according to the inclination angle of the original slope and the soil texture.
8. The method for constructing a retaining wall structure in a rainfall area according to claim 7, characterized in that: The method for calculating the number of steps on the right side of the top of the retaining wall or the number of steps on the left side of the top of the retaining wall in the normal rainfall area is as follows: When the slope of the original slope rock and soil is greater than 45°, the multi-step steps on the right side of the top of the retaining wall or the multi-step steps on the left side of the top of the retaining wall are set to two or more steps; when the slope of the original slope rock and soil is less than 45°, the multi-step steps on the right side of the top of the retaining wall or the multi-step steps on the left side of the top of the retaining wall are set to one level and a single-layer step is sufficient; When the amount of rock in the soil texture is greater than 50%, the multiple steps on the right side of the top of the retaining wall or the multiple steps on the left side of the top of the retaining wall can be set as a single-layer step at one level; when the amount of rock in the soil texture is less than 50%, the multiple steps on the right side of the top of the retaining wall or the multiple steps on the left side of the top of the retaining wall can be set as two or more levels.
9. The method for constructing a retaining wall structure in a rainfall area according to claim 8, characterized in that: The value of gutter width C is: After optimization, the topmost step is embedded 1 meter into the slopes on both sides.
10. The method for constructing a retaining wall structure in a rainfall area according to claim 9, characterized in that: The height of a single layer of the multiple steps on the right side of the top of the retaining wall or the multiple steps on the left side of the top of the retaining wall is the same as the height of the first layer of steps on the left side of the top of the retaining wall or the first layer of steps on the right side of the top of the retaining wall.