Construction method for realizing detection and treatment of pile foundation

By using conduits and airbags to detect the compactness of concrete in pile foundation construction and using high-pressure grouting for defect repair, the existing pile foundation inspection and treatment costs and complex operations are solved, and a low-cost and efficient construction process is achieved .

CN119021284APending Publication Date: 2024-11-26CHINA MCC5 GROUP CORP LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410843631.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The inspection and treatment cost in existing pile foundation construction is high and the operation is complex, and efficient quality inspection and repair methods are lacking.

Method used

The conduit is arranged and inflated in the pile hole, the concrete density is detected by the airbag, and high-pressure grouting is carried out when necessary for defect repair, simplifying the detection and treatment process.

Benefits of technology

It realizes low-cost and simple operation pile foundation inspection and treatment, avoids additional construction steps and drilling operations, and reduces construction costs and time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021284A_ABST
    Figure CN119021284A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for achieving detection and treatment of a pile foundation. The construction method comprises the following steps that hole forming is conducted on the pile foundation; binding a reinforcement cage; mounting a guide pipe; installing an air bag; pouring concrete; recovering the air bag; pile foundation detection; pile foundation treatment; and sealing the catheter. The method has the beneficial effects that before pile foundation pouring, the guide pipe is reserved in advance, the compactness degree of pile foundation concrete is detected through the air tightness of the guide pipe, operation is easy and convenient, and the construction cost is low; and if the pile foundation has defects, high-pressure grouting can be conducted through the guide pipe, supplementing and tamping of concrete at the defect position are achieved, and therefore the pile foundation is treated and repaired, and other construction steps are not additionally brought.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of building pile foundation construction, and specifically relates to a construction method for pile foundation detection and management. Background Art

[0002] A pile foundation is a deep foundation that connects the tops of several piles into a whole through a cap to jointly bear dynamic and static loads. A pile is a vertical or inclined foundation component set in the soil. Its function is to penetrate soft, highly compressible soil layers or water and transfer the load borne by the pile to a harder, denser or less compressible foundation bearing layer.

[0003] Pile foundation is the top priority to ensure construction quality. After the pile foundation construction is completed, expensive or complex testing equipment is often used to test the quality of the pile foundation. When defects are found, the pile foundation is repaired. The overall operation steps are complicated and the construction cost is high. Summary of the invention

[0004] The purpose of this application is to provide a construction method for pile foundation detection and management, which solves the problems of high cost and difficult operation of existing pile foundation detection and management.

[0005] The purpose of this application is achieved through the following technical solutions:

[0006] A construction method for pile foundation detection and treatment comprises the following steps:

[0007] The first step is to drill the pile foundation holes;

[0008] The second step is to tie the steel cage;

[0009] The third step is to install the conduit: arrange the conduit in the pile hole along the pile hole direction, and open a through hole on the conduit;

[0010] Step 4: balloon installation: place the balloon in the catheter and fill the balloon with gas so that the balloon fills the space in the catheter;

[0011] Step 5: pouring concrete;

[0012] Step 6: airbag recovery;

[0013] Step 7, pile foundation inspection: pressurize the pipe. If the air pressure is stable or changes evenly, it proves that the pile foundation concrete is dense, and then proceed to step 9; if the air pressure cannot be stabilized, it proves that the pile foundation concrete is not dense, and then proceed to step 8;

[0014] Step 8: Pile foundation management;

[0015] Step 9: Seal the catheter.

[0016] Furthermore, in the first step, mechanical equipment is used to perform pile foundation drilling operations.

[0017] Furthermore, in the second step, the steel cage is tied and the tied steel cage is hoisted into the pile hole.

[0018] Furthermore, in the third step, the conduit is fixed together with the steel cage.

[0019] Furthermore, in the third step, the number of conduits is determined according to the pile diameter: when the pile diameter is less than 300 mm, one conduit is arranged; when the pile diameter is 300 mm ≤ and less than 600 mm, two conduits are arranged; when the pile diameter is 600 mm ≤, three conduits are arranged.

[0020] Furthermore, in the fifth step, concrete pouring operation is performed in the pile hole.

[0021] Furthermore, in the sixth step, after the initial setting of the concrete and before the final setting, the gas in the air bag is released and the air bag is pulled out from the conduit.

[0022] Furthermore, in the eighth step, high-pressure grouting is performed through the conduit, and the concrete slurry penetrates into the defects of the pile body through the through holes around the conduit.

[0023] Furthermore, in the eighth step, pressure-maintaining and inflation are performed at intervals during the grouting process, and inflation can be stopped when the pressure becomes stable.

[0024] Furthermore, in the ninth step, the conduit is sealed by grouting, and then a waterproof coating is applied to the conduit opening.

[0025] Beneficial effects of this application:

[0026] (1) Before pouring the pile foundation, a conduit is reserved in advance, and the air tightness of the conduit is used to detect the density of the pile foundation concrete. The operation is simple and convenient, and the construction cost is low.

[0027] (2) If there are defects in the pile foundation, high-pressure grouting can be performed using a conduit to supplement and fill the defects with concrete, thereby repairing the pile foundation without bringing in any additional construction steps.

[0028] The aforementioned main scheme of the present application and its further options can be freely combined to form multiple schemes, all of which are schemes that can be adopted and claimed for protection in the present application; and in the present application, (non-conflicting options) can also be freely combined with each other and with other options. After understanding the scheme of the present application, those skilled in the art can understand that there are many combinations based on the prior art and common knowledge, all of which are technical schemes to be protected by the present application, and they are not exhaustively listed here. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a construction stereogram of this application.

[0030] Figure 2 yes Figure 1 A partial enlarged view of .

[0031] Figure 3 This is a top view of the construction of this application.

[0032] In the figure: 1-pile body, 2-reinforcement cage, 3-conduit, 4-air bag, 5-broken pile, 6-local loose area. DETAILED DESCRIPTION

[0033] The following non-limiting examples are provided to illustrate the present application.

[0034] Example 1

[0035] refer to Figure 1 to Figure 3 As shown, a construction method for pile foundation detection and treatment includes the following steps.

[0036] The first step is pile foundation drilling: use mechanical equipment to carry out pile foundation drilling operations.

[0037] The second step is to tie the steel cage: tie the steel cage 2 and hoist the tied steel cage 2 into the pile hole. After hoisting, ensure that the steel cage 2 is located at the center and in a vertical state.

[0038] The third step is to install the conduit: arrange the conduit 3 in the pile hole along the pile hole direction (vertical direction), and tie and fix the conduit 3 with the steel cage 2. A through hole is opened on the conduit 3 to achieve the connection between the inside and outside of the conduit 3, and the holes are evenly opened on the entire pipe body to ensure the uniform and complete effect of detection and treatment.

[0039] The conduit is made of metal or rubber, preferably plastic. The number of conduits is determined according to the pile diameter: if the pile diameter is less than 300 mm, one conduit is arranged; if the pile diameter is 300 mm or less and less than 600 mm, two conduits are arranged; if the pile diameter is 600 mm or less, three conduits are arranged.

[0040] Step 4: airbag installation: arrange airbag 4 (expandable rubber material) in conduit 3, and insert airbag 4 into conduit 3. Then fill airbag 4 with gas (air is fine) to expand the airbag 4, and the expanded airbag 4 fills up the space in conduit 3, completely filling the inside of conduit 3. The airbag 4 blocks all through holes on conduit 3 to prevent concrete from flowing into conduit 3 during pouring.

[0041] The fifth step is pouring concrete: pouring concrete in the pile hole, and forming a pile body 1 after the concrete solidifies.

[0042] Step 6: airbag recovery: after the initial setting of the concrete and before the final setting, the gas in the airbag 4 is released, and the airbag 4 is pulled out from the conduit 3, and the airbag 4 is recovered for turnover use.

[0043] Step 7, pile foundation inspection: pressurize the conduit 3. If the air pressure is stable or changes evenly, it proves that the pile foundation concrete is dense and the pile body 1 has no defects, and then proceed to step 9. If the air pressure cannot be stabilized, it proves that the pile foundation concrete is not dense and the pile body 1 has defects, and then proceed to step 8.

[0044] The defects of the pile body 1 include a broken pile 5 and a local loose compaction 6. The broken pile 5 is a location where the pile body 1 has continuous concrete that is not well wrapped in the circumferential direction, and the local loose compaction 6 is a location where the pile body 1 has concrete that is not well wrapped in the local (circumferentially non-continuous) part.

[0045] The eighth step is to treat the problematic pile foundation by performing high-pressure grouting through the conduit 3, and the concrete slurry penetrates into the defects of the pile body through the through holes around the conduit, thereby supplementing and filling the defective position to achieve repair of the defective position.

[0046] During the grouting process, pressure is maintained and inflation is carried out at intervals. The pressure should not be too high at this time. When the slurry is full and the inflation pressure (this pressure range is determined by experiments before construction) tends to be stable, the inflation can be stopped.

[0047] The ninth step is to seal the conduit: seal the conduit by grouting. After the conduit is filled with concrete, apply two layers of waterproof coating on the conduit opening to prevent water vapor from penetrating into the pile foundation.

[0048] In this construction method, before pouring the pile foundation, a conduit is reserved in advance, and the air tightness of the conduit is used to detect the compactness of the pile foundation concrete. If the concrete of the pile body 1 is not compact, there is unstable air leakage, and if the concrete of the pile body 1 is compact, there is no air leakage or the air leakage changes evenly with a small amplitude. The overall operation is simple and convenient, the construction cost is low, and the complicated operation and cost investment of expensive equipment are avoided.

[0049] If there are defects in the pile foundation, high-pressure grouting can be performed through the conduit to supplement and fill the defects with concrete, thereby repairing the pile foundation without any additional construction steps. This avoids the complicated operation of drilling additional holes in the pile foundation and then using the holes for grouting, saving construction time.

[0050] The aforementioned basic examples and their further selected examples can be freely combined to form multiple embodiments, all of which are embodiments that can be adopted and claimed for protection in this application. In the scheme of this application, each selected example can be arbitrarily combined with any other basic examples and selected examples.

[0051] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. A construction method for pile foundation detection and treatment, characterized in that: The steps include: The first step is to drill the pile foundation holes; The second step is to tie the steel cage; The third step is to install the conduit: arrange the conduit in the pile hole along the pile hole direction, and open a through hole on the conduit; Step 4: balloon installation: place the balloon in the catheter and fill the balloon with gas so that the balloon fills the space in the catheter; Step 5: pouring concrete; Step 6: airbag recovery; Step 7, pile foundation inspection: pressurize the pipe. If the air pressure is stable or changes evenly, it proves that the pile foundation concrete is dense, and then proceed to step 9; if the air pressure cannot be stabilized, it proves that the pile foundation concrete is not dense, and then proceed to step 8; Step 8: Pile foundation management; Step 9: Seal the catheter.

2. The construction method for pile foundation detection and treatment according to claim 1 is characterized in that: The first step is to use mechanical equipment to perform pile foundation hole drilling operations.

3. The construction method for pile foundation detection and treatment according to claim 1 or 2, characterized in that: The second step is to tie the steel cage and hoist the tied steel cage into the pile hole.

4. The construction method for pile foundation detection and treatment according to claim 1 is characterized in that: The third step is to fix the conduit and the steel cage together.

5. The construction method for pile foundation detection and treatment according to claim 1 or 4, characterized in that: In the third step, the number of conduits is determined according to the pile diameter: if the pile diameter is less than 300 mm, one conduit is arranged; If the pile diameter is 300mm≤and <600mm, two guide tubes shall be arranged; if the pile diameter is 600mm≤and three guide tubes shall be arranged.

6. The construction method for pile foundation detection and treatment according to claim 1 is characterized in that: The fifth step is to perform concrete pouring operation in the pile hole.

7. The construction method for pile foundation detection and treatment according to claim 1 is characterized in that: The sixth step is to release the gas in the air bag after the initial setting of the concrete and before the final setting, and to pull the air bag out of the conduit.

8. The construction method for pile foundation detection and treatment according to claim 1, characterized in that: In the eighth step, high-pressure grouting is performed through the conduit, and the concrete slurry penetrates into the defects of the pile body through the through holes around the conduit.

9. The construction method for pile foundation detection and treatment according to claim 8, characterized in that: In the eighth step, during the grouting process, pressure is maintained and inflated at intervals, and the inflation can be stopped when the pressure becomes stable.

10. The construction method for pile foundation detection and treatment according to claim 1, characterized in that: The ninth step is to seal the conduit by grouting, and then apply waterproof coating on the conduit opening.

Citation Information

Cited By

  • Construction method of combined waterproof curtain

    CN119754323A