Window frame construction process in passive building

By using connectors with insulation pads and precise measurement marking lines in passive buildings to fix the window frames, the heat loss problem of thermal insulation wall panels caused by window frame installation is solved, and more efficient energy-saving effects and installation stability are achieved. .

CN119021557AActive Publication Date: 2024-11-26YONGDEXIN DOORS & WINDOWS TECH (TAIZHOU) CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411094704.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-10
Publication Date
2024-11-26
Estimated Expiration
2044-08-10

AI Technical Summary

Technical Problem

In passive buildings, the installation method of window frames leads to heat loss of heat insulated wall panels, and the prior art is difficult to effectively reduce heat conduction.

Method used

Install the connections with thermal insulation pads on the insulated walls, and measure the door and window sizes are larger than the window frame size through predictions, vertical and horizontal marking lines are set, and connecting parts are fixed with elastic markings, positioning parts and guide blocks. Ensure the sealing and stability of the window frames and the thermally insulated walls.

Benefits of technology

It effectively reduces the heat loss of the heat-insulated wall, improves the air conditioner refrigeration effect, reduces energy consumption, and saves wall materials, reflecting the concept of energy conservation and environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021557A_ABST
    Figure CN119021557A_ABST
Patent Text Reader

Abstract

The invention relates to a window frame construction technology in a passive building, relates to the field of window frame construction, and is used for installing a window frame on a heat insulation wall body, and a door window opening is formed in the heat insulation wall body. A vertical marking line and a horizontal marking line are reserved on the heat insulation wall body around the periphery of the door window in a line snapping mode; the connecting pieces with the heat insulation pads are installed on the heat insulation outer wall at intervals along the vertical marks, and the sides, with the heat insulation pads, of the connecting pieces face the heat insulation wall body; supporting the window frame and connecting the window frame with the connecting pieces in sequence; a gap between the window frame and the heat insulation outer wall is sealed through a waterproof film. In the process of installing the connecting piece on the heat insulation wall body, the connecting piece and the heat insulation wall body are isolated through the heat insulation pad, so that heat on the heat insulation wall body is difficult to transfer to the connecting piece, and heat loss of the heat insulation wall body is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of window frame construction, and in particular to a window frame construction process in a passive building. Background Art

[0002] Passive buildings, also known as passive houses, are energy-saving buildings built based on passive design. Passive houses can adjust the indoor temperature to a suitable level with very little energy consumption, which is very environmentally friendly.

[0003] The exterior walls of passive houses are generally made of thermal insulation wall panels, and the window frames are generally installed on the thermal insulation wall panels in an external hanging manner. During the installation process, the window frames are mostly connected to the thermal insulation wall panels through steel angle brackets. The heat on the thermal insulation exterior wall is conducted through the steel angle brackets, resulting in heat loss on the thermal insulation exterior wall, which needs to be improved. Summary of the invention

[0004] In order to reduce heat loss of thermal insulation exterior walls, the present application provides a window frame construction process in a passive building.

[0005] The window frame construction process in a passive building provided in this application adopts the following technical solution: A window frame construction process in a passive building is used to install the window frame on an insulating wall, comprising the following steps: a door window is opened on the insulating wall; vertical marking lines and horizontal marking lines are left on the insulating wall around the outer circumference of the door window by means of a spring line; a connector with an insulating pad is installed on the insulating outer wall along the vertical marking intervals, with the side of the connector with the insulating pad facing the insulating wall; the window frame is supported and connected to each connector in turn; and the gap between the window frame and the insulating outer wall is sealed with a waterproof membrane.

[0006] By adopting the above technical solution, in the process of installing the connector to the insulation wall, the connector and the insulation wall are isolated by the insulation pad, so that the heat on the insulation wall is difficult to transfer to the connector, which is conducive to reducing the heat loss of the insulation wall. The insulation wall reduces the heat exchange between indoor and outdoor, which is conducive to improving the cooling effect of the air conditioner and reducing energy consumption. The installation of the insulation wall can save a lot of wall materials, which is conducive to embodying the concept of energy saving and environmental protection.

[0007] Preferably, before installation, the sizes of the door window and the window frame are measured, the size of the door window is larger than the size of the window frame, and the size difference between the door window and the window frame is ≤5mm.

[0008] By adopting the above technical solution, the size of the door and window is set to be larger than the size of the window frame, so that after the window frame connector is installed on the insulation wall, the window frame and the insulation wall are spaced apart, reducing the structure between the window frame and the insulation wall, making it difficult for the heat on the insulation wall to be transferred to the window frame, which is beneficial to reducing the heat loss of the insulation wall.

[0009] Preferably, the connecting parts are distributed on the heat-insulating outer wall along the hammer mark through the positioning part. The positioning part is provided with a guide ruler parallel to the vertical mark. A plurality of guide blocks are slidably connected to the guide ruler. The guide blocks press against the connecting parts, so that the connecting parts slide along a direction parallel to the horizontal mark and press against the window frame to be connected to the window frame.

[0010] By adopting the above technical solution, in the actual installation process, the positioning member is sequentially penetrated with a guide ruler, a connector and a heat insulation pad, the guide block is moved so that the guide block is pressed against the side where two adjacent connectors are close to each other, and then the window frame is supported between a number of connectors, the connector is moved close to the window frame, and the connector is abutted against the guide block so that the connector is always flush with the horizontal marking line during the movement until the connector abuts against the window frame, and the window frame and the connector are fixed, which is beneficial to ensure the verticality of the window frame after the window frame and the connector are fixed.

[0011] Preferably, the driving block is inserted into the guide ruler, and the driving block is moved and inserted between two adjacent guide blocks, so that the two adjacent guide blocks move against each other and press against the connecting piece.

[0012] By adopting the above technical solution, during the actual installation process, the driving block is inserted between two adjacent guide blocks, so that the two guide blocks move toward the connecting piece and press against the connecting piece, making it convenient to position the guide blocks.

[0013] Preferably, after the window frame is connected to the connecting piece, the guide ruler is moved close to the window frame to fill the gap between the window frame and the heat-insulating wall.

[0014] By adopting the above technical solution, after the window frame and the connecting piece are fixed, the guide ruler is moved close to the window frame so that the guide ruler enters the gap between the window frame and the insulation wall, which is beneficial to improve the stability of the window frame installation.

[0015] Preferably, the load-bearing blocks are installed on the heat-insulating wall along the direction of the horizontal marking line, and the window frame is supported by the load-bearing blocks.

[0016] By adopting the above technical solution, the load-bearing block is installed on the insulation wall along the horizontal marking line, and then the window frame is supported on the load-bearing block, which is conducive to maintaining the horizontality of the window frame.

[0017] Preferably, the window sill is installed between the load-bearing block and the window frame.

[0018] By adopting the above technical solution, after the window frame is installed on the insulation wall, the window sill is installed between the load-bearing block and the window frame, thereby reducing the erosion of the load-bearing block and the waterproof membrane under the window frame by rainwater left from the window frame.

[0019] Preferably, the heat-insulating walls and window frames are cleaned before the waterproof membrane is provided.

[0020] By adopting the above technical solution, the heat insulating wall and the window frame are cleaned before the waterproof membrane is set, which is conducive to the waterproof membrane being closely attached to the heat insulating wall and the window frame.

[0021] Preferably, the waterproof membrane on the inner side of the window frame is pre-attached to the window frame before the window frame is installed, and the waterproof membrane protruding from the frame is fixed with tape.

[0022] By adopting the above technical solution, after the window frame and the connecting parts are installed, the inner side of the window frame is close to the inner wall of the door and window, which makes it inconvenient to stick the film on the inside of the window frame. By pre-sticking the waterproof film on the inside of the window frame, it is convenient to set the waterproof film on the inside of the window frame.

[0023] Preferably, the waterproof membrane is smoothed with a scraper.

[0024] By adopting the above technical solution, after the gap between the window frame and the insulation wall is covered by the waterproof film, the pasted waterproof film is scraped flat by a scraper to make the waterproof film better fit the insulation wall and the window frame.

[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. When installing the connector to the insulation wall, the connector and the insulation wall are isolated by the insulation pad, so that the heat on the insulation wall is difficult to transfer to the connector, which is conducive to reducing the heat loss of the insulation wall; 2. Set the size of the door and window to be larger than the size of the window frame, so that after the window frame connector is installed on the insulation wall, the window frame and the insulation wall are spaced apart, reducing the structure between the window frame and the insulation wall, which is conducive to reducing the heat loss of the insulation wall; 3. After fixing the window frame and the connector, move the guide ruler close to the window frame so that the guide ruler enters the gap between the window frame and the insulation wall, which is helpful to improve the stability of the window frame installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a structural schematic diagram of a window frame being fixed to a heat-insulating wall through a connector.

[0027] Figure 2 This is a structural schematic diagram from another perspective of the window frame being fixed to the insulation wall through connectors, mainly used to show the position of the insulation pad.

[0028] Explanation of the reference numerals: 1. Insulating wall; 11. Door and window; 2. Window frame; 3. Connector; 31. Mounting portion; 311. Positioning opening one; 312. Positioning opening two; 32. Connecting portion; 33. Insulating pad; 4. Positioning piece one; 5. Guide ruler; 51. Strip opening one; 52. Guide opening one; 53. Strip opening two; 54. Guide block; 55. Driving block; 551. Guide surface; 6. Load-bearing block. DETAILED DESCRIPTION

[0029] The present application is further described in detail below in conjunction with the accompanying drawings.

[0030] The present application embodiment discloses a window frame construction process in a passive building. Figure 1 A window frame construction process in a passive building is used to install a window frame 2 on an insulating wall 1, comprising the following steps: A rectangular door and window 11 is opened on the insulating wall 1, and the transverse and longitudinal dimensions of the door and window 11 are measured with a tape measure. Compared with the transverse and longitudinal dimensions of the window frame 2, the size of the door and window 11 should be larger than that of the window frame 2, and the difference between the size of the door and window 11 and the size of the window frame 2 is ≤5mm. In this embodiment, the size of the door and window 11 is 4mm larger than that of the window frame 2.

[0031] Fix the elastic line on the insulation wall in the vertical direction, check the verticality of the elastic line with a level meter, and after the detection is correct, use the elastic line to leave vertical marking lines on both sides of the door and window 11; fix the elastic line on the insulation wall in the horizontal direction, check the horizontality of the elastic line with a level meter, and after the detection is correct, use the elastic line to leave horizontal marking lines below the door and window 11.

[0032] A plurality of connectors 3 for fixing the window frame 2 are prepared. The connector 3 includes a mounting portion 31 and a connecting portion 32. The mounting portion 31 is used to be fixed on the heat-insulating wall 1. The connecting portion 32 is used to be fixedly connected to the window frame 2. The connecting portion 32 is located at one end of the mounting portion 31. The connecting portion 32 and the mounting portion 31 are integrally formed. The connecting portion 32 and the mounting portion 31 are assembled into an "L" shape. In this embodiment, the connector 3 is an angle steel.

[0033] The mounting portion 31 is provided with a positioning opening 311 and a plurality of positioning openings 312. The positioning opening 311 is in the shape of a long strip. The positioning opening 312 is located on the side of the positioning opening 311 away from the connecting portion 32. The length direction of the positioning opening 311 is parallel to the horizontal marking line. The distribution direction of the positioning opening 311 and the positioning opening 312 is parallel to the horizontal marking line. The distribution direction of the plurality of positioning openings 312 is parallel to the horizontal marking line. A plurality of positioning members 4 are prepared for positioning the mounting portion 31. The number of positioning members 4 corresponds to the number of connecting members 3. The positioning members 4 are used to penetrate the corresponding positioning openings 311 and are fixed to the heat insulating wall 1. The positioning members 4 are pressed against the side of the mounting portion 31 away from the heat insulating wall 1 for preliminary positioning. The positioning members 4 can move in the positioning opening 311 along the length direction of the positioning opening 311. In this embodiment, the positioning members 4 are expansion screws.

[0034] Reference Figure 2 , prepare a plurality of thermal insulation pads 33 , the shape of the thermal insulation pads 33 is consistent with the shape of the mounting portion 31 , and the position and quantity of the thermal insulation pads 33 correspond one to one with the position and quantity of the connecting members 3 .

[0035] A plurality of guide rulers 5 are prepared. The guide rulers 5 are used to abut against the side of the installation portion 31 away from the heat-insulating wall 1. The end of the guide ruler 5 close to the window frame 2 is used to abut against the window frame 2. The length direction of the guide ruler 5 is parallel to the vertical marking line. A long strip opening 51 is provided on the guide ruler 5. A plurality of guide openings 52 are provided on the guide ruler 5. The guide openings 52 are spaced apart from the long strip opening 51. The number of the guide openings 52 is consistent with the number of the positioning openings 311 located on the same side of the door and window 11. The guide openings 52 are provided for corresponding positioning members 4 to pass through. The positioning members 4 are slidably connected to the guide ruler 5 along the length direction of the guide openings 52. When the plurality of positioning members 4 abut against the inner wall of the guide openings 52 close to the window frame 2, the positioning members 4 and the long strip openings 51 are both located on the vertical marking line.

[0036] The guide ruler 5 is provided with a plurality of second strip openings 53, the length direction of which is parallel to the length direction of the first strip opening 51. The guide ruler 5 is slidably connected with a plurality of guide blocks 54, which protrude from the guide ruler 5 in the direction close to the heat insulation wall 1, so that the connector 3 is located on the moving path of the guide block 54, and the end face of the guide block 54 close to the connector 3 is parallel to the horizontal marking line. The drive block 55 is inserted into the second strip opening 53, and the drive block 55 is located between adjacent connectors 3. The guide block 54 is located on the opposite sides of the drive block 55 distributed in the vertical direction. The opposite ends of the drive block 55 distributed in the vertical direction are machined and formed with guide surfaces 551, and the two guide surfaces 551 are inclined and approach each other in the direction close to the heat insulation wall 1, and the guide surface 551 is used to abut the guide block 54, so that the guide block 54 moves to press against the side of the connector 3 close to the guide block 54. The guide ruler 5 is spaced apart from the heat insulation wall 1.

[0037] Place the heat insulation pad 33 on the side of the corresponding installation part 31 close to the heat insulation wall 1, place the guide ruler 5 on the side of the installation part 31 away from the heat insulation pad 33, and the positioning piece 14 passes through the guide ruler 5, the installation part 31 and the heat insulation pad 33 in sequence, and preliminarily locates the connecting piece 3. After the preliminary positioning, the connecting pieces 3 are evenly distributed on the opposite sides of the door window 11. The connecting pieces 3 on the same side of the door window 11 are evenly distributed along the vertical marking line, and several positioning pieces 14 are all located on the vertical marking line. When the positioning piece 14 abuts against the inner wall of the guide opening 1 52 away from the window frame 2, the long strip opening 1 51 is also located on the vertical marking line, and the driving block 55 is inserted into the long strip opening 2 53 in the direction close to the heat insulation wall 1, so that the guide block 54 fits the corresponding installation part 31, and the installation part 31 is adjusted to be horizontal.

[0038] Prepare several load-bearing blocks 6 and fix them on the insulation wall 1 through expansion screws. The load-bearing blocks 6 are used to support the window panels. The lower ends of the load-bearing blocks 6 are parallel to the horizontal marking lines so that the upper ends of the installed load-bearing blocks 6 remain horizontal, which is beneficial to ensure the horizontality of the window frame 2 when it is supported on the load-bearing blocks 6.

[0039] After the load-bearing block 6 is installed, the surface of the window frame 2 and the inner wall of the installation bed are cleaned by using a fan, and the prepared waterproof membrane is pre-pasted to the flat part of the window frame 2. The waterproof membrane is arranged around the outer periphery of the window frame 2. After the corner is processed at the bend, it is scraped flat by a scraper to make the waterproof membrane firmly connected, and then the waterproof membrane of the corner processing part is fixed by tape. The window frame 2 with the pre-pasted waterproof membrane is placed on the load-bearing block 6, so that the window frame 2 is located between the connecting parts 32 on both sides, the mounting part 31 is moved in the direction close to the window frame 2, so that the connecting part 32 fits the window frame 2, and the mounting part 31 is fitted by the guide block 54, so that the mounting part 31 moves in the direction parallel to the horizontal marking line, so that the connecting part 32 close to the window frame 2 is always kept vertical, and the connecting parts 32 on both sides are fitted and pressed against the window frame 2 to ensure the verticality of the window frame 2. It is conducive to ensuring the horizontality and verticality of the window frame 2, and there is no need to detect and confirm the horizontality and verticality separately. In this embodiment, the window frame 2 and the connecting part 32 are fixed by expansion bolts.

[0040] After the window frame 2 and the connecting portion 32 are fixed, the expansion bolts are passed through the plurality of positioning holes 312 to fix the heat insulating wall 1 and the mounting portion 31, thereby fixing the window frame 2. After the fixing is completed, the driving block 55 is removed, and the guide ruler 5 is moved toward the direction close to the window frame 2, so that the guide ruler 5 moves to the gap between the window frame 2 and the heat insulating wall 1 to fill it, thereby increasing the positioning stability of the window frame 2.

[0041] The waterproof film pre-installed on the window frame 2 is unfolded and pasted on the inner wall of the door window 11, and the waterproof film is scraped flat with a scraper to make it sticky and firm.

[0042] The heat-insulating wall 1 around the door and window 11 is cleaned by a fan. After the cleaning is completed, the prepared waterproof film is used to seal the gap between the window frame 2 and the outside of the heat-insulating wall 1. The bottom of the window frame 2 is sealed first, then the two sides of the window frame 2 are sealed, and finally the top is sealed. In the process of sealing the gap between the window frame 2 and the heat-insulating wall 1, the waterproof film covers the load-bearing block 6, the connecting piece 3 and the guide ruler 5, and protects the load-bearing block 6, the connecting piece 3 and the guide ruler 5, so that rainwater is not easy to erode the load-bearing block 6, the connecting piece 3 and the guide ruler 5. In this embodiment, the waterproof film pre-bonded on the window frame 2 is a waterproof and air-proof film, and the waterproof film bonded outdoors to seal the gap between the window frame 2 and the heat-insulating wall 1 is a waterproof and breathable film.

[0043] The prepared window sill is fixed to the window frame 2 by means of expansion bolts, so that the window sill is located between the window frame 2 and the load-bearing block 6 .

[0044] The implementation principle of the window frame construction process in a passive building in an embodiment of the present application is: when the window frame 2 is installed on the insulating wall 1, the connecting piece 3 and the insulating wall 1 are separated by the insulating wall 1, and the insulating wall 1 and the installed window frame 2 are spaced apart to reduce the thermal bridge on the insulating wall 1 and reduce the heat loss on the insulating wall 1.

[0045] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A construction process for a window frame (2) in a passive building, for installing the window frame (2) on an insulating wall (1), Features: The following steps are involved: S1, a door and window (11) are provided on the heat-insulating wall (1); S2, leaving vertical and horizontal marking lines on the heat-insulating wall (1) around the outer circumference of the door and window (11) by means of a spring line; S3, installing the connecting piece (3) with the heat insulation pad (33) on the heat insulation exterior wall along the vertical marking intervals, with the side of the connecting piece (3) with the heat insulation pad (33) facing the heat insulation wall (1); S4, supporting the window frame (2) and connecting the window frame (2) to each connecting member (3) in sequence; S5. Use a waterproof membrane to seal the gap between the window frame (2) and the thermal insulation exterior wall.

2. A construction process for a window frame (2) in a passive building according to claim 1, Features: Before installation, the dimensions of the door window (11) and the window frame (2) are measured. The dimension of the door window (11) is larger than the dimension of the window frame (2), and the dimension difference between the door window (11) and the window frame (2) is ≤5 mm.

3. A construction process for a window frame (2) in a passive building according to claim 2, Features: The connecting member (3) is distributed on the heat-insulating outer wall along the vertical mark through the positioning member (4); the positioning member (4) is provided with a guide ruler (5) parallel to the vertical mark; a plurality of guide blocks (54) are slidably connected to the guide ruler (5); the guide blocks (54) are pressed against the connecting member (3), so that the connecting member (3) is slidably pressed against the window frame (2) in a direction parallel to the horizontal mark and is connected to the window frame (2).

4. A construction process for a window frame (2) in a passive building according to claim 3, Features: The driving block (55) is inserted into the guide ruler (5), and the driving block (55) is moved and inserted between two adjacent guide blocks (54), so that the two adjacent guide blocks (54) move toward each other and press against the connecting member (3).

5. A construction process for a window frame (2) in a passive building according to claim 3, Features: After the window frame (2) is connected to the connecting piece (3), the guide ruler (5) is moved close to the window frame (2) to fill the gap between the window frame (2) and the heat-insulating wall (1).

6. A construction process for a window frame (2) in a passive building according to claim 1, Features: The load-bearing block (6) is installed on the heat-insulating wall (1) along the direction of the horizontal marking line, and the window frame (2) is supported by the load-bearing block (6).

7. A construction process for a window frame (2) in a passive building according to claim 6, Features: Install the window sill between the bearing block (6) and the window frame (2).

8. A construction process for a window frame (2) in a passive building according to claim 1, Features: Before installing the waterproof membrane, the heat-insulating wall (1) and the window frame (2) are cleaned.

9. A construction process for a window frame (2) in a passive building according to claim 1, Features: The waterproof membrane on the inner side of the window frame (2) is pre-attached to the window frame (2) before the window frame (2) is installed, and the waterproof membrane protruding from the frame is fixed with adhesive tape.

10. A construction process for a window frame (2) in a passive building according to claim 1, Features: Use a scraper to smooth the waterproof membrane.

Citation Information

Patent Citations

  • Door and window connector, assembly type passive house external wall, and door and window installation method thereof

    CN104929478A

  • Opening built-in door and window structure for passive building external wall external thermal insulation system and mounting method of structure

    CN106223818A

  • Fabricated passive house building outer wall door and window

    CN213597823U

  • External window mounting node suitable for passive low-energy-consumption transformation of existing building

    CN216360952U

  • A connection structure for large-span energy-saving doors and windows

    CN221032154U