Soil body seepage failure test system and method for foundation pit support water stop system
Through the soil permeation failure test system of the foundation pit support water stop system, the leakage process in the foundation pit soil sample is simulated, the pore water pressure and soil migration are monitored, and the problem of the inability to explain the impact of foundation pit leakage in the existing technology is solved. , and the accuracy of the stability of foundation pits and the reduction of construction risks are achieved.
Patent Information
- Application Number
- CN202411042946.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-26
AI Technical Summary
The existing technology cannot effectively explain the impact of foundation pit leakage on the overall permeability stability of foundation pits and the physical mechanism of action of foundation pits infiltration failure under particle loss conditions, resulting in the inability to accurately predict and control leakage accidents in foundation pit construction.
A soil permeation damage test system for foundation pit support water stop system was designed, including test soil sample simulation device, water supply device, data monitoring device and image acquisition device. By simulating the leakage process in foundation pit soil samples, pores are monitored. Water pressure, flow rate and soil migration reveal the spatial and temporal evolution laws and physical action mechanisms of leakage on foundation pits.
The system can accurately analyze the evolution process of formation permeation failure under foundation pit leakage conditions, provide more accurate experimental data and theoretical basis, provide reference for foundation pit construction safety, and reduce construction risks.
Smart Images

Figure CN119023527A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of seepage control of foundation pits in municipal engineering, and in particular to a soil penetration and damage test system and method for a foundation pit support and water-stopping system. Background Art
[0002] The construction of underground space engineering inevitably involves the excavation of foundation pit engineering. The construction and excavation of deep foundation pits inevitably face the groundwater level control of multi-layer aquifer systems. Combining the support and water-stopping system with a dewatering well is a widely used engineering measure to lower the groundwater level. However, in actual engineering, the support and water-stopping system often leaks due to factors such as construction technology, geological conditions, and construction quality control. If the leakage occurs below the excavation surface of the foundation pit, it is very likely to cause disasters such as uplift, sudden surges, and pipe bursts on the excavation surface. Therefore, the study of the seepage damage of the foundation soil under the leakage of the foundation pit support and water-stopping system is of great significance for the safe construction and seepage control of foundation pit engineering.
[0003] Physical model test is one of the main means to study the mechanism of seepage damage in foundation pits. It has the advantages of simple operation, high repeatability, and intuitive and visual reproduction of the evolution process of seepage damage disasters. At present, the research on the leakage of foundation pit support water-stopping system mainly focuses on the impact of water-stopping system leakage on groundwater level, three-dimensional numerical simulation of leakage on the surrounding area, and leakage centrifugal test. The seepage damage disaster accidents of foundation soil caused by leakage are ignored, and it is impossible to explain the impact of leakage on the overall seepage stability of foundation pits and the physical mechanism of seepage damage of foundation pits under the condition of particle loss. Summary of the invention
[0004] Therefore, the technical problem to be solved by the present invention is to overcome the defect that the foundation soil penetration damage test in the prior art cannot explain the influence of leakage on the overall penetration stability of the foundation pit and the physical action mechanism of the foundation pit penetration damage under the condition of particle loss, thereby providing a soil penetration damage test system and method for the foundation pit support and water-stopping system.
[0005] In order to solve the above technical problems, the present invention provides a soil penetration failure test system for foundation pit support and water-stopping system, comprising:
[0006] The test soil sample simulation device is provided with a water inlet area and a soil sample area, a support water-stopping system leakage simulation component is installed in the soil sample area, the support water-stopping system leakage simulation component divides the soil sample area into a front soil sample filling area and a rear soil sample filling area, the height of the water inlet area is not lower than the height of the soil sample filled in the soil sample area, and the support water-stopping system leakage simulation component is not lower than the height of the water inlet area;
[0007] Optionally, the support and waterproofing system leakage simulation component is suitable for the working condition where the leakage position of the foundation pit support and waterproofing system is located below the soil layer.
[0008] Optionally, a drainage area is provided on the side of the soil sample area away from the water inlet area, and a retaining baffle is installed between the drainage area and the soil sample area, and the height of the retaining baffle is slightly greater than the height of the filled soil sample.
[0009] Optionally, a reserved outlet is also provided in the drainage area, and a flow meter is installed outside the reserved outlet.
[0010] The water supply device includes a lifting component and a water delivery component installed on the lifting component. The lifting component is suitable for driving the water delivery component to lift and lower. One end of the water delivery component is connected to a water supply part, and the other end is connected to a water inlet area. The water supply part and the water inlet area are all connected to the water delivery component through a water supply hose.
[0011] Optionally, the water supply component includes a water storage component, in which a partition plate is installed, the partition plate divides the inner cavity of the water storage component into a water inlet chamber and a drainage chamber, and the water supply component and the water inlet area are both connected to the water inlet chamber.
[0012] Optionally, the lifting assembly includes a fixed pulley and a flexible traction member wound around the fixed pulley, and the water delivery assembly is fixedly connected to one end of the flexible traction member.
[0013] The data monitoring device includes a pore water pressure sensor, a flow meter and an automatic data recorder, which are used to monitor and record the pore water pressure in the test soil sample and the flow at the reserved outlet of the drainage area.
[0014] Optionally, the soil sample area is suitable for filling with a test soil sample, and a pore water pressure sensor is buried in the test soil sample.
[0015] Optionally, a plurality of pore water pressure sensors are buried, and each of the plurality of pore water pressure sensors is electrically connected to the automatic data recorder.
[0016] The image acquisition device comprises a high-pixel camera and a camera tripod for mounting the high-pixel camera. The high-pixel camera is arranged toward the soil sample area and is used for recording image data of the soil sample area in real time.
[0017] The present invention also provides a soil penetration failure test method for a foundation pit support and waterproofing system, and the soil penetration failure test system for a foundation pit support and waterproofing system of the present invention is applied, comprising the following steps:
[0018] Obtain soil samples from the foundation pit project site as test soil samples, and use the test soil samples to fill the soil sample area;
[0019] Start the water supply assembly to supply water to the water inlet area, and let the water overflow to the soil sample area, so that the water surface height is higher than the first preset height of the upper surface of the test soil sample, use the underwater dumping method to mix the soil sample evenly and fill it to the second preset height, compact the test soil sample and let it stand for the first preset time, repeat the above operations in this step until the test soil sample height reaches the third preset height, and let it stand for the second preset time;
[0020] Raise the height of the water supply assembly to allow water to automatically flow from the water supply assembly into the water inlet area, observe and record the migration patterns of the test soil samples in the front soil sample filling area and the rear soil sample filling area at the current height of the water supply assembly, and repeat the above operations in this step until the test soil sample in the rear soil sample filling area is obviously uplifted, which means that the foundation pit soil is judged to have seepage damage.
[0021] Optionally, the migration regularity steps of the test soil samples in the front soil sample filling area and the rear soil sample filling area at the current water supply component height are observed, and the flow changes in the drainage area at different water supply heights are recorded.
[0022] The technical solution of the present invention has the following advantages:
[0023] 1. The foundation pit support and water-stopping system soil penetration and destruction test system provided by the present invention comprises: a test soil sample simulation device, which is provided with a water inlet area and a soil sample area, a support and water-stopping system leakage simulation component is installed in the soil sample area, the support and water-stopping system leakage simulation component divides the soil sample area into a front soil sample filling area and a rear soil sample filling area, the height of the water inlet area is not lower than the height of the soil sample area, and the support and water-stopping system leakage simulation component is not lower than the height of the water inlet area; a water supply device, which comprises a lifting component and a water supply component installed on the lifting component, the lifting component is suitable for driving the water supply component to lift and lower, one end of the water supply component is connected to a water supply component, and the other end is connected to the water inlet area, and the water supply component and the water inlet area are all connected to the water supply component through a water supply hose.
[0024] During the test, the soil samples at the foundation pit engineering site are used as test soil samples to fill the soil sample area, and the water supply assembly is driven to lift to different heights by the lifting assembly, and then the previous change law of the test soil samples in the front soil sample filling area and the rear soil sample filling area on both sides of the soil sample area under the action of different water levels in the water inlet area is observed and recorded. The test system provided by the present invention for studying the seepage damage of soil under the leakage of the foundation pit support and water-stopping system can reveal the temporal and spatial evolution law and physical action mechanism of the seepage damage of the stratum caused by the leakage of the foundation pit support and water-stopping system.
[0025] 2. The foundation pit support water-stopping system soil penetration and damage test system provided by the present invention can accurately monitor the pore water pressure change curves of different parts of the foundation pit soil and the leakage of the support water-stopping system in real time by setting a pore water pressure sensor on the side wall of the test device. The soil particle migration and surface uplift before and after the leakage can be observed and obtained in all directions through a transparent acrylic plate model and a high-pixel camera. At the same time, the flow meter set at the outlet of the water outlet can more accurately determine the flow change law and the starting point of the foundation pit penetration and damage. In general, the test device of the present invention has a simple structure, a simple and clear test method, and a safe and convenient test operation process.
[0026] 3. In the soil penetration and destruction test system of the foundation pit support and water-stopping system provided by the present invention, the leakage simulation parts of the support and water-stopping system can be set with different leakage types (point leakage, linear leakage and surface leakage) and leakage depth conditions according to the actual accident project, and have the advantages of flexible layout and repeated use.
[0027] 4. The soil penetration and destruction test system for the foundation pit support and water-stopping system provided by the present invention can accurately analyze the development process of the penetration and destruction test through high-precision pore water pressure, high-pixel camera and flow meter, getting rid of the errors caused by the traditional reliance on calipers to measure soil displacement, and accurately analyzing the evolution process of the penetration and destruction disaster of the formation at each stage under the condition of foundation pit leakage, so that the test results are more accurate and the test data are richer and more detailed.
[0028] 5. In the soil seepage damage test system of the foundation pit support and water-stopping system provided by the present invention, the water tank model can simulate the formation seepage damage accidents caused by leakage of the foundation pit support and water-stopping system under different formation conditions (single-layer homogeneous foundation and double-layer or multi-layer heterogeneous foundation) and environmental conditions, revealing the influence of leakage of the support and water-stopping system on the formation seepage damage, and providing an experimental and data basis for the subsequent in-depth numerical simulation of foundation pit seepage damage under the condition of leakage of the support and water-stopping system based on the dominant flow theory.
[0029] 6. The soil penetration and damage test method of the foundation pit support and water-stopping system provided by the present invention comprises the following steps: obtaining soil samples from the foundation pit project site as test soil samples, and filling the soil sample area with the test soil samples; starting the water supply component to supply water to the water inlet area, and allowing the water to overflow into the soil sample area, so that the water surface height is higher than the first preset height of the upper surface of the test soil sample, using the underwater dumping method to mix the soil sample evenly and fill it to a second preset height, compacting the test soil sample and leaving it for a first preset time, repeating the above operations in this step until the test soil sample height reaches a third preset height, and leaving it for a second preset time; raising the height of the water supply component to allow water to automatically flow from the water supply component into the water inlet area, observing and recording the migration patterns of the test soil samples in the front soil sample filling area and the rear soil sample filling area at the current water supply component height, repeating the above operations in this step until the test soil sample in the rear soil sample filling area bulges, i.e., judging that penetration and damage has occurred in the foundation pit soil. The migration law of the test soil samples obtained by recording can reveal the temporal and spatial evolution law and physical action mechanism of stratum seepage damage caused by leakage of the foundation pit support and water-stopping system, and provide a theoretical reference for subsequent foundation pit excavation construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0031] Figure 1 It is a schematic structural diagram of a soil penetration and destruction test system for a foundation pit support and water-stopping system provided in an embodiment of the present invention.
[0032] Figure 2 It is a schematic structural diagram of a leakage simulation component of a support and water-stopping system provided in an embodiment of the present invention.
[0033] Figure 3 It is a schematic structural diagram of a test soil sample simulation device provided in an embodiment of the present invention.
[0034] Explanation of the reference numerals in the accompanying drawings: 1. Water supply tank; 2. Constant water head; 3. Peristaltic pump; 4. Water supply hose; 5. Water outlet hose; 6. Metal load-bearing frame; 7. Pulley; 8. Wire rope; 9. Water inlet valve; 10. Water inlet chamber; 11. Partition partition; 12. Drainage chamber; 13. Water inlet area; 14. Water retaining partition; 15. Front soil sample filling area; 16. Leakage simulation part of support and water-stopping system; 17. Rear soil sample filling area; 18. Retaining partition; 19. Drainage area; 20. Pore water pressure sensor; 21. Flow meter; 22. Automatic data recorder; 23. Reserved outlet; 24. High-pixel camera; 25. Camera tripod; 26. Recovery water tank; 27. Linear leakage; 28. Reserved card slot. DETAILED DESCRIPTION
[0035] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0037] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0038] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0039] Figures 1 to 3 The present embodiment shows a soil penetration and damage test system for a foundation pit support and water-stopping system, comprising a test soil sample simulation device for simulating the penetration and damage of foundation pit soil under the condition of leakage of the support and water-stopping system, a water supply device for providing a test constant water head, a data monitoring device for real-time acquisition of high-precision pore water pressure and outlet flow at different parts of the foundation pit soil during the test, and a high-pixel image acquisition device for real-time shooting of soil displacement at different parts of the foundation pit.
[0040] The test soil sample simulation device is provided with a water inlet area 13 and a soil sample area. A support water-stopping system leakage simulation component 16 is installed in the soil sample area. The support water-stopping system leakage simulation component 16 divides the soil sample area into a front soil sample filling area 15 and a rear soil sample filling area 17. The height of the water inlet area 13 is not lower than the height of the soil sample area, and the support water-stopping system leakage simulation component 16 is not lower than the height of the water inlet area 13. A drainage area 19 is provided on the side of the soil sample area away from the water inlet area 13, and a retaining partition 18 is installed between the drainage area 19 and the soil sample area. A reserved outlet 23 is also provided in the drainage area 19, and the bottom of the reserved outlet 23 is connected to a recovery water tank 26 through a pipeline.
[0041] In this embodiment, the test soil sample simulation device is made of a transparent acrylic plate. The thickness of the acrylic plate is 2 cm, the model size of the water inlet area 13 is 24 cm long, 30 cm wide, and 120 cm high, and the size of the front soil sample filling area 15 is 50 cm long, 30 cm wide, and 120 cm high. A water retaining baffle 14 is installed between the water inlet area 13 and the soil sample area, so that the water in the water inlet area 13 can overflow to the soil sample area through the water retaining baffle 14, and the soil sample is filled by the underwater dumping method. The water retaining baffle 14 is made of a transparent acrylic plate, with a height of 50 cm and a thickness of 3 cm. The size of the rear soil sample filling area is 50 cm long, 30 cm wide, and 60 cm high, and the size of the drainage area 19 is 10 cm long, 30 cm wide, and 60 cm high. The test soil sample filled in the soil sample area is made of soil samples obtained from the foundation pit project site to be simulated, ensuring that the particle gradation curve of the soil is consistent with the site. The soil sample sizes of the front and rear soil sample filling areas are 50 cm long, 30 cm wide, and 45 cm high. A retaining baffle 18 is installed between the rear soil sample filling area 17 and the water outlet area on the rear side of the support and water-stopping system leakage simulation part 16, and the filling height of the test soil sample should be slightly smaller than the retaining baffle 18. The retaining baffle 18 is made of a transparent acrylic plate with a thickness of 3 cm and a height of 46 cm. The support and water-stopping system leakage simulation part 16 is made of a transparent acrylic plate with a thickness of 3 cm and a depth of 105 cm. In this embodiment, the curtain leakage type adopts a linear leakage 27, which is 3 cm long, 20 cm wide, and 1 cm high. The installation position of the linear leakage 27 is located in the middle position of the depth direction of the test soil sample. The leakage position on the support and water-stopping system leakage simulation part 16 is located below the soil layer. The support and water-stopping system leakage simulation part 16 is installed in the reserved card slot 28 on the inner wall of the test soil sample simulation device, and the depth of the reserved card slot 28 is not less than three centimeters. After the support and water-stopping system leakage simulation part 16 is installed in the reserved card slot 28, waterproof latex is applied to the installation gap to prevent water seepage and leakage. The material for making the support and water-stopping system leakage simulation part 16 can also be a concrete prefabricated part with a smaller permeability coefficient.
[0042] The water supply device includes a lifting component and a water delivery component installed on the lifting component. The lifting component is suitable for driving the water delivery component to lift and lower. One end of the water delivery component is connected to a water supply part, and the other end is connected to the bottom of the water inlet area 13. The water supply part, the water inlet area 13 and the water delivery component are all connected through a water supply hose 4. A water inlet valve 9 is installed on the water supply hose 4 between the water inlet area 13 and the water delivery component, and a peristaltic pump 3 is installed on the hose between the water supply part and the water delivery component. The water supply part in this embodiment uses a water supply tank 1. In some other embodiments, the water supply part can also be a municipal water supply. The water delivery component includes a water storage tank as a water storage part and a fixed water head 2 installed on the top of the water storage tank. A partition 11 is installed in the water storage tank. The partition 11 divides the inner cavity of the water storage part into a water inlet chamber 10 and a drainage chamber 12. The water supply tank 1 and the water inlet area 13 are both connected to the water inlet chamber 10. A water outlet hose 5 is connected between the drainage chamber 12 and the water supply tank 1. The lifting assembly comprises a fixed pulley 7 and a steel wire rope 8 as a flexible traction member wound around the fixed pulley 7, and the water supply assembly is fixedly connected to one end of the steel wire rope 8. The fixed pulley 7 is fixedly mounted on the metal bearing frame 6.
[0043] The water supply tank 1 provided in this embodiment is made of a cylindrical bucket with a measuring range of 50 liters. The fixed water head 2 is made of transparent acrylic, and the water in the water inlet chamber 10 overflows from the partition 11 to the drainage chamber 12; the peristaltic pump 3 can pump the water in the water supply tank 1 to the water inlet chamber 10 through the water inlet of the water inlet chamber 10, and the water in the water inlet chamber 10 enters the water inlet area 13 of the test soil sample simulation device from the water inlet of the water inlet area 13. The water overflowing from the partition 11 to the drainage chamber 12 flows back to the water supply tank 1 from the drainage outlet of the drainage chamber 12, forming a water circulation system; the fixed water head 2 is suspended on the metal load-bearing frame 6 by a steel wire rope 8, and the steel wire rope 8 is pulled by a pulley 7 to realize the lifting and lowering of the device.
[0044] The data monitoring device includes a pore water pressure sensor 20, a flow meter 21 and a data automatic recorder 22. During the test, the soil sample area is filled with a test soil sample, and the pore water pressure sensor 20 is buried in the test soil sample. A plurality of pore water pressure sensors 20 are buried, and the plurality of pore water pressure sensors 20 are electrically connected to the data automatic recorder 22.
[0045] In this embodiment, the data monitoring device includes a high-precision pore water pressure sensor 20, a flow meter 21 and a data automatic recorder 22. The high-precision pore water pressure sensor 20 is installed on the side walls of the front soil sample filling area 15 and the rear soil sample filling area 17, and is installed by drilling without intrusion. The monitoring point spacing is 5cm, 10cm, and 15cm respectively. The signal collected by the pore water pressure sensor 20 is transmitted to the data automatic recorder 22 through a wire. The flow meter 21 is installed on the pipeline between the recovery water tank 26 and the reserved outlet 23. The flow meter 21 is used to record the flow data at the outlet of the recovery water tank 26 in real time.
[0046] The image acquisition device includes a high-pixel camera 24 and a camera tripod 25 for mounting the high-pixel camera 24. The high-pixel camera 24 is arranged toward the soil sample area, and is used to record the image data of the soil sample area in real time, capture the catastrophic evolution process of the foundation pit seepage damage in different test time periods, and use image analysis technology to support the displacement change law of the foundation pit soil on both sides of the leakage of the water-stopping system.
[0047] This embodiment also provides a soil penetration damage test method for a foundation pit support and waterproofing system, which is performed using the soil penetration damage test system for a foundation pit support and waterproofing system provided by this embodiment, and includes the following steps:
[0048] Obtain soil samples from the foundation pit project as test soil samples, and use the test soil samples to fill the soil sample area; obtain soil samples, stratigraphic data and support and water-stopping system structure information from the foundation pit project, use an oven to dry the on-site soil samples, measure the physical and mechanical parameters and particle grading curves of the soil samples, and install the support and water-stopping system leakage simulation component 16 in the test soil sample simulation device.
[0049] Start the water supply assembly to supply water to the water inlet area 13, and let the water overflow to the soil sample area, so that the water surface height is higher than the first preset height of the upper surface of the test soil sample, use the underwater dumping method to mix the soil sample evenly and fill it to the second preset height, compact the test soil sample and let it stand for the first preset time, repeat the above operations in this step until the test soil sample height reaches the third preset height, and let it stand for the second preset time. Specifically, open the peristaltic pump 3 and the water inlet valve 9, connect the water inlet chamber 10 of the water supply assembly and the water inlet area 13 of the test soil sample simulation device, so that the water level in the water inlet area 13 rises to the overflow height, overflows to the front soil sample filling area 15 by five centimeters, close the water inlet valve 9, and then use the underwater dumping method to mix the soil sample evenly and fill it by five centimeters, compact it and let it stand for a period of time. Reopen the water inlet valve 9, repeat the above operations until the test soil sample reaches the predetermined height and is saturated and left for twenty-four hours.
[0050] Raise the height of the water supply assembly to allow water to automatically flow from the water supply assembly into the water inlet area 13, observe and record the migration patterns of the test soil samples in the front soil sample filling area 15 and the rear soil sample filling area 17 at the current height of the water supply assembly, and at the same time, observe and record the flow changes in the drainage area 19. Repeat the above operations in this step until the test soil sample in the rear soil sample filling area 17 is significantly uplifted, and the outlet flow in the water outlet area is significantly increased, that is, it is judged that the foundation pit soil has undergone seepage damage. Specifically, turn on the high-precision pore water pressure sensor 20, high-pixel camera 24, flow meter 21 and data automatic recorder 22 at each monitoring point, lift the water supply assembly to 5-20cm, stabilize for a period of time, and observe the migration patterns of the soil samples on both sides of the support water-stopping system leakage simulation component 16 and the flow changes in the water outlet area at the height of the water supply assembly. Repeat the above operation, gradually raise the height of the water supply assembly until the test soil sample in the rear soil sample filling area 17 behind the support water-stopping system leakage simulation component 16 is obviously uplifted, and the outlet flow rate of the water outlet area is significantly increased, that is, it is judged that the foundation pit soil has infiltration damage. Then gradually lower the height of the fixed water supply assembly to the initial position, and finally close the peristaltic pump 3 and the water inlet valve 9 in the water supply device.
[0051] The pore water pressure, outlet flow rate and soil displacement images of the foundation pit soil at different test stages and locations in the data automatic recorder are exported, the leakage simulation component 16 of the support and water-stopping system is taken out, the test device system is cleaned, and preparations are made for the next foundation pit penetration damage test.
[0052] The foundation pit support and waterproofing system soil penetration and destruction test system provided in this embodiment can monitor the pore water pressure change curves of different parts of the foundation pit soil and the support and waterproofing system leakage simulation part 16 in real time and accurately by setting a high-precision pore water pressure sensor 20 on the side wall of the test soil sample simulation device. The soil particle migration and surface uplift conditions before and after the leakage can be observed and obtained in all directions through the transparent acrylic plate model and the high-pixel camera 24. At the same time, the flow meter 21 set at the outlet of the water outlet area can more accurately determine the flow change law and the starting point of the foundation pit penetration and destruction. In general, the test device of the present invention has a simple structure, a simple and clear test method, and a safe and convenient test operation process. The support and waterproofing system leakage simulation part 16 can be set according to the actual accident project to set different leakage types and leakage depths such as point leakage, linear leakage 27 and surface leakage, and has the advantages of flexible layout and multiple reuse. The depth and thickness of the curtain can be reduced in proportion to the foundation pit project, and the type and area of curtain leakage can be determined based on the on-site survey using geophysical exploration technology or ultrasonic imaging computer tomography (CT) technology. The high-precision pore water pressure sensor 20, high-pixel camera 24 and flow meter 21 can accurately analyze the development process of the seepage damage test, get rid of the error caused by the traditional reliance on calipers to measure soil displacement, and accurately analyze the evolution process of the stratum seepage damage disaster at each stage under the condition of foundation pit leakage, making the test results more accurate and the test data richer and more detailed. The test soil sample simulation device can simulate the formation seepage damage accidents caused by leakage under the foundation pit support and water-stopping system under different formation conditions and environmental conditions such as single-layer homogeneous foundation, double-layer or multi-layer heterogeneous foundation, revealing the influence of the leakage of the support and water-stopping system on the formation seepage damage, and providing an experimental and data basis for the subsequent in-depth numerical simulation of foundation pit seepage damage under the condition of support and water-stopping system leakage based on the theory of dominant flow.
[0053] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A soil penetration and damage test system for foundation pit support and water-stopping system, characterized in that: include: A test soil sample simulation device, wherein a water inlet area (13) and a soil sample area are arranged inside the device, a support water-stopping system leakage simulation component (16) is installed in the soil sample area, the support water-stopping system leakage simulation component (16) divides the soil sample area into a front soil sample filling area (15) and a rear soil sample filling area (17), the height of the water inlet area (13) is not lower than the height of the soil sample filled in the soil sample area, and the support water-stopping system leakage simulation component (16) is not lower than the height of the water inlet area (13); A water supply device, comprising a lifting assembly and a water delivery assembly mounted on the lifting assembly, the lifting assembly being suitable for driving the water delivery assembly to move up and down, one end of the water delivery assembly being connected to a water supply component, and the other end being connected to the water inlet area (13), the water supply component and the water inlet area (13) being connected to the water delivery assembly via a water supply hose (4); A data monitoring device, comprising a pore water pressure sensor (20), a flow meter (21) and an automatic data recorder (22), for recording the pore water pressure in the test soil sample and the flow rate at a reserved outlet (23) of the drainage area; The image acquisition device comprises a high-pixel camera (24) and a camera tripod (25) for mounting the high-pixel camera (24); the high-pixel camera (24) is arranged toward the soil sample area and is used to record image data of the soil sample area in real time during the test process.
2. The soil penetration and damage test system for foundation pit support and waterproofing system according to claim 1 is characterized in that: A drainage area (19) is arranged on the side of the soil sample area away from the water inlet area (13), and a retaining baffle (18) is installed between the drainage area (19) and the soil sample area, wherein the height of the retaining baffle (18) is higher than the height of the filled soil sample.
3. The soil penetration and damage test system for foundation pit support and waterproofing system according to claim 2 is characterized in that: A reserved outlet (23) is also provided in the drainage area (19), and a flow meter (21) is installed outside the reserved outlet (23).
4. The soil penetration failure test system for foundation pit support and waterproofing system according to any one of claims 1 to 3, characterized in that: The support and waterproofing system leakage simulation component (16) is suitable for the working condition where the leakage position of the foundation pit support and waterproofing system is located below the soil layer.
5. The soil penetration and damage test system for foundation pit support and waterproofing system according to any one of claims 1 to 3, characterized in that: The water supply component comprises a water storage component, in which a partition plate (11) is installed, and the partition plate (11) divides the inner cavity of the water storage component into a water inlet chamber (10) and a water discharge chamber (12), and the water supply component and the water inlet area (13) are both connected to the water inlet chamber (10).
6. The soil penetration and damage test system for foundation pit support and waterproofing system according to any one of claims 1 to 3, characterized in that: The lifting component comprises a fixed pulley (7) and a flexible traction member wound around the fixed pulley (7), and the water delivery component is fixedly connected to one end of the flexible traction member.
7. The soil penetration failure test system for foundation pit support and waterproofing system according to any one of claims 1 to 3, characterized in that: The soil sample area is filled with a test soil sample, and the pore water pressure sensor (20) is buried in the test soil sample.
8. The soil penetration and damage test system for foundation pit support and waterproofing system according to claim 7 is characterized in that: A plurality of the pore water pressure sensors (20) are buried, and the plurality of the pore water pressure sensors (20) are all electrically connected to the data automatic recorder (22).
9. A soil penetration failure test method for foundation pit support and waterproofing system, characterized in that: The soil penetration failure test system for foundation pit support and waterproofing system according to any one of claims 1 to 8 comprises the following steps: Obtain soil samples from the foundation pit project site as test soil samples, and use the test soil samples to fill the soil sample area; The water supply assembly is started to supply water to the water inlet area (13), and the water is allowed to overflow into the soil sample area, so that the water surface height is higher than a first preset height of the upper surface of the test soil sample, the soil sample is stirred evenly by an underwater dumping method and filled to a second preset height, the test soil sample is compacted and left to stand for a first preset time, and the above operations in this step are repeated until the test soil sample reaches a third preset height and is left to stand for a second preset time; The water supply assembly is raised to allow water to automatically flow from the water supply assembly into the water inlet area (13). The migration pattern of the test soil samples in the front soil sample filling area (15) and the rear soil sample filling area (17) at the current height of the water supply assembly is observed and recorded. The above operation in this step is repeated until the test soil sample in the rear soil sample filling area (17) is obviously raised, which means that the foundation pit soil is judged to have undergone seepage damage.
10. The soil penetration failure test method of foundation pit support and waterproofing system according to claim 9 is characterized in that: While observing and recording the migration regularity of the test soil samples in the front soil sample filling area (15) and the rear soil sample filling area (17) at the current water supply component height, the flow rate changes in the drainage area (19) are observed and recorded.
Citation Information
Cited By
Foundation pit support waterproof system soil body seepage failure test system and foundation pit support waterproof system soil body seepage failure test method
CN120028216A
A soil penetration damage test system and method for foundation pit support and waterproofing system
CN120028216B