Metering device remote detection method and device and terminal equipment

The remote detection method obtains and analyzes a variety of data from the metering device and automatically judges the detection results, solving the problem of inefficiency of the traditional detection method, improving the detection efficiency and data reliability of the metering device, and reducing the amount loss.

CN119024255AActive Publication Date: 2024-11-26GUANGDONG POWER GRID CO LTD +1

Patent Information

Application Number
CN202411260868.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-26
Estimated Expiration
2044-09-10

AI Technical Summary

Technical Problem

The traditional metrology device detection method is inefficient and cannot detect the measurement misalignment problems in a timely manner, resulting in the loss of amounts and complicated handling.

Method used

Provide a remote detection method of metering device, by obtaining historical row kilowatt-hour power data, forward active meter code data, reverse active meter code data, main meter power consumption data, sub-meter power consumption data, and built-in power meter Clock data, zero-point table code data and frozen table code data are automatically detected to determine the detection result of the metering device.

Benefits of technology

It realizes automated data acquisition, improves detection efficiency, reduces manual errors, promptly detects metrological abnormalities, and reduces amount losses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119024255A_ABST
    Figure CN119024255A_ABST
Patent Text Reader

Abstract

The invention discloses a remote detection method and device for a metering device and terminal equipment. The method comprises the following steps: acquiring historical row-degree electric quantity data; judging whether the historical row-degree electric quantity data is zero or not, and if yes, determining that the detection result is no load; otherwise, obtaining plant-station forward active total meter code data, plant-station reverse active total meter code data, plant-station main meter electric energy consumption data, plant-station auxiliary meter electric energy consumption data, plant-station electric energy meter built-in clock data, plant-station zero meter code data and plant-station frozen meter code data; power consumption data of the plant-station total meter code and power consumption data of each plant-station sub-meter code; and performing loop detection main and auxiliary meter electric quantity comparison detection, clock detection, freezing time detection and total time-sharing meter code comparison detection, and when each result is normal, determining that the detection result is normal, otherwise, determining that the detection result is abnormal. According to the invention, automatic data acquisition is realized, data reliability is improved, manual errors are reduced, and inspection efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric energy metering detection, and in particular to a remote detection method, device and terminal equipment for a metering device. Background Art

[0002] Traditional metering device inspection work usually requires personnel to go to the electricity consumption site to complete it, which is infrequent and takes a long time, which is not conducive to timely detection and treatment of metering inaccuracy. Once the metering inaccuracy problem is discovered later, the related amount will be more, and it will be more complicated to deal with. In addition, the traditional metering device inspection method is inefficient and cannot detect metering inaccuracy problems in a timely manner. Summary of the invention

[0003] The present invention provides a remote detection method, device and terminal equipment for a metering device, so as to solve the technical problems of low detection efficiency and high error rate in the prior art.

[0004] In order to solve the above technical problems, an embodiment of the present invention provides a remote detection method for a metering device, comprising:

[0005] In the case where the metering device to be detected is a plant metering device, obtaining historical power consumption data of the plant metering device within a first preset time period;

[0006] Determine whether the historical electric quantity data are all zero. If so, determine that the detection result of the plant metering device is no load. If not, obtain the plant forward active total meter code data, the plant reverse active total meter code data, the plant main meter electric energy consumption data, the plant auxiliary meter electric energy consumption data, the plant electric energy meter built-in clock data, the plant zero meter code data, the plant frozen meter code data, the plant total meter code electric energy consumption data and the electric energy consumption data of each plant sub-meter code of the plant metering device;

[0007] Determine the plant station loop detection result according to the plant station forward active total meter code data and the plant station reverse active total meter code data; determine the main and sub-meter power comparison detection result according to the plant station main meter power consumption data and the plant station sub-meter power consumption data; determine the plant station clock detection result according to the plant station power meter built-in clock data; determine the plant station freezing time detection result according to the plant station zero point meter code data and the plant station freezing meter code data; determine the plant station total time meter code comparison detection result according to the plant station total meter code power consumption data and the power consumption data of each plant station sub-meter code;

[0008] When the plant station circuit detection result, the main and sub-meter power comparison detection result, the plant station clock detection result, the plant station freeze time detection result and the plant station total time-sharing meter code comparison detection result are all normal, it is determined that the detection result of the plant station metering device is normal; if not, it is determined that the detection result of the plant station metering device is abnormal.

[0009] As a preferred solution, before obtaining the first historical electric quantity data of the plant metering device within the first preset time period, the method further includes:

[0010] Get the plant operation status;

[0011] Determine whether the plant operation state is a shutdown state; if so, the detection result of the plant metering device is shutdown, and the detection is stopped; if not, continue the detection;

[0012] Determining the plant station loop detection result according to the plant station forward active total meter code data and the plant station reverse active total meter code data includes:

[0013] According to the forward active total meter code data and the reverse active total meter code data of the plant station, it is determined whether the 10kV outgoing line, 10kV station transformer, 10kV power transformer and 10kV arc extinguishing device in the plant station are all reverse active; if so, it is determined that the plant station circuit detection result is abnormal; if not, then

[0014] Determine whether the 10kV capacitor bank and 35kV reactor in the plant are both in the forward reactive direction, or both in the reverse active direction, or both in the forward active direction; if so, determine that the plant circuit detection result is abnormal; if not, then

[0015] Determine whether the 10kV main transformer and 35kV transformer in the plant are both active in the positive direction; if so, the plant circuit detection result is abnormal; if not, then

[0016] Determine whether the 500kV main transformer, 220kV main transformer, 110kV main transformer and 35kV main transformer in the plant are all reverse active; if so, determine that the plant circuit detection result is abnormal; if not, then

[0017] Determine whether the 500kV main transformer, 220kV main transformer and 110kV main transformer in the plant are all in positive active mode. If so, determine that the plant circuit detection result is abnormal; if not, then

[0018] Determine whether the 500kV main transformer, 220kV main transformer, 110kV main transformer, 35kV main transformer and 10kV main transformer in the plant are all active in the positive direction; if so, determine that the plant circuit detection result is abnormal; if not, determine that the plant circuit detection result is normal;

[0019] The step of determining the comparison test result of the main and auxiliary meters according to the power consumption data of the main meter of the power plant and the power consumption data of the auxiliary meter of the power plant includes:

[0020] Calculate the difference between the power consumption data of the main meter of the power plant and the power consumption data of the auxiliary meter of the power plant;

[0021] Determine whether the difference between the power consumption of the first main and secondary meters exceeds a preset first preset difference; if so, determine that the power comparison test result of the main and secondary meters is abnormal; if not, determine that the power comparison test result of the main and secondary meters is normal;

[0022] Determining the plant station clock detection result according to the built-in clock data of the plant station electric energy meter includes:

[0023] Determine whether the built-in clock data of the power meter of the plant station is inconsistent with the actual time; if so, determine that the detection result of the plant station clock is abnormal; if not, determine that the detection result of the plant station clock is normal;

[0024] The step of determining the plant station freezing time detection result according to the plant station zero point table code data and the plant station freezing table code data comprises:

[0025] Determine whether the plant station zero point table code data and the plant station freezing table code data are not equal; if so, determine that the plant station freezing time detection result is abnormal; if not, determine that the plant station freezing time detection result is normal;

[0026] The step of determining the comparison test result of the total time-division meter code of the plant station according to the total meter code power consumption data of the plant station and the power consumption data of each sub-meter code of the plant station includes:

[0027] Determine whether the sum of the power consumption data of the total meter code of the plant station and the power consumption data of each of the sub-meter codes of the plant station are not equal; if so, determine that the comparison test result of the total time-sharing meter code of the plant station is abnormal; if not, determine that the comparison test result of the total time-sharing meter code of the plant station is normal;

[0028] Among them, the reverse active power means that the flow direction of reactive electric energy is the direction of flowing into the bus; the forward reactive power means that the flow direction of reactive electric energy is the direction of flowing out of the bus; the reverse active power means that the flow direction of active electric energy is the direction of flowing into the bus; the forward active power means that the flow direction of active electric energy is the direction of flowing out of the bus.

[0029] As a preferred solution, the remote detection method of the metering device further includes:

[0030] When the metering device to be detected is a special variable metering device, obtaining the user's operating status;

[0031] Determine whether the user operation state is in a shutdown state; if so, the detection result of the special transformer metering device is shutdown, and the detection is stopped; if not, obtain the special transformer three-phase current of the special transformer metering device;

[0032] Determine whether the three-phase currents of the special transformer are all less than the preset first current threshold; if so, the detection result of the special transformer metering device is no load; if not, obtain the special transformer A phase voltage, special transformer B phase voltage, special transformer C phase voltage, special transformer A phase current, special transformer B phase current, special transformer C phase current, the special transformer data items corresponding to the second largest value data of the current of the special transformer metering device in the second preset time period, the special transformer electric energy meter built-in clock data, special transformer zero point table code data, special transformer frozen table code data, special transformer total table code electric energy consumption data and each special transformer sub-table code electric energy consumption data; wherein, the special transformer data items include: voltage, current, active power, reactive power and power factor;

[0033] Determine the detection result of the special transformer circuit according to the special transformer A phase voltage, the special transformer B phase voltage, the special transformer C phase voltage, the special transformer A phase current, the special transformer B phase current, and the special transformer C phase current; determine the special transformer load detection result according to the special transformer data item corresponding to the second maximum current value data in the second preset time period; determine the special transformer clock detection result according to the built-in clock data of the special transformer electric energy meter; determine the special transformer freezing time detection result according to the special transformer zero point table code data and the special transformer freezing table code data; determine the special transformer total time table code comparison detection result according to the special transformer total table code electric energy consumption data and the electric energy consumption data of each special transformer sub-meter code;

[0034] When the special transformer circuit detection result, the special transformer load detection result, the special transformer clock detection result, the special transformer freeze time detection result and the special transformer total time table code comparison detection result are all normal, it is determined that the detection result of the special transformer metering device is normal; if not, it is determined that the detection result of the special transformer metering device is abnormal.

[0035] As a preferred solution, the special transformer circuit detection result is determined according to the special transformer A phase voltage, the special transformer B phase voltage, the special transformer C phase voltage, the special transformer A phase current, the special transformer B phase current, and the special transformer C phase current, including:

[0036] Calculating the phase angle of the special transformer A phase according to the phase voltage of the special transformer A phase and the phase current of the special transformer A phase;

[0037] Calculating the phase angle of the special transformer B phase according to the phase voltage of the special transformer B phase and the phase current of the special transformer B phase;

[0038] Calculating the phase angle of the special transformer C phase according to the phase voltage of the special transformer C phase and the phase current of the special transformer C phase;

[0039] If the power system corresponding to the special transformer metering device is a three-phase four-wire system, it is determined whether at least one of the special transformer A phase angle, the special transformer B phase angle and the special transformer C phase angle is within a preset first angle range; if so, it is determined that the special transformer circuit detection result is abnormal; if not, it is determined that the special transformer circuit detection result is normal;

[0040] If the power system corresponding to the dedicated transformer metering device is a three-phase three-wire system, it is determined whether the phase angle of the dedicated transformer A phase is within the preset second angle range; if so, it is determined that the detection result of the dedicated transformer circuit is abnormal; if not, then

[0041] Determine whether the phase angle of the special transformer C phase is within a preset third angle range; if so, determine that the detection result of the special transformer circuit is abnormal; if not, determine that the detection result of the special transformer circuit is normal;

[0042] The determining of the special transformer load detection result according to the special transformer data item corresponding to the second largest current value data within the second preset time period includes:

[0043] According to the special transformer data item, determine whether there is a current abnormality, a voltage abnormality or a power abnormality; if so, determine that the special transformer load detection result is abnormal; if not, determine that the special transformer load detection result is normal;

[0044] The step of determining the special transformer clock detection result according to the built-in clock data of the special transformer electric energy meter comprises:

[0045] Determine whether the built-in clock data of the special transformer electric energy meter is inconsistent with the actual time; if so, determine that the detection result of the special transformer clock is abnormal; if not, determine that the detection result of the special transformer clock is normal;

[0046] The step of determining the special transformer freezing time detection result according to the special transformer zero point table code data and the special transformer freezing table code data comprises:

[0047] Determine whether the special transformer zero point table code data and the special transformer freezing table code data are not equal; if so, determine that the special transformer freezing time detection result is abnormal; if not, determine that the special transformer freezing time detection result is normal;

[0048] The method of comparing the detection result of the total time-divided table code of the special transformer according to the total table code power consumption data of the special transformer and the power consumption data of each of the special transformer time-divided table codes comprises:

[0049] Determine whether the sum of the electric energy consumption data of the special transformer total meter code and the electric energy consumption data of each special transformer sub-meter code is not equal; if so, determine that the comparison test result of the special transformer total time-sharing meter code is abnormal; if not, determine that the comparison test result of the special transformer total time-sharing meter code is normal.

[0050] As a preferred solution, the remote detection method of the metering device further includes:

[0051] When the metering device to be detected is a public transformer metering device, obtaining the operation status of the station area;

[0052] Determine whether the operation state of the transformer area is a shutdown state; if so, the detection result of the public transformer metering device is shutdown, and the detection is stopped; if not, obtain the public transformer three-phase current of the public transformer metering device;

[0053] Determine whether the three-phase currents of the public transformer are all less than the preset second current threshold; if so, the detection result of the public transformer metering device is no load; if not, obtain the public transformer A phase voltage, public transformer B phase voltage, public transformer C phase voltage, public transformer A phase current, public transformer B phase current, public transformer C phase current, the public transformer data items corresponding to the second largest current value data of the public transformer metering device in the second preset time period, the public transformer electric energy meter built-in clock data, the public transformer reverse active total table code first data, the public transformer reverse active total table code second data, the public transformer total table code electric energy consumption data and the electric energy consumption data of each public transformer sub-table code; wherein the public transformer data items include: voltage, current, active power, reactive power and power factor; the public transformer reverse active total table code first data is the data corresponding to the public transformer reverse active total table code at the preset first time point; the public transformer reverse active total table code second data is the data corresponding to the public transformer reverse active total table code at the preset second time point;

[0054] Determine the public transformer circuit detection result according to the public transformer A phase voltage, the public transformer B phase voltage, the public transformer C phase voltage, the public transformer A phase current, the public transformer B phase current and the public transformer C phase current; determine the public transformer load detection result according to the public transformer data item corresponding to the second maximum current value data in the second preset time period; determine the public transformer clock detection result according to the built-in clock data of the public transformer electric energy meter; determine the public transformer freezing time detection result according to the first data of the public transformer reverse active total table code and the second data of the public transformer reverse active total table code; determine the public transformer total time table code comparison detection result according to the public transformer total table code electric energy consumption data and the electric energy consumption data of each public transformer sub-table code;

[0055] If the public transformer circuit detection result, the public transformer load detection result, the public transformer clock detection result, the public transformer freeze time detection result and the public transformer total time table code comparison detection result are all normal, it is determined that the detection result of the public transformer metering device is normal; if not, it is determined that the detection result of the public transformer metering device is abnormal.

[0056] As a preferred solution, determining the public transformer circuit detection result according to the public transformer A phase voltage, the public transformer B phase voltage, the public transformer C phase voltage, the public transformer A phase current, the public transformer B phase current and the public transformer C phase current includes:

[0057] Calculating the phase angle of the public transformer A phase according to the phase voltage of the public transformer A phase and the phase current of the public transformer A phase;

[0058] Calculating the phase angle of the public transformer B phase according to the phase voltage of the public transformer B phase and the phase current of the public transformer B phase;

[0059] Calculating the phase angle of the public transformer C phase according to the phase voltage of the public transformer C phase and the phase current of the public transformer C phase;

[0060] The step of determining the public variable load detection result according to the public variable data item corresponding to the second largest current value data within the second preset time period includes:

[0061] If the power system corresponding to the public transformer metering device is a three-phase four-wire system, it is determined whether at least one phase angle among the public transformer A phase angle, the public transformer B phase angle and the public transformer C phase angle is within a preset first angle range; if so, it is determined that the public transformer circuit detection result is abnormal; if not, it is determined that the public transformer circuit detection result is normal;

[0062] If the power system corresponding to the public transformer metering device is a three-phase three-wire system, it is determined whether the phase angle of the public transformer phase A is within the preset second angle range; if so, it is determined that the public transformer circuit detection result is abnormal; if not, then

[0063] Determine whether the phase angle of the public transformer C phase is within a preset third angle range; if so, determine that the public transformer circuit detection result is abnormal; if not, determine that the public transformer circuit detection result is normal;

[0064] The step of determining the public transformer clock detection result according to the built-in clock data of the public transformer electric energy meter includes:

[0065] Determine whether the built-in clock data of the public transformer electric energy meter is inconsistent with the actual time; if so, determine that the public transformer clock detection result is abnormal; if not, determine that the public transformer clock detection result is normal;

[0066] The method of determining the public transformer freezing time detection result according to the first data of the public transformer reverse active power total table code and the second data of the public transformer reverse active power total table code comprises:

[0067] Calculating the reverse running difference between the first data of the total table code of reverse active power of the public transformer and the second data of the total table code of reverse active power of the public transformer;

[0068] Determine whether the reverse walking difference is not zero; if so, determine that the public variable freezing time detection result is abnormal; if not, determine that the public variable freezing time detection result is normal;

[0069] The step of determining the comparison test result of the public variable total hourly table code according to the public variable total table code power consumption data and the power consumption data of each public variable hourly table code comprises:

[0070] Determine whether the sum of the power consumption data of the public variable total table code and the power consumption data of each public variable sub-table code is not equal; if so, determine that the public variable total sub-table code comparison test result is abnormal; if not, determine that the public variable total sub-table code comparison test result is normal.

[0071] As a preferred solution, the remote detection method of the metering device further includes:

[0072] When the metering device to be detected is a low-voltage metering device, the built-in clock data of the low-voltage electric energy meter, the low-voltage zero point meter code data, the low-voltage frozen meter code data, the low-voltage total meter code electric energy consumption data and the electric energy consumption data of each low-voltage sub-meter code are obtained;

[0073] Determine the low-voltage clock detection result according to the built-in clock data of the low-voltage electric energy meter; determine the low-voltage freezing time detection result according to the low-voltage zero point meter code data and the low-voltage freezing meter code data; determine the low-voltage total time meter code comparison detection result according to the low-voltage total meter code electric energy consumption data and the electric energy consumption data of each low-voltage sub-meter code;

[0074] When the low-voltage clock detection result, the low-voltage freezing time detection result and the low-voltage total time table code comparison detection result are all normal, the detection result of the low-voltage metering device is determined to be normal. If not, the detection result of the low-voltage metering device is determined to be abnormal.

[0075] As a preferred solution, determining the low-voltage clock detection result according to the built-in clock data of the low-voltage electric energy meter includes:

[0076] Determine whether the built-in clock data of the low-voltage electric energy meter is inconsistent with the actual time; if so, determine that the low-voltage clock detection result is abnormal; if not, determine that the low-voltage clock detection result is normal;

[0077] The step of determining the low-pressure freezing time detection result according to the low-pressure zero point table code data and the low-pressure freezing table code data comprises:

[0078] Determine whether the low-pressure zero point table code data and the low-pressure freezing table code data are not equal; if so, determine that the low-pressure freezing time detection result is abnormal; if not, determine that the low-pressure freezing time detection result is normal;

[0079] The step of determining the low voltage total time meter code comparison test result according to the low voltage total meter code power consumption data and the power consumption data of each low voltage sub-meter code comprises:

[0080] Determine whether the sum of the low-voltage total meter code power consumption data and the power consumption data of each low-voltage sub-meter code is not equal; if so, determine that the low-voltage total time-sharing meter code comparison test result is abnormal; if not, determine that the low-voltage total time-sharing meter code comparison test result is normal.

[0081] Based on the above embodiment, another embodiment of the present invention provides a remote detection device for a metering device, including: a data acquisition module and a detection module;

[0082] The data acquisition module, when the metering device to be detected is a plant metering device, acquires the historical electric quantity data of the plant metering device within a first preset time period; when the historical electric quantity data is not all zero, acquires the plant forward active total meter code data, the plant reverse active total meter code data, the plant main meter electric energy consumption data, the plant auxiliary meter electric energy consumption data, the plant electric energy meter built-in clock data, the plant zero meter code data, the plant frozen meter code data, the plant total meter code electric energy consumption data and the electric energy consumption data of each plant sub-meter code of the plant metering device;

[0083] The detection module determines whether the historical power data are all zero. If so, it is determined that the detection result of the plant metering device is no load. If not, the plant circuit detection result is determined according to the forward active total meter code data and the reverse active total meter code data of the plant; the main and auxiliary meter power comparison detection result is determined according to the power consumption data of the main meter of the plant and the power consumption data of the auxiliary meter of the plant; the plant clock detection result is determined according to the built-in clock data of the power meter of the plant; the zero point meter code data and the power consumption data of the auxiliary meter of the plant are used to determine the detection result of the power meter of the plant; the detection result of the power meter of the plant is determined according to the zero point meter code data and the power consumption data of the auxiliary meter of the plant. The plant station freezes the meter code data to determine the plant station freezing time detection result; according to the power consumption data of the plant station total meter code and the power consumption data of each plant station sub-meter code, the plant station total time-sharing meter code comparison detection result is determined; when the plant station loop detection result, the main and sub-meter power comparison detection result, the plant station clock detection result, the plant station freezing time detection result and the plant station total time-sharing meter code comparison detection result are all normal, it is determined that the detection result of the plant station metering device is normal, if not, it is determined that the detection result of the plant station metering device is abnormal.

[0084] Based on the above embodiments, another embodiment of the present invention provides a terminal device, which includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor. When the processor executes the computer program, the remote detection method of the metering device described in the above invention embodiment is implemented.

[0085] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0086] In the case that the metering device to be detected is a plant metering device, the present invention obtains the historical power data of the plant metering device within the first preset time period; determines whether the historical power data are all zero, if so, determines that the detection result of the plant metering device is no load, if not, obtains the plant forward active total meter code data, the plant reverse active total meter code data, the plant main meter power consumption data, the plant auxiliary meter power consumption data, the plant electric energy meter built-in clock data, the plant zero meter code data, the plant freeze meter code data, the plant total meter code power consumption data and the power consumption data of each plant sub-meter code; determines the plant loop detection result according to the plant forward active total meter code data and the plant reverse active total meter code data; and determines the power plant loop detection result according to the plant According to the power consumption data of the main meter of the station and the power consumption data of the sub-meter of the station, the power comparison test result of the main and sub-meters is determined; according to the built-in clock data of the power meter of the station, the clock test result of the station is determined; according to the zero point meter code data of the station and the freezing meter code data of the station, the freezing time test result of the station is determined; according to the power consumption data of the total meter code of the station and the power consumption data of each sub-meter code of the station, the total time-sharing meter code comparison test result of the station is determined; when the loop test result of the station, the power comparison test result of the main and sub-meters, the clock test result of the station, the freezing time test result of the station and the total time-sharing meter code comparison test result of the station are all normal, the test result of the metering device of the station is determined to be normal, if not, the test result of the metering device of the station is determined to be abnormal. The present invention realizes automatic data collection, improves data reliability, reduces manual errors, and improves inspection efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0087] Figure 1 It is a flow chart of a remote detection method of a metering device provided by an embodiment of the present invention;

[0088] Figure 2 The present invention is a schematic structural diagram of a remote detection device for a metering device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0089] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0090] Embodiment 1

[0091] Please refer to Figure 1 , is a flow chart of a remote detection method for a metering device provided by an embodiment of the present invention, comprising:

[0092] S1. When the metering device to be detected is a plant metering device, obtain historical power consumption data of the plant metering device within a first preset time period.

[0093] It should be noted that the first preset time is 6 months before the current moment.

[0094] In step S1, when the metering device to be detected is a plant metering device, the historical electric quantity data of the plant metering device within 6 months before the current time is obtained.

[0095] S2. Determine whether the historical electric quantity data are all zero. If so, determine that the detection result of the plant metering device is no load. If not, obtain the plant forward active total meter code data, the plant reverse active total meter code data, the plant main meter electric energy consumption data, the plant auxiliary meter electric energy consumption data, the plant electric energy meter built-in clock data, the plant zero meter code data, the plant frozen meter code data, the plant total meter code electric energy consumption data and the electric energy consumption data of each plant sub-meter code of the plant metering device.

[0096] It should be noted that the forward active meter code data of the plant station refers to the forward active meter code data counted by the plant station metering device; similarly, the total reverse active meter code data of the plant station, the power consumption data of the main meter of the plant station, the power consumption data of the auxiliary meter of the plant station, the built-in clock data of the power meter of the plant station, the zero point meter code data of the plant station, the frozen meter code data of the plant station, the total meter code power consumption data of the plant station and the power consumption data of each sub-meter code of the plant station are all relevant data counted by the plant station metering device.

[0097] In step S2, if the historical power data within 6 months are all zero, the no-load plant metering device detection result is directly generated. If the historical power data within 6 months is not zero, the data for monitoring is obtained.

[0098] When obtaining the data of the forward active power meter code of the data plant and the total reverse active power meter code of the data plant, take the data at 0:00 on the day. If the data is incomplete or the daily power on all lines in the substation is zero, trace back 1 day, and the maximum number of days to trace back is the preset number of days. The preset number of days can be adjusted, and the default is 10 days.

[0099] It should also be noted that the no-load test result indicates that the metering device cannot detect valid data, and no further judgment is made as to whether the metering device is abnormal. Manual inspection can be arranged later to find out the specific reason why the electricity data is zero.

[0100] S3. Determine the plant station loop detection result according to the plant station forward active total meter code data and the plant station reverse active total meter code data; determine the main and sub-meter power comparison detection result according to the plant station main meter power consumption data and the plant station sub-meter power consumption data; determine the plant station clock detection result according to the plant station power meter built-in clock data; determine the plant station freezing time detection result according to the plant station zero point meter code data and the plant station freezing meter code data; determine the plant station total time meter code comparison detection result according to the plant station total meter code power consumption data and the power consumption data of each plant station sub-meter code.

[0101] It should be noted that there are five inspection items for the inspection of plant and station metering devices, namely: plant and station circuit inspection, plant and station main and auxiliary meter power comparison inspection, plant and station clock inspection, plant and station freeze time inspection and plant and station total time and minute meter code comparison inspection.

[0102] S4. When the plant station circuit detection result, the main and sub-meter power comparison detection result, the plant station clock detection result, the plant station freeze time detection result and the plant station total time-sharing meter code comparison detection result are all normal, it is determined that the detection result of the plant station metering device is normal; if not, it is determined that the detection result of the plant station metering device is abnormal.

[0103] In a preferred embodiment, before obtaining the first historical electric quantity data of the plant metering device within the first preset time period, it also includes:

[0104] Get the plant operation status;

[0105] Determine whether the plant operation state is a shutdown state; if so, the detection result of the plant metering device is shutdown, and the detection is stopped; if not, continue the detection;

[0106] Determining the plant station loop detection result according to the plant station forward active total meter code data and the plant station reverse active total meter code data includes:

[0107] According to the forward active total meter code data and the reverse active total meter code data of the plant station, it is determined whether the 10kV outgoing line, 10kV station transformer, 10kV power transformer and 10kV arc extinguishing device in the plant station are all reverse active; if so, it is determined that the plant station circuit detection result is abnormal; if not, then

[0108] Determine whether the 10kV capacitor bank and 35kV reactor in the plant are both in the forward reactive direction, or both in the reverse active direction, or both in the forward active direction; if so, determine that the plant circuit detection result is abnormal; if not, then

[0109] Determine whether the 10kV main transformer and 35kV transformer in the plant are both active in the positive direction; if so, the plant circuit detection result is abnormal; if not, then

[0110] Determine whether the 500kV main transformer, 220kV main transformer, 110kV main transformer and 35kV main transformer in the plant are all reverse active; if so, determine that the plant circuit detection result is abnormal; if not, then

[0111] Determine whether the 500kV main transformer, 220kV main transformer and 110kV main transformer in the plant are all in positive active mode. If so, determine that the plant circuit detection result is abnormal; if not, then

[0112] Determine whether the 500kV main transformer, 220kV main transformer, 110kV main transformer, 35kV main transformer and 10kV main transformer in the plant are all active in the positive direction; if so, determine that the plant circuit detection result is abnormal; if not, determine that the plant circuit detection result is normal;

[0113] The step of determining the comparison test result of the main and auxiliary meters according to the power consumption data of the main meter of the power plant and the power consumption data of the auxiliary meter of the power plant includes:

[0114] Calculate the difference between the power consumption data of the main meter of the power plant and the power consumption data of the auxiliary meter of the power plant;

[0115] Determine whether the difference between the power consumption of the first main and secondary meters exceeds a preset first preset difference; if so, determine that the power comparison test result of the main and secondary meters is abnormal; if not, determine that the power comparison test result of the main and secondary meters is normal;

[0116] Determining the plant station clock detection result according to the built-in clock data of the plant station electric energy meter includes:

[0117] Determine whether the built-in clock data of the power meter of the plant station is inconsistent with the actual time; if so, determine that the detection result of the plant station clock is abnormal; if not, determine that the detection result of the plant station clock is normal;

[0118] The step of determining the plant station freezing time detection result according to the plant station zero point table code data and the plant station freezing table code data comprises:

[0119] Determine whether the plant station zero point table code data and the plant station freezing table code data are not equal; if so, determine that the plant station freezing time detection result is abnormal; if not, determine that the plant station freezing time detection result is normal;

[0120] The step of determining the comparison test result of the total time-division meter code of the plant station according to the total meter code power consumption data of the plant station and the power consumption data of each sub-meter code of the plant station includes:

[0121] Determine whether the sum of the power consumption data of the total meter code of the plant station and the power consumption data of each of the sub-meter codes of the plant station are not equal; if so, determine that the comparison test result of the total time-sharing meter code of the plant station is abnormal; if not, determine that the comparison test result of the total time-sharing meter code of the plant station is normal;

[0122] Among them, the reverse active power means that the flow direction of reactive electric energy is the direction of flowing into the bus; the forward reactive power means that the flow direction of reactive electric energy is the direction of flowing out of the bus; the reverse active power means that the flow direction of active electric energy is the direction of flowing into the bus; the forward active power means that the flow direction of active electric energy is the direction of flowing out of the bus.

[0123] In this embodiment, before obtaining the first historical power consumption data of the plant station metering device within the first preset time period, the plant station operating status must also be obtained; if the plant station operating status is shutdown, the detection result of the plant station metering device is shutdown, and the detection is stopped, that is, no subsequent operations are performed; if the plant station operating status is not shutdown, the detection continues, that is, the subsequent operations continue.

[0124] In the plant circuit detection, the total forward active power, total forward reactive power, total reverse active power and total reverse reactive power of the energy meter should follow the principle of taking the direction of flowing into the bus as the reverse direction and the direction of flowing out of the bus as the positive direction. If the following situations occur, the plant circuit detection result is abnormal, otherwise, the plant circuit detection result is normal. The following situations include:

[0125] (1) 10kV outgoing line, 10kV station transformer, 10kV power transformer, and 10kV arc extinguishing device are in "reverse active mode";

[0126] (2) 10kV capacitor bank and 35kV reactor operate in "forward reactive power", "reverse active power" or "forward active power" mode;

[0127] (3) 10kV main transformer goes low, 35kV goes low and goes “positive active”;

[0128] (4) 500kV main transformer high, 220kV main transformer high, 110kV main transformer high, 35kV main transformer high to go "reverse active";

[0129] (5) 500kV main transformer, 220kV main transformer and 110kV main transformer are in positive active mode;

[0130] (6) 500kV main transformer goes low, 220kV main transformer goes low, 110kV main transformer goes low, 35kV main transformer goes low, and 10kV main transformer goes low to perform “positive active power”.

[0131] In a preferred embodiment, the remote detection method of the metering device further includes:

[0132] When the metering device to be detected is a special variable metering device, obtaining the user's operating status;

[0133] Determine whether the user operation state is in a shutdown state; if so, the detection result of the special transformer metering device is shutdown, and the detection is stopped; if not, obtain the special transformer three-phase current of the special transformer metering device;

[0134] Determine whether the three-phase currents of the special transformer are all less than the preset first current threshold; if so, the detection result of the special transformer metering device is no load; if not, obtain the special transformer A phase voltage, special transformer B phase voltage, special transformer C phase voltage, special transformer A phase current, special transformer B phase current, special transformer C phase current, the special transformer data items corresponding to the second largest value data of the current of the special transformer metering device in the second preset time period, the special transformer electric energy meter built-in clock data, special transformer zero point table code data, special transformer frozen table code data, special transformer total table code electric energy consumption data and each special transformer sub-table code electric energy consumption data; wherein, the special transformer data items include: voltage, current, active power, reactive power and power factor;

[0135] Determine the detection result of the special transformer circuit according to the special transformer A phase voltage, the special transformer B phase voltage, the special transformer C phase voltage, the special transformer A phase current, the special transformer B phase current, and the special transformer C phase current; determine the special transformer load detection result according to the special transformer data item corresponding to the second maximum current value data in the second preset time period; determine the special transformer clock detection result according to the built-in clock data of the special transformer electric energy meter; determine the special transformer freezing time detection result according to the special transformer zero point table code data and the special transformer freezing table code data; determine the special transformer total time table code comparison detection result according to the special transformer total table code electric energy consumption data and the electric energy consumption data of each special transformer sub-meter code;

[0136] When the special transformer circuit detection result, the special transformer load detection result, the special transformer clock detection result, the special transformer freeze time detection result and the special transformer total time table code comparison detection result are all normal, it is determined that the detection result of the special transformer metering device is normal; if not, it is determined that the detection result of the special transformer metering device is abnormal.

[0137] In this embodiment, the metering device to be detected is a special transformer metering device, and the user's operating status is obtained. If the user's operating status is out of service, the detection result of the special transformer metering device is out of service, and the detection is stopped, that is, no subsequent operations are performed; if the user's operating status is not out of service, the special transformer three-phase current of the special transformer metering device is obtained.

[0138] If the three-phase current of the special transformer is less than the preset first current threshold, the detection result of the no-load special transformer metering device is directly generated. If the three-phase current of the special transformer is less than the preset first current threshold, the data for detection is obtained. The first current threshold is adjustable and the default value is 0.03A.

[0139] It should be noted that the phase voltage of special transformer A refers to the phase voltage of item A counted by the special transformer metering device; similarly, the phase voltage of special transformer B, the phase voltage of special transformer C, the phase current of special transformer A, the phase current of special transformer B, the phase current of special transformer C, special transformer data items, special transformer electric energy meter built-in clock data, special transformer zero point meter code data, special transformer frozen meter code data, special transformer total meter code electric energy consumption data and the electric energy consumption data of each special transformer sub-meter code are all relevant data counted by the special transformer metering device.

[0140] When obtaining the special transformer A phase voltage, the special transformer B phase voltage, the special transformer C phase voltage, the special transformer A phase current, the special transformer B phase current and the special transformer C phase current, the data at 0 o'clock on the day are taken.

[0141] When obtaining the special transformer data item corresponding to the second largest current value data of the special transformer metering device within the second preset time period, the data item corresponding to the second largest current value in the 24 hourly data of the electric energy meter of the previous day is taken, and the data items include voltage, current, active power, reactive power, and power factor.

[0142] There are five test items for the inspection of special transformer metering devices, namely: special transformer circuit inspection, special transformer load inspection, special transformer clock inspection, special transformer freeze time inspection and special transformer total time and minute meter code comparison inspection.

[0143] In a preferred embodiment, determining the special transformer loop detection result according to the special transformer A phase voltage, the special transformer B phase voltage, the special transformer C phase voltage, the special transformer A phase current, the special transformer B phase current, and the special transformer C phase current includes:

[0144] Calculating the phase angle of the special transformer A phase according to the phase voltage of the special transformer A phase and the phase current of the special transformer A phase;

[0145] Calculating the phase angle of the special transformer B phase according to the phase voltage of the special transformer B phase and the phase current of the special transformer B phase;

[0146] Calculating the phase angle of the special transformer C phase according to the phase voltage of the special transformer C phase and the phase current of the special transformer C phase;

[0147] If the power system corresponding to the special transformer metering device is a three-phase four-wire system, it is determined whether at least one of the special transformer A phase angle, the special transformer B phase angle and the special transformer C phase angle is within a preset first angle range; if so, it is determined that the special transformer circuit detection result is abnormal; if not, it is determined that the special transformer circuit detection result is normal;

[0148] If the power system corresponding to the dedicated transformer metering device is a three-phase three-wire system, it is determined whether the phase angle of the dedicated transformer A phase is within the preset second angle range; if so, it is determined that the detection result of the dedicated transformer circuit is abnormal; if not, then

[0149] Determine whether the phase angle of the special transformer C phase is within a preset third angle range; if so, determine that the detection result of the special transformer circuit is abnormal; if not, determine that the detection result of the special transformer circuit is normal;

[0150] The determining of the special transformer load detection result according to the special transformer data item corresponding to the second largest current value data within the second preset time period includes:

[0151] According to the special transformer data item, determine whether there is a current abnormality, a voltage abnormality or a power abnormality; if so, determine that the special transformer load detection result is abnormal; if not, determine that the special transformer load detection result is normal;

[0152] The step of determining the special transformer clock detection result according to the built-in clock data of the special transformer electric energy meter comprises:

[0153] Determine whether the built-in clock data of the special transformer electric energy meter is inconsistent with the actual time; if so, determine that the detection result of the special transformer clock is abnormal; if not, determine that the detection result of the special transformer clock is normal;

[0154] The step of determining the special transformer freezing time detection result according to the special transformer zero point table code data and the special transformer freezing table code data comprises:

[0155] Determine whether the special transformer zero point table code data and the special transformer freezing table code data are not equal; if so, determine that the special transformer freezing time detection result is abnormal; if not, determine that the special transformer freezing time detection result is normal;

[0156] The method of comparing the detection result of the total time-divided table code of the special transformer according to the total table code power consumption data of the special transformer and the power consumption data of each of the special transformer time-divided table codes comprises:

[0157] Determine whether the sum of the electric energy consumption data of the special transformer total meter code and the electric energy consumption data of each special transformer sub-meter code is not equal; if so, determine that the comparison test result of the special transformer total time-sharing meter code is abnormal; if not, determine that the comparison test result of the special transformer total time-sharing meter code is normal.

[0158] In this embodiment, in the special transformer circuit detection, the relevant data needs to meet the following data requirements:

[0159] (1) When the meter connection mode is three-phase three-wire, the phase current of phase B, the active power of phase B and the reactive power of phase B cannot have data at the same time, and the amount of data is greater than 0;

[0160] (2) When the meter connection mode is three-phase three-wire, the phase voltage of phase A, the phase voltage of phase C, the phase current of phase A, the phase current of phase C, the total active power, the active power of phase A, the active power of phase C, the total reactive power, the reactive power of phase A and the reactive power of phase C shall all have data, and the minimum current shall be greater than 0.25A;

[0161] (3) When the meter connection mode is three-phase four-wire, the phase voltage of phase A, the phase voltage of phase B, the phase voltage of phase C, the phase current of phase A, the phase current of phase B, the phase current of phase C, the total active power, the active power of phase A, the active power of phase B, the active power of phase C, the total reactive power, the reactive power of phase A, the reactive power of phase B and the reactive power of phase C shall all have data, and the minimum current shall be greater than 0.25A;

[0162] If the ammeter data is missing or does not meet the requirements of point (2), the data will be retrieved one day back, and the maximum number of days to be traced back is the preset number of days. The preset number of days can be adjusted and the default is 10 days.

[0163] In the special transformer load detection, the relevant data needs to meet the following data requirements:

[0164] (1) When the meter connection mode is three-phase three-wire, the phase current of phase B, the active power of phase B and the reactive power of phase B cannot have data at the same time, and the amount of data is greater than 0;

[0165] (2) When the meter connection mode is three-phase three-wire, the phase voltage of phase A, the phase voltage of phase C, the phase current of phase A, the phase current of phase C, the total active power, the active power of phase A, the active power of phase C, the total reactive power, the reactive power of phase A and the reactive power of phase C shall all have data, and the minimum current shall be greater than 0.25A;

[0166] (3) When the meter is connected in a three-phase four-wire mode, the currents of phase A and phase C are basically balanced, or when the meter is connected in a three-phase four-wire mode, the currents of phase A, phase B and phase C are basically balanced, that is, the ratio of a certain current to the average current of each phase is less than a first preset ratio, and the first preset ratio is adjustable and is 30% by default;

[0167] (4) When the meter connection mode is three-phase four-wire, the phase voltage of phase A, the phase voltage of phase B, the phase voltage of phase C, the phase current of phase A, the phase current of phase B, the phase current of phase C, the total active power, the active power of phase A, the active power of phase B, the active power of phase C, the total reactive power, the reactive power of phase A, the reactive power of phase B and the reactive power of phase C shall all have data, and the minimum current shall be greater than 0.25A;

[0168] If the current meter data is missing or does not meet the requirements of point (2), the data will be retrieved one day back, and the maximum number of days to be traced back is the preset number of days. The preset number of days can be adjusted and the default is 10 days;

[0169] According to the special variable data item, it is judged whether there is a current abnormality, a voltage abnormality or a power abnormality, specifically including:

[0170] 1. If any of the following conditions is met, there is a current abnormality:

[0171] i. Both (1) and (4) of the above data requirements are met, or both (2) and (4) are met;

[0172] ii. The load current is higher than the second preset ratio of the calibrated current of the electric energy meter. The second preset ratio is adjustable and the default is 100%;

[0173] iii. The current unbalance rate of one phase among phase A, phase B and phase C is greater than the third preset ratio, which is adjustable and is 30% by default;

[0174] 2. If any of the following conditions is met, there is a voltage abnormality:

[0175] i. Both (1) and (4) of the above data requirements are met, or both (2) and (4) are met;

[0176] ii. The fourth preset ratio of a phase voltage lower than the rated voltage of the electric energy meter, the fourth preset ratio is adjustable, and the default is 93% (three-phase three-wire determines the A and C phase voltages, three-phase four-wire determines the A, B, C three-phase voltages);

[0177] iii. The fifth preset ratio of a phase higher than the rated voltage of the rated energy meter, the fifth preset ratio is adjustable, and the default is 110% (three-phase three-wire determines the A and C phase voltages, three-phase four-wire determines the A, B, C three-phase voltages);

[0178] 3. If this condition is met, there is a power anomaly: the ratio of the difference between the total active power and the sum of the three-phase active power to the total active power exceeds the sixth preset ratio, which is adjustable and defaults to 10%.

[0179] In a preferred embodiment, the remote detection method of the metering device further includes:

[0180] When the metering device to be detected is a public transformer metering device, obtaining the operation status of the station area;

[0181] Determine whether the operation state of the transformer area is a shutdown state; if so, the detection result of the public transformer metering device is shutdown, and the detection is stopped; if not, obtain the public transformer three-phase current of the public transformer metering device;

[0182] Determine whether the three-phase currents of the public transformer are all less than the preset second current threshold; if so, the detection result of the public transformer metering device is no load; if not, obtain the public transformer A phase voltage, public transformer B phase voltage, public transformer C phase voltage, public transformer A phase current, public transformer B phase current, public transformer C phase current, the public transformer data items corresponding to the second largest current value data of the public transformer metering device in the second preset time period, the public transformer electric energy meter built-in clock data, the public transformer reverse active total table code first data, the public transformer reverse active total table code second data, the public transformer total table code electric energy consumption data and the electric energy consumption data of each public transformer sub-table code; wherein the public transformer data items include: voltage, current, active power, reactive power and power factor; the public transformer reverse active total table code first data is the data corresponding to the public transformer reverse active total table code at the preset first time point; the public transformer reverse active total table code second data is the data corresponding to the public transformer reverse active total table code at the preset second time point;

[0183] Determine the public transformer circuit detection result according to the public transformer A phase voltage, the public transformer B phase voltage, the public transformer C phase voltage, the public transformer A phase current, the public transformer B phase current and the public transformer C phase current; determine the public transformer load detection result according to the public transformer data item corresponding to the second maximum current value data in the second preset time period; determine the public transformer clock detection result according to the built-in clock data of the public transformer electric energy meter; determine the public transformer freezing time detection result according to the first data of the public transformer reverse active total table code and the second data of the public transformer reverse active total table code; determine the public transformer total time table code comparison detection result according to the public transformer total table code electric energy consumption data and the electric energy consumption data of each public transformer sub-table code;

[0184] If the public transformer circuit detection result, the public transformer load detection result, the public transformer clock detection result, the public transformer freeze time detection result and the public transformer total time table code comparison detection result are all normal, it is determined that the detection result of the public transformer metering device is normal; if not, it is determined that the detection result of the public transformer metering device is abnormal.

[0185] In this embodiment, the metering device to be detected is a public transformer metering device, and the operating status of the substation is obtained. If the operating status of the substation is shutdown, the detection result of the public transformer metering device is shutdown, and the detection is stopped, that is, no subsequent operations are performed; if the operating status of the substation is not shutdown, the public transformer three-phase current of the public transformer metering device is obtained.

[0186] If the three-phase current of the public transformer is less than the preset second current threshold, the detection result of the public transformer metering device without load is directly generated. If the three-phase current of the public transformer is less than the preset second current threshold, the data for detection is obtained. The second current threshold is adjustable and the default value is 0.03A.

[0187] It should be noted that the phase voltage of public transformer A refers to the phase voltage of item A counted by the public transformer metering device; similarly, the phase voltage of public transformer B, the phase voltage of public transformer C, the phase current of public transformer A, the phase current of public transformer B, the phase current of public transformer C, public transformer data items, the built-in clock data of public transformer electric energy meter, the zero point meter code data of public transformer, the frozen meter code data of public transformer, the total meter code electric energy consumption data of public transformer and the electric energy consumption data of each sub-meter code of public transformer are all relevant data counted by the public transformer metering device.

[0188] When obtaining the phase voltage of public transformer A phase, the phase voltage of public transformer B phase, the phase voltage of public transformer C phase, the phase current of public transformer A phase, the phase current of public transformer B phase and the phase current of public transformer C phase, the data at 0 o'clock of the day are taken.

[0189] When obtaining the public variable data item corresponding to the second largest current value data of the public variable metering device within the second preset time period, the data item corresponding to the second largest current value in the 24 hourly data of the electric energy meter of the previous day is taken, and the data items include voltage, current, active power, reactive power, and power factor.

[0190] The first time point for obtaining the first data of the total reverse active power table code of the public transformer is 0:00 on the 1st of the current month; the second time point for obtaining the second data of the total reverse active power table code of the public transformer is 0:00 on the 1st of the previous month.

[0191] There are five test items for the inspection of public transformer metering devices, namely: public transformer circuit inspection, public transformer load inspection, public transformer clock inspection, public transformer freeze time inspection and public transformer total time and minute table code comparison inspection.

[0192] In a preferred embodiment, determining the public transformer circuit detection result according to the public transformer A phase voltage, the public transformer B phase voltage, the public transformer C phase voltage, the public transformer A phase current, the public transformer B phase current and the public transformer C phase current includes:

[0193] Calculating the phase angle of the public transformer A phase according to the phase voltage of the public transformer A phase and the phase current of the public transformer A phase;

[0194] Calculating the phase angle of the public transformer B phase according to the phase voltage of the public transformer B phase and the phase current of the public transformer B phase;

[0195] Calculating the phase angle of the public transformer C phase according to the phase voltage of the public transformer C phase and the phase current of the public transformer C phase;

[0196] The step of determining the public variable load detection result according to the public variable data item corresponding to the second largest current value data within the second preset time period includes:

[0197] If the power system corresponding to the public transformer metering device is a three-phase four-wire system, it is determined whether at least one phase angle among the public transformer A phase angle, the public transformer B phase angle and the public transformer C phase angle is within a preset first angle range; if so, it is determined that the public transformer circuit detection result is abnormal; if not, it is determined that the public transformer circuit detection result is normal;

[0198] If the power system corresponding to the public transformer metering device is a three-phase three-wire system, it is determined whether the phase angle of the public transformer phase A is within the preset second angle range; if so, it is determined that the public transformer circuit detection result is abnormal; if not, then

[0199] Determine whether the phase angle of the public transformer C phase is within a preset third angle range; if so, determine that the public transformer circuit detection result is abnormal; if not, determine that the public transformer circuit detection result is normal;

[0200] The step of determining the public transformer clock detection result according to the built-in clock data of the public transformer electric energy meter includes:

[0201] Determine whether the built-in clock data of the public transformer electric energy meter is inconsistent with the actual time; if so, determine that the public transformer clock detection result is abnormal; if not, determine that the public transformer clock detection result is normal;

[0202] The method of determining the public transformer freezing time detection result according to the first data of the public transformer reverse active power total table code and the second data of the public transformer reverse active power total table code comprises:

[0203] Calculating the reverse running difference between the first data of the total table code of reverse active power of the public transformer and the second data of the total table code of reverse active power of the public transformer;

[0204] Determine whether the reverse walking difference is not zero; if so, determine that the public variable freezing time detection result is abnormal; if not, determine that the public variable freezing time detection result is normal;

[0205] The step of determining the comparison test result of the public variable total hourly table code according to the public variable total table code power consumption data and the power consumption data of each public variable hourly table code comprises:

[0206] Determine whether the sum of the power consumption data of the public variable total table code and the power consumption data of each public variable sub-table code is not equal; if so, determine that the public variable total sub-table code comparison test result is abnormal; if not, determine that the public variable total sub-table code comparison test result is normal.

[0207] In this embodiment, in the public transformer circuit detection, the relevant data needs to meet the following data requirements:

[0208] (1) When the meter connection mode is three-phase three-wire, the phase current of phase B, the active power of phase B and the reactive power of phase B cannot have data at the same time, and the amount of data is greater than 0;

[0209] (2) When the meter connection mode is three-phase three-wire, the phase voltage of phase A, the phase voltage of phase C, the phase current of phase A, the phase current of phase C, the total active power, the active power of phase A, the active power of phase C, the total reactive power, the reactive power of phase A and the reactive power of phase C shall all have data, and the minimum current shall be greater than 0.25A;

[0210] (3) When the meter connection mode is three-phase four-wire, the phase voltage of phase A, the phase voltage of phase B, the phase voltage of phase C, the phase current of phase A, the phase current of phase B, the phase current of phase C, the total active power, the active power of phase A, the active power of phase B, the active power of phase C, the total reactive power, the reactive power of phase A, the reactive power of phase B and the reactive power of phase C shall all have data, and the minimum current shall be greater than 0.25A;

[0211] If the ammeter data is missing or does not meet the requirements of point (2), the data will be retrieved one day back, and the maximum number of days to be traced back is the preset number of days. The preset number of days can be adjusted and the default is 10 days.

[0212] In the public transformer load detection, the relevant data needs to meet the following data requirements:

[0213] (1) When the meter connection mode is three-phase three-wire, the phase current of phase B, the active power of phase B and the reactive power of phase B cannot have data at the same time, and the amount of data is greater than 0;

[0214] (2) When the meter connection mode is three-phase three-wire, the phase voltage of phase A, the phase voltage of phase C, the phase current of phase A, the phase current of phase C, the total active power, the active power of phase A, the active power of phase C, the total reactive power, the reactive power of phase A and the reactive power of phase C shall all have data, and the minimum current shall be greater than 0.25A;

[0215] (3) When the meter is connected in a three-phase four-wire mode, the currents of phase A and phase C are basically balanced, or when the meter is connected in a three-phase four-wire mode, the currents of phase A, phase B and phase C are basically balanced, that is, the ratio of a certain current to the average current of each phase is less than a first preset ratio, and the first preset ratio is adjustable and is 30% by default;

[0216] (4) When the meter connection mode is three-phase four-wire, the phase voltage of phase A, the phase voltage of phase B, the phase voltage of phase C, the phase current of phase A, the phase current of phase B, the phase current of phase C, the total active power, the active power of phase A, the active power of phase B, the active power of phase C, the total reactive power, the reactive power of phase A, the reactive power of phase B and the reactive power of phase C shall all have data, and the minimum current shall be greater than 0.25A;

[0217] If the current meter data is missing or does not meet the requirements of point (2), the data will be retrieved one day back, and the maximum number of days to be traced back is the preset number of days. The preset number of days can be adjusted and the default is 10 days;

[0218] According to the public variable data item, judging whether there is a current abnormality, a voltage abnormality or a power abnormality specifically includes:

[0219] 4. If any of the following conditions is met, there is a current abnormality:

[0220] iv. Both (1) and (4) of the above data requirements are met, or both (2) and (4) are met;

[0221] v. A second preset ratio of the load current being higher than the calibrated current of the electric energy meter;

[0222] vi. The current unbalance ratio of one phase among phase A, phase B and phase C is greater than a third preset ratio;

[0223] 5. If any of the following conditions is met, there is a voltage abnormality:

[0224] iv. Both (1) and (4) of the above data requirements are met, or both (2) and (4) are met;

[0225] v. The voltage of a certain phase is lower than the fourth preset ratio of the rated voltage of the electric energy meter (three-phase three-wire determines the voltage of phases A and C, and three-phase four-wire determines the voltage of phases A, B, and C);

[0226] vi. A phase is higher than the fifth preset ratio of the rated voltage of the rated energy meter (three-phase three-wire determines the voltage of phases A and C, and three-phase four-wire determines the voltage of phases A, B, and C);

[0227] 6. If this condition is met, there is a power anomaly: the ratio of the difference between the total active power and the sum of the three-phase active powers to the total active power exceeds a sixth preset ratio.

[0228] In a preferred embodiment, the remote detection method of the metering device further includes:

[0229] When the metering device to be detected is a low-voltage metering device, the built-in clock data of the low-voltage electric energy meter, the low-voltage zero point meter code data, the low-voltage frozen meter code data, the low-voltage total meter code electric energy consumption data and the electric energy consumption data of each low-voltage sub-meter code are obtained;

[0230] Determine the low-voltage clock detection result according to the built-in clock data of the low-voltage electric energy meter; determine the low-voltage freezing time detection result according to the low-voltage zero point meter code data and the low-voltage freezing meter code data; determine the low-voltage total time meter code comparison detection result according to the low-voltage total meter code electric energy consumption data and the electric energy consumption data of each low-voltage sub-meter code;

[0231] When the low-voltage clock detection result, the low-voltage freezing time detection result and the low-voltage total time table code comparison detection result are all normal, the detection result of the low-voltage metering device is determined to be normal. If not, the detection result of the low-voltage metering device is determined to be abnormal.

[0232] In a preferred embodiment, determining the low-voltage clock detection result according to the built-in clock data of the low-voltage electric energy meter includes:

[0233] Determine whether the built-in clock data of the low-voltage electric energy meter is inconsistent with the actual time; if so, determine that the low-voltage clock detection result is abnormal; if not, determine that the low-voltage clock detection result is normal;

[0234] The step of determining the low-pressure freezing time detection result according to the low-pressure zero point table code data and the low-pressure freezing table code data comprises:

[0235] Determine whether the low-pressure zero point table code data and the low-pressure freezing table code data are not equal; if so, determine that the low-pressure freezing time detection result is abnormal; if not, determine that the low-pressure freezing time detection result is normal;

[0236] The step of determining the low voltage total time meter code comparison test result according to the low voltage total meter code power consumption data and the power consumption data of each low voltage sub-meter code comprises:

[0237] Determine whether the sum of the low-voltage total meter code power consumption data and the power consumption data of each low-voltage sub-meter code is not equal; if so, determine that the low-voltage total time-sharing meter code comparison test result is abnormal; if not, determine that the low-voltage total time-sharing meter code comparison test result is normal.

[0238] Embodiment 2

[0239] Please refer to Figure 2 , is a structural diagram of a remote detection device for a metering device provided by an embodiment of the present invention, comprising: a data acquisition module and a detection module;

[0240] The data acquisition module, when the metering device to be detected is a plant metering device, acquires the historical electric quantity data of the plant metering device within a first preset time period; when the historical electric quantity data is not all zero, acquires the plant forward active total meter code data, the plant reverse active total meter code data, the plant main meter electric energy consumption data, the plant auxiliary meter electric energy consumption data, the plant electric energy meter built-in clock data, the plant zero meter code data, the plant frozen meter code data, the plant total meter code electric energy consumption data and the electric energy consumption data of each plant sub-meter code of the plant metering device;

[0241] The detection module determines whether the historical power data are all zero. If so, it is determined that the detection result of the plant metering device is no load. If not, the plant circuit detection result is determined according to the forward active total meter code data and the reverse active total meter code data of the plant; the main and auxiliary meter power comparison detection result is determined according to the power consumption data of the main meter of the plant and the power consumption data of the auxiliary meter of the plant; the plant clock detection result is determined according to the built-in clock data of the power meter of the plant; the zero point meter code data and the power consumption data of the auxiliary meter of the plant are used to determine the detection result of the power meter of the plant; the detection result of the power meter of the plant is determined according to the zero point meter code data and the power consumption data of the auxiliary meter of the plant. The plant station freezes the meter code data to determine the plant station freezing time detection result; according to the power consumption data of the plant station total meter code and the power consumption data of each plant station sub-meter code, the plant station total time-sharing meter code comparison detection result is determined; when the plant station loop detection result, the main and sub-meter power comparison detection result, the plant station clock detection result, the plant station freezing time detection result and the plant station total time-sharing meter code comparison detection result are all normal, it is determined that the detection result of the plant station metering device is normal, if not, it is determined that the detection result of the plant station metering device is abnormal.

[0242] Embodiment 3

[0243] Accordingly, an embodiment of the present invention provides a terminal device, which includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, and when the processor executes the computer program, the remote detection method of the metering device described in the above embodiment of the invention is implemented.

[0244] It should be noted that the device embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the accompanying drawings of the device embodiments provided by the present invention, the connection relationship between the modules indicates that there is a communication connection between them, which may be specifically implemented as one or more communication buses or signal lines. A person of ordinary skill in the art may understand and implement it without paying any creative effort.

[0245] Those skilled in the art can clearly understand that for the sake of convenience and brevity, the specific working process of the device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0246] The terminal device may be a computing device such as a desktop computer, a notebook, a palmtop computer, a cloud server, etc. The terminal device may include, but is not limited to, a processor and a memory.

[0247] The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the device, and various interfaces and lines are used to connect various parts of the entire device.

[0248] The memory can be used to store the computer program, and the processor realizes various functions of the device by running or executing the computer program stored in the memory and calling the data stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, at least one application required for a function, etc.; the data storage area can store data created according to the use of the mobile phone, etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (FlashCard), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.

Claims

1. A remote detection method for a metering device, characterized in that: include: In the case where the metering device to be detected is a plant metering device, obtaining historical power consumption data of the plant metering device within a first preset time period; Determine whether the historical electric quantity data are all zero. If so, determine that the detection result of the plant metering device is no load. If not, obtain the plant forward active total meter code data, the plant reverse active total meter code data, the plant main meter electric energy consumption data, the plant auxiliary meter electric energy consumption data, the plant electric energy meter built-in clock data, the plant zero meter code data, the plant frozen meter code data, the plant total meter code electric energy consumption data and the electric energy consumption data of each plant sub-meter code of the plant metering device; Determine the plant station loop detection result according to the plant station forward active total meter code data and the plant station reverse active total meter code data; Determine the comparison test result of the main and auxiliary meters according to the power consumption data of the main meter of the power plant and the power consumption data of the auxiliary meter of the power plant; Determine the plant station clock detection result according to the built-in clock data of the plant station electric energy meter; Determine the plant station freezing time detection result according to the plant station zero point table code data and the plant station freezing table code data; Determine the comparison test result of the total time-division meter code of the plant station according to the power consumption data of the total meter code of the plant station and the power consumption data of each of the sub-meter codes of the plant station; When the plant station circuit detection result, the main and sub-meter power comparison detection result, the plant station clock detection result, the plant station freeze time detection result and the plant station total time-sharing meter code comparison detection result are all normal, it is determined that the detection result of the plant station metering device is normal; if not, it is determined that the detection result of the plant station metering device is abnormal.

2. The remote detection method of a metering device according to claim 1, characterized in that: Before obtaining the first historical electric quantity data of the plant metering device within the first preset time period, the method further includes: Get the plant operation status; Determine whether the plant operation state is a shutdown state; if so, the detection result of the plant metering device is shutdown, and the detection is stopped; if not, continue the detection; Determining the plant station loop detection result according to the plant station forward active total meter code data and the plant station reverse active total meter code data includes: According to the forward active total meter code data and the reverse active total meter code data of the plant station, it is determined whether the 10kV outgoing line, 10kV station transformer, 10kV power transformer and 10kV arc extinguishing device in the plant station are all reverse active; if so, it is determined that the plant station circuit detection result is abnormal; if not, then Determine whether the 10kV capacitor bank and 35kV reactor in the plant are both in the forward reactive direction, or both in the reverse active direction, or both in the forward active direction; if so, determine that the plant circuit detection result is abnormal; if not, then Determine whether the 10kV main transformer and 35kV transformer in the plant are both active in the positive direction; if so, the plant circuit detection result is abnormal; if not, then Determine whether the 500kV main transformer, 220kV main transformer, 110kV main transformer and 35kV main transformer in the plant are all reverse active; if so, determine that the plant circuit detection result is abnormal; if not, then Determine whether the 500kV main transformer, 220kV main transformer and 110kV main transformer in the plant are all in positive active mode. If so, determine that the plant circuit detection result is abnormal; if not, then Determine whether the 500kV main transformer, 220kV main transformer, 110kV main transformer, 35kV main transformer and 10kV main transformer in the plant are all active in the positive direction; if so, determine that the plant circuit detection result is abnormal; if not, determine that the plant circuit detection result is normal; The step of determining the comparison test result of the main and auxiliary meters according to the power consumption data of the main meter of the power plant and the power consumption data of the auxiliary meter of the power plant includes: Calculate the difference between the power consumption data of the main meter of the power plant and the power consumption data of the auxiliary meter of the power plant; Determine whether the difference between the power consumption of the first main and secondary meters exceeds a preset first preset difference; if so, determine that the power comparison test result of the main and secondary meters is abnormal; if not, determine that the power comparison test result of the main and secondary meters is normal; Determining the plant station clock detection result according to the built-in clock data of the plant station electric energy meter includes: Determine whether the built-in clock data of the power meter of the plant station is inconsistent with the actual time; if so, determine that the detection result of the plant station clock is abnormal; if not, determine that the detection result of the plant station clock is normal; The step of determining the plant station freezing time detection result according to the plant station zero point table code data and the plant station freezing table code data comprises: Determine whether the plant station zero point table code data and the plant station freezing table code data are not equal; if so, determine that the plant station freezing time detection result is abnormal; if not, determine that the plant station freezing time detection result is normal; The step of determining the comparison test result of the total time-division meter code of the plant station according to the total meter code power consumption data of the plant station and the power consumption data of each sub-meter code of the plant station includes: Determine whether the sum of the power consumption data of the total meter code of the plant station and the power consumption data of each of the sub-meter codes of the plant station are not equal; if so, determine that the comparison test result of the total time-sharing meter code of the plant station is abnormal; if not, determine that the comparison test result of the total time-sharing meter code of the plant station is normal; Among them, the reverse active power means that the flow direction of reactive electric energy is the direction of flowing into the bus; the forward reactive power means that the flow direction of reactive electric energy is the direction of flowing out of the bus; the reverse active power means that the flow direction of active electric energy is the direction of flowing into the bus; the forward active power means that the flow direction of active electric energy is the direction of flowing out of the bus.

3. The remote detection method of a metering device according to claim 1, characterized in that: Also includes: When the metering device to be detected is a special variable metering device, obtaining the user's operating status; Determine whether the user operation status is a shutdown state; If yes, the detection result of the special transformer metering device is out of service, and the detection is stopped; if no, the three-phase current of the special transformer metering device is obtained; Determine whether the three-phase currents of the special transformer are all less than the preset first current threshold; if so, the detection result of the special transformer metering device is no load; if not, obtain the special transformer A phase voltage, special transformer B phase voltage, special transformer C phase voltage, special transformer A phase current, special transformer B phase current, special transformer C phase current, the special transformer data items corresponding to the second largest value data of the current of the special transformer metering device in the second preset time period, the special transformer electric energy meter built-in clock data, special transformer zero point table code data, special transformer frozen table code data, special transformer total table code electric energy consumption data and each special transformer sub-table code electric energy consumption data; wherein, the special transformer data items include: voltage, current, active power, reactive power and power factor; Determine the detection result of the special transformer circuit according to the special transformer A phase voltage, the special transformer B phase voltage, the special transformer C phase voltage, the special transformer A phase current, the special transformer B phase current, and the special transformer C phase current; determine the special transformer load detection result according to the special transformer data item corresponding to the second maximum current value data in the second preset time period; determine the special transformer clock detection result according to the built-in clock data of the special transformer electric energy meter; determine the special transformer freezing time detection result according to the special transformer zero point table code data and the special transformer freezing table code data; determine the special transformer total time table code comparison detection result according to the special transformer total table code electric energy consumption data and the electric energy consumption data of each special transformer sub-meter code; When the special transformer circuit detection result, the special transformer load detection result, the special transformer clock detection result, the special transformer freeze time detection result and the special transformer total time table code comparison detection result are all normal, it is determined that the detection result of the special transformer metering device is normal; if not, it is determined that the detection result of the special transformer metering device is abnormal.

4. The remote detection method of a metering device according to claim 3, characterized in that: The method of determining a detection result of a special transformer circuit according to the special transformer A phase voltage, the special transformer B phase voltage, the special transformer C phase voltage, the special transformer A phase current, the special transformer B phase current, and the special transformer C phase current comprises: Calculating the phase angle of the special transformer A phase according to the phase voltage of the special transformer A phase and the phase current of the special transformer A phase; Calculating the phase angle of the special transformer B phase according to the phase voltage of the special transformer B phase and the phase current of the special transformer B phase; Calculating the phase angle of the special transformer C phase according to the phase voltage of the special transformer C phase and the phase current of the special transformer C phase; If the power system corresponding to the special transformer metering device is a three-phase four-wire system, it is determined whether at least one of the special transformer A phase angle, the special transformer B phase angle and the special transformer C phase angle is within a preset first angle range; if so, it is determined that the special transformer circuit detection result is abnormal; if not, it is determined that the special transformer circuit detection result is normal; If the power system corresponding to the dedicated transformer metering device is a three-phase three-wire system, it is determined whether the phase angle of the dedicated transformer A phase is within the preset second angle range; if so, it is determined that the detection result of the dedicated transformer circuit is abnormal; if not, then Determine whether the phase angle of the special transformer C phase is within a preset third angle range; if so, determine that the detection result of the special transformer circuit is abnormal; if not, determine that the detection result of the special transformer circuit is normal; The determining of the special transformer load detection result according to the special transformer data item corresponding to the second largest current value data within the second preset time period includes: According to the special transformer data item, determine whether there is a current abnormality, a voltage abnormality or a power abnormality; if so, determine that the special transformer load detection result is abnormal; if not, determine that the special transformer load detection result is normal; The step of determining the special transformer clock detection result according to the built-in clock data of the special transformer electric energy meter comprises: Determine whether the built-in clock data of the special transformer electric energy meter is inconsistent with the actual time; if so, determine that the detection result of the special transformer clock is abnormal; if not, determine that the detection result of the special transformer clock is normal; The step of determining the special transformer freezing time detection result according to the special transformer zero point table code data and the special transformer freezing table code data comprises: Determine whether the special transformer zero point table code data and the special transformer freezing table code data are not equal; if so, determine that the special transformer freezing time detection result is abnormal; if not, determine that the special transformer freezing time detection result is normal; The method of comparing the detection result of the total time-divided table code of the special transformer according to the total table code power consumption data of the special transformer and the power consumption data of each of the special transformer time-divided table codes comprises: Determine whether the sum of the electric energy consumption data of the special transformer total meter code and the electric energy consumption data of each special transformer sub-meter code is not equal; if so, determine that the comparison test result of the special transformer total time-sharing meter code is abnormal; if not, determine that the comparison test result of the special transformer total time-sharing meter code is normal.

5. The remote detection method of a metering device according to claim 1, characterized in that: Also includes: When the metering device to be detected is a public transformer metering device, obtaining the operation status of the station area; Determine whether the operation status of the substation is a shutdown status; If yes, the detection result of the public transformer metering device is out of service, and the detection is stopped; if no, the public transformer three-phase current of the public transformer metering device is obtained; Determine whether the three-phase currents of the public transformer are all less than the preset second current threshold; if so, the detection result of the public transformer metering device is no load; if not, obtain the public transformer A phase voltage, public transformer B phase voltage, public transformer C phase voltage, public transformer A phase current, public transformer B phase current, public transformer C phase current, the public transformer data items corresponding to the second largest current value data of the public transformer metering device in the second preset time period, the public transformer electric energy meter built-in clock data, the public transformer reverse active total table code first data, the public transformer reverse active total table code second data, the public transformer total table code electric energy consumption data and the electric energy consumption data of each public transformer sub-table code; wherein the public transformer data items include: voltage, current, active power, reactive power and power factor; the public transformer reverse active total table code first data is the data corresponding to the public transformer reverse active total table code at the preset first time point; the public transformer reverse active total table code second data is the data corresponding to the public transformer reverse active total table code at the preset second time point; Determine the public transformer circuit detection result according to the public transformer A phase voltage, the public transformer B phase voltage, the public transformer C phase voltage, the public transformer A phase current, the public transformer B phase current and the public transformer C phase current; determine the public transformer load detection result according to the public transformer data item corresponding to the second maximum current value data in the second preset time period; determine the public transformer clock detection result according to the built-in clock data of the public transformer electric energy meter; determine the public transformer freezing time detection result according to the first data of the public transformer reverse active total table code and the second data of the public transformer reverse active total table code; determine the public transformer total time table code comparison detection result according to the public transformer total table code electric energy consumption data and the electric energy consumption data of each of the public transformer sub-table codes; If the public transformer circuit detection result, the public transformer load detection result, the public transformer clock detection result, the public transformer freeze time detection result and the public transformer total time table code comparison detection result are all normal, it is determined that the detection result of the public transformer metering device is normal; if not, it is determined that the detection result of the public transformer metering device is abnormal.

6. The remote detection method of a metering device according to claim 5, characterized in that: Determining the public transformer circuit detection result according to the public transformer A phase voltage, the public transformer B phase voltage, the public transformer C phase voltage, the public transformer A phase current, the public transformer B phase current and the public transformer C phase current includes: Calculating the phase angle of the public transformer A phase according to the phase voltage of the public transformer A phase and the phase current of the public transformer A phase; Calculating the phase angle of the public transformer B phase according to the phase voltage of the public transformer B phase and the phase current of the public transformer B phase; Calculating the phase angle of the public transformer C phase according to the phase voltage of the public transformer C phase and the phase current of the public transformer C phase; The step of determining the public variable load detection result according to the public variable data item corresponding to the second largest current value data within the second preset time period includes: If the power system corresponding to the public transformer metering device is a three-phase four-wire system, it is determined whether at least one phase angle among the public transformer A phase angle, the public transformer B phase angle and the public transformer C phase angle is within a preset first angle range; if so, it is determined that the public transformer circuit detection result is abnormal; if not, it is determined that the public transformer circuit detection result is normal; If the power system corresponding to the public transformer metering device is a three-phase three-wire system, it is determined whether the phase angle of the public transformer phase A is within the preset second angle range; if so, it is determined that the public transformer circuit detection result is abnormal; if not, then Determine whether the phase angle of the public transformer C phase is within a preset third angle range; if so, determine that the public transformer circuit detection result is abnormal; if not, determine that the public transformer circuit detection result is normal; The step of determining the public transformer clock detection result according to the built-in clock data of the public transformer electric energy meter includes: Determine whether the built-in clock data of the public transformer electric energy meter is inconsistent with the actual time; if so, determine that the public transformer clock detection result is abnormal; if not, determine that the public transformer clock detection result is normal; The method of determining the public transformer freezing time detection result according to the first data of the public transformer reverse active power total table code and the second data of the public transformer reverse active power total table code comprises: Calculating the reverse running difference between the first data of the total table code of reverse active power of the public transformer and the second data of the total table code of reverse active power of the public transformer; Determine whether the reverse walking difference is not zero; if so, determine that the public variable freezing time detection result is abnormal; if not, determine that the public variable freezing time detection result is normal; The step of determining the comparison test result of the public variable total hourly table code according to the public variable total table code power consumption data and the power consumption data of each public variable hourly table code comprises: Determine whether the sum of the power consumption data of the public variable total table code and the power consumption data of each public variable sub-table code is not equal; if so, determine that the public variable total sub-table code comparison test result is abnormal; if not, determine that the public variable total sub-table code comparison test result is normal.

7. The remote detection method of a metering device according to claim 1, characterized in that: Also includes: When the metering device to be detected is a low-voltage metering device, the built-in clock data of the low-voltage electric energy meter, the low-voltage zero point meter code data, the low-voltage frozen meter code data, the low-voltage total meter code electric energy consumption data and the electric energy consumption data of each low-voltage sub-meter code are obtained; Determine the low-voltage clock detection result according to the built-in clock data of the low-voltage electric energy meter; determine the low-voltage freezing time detection result according to the low-voltage zero point table code data and the low-voltage freezing table code data; Determine the low-voltage total time-division meter code comparison test result according to the low-voltage total meter code power consumption data and the power consumption data of each low-voltage sub-meter code; When the low-voltage clock detection result, the low-voltage freezing time detection result and the low-voltage total time table code comparison detection result are all normal, the detection result of the low-voltage metering device is determined to be normal. If not, the detection result of the low-voltage metering device is determined to be abnormal.

8. The remote detection method of a metering device according to claim 7, characterized in that: Determining a low-voltage clock detection result according to the built-in clock data of the low-voltage electric energy meter includes: Determine whether the built-in clock data of the low-voltage electric energy meter is inconsistent with the actual time; if so, determine that the low-voltage clock detection result is abnormal; if not, determine that the low-voltage clock detection result is normal; The step of determining the low-pressure freezing time detection result according to the low-pressure zero point table code data and the low-pressure freezing table code data comprises: Determine whether the low-pressure zero point table code data and the low-pressure freezing table code data are not equal; if so, determine that the low-pressure freezing time detection result is abnormal; if not, determine that the low-pressure freezing time detection result is normal; The step of determining the low voltage total time meter code comparison test result according to the low voltage total meter code power consumption data and the power consumption data of each low voltage sub-meter code comprises: Determine whether the sum of the low-voltage total meter code power consumption data and the power consumption data of each low-voltage sub-meter code is not equal; if so, determine that the low-voltage total time-sharing meter code comparison test result is abnormal; if not, determine that the low-voltage total time-sharing meter code comparison test result is normal.

9. A remote detection device for a metering device, characterized in that: include: Data acquisition module and detection module; The data acquisition module, when the metering device to be detected is a plant metering device, acquires the historical electric quantity data of the plant metering device within a first preset time period; when the historical electric quantity data is not all zero, acquires the plant forward active total meter code data, the plant reverse active total meter code data, the plant main meter electric energy consumption data, the plant auxiliary meter electric energy consumption data, the plant electric energy meter built-in clock data, the plant zero meter code data, the plant frozen meter code data, the plant total meter code electric energy consumption data and the electric energy consumption data of each plant sub-meter code of the plant metering device; The detection module determines whether the historical power data are all zero. If so, it is determined that the detection result of the plant metering device is no load. If not, the plant loop detection result is determined according to the forward active total meter code data of the plant and the reverse active total meter code data of the plant; the main and sub-meter power consumption data are determined according to the plant main meter power consumption data and the plant sub-meter power consumption data. Determine the plant station clock detection result according to the built-in clock data of the plant station electric energy meter; Determine the plant station freezing time detection result according to the plant station zero point table code data and the plant station freezing table code data; Determine the comparison test result of the total time-division meter code of the plant station according to the power consumption data of the total meter code of the plant station and the power consumption data of each of the sub-meter codes of the plant station; When the plant station circuit detection result, the main and sub-meter power comparison detection result, the plant station clock detection result, the plant station freeze time detection result and the plant station total time-sharing meter code comparison detection result are all normal, it is determined that the detection result of the plant station metering device is normal; if not, it is determined that the detection result of the plant station metering device is abnormal.

10. A terminal device, characterized in that: The method comprises a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein the processor implements the remote detection method of the metering device according to any one of claims 1 to 8 when executing the computer program.

Citation Information

Patent Citations

  • Electric quantity data exception analysis method based on automated checking and reading

    CN107632898A

  • Line loss acquisition device, system and method

    CN109521280A

  • Special transformer metering abnormity monitoring analysis method and device, and storage medium

    CN112748369A

  • Electrical measurement method based on reference energy

    WO2016029773A1

Cited By

  • Electric energy meter error state evaluation method and device, electronic equipment and storage medium

    CN121541132A