Resource allocation method and device for machining production line, electronic equipment and medium

By receiving tasks in the machining production line, analyzing resource requirements and production line occupation information, and generating target resource allocation plans, the problem of insufficient resource allocation flexibility is solved, and efficient resource utilization and production efficiency are achieved.

CN119024788AInactive Publication Date: 2024-11-26HEBEI TIANZHIYUN TECHNOLOGY CO LTD

Patent Information

Application Number
CN202411123130.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The resource allocation process of the machining production line is affected by factors such as material resources, human resources and information resources, which leads to the inability to flexibly cooperate with the processing and production tasks, resulting in poor processing and production results.

Method used

By receiving processing and production tasks, determining the preparatory processing production process and resource requirements, obtaining production line resource occupation information, generating target processing production process and target application resources, generating resource allocation plans based on this information, optimizing resource usage plans, and achieving accurate resource matching and Efficient use.

Benefits of technology

It improves the immediacy and accuracy of resource allocation, reduces idleness and waste of resources, optimizes production processes, reduces waiting time and handling distance, and improves production efficiency and product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119024788A_ABST
    Figure CN119024788A_ABST
Patent Text Reader

Abstract

The invention provides a resource allocation method and device for a machining production line, electronic equipment and a medium, and relates to the technical field of data processing. The resource allocation method of the machining production line comprises the following steps: determining a preparation machining production flow and a preparation resource demand according to a received machining production task; production line resource occupation information is acquired, and pre-selected production line resources are determined according to the production line resource occupation information; generating a target processing production flow and target application resources according to the preparation processing production flow, the preparation resource demand and the pre-selected production line resources; and generating a resource allocation scheme corresponding to the processing production task based on the target processing production flow and the target application resource. In combination with real-time acquisition of the production line resource occupation information, accurate matching and pre-selection of the production line resources are realized, and idle and waste of the resources are avoided. And in combination with dynamic adjustment of the resource use plan, the resource allocation efficiency is integrally improved, and the processing and production effect is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of data processing technology, for example, to a resource allocation method, device, electronic equipment and medium for a machining production line. Background Art

[0003] Machining production line refers to a production line that arranges processing equipment (such as machine tools) in a certain order and connects them into a whole through conveying devices and auxiliary devices to complete the specified processing process of the workpiece. This kind of production line plays an important role in modern industrial production and can significantly improve production efficiency and processing quality. With the development of science and technology and the progress of social economy, machining production lines are gradually developing in the direction of automation and intelligence. The application of automation technologies such as CNC machine tools and robots has greatly improved production efficiency and processing accuracy. The application of intelligent technologies such as artificial intelligence, big data, and the Internet of Things enables the production line to realize functions such as real-time monitoring, intelligent scheduling, and predictive maintenance, further improving the overall performance of the production line.

[0004] In the relevant technology, the basic usage methods of various equipment, tools, and machines are generally pre-set. However, the resource allocation process of the machining production line may be affected by a large number of factors such as material resources, human resources, and information resources. Therefore, the resource allocation process based on the basic usage method cannot cooperate with different processing and production tasks, resulting in poor processing and production effects achieved by the resource allocation process of the current machining production line. Summary of the invention

[0006] The present application aims to provide a resource allocation method, device, electronic equipment and medium for a machining production line.

[0007] According to one aspect of the present application, a resource allocation method for a machining production line is proposed, including: determining a preliminary machining production process and preliminary resource requirements based on a received machining production task; obtaining production line resource occupancy information, and determining pre-selected production line resources based on the production line resource occupancy information; generating a target machining production process and target application resources based on the preliminary machining production process, preliminary resource requirements and pre-selected production line resources; and generating a resource allocation plan corresponding to the machining production task based on the target machining production process and target application resources.

[0008] According to some embodiments, the preliminary processing production process and preliminary resource requirements are determined based on the received processing production tasks, including: receiving the processing production tasks and analyzing them to determine the processing production goals; obtaining the preliminary resource requirements corresponding to the processing production goals; and generating the preliminary processing production process based on the preliminary resource requirements.

[0009] According to some embodiments, a preparatory processing production flow is generated according to the preparatory resource requirements, including: determining the facility resources, raw materials and information resources corresponding to the processing and production goals according to the preparatory resource requirements; analyzing the information resources to determine the market production data at the current moment; generating the preparatory processing production flow according to the preset facility association information corresponding to the facility resources, the processing information of the raw materials and the market production data.

[0010] According to some embodiments, a preliminary processing production process is generated based on preset facility association information corresponding to the facility resources, processing information of raw materials and market production data, including: determining the preselected work sequence of the facility resources based on the preset facility association information corresponding to the facility resources; determining the preselected work time period of the facility resources based on the processing information of the raw materials; generating an initial processing production process based on the preselected work sequence and the preselected work time period; and adjusting the initial processing production process based on the market production data and processing production goals to generate a preliminary processing production process.

[0011] According to some embodiments, a target processing production process and target application resources are generated based on the preliminary processing production process, preliminary resource requirements and pre-selected production line resources, including: determining the target application resources based on the preliminary resource requirements and pre-selected production line resources; obtaining the processing production mode corresponding to the target application resources and the processing production status within a preset working period; and adjusting the preliminary processing production process based on the processing production mode and the processing production status to generate the target processing production process.

[0012] According to some embodiments, the preliminary processing production process is adjusted according to the processing production mode and the processing production status to generate a target processing production process, including: determining the non-processing production time of the corresponding target application resources according to the processing production mode; determining the occupied idle information within a preset working period according to the processing production status; and adjusting the preliminary processing production process according to the non-processing production time and the occupied idle information to generate the target processing production process.

[0013] According to some embodiments, a resource allocation plan corresponding to the processing and production task is generated based on the target processing and production process and the target application resources, including: determining the initial working time period and initial working duration of the target application resources within a preset time period based on the production line resource occupancy information; performing a processing and production simulation on the target processing and production process based on the initial working time period and the initial working duration to generate a corresponding target allocation plan.

[0014] According to one aspect of the present application, a resource allocation device for a machining production line is proposed, which is characterized in that it includes: a task analysis module, which is used to determine the preliminary processing production process and preliminary resource requirements based on the received processing production task; a pre-selected production line resource determination module, which is used to obtain the production line resource occupancy information, and determine the pre-selected production line resources based on the production line resource occupancy information; a target information determination module, which is used to generate the target processing production process and target application resources based on the preliminary processing production process, preliminary resource requirements and pre-selected production line resources; a resource allocation plan generation module, which is used to generate a resource allocation plan corresponding to the processing production task based on the target processing production process and target application resources.

[0015] According to one aspect of the present application, an electronic device is provided, which includes: a processor; and a memory storing a computer program, wherein when the computer program is executed by the processor, the processor executes the resource allocation method for a machining production line as described above.

[0016] According to one aspect of the present application, a non-transitory computer-readable medium is provided, on which readable instructions are stored. When the instructions are executed by a processor, the processor executes the resource allocation method for a machining production line as described above.

[0017] It should be understood that the foregoing general description and the following detailed description are exemplary only and are not restrictive of the present application.

[0018] Beneficial effects: Through the above-mentioned embodiments provided by the present application, the received processing and production tasks are quickly responded to, and the preparatory processing and production process and the determination process of the preparatory resource requirements are immediately started, so that the various resources required for production can be quickly identified. At the same time, combined with the real-time acquisition of the production line resource occupancy information, the accurate matching and preselection of the production line resources are realized, the idleness and waste of resources are avoided, and the immediacy and accuracy of resource allocation are significantly improved. The cumbersomeness of manual operation is reduced, and the resource allocation strategy is optimized through data analysis and prediction functions, and the allocation efficiency is further improved. Based on the actual situation of the preparatory processing and production process and the preselected production line resources, the generated target processing and production process is more reasonable and efficient. Through process optimization, the waiting time, handling distance and unnecessary operations in the production process are reduced, and the production efficiency and product quality are improved. Through detailed resource demand analysis and the formulation of resource allocation plans, the sufficiency and timeliness of the resources required for production are ensured. At the same time, by dynamically adjusting the resource use plan, the efficient use of resources is achieved. The overall resource allocation efficiency is improved, thereby improving the processing and production effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without exceeding the scope of protection required by the present application.

[0021] Figure 1 A flow chart of a resource allocation method for a machining production line provided in an embodiment of the present application; Figure 2 A block diagram of a resource allocation device for a machining production line provided in an embodiment of the present application; Figure 3 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0023] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in many forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that this application will be comprehensive and complete and will fully convey the concepts of the example embodiments to those skilled in the art. The same reference numerals in the figures represent the same or similar parts, and thus their repeated description will be omitted.

[0024] In addition, described feature, structure or characteristic can be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present application. However, those skilled in the art will appreciate that the technical scheme of the present application can be put into practice without one or more of the specific details, or other methods, components, devices, steps, etc. can be adopted. In other cases, known methods, devices, realizations or operations are not shown or described in detail to avoid blurring the various aspects of the application.

[0025] The block diagrams shown in the accompanying drawings are merely functional entities and do not necessarily correspond to physically independent entities. That is, these functional entities may be implemented in software form, or in one or more hardware modules or integrated circuits, or in different networks and / or processor devices and / or microcontroller devices.

[0026] The flowcharts shown in the accompanying drawings are only exemplary and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps can be decomposed, and some operations / steps can be combined or partially combined, so the actual execution order may change according to actual conditions.

[0027] It should be understood that although the terms first, second, third, etc. may be used herein to describe various components, these components should not be limited by these terms. These terms are used to distinguish one component from another component. Therefore, the first component discussed below can be referred to as the second component without departing from the teachings of the concepts of the present application. As used herein, the term "and / or" includes any one of the associated listed items and all combinations of one or more.

[0028] For specific implementation methods, please refer to the following embodiments.

[0029] Figure 1 This is a flow chart of a resource allocation method for a machining production line provided in an embodiment of the present application. The method of this embodiment can be applied to a resource allocation server. Figure 1 As shown, the method includes: step S10, step S11, step S12 and step S13.

[0030] In step S10, the preliminary processing and production process and preliminary resource requirements are determined according to the received processing and production tasks.

[0031] The processing and production tasks may include information related to the process of processing and production using the machining production line and the items obtained from the processing and production, such as the preliminary processing and production process, the preliminary resource requirements, and the target processing products. Among them, the preliminary processing and production process can be used to preliminarily plan the various links and their sequence in the entire production process from the entry of raw materials to the delivery of finished products, including but not limited to: raw material inspection, cutting, stamping, welding, spraying, assembly, quality inspection and packaging. The preliminary resource requirements can be used to indicate the production line, raw materials, labor resources, etc. that need to be used.

[0032] According to the exemplary embodiment, a processing and production task sent by a worker may be received, and a preliminary processing and production process and preliminary resource requirements may be extracted therefrom.

[0033] In step S11, production line resource occupancy information is obtained, and pre-selected production line resources are determined according to the production line resource occupancy information.

[0034] The production line resource occupancy information can be used to indicate the current status of the resources used on each production line. If production and processing are in progress, it can be indicated as being in an occupied state. The occupied state includes the state of being in production and processing, and can also include the state of completing part of the production and processing tasks and continuing to run after a period of pause.

[0035] The conditions for determining the pre-selected production line resources according to the production line resource occupancy information may be preset. The setting process may be set according to the data in the historical resource allocation process of the machining production line. In some implementations, the production line resources that are not occupied and are in operation but the remaining processing and production workload is not greater than one-third of the ongoing processing and production tasks may be used as pre-selected production line resources.

[0036] According to an example embodiment, production line resource occupancy information that is pre-stored and updated according to production conditions may be obtained, and production line resources that meet the pre-set stored conditions may be determined from all production line resources as pre-selected production line resources.

[0037] In step S12, a target processing production process and target application resources are generated according to the prepared processing production process, the prepared resource requirements and the pre-selected production line resources.

[0038] The target processing production process can be based on the preliminary processing production process, preliminary resource requirements and pre-selected production line resources. The production process needs to be further refined and optimized to form the target processing production process. The target application resources can be used to indicate the resources that need to be re-evaluated and determined for final application according to the optimized target processing production process. The target application resources can include human resources, equipment resources, production line resources, material resources, energy resources and technical resources.

[0039] According to the example embodiment, each step in the preparatory processing production process is adjusted and optimized according to the actual capacity and efficiency of the production line resources to obtain the target processing production process. For example, the material handling time is reduced by adjusting the process sequence, or parallel operations are used to improve production efficiency. According to the actual needs of the target processing production process, that is, the preparatory resource needs, human resources, equipment resources, material resources, etc. are reasonably allocated to ensure that the resources in the production process are adequately supplied and efficiently utilized. According to the actual needs of the production line, some equipment is upgraded or replaced, and the upgrade and replacement are taken into consideration in the target application resources.

[0040] In some implementations, a target processing production process determination model and a target application resource model can be pre-set, and the corresponding target processing production process and target application resources can be output by inputting the preliminary processing production process, preliminary resource requirements and pre-selected production line resources into the model.

[0041] In step S13, a resource allocation plan corresponding to the processing and production task is generated based on the target processing and production process and the target application resources.

[0042] According to the example embodiment, the specific content of the processing and production tasks is first extracted from the target processing and production process, including key information such as production quantity, product specifications, and delivery date. The processing and production tasks can then be mapped to the resource allocation framework to determine the specific work that needs to be completed in each production link. According to the target application resources, the number, skills, and availability of existing human resources such as operators, technicians, and quality inspectors are evaluated; whether the equipment on the production line meets the task requirements, including equipment performance, production capacity, maintenance status, etc. Confirm whether the inventory of raw materials, auxiliary materials, parts, packaging materials, etc. is sufficient, and whether they need to be purchased or allocated in advance. Evaluate the stability of energy supply such as electricity, water, and gas, as well as the completeness of technical resources such as production process drawings, operation manuals, and quality inspection standards.

[0043] According to the skill requirements of the production process, workers' positions should be arranged reasonably, and skill training and job rotation should be carried out when necessary. For key positions, backup personnel can be set up to deal with emergencies. According to the production tasks and equipment capacity, equipment use plans should be formulated, including equipment start-up time, production batches, maintenance cycles, etc. Make material demand plans to ensure that materials arrive at the production site on time and in quantity. For key materials, establish a safety inventory mechanism to deal with supply chain risks. Ensure the stability of energy supply and timely update of technical resources. Consider energy-saving measures for production links with high energy consumption. Map the allocation process of these resources to the resource allocation framework, and then obtain the resource allocation plan corresponding to the processing and production tasks.

[0044] In some implementations, the resource allocation schemes corresponding to different target processing production processes and different target application resources can be pre-set based on the historical resource allocation data of the machining production line. This application can quickly identify the various resources required for production by quickly responding to the received processing and production tasks, and immediately starting the preparatory processing and production process and the determination process of the preparatory resource requirements. At the same time, combined with the real-time acquisition of production line resource occupancy information, the accurate matching and pre-selection of production line resources are realized, the idleness and waste of resources are avoided, and the immediacy and accuracy of resource allocation are significantly improved. The cumbersome manual operation is reduced, and the resource allocation strategy is optimized through data analysis and prediction functions, further improving the allocation efficiency. Based on the actual situation of the preparatory processing and production process and the pre-selected production line resources, the generated target processing and production process is more reasonable and efficient. Through process optimization, the waiting time, handling distance and unnecessary operations in the production process are reduced, and the production efficiency and product quality are improved. Through detailed resource demand analysis and the formulation of resource allocation plans, the sufficiency and timeliness of the resources required for production are ensured. At the same time, by dynamically adjusting the resource use plan, the efficient use of resources is achieved. The overall resource allocation efficiency is improved, thereby improving the processing and production effect.

[0045] According to some embodiments, a processing and production task may be received and analyzed to determine a processing and production target; a preparatory resource requirement corresponding to the processing and production target may be obtained; and a preparatory processing and production process may be generated based on the preparatory resource requirement.

[0046] According to the example embodiment, a processing and production task sent from the outside is received, and the specifications, quantity, delivery date, dimensional tolerance, surface roughness, etc. of the parts to be processed and produced are analyzed and determined, and the determined information is used as the processing and production target. The pre-set pre-resource requirements corresponding to the different processing and production targets are obtained, and the pre-resource requirements corresponding to the processing and production target at the current moment are searched and selected. Based on the information in the pre-resource requirements and the preset process determination model, a detailed processing process flow chart is designed to clarify the operating steps, required equipment, processing parameters, etc. of each process, and the pre-processing production process is output.

[0047] This application clarifies the specific goals of production through in-depth analysis of processing and production tasks, provides clear guidance for subsequent resource allocation and process design, ensures that production activities always revolve around core goals, and improves production efficiency and accuracy. Based on the processing and production goals, the required preparatory resources are accurately calculated and obtained, avoiding waste and shortage of resources and ensuring the smooth progress of the production process. According to the preparatory resource requirements, a preparatory processing production process is generated, which reduces waiting time, transportation distance and unnecessary operations in the production process, and improves production efficiency and product quality.

[0048] According to some embodiments, the facility resources, raw materials and information resources corresponding to the processing and production goals can be determined based on the preliminary resource requirements; the information resources can be analyzed to determine the market production data at the current moment; and the preliminary processing and production flow can be generated based on the preset facility association information corresponding to the facility resources, the processing information of the raw materials and the market production data.

[0049] In this application, facility resources may include human resources, processing equipment resources, and assembly line resources. Information resources may be used to represent information related to processing and production at the current moment. Preset facility association information may be used to represent the working association between different production and processing equipment and assembly lines. For example, if a part processed from equipment A is to be transferred to equipment B, production line C may be used to transfer from equipment A to equipment B.

[0050] According to the example embodiment, the facility resources, raw materials and information resources corresponding to the processing and production target are extracted from the preparatory resource requirements. Then, the market production data at the current moment is extracted from the information resources, wherein the market production data can be used to represent the market demand related to production and processing in the current application scenario. Then, the preset facility association information corresponding to the facility resources, the processing information of the raw materials and the market production data can be input into the preset optimal process determination model, and the preparatory processing production process can be directly output.

[0051] This application analyzes the demand for preparatory resources in detail and accurately determines the facility resources, raw materials and information resources required for processing and production goals, ensuring that the supply and demand of resources in the production process match each other, avoiding waste and shortage of resources, and improving resource utilization efficiency. The introduction of the analysis link of market production data enables the generated preparatory processing production process to closely follow the current market dynamics. Through real-time monitoring and interpretation of market data, production strategies can be adjusted in a timely manner, and product structures and production processes can be optimized to adapt to changes in market demand.

[0052] According to some embodiments, the preselected work order of facility resources can be determined based on preset facility association information corresponding to the facility resources; the preselected work time periods of facility resources can be determined based on processing information of raw materials; an initial processing production process can be generated based on the preselected work order and the preselected work time periods; and the initial processing production process can be adjusted based on market production data and processing production goals to generate a preliminary processing production process.

[0053] According to an example embodiment, preset facility association information of facility resources can be obtained from a database, which generally includes physical connection relationships between facilities, production capacity matching, operation sequence dependency, etc. Based on the preset facility association information, a logical analysis is performed on the relationship between facility resources to identify which facilities need to be prepared first or are at the front end of the production process, and which facilities can be involved in the subsequent stage. Based on the analysis results, the pre-selected working order of the facility resources is determined to ensure that each facility in the production process can work in the optimal order.

[0054] Collect and analyze in detail the processing information of raw materials, including key parameters such as processing time, processing temperature, processing pressure, and the changes in the morphology of raw materials at different processing stages. Combined with the production capacity of facility resources, use the preset corresponding model to evaluate the workload and efficiency of each facility under given raw material processing information. Based on the above analysis, allocate reasonable pre-selected working time periods for facility resources to ensure that raw materials can be processed in the best state while avoiding facility overload or idleness.

[0055] The pre-selected work sequence and pre-selected work time periods of facility resources are integrated to form a preliminary processing and production process framework. The preliminary processing and production process is logically checked to ensure smooth connection between each link without logical conflicts or omissions. Based on the inspection results, the initial processing and production process is generated to clarify when and what work each facility performs. Combine market production data and the processing and production goals in the current scenario to evaluate whether the initial processing and production process can meet market demand and cost-effectiveness requirements. During the evaluation process, identify the production links or facility resources that need to be adjusted, such as increasing the working hours of a facility to meet the demand growth, or adjusting the processing sequence to optimize the cost structure. According to the identified adjustment points, make corresponding adjustments to the initial processing and production process, including modifying the work sequence, adjusting the working hours, optimizing resource allocation, etc., and use the adjusted processing and production process as the preliminary processing and production process.

[0056] This application determines the pre-selected working order of the facilities by pre-setting the facility association information, effectively avoiding resource conflicts and idleness, and ensuring the efficient use of facility resources. At the same time, reasonable pre-selected working time periods are allocated according to the processing information of the raw materials, further improving the accuracy and efficiency of resource allocation. The generated initial processing production process is based on the pre-selected working order and time periods of the facility resources, ensuring the logic and coherence of the production process. This process fully considers the dependencies between the facilities and the processing characteristics of the raw materials, providing a strong guarantee for the smooth progress of production activities. The optimization of the preparatory processing production process not only improves the efficiency of production activities, but also reduces production costs by reducing unnecessary waiting time and waste of resources.

[0057] According to some embodiments, the target application resources can be determined based on the prepared resource requirements and the pre-selected production line resources; the processing production mode corresponding to the target application resources and the processing production status within a preset working period are obtained; and the prepared processing production process is adjusted according to the processing production mode and the processing production status to generate the target processing production process.

[0058] According to the example embodiment, the pre-resource requirements are analyzed to extract the specific resource types, quantities and quality requirements required for production. Using the preset corresponding model, the pre-selected production line resources are comprehensively evaluated, including factors such as equipment performance, capacity, maintenance status and availability. Based on the evaluation results of the pre-resource requirements and the pre-selected production line resources, resource matching is performed to determine the final target application resources. This includes determining which production lines, equipment or tools will be used for actual production, as well as their configuration and layout.

[0059] For the determined target application resources, obtain the corresponding processing and production mode information that has been pre-detected and stored. The processing and production mode describes how to process the raw materials, including processing steps, process parameters, required tools and equipment, etc. Query the processing and production status of the target application resources within the preset working period. The preset working period is a pre-set time period for production activities. The preset working period is greater than the sum of all pre-selected working periods to accommodate possible processing time adjustments, equipment maintenance, production interruptions and other factors. The processing and production status indicates whether the resource is in a processing state and whether there is a conflict with other production tasks.

[0060] According to the acquired processing production mode and the processing production status within the preset working period, their impact on the pre-processing production process is obtained, including factors that may cause production conflicts, delays or reduced efficiency. Based on the analysis results, a specific adjustment strategy is formulated using the preset model, which may include adjusting the processing sequence, optimizing the production rhythm, reallocating resources, adjusting the processing time, etc. The purpose of the adjustment is to ensure that the target processing production process can maximize production efficiency and resource utilization while meeting production needs.

[0061] According to the formulated adjustment strategy, adjust the preparatory processing production process. During the adjustment process, pay attention to maintaining the consistency and logic of the process to avoid introducing new conflicts or problems. After the adjustment is completed, generate the target processing production process and clarify the specific tasks, time nodes and resource requirements of each production link.

[0062] This application adjusts the preliminary processing production process according to the processing production mode and the processing production status within the preset working period, and generates a target processing production process that is more in line with the actual production situation. This flexibility enables the production process to quickly adapt to changes in production conditions, such as equipment failures, fluctuations in raw material supply, etc., thereby ensuring the continuity and stability of production. By optimizing the configuration of target application resources and adjusting the production process, the waiting time and resource waste in the production process are reduced, and production efficiency is improved. At the same time, reasonable processing production modes and preset working time arrangements enable production activities to be carried out efficiently and orderly, further improving overall production efficiency.

[0063] According to some embodiments, the non-processing production time of the corresponding target application resources can be determined according to the processing and production mode; the occupied idle information within the preset working period can be determined according to the processing and production status; and the preparatory processing and production process can be adjusted according to the non-processing production time and the occupied idle information to generate the target processing and production process.

[0064] According to an example embodiment, the non-processing production time of the target application resource that is pre-set and stored corresponding to the processing production mode is obtained. These time periods include necessary equipment idle time, response time, and any possible interruption time to ensure that the equipment will not be damaged or misoperated due to continuous work during the processing process.

[0065] Find the preset working period arrangement and determine the overall usage of the target application resources during that period. Through the monitoring system or production schedule, collect the actual occupancy and idle period information of the target application resources during the preset working period, including the scheduled production tasks, expected maintenance time, possible equipment failure time, etc. Compare and analyze the collected occupancy and idle data to identify potential conflict points and available idle periods.

[0066] Match the non-processing production time of the target application resources with the occupancy idle information within the preset working period, and determine the appropriate time period to arrange non-processing production activities, such as equipment preheating, cooling, maintenance, etc. According to the matching results, adjust the processing sequence and time period in the preparatory processing production process. Ensure that no processing operations are performed during the non-processing production period of the equipment, and make full use of the idle time to arrange production tasks to improve production efficiency and resource utilization. During the adjustment process, it is necessary to consider maintaining the consistency and logic of the production process to avoid introducing new conflicts or problems. At the same time, the production process can be further optimized based on the priority and urgency of the production tasks to ensure the smooth execution of the production plan. After the above adjustments and optimizations, the final target processing production process is generated.

[0067] This application avoids the equipment from being mistakenly scheduled for production tasks during a period when it cannot work continuously by accurately incorporating the non-processing production time of the target application resources into the production process planning. This reduces waiting time and resource waste in the production process, thereby significantly improving production efficiency. After considering the idle information of the preset working period, the production process is adjusted to make full use of the idle time of the equipment to arrange production tasks. This way of optimizing resource utilization not only improves the utilization rate of equipment, but also reduces bottlenecks and conflicts in the production process, ensuring the smooth progress of production activities. By reducing unnecessary waiting time and resource waste, and optimizing each link in the production process, this method helps to reduce production costs. This includes reducing energy consumption, reducing raw material waste, and reducing equipment maintenance costs.

[0068] According to some embodiments, the initial working period and initial working duration of the target application resources within a preset period can be determined based on the production line resource occupancy information; based on the initial working period and initial working duration, the target processing production process is simulated to generate a corresponding target allocation plan.

[0069] According to the example embodiment, the processing and production tasks currently in progress are extracted from the production line resource occupancy information. Then, the occupation of all production line resources by the processing and production tasks currently in progress within the current preset time period can be obtained from the preset production scheduling system, including the estimated completion time, resource idle time period, etc. Based on the production line resource occupancy information, the processing and production status of the processing and production tasks in progress is further determined, including their processing cycles, production line switching time, equipment maintenance requirements, etc. Then, an initial working time period and initial working duration are allocated to the target application resources within the preset time period. This time period and duration should try to avoid conflicts with other high-priority or long-time occupied tasks, while taking into account the non-processing production time of the target application resources and the requirements of the processing and production mode. This can be achieved specifically by using a pre-set model.

[0070] Load the target processing and production process into the preset production simulation system, which should have the ability to simulate the production process. Set the initial working period and initial working time of the target application resources in the simulation system, as well as other relevant parameters such as equipment performance and material supply. Start the preset simulation system and perform simulation according to the target processing and production process. During the simulation, the system will consider factors such as the non-processing production time, processing speed, and production line switching time of the equipment, and calculate the production progress and resource occupancy in real time. After the simulation is completed, the corresponding target allocation plan is generated based on the simulation results.

[0071] This application can accurately determine the initial working period and initial working duration of the target application resources within a preset period of time by deeply analyzing the resource occupancy information of the production line. This refined resource allocation method ensures the efficient use of resources and avoids idleness and waste of resources. With the help of processing and production simulation technology, the execution process of production tasks can be predicted and optimized without actually starting the production process. Through simulation, potential production bottlenecks and conflicts can be discovered and resolved in a timely manner, thereby reducing waiting time and downtime in actual production and improving overall production efficiency.

[0072] The following describes an apparatus embodiment of the present application, which can be used to execute the method embodiment of the present application. For details not disclosed in the apparatus embodiment of the present application, reference can be made to the method embodiment of the present application.

[0073] Figure 2 This is a block diagram of a resource allocation device for a machining production line provided in an embodiment of the present application. Figure 2 As shown, the resource allocation device 200 for a machining production line includes a task analysis module 201 , a pre-selected production line resource determination module 202 , a target information determination module 203 and a resource allocation plan generation module 204 .

[0074] Task analysis module 201, used to determine the preparation process and resource requirements according to the received processing and production tasks; The pre-selected production line resource determination module 202 is used to obtain production line resource occupancy information and determine the pre-selected production line resources according to the production line resource occupancy information; The target information determination module 203 is used to generate a target processing production process and target application resources according to the prepared processing production process, the prepared resource requirements and the pre-selected production line resources; The resource allocation plan generation module 204 is used to generate a resource allocation plan corresponding to the processing and production task based on the target processing and production process and the target application resources.

[0075] Optionally, the task analysis module 201 may be specifically used for: Receive and analyze processing and production tasks, and determine processing and production goals; Obtain the preparatory resource requirements corresponding to the processing and production goals; Generate preparatory processing production flow according to preparatory resource requirements.

[0076] Optionally, when generating a preparatory processing production flow according to the preparatory resource requirements, the task analysis module 201 may be specifically used to: Determine the facility resources, raw materials and information resources corresponding to the processing and production goals based on the preparatory resource requirements; Analyze information resources to determine market production data at the current moment; Generate a preparatory processing production flow based on the preset facility association information corresponding to the facility resources, the processing information of the raw materials and the market production data.

[0077] Optionally, when the task analysis module 201 generates a pre-processing production flow according to preset facility association information corresponding to facility resources, processing information of raw materials and market production data, it can be specifically used to: Determine the pre-selected work order of the facility resources according to the preset facility association information corresponding to the facility resources; Determine the pre-selected working hours of facility resources based on the processing information of raw materials; Generate the initial processing production flow according to the pre-selected work sequence and pre-selected work period; According to market production data and processing production goals, the initial processing production process is adjusted to generate a preliminary processing production process.

[0078] Optionally, the target information determination module 203 may be specifically used for: Determine target application resources based on pre-resource requirements and pre-selected production line resources; Obtain the processing and production mode corresponding to the target application resources and the processing and production status within the preset working period; According to the processing production mode and processing production status, the preliminary processing production process is adjusted to generate the target processing production process.

[0079] Optionally, when the target information determination module 203 adjusts the preliminary processing production process according to the processing production mode and the processing production status to generate the target processing production process, it can be specifically used to: According to the processing and production mode, determine the non-processing production time of the corresponding target application resources; According to the processing and production status, determine the occupancy and idleness information within the preset working period; According to the non-processing production time and idle time information, the preparatory processing production process is adjusted to generate the target processing production process.

[0080] Optionally, the resource allocation solution generating module 204 may be specifically used for: Determine the initial working period and initial working duration of the target application resources within a preset period according to the production line resource occupancy information; According to the initial working period and initial working time, the target processing production process is simulated to generate the corresponding target allocation plan.

[0081] The device performs functions similar to the method provided above. For other functions, please refer to the previous description and will not be repeated here.

[0082] Figure 3 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application, such as Figure 3 As shown, the electronic device 300 of this embodiment may include: a memory 301 and a processor 302 .

[0083] The memory 301 stores a computer program. When the computer program is executed by the processor 302, the processor 302 executes the method in the above embodiment.

[0084] The processor 302 and the memory 301 are connected, for example, via a bus.

[0085] Optionally, the electronic device 300 may further include a transceiver. It should be noted that in actual applications, the number of transceivers is not limited to one, and the structure of the electronic device 300 does not constitute a limitation on the embodiments of the present application.

[0086] The processor 302 may be a CPU (Central Processing Unit), a general-purpose processor, a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array), or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It may implement or execute various exemplary logic blocks, modules, and circuits described in conjunction with the disclosure of this application. The processor 302 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, and the like.

[0087] The bus may include a path to transmit information between the above components. The bus may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus. The bus may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, only one thick line is used in the figure, but it does not mean that there is only one bus or one type of bus.

[0088] The memory 301 can be a ROM (Read Only Memory) or other types of static storage devices that can store static information and instructions, a RAM (Random Access Memory) or other types of dynamic storage devices that can store information and instructions, or an EEPROM (Electrically Erasable Programmable Read Only Memory), a CD-ROM (Compact Disc Read Only Memory) or other optical disk storage, optical disk storage (including compressed optical disk, laser disk, optical disk, digital versatile disk, Blu-ray disk, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited to these.

[0089] The memory 301 is used to store the application code for executing the solution of the present application, and the execution is controlled by the processor 302. The processor 302 is used to execute the application code stored in the memory 301 to implement the contents shown in the above method embodiment.

[0090] The electronic devices include, but are not limited to, mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), and fixed terminals such as digital TVs, desktop computers, etc. It can also be a server, etc. Figure 3 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0091] The electronic device of this embodiment can be used to execute the method of any of the above embodiments, and its implementation principle and technical effect are similar, which will not be described in detail here.

[0092] The present application also provides a non-transitory computer-readable storage medium having computer-readable instructions stored thereon. When the aforementioned instructions are executed by a processor, the processor executes the method in the above embodiment.

[0093] Those skilled in the art can understand that all or part of the steps of implementing the above-mentioned method embodiments can be completed by hardware related to program instructions. The aforementioned program can be stored in a non-transient computer-readable storage medium. When the program is executed, the steps of the above-mentioned method embodiments are executed; and the aforementioned storage medium includes: ROM, RAM, disk or optical disk and other media that can store program codes.

[0094] The embodiments of the present application are described in detail above. Specific examples are used herein to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method and its core idea of ​​the present application. At the same time, changes or deformations made by those skilled in the art based on the ideas of the present application, the specific implementation methods and the scope of application of the present application, all belong to the scope of protection of the present application. In summary, the content of this specification should not be construed as a limitation on the present application.

Claims

1. A resource allocation method for a machining production line, characterized in that: include: Determine the preparatory processing and production process and preparatory resource requirements based on the received processing and production tasks; Acquiring production line resource occupancy information, and determining pre-selected production line resources according to the production line resource occupancy information; Generate a target processing production process and target application resources according to the prepared processing production process, the prepared resource requirements and the pre-selected production line resources; Based on the target processing and production process and the target application resources, a resource allocation plan corresponding to the processing and production task is generated.

2. The method according to claim 1, characterized in that: Determining the preparation process and resource requirements based on the received processing and production tasks includes: Receive and analyze the processing and production tasks to determine the processing and production goals; Obtaining the preparation resource requirement corresponding to the processing production target; The preparatory processing production flow is generated according to the preparatory resource requirements.

3. The method according to claim 2, characterized in that Generating the preparatory processing production flow according to the preparatory resource requirements includes: Determine the facility resources, raw materials and information resources corresponding to the processing and production goals according to the preliminary resource requirements; Analyzing the information resources to determine the market production data at the current moment; The preparatory processing production flow is generated according to the preset facility association information corresponding to the facility resources, the processing information of the raw materials and the market production data.

4. The method according to claim 3, characterized in that The generating of the preparatory processing production flow according to the preset facility association information corresponding to the facility resources, the processing information of the raw materials and the market production data comprises: Determining a pre-selected work order of the facility resources according to preset facility association information corresponding to the facility resources; Determining the preselected working time period of the facility resources according to the processing information of the raw materials; Generate an initial processing production flow according to the preselected work sequence and the preselected work time period; The initial processing production process is adjusted according to the market production data and the processing production target to generate the preliminary processing production process.

5. The method according to claim 1, characterized in that The generating of the target processing and production process and the target application resources according to the prepared processing and production process, the prepared resource requirements and the pre-selected production line resources includes: Determining the target application resources according to the prepared resource requirements and the pre-selected production line resources; Obtaining the processing and production mode corresponding to the target application resource and the processing and production status within a preset working period; According to the processing production mode and the processing production status, the preliminary processing production process is adjusted to generate the target processing production process.

6. The method according to claim 5, characterized in that The step of adjusting the preliminary processing production process according to the processing production mode and the processing production state to generate the target processing production process includes: According to the processing and production mode, determining the non-processing and production time of the corresponding target application resource; Determine the occupancy and idleness information within the preset working period according to the processing and production status; According to the non-processing production time and the idle time information, the preparatory processing production process is adjusted to generate the target processing production process.

7. The method according to claim 5 or 6, characterized in that: The generating of a resource allocation plan corresponding to the processing and production task based on the target processing and production process and the target application resources includes: Determining the initial working period and initial working duration of the target application resource within the preset period according to the production line resource occupancy information; According to the initial working period and the initial working duration, a processing and production simulation is performed on the target processing and production process to generate a corresponding target allocation plan.

8. A resource allocation device for a machining production line, characterized in that: include: The task analysis module is used to determine the preparation process and resource requirements based on the received processing and production tasks; A pre-selected production line resource determination module, used to obtain production line resource occupancy information and determine pre-selected production line resources according to the production line resource occupancy information; A target information determination module, used to generate a target processing and production process and target application resources according to the prepared processing and production process, the prepared resource requirements and the pre-selected production line resources; The resource allocation plan generation module is used to generate a resource allocation plan corresponding to the processing and production task based on the target processing and production process and the target application resources.

9. An electronic device, characterized in that: include: processor; A memory storing a computer program, which, when executed by the processor, enables the processor to execute the resource allocation method for a machining production line as described in any one of claims 1 to 7.

10. A non-transitory computer-readable storage medium, characterized in that: Computer-readable instructions are stored thereon, and when the instructions are executed by a processor, the processor executes the resource allocation method for a machining production line as described in any one of claims 1-7.

Citation Information

Patent Citations

  • Production scheduling method, system and equipment, medium and production scheduling management platform

    CN113344338A

  • Production scheduling method, device and equipment of manufacturing execution system and storage medium

    CN114493119A

  • Hair restorer production process management method and system

    CN117391641A

  • Production management method, electronic equipment and computer readable storage medium

    CN117952400A

Cited By

  • Enterprise production management method, device, equipment and medium

    CN119294687A

  • Model business trade management system and trade data management method

    CN119313296A