Landscape design method, device and equipment based on BIM (Building Information Modeling) and medium

Through the BIM-based landscape design method, an accurate three-dimensional topography and element model is established, which solves the problem of inaccurate information transmission in traditional landscape design and improves the efficiency and quality of design and construction.

CN119026213APending Publication Date: 2024-11-26HANGZHOU JIUMU LANDSCAPE DESIGN CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411085926.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In traditional landscape design, information transmission between designers and construction workers relies on hand-drawn drawings, which can easily lead to information misunderstanding or omission, affecting the construction effect.

Method used

Using BIM-based landscape design method, by obtaining project planning diagrams and project locations, establishing initial BIM models, extracting landscape elements and building element models, generating accurate three-dimensional terrain models and BIM models for data support in the design and construction phases and simulation.

Benefits of technology

It improves the design efficiency and construction quality of landscape design, reduces terrain errors and human errors, and promotes the collaboration and standardization of design and construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026213A_ABST
    Figure CN119026213A_ABST
Patent Text Reader

Abstract

The invention relates to the field of data processing, in particular to a BIM-based landscape design method and device, equipment and a medium. The method comprises the steps of obtaining a project planning map and a project position of a to-be-built project to preliminarily obtain a design concept of a designer, obtaining topographic data such as topography and vegetation of the project position of the to-be-built project in combination with the project position, and establishing an initial BIM model corresponding to the project position, so that a more accurate three-dimensional topographic model can be created; according to the method, landscape elements in a project planning map are extracted, a corresponding element model is established, the element model is filled into an initial BIM model to obtain a BIM model of a to-be-built project, the obtained BIM model integrates all basic data and information of the project, in the construction stage, the BIM model can be used for construction progress simulation, material management, cost control and other work, and the construction efficiency is improved. And the construction efficiency and quality are improved, so that the construction effect corresponding to landscape design is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of data processing, and in particular to a BIM-based landscape design method, device, equipment and medium. Background Art

[0002] Landscape design refers to the overall consideration and design of the surrounding environmental elements during the process of architectural design or planning design. It not only focuses on the use and transformation of natural elements such as terrain, vegetation, and water bodies, but also involves the layout and planning of artificial elements such as buildings, roads, and facilities. The goal of landscape design is to create an outdoor space that is both beautiful and practical to meet people's use needs and aesthetic needs.

[0003] In the traditional landscape design process, designers mainly rely on hand-drawn drawings to express design concepts, and the information transmission between designers and construction workers depends on drawings. This communication method can easily lead to misunderstanding or omission of information, which in turn affects the construction effect. Summary of the invention

[0004] In order to improve the construction effect corresponding to the landscape design, the present application provides a landscape design method, device, equipment and medium based on BIM.

[0005] In the first aspect, the present application provides a BIM-based landscape design, which adopts the following technical solutions: A BIM-based landscape design, including: Obtain the project plan and location of the project to be built; Based on the project location, establish an initial BIM model; Extracting landscape elements from the project planning map and establishing an element model corresponding to each landscape element; Based on the initial BIM model and the element model, a BIM model corresponding to the project to be built is constructed.

[0006] By adopting the above technical solution, the project planning map and project location of the project to be built are obtained to preliminarily obtain the designer's design concept, and combined with the project location, the terrain data such as the terrain and vegetation of the project location where the project to be built is obtained, and the initial BIM model corresponding to the project location is established, which can create a more accurate three-dimensional terrain model, extract the landscape elements in the project planning map, and establish the corresponding element model, which greatly improves the design efficiency. At the same time, due to the accuracy and consistency of the element model, the accuracy of the BIM model is also ensured. The element model is filled into the initial BIM model to obtain the BIM model of the project to be built. The obtained BIM model integrates all the basic data and information of the project, and provides comprehensive data support for subsequent design and construction. In the design stage, multiple schemes can be compared and optimized based on the BIM model; in the construction stage, the BIM model can be used for construction progress simulation, material management and cost control, etc., to improve construction efficiency and quality, thereby improving the corresponding construction effect of landscape design.

[0007] In a possible implementation, establishing an initial BIM model based on the project location includes: Obtaining terrain data and basic location information corresponding to the project location, wherein the basic location information includes topography, surrounding buildings and roads; Based on the terrain data, create a three-dimensional terrain model corresponding to the project location; Establishing a layer corresponding to the basic location information; The layer corresponding to the basic location information is added to the three-dimensional terrain model to obtain an initial BIM model.

[0008] By adopting the above technical solutions, the terrain data corresponding to the project location, including elevation, slope, geological conditions, etc., can be obtained to create an accurate three-dimensional terrain model, which provides a real and reliable terrain foundation for project design and reduces design changes and cost increases caused by terrain errors. The basic location information (such as topography, surrounding buildings, roads, etc.) is divided and managed according to layers. The layered information management method improves the transparency and efficiency of the design process and promotes communication and collaboration among various disciplines.

[0009] In a possible implementation, extracting landscape elements in the project planning map includes: Determine the extraction rules corresponding to the project planning map; Based on the extraction rules, landscape elements are extracted from the project planning map.

[0010] By adopting the above technical solution and formulating clear extraction rules, it can be ensured that different designers or design teams follow the same standards when extracting landscape elements, thereby promoting the standardization and regularization of design. Then, landscape elements such as green spaces, water bodies, sculptures, seats, etc. can be extracted from the project planning map, which is not only more efficient, but also can reduce human errors and improve the accuracy of the design.

[0011] In a possible implementation, determining the extraction rule corresponding to the project planning diagram includes: Determining whether the building shape corresponding to the project planning diagram is a regular building shape; If the building shape corresponding to the project planning diagram is a regular building shape, determining that the extraction rule corresponding to the project planning diagram is a deep learning network model; Wherein, extracting landscape elements from the project planning map based on the extraction rule includes: The project planning map is input into the deep learning network model, and the output of the deep learning network model is obtained to obtain the landscape elements in the project planning map.

[0012] By adopting the above technical solution, the deep learning network model is used to extract landscape elements for project planning drawings with regular building shapes and realizes automated processing. The deep learning network model has strong generalization ability and can handle project planning drawings of different styles and scales. After training and optimization with a large amount of data, the deep learning network model can accurately identify landscape elements in project planning drawings, including green spaces, water bodies, trees, roads, etc. This high-precision recognition helps to ensure the accuracy of the extraction results.

[0013] In a possible implementation, when the building shape corresponding to the project planning diagram is an irregular building shape, the method further includes: Determine that the extraction rule corresponding to the project planning map is partition extraction; Wherein, extracting landscape elements from the project planning map based on the extraction rule includes: Setting coordinate points corresponding to each of the plurality of sampling points on the project planning map; Based on the coordinate points corresponding to each sampling point, dividing the building shape into a plurality of building sub-shapes; Each building sub-shape is extracted to obtain landscape elements.

[0014] By adopting the above technical solution, for irregular building shapes, a division extraction method is adopted. The division extraction method can more flexibly cope with complex and changeable building contours by setting sampling points and dividing the building shape into multiple sub-shapes based on the coordinate points, thereby improving the adaptability of the extraction method. After the irregular building shape is divided into multiple sub-shapes, a more detailed extraction operation can be performed on each sub-shape, which helps to reduce the loss of details or error accumulation caused by overall processing, thereby improving the extraction accuracy of landscape elements.

[0015] In a possible implementation, an element model corresponding to each landscape element is established, and the process of establishing the element model corresponding to each landscape element includes: Identify the material corresponding to the landscape element; Determining the texture of the landscape element based on the material of the landscape element; Based on the texture and material of the landscape element, an element model corresponding to the landscape element is established.

[0016] By adopting the above technical solution, by identifying the material of landscape elements and determining their texture based on the material, the appearance characteristics of landscape elements in the real world can be simulated more accurately, which helps to improve the authenticity and credibility of project design and make the design results closer to the actual construction effect. The established element model contains detailed information such as the material and texture of the landscape elements, which can be directly imported into the rendering software for processing, thereby saving a lot of modeling and material mapping time, and can serve as the basis for subsequent rendering and visualization work.

[0017] In a possible implementation, constructing a BIM model corresponding to the project to be built based on the initial BIM model and the element model includes: Determine the model position corresponding to each element model; Based on the model position corresponding to each element model, each element model is input into the initial BIM model to obtain the BIM model corresponding to the project to be built.

[0018] By adopting the above technical solution, modular construction is achieved by constructing each landscape element as an independent element model and directly inserting these element models into the initial BIM model when building the BIM model, thereby avoiding the complexity of building each element one by one from scratch and significantly improving the efficiency of model construction.

[0019] In the second aspect, the present application provides a BIM-based landscape design device, which adopts the following technical solution: A BIM-based landscape design device, comprising: The acquisition module is used to obtain the project planning map and project location of the project to be built; A building module for building an initial BIM model based on the project location; An extraction module is used to extract landscape elements in the project planning map and establish an element model corresponding to each landscape element; A construction module is used to construct a BIM model corresponding to the project to be built based on the initial BIM model and the element model.

[0020] In a third aspect, the present application provides an electronic device, which adopts the following technical solution: An electronic device, comprising: at least one processor; Memory; At least one application, wherein the at least one application is stored in a memory and configured to be executed by at least one processor, and the at least one application is configured to: execute the BIM-based landscape design method described in the first aspect above.

[0021] In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution: A computer-readable storage medium includes: a computer program that can be loaded by a processor and execute the BIM-based landscape design method described in the first aspect.

[0022] In summary, the present application includes the following beneficial technical effects: obtaining the project planning map and project location of the project to be built, so as to preliminarily obtain the designer's design concept, and combining the project location, obtaining the terrain data such as the terrain and vegetation of the project location where the project to be built is located, and establishing the initial BIM model corresponding to the project location, which can create a more accurate three-dimensional terrain model, extract the landscape elements in the project planning map, and establish the corresponding element model, which greatly improves the design efficiency. At the same time, due to the accuracy and consistency of the element model, the accuracy of the BIM model is also ensured, and the element model is filled into the initial BIM model to obtain the BIM model of the project to be built. The obtained BIM model integrates all the basic data and information of the project, and provides comprehensive data support for subsequent design and construction. In the design stage, multiple schemes can be compared and optimized based on the BIM model; in the construction stage, the BIM model can be used for construction progress simulation, material management and cost control, etc., to improve construction efficiency and quality, thereby improving the corresponding construction effect of landscape design. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a flow chart of a BIM-based landscape design method provided in an embodiment of the present application; Figure 2is a block diagram of a BIM-based landscape design device provided in an embodiment of the present application; Figure 3 It is a schematic diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0024] The following is combined with Figure 1 -Attached Figure 3 This application is described in further detail.

[0025] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0026] In order to facilitate understanding of the technical solution proposed in this application, several elements introduced in the description of this application are first introduced here. It should be understood that the following introduction is only for the convenience of understanding these elements, so as to understand the content of the embodiments of this application, and does not necessarily cover all possible situations.

[0027] Landscape design (also known as landscape architecture) is a comprehensive discipline that involves the overall consideration and design of the surrounding environmental elements, including natural elements and artificial elements, aiming to make the building (group) echo the natural environment, improve the convenience and comfort of use, and enhance the overall artistic value. Landscape design refers to the overall consideration and design of the surrounding environmental elements in the process of architectural design or planning design. It not only focuses on the use and transformation of natural elements such as terrain, vegetation, water bodies, etc., but also involves the layout and planning of artificial elements such as buildings, roads, facilities, etc. The goal of landscape design is to create an outdoor space that is both beautiful and practical to meet people's use needs and aesthetic needs.

[0028] BIM (Building Information Modeling) technology is a method of building design, construction and management based on digital modeling. It is based on a three-dimensional building model, comprehensively considers the entire process of building design, construction, operation and management, and realizes the integrated management and collaborative operation of building information, thereby improving the design quality and construction efficiency of building projects.

[0029] BIM technology integrates building information into a unified model, and uses the three-dimensional model as a carrier to collect, transmit, analyze, and predict and optimize information data, bringing real driving force for change to the construction industry. The basic principle of BIM technology is to integrate various information required for building design, construction, and operation management into a unified modeling environment to achieve information sharing and collaborative work.

[0030] In the traditional landscape design process, designers mainly rely on hand-drawn drawings to express design concepts, and the information transmission between designers and construction workers depends on drawings. This communication method can easily lead to misunderstanding or omission of information, which in turn affects the construction effect.

[0031] In view of this, the embodiment of the present application provides a BIM-based landscape design method, which obtains the project planning map and project location of the project to be built, so as to preliminarily obtain the designer's design concept, and in combination with the project location, obtains the terrain data such as the terrain and vegetation of the project location where the project to be built is located, and establishes the initial BIM model corresponding to the project location, which can create a more accurate three-dimensional terrain model, extract the landscape elements in the project planning map, and establish the corresponding element model, which greatly improves the design efficiency. At the same time, due to the accuracy and consistency of the element model, the accuracy of the BIM model is also ensured, and the element model is filled into the initial BIM model to obtain the BIM model of the project to be built. The obtained BIM model integrates all the basic data and information of the project, and provides comprehensive data support for subsequent design and construction. In the design stage, multiple schemes can be compared and optimized based on the BIM model; in the construction stage, the BIM model can be used to simulate the construction progress, material management and cost control, etc., to improve the construction efficiency and quality, thereby improving the construction effect corresponding to the landscape design.

[0032] The present application embodiment provides a BIM-based landscape design method, such as Figure 1 As shown, the method provided in the embodiment of the present application is executed by an electronic device, which can be a server or a terminal device, wherein the server can be an independent physical server, or a server cluster or distributed system composed of multiple physical servers, or a cloud server providing cloud computing services. The terminal device can be a smart phone, a tablet computer, a laptop computer, a desktop computer, etc., but is not limited thereto. The terminal device and the server can be directly or indirectly connected via wired or wireless communication, which is not limited in the embodiment of the present application. The method includes steps S101 to S104, wherein: Step S101: Obtain a project planning map and project location of a project to be constructed.

[0033] The project planning map of the project to be built includes information such as the floor area, number of floors and purpose of the building to be built, and the project location of the project to be built is the specific location of the city where the building to be built is located. For example, the purpose of the building to be built is a shopping mall, and the location is No. 100, First Street, Haidian District, Beijing. Specifically, a drawing receiving instruction can be sent to obtain the project planning map of the project to be built input by the user, or directly obtain the existing project planning map of the project to be built.

[0034] Step S102: Establish an initial BIM model based on the project location.

[0035] After obtaining the project location, the surrounding scenery, boundary lines and elevation data of the project location can be obtained, and then a project file to be built can be created using BIM software, and based on the project location and the surrounding scenery, boundary lines and elevation data corresponding to the project location, a site model including infrastructure such as terrain, roads, and water systems can be drawn to obtain an initial BIM model. Among them, BIM software can be Revit, ArchiCAD, AutoCAD Civil 3D, etc.

[0036] Specifically, the surrounding scenery, boundary lines and elevation data of the project location are input into the BIM software so that the BIM software can draw a site model of the project location as an initial BIM model.

[0037] Step S103: extract the landscape elements in the project planning map, and establish an element model corresponding to each landscape element.

[0038] Each landscape element is an independent minimum landscape entity in the project planning map, such as green belts, flower beds, sculptures, trails, etc. Furthermore, a building is divided into multiple sub-buildings, and a sub-building is a landscape element, such as a window, a building top, and a door.

[0039] Wherein, a preset shape database is established according to the landscape elements in the historical project planning map and the common building landscape elements, and the preset shape database contains a plurality of preset landscape element shapes.

[0040] Specifically, each landscape element in the project planning map is identified to extract the landscape boundary of each landscape element, and based on each landscape boundary, an element model corresponding to the landscape element is established. More specifically, the project planning map is identified, and the shape corresponding to each independent individual in the project planning map is compared with the shape of the preset landscape element in the preset shape database, and the individual whose shape similarity with the preset landscape element in the preset shape database is higher than the preset similarity threshold is taken as the first landscape element, and the first landscape element is extracted; the rest of the project planning map except the first landscape element is extracted, and the boundary corresponding to the rest is identified, and the rest is divided into a plurality of sub-parts according to the boundary corresponding to the rest, and each sub-part is taken as a second landscape element, so as to obtain the landscape element in the project planning map. Among them, the division rule of the rest can be the principle of equal area division.

[0041] Furthermore, after obtaining the landscape elements in the project planning map, the boundary line of each landscape element is displayed to mark the extracted landscape elements.

[0042] Furthermore, after obtaining the landscape elements in the project planning map, a landscape element boundary layer is established for each landscape element in the project planning map in the order from top to bottom and from left to right, as an element model corresponding to each landscape element.

[0043] Step S104: construct a BIM model corresponding to the project to be built based on the initial BIM model and the element model.

[0044] Specifically, the element model corresponding to each landscape element is input into the initial BIM model in the file of the project to be built in the BIM software, and the positional relationship between each element model and the initial BIM model is checked and adjusted to obtain the BIM model corresponding to the project to be built.

[0045] Furthermore, a common color corresponding to each landscape element is obtained, and the color of each landscape element in the BIM model corresponding to the project to be constructed is adjusted according to the common color of each landscape element, so as to complete the optimization of the BIM model corresponding to the project to be constructed.

[0046] Furthermore, after obtaining the BIM model of the project to be built, the BIM model is encrypted. When it is detected that someone wants to modify the BIM model, a password verification or identity authentication instruction can be generated to perform security verification on the person who modifies the BIM model.

[0047] In a possible implementation of the embodiment of the present application, in the above step S102, an initial BIM model is established based on the project location, including: Obtain terrain data and basic location information corresponding to the project location; Create a 3D terrain model corresponding to the project location based on terrain data; Establish the layer corresponding to the basic location information; The layer corresponding to the basic location information is added to the three-dimensional terrain model to obtain the initial BIM model.

[0048] The basic location information may include topography, surrounding buildings and roads, etc., and may also include surrounding green plants. Specifically, the topography may include elevation data, slope data, soil type, etc., and the surrounding buildings may be bus stops, shopping malls, etc.

[0049] Specifically, GIS (Geographic Information System) technology can be used to obtain elevation data, slope data, soil type, etc. of the project location, and collect the topography around the project location, where the topography can include natural geographical features such as mountains, rivers, and lakes. Furthermore, BIM software with modeling functions can be used to establish a three-dimensional terrain model corresponding to the project location. Specifically, the collected terrain data (such as elevation data, slope data, etc.) is imported into the BIM software to obtain a created three-dimensional terrain model.

[0050] After obtaining the basic information and location of the terrain, surrounding buildings, roads, etc., a terrain layer, a building layer, and a road layer can be established for the terrain, surrounding buildings, and roads. Specifically, the terrain layer can be established by using ArcGIS's Geoprocessing tools to stitch the terrain around the project location into a complete image, and then symbolize the complete image through raster data, and set different colors or textures for different elevation ranges to distinguish different terrain features, and then create terrain through terrain tools, and use Landscapelayerblend nodes to create layer nodes, and set different materials to represent different terrain features, and draw different layers on the terrain to achieve detailed expression of the terrain.

[0051] The building layer can be established by obtaining image information of surrounding buildings and creating a new layer, and inputting the image information of surrounding buildings and the new layer into the trained network model to obtain the output building layer. The network model is trained by a large number of image information samples, new layer samples and corresponding building layer samples, and each surrounding building corresponds to a building layer.

[0052] The road layer can be established by obtaining the vector data of the road, then importing the appropriate amount of data into ArcGIS, creating a new layer to store the road data, selecting the starting point and end point on the map, and planning the road trajectory to obtain the road layer.

[0053] Furthermore, the defined layers are superimposed on the three-dimensional terrain model in the BIM software, and the positional relationship between each element model and the initial BIM model is checked and adjusted to obtain the BIM model corresponding to the project to be built.

[0054] A possible implementation of the embodiment of the present application, in the above embodiment, extracting landscape elements in the project planning map includes: Determine the extraction rules corresponding to the project planning diagram; Based on the extraction rules, landscape elements are extracted from the project planning map.

[0055] Since landscape elements may include green belts (grass, trees), flower beds, water features (ponds, fountains), trails, sculptures, seats, lighting facilities, etc., for each landscape element, different landscape elements correspond to different graphic features. For example, a green belt may be represented by a series of continuous lines or filled areas; a flower bed may have a regular geometric shape (such as a circle, a rectangle) and details of the internal planting area; a water feature may contain a water body boundary and possible water flow or fountain symbols; and a trail is a linear element connecting different areas. Therefore, the corresponding landscape elements in the project planning map can be identified, and the extraction rules required to extract each landscape element can be determined. Specifically, the project planning map is identified, and the shape corresponding to each landscape element in the project planning map is compared with the shape of the preset landscape elements in the preset shape database. The preset landscape elements whose shape similarity with the landscape elements in the project planning map is higher than the preset similarity threshold are used as the target preset landscape elements, and the preset extraction rules corresponding to the target preset landscape elements are used as the extraction rules of the corresponding landscape elements in the project planning map. Among them, each preset shape in the preset shape database corresponds to a preset extraction rule.

[0056] Furthermore, after obtaining the extraction rules corresponding to each landscape element in the project planning map, the corresponding extraction rules are used to extract the landscape elements from the project planning map. For example, green belts may be extracted by identifying continuous green filled areas; flower beds may be identified by finding geometric shapes with specific boundaries and internal patterns.

[0057] A possible implementation of the embodiment of the present application, in the above embodiment, determining the extraction rule corresponding to the project planning diagram includes: Determine whether the building shape corresponding to the project planning map is a regular building shape; If the building shape corresponding to the project planning diagram is a regular building shape, then determining that the extraction rule corresponding to the project planning diagram is a deep learning network model; Among them, based on the extraction rules, landscape elements are extracted from the project planning map, including: The project planning map is input into the deep learning network model, and the output of the deep learning network model is obtained to obtain the landscape elements in the project planning map.

[0058] As people's aesthetic standards continue to improve, many novel and unique building components are no longer limited to the existing common regular shapes, and people begin to pursue unique and strange building components. When the building components are not regular shapes, it will be difficult to extract landscape elements. Therefore, a preliminary analysis of the project planning map can be conducted to confirm whether the building shapes are mainly regular shapes. Specifically, the shape analysis tool in the image processing software can be used to determine whether the building shapes in the project planning map are regular shapes.

[0059] If the building shape is indeed mainly regular, and the planning map contains complex landscape elements (such as different types of trees, flower beds, water features, etc.), then select the deep learning network model as the extraction tool. Specifically, the project planning map to be processed is input into the trained deep learning network model. The deep learning model will automatically process the input image and extract the feature information in the image through structures such as convolutional layers, pooling layers, and fully connected layers. The deep learning network model will use this feature information to predict the probability of each pixel or area in the image belonging to which landscape element. The deep learning network model outputs the prediction results for each landscape element, including the location of the element (usually given in the form of a bounding box) and the category (such as trees, flower beds, water features, etc.). After the deep learning network model outputs, the output of the deep learning network model is obtained to obtain the landscape elements in the project planning map.

[0060] The training process of the deep learning network model can be as follows: Collect a large number of project planning drawings containing landscape elements as training data. These data need to be labeled, that is, the position and category of each landscape element (such as trees, flower beds, water features, etc.) in the image need to be clearly marked. Use the labeled training data to train the deep learning network model. During the training process, the model will learn how to identify different types of landscape elements and be able to accurately locate and classify these elements in new, unlabeled planning drawings.

[0061] In a possible implementation manner of the embodiment of the present application, in the above embodiment, when the building shape corresponding to the project planning diagram is an irregular building shape, the method further includes: Determine that the extraction rule corresponding to the project planning diagram is partition extraction; Among them, based on the extraction rules, landscape elements are extracted from the project planning map, including: Set the coordinate points corresponding to multiple sampling points on the project planning map; Based on the coordinate points corresponding to each sampling point, the building shape is divided into multiple building sub-shapes; Each building sub-shape is extracted to obtain landscape elements.

[0062] The project planning map is identified to confirm that the building shape is an irregular shape, that is, the building shape in the project planning map whose similarity with the preset landscape element shape is not higher than the similarity threshold. According to the complexity of the project planning map and the characteristics of the irregular building shape, multiple sampling points are set on the project planning map. Among them, the sampling points are evenly distributed around and inside the building shape, and can fully cover and divide the building shape.

[0063] Furthermore, a clear coordinate system is set for the planning map so that the coordinates of each sampling point can be accurately located, and image processing software is used to record the coordinate points corresponding to each sampling point on the planning map, and a partitioning strategy is used to divide the irregular building shape into multiple building sub-shapes according to the coordinates of each sampling point. The partitioning strategy can be polygonal partitioning based on connection lines, clustering partitioning based on distance or density, etc., which is not limited in the embodiments of the present application.

[0064] Furthermore, each building sub-shape is analyzed individually to identify the landscape elements around it. According to the characteristics of the landscape elements, image segmentation technology is used to extract the landscape elements around each building sub-shape. The landscape elements extracted from all the building sub-shapes are integrated to form a complete set of landscape elements.

[0065] In a possible implementation of the embodiment of the present application, in the above step S103, an element model corresponding to each landscape element is established. The process of establishing the element model corresponding to each landscape element includes: Identify the materials corresponding to landscape elements; Determine the texture of the landscape element based on the material of the landscape element; Based on the texture and material of the landscape elements, the element models corresponding to the landscape elements are established.

[0066] Different landscape elements may have different corresponding materials. For example, lime is a common material for sculptures. At the same time, the textures corresponding to each material may be different. Therefore, an element model corresponding to the landscape element can be established based on the material and texture corresponding to the landscape element. Specifically, based on the shape corresponding to the landscape element, it is determined whether the material corresponding to the shape exists in the preset shape database. If the material corresponding to the shape exists in the preset shape database, the material corresponding to the shape is obtained from the preset shape database as the material of the corresponding landscape element. When the shape corresponding to the landscape element does not exist in the preset database, the name corresponding to the landscape element is identified, and the common material corresponding to the name is obtained as the material corresponding to the landscape element. More specifically, when the shape corresponding to the landscape element does not exist in the preset database, the position of the landscape element in the project planning map is identified, that is, the position of the landscape element in the project to be built is identified, and the name corresponding to the landscape element is determined based on the building component corresponding to the position in the project to be built. Among them, one preset shape in the preset shape database corresponds to one or more preset materials, and one building component corresponds to one common material.

[0067] By taking photos, scanning or using a special texture capture device, set the texture sample of the corresponding surface for the material of each landscape element in advance to obtain the corresponding unique texture features, such as texture thickness, direction, color change, etc. After obtaining the material corresponding to the landscape element and the texture sample of each material, the texture sample corresponding to the material of the landscape element is used as the texture corresponding to the landscape element.

[0068] Furthermore, different landscape elements have different corresponding common colors. For example, the common color of green plants is green, and the common color of sculptures is lime. Therefore, the common color corresponding to the landscape element can be used as the color of the landscape element. One landscape element corresponds to one or more common colors.

[0069] The shape and size of the landscape element are obtained, and a basic three-dimensional model corresponding to the landscape element is created in the modeling software. Then, the previously determined material, texture and color are input into the basic model corresponding to the landscape element, so that the modeling software can adjust the color, glossiness, reflectivity and other properties of the material. The adjusted model is the element model corresponding to the landscape element.

[0070] A possible implementation of the embodiment of the present application is to construct a BIM model corresponding to the project to be built based on the initial BIM model and the element model in the above step S104, including: Determine the model position corresponding to each element model; Based on the model position corresponding to each element model, each element model is input into the initial BIM model to obtain the BIM model corresponding to the project to be built.

[0071] Specifically, the global coordinate system of the project is set in the BIM software to ensure that all element models can be accurately positioned in this coordinate system, and the absolute position of the project is set to ensure that the model corresponds to the actual site. For each element model, its specific position in the BIM model is determined based on its design drawings and on-site survey data.

[0072] Use the import function of the BIM software to import each element model into the specific position corresponding to the initial BIM model. Specifically, use the parametric design function of the BIM software to set parameters and constraints for the element model, and adjust the parameters to achieve the association and automatic adjustment between the element models. During the import process, adjust the position, rotation angle and size of the element model to ensure that it is correctly aligned and meets the design requirements.

[0073] The above embodiment introduces a BIM-based landscape design method from the perspective of method flow, and the following embodiment introduces a BIM-based landscape design device from the perspective of a virtual module or a virtual unit. For details, please refer to the following embodiment.

[0074] See also Figure 2 The BIM-based landscape design device 20 may specifically include: an acquisition module 201, a building module 202, an extraction module 203 and a construction module 204, specifically: A BIM-based landscape design device 20, comprising: An acquisition module 201 is used to acquire a project planning map and a project location of a project to be built; Establishing module 202, for establishing an initial BIM model based on the project location; Extraction module 203, used to extract landscape elements in the project planning map and establish an element model corresponding to each landscape element; The construction module 204 is used to construct a BIM model corresponding to the project to be built based on the initial BIM model and the element model.

[0075] In a possible implementation of the embodiment of the present application, when the establishment module 202 establishes the initial BIM model based on the project location, it is specifically used to: Obtain terrain data and basic location information corresponding to the project location. Basic location information includes topography, surrounding buildings and roads; Create a 3D terrain model corresponding to the project location based on terrain data; Establish the layer corresponding to the basic location information; The layer corresponding to the basic location information is added to the three-dimensional terrain model to obtain the initial BIM model.

[0076] In a possible implementation of the embodiment of the present application, the extraction module 203 is specifically used to extract landscape elements in the project planning map: Determine the extraction rules corresponding to the project planning diagram; Based on the extraction rules, landscape elements are extracted from the project planning map.

[0077] In a possible implementation of the embodiment of the present application, when the extraction module 203 determines the extraction rule corresponding to the project planning diagram, it is specifically used to: Determine whether the building shape corresponding to the project planning map is a regular building shape; If the building shape corresponding to the project planning diagram is a regular building shape, then determining that the extraction rule corresponding to the project planning diagram is a deep learning network model; The extraction module 203 is specifically used to extract landscape elements from the project planning map based on the extraction rules: The project planning map is input into the deep learning network model, and the output of the deep learning network model is obtained to obtain the landscape elements in the project planning map.

[0078] In a possible implementation of the embodiment of the present application, when the building shape corresponding to the project planning diagram is an irregular building shape, the BIM-based landscape design device may further include: A determination module, used to determine that the extraction rule corresponding to the project planning diagram is partition extraction; The extraction module 204 is specifically used to extract landscape elements from the project planning map based on the extraction rules: Set the coordinate points corresponding to multiple sampling points on the project planning map; Based on the coordinate points corresponding to each sampling point, the building shape is divided into multiple building sub-shapes; Each building sub-shape is extracted to obtain landscape elements.

[0079] In a possible implementation of the embodiment of the present application, the extraction module 203 is used to establish the element model corresponding to each landscape element, and the process of establishing the element model corresponding to each landscape element is specifically used to: Identify the materials corresponding to landscape elements; Determine the texture of the landscape element based on the material of the landscape element; Based on the texture and material of the landscape elements, the element models corresponding to the landscape elements are established.

[0080] In a possible implementation of the embodiment of the present application, when the construction module 204 constructs the BIM model corresponding to the project to be built based on the initial BIM model and the element model, it is specifically used to: Determine the model position corresponding to each element model; Based on the model position corresponding to each element model, each element model is input into the initial BIM model to obtain the BIM model corresponding to the project to be built.

[0081] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0082] See also Figure 3 , the embodiment of the present application also introduces an electronic device from the perspective of a physical device, such as Figure 3 As shown, Figure 3 The electronic device 30 shown includes: a processor 301 and a memory 303. The processor 301 and the memory 303 are connected, such as through a bus 302. Optionally, the electronic device 30 may also include a transceiver 304. It should be noted that in actual applications, the transceiver 304 is not limited to one, and the structure of the electronic device 30 does not constitute a limitation on the embodiments of the present application.

[0083] The processor 301 may be a CPU (Central Processing Unit), a general-purpose processor, a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array) or other programmable logic devices, transistor logic devices, hardware components or any combination thereof. It may implement or execute various exemplary logic blocks, modules and circuits described in conjunction with the disclosure of this application. The processor 301 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc.

[0084] The bus 302 may include a path to transmit information between the above components. The bus 302 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus. The bus 302 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 3 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.

[0085] The memory 303 may be a ROM (Read Only Memory) or other types of static storage devices that can store static information and instructions, a RAM (Random Access Memory) or other types of dynamic storage devices that can store information and instructions, or an EEPROM (Electrically Erasable Programmable Read Only Memory), a CD-ROM (Compact Disc Read Only Memory) or other optical disk storage, optical disk storage (including compressed optical disk, laser disk, optical disk, digital versatile disk, Blu-ray disk, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto.

[0086] The memory 303 is used to store the application code for executing the solution of the present application, and the execution is controlled by the processor 301. The processor 301 is used to execute the application code stored in the memory 303 to implement the contents shown in the above method embodiment.

[0087] The electronic devices include but are not limited to: mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc., and can also be servers, etc. Figure 3 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0088] An embodiment of the present application provides a computer-readable storage medium, on which a computer program is stored. When the computer-readable storage medium is run on a computer, the computer can execute the corresponding content in the aforementioned method embodiment.

[0089] It should be understood that, although the steps in the flowchart of the accompanying drawings are displayed in sequence as indicated by the arrows, these steps are not necessarily executed in sequence in the order indicated by the arrows. Unless otherwise specified herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least a part of the steps in the flowchart of the accompanying drawings may include multiple sub-steps or multiple stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and their execution order is not necessarily sequential, but can be executed in turn or alternately with other steps or at least a part of the sub-steps or stages of other steps.

[0090] The above are only some implementation methods of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A BIM-based landscape design method, characterized in that: include: Obtain the project plan and location of the project to be built; Based on the project location, establish an initial BIM model; Extracting landscape elements from the project planning map and establishing an element model corresponding to each landscape element; Based on the initial BIM model and the element model, a BIM model corresponding to the project to be built is constructed.

2. The BIM-based landscape design method according to claim 1, characterized in that: The establishing of an initial BIM model based on the project location includes: Obtaining terrain data and basic location information corresponding to the project location, wherein the basic location information includes topography, surrounding buildings and roads; Based on the terrain data, create a three-dimensional terrain model corresponding to the project location; Establishing a layer corresponding to the basic location information; The layer corresponding to the basic location information is added to the three-dimensional terrain model to obtain an initial BIM model.

3. The BIM-based landscape design method according to claim 1, characterized in that: The extracting of landscape elements in the project planning map includes: Determining extraction rules corresponding to the project planning map; Based on the extraction rules, landscape elements are extracted from the project planning map.

4. The BIM-based landscape design method according to claim 3, characterized in that: The step of determining the extraction rule corresponding to the project planning diagram includes: Determining whether the building shape corresponding to the project planning diagram is a regular building shape; If the building shape corresponding to the project planning diagram is a regular building shape, determining that the extraction rule corresponding to the project planning diagram is a deep learning network model; Wherein, extracting landscape elements from the project planning map based on the extraction rule includes: The project planning map is input into the deep learning network model, and the output of the deep learning network model is obtained to obtain the landscape elements in the project planning map.

5. The BIM-based landscape design method according to claim 4, characterized in that: When the building shape corresponding to the project planning diagram is an irregular building shape, the method further includes: Determine that the extraction rule corresponding to the project planning map is partition extraction; Wherein, extracting landscape elements from the project planning map based on the extraction rule includes: Setting coordinate points corresponding to each of the plurality of sampling points on the project planning map; Based on the coordinate points corresponding to each sampling point, dividing the building shape into a plurality of building sub-shapes; Each building sub-shape is extracted to obtain landscape elements.

6. The BIM-based landscape design method according to any one of claims 1 to 5, characterized in that: The process of establishing the element model corresponding to each landscape element includes: Identify the material corresponding to the landscape element; Determining the texture of the landscape element based on the material of the landscape element; Based on the texture and material of the landscape element, an element model corresponding to the landscape element is established.

7. The BIM-based landscape design method according to claim 1, characterized in that: The constructing a BIM model corresponding to the project to be built based on the initial BIM model and the element model includes: Determine the model position corresponding to each element model; Based on the model position corresponding to each element model, each element model is input into the initial BIM model to obtain the BIM model corresponding to the project to be built.

8. A BIM-based landscape design device, characterized in that: include: An acquisition module is used to obtain the project planning map and project location of the project to be built; A building module for building an initial BIM model based on the project location; An extraction module is used to extract landscape elements in the project planning map and establish an element model corresponding to each landscape element; A construction module is used to construct a BIM model corresponding to the project to be built based on the initial BIM model and the element model.

9. An electronic device, characterized in that: The electronic device includes: at least one processor; Memory; At least one application, wherein the at least one application is stored in a memory and configured to be executed by at least one processor, and the at least one application is configured to: execute the BIM-based landscape design method according to any one of claims 1 to 7.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed in a computer, the computer is caused to execute the BIM-based landscape design method according to any one of claims 1 to 7.

Citation Information

Cited By

  • Method for obtaining landscape layout diagram, medium and equipment

    CN119203351A