Dynamic correction method and system for digital twin model parameters of line equipment based on MPC
By adopting a dynamic parameter correction method for digital twin models of transmission line equipment based on MPC, integrating the Seq2Seq algorithm and the Transformer model with multi-head self-attention mechanism, optimizing the time series prediction framework and updating static attributes, the problem of prediction accuracy and computational complexity of digital twin models of transmission line equipment is solved, and efficient model parameter correction and accurate physical system matching are achieved.
Patent Information
- Application Number
- CN202410828662.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-06-25
AI Technical Summary
Existing technologies in digital twin models of transmission line equipment have low prediction accuracy and complex calculations, and cannot adapt to the influence of various uncertain factors in a timely manner. This leads to a gradual increase in the error between the model prediction results and the actual operation, which cannot meet the application needs of key business scenarios such as design, infrastructure construction and operation and maintenance.
A dynamic parameter correction method for digital twin models of line equipment based on MPC is adopted. By collecting historical operating data, static, dynamic and performance attributes are divided. The Seq2Seq algorithm and the Transformer model with multi-head self-attention mechanism are integrated. An adaptive memory decay mechanism is introduced to optimize the timing prediction framework. Static attributes are updated through event-driven updates, and dynamic and performance attributes are corrected based on the MPC control strategy.
It achieves high prediction accuracy and low computational complexity in digital twin models, ensures cooperative closed-loop matching between the model and the physical system, reduces computational complexity, and improves prediction accuracy and adaptability.
Smart Images

Figure CN119026445A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a digital twin model parameter correction method, belongs to the field of digital twin models, and in particular to an MPC-based line equipment digital twin model parameter dynamic correction method and system. Background Art
[0002] With the rapid development of science and technology, digital twin technology, as a cutting-edge information technology means, has made remarkable progress in the fields of industry, energy, transportation, etc. Digital twin technology achieves matching with specific physical entities by establishing high-fidelity models, providing new methods for state assessment, operation monitoring and performance prediction of physical equipment.
[0003] As a core component of the power grid, transmission line equipment is the main force for the digital and intelligent transformation of the power grid. However, in the existing digital construction of transmission line equipment, most of them have only realized the construction of digital twins of the appearance of transmission line equipment, the panoramic display of the operating status, or simple equipment status evaluation. The construction level is still in the primary stage and cannot meet the actual application needs of key business scenarios in the design, infrastructure, operation and maintenance stages. In addition, during construction, the actual physical entity of the transmission line equipment considered is often affected by a variety of uncertain factors during operation, which puts higher requirements on the synchronization accuracy of the parameters of the digital twin model of transmission line equipment. At present, the research on digital twin technology often fails to timely identify and adaptively adjust the digital twin model, resulting in errors between the model's prediction results and the actual operation, reducing the prediction accuracy of the digital twin model. The RB unscented Kalman filter technology or the method based on the extended Kalman filter in the existing means has strong model convergence and good convergence effect, but the calculation is complex, the time cost is high, and there is a problem of sensitivity of the initial setting conditions to the parameter solution. Therefore, how to improve the prediction accuracy of digital twin models and reduce the computational complexity remains a problem that needs to be urgently solved by existing technologies. Summary of the invention
[0004] The purpose of the present invention is to overcome the above-mentioned defects and problems existing in the prior art, and to provide a method and system for dynamic correction of parameters of a digital twin model of line equipment based on MPC, which is simple in calculation and has high prediction accuracy.
[0005] To achieve the above objectives, the technical solution of the present invention is: a method for dynamic correction of parameters of a line equipment digital twin model based on MPC, comprising:
[0006] S1. Collect historical operation data during transmission line construction and build a digital twin model of transmission line construction equipment;
[0007] S2. Divide the system attributes of the digital twin model of the transmission line construction equipment into static attributes, dynamic attributes and performance attributes;
[0008] S3. In the digital twin model of power transmission line construction equipment, the Seq2Seq algorithm and the Transformer model with multi-head self-attention mechanism are integrated to build a time series prediction framework, and an adaptive memory decay mechanism is introduced to optimize the output objective function of the time series prediction framework to control the parameter convergence speed of dynamic attributes and performance attributes;
[0009] S4, updating static attributes in the digital twin model of transmission line construction equipment through event-driven;
[0010] S5. Modify the dynamic and performance attributes in the digital twin model of transmission line construction equipment based on the MPC control strategy.
[0011] The step S3 introduces an adaptive memory decay mechanism to optimize the output objective function of the time series prediction framework, specifically:
[0012] For three different types of data points in historical operation data, namely stable data points, fluctuating data points and mutation data points, the memory decay factor λ(t) is introduced to optimize the output objective function to adapt to the dynamic characteristics of the data points; the details are as follows:
[0013] For stationary data points: keep the memory decay factor as a fixed constant value λ between [0, 1];
[0014] For the fluctuation data points and mutation data points: introduce the correction term Δλ(t), the expression of the correction term is as follows:
[0015] λ(t)=λ(t-1)+Δλ(t);
[0016] Then for the fluctuating data points, the correction is: Δλ(t)=α(1-λ(t-1))α>0;
[0017] Then for the mutation data point, the correction is: Δλ(t)=β(1+λ(t-1))β>0;
[0018] Among them: α and β are adjustment coefficients, and t is the current time step;
[0019] The optimized output objective function is as follows:
[0020]
[0021] Where: J is the output objective function, w1 and w2 are weight coefficients, y p is the predicted output, y s is the actual output, ΔU is the control increment, T is the total number of time steps, and t is the current time step;
[0022] The constraints of the output objective function are as follows:
[0023] V m_min ≤V m (t)≤V m_max
[0024] I m_min ≤I m (t)≤I m_max
[0025] T m_min ≤T m (t)≤T m_max
[0026] ΔU min ≤ΔU(t)≤ΔU max ;
[0027]
[0028] f min ≤f(t)≤f max
[0029] V min ≤V(t)≤V max
[0030] 0 <w1<1.0<w2<1;
[0031] w1+w2=1;
[0032] Where: V m ,I m , T m Both are state quantities, V m_min 、V m_max ,I m_min ,I m_max , T m_min , T m_max are the upper and lower limits of its state quantity, ΔU is the increment value, and ΔU min , ΔU max are the upper and lower limits of the increment value, ε is the change rate constraint, f is the frequency, V is the voltage, f min 、f max are the upper and lower limits of the frequency, and dt is the time increment.
[0033] The expression of the multi-head self-attention mechanism in step S3 is as follows:
[0034]
[0035] head i =Attention(QWi Q , KW i K , VW i V );
[0036] MultiHead(Q,K,V)=Concat(head1,...,head h )W ° ;
[0037] Among them: Attention(Q, K, V) is the output matrix of single-point attention, Q, K, V are all matrices, sofftmax is the activation function, d k is the key value of the input dimension, W i Q , W i K , W i V They are the weight matrices corresponding to Q, K, and V in the i-th attention head, MultiHead(Q, K, V) is the output matrix of multi-head attention, and Concat is the concatenation operation.
[0038] The step S4, updating the static attributes in the digital twin model of the transmission line construction equipment through event-driven means: based on the changes in the construction site during the transmission line construction and the changes in the structural attributes corresponding to the construction site changes, triggering the re-identification and re-assignment of the parameters of the static attributes, and updating the assignments to the digital twin model of the transmission line construction equipment.
[0039] The step S5 specifically includes:
[0040] S51, defining error limits within different time steps t; the expression of the error limit is as follows:
[0041]
[0042] Where: θ(t) is the error limit within time step t, y p is the predicted output, y s is the actual output, t is the current time step;
[0043] S52. For dynamic attributes, periodically obtain measured data of the dynamic attributes at each time step t, and use it as the actual output; for performance attributes, predict the parameters of the performance attributes based on the time series prediction framework, and use the prediction results as the actual output;
[0044] S53, based on the actual output historical data, set the maximum error limit θ′; when θ(t)>θ′, trigger the parameter update, update the parameters of the dynamic attributes and performance attributes respectively, and then proceed to step S53;
[0045] S53, iterating the digital twin model of the transmission line construction equipment, and setting the value strategy of the output objective functions w1 and w2 in the model to balance the values of the weight coefficients w1 and w2 and correct the performance attributes; the value strategy is as follows:
[0046]
[0047] Wherein: w1 and w2 are weight coefficients; lter is the number of iterations of the MPC control strategy; N1 is the iteration threshold; N is the maximum number of iterations; A1 is the value of w1 when the iteration number is less than N1; A2 is the value of w2 when the iteration number is less than N1; B1 is the value of w1 when the iteration number is between N1 and N; B2 is the value of w2 when the iteration number is between N1 and N.
[0048] The time series prediction framework includes an encoder and a decoder;
[0049] The stack structure of the Transformer in the encoder includes a first encoding sublayer and a second encoding sublayer arranged in sequence; the first encoding sublayer includes a multi-head self-attention mechanism and an accumulation and layer normalization mechanism arranged in sequence; the second encoding sublayer includes a feedforward neural network and an accumulation and layer normalization mechanism arranged in sequence;
[0050] The stack structure of the Transformer in the decoder includes a first decoding sublayer, a second decoding sublayer and a third decoding sublayer arranged in sequence; the first decoding sublayer includes a masked multi-head self-attention mechanism and a cumulative sum layer normalization mechanism arranged in sequence; the second decoding sublayer includes a multi-head self-attention mechanism and a cumulative sum layer normalization mechanism arranged in sequence; the third decoding sublayer includes a feedforward neural network and a cumulative sum layer normalization mechanism arranged in sequence;
[0051] The encoding second sublayer is connected to the decoding second sublayer.
[0052] The digital twin model of the transmission line construction equipment includes a physical line and a digital twin line;
[0053] The physical circuit refers to: the entity reference target of digital twin circuit modeling; specifically including physical entities and IoT perception data;
[0054] The digital twin circuit refers to: the digital expression of the physical circuit in the virtual space; specifically including the modeling of static properties, dynamic properties and performance properties.
[0055] The static attributes refer to: structural attributes of transmission line construction equipment; specifically including line length, conductor cross-sectional dimensions, tower parameters, insulator parameters, transformer capacity, supplier information of used materials, and specific information of construction equipment;
[0056] The dynamic attributes refer to dynamic indicators whose values change with working conditions and reflect the real-time operating status of the power transmission line construction system and equipment; specifically, they include the tower installation progress, material consumption, wind speed and direction, and equipment temperature;
[0057] The performance attributes refer to: performance indicators that reflect the stability of transmission line construction systems and equipment operation; specifically include maintenance records, life parameters, process parameters, work efficiency of workers or equipment, and quality control indicators.
[0058] A dynamic correction system for parameters of a line equipment digital twin model based on MPC, which is applied to the above method, and includes:
[0059] The digital twin model building module is used to collect historical operation data during the construction of transmission lines and build a digital twin model of transmission line construction equipment;
[0060] A system attribute division module is used to divide the system attributes of the digital twin model of the transmission line construction equipment into static attributes, dynamic attributes and performance attributes;
[0061] The digital twin model optimization module is used to integrate the Seq2Seq algorithm and the multi-head self-attention mechanism Transformer model in the initial digital twin model of transmission line construction equipment, build a time series prediction framework, and introduce an adaptive memory decay mechanism to optimize the output objective function of the time series prediction framework;
[0062] The attribute update module is used to update the static attributes in the digital twin model of the transmission line construction equipment through event-driven;
[0063] The attribute correction module is used to correct the dynamic attributes and performance attributes in the digital twin model of transmission line construction equipment based on the MPC control strategy.
[0064] A dynamic correction device for parameters of a line equipment digital twin model based on MPC, the device comprising a processor and a memory;
[0065] The memory is used to store computer program code and transmit the computer program code to the processor;
[0066] The processor is used to execute the above-mentioned MPC-based line equipment digital twin model parameter dynamic correction method according to the instructions in the computer program code.
[0067] Compared with the prior art, the present invention has the following beneficial effects:
[0068] The present invention discloses a method and system for dynamic correction of parameters of a digital twin model of line equipment based on MPC. The method first collects historical operation data in the construction of a transmission line, constructs a digital twin model of the transmission line construction equipment, and then divides its system attributes into static attributes, dynamic attributes and performance attributes. Then, a Seq2Seq algorithm and a multi-head self-attention mechanism Transformer model are integrated to construct a time series prediction framework, and an adaptive memory decay mechanism is introduced to optimize the output objective function of the time series prediction framework. Finally, the static attributes in the digital twin model of the transmission line construction equipment are updated through event-driven, and the dynamic attributes and performance attributes in the digital twin model of the transmission line construction equipment are corrected based on the MPC control strategy. In the application of this design, an adaptive memory decay mechanism is designed and constraints are added to effectively control the convergence speed of attribute parameters, reduce the calculation complexity of the model, and correct, adjust and optimize various attributes of the system, so as to realize the coordinated closed-loop matching between the output of the digital twin model and the operation of the physical system, so that it has higher prediction accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0069] Figure 1 It is a flow chart of the method steps of the present invention.
[0070] Figure 2 It is a schematic diagram of system attribute division of the present invention.
[0071] Figure 3 It is a structural schematic diagram of the time series prediction framework of the present invention.
[0072] Figure 4 It is a schematic diagram of model frequency comparison before and after parameter correction of the present invention.
[0073] Figure 5 Schematic diagram of error comparison of different methods of the present invention.
[0074] Figure 6 It is a schematic diagram of the system structure of the present invention.
[0075] Figure 7 It is a schematic diagram of the device structure of the present invention.
[0076] In the figure: digital twin model construction module 1, system attribute division module 2, digital twin model optimization module 3, attribute update module 4, attribute correction module 5, processor 6, memory 7, computer program code 71. DETAILED DESCRIPTION
[0077] The present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0078] Embodiment 1:
[0079] See also Figure 1 , a method for dynamic correction of parameters of a line equipment digital twin model based on MPC, comprising:
[0080] S1. Collect historical operation data during transmission line construction and build a digital twin model of transmission line construction equipment;
[0081] Further, the digital twin model of the transmission line construction equipment includes a physical line and a digital twin line;
[0082] The physical line refers to: the entity reference target of digital twin line modeling; specifically including physical entities (such as transmission lines, equipment, sensors, etc.) and IoT perception data; various physical entities are combined into a whole through logical relationships such as operation plans and process routes to form a physical line with certain operating capabilities, and the operating data of the physical line is obtained through IoT devices, and transmitted to the digital twin line via the network, forming a data interaction channel between the physical line and the digital twin line.
[0083] The digital twin circuit refers to: the digital expression of the physical circuit in the virtual space; specifically including the modeling of static properties, dynamic properties and performance properties.
[0084] In this embodiment, static attributes, dynamic attributes and performance attributes are established on the basis of the geometric model, and then the behavior rules of the transmission line construction equipment in the digital twin model and the operation logic of the digital twin line are improved.
[0085] For example: building a digital twin engineering scenario on the Plant Simulation platform.
[0086] Manage the tower models, construction machinery models, tool models, etc. referenced in the digital twin engineering scene to form a model library;
[0087] Construction planning and construction simulation are linked to form a resource library of different processes and methods such as foundation construction, tower assembly construction, and line construction; the resource library supports viewing safety measures, quality measures, safety accident cases, and major machinery and tool information associated with different processes and methods, thereby providing model data support for twin projects.
[0088] The operation data of the construction process is obtained through the Internet of Things devices and transmitted to the digital twin line via the network. The corresponding digital twin model is established to determine the key status parameters such as equipment operation status, equipment quantity, equipment performance, etc. as the input and output of the digital twin model.
[0089] S2. Divide the system attributes of the digital twin model of the transmission line construction equipment into static attributes, dynamic attributes and performance attributes;
[0090] Furthermore, real-time data is the basis for building a digital twin model and the prerequisite for parameter correction. It collects basic information of transmission line construction equipment, environmental and climate information, operating status and maintenance records, material and supplier information, testing equipment and other data, and transmits them to the digital twin model.
[0091] See also Figure 2 Specifically, the static attributes refer to: structural attributes of transmission line construction equipment; specifically including line length, conductor cross-sectional dimensions, tower parameters, insulator parameters, transformer capacity, supplier information of used materials, and specific information of construction equipment (such as rotary excavators, cement mixers, winches, cranes, etc.); in actual application, a comprehensive method of on-site measurement and electrical testing is used to confirm the static attribute values. The static attributes provide basic data for describing the physical structure and steady-state characteristics of transmission system construction equipment.
[0092] The dynamic attributes refer to: dynamic indicators whose values change with working conditions and reflect the real-time operating status of the transmission line construction system and equipment; specifically, they include tower installation progress, material consumption, wind speed and direction, and equipment temperature; in actual application, the measurement and collection of dynamic attributes are achieved through sensor technology, monitoring systems, manual observation and recording, and fusion with SCADA system data. Dynamic attributes directly drive the state evolution of the digital twin model.
[0093] The performance attributes refer to: performance indicators that reflect the stability of the operation of the transmission line construction system and equipment; specifically including maintenance records, life parameters, process parameters, work efficiency of workers or equipment, quality control indicators (such as quality scores of welding joints, cement quality, geometric accuracy of tower structures, etc.); these data are difficult to obtain through direct measurement. In this embodiment, by analyzing historical operation data, parameter prediction of performance attributes is achieved, and it is used as a data source for key performance parameters to drive the optimization and evaluation of the digital twin model.
[0094] S3. In the initial digital twin model of power transmission line construction equipment, the Seq2Seq algorithm and the Transformer model with multi-head self-attention mechanism are integrated to build a time series prediction framework, and an adaptive memory decay mechanism is introduced to optimize the output objective function of the time series prediction framework to control the parameter convergence speed of dynamic attributes and performance attributes;
[0095] In this embodiment, on the basis of the seq2seq algorithm, a multi-head attention Transformer model is integrated for time series prediction, which improves the accuracy of sequence prediction; the multi-head self-attention Transformer model has been widely used and studied in the field of machine translation. It takes multiple time series data points as input and predicts multiple time series data points as output, forming a multi-input and multi-output time series prediction framework; and in this process, it is necessary to transform the time series prediction framework, and the main aspects of the transformation are to design the stacking method and the attention mechanism; the details are as follows:
[0096] See also Figure 3 , the time series prediction framework includes an encoder and a decoder;
[0097] The stack structure of the Transformer in the encoder includes a first encoding sublayer and a second encoding sublayer arranged in sequence; the first encoding sublayer includes a multi-head self-attention mechanism and an accumulation and layer normalization mechanism arranged in sequence; the second encoding sublayer includes a feedforward neural network and an accumulation and layer normalization mechanism arranged in sequence;
[0098] The multi-head self-attention mechanism is used to capture relevant information in the sequence, and the feedforward neural network is used to perform nonlinear transformation and mapping on the input. Between the two sub-layers, residual connections are used to promote information transfer, and the stability of the model is enhanced by accumulation and layer normalization mechanisms. To ensure consistent dimensions, all sub-layers in the encoder and the embedding layer will generate output dimensions of d model The feature representation of .
[0099] The stack structure of the Transformer in the decoder includes a first decoding sublayer, a second decoding sublayer and a third decoding sublayer arranged in sequence; the first decoding sublayer includes a masked multi-head self-attention mechanism and a cumulative sum layer normalization mechanism arranged in sequence; the second decoding sublayer includes a multi-head self-attention mechanism and a cumulative sum layer normalization mechanism arranged in sequence; the third decoding sublayer includes a feedforward neural network and a cumulative sum layer normalization mechanism arranged in sequence;
[0100] The encoding second sublayer is connected to the decoding second sublayer and is used to perform a multi-head attention mechanism on the encoder output so as to focus on relevant information of the input sequence.
[0101] Furthermore, for the single-point attention with matrix K scale, the input includes the query and key value d of dimension k and dimension value d v , get each point information by querying the key value, and then divide it by the key value of the input dimension The SoftMax function is used to obtain the weight of the value. Finally, the attention function is calculated by querying at the same time, packaged together into the matrix Q, and the key and value are also compressed into the matrix K and V. The calculation formula of the final output matrix is as follows:
[0102]
[0103] Among them: Attention (Q, K, V) is the output matrix of single-point attention, Q, K, V are all matrices, softmax is the activation function, d k is the key value of the input dimension;
[0104] In the single-point attention mechanism, each attention head can perform attention calculations independently and simultaneously to capture the correlation information between the input sequences. The calculation formula is as follows:
[0105] head i =Attention(QW i Q , KW i K , VW i V );
[0106] Where: W i Q , W i K , W i V They are the weight matrices corresponding to Q, K, and V in the i-th attention head;
[0107] In this embodiment, the results of parallel calculations of multiple attention heads are concatenated through the Concat function, so that the model comprehensively considers the calculation results of multiple attention heads and fully captures the correlation relationship in the input sequence. The expression of the multi-head self-attention mechanism is as follows:
[0108] MutiHead(Q,K,V)=Concat(head1,...,head h )W o ;
[0109] Among them: MultiHead(Q, K, V) is the output matrix of multi-head attention, and Concat is the concatenation operation.
[0110] Furthermore, the introduction of the adaptive memory decay mechanism to optimize the output objective function of the time series prediction framework specifically refers to:
[0111] In the process of collecting, processing and analyzing historical operation data, data saturation will occur. When the amount of data reaches a certain level, continuing to increase the amount of data will gradually reduce the contribution to the improvement of results or the acquisition of new information. Therefore, in order to solve this phenomenon caused by the continuous input of online data during the correction process, the memory decay factor is introduced to adapt to the dynamic characteristics of the data points. The details are as follows:
[0112] For three different types of data points in historical operation data, namely stable data points, fluctuating data points and mutation data points, the memory decay factor λ(t) is introduced to optimize the output objective function to adapt to the dynamic characteristics of the data points; the details are as follows:
[0113] For stationary data points: keep the memory decay factor as a fixed constant value λ between [0, 1];
[0114] For the fluctuation data points and mutation data points: introduce the correction term Δλ(t), the expression of the correction term is as follows:
[0115] λ(t)=λ(t-1)+Δλ(t);
[0116] Then for the fluctuating data points, the correction is: Δλ(t)=a(1-λ(t-1))α>0;
[0117] Then for the mutation data point, the correction is: Δλ(t)=β(1+λ(t-1))β>0;
[0118] Among them: α, β are adjustment coefficients, t is the current time step; by properly selecting the adjustment coefficients, it can be ensured that the covariance matrix is kept minimized, thereby optimizing the data smoothing process.
[0119] The optimized output objective function is as follows:
[0120]
[0121] Where: J is the output objective function, w1 and w2 are weight coefficients, y p is the predicted output, y s is the actual output, ΔU is the control increment, T is the total number of time steps, and t is the current time step;
[0122] The constraints of the output objective function are as follows:
[0123] V m_min ≤V m (t)≤V m_max
[0124] I m_min ≤I m (t)≤I m_max
[0125] T m_min ≤T m (t)≤T m_max
[0126] ΔU min ≤ΔU(t)≤ΔU max ;
[0127]
[0128] f min ≤f(t)≤f max
[0129] V min ≤V(t)≤V max
[0130] 0 <w1<1,0<w2<1;
[0131] w1+w2=1,
[0132] Where: V m ,I m , T m Both are state quantities, V m_min 、V m_max ,I m_min ,I m_max , T m_min , T m_max are the upper and lower limits of its state quantity, ΔU is the increment value, and ΔU min , ΔU max are the upper and lower limits of the increment value, ε is the change rate constraint, f is the frequency, V is the voltage, f min 、f max are the upper and lower limits of the frequency, and dt is the time increment.
[0133] S4, updating static attributes in the digital twin model of transmission line construction equipment through event-driven;
[0134] Furthermore, it specifically means: based on the changes in the construction site during the transmission line construction and the changes in structural attributes corresponding to the construction site changes, the re-identification and re-assignment of the parameters of the static attributes are triggered, and the assignments are updated to the digital twin model of the transmission line construction equipment.
[0135] In this embodiment, the correction of static attribute parameters is event-driven, and the update of static attributes is triggered according to the changes in field signals and data. For example, when the system undergoes structural changes, equipment is replaced, or other events that affect static parameters occur, the re-identification and re-assignment of static parameters will be triggered to ensure that the digital twin model is consistent with the actual system. When the equipment operation exceeds the life threshold or the model error is too large, the re-identification program is enabled to re-measure the equipment, determine the static attribute parameter values, and assign and update them to the digital twin model.
[0136] S5. Modify the dynamic and performance attributes in the digital twin model of transmission line construction equipment based on the MPC control strategy.
[0137] In this embodiment, MPC is an advanced and powerful control strategy that uses system models to predict future dynamic behaviors and optimizes control inputs based on these predictions to achieve specific control goals; the advantage of MPC for parameter correction is that it can automatically adjust parameters based on the system dynamic model and predictive control strategy to minimize performance indicators or meet constraints, and re-optimize parameters at each time step, thereby achieving precise control of the system, strong adaptability, and the ability to handle nonlinear systems. It can also optimize parameter correction for multivariable systems. Among them, the prediction equation is the design basis of the MPC control strategy. By discretizing the linear state space equation and redefining the output variable as the prediction equation, the principle is as follows:
[0138] The expression of the prediction equation is as follows:
[0139]
[0140] y=[P d , P p ];
[0141] Where: x is the system state vector, A is the state transfer matrix, B is the control input matrix, y is the output vector, c is the output matrix, P d is a dynamic attribute parameter, P p It is a static attribute parameter;
[0142] When the prediction time domain is p and the control time domain is m, at the kth moment, the state variables in the prediction time domain and the corresponding output variables are:
[0143]
[0144]
[0145] Where: X L is the extended state vector, A L is the extended state transfer matrix, BL is the extended control input matrix, U L is the extended control input vector, Y L is the extended output vector, x(k|k) is the state quantity predicted at time k+1 by time k;
[0146] In this embodiment, the MPC control strategy minimizes the error between the predicted output and the actual output by solving the optimal parameters, and controls the incremental smoothness constraint to avoid parameter oscillation; the controller performance is adjusted by setting the value of the weight coefficient, and the output objective function and the constraint parameters of the output objective function are defined as shown above.
[0147] The step S5 specifically includes:
[0148] S51, defining error limits within different time steps t; the expression of the error limit is as follows:
[0149]
[0150] Where: θ(t) is the error limit within time step t, y p is the predicted output, y s is the actual output, t is the current time step;
[0151] S52. For dynamic attributes, periodically obtain measured data of the dynamic attributes at each time step t, and use it as the actual output; for performance attributes, predict the parameters of the performance attributes based on the time series prediction framework, and use the prediction results as the actual output;
[0152] S53, based on the actual output historical data, set the maximum error limit θ′; when θ(t)>θ′, trigger the parameter update, update the parameters of the dynamic attributes and performance attributes respectively, and then proceed to step S53;
[0153] S54, iterating the digital twin model of the transmission line construction equipment, and setting the value strategy of the output objective functions w1 and w2 in the model to balance the values of the weight coefficients w1 and w2 and correct the performance attributes; the value strategy is as follows:
[0154]
[0155]
[0156] Wherein: w1 and w2 are weight coefficients; lter is the number of iterations of the MPC control strategy; N1 is the iteration threshold; N is the maximum number of iterations; A1 is the value of w1 when the iteration number is less than N1; A2 is the value of w2 when the iteration number is less than N1; B1 is the value of w1 when the iteration number is between N1 and N; B2 is the value of w2 when the iteration number is between N1 and N.
[0157] In this embodiment, the dynamic attribute parameters are periodically acquired through sensors, and the real-time measurement values of the dynamic parameters are synchronously collected at a certain period by adopting a periodic driving mode. Based on the MPC control strategy, it is determined whether to update the original parameter values in the digital model by using the error limit value;
[0158] As for performance parameters, the prediction of performance parameters is achieved through a time series prediction framework that integrates the Seq2Seq algorithm and the multi-head self-attention mechanism Transformer model. In this process, the error limit is used as a driving factor. When the error between the simulation results of the virtual entity and the measured data of the actual physical system exceeds the set limit, the performance parameters are corrected based on the MPC control strategy.
[0159] For example, the number of model iterations is set to 1000, and the values of adaptive weights w1 and w2 are adjusted to achieve the comprehensive optimization of error minimization and control increment smoothing.
[0160] The output objective function is divided into two parts: w1||λ(t)(y p (t)-y s (t))|| 2 This item is used to reflect the error between the predicted output and the actual output. This item is used to control the incremental smoothing.
[0161] Furthermore, the value selection strategy of w1 and w2 is defined as follows:
[0162]
[0163]
[0164] The above value selection strategy is understood as follows: when the number of iterations is less than 700, the value of w1 is kept greater than 0.85, so as to prioritize minimizing the error, and the corresponding value of w2 is less than 0.15, and the sum of the two is 1, which meets the constraint condition; in the specific correction, when the error value is greater than the error limit θ, the value of w1 is increased to reduce the error;
[0165] Similarly, when the number of iterations is greater than 700 and less than 1000, the value of w1 is gradually reduced and the value of w2 is increased to make the control increment smoother.
[0166] See also Figure 4 , in this embodiment, a construction progress simulation comparison chart within a randomly selected thirty-six-hour period in the construction cycle. The figure intuitively shows the comparison between the construction progress output by the digital twin model before and after parameter correction and the construction progress of the physical model; for the digital twin model before parameter correction, although the error between its output value and the actual value is kept within a certain range, the oscillation phenomenon is serious and the reference value is limited, while the digital twin model after parameter correction still has a certain error compared with the actual value in the first ten hours or so due to the model adaptation period, but its error has been significantly reduced compared with before correction. After ten hours, the model adaptation is completed, and the error between its output value and the actual value is controlled within 0.02. It can be seen that the values of the two are almost close to the overlap state, which shows that the correction effect is excellent and shows good effectiveness.
[0167] See also Figure 5 In this embodiment, the errors of the MPC correction method, the RB unscented Kalman filter technology, and the Bayesian method are compared. As can be seen from the figure, within 24 hours, the error function value of the RB correction method decreases from about 0.23 to about 0.14, and the error function value of the Bayesian correction method decreases from about 0.21 to about 0.13, and then the two oscillate irregularly around 0.14 and 0.13, respectively, and both show poor convergence. Compared with the previous two, the error function value of the MPC-based correction method of the present invention decreases from about 0.16 to about 0.10 within 24 hours, and the convergence is significantly enhanced, and the curve converges around the 6th hour, and the convergence speed is significantly increased, due to It plays a role in controlling the incremental smoothness constraint and avoiding parameter oscillation. This point is fully taken into consideration in the present invention, so the error function curve is smoother.
[0168] Embodiment 2:
[0169] See also Figure 6 , a line equipment digital twin model parameter dynamic correction system based on MPC, the system is applied to the method described in Example 1, the system comprising:
[0170] Digital twin model construction module 1 is used to collect historical operation data in the construction of transmission lines and build a digital twin model of transmission line construction equipment;
[0171] Furthermore, the digital twin model of the power transmission line construction equipment constructed by the digital twin model construction module 1 includes: a physical line and a digital twin line;
[0172] The physical circuit refers to: the entity reference target of digital twin circuit modeling; specifically including physical entities and IoT perception data;
[0173] The digital twin circuit refers to: the digital expression of the physical circuit in the virtual space; specifically including the modeling of static properties, dynamic properties and performance properties.
[0174] The system attribute division module 2 is used to divide the system attributes of the digital twin model of the transmission line construction equipment into static attributes, dynamic attributes and performance attributes;
[0175] Furthermore, the attributes divided by the system attribute division module 2 are as follows:
[0176] The static attributes refer to: structural attributes of transmission line construction equipment; specifically including line length, conductor cross-sectional dimensions, tower parameters, insulator parameters, transformer capacity, supplier information of used materials, and specific information of construction equipment;
[0177] The dynamic attributes refer to dynamic indicators whose values change with working conditions and reflect the real-time operating status of the power transmission line construction system and equipment; specifically, they include the tower installation progress, material consumption, wind speed and direction, and equipment temperature;
[0178] The performance attributes refer to: performance indicators that reflect the stability of transmission line construction systems and equipment operation; specifically include maintenance records, life parameters, process parameters, work efficiency of workers or equipment, and quality control indicators.
[0179] Digital twin model optimization module 3 is used to integrate the Seq2Seq algorithm and the multi-head self-attention mechanism Transformer model in the initial transmission line construction equipment digital twin model, build a time series prediction framework, and introduce an adaptive memory decay mechanism to optimize the output objective function of the time series prediction framework;
[0180] Furthermore, the digital twin model optimization module 3 is used to construct a framework and perform optimization according to the following method:
[0181] The introduction of the adaptive memory decay mechanism to optimize the output objective function of the time series prediction framework specifically refers to:
[0182] For three different types of data points in historical operation data, namely stable data points, fluctuating data points and mutation data points, the memory decay factor λ(t) is introduced to optimize the output objective function to adapt to the dynamic characteristics of the data points; the details are as follows:
[0183] For stationary data points: keep the memory decay factor as a fixed constant value λ between [0, 1];
[0184] For the fluctuation data points and mutation data points: introduce the correction term Δλ(t), the expression of the correction term is as follows:
[0185] λ(t)=λ(t-1)+Δλ(t);
[0186] Then for the fluctuating data points, the correction is: Δλ(t)=α(1-λ(t-1))α>0;
[0187] Then for the mutation data point, the correction is: Δλ(t)=β(1+λ(t-1))β>0;
[0188] Among them: α and β are adjustment coefficients, and t is the current time step;
[0189] The optimized output objective function is as follows:
[0190]
[0191] Where: J is the output objective function, w1 and w2 are weight coefficients, y p is the predicted output, y s is the actual output, ΔU is the control increment, T is the total number of time steps, and t is the current time step;
[0192] The constraints of the output objective function are as follows:
[0193] V m_min ≤V m (t)≤V m_max
[0194] I m_min ≤I m (t)≤I m_max
[0195] T m_min ≤T m (t)≤T m_max
[0196] ΔU min ≤ΔU(t)≤ΔU max ;
[0197]
[0198] f min ≤f(t)≤f max
[0199] V min ≤V(t)≤V max
[0200] 0 <w1<1,0<w2<1;
[0201] w1+w2=1;
[0202] Where: V m ,I m , T m Both are state quantities, Vm_min 、V m_max ,I m_min ,I m_max , T m_min , T m_max are the upper and lower limits of its state quantity, ΔU is the increment value, and ΔU min , ΔU max are the upper and lower limits of the increment value, ε is the change rate constraint, f is the frequency, V is the voltage, f min 、f max are the upper and lower limits of the frequency, and dt is the time increment.
[0203] The expression of the multi-head self-attention mechanism is as follows:
[0204]
[0205] head i =Attention(QW i Q , KW i K , VW i V );
[0206] MultiHead(Q,K,V)=Concat(head1,...,head h )W ° ;
[0207] Among them: Attention (Q, K, V) is the output matrix of single-point attention, Q, K, V are all matrices, softmax is the activation function, d k is the key value of the input dimension, W i Q , W i K , W i V They are the weight matrices corresponding to Q, K, and V in the i-th attention head, MultiHead(Q, K, V) is the output matrix of multi-head attention, and Concat is the concatenation operation.
[0208] The time series prediction framework constructed by the digital twin model optimization module 3 includes an encoder and a decoder;
[0209] The stack structure of the Transformer in the encoder includes a first encoding sublayer and a second encoding sublayer arranged in sequence; the first encoding sublayer includes a multi-head self-attention mechanism and an accumulation and layer normalization mechanism arranged in sequence; the second encoding sublayer includes a feedforward neural network and an accumulation and layer normalization mechanism arranged in sequence;
[0210] The stack structure of the Transformer in the decoder includes a first decoding sublayer, a second decoding sublayer and a third decoding sublayer arranged in sequence; the first decoding sublayer includes a masked multi-head self-attention mechanism and a cumulative sum layer normalization mechanism arranged in sequence; the second decoding sublayer includes a multi-head self-attention mechanism and a cumulative sum layer normalization mechanism arranged in sequence; the third decoding sublayer includes a feedforward neural network and a cumulative sum layer normalization mechanism arranged in sequence;
[0211] The encoding second sublayer is connected to the decoding second sublayer.
[0212] The attribute updating module 4 is used to update the static attributes in the digital twin model of the transmission line construction equipment through event-driven;
[0213] Furthermore, the attribute updating module 4 is used to update the static attributes according to the following method:
[0214] Based on the changes in the construction site during transmission line construction and the changes in structural attributes corresponding to the construction site changes, the re-identification and re-assignment of the parameters of the static attributes are triggered, and the assignments are updated to the digital twin model of the transmission line construction equipment.
[0215] The attribute correction module 5 is used to correct the dynamic attributes and performance attributes in the digital twin model of the transmission line construction equipment based on the MPC control strategy.
[0216] Furthermore, the attribute correction module 5 is used to perform correction according to the following steps:
[0217] S51, defining error limits within different time steps t; the expression of the error limit is as follows:
[0218]
[0219] Where: θ(t) is the error limit within time step t, y p is the predicted output, y s is the actual output, t is the current time step;
[0220] S52. For dynamic attributes, periodically obtain measured data of the dynamic attributes at each time step t, and use it as the actual output; for performance attributes, predict the parameters of the performance attributes based on the time series prediction framework, and use the prediction results as the actual output;
[0221] S53, based on the actual output historical data, set the maximum error limit θ′; when θ(t)>θ′, trigger parameter update, update the parameters of dynamic attributes and performance attributes respectively, and then proceed to step S54;
[0222] S54, iterating the digital twin model of the transmission line construction equipment, and setting the value strategy of the output objective functions w1 and w2 in the model to balance the values of the weight coefficients w1 and w2 and correct the performance attributes; the value strategy is as follows:
[0223]
[0224] Wherein: w1 and w2 are weight coefficients; lter is the number of iterations of the MPC control strategy; N1 is the iteration threshold; N is the maximum number of iterations; A1 is the value of w1 when the iteration number is less than N1; A2 is the value of w2 when the iteration number is less than N1; B1 is the value of w1 when the iteration number is between N1 and N; B2 is the value of w2 when the iteration number is between N1 and N.
[0225] Embodiment 3:
[0226] See also Figure 7 , a dynamic correction device for parameters of a line equipment digital twin model based on MPC, the device comprising a processor 6 and a memory 7;
[0227] The memory 7 is used to store computer program code 71 and transmit the computer program code 71 to the processor 6;
[0228] The processor 6 is used to implement the MPC-based line equipment digital twin model parameter dynamic correction method described in Example 1 according to the instructions in the computer program code 71.
[0229] This embodiment also includes a computer-readable storage medium, which stores computer-executable instructions. When the computer-executable instructions are executed on a computer, the MPC-based line equipment digital twin model parameter dynamic correction method described in Example 1 is implemented.
[0230] Generally speaking, the computer instructions for implementing the method of the present invention may be carried in any combination of one or more computer-readable storage media. Non-transitory computer-readable storage media may include any computer-readable media, except for the signal itself that is temporarily propagating.
[0231] The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination thereof. More specific examples of computer-readable storage media (a non-exhaustive list) include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EKROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In the present invention, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in conjunction with an instruction execution system, device, or device.
[0232] Computer program code for performing the operation of the present invention can be written in one or more programming languages or a combination thereof, including object-oriented programming languages such as Java, SMalltalk, C++, and conventional procedural programming languages such as "C" or similar programming languages, in particular, Python suitable for neural network computing and platform frameworks based on TensorFlow, PyTorch, etc. can be used. The program code can be executed entirely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer or to an external computer (for example, using an Internet service provider to connect via the Internet) through any type of network, including a local area network (LAN) or a wide area network (WAN).
[0233] The above-mentioned devices and non-temporary computer-readable storage media can be found in the specific description of a method for dynamic correction of parameters of a digital twin model of line equipment based on MPC and its beneficial effects, which will not be repeated here.
[0234] Although the embodiments of the present invention have been shown and described above, it should be understood that the above embodiments are exemplary and should not be construed as limitations on the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A method for dynamic correction of parameters of a line equipment digital twin model based on MPC, characterized in that: include: S1. Collect historical operation data during transmission line construction and build a digital twin model of transmission line construction equipment; S2. Divide the system attributes of the digital twin model of the transmission line construction equipment into static attributes, dynamic attributes and performance attributes; S3. In the digital twin model of power transmission line construction equipment, the Seq2Seq algorithm and the Transformer model with multi-head self-attention mechanism are integrated to build a time series prediction framework, and an adaptive memory decay mechanism is introduced to optimize the output objective function of the time series prediction framework to control the parameter convergence speed of dynamic attributes and performance attributes; S4, updating static attributes in the digital twin model of transmission line construction equipment through event-driven; S5. Modify the dynamic and performance attributes in the digital twin model of transmission line construction equipment based on the MPC control strategy.
2. According to the MPC-based method for dynamic correction of parameters of a line equipment digital twin model according to claim 1, it is characterized in that: The step S3 introduces an adaptive memory decay mechanism to optimize the output objective function of the time series prediction framework, specifically: For three different types of data points in historical operation data, namely stable data points, fluctuating data points and mutation data points, the memory decay factor λ(t) is introduced to optimize the output objective function to adapt to the dynamic characteristics of the data points; the details are as follows: For stationary data points: keep the memory decay factor as a fixed constant value λ between [0,1]; For the fluctuation data points and mutation data points: introduce the correction term Δλ(t), the expression of the correction term is as follows: λ(t)=λ(t-1)+Δλ(t); Then for the fluctuating data points, the correction is: Δλ(t)=α(1-λ(t-1)) α>0; Then for the mutation data point, the correction is: Δλ(t)=β(1+λ(t-1)) β>0; Among them: α and β are adjustment coefficients, and t is the current time step; The optimized output objective function is as follows: Where: J is the output objective function, w1 and w2 are weight coefficients, y p is the predicted output, y s is the actual output, ΔU is the control increment, T is the total number of time steps, and t is the current time step; The constraints of the output objective function are as follows: V m_min ≤V m (t)≤V m_max I m_min ≤I m (t)≤I m_max T m_min ≤T m (t)≤T m_max D.U. min ≤ΔU(t)≤ΔU max ; f min ≤f(t)≤f max V min ≤V(t)≤V max 0<w1<1,0<w2<1; w1+w2=1; Where: V m ,I m 、T m Both are state quantities, V m_min 、V m_max ,I m_min ,I m_max 、T m_min 、T m_max are the upper and lower limits of its state quantity, ΔU is the increment value, and ΔU min , ΔU max are the upper and lower limits of the increment value, ε is the change rate constraint, f is the frequency, V is the voltage, f min 、f max are the upper and lower limits of the frequency, and dt is the time increment.
3. The method for dynamic correction of parameters of a line equipment digital twin model based on MPC according to claim 1, characterized in that: The expression of the multi-head self-attention mechanism in step S3 is as follows: MultiHead(Q,K,V)=Concat(head1,…,head h )W o ; Among them: Attention (Q, K, V) is the output matrix of single-point attention, Q, K, V are all matrices, softmax is the activation function, d k is the key value of the input dimension, They are the weight matrices corresponding to Q, K, and V in the i-th attention head, MultiHead(Q, K, V) is the output matrix of multi-head attention, and Concat is the concatenation operation.
4. The method for dynamic correction of parameters of a line equipment digital twin model based on MPC according to claim 1, characterized in that: The step S4, updating the static attributes in the digital twin model of the transmission line construction equipment through event-driven means: based on the changes in the construction site during the transmission line construction and the changes in the structural attributes corresponding to the construction site changes, triggering the re-identification and re-assignment of the parameters of the static attributes, and updating the assignments to the digital twin model of the transmission line construction equipment.
5. The method for dynamic correction of parameters of a line equipment digital twin model based on MPC according to claim 1, characterized in that: The step S5 specifically includes: S51, defining error limits within different time steps t; the expression of the error limit is as follows: Where: θ(t) is the error limit within time step t, y p is the predicted output, y s is the actual output, t is the current time step; S52. For dynamic attributes, periodically obtain measured data of the dynamic attributes at each time step t, and use it as the actual output; for performance attributes, predict the parameters of the performance attributes based on the time series prediction framework, and use the prediction results as the actual output; S53, based on the actual output historical data, set the maximum error limit θ′; when θ(t)>θ′, trigger parameter update, update the parameters of dynamic attributes and performance attributes respectively, and then proceed to step S54; S54, iterating the digital twin model of the transmission line construction equipment, and setting the value strategy of the output objective functions w1 and w2 in the model to balance the values of the weight coefficients w1 and w2 and correct the performance attributes; the value strategy is as follows: Wherein: w1 and w2 are weight coefficients; lter is the number of iterations of the MPC control strategy; N1 is the iteration threshold; N is the maximum number of iterations; A1 is the value of w1 when the iteration number is less than N1; A2 is the value of w2 when the iteration number is less than N1; B1 is the value of w1 when the iteration number is between N1 and N; B2 is the value of w2 when the iteration number is between N1 and N.
6. The method for dynamic correction of parameters of a line equipment digital twin model based on MPC according to claim 1, characterized in that: The time series prediction framework includes an encoder and a decoder; The stack structure of the Transformer in the encoder includes a first encoding sublayer and a second encoding sublayer arranged in sequence; the first encoding sublayer includes a multi-head self-attention mechanism and an accumulation and layer normalization mechanism arranged in sequence; the second encoding sublayer includes a feedforward neural network and an accumulation and layer normalization mechanism arranged in sequence; The stack structure of the Transformer in the decoder includes a first decoding sublayer, a second decoding sublayer and a third decoding sublayer arranged in sequence; the first decoding sublayer includes a masked multi-head self-attention mechanism and a cumulative sum layer normalization mechanism arranged in sequence; the second decoding sublayer includes a multi-head self-attention mechanism and a cumulative sum layer normalization mechanism arranged in sequence; the third decoding sublayer includes a feedforward neural network and a cumulative sum layer normalization mechanism arranged in sequence; The encoding second sublayer is connected to the decoding second sublayer.
7. The method for dynamic correction of parameters of a line equipment digital twin model based on MPC according to claim 1, characterized in that: The digital twin model of the transmission line construction equipment includes a physical line and a digital twin line; The physical circuit refers to: the entity reference target of digital twin circuit modeling; specifically including physical entities and IoT perception data; The digital twin circuit refers to: the digital expression of the physical circuit in the virtual space; specifically including the modeling of static properties, dynamic properties and performance properties.
8. The method for dynamic correction of parameters of a line equipment digital twin model based on MPC according to claim 1, characterized in that: The static attributes refer to: structural attributes of transmission line construction equipment; specifically including line length, conductor cross-sectional dimensions, tower parameters, insulator parameters, transformer capacity, supplier information of used materials, and specific information of construction equipment; The dynamic attributes refer to dynamic indicators whose values change with working conditions and reflect the real-time operating status of the power transmission line construction system and equipment; specifically, they include the tower installation progress, material consumption, wind speed and direction, and equipment temperature; The performance attributes refer to: performance indicators that reflect the stability of transmission line construction systems and equipment operation; specifically include maintenance records, life parameters, process parameters, work efficiency of workers or equipment, and quality control indicators.
9. A dynamic correction system for parameters of a line equipment digital twin model based on MPC, characterized by: The system is applied to the method described in any one of claims 1 to 8, and the system comprises: A digital twin model building module (1) is used to collect historical operation data during the construction of the transmission line and build a digital twin model of the transmission line construction equipment; A system attribute division module (2), used for dividing the system attributes of the digital twin model of the power transmission line construction equipment into static attributes, dynamic attributes and performance attributes; The digital twin model optimization module (3) is used to integrate the Seq2Seq algorithm and the multi-head self-attention mechanism Transformer model in the initial transmission line construction equipment digital twin model to build a time series prediction framework, and introduce an adaptive memory decay mechanism to optimize the output objective function of the time series prediction framework; An attribute updating module (4), used for updating static attributes in the digital twin model of the transmission line construction equipment through event-driven operation; The attribute correction module (5) is used to correct the dynamic attributes and performance attributes in the digital twin model of the transmission line construction equipment based on the MPC control strategy.
10. A dynamic correction device for parameters of a line equipment digital twin model based on MPC, characterized in that: The device comprises a processor (6) and a memory (7); The memory (7) is used to store computer program code (71) and transmit the computer program code (71) to the processor (6); The processor (6) is used to execute the MPC-based line equipment digital twin model parameter dynamic correction method described in any one of claims 1 to 8 according to the instructions in the computer program code (71).
Citation Information
Patent Citations
Novel power system power supply optimal planning method based on digital twinning
CN115526401A
Distribution transformer short-term load prediction method based on digital twinning and neural network technology
CN116388150A
Generative construction method and system for digital twin model of power grid
CN117454766A
Method for constructing digital twinborn model library of power system and related equipment
CN117828820A
Power grid equipment energy efficiency optimization method and system based on digital twinning
CN117932968A
Cited By
Dynamic correction method for digital twin model parameters of line equipment of MPC
CN120871633A
A method for dynamic correction of parameters of a line device digital twin model of an MPC
CN120871633B
Dynamic risk early warning and virtual drilling method and system based on digital twin mine
CN122472553A