Ecological restoration digital cooperation method and device and storage medium
By establishing the relationship between the restoration section and the previous section in the ecological restoration project, the optimal collaborative repair process is obtained, and the inefficiency problem caused by the single logic of the restoration section in the existing technology is solved, and efficient collaborative repair of the ecological restoration project is achieved.
Patent Information
- Application Number
- CN202411063958.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the prior art, each restoration section of an ecological restoration project will only be repaired one by one according to a single logic, ignoring the internal connection between the restoration sections, resulting in ineffective repair.
By obtaining all repair sections of the ecological project to be repaired, establish the association relationship between the repair section and its precedent repair section, obtain the optimal collaborative repair process based on these relationships, and execute the repair section according to the optimal process to ensure that it does not exist before The sections of the sequence restoration section are constructed simultaneously until all restoration sections are completed.
The overall efficiency of ecological restoration projects has been improved. Through the coordinated implementation between restoration sections, multiple construction sections can be constructed at the same time in some time periods, thereby improving restoration efficiency.
Smart Images

Figure CN119026735A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of ecological restoration technology, and in particular to a digital collaborative method, device and storage medium for ecological restoration. Background Art
[0002] With the innovation of mining of various resources and minerals, the ecological restoration of tailings has gradually become an increasingly important task;
[0003] However, the ecological restoration project method adopted in the existing technology is inefficient. Each restoration section will only be repaired one by one according to a single logic, ignoring the possible internal connections between the restoration sections. Therefore, how to solve the ecological restoration problem in an overall one-time coordinated manner and improve the efficiency of ecological restoration projects is a problem that must be solved at present. Summary of the invention
[0004] In view of this, the purpose of the present invention is to provide a digital collaborative method, device and storage medium for ecological restoration, so as to solve the problem in the prior art that each restoration section will only carry out restoration one by one according to a single logic, ignoring the possible intrinsic connections between the restoration sections, resulting in low restoration efficiency.
[0005] According to a first aspect of an embodiment of the present invention, a digital collaborative method for ecological restoration is provided, the method comprising:
[0006] Obtain all restoration sections of the ecological project to be restored, and for restoration sections that have predecessor restoration sections, establish an association relationship between the restoration section and its corresponding predecessor restoration section;
[0007] The optimal section collaborative repair process is obtained based on the association relationship between the repair section and its corresponding preceding repair section;
[0008] The restoration process of the ecological project to be restored is carried out according to the optimal restoration process, including:
[0009] According to the optimal work-section collaborative repair process, the repair work sections without a preceding repair work section are obtained, and the repair work sections without a preceding repair work section are constructed and executed together;
[0010] After the construction of all repair sections without a previous repair section is completed, it is determined whether the current construction progress meets the previous repair section of any repair section in the remaining repair sections, and one or more repair sections in the remaining repair sections that meet the previous repair section are constructed and executed together;
[0011] Continue to determine whether the current construction progress meets the requirements of the preceding restoration section of any of the remaining restoration sections, and execute one or more restoration sections that meet the requirements of the preceding restoration sections in the remaining restoration sections together, and repeat this step until the construction of all restoration sections of the ecological project to be restored is completed according to the optimal section collaborative restoration process.
[0012] Preferably,
[0013] The process of obtaining the optimal section collaborative repair process based on the association relationship between the repair section and its corresponding preceding repair section includes:
[0014] Input all the restoration sections of the ecological project to be restored, as well as the association relationship between the restoration section and its corresponding previous restoration section, into the pre-built ecological restoration digital twin model. The pre-built ecological restoration digital twin model generates one or more section collaborative restoration processes of the ecological project to be restored according to the association relationship between the restoration section and its corresponding previous restoration section;
[0015] If there is only one collaborative restoration process for the work section of the ecological project to be restored, then this collaborative restoration process for the work section of the ecological project to be restored is used as the optimal collaborative restoration process for the work section;
[0016] If there are multiple collaborative restoration processes for the ecological project to be restored, the pre-built digital twin model for ecological restoration simulates and runs each collaborative restoration process for the ecological project to be restored, and calculates the collaborative efficiency of each collaborative restoration process for the ecological project to be restored, and selects the collaborative restoration process for the section with the highest collaborative efficiency as the optimal collaborative restoration process for the section.
[0017] Preferably, it also includes:
[0018] Access the restoration section record database of the ecological restoration project under the same historical scenario to query whether there is an abnormal event in any restoration section. If so, generate a restoration reminder log for the ecological project to be restored according to the restoration section with the abnormal event;
[0019] The repair reminder log includes: the sequence number, cause and measures of the repair section where the abnormal event occurred.
[0020] Preferably,
[0021] The ecological projects under the historical equivalent scenario include:
[0022] For a historical ecological restoration project, if all the restoration sections it contains are the same as the restoration sections included in the ecological project to be restored, regardless of whether the optimal section collaborative restoration process is the same, this historical ecological restoration project will be regarded as an ecological restoration project under the same historical scenario as the ecological project to be restored.
[0023] Preferably,
[0024] The abnormal events include: rework, delay or waiting;
[0025] The rework includes: the repair section that failed the acceptance after the completion of the construction and needs to be re-constructed;
[0026] The delay includes: a repair section whose total construction completion time is greater than a preset total construction completion time threshold;
[0027] The waiting includes: during the construction process of the repair section, the repair section stops construction at a certain node for a time greater than a preset waiting time threshold.
[0028] Preferably,
[0029] The collaborative efficiency of the collaborative restoration process of each section of the ecological project to be restored is calculated separately, including:
[0030] Setting the weight parameters of the ecological project to be restored in the pre-built digital twin model of ecological restoration, setting the estimated completion time of the ecological project to be restored according to the completion time of the ecological restoration project under the same historical scenario; setting the efficiency error factor of each restoration section;
[0031] Obtain the efficiency of each restoration section after simulating the coordinated restoration process of each section of each ecological project to be restored, and obtain the total time of simulating the coordinated restoration process of each section of each ecological project to be restored;
[0032] Obtain the time saved in the whole process of the ecological project to be restored according to the total time of the coordinated restoration process of each work section of the ecological project to be restored and the estimated completion time of the ecological project to be restored;
[0033] The collaborative efficiency of the collaborative restoration process of each section of the ecological project to be restored is obtained based on the weight parameters of the ecological project to be restored, the estimated completion time, the time saved in the whole process, the efficiency of each restoration section and the efficiency error factor of each restoration section.
[0034] Preferably,
[0035] The restoration process of executing the restoration process of the ecological project to be restored according to the optimal process section collaborative restoration process also includes:
[0036] During the construction process of any repair section, if rework, delay or waiting occurs, the serial number, cause and measures of the repair section where the rework, delay or waiting occurs are obtained, and the serial number, cause and measures of the repair section where the rework, delay or waiting occurs are uploaded to the repair section record database.
[0037] Preferably,
[0038] For the same restoration section in an ecological restoration project under the same historical scenario, if rework, delay or waiting occurs multiple times, the total number of rework, delay or waiting for the restoration section shall be recorded in the restoration section record database. The total number of occurrences is the historical number of occurrences plus the number of occurrences during the construction process of the ecological project to be restored.
[0039] According to a second aspect of an embodiment of the present invention, there is provided an ecological restoration digital collaboration device, the device comprising:
[0040] Restoration relationship division module: used to obtain all restoration sections of the ecological project to be restored, and for restoration sections with predecessor restoration sections, establish an association relationship between the restoration section and its corresponding predecessor restoration section;
[0041] Collaborative relationship acquisition module: used to acquire the optimal section collaborative repair process based on the association relationship between the repair section and its corresponding preceding repair section;
[0042] The collaborative execution module is used to execute the restoration section of the ecological project to be restored according to the optimal section collaborative restoration process, including:
[0043] According to the optimal work-section collaborative repair process, the repair work sections without a preceding repair work section are obtained, and the repair work sections without a preceding repair work section are constructed and executed together;
[0044] After the construction of all repair sections without a previous repair section is completed, it is determined whether the current construction progress meets the previous repair section of any repair section in the remaining repair sections, and one or more repair sections in the remaining repair sections that meet the previous repair section are constructed and executed together;
[0045] Continue to determine whether the current construction progress meets the requirements of the preceding restoration section of any of the remaining restoration sections, and execute one or more restoration sections that meet the requirements of the preceding restoration sections in the remaining restoration sections together, and repeat this step until the construction of all restoration sections of the ecological project to be restored is completed according to the optimal section collaborative restoration process.
[0046] According to a third aspect of an embodiment of the present invention, there is provided a storage medium, wherein the storage medium stores a computer program, and when the computer program is executed by a main controller, each step in the above method is implemented.
[0047] The technical solution provided by the embodiments of the present invention may have the following beneficial effects:
[0048] The present application obtains all restoration sections of the ecological project to be restored, and for the restoration sections with predecessor restoration sections in the restoration sections, establishes the association relationship between the restoration sections and their corresponding predecessor restoration sections; and obtains the optimal section collaborative restoration process based on the association relationship between the restoration sections and their corresponding predecessor restoration sections; when executing the optimal section collaborative restoration process, the restoration sections without predecessor restoration sections are constructed together, and at the same time, each time a construction stage is completed, it is determined whether it is the predecessor restoration section of one or more restoration sections. If so, one or more subsequent restoration sections are also constructed together until the construction of all restoration sections is completed according to the optimal section collaborative restoration process, and all restoration sections are coordinated by utilizing the predecessor execution relationship between the restoration sections, so that multiple restoration sections can be executed together in some time periods, thereby improving the efficiency of restoration.
[0049] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.
[0051] Figure 1 is a flowchart of a digital collaborative method for ecological restoration according to an exemplary embodiment;
[0052] Figure 2 is a schematic diagram of an optimal work-section collaborative repair process according to an exemplary embodiment;
[0053] Figure 3 is a system schematic diagram of a digital collaborative device for ecological restoration according to another exemplary embodiment;
[0054] In the attached figure: 1-repair relationship division module, 2-collaborative relationship acquisition module, 3-collaborative execution module. DETAILED DESCRIPTION
[0055] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present invention. Instead, they are merely examples of devices and methods consistent with some aspects of the present invention as detailed in the appended claims.
[0056] Embodiment 1
[0057] Figure 1 is a flow chart of a digital collaborative method for ecological restoration according to an exemplary embodiment. Figure 1 As shown, the method includes:
[0058] S1, obtaining all restoration sections of the ecological project to be restored, and establishing an association relationship between the restoration section and its corresponding predecessor restoration section for the restoration section that has a predecessor restoration section among the restoration sections;
[0059] S2, obtaining the optimal section collaborative repair process based on the association relationship between the repair section and its corresponding previous repair section;
[0060] S3, executing the restoration section of the ecological project to be restored according to the optimal section collaborative restoration process, including:
[0061] According to the optimal work-section collaborative repair process, the repair work sections without a preceding repair work section are obtained, and the repair work sections without a preceding repair work section are constructed and executed together;
[0062] After the construction of all repair sections without a previous repair section is completed, it is determined whether the current construction progress meets the previous repair section of any repair section in the remaining repair sections, and one or more repair sections in the remaining repair sections that meet the previous repair section are constructed and executed together;
[0063] Continue to determine whether the current construction progress meets the requirements of the previous restoration section of any restoration section in the remaining restoration sections, and perform construction together with one or more restoration sections in the remaining restoration sections that meet the requirements of the previous restoration sections, and repeat this step until the construction of all restoration sections of the ecological project to be restored is completed according to the optimal section collaborative restoration process;
[0064] It is understandable that for an ecological project to be repaired, it is divided into multiple repair sections, such as repair sections A0, A1, A2, B0, C0, etc. For some repair sections, they have certain connections, such as a certain repair section can only be constructed after another or more repair sections are completed, just like building a house must first build a foundation, and other construction can be carried out on the basis of this foundation. In simple terms, repair section A1 must be carried out after the construction of repair section A0 is completed, then repair section A0 is the predecessor repair section of repair section A1, and repair section B0 itself has no predecessor repair section, then repair section B0 can be constructed at any time, but if repair section B0 is the predecessor repair section of another repair section, then the progress of repair section B0 will inevitably affect the progress of subsequent repair sections. Therefore, although repair section B0 does not have a predecessor repair section as a restriction condition, it needs to be executed first for the overall repair efficiency;
[0065] For all restoration sections, even if some restoration sections have a pre-execution relationship, their existing construction processes may also include multiple methods. In this case, it is necessary to simulate the efficiency of each construction process to select the optimal section collaborative restoration process. The simulation operation technology uses digital twin technology. As a relatively mature virtual simulation technology, digital twin technology can realize the simulation of the above-mentioned ecological restoration section in this embodiment, specifically including:
[0066] According to the environment of the ecological restoration project and the equipment or buildings used in the construction process, 3dmax software is used to construct and render the original proportions to characterize the appearance, size and structure of the environment, equipment or building. On the basis of the geometric model, ANSYS software and MATLAB software are used to improve its physical model to reflect the force changes of the environment, building or equipment and to represent the mechanical coupling characteristics of the environment, building or equipment. The geometric model and physical model of the environment, equipment or building are imported into Unity3D, and the behavior model and rule model of each environment, equipment or building are set in the Unity3D environment. The behavior model is used to represent the movement or change state and movement or change action of the environment, equipment or building during operation. For example, if a certain device performs a pit digging action at a certain location in the virtual environment, a pit will appear at the corresponding address in the virtual environment, and the size or shape of the pit is related to the action of the virtual device. The rule model is used to represent the operation trajectory, constraints, range of motion and expert knowledge of the relevant equipment to complete the construction of the digital twin model of ecological restoration.
[0067] It should be emphasized that realizing virtual-reality mapping through digital twin modeling is a relatively common technology in the prior art. This embodiment only utilizes this technology and will not be described in detail here.
[0068] All restoration sections of the ecological project to be restored, as well as the association relationship between the restoration section and its corresponding preceding restoration section (such as restoration section A0 is the preceding restoration section of restoration section A1, restoration section B0 is the preceding restoration section of restoration section B1, restoration sections B1 and A1 are together the preceding restoration section of restoration section C0, and so on) are input into the above-built digital twin model of ecological restoration. The digital twin model of ecological restoration generates one or more section collaborative restoration processes of the ecological project to be restored according to the association relationship between the restoration section and its corresponding preceding restoration section; if there is only one section collaborative restoration process of the ecological project to be restored, the section collaborative restoration process of the ecological project to be restored is used as the optimal section collaborative restoration process; if there are multiple section collaborative restoration processes of the ecological project to be restored, it is necessary to simulate and run the section collaborative restoration process of each ecological project to be restored separately through the digital twin model of ecological restoration, and calculate the collaborative efficiency of the section collaborative restoration process of each ecological project to be restored separately, and select the section collaborative restoration process with the highest collaborative efficiency as the optimal section collaborative restoration process;
[0069] It is understandable that in order to facilitate the ecological restoration digital twin model to calculate the collaborative efficiency of the collaborative restoration process of each section of the ecological project to be restored, it is necessary to preset some values in the controller of the ecological restoration digital twin model in advance, including: the weight parameters of the ecological project to be restored, the estimated completion time (the estimated completion time is the average completion time of the ecological restoration project under the same historical scenario), and the efficiency error factor of each restoration section;
[0070] After the simulation of the coordinated restoration process of each section of the ecological project to be restored is completed, it is necessary to obtain the efficiency of each restoration section and the total duration of the complete process; according to the total duration of the coordinated restoration process of each section of the ecological project to be restored and the preset estimated duration, the error duration between the two is obtained, that is, the time saved. Based on the data obtained after the above simulation is completed and the preset data, the coordinated efficiency is calculated. The calculation formula is as follows:
[0071]
[0072] In the formula, ρ is the synergistic efficiency of ecological restoration, i refers to different ecological restoration stages, γ i is a weight parameter, which is set according to different ecological restoration projects. i It is the repair efficiency of each section, which is obtained after the digital twin model simulates and runs the entire repair process, such as sections A0, A01, A011, B0, B01, C0, etc. is the efficiency error factor estimated for each restoration stage, t0 refers to the estimated time to complete the ecological restoration, δ tRefers to time saving throughout the entire process of ecological restoration projects;
[0073] Assume that the optimal work-section collaborative repair process is selected as shown in the attached Figure 2 As shown,
[0074] 301 means that Section A0 has no preceding repair section, and Section A0 is the preceding section of Section A01. 302 means that Section A01 is the preceding section of Section A011. 303 means that Section A011 is the preceding section of Section A0111. 304 means that Section A0111 is the preceding section of Section A011111. 305 means that Section A01111 is the end of the process, with a preceding section but no succeeding section. 306 means that Section A0 is Section A02. 307 refers to the section A0 is the predecessor section of section A03, and section A03 is the predecessor section of section A0111; 308 refers to the section B0 is the first stage of the section and has no predecessor section; 309 refers to the section B0 is the predecessor section of section B01, and section B01 is the predecessor section of section A01111; 310 refers to the section C0 has no predecessor section, and section C0 is the predecessor section of section A01111;
[0075] It is worth emphasizing that the Figure 2 The connection between all the repair sections in the represents the optimal section collaborative repair process, and does not represent the above-mentioned association relationship input into the digital twin model. In fact, the association relationship between the repair section input into the digital twin model and its corresponding predecessor repair section may only be that section A0, section B0, and section C0 are the starting sections of all sections, and there is no predecessor repair section. Section A01111 is the ending section of all sections, section B0 is the predecessor repair section of section B1, and section A0111, section B01, and section C0 are together the predecessor repair sections of section A01111; this is only for explanation and does not represent the actual association relationship input into the model. The model generates one or more repair processes based on the input association relationship. When the repair process is generated, except for the starting section, other sections must have a predecessor repair section and must satisfy the association relationship of the input repair section. In fact, the repair process only represents the construction sequence, but it is the most efficient under the optimal section collaborative repair process;
[0076] According to the attached Figure 2 According to the order of the work sections and the time summary, the longest work section duration is:
[0077] Section A0+Section A01+Section A011+Section A0111+Section A01111;
[0078] Work sections A0, A01, A011, A0111 and A01111 are not allowed to delay work;
[0079] During the time period of section A01+section A011, section A02 shall not be later than section A01+section A011-section A02;
[0080] During the time period of section A01+section A011, section A03 cannot be later than section A01+section A011-section A03;
[0081] Sections B0 and B01 are within the time period of Section A0+Section A01+Section A011+Section A0111;
[0082] Section B0 cannot be later than Section A0+Section A01+Section A011+Section A0111-Section B0-Section B01;
[0083] Section B01 depends on the start time of section B0, and cannot be later than section A0+section A01+section A011+section A0111-section B01;
[0084] Section C0 cannot be later than Section A0 + Section A01 + Section A011 + Section A0111 - Section C0;
[0085] According to the attached Figure 2 , it can be seen that sections A0, B0 and C0 can be carried out simultaneously. After section A0 is completed, sections A01, A02 and A03 can be carried out simultaneously, thereby improving the collaborative efficiency of the entire ecological restoration project;
[0086] After determining the optimal collaborative restoration process for a certain work section, first query the restoration work section record database of ecological restoration projects under historical equivalent scenarios to query whether there are any abnormal events in any restoration work section. If so, generate a restoration reminder log for the ecological project to be restored based on the restoration work section with the abnormal event. In simple terms, through the database of ecological restoration projects under historical equivalent scenarios similar to the current project to be restored, the historical equivalent scenarios here refer to the same restoration work sections included in the two, for example, both include (work section A0, work section A1, work section C0, etc.), but it does not require the same execution process for the two during the actual construction process, that is, the collaborative restoration process for the work sections may be different. Obtain the same restoration work sections under historical equivalent scenarios by querying the database. Abnormal events of a work section. Abnormal events refer to whether the repair work section has experienced rework, delay or waiting. Rework refers to a repair work section that fails to pass the acceptance inspection after construction and needs to be reconstructed; delay refers to a repair work section whose total construction completion time is greater than the preset total construction completion time threshold; waiting refers to a repair work section where the construction is stopped at a certain node during the construction process of the repair work section for a time greater than the preset waiting time threshold; if an abnormal event occurs in the same repair work section, the serial number, cause and measures of the same repair work section in the same historical scenario are extracted from the database and a construction reminder log is generated. During the repair process of the project to be repaired, the probability of the occurrence of the same abnormal event is reduced through the construction reminder log;
[0087] Similarly, during the execution of the current repair project, if an abnormal event occurs in a repair section, after the abnormal event is handled, the serial number, cause and measures of the repair section of the abnormal event also need to be manually uploaded to the database to provide a reference for subsequent repair projects;
[0088] In order to further increase the probability of the same abnormal events occurring during the execution of the repair project, for abnormal events that have occurred multiple times in the same historical scenario, the number of occurrences needs to be marked in the database and specially stated in the construction reminder log. If the accident continues to occur in the current repair project, the number of occurrences in the database will be increased by 1.
[0089] Embodiment 2
[0090] Figure 3 : is a system schematic diagram of an ecological restoration digital collaborative device according to another exemplary embodiment, including:
[0091] Restoration relationship division module 1: used to obtain all restoration sections of the ecological project to be restored, and for restoration sections with predecessor restoration sections, establish an association relationship between the restoration section and its corresponding predecessor restoration section;
[0092] Collaborative relationship acquisition module 2: used to acquire the optimal section collaborative repair process based on the association relationship between the repair section and its corresponding preceding repair section;
[0093] Collaborative execution module 3: used to execute the restoration section of the ecological project to be restored according to the optimal section collaborative restoration process, including:
[0094] According to the optimal work-section collaborative repair process, the repair work sections without a preceding repair work section are obtained, and the repair work sections without a preceding repair work section are constructed and executed together;
[0095] After the construction of all repair sections without a previous repair section is completed, it is determined whether the current construction progress meets the previous repair section of any repair section in the remaining repair sections, and one or more repair sections in the remaining repair sections that meet the previous repair section are constructed and executed together;
[0096] Continue to determine whether the current construction progress meets the requirements of the preceding restoration section of any of the remaining restoration sections, and execute one or more restoration sections that meet the requirements of the preceding restoration sections in the remaining restoration sections together, and repeat this step until the construction of all restoration sections of the ecological project to be restored is completed according to the optimal section collaborative restoration process.
[0097] Embodiment three:
[0098] This embodiment provides a storage medium, wherein the storage medium stores a computer program, and when the computer program is executed by a main controller, each step in the above method is implemented;
[0099] It is understandable that the storage medium mentioned above can be a read-only memory, a magnetic disk or an optical disk, etc.
[0100] It can be understood that the same or similar parts of the above embodiments can be referenced to each other, and the contents not described in detail in some embodiments can refer to the same or similar contents in other embodiments.
[0101] It should be noted that, in the description of the present invention, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of the present invention, unless otherwise specified, the meaning of "plurality" refers to at least two.
[0102] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by those skilled in the art to which the embodiments of the present invention belong.
[0103] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0104] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0105] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.
[0106] The storage medium mentioned above can be a read-only memory, a magnetic disk or an optical disk, etc.
[0107] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0108] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A digital collaborative method for ecological restoration, characterized in that: The method comprises: Obtain all restoration sections of the ecological project to be restored, and for restoration sections that have predecessor restoration sections, establish an association relationship between the restoration section and its corresponding predecessor restoration section; The optimal section collaborative repair process is obtained based on the association relationship between the repair section and its corresponding preceding repair section; The restoration process of the ecological project to be restored is carried out according to the optimal restoration process, including: According to the optimal work-section collaborative repair process, the repair work sections without a preceding repair work section are obtained, and the repair work sections without a preceding repair work section are constructed and executed together; After the construction of all repair sections without a previous repair section is completed, it is determined whether the current construction progress meets the previous repair section of any repair section in the remaining repair sections, and one or more repair sections in the remaining repair sections that meet the previous repair section are constructed and executed together; Continue to determine whether the current construction progress meets the requirements of the preceding restoration section of any of the remaining restoration sections, and execute one or more restoration sections that meet the requirements of the preceding restoration sections in the remaining restoration sections together, and repeat this step until the construction of all restoration sections of the ecological project to be restored is completed according to the optimal section collaborative restoration process.
2. The method according to claim 1, characterized in that The process of obtaining the optimal section collaborative repair process based on the association relationship between the repair section and its corresponding preceding repair section includes: Input all the restoration sections of the ecological project to be restored, as well as the association relationship between the restoration section and its corresponding previous restoration section, into the pre-built ecological restoration digital twin model. The pre-built ecological restoration digital twin model generates one or more section collaborative restoration processes of the ecological project to be restored according to the association relationship between the restoration section and its corresponding previous restoration section; If there is only one collaborative restoration process for the work section of the ecological project to be restored, then this collaborative restoration process for the work section of the ecological project to be restored is used as the optimal collaborative restoration process for the work section; If there are multiple collaborative restoration processes for the ecological project to be restored, the pre-built digital twin model for ecological restoration simulates and runs each collaborative restoration process for the ecological project to be restored, and calculates the collaborative efficiency of each collaborative restoration process for the ecological project to be restored, and selects the collaborative restoration process for the section with the highest collaborative efficiency as the optimal collaborative restoration process for the section.
3. The method according to claim 1, characterized in that Also includes: Access the restoration section record database of the ecological restoration project under the same historical scenario to query whether there is an abnormal event in any restoration section. If so, generate a restoration reminder log for the ecological project to be restored according to the restoration section with the abnormal event; The repair reminder log includes: the sequence number, cause and measures of the repair section where the abnormal event occurred.
4. The method according to claim 3, characterized in that: The ecological projects under the historical equivalent scenario include: For a historical ecological restoration project, if all the restoration sections it contains are the same as the restoration sections included in the ecological project to be restored, regardless of whether the optimal section collaborative restoration process is the same, this historical ecological restoration project will be regarded as an ecological restoration project under the same historical scenario as the ecological project to be restored.
5. The method according to claim 4, characterized in that The abnormal events include: rework, delay or waiting; The rework includes: the repair section that failed the acceptance after the completion of the construction and needs to be re-constructed; The delay includes: a repair section whose total construction completion time is greater than a preset total construction completion time threshold; The waiting includes: during the construction process of the repair section, the repair section stops construction at a certain node for a time greater than a preset waiting time threshold.
6. The method according to claim 2, characterized in that The collaborative efficiency of the collaborative restoration process of each section of the ecological project to be restored is calculated separately, including: Setting the weight parameters of the ecological project to be restored in the pre-built digital twin model of ecological restoration, setting the estimated completion time of the ecological project to be restored according to the completion time of the ecological restoration project under the same historical scenario; setting the efficiency error factor of each restoration section; Obtain the efficiency of each restoration section after simulating the coordinated restoration process of each section of the ecological project to be restored, and obtain the total time of simulating the coordinated restoration process of each section of the ecological project to be restored; Obtain the time saved in the whole process of the ecological project to be restored according to the total time of the coordinated restoration process of each work section of the ecological project to be restored and the estimated completion time of the ecological project to be restored; The collaborative efficiency of the collaborative restoration process of each section of the ecological project to be restored is obtained based on the weight parameters of the ecological project to be restored, the estimated completion time, the time saved in the whole process, the efficiency of each restoration section and the efficiency error factor of each restoration section.
7. The method according to claim 5, characterized in that The restoration process of executing the restoration process of the ecological project to be restored according to the optimal process section collaborative restoration process also includes: During the construction process of any repair section, if rework, delay or waiting occurs, the serial number, cause and measures of the repair section where the rework, delay or waiting occurs are obtained, and the serial number, cause and measures of the repair section where the rework, delay or waiting occurs are uploaded to the repair section record database.
8. The method according to claim 7, characterized in that For the same restoration section in an ecological restoration project under the same historical scenario, if rework, delay or waiting occurs multiple times, the total number of rework, delay or waiting for the restoration section shall be recorded in the restoration section record database. The total number of occurrences is the historical number of occurrences plus the number of occurrences during the construction process of the ecological project to be restored.
9. A digital collaborative device for ecological restoration, characterized in that: The device comprises: Restoration relationship division module: used to obtain all restoration sections of the ecological project to be restored, and for restoration sections with predecessor restoration sections, establish an association relationship between the restoration section and its corresponding predecessor restoration section; Collaborative relationship acquisition module: used to acquire the optimal section collaborative repair process based on the association relationship between the repair section and its corresponding preceding repair section; The collaborative execution module is used to execute the restoration section of the ecological project to be restored according to the optimal section collaborative restoration process, including: According to the optimal work-section collaborative repair process, the repair work sections without a preceding repair work section are obtained, and the repair work sections without a preceding repair work section are constructed and executed together; After the construction of all repair sections without a previous repair section is completed, it is determined whether the current construction progress meets the previous repair section of any repair section in the remaining repair sections, and one or more repair sections in the remaining repair sections that meet the previous repair section are constructed and executed together; Continue to determine whether the current construction progress meets the requirements of the preceding restoration section of any of the remaining restoration sections, and execute one or more restoration sections that meet the requirements of the preceding restoration sections in the remaining restoration sections together, and repeat this step until the construction of all restoration sections of the ecological project to be restored is completed according to the optimal section collaborative restoration process.
10. A storage medium, characterized in that: The storage medium stores a computer program, and when the computer program is executed by the main controller, each step in the digital collaborative method for ecological restoration as described in any one of claims 1 to 8 is implemented.
Citation Information
Patent Citations
Process execution control method, device, computer equipment and storage medium
CN110489086A
Main task processing method and device, server and storage medium
CN112416552A
Multi-energy system digital twin application process modeling and deploying method and system
CN112541836A
Task execution method and device and electronic equipment
CN115756769A
Task processing method and device, electronic equipment and storage medium
CN116048757A