The invention relates to the technical field of building and
ecological engineering, and discloses a bamboo-based
wetland soft soil roadbed reinforcing method which comprises the following steps: S1, preparing a plurality of bamboo rafts or
mortar bamboo pipes for later use; s2, flattening the soft soil roadbed of the
wetland to a designed elevation; s3, laying anti-seepage geotechnical cloth; s4, laying the manufactured bamboo rafts or
mortar bamboo pipes; s5, laying
water seepage geotechnical cloth; s6, if the bamboo rafts are laid in the step S4, gravel soil of 15-25 cm continues to be laid, another layer of bamboo rafts are laid again, and if the
mortar bamboo pipes are laid in the step S4, the step is omitted; s7, gravel soil with the thickness of 20-35 cm continues to be laid; and S8, continuously paving the upper-layer pavement. According to the reinforcing method, the rigidity and gap distribution characteristics of bamboo are utilized, the vehicle load is homogenized, the soft foundation
bearing capacity is enhanced, the seepage-proof
geotextile isolates the soil body, gaps between bamboo
layers are communicated with
wetland water bodies on the two sides,
microorganism exchange and ecological balance are promoted, the material cost is greatly saved, and the construction period is shortened.