Electric vehicle charging station locating and sizing method based on big data

Through big data technology, combined with area formulation units and site selection feedback units, the charging station configuration solution is obtained and calculated, and the problem of insufficient accuracy and flexibility in site selection and capacity setting of charging stations is solved, providing more accurate and flexible electric power Car charging station site selection plan.

CN119026796AInactive Publication Date: 2024-11-26JIANGSU WUXI TRANSPORTATION HIGHER VOCATIONAL & TECH SCHOOL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411063931.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The accuracy and flexibility of the existing electric vehicle charging station site selection and capacity setting methods are poor, and big data technology is not effectively utilized.

Method used

Using a big data-based method, by receiving site selection and capacity-setting instructions, using area drawing units and site selection feedback units, the residential location set, the target charging area and the charging station configuration scheme are obtained, the target energy consumption is calculated, and the charging station configuration scheme is calculated according to the charging station configuration scheme. Sequence selection and capacity determination.

Benefits of technology

It improves the accuracy and flexibility of charging station site selection and capacity setting, and provides a more accurate and flexible charging station configuration solution to meet the charging needs of electric vehicles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026796A_ABST
    Figure CN119026796A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of electric vehicle charging facility planning and construction, and discloses an electric vehicle charging station locating and sizing method based on big data, which comprises the following steps: confirming a region drawing unit and a locating feedback unit, confirming a living position set by utilizing a region drawing instruction after confirming that a region drawing instruction from the region drawing unit is received, and setting the locating feedback unit; acquiring a plurality of target charging areas by utilizing the living position set, and executing the following operations on each target charging area in the plurality of target charging areas: acquiring target energy consumption by utilizing the target charging area, and acquiring one or more charging station configuration schemes based on the target energy consumption, and acquiring a charging station configuration scheme sequence according to the one or more charging station configuration schemes, and sending the charging station configuration scheme sequence to an initiating end of a addressing and sizing instruction by using a addressing feedback unit to realize addressing and sizing of the charging station. The main purpose of the invention is to solve the problems of poor accuracy and flexibility during locating and sizing of the charging station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for site selection and capacity determination of an electric vehicle charging station based on big data, and belongs to the technical field of electric vehicle charging facility planning and construction. Background Art

[0002] With the popularity of electric vehicles, more and more electric vehicles are put into practical use. Therefore, the construction of charging stations has become an important part of urban infrastructure. Correspondingly, how to accurately select the location and capacity of electric vehicle charging stations has become an urgent problem to be solved.

[0003] At present, the methods for site selection and capacity determination of charging stations often rely on empirical judgment or simple data statistics.

[0004] Although the above method can realize the site selection and capacity determination of charging stations, it does not consider combining big data technology to formulate the actual area for charging station site selection and capacity determination when selecting the site and capacity of charging stations, resulting in poor accuracy and flexibility when selecting the site and capacity of charging stations. Summary of the invention

[0005] The present invention provides a method, device and computer-readable storage medium for site selection and capacity determination of electric vehicle charging stations based on big data, the main purpose of which is to solve the problems of poor accuracy and flexibility in site selection and capacity determination of charging stations.

[0006] To achieve the above-mentioned purpose, the present invention provides a method for site selection and capacity determination of electric vehicle charging stations based on big data, comprising:

[0007] Receiving a site selection and capacity determination instruction, and confirming a site selection system for site selection and capacity determination based on the site selection and capacity determination instruction, wherein the site selection system includes: a region planning unit and a site selection feedback unit;

[0008] After confirming receipt of the regional planning instruction from the regional planning unit, a residential location set is confirmed using the regional planning instruction;

[0009] A plurality of target charging areas are obtained by using the residential location set, and the following operations are performed on each of the plurality of target charging areas:

[0010] Obtaining a target energy consumption using a target charging area, and obtaining one or more charging station configuration solutions based on the target energy consumption;

[0011] Acquire a charging station configuration scheme sequence according to the one or more charging station configuration schemes;

[0012] The charging station configuration scheme sequence is sent to the initiator of the site selection and capacity determination instruction by using the site selection feedback unit to realize the site selection and capacity determination of the charging station.

[0013] Optionally, the step of using the regional planning instruction to determine the residential location set includes:

[0014] The regional drafting instruction is parsed to obtain a site selection area, and a reference vehicle set is obtained based on the site selection area, wherein the reference vehicle set includes multiple reference vehicles, and the following operations are performed on the reference vehicles in the reference vehicle set:

[0015] Obtain relevant information of a reference vehicle, perform an identification operation on the reference vehicle based on the relevant information, and obtain a first identified vehicle, wherein the relevant information includes: an actual location of the reference vehicle, a type of the reference vehicle, and an identification code of the reference vehicle, and the type of the reference vehicle includes: a pure electric vehicle and other vehicles, and the first identified vehicles are aggregated to obtain a first identified vehicle set;

[0016] Obtaining road information of the site selection area, wherein the road information is composed of intersections, road sections, and charging stations located in the road sections, and identifying the road sections as first road sections and second road sections according to whether there are charging stations in the road sections, wherein the first road section includes the charging station;

[0017] The target information of the target vehicle is monitored and recorded at each intersection, wherein the target information includes the intersection travel time, vehicle type and identification code of each intersection, and the vehicle type includes: pure electric vehicles and other vehicles. Based on the target information, an identification operation is performed on the target vehicle to obtain a second identified vehicle. When the vehicle type of the second identified vehicle is a pure electric vehicle, a conversion coefficient for reference is obtained, and the reference stay time is calculated using the second identified vehicle and the conversion coefficient. The calculation formula is as follows:

[0018] t=(β+α)(t1-t0)

[0019] Wherein, t is the reference stay time, t1 represents the travel time of the first intersection, t0 represents the travel time of the second intersection, wherein the first intersection and the second intersection are two adjacent intersections, α represents the conversion coefficient, and β represents the preset coefficient;

[0020] If the road section corresponding to the first intersection and the second intersection is the first road section, compare the reference stay time with a preset time threshold, and if the reference stay time is greater than or equal to the time threshold, confirm that the second identified vehicle is a target identified vehicle, and aggregate the target identified vehicles to obtain a target identified vehicle set;

[0021] A residential location set is obtained based on the first identified vehicle set and the target identified vehicle set.

[0022] Optionally, obtaining a conversion factor for reference includes:

[0023] Acquire a driving-in charging data set of the vehicle, wherein the driving-in charging data set is composed of a plurality of reference charging data sets, and the reference charging data set includes a plurality of driving-in charging data, and the reference charging data set corresponds to the first road section one by one, wherein the driving-in charging data is composed of: a travel time at the first intersection, a charging distance, and a driving-out time of the charging station, and the road section corresponding to the driving-in charging data is the same first road section;

[0024] The following operations are performed on the reference charging dataset in the drive-in charging dataset:

[0025] The following operations are performed on the drive-in charging data in the reference charging dataset:

[0026] Acquire the driving-in time based on the driving-in charging data, wherein the driving-in time is composed of: the absolute difference between the travel time of the first intersection and the driving-out time of the charging station;

[0027] Summarizing the entry times to obtain an entry time set, and obtaining an entry mean and an entry variance based on the entry time set, wherein the entry mean is the mean of the entry times in the entry time set, and the entry variance is the variance of the entry times in the entry time set;

[0028] The entry variance is compared with a preset variance threshold. If the entry variance is greater than the variance threshold, the following operations are performed on the entry times in the entry time concentration:

[0029] Calculate the absolute difference between the entry time and the entry mean to obtain a reference difference, summarize the reference differences to obtain a reference difference set, and perform a sorting operation on the reference differences in the reference difference set in descending order to obtain a reference difference sequence;

[0030] Extract reference difference values ​​from the reference difference value sequence in sequence, and perform the following operations on the extracted reference difference values:

[0031] The entry time corresponding to the reference difference is eliminated from the entry time set, the retained entry time is summarized to obtain an updated time set, the updated time set is used as the entry time set, and the step of obtaining the entry mean and the entry variance based on the entry time set is returned until the entry variance is less than or equal to the variance threshold, the entry time is summarized to obtain a first charging data set, the multiple first charging data sets are summarized to obtain a target charging data set, and the conversion coefficient is calculated based on the target charging data set.

[0032] Optionally, the conversion coefficient is calculated based on the target charging data set, and the calculation formula is as follows:

[0033]

[0034] Among them, T lrepresents the lth entry time in the first charging data set, m represents the total number of entry times in the first charging data set, S i represents the i-th charging distance in the target charging data set, S j represents the jth charging distance in the target charging data set, and n represents that there are n charging distances in the target charging data set.

[0035] Optionally, the acquiring of the residential location set based on the first identified vehicle set and the target identified vehicle set includes:

[0036] First identified vehicles whose reference vehicle type is a pure electric vehicle are sequentially extracted from the first identified vehicle set, and the following operations are performed on the extracted first identified vehicles:

[0037] Based on the extracted first identification vehicle, one or more out-of-town times are obtained, and the out-of-town frequency is calculated using the one or more out-of-town times. The calculation formula is as follows:

[0038]

[0039] Among them, Q represents the frequency of going out, Y h represents the hth outgoing time among one or more outgoing times, and f represents that there are a total of f outgoing times among the one or more outgoing times;

[0040] Compare the outgoing frequency with the preset outgoing threshold;

[0041] If the outgoing frequency is less than or equal to the outgoing threshold, confirming that the extracted first identified vehicle is the target charging vehicle;

[0042] Extract the second-identified vehicles from the target-identified vehicle set in sequence, and perform the following operations on the extracted second-identified vehicles:

[0043] Acquire one or more entry times based on the extracted second-identified vehicle, calculate the entry frequency based on the one or more entry times, compare the entry frequency with a preset entry threshold, and if the entry frequency is greater than or equal to the entry threshold, confirm that the extracted second-identified vehicle is a target charging vehicle, aggregate the target charging vehicles, and obtain a target charging vehicle set;

[0044] A residential location set is acquired based on the identification code corresponding to the target charging vehicle in the target charging vehicle set, wherein the residential location set includes multiple residential locations.

[0045] Optionally, the acquiring a plurality of target charging areas by using the residential location set includes:

[0046] The elbow fitting curve and the silhouette coefficient polyline are obtained by using the pre-constructed elbow method, the pre-constructed silhouette coefficient method, the preset cluster value threshold, the pre-constructed K-means clustering method and the residential location set, wherein the abscissa of the elbow fitting curve is the cluster value and the ordinate is SSE, and the abscissa of the silhouette coefficient polyline is the cluster value and the ordinate is the silhouette coefficient;

[0047] Obtain one or more local peaks in the silhouette coefficient curve, wherein the local peaks correspond to the silhouette coefficients one by one, and perform a sorting operation on the local peaks in order from large to small to obtain a local peak sequence;

[0048] Obtain multiple local derivatives in the elbow fitting curve, wherein the local derivatives correspond to the cluster values ​​one by one;

[0049] Extract local peaks from the local peak sequence in sequence, and perform the following operations on the extracted local peaks:

[0050] Based on the cluster value corresponding to the local peak, the target local derivative is identified from multiple local derivatives, and the comprehensive evaluation value is calculated based on the extracted local peak and the target local derivative. The calculation formula is as follows:

[0051]

[0052] Among them, Z represents the comprehensive evaluation value, F(K a ) represents the extracted local peak value, K a Represents the cluster value corresponding to the local peak, N(K a )′ represents the target local derivative, ω are all preset coefficients;

[0053] Summarizing the comprehensive evaluation values ​​to obtain a comprehensive evaluation value set, and confirming a target cluster value based on the comprehensive evaluation value set, wherein the target cluster value is a cluster value corresponding to the largest comprehensive evaluation value in the comprehensive evaluation value set;

[0054] Dividing the residential location set into M charging area clusters using the target cluster value and the K-means clustering method, wherein M is the same as the target cluster value;

[0055] Extract charging area clusters from the M charging area clusters in sequence, and perform the following operations on the extracted charging area clusters:

[0056] The charging area is obtained by using the extracted charging area cluster, wherein the charging area is circular, and when the charging area does not include a charging station, the charging area is confirmed as a target charging area, and the target charging areas are aggregated to obtain multiple target charging areas.

[0057] Optionally, the obtaining target energy consumption by using the target charging area includes:

[0058] The following operations are performed for each of the multiple target charging areas:

[0059] Acquire one or more target charging positions according to the target charging area, identify a target charging vehicle set in the target charging area, extract target charging positions from the one or more target charging positions in sequence, and perform the following operations on the extracted target charging positions:

[0060] Acquire a fitting path using the residential locations corresponding to the target charging vehicles in the target charging vehicle set and the extracted target charging locations;

[0061] Acquire a fitted distance according to the fitted path, acquire an existing charging station based on the residential location, and acquire an existing distance using the existing charging station and the residential location;

[0062] Obtain the energy consumption data of existing charging stations, where the energy consumption data includes: the type of charging pile and the number of existing charging piles, where the type of charging pile corresponds to the number of existing charging piles. Calculate the target energy consumption using the energy consumption data, the existing distance and the fitted distance. The calculation formula is as follows:

[0063]

[0064] Among them, u represents the target energy consumption of the fitted charging station, q represents the number of residential locations corresponding to the target charging vehicle set, and L p1 represents the existing distance corresponding to the pth target vehicle in the target charging vehicle set, L p0 represents the fitting distance corresponding to the pth target vehicle in the target charging vehicle set, w s represents the number of existing charging piles corresponding to the sth charging pile type, d represents the total number of charging pile types in the existing charging station, g s Represents the average energy consumption of the sth type of charging pile in the existing charging stations.

[0065] Optionally, the acquiring one or more charging station configuration solutions based on the target energy consumption includes:

[0066] Acquire a fitting energy consumption data set for fitting, wherein the fitting energy consumption data set includes a plurality of fitting energy consumption data, and the fitting energy consumption data is composed of: a fitting charging pile type of a fitting charging pile and a fitting average energy consumption of the fitting charging pile;

[0067] One or more charging station configuration solutions are obtained based on the fitted energy consumption data set and the pre-built charging station constraint relationship, where the charging station constraint relationship is as follows:

[0068]

[0069] Among them, O means there are O types of charging piles in the fitted charging station, R I In the fitting charging station, the first type of fitting charging pile in the fitting energy consumption data set is selected, and the number of corresponding fitting charging piles is H I It indicates that in the fitting charging station, the first fitting charging pile in the fitting energy consumption dataset is selected, and its corresponding fitting average energy consumption.

[0070] Optionally, acquiring a charging station configuration scheme sequence according to the one or more charging station configuration schemes includes:

[0071] Extract charging station configuration schemes from the one or more charging station configuration schemes in sequence, and perform the following operations on the extracted charging station configuration schemes:

[0072] The comprehensive charging station energy consumption is calculated based on the extracted charging station configuration scheme and the pre-built comprehensive charging station energy consumption relationship, where the comprehensive charging station energy consumption relationship is as follows:

[0073]

[0074] Among them, M C represents the comprehensive charging station energy consumption corresponding to the Cth charging configuration scheme, G C represents the fixed site energy consumption corresponding to the Cth charging configuration scheme, W C represents the number of fitted charging piles corresponding to the Cth charging configuration scheme, X C represents the fixed configuration energy consumption of the fitted charging pile corresponding to the Cth charging configuration scheme, and B represents that there are B types of fitted charging piles in the extracted charging station configuration scheme;

[0075] Performing a labeling operation on the extracted charging station configuration scheme using the comprehensive charging station energy consumption to obtain a labeled charging station configuration scheme;

[0076] Summarizing the identified charging station configuration schemes to obtain an identified charging station configuration scheme set;

[0077] A charging station configuration scheme sequence is acquired based on the identified charging station configuration scheme set.

[0078] Optionally, acquiring a charging station configuration scheme sequence based on the identified charging station configuration scheme set includes:

[0079] Extract the identified charging station configuration solutions from the identified charging station configuration solution set in sequence, and perform the following operations on the extracted identified charging station configuration solutions:

[0080] The comprehensive configuration evaluation value is calculated based on the extracted identified charging station configuration scheme and the pre-built comprehensive evaluation relationship, where the comprehensive evaluation relationship is as follows:

[0081] x=∈M C +θB

[0082] Among them, x represents the comprehensive configuration evaluation value, ∈ and λ are preset coefficients,

[0083] The comprehensive configuration evaluation values ​​are summarized to obtain a comprehensive configuration evaluation value set, and the comprehensive configuration evaluation values ​​in the comprehensive configuration evaluation value set are sorted in descending order to obtain a comprehensive evaluation sequence, and a charging station configuration scheme sequence is obtained based on the comprehensive evaluation sequence.

[0084] In order to solve the above problem, the present invention further provides an electronic device, the electronic device comprising:

[0085] at least one processor; and,

[0086] a memory communicatively connected to the at least one processor; wherein,

[0087] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to implement the above-mentioned method for site selection and capacity determination of electric vehicle charging stations based on big data.

[0088] In order to solve the above problems, the present invention also provides a computer-readable storage medium, in which at least one instruction is stored. The at least one instruction is executed by a processor in an electronic device to implement the above-mentioned big data-based electric vehicle charging station site selection and capacity determination method.

[0089] Compared with the problem described in the background technology, the present invention first receives a site selection and capacity determination instruction, and confirms a site selection system for site selection and capacity determination based on the site selection and capacity determination instruction, wherein the site selection system includes: an area planning unit and a site selection feedback unit. It can be seen that the site selection system confirmed by the present invention includes an area planning unit for planning an area, through which the area planning unit can be used to confirm the area in the site selection system where the area is desired to be sited and capacity determined, thereby improving the flexibility of site selection and capacity determination for electric vehicle charging stations. In addition, after the present invention confirms the reception of the area planning instruction from the area planning unit, the area planning instruction is used to confirm the residential location set. It can be seen that the present invention performs different processing on the first identification vehicle and the second identification vehicle in the site selection area, thereby making the processed first identification vehicle and the second identification vehicle more consistent with the situation of the pure electric vehicles included in the site selection area, thereby improving the accuracy of confirming the residential location set based on the first identification vehicle and the second identification vehicle. The present invention uses a residential location set to obtain multiple target charging areas, and performs the following operations on each of the multiple target charging areas: using the target charging area to obtain the target energy consumption, based on the target energy consumption, obtaining one or more charging station configuration schemes, and obtaining a charging station configuration scheme sequence according to the one or more charging station configuration schemes. It can be seen that the embodiment of the present invention not only considers the calculation of the target energy consumption required for the fitted charging station in combination with the existing charging station, but also fits one or more charging station configuration schemes according to the target energy consumption, and calculates the comprehensive configuration evaluation value according to the charging station configuration scheme, and obtains the charging station configuration scheme sequence according to the comprehensive configuration evaluation value, so that the given charging station configuration scheme sequence is more accurate and flexible. Therefore, the method, device, electronic device and computer-readable storage medium for site selection and capacity determination of electric vehicle charging stations based on big data proposed in the present invention mainly aim to solve the problem of poor accuracy and flexibility in site selection and capacity determination of charging stations. BRIEF DESCRIPTION OF THE DRAWINGS

[0090] Figure 1 A schematic diagram of a process for selecting a site and determining the capacity of an electric vehicle charging station based on big data provided by an embodiment of the present invention;

[0091] Figure 2 A schematic diagram of the structure of an electronic device for implementing the method for site selection and capacity determination of electric vehicle charging stations based on big data provided in one embodiment of the present invention.

[0092] The purpose, features and advantages of the present invention will be further described with reference to the accompanying drawings in conjunction with the embodiments. DETAILED DESCRIPTION

[0093] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0094] The embodiment of the present application provides a method for site selection and capacity determination of electric vehicle charging stations based on big data. The execution subject of the method for site selection and capacity determination of electric vehicle charging stations based on big data includes but is not limited to at least one of the electronic devices such as a server and a terminal that can be configured to execute the method provided by the embodiment of the present application. In other words, the method for site selection and capacity determination of electric vehicle charging stations based on big data can be executed by software or hardware installed on a terminal device or a server device. The server includes but is not limited to: a single server, a server cluster, a cloud server or a cloud server cluster, etc.

[0095] Embodiment 1:

[0096] Reference Figure 1 FIG. 1 is a flow chart of a method for selecting a site and determining the capacity of an electric vehicle charging station based on big data provided by an embodiment of the present invention. In this embodiment, the method for selecting a site and determining the capacity of an electric vehicle charging station based on big data includes:

[0097] S1. Receive a site selection and capacity determination instruction, and confirm a site selection system for site selection and capacity determination based on the site selection and capacity determination instruction, wherein the site selection system includes: a regional planning unit and a site selection feedback unit.

[0098] It should be explained that the site selection and capacity determination instruction is an instruction issued by the site selection and capacity determination load personnel of the electric vehicle charging station, and the site selection system refers to the software or APP used for electric vehicle site selection and capacity determination, and the site selection system includes: a regional planning unit and a site selection feedback unit. Please refer to the subsequent embodiments for the application of specific units.

[0099] For example, Xiao Zhang wants to open an electric vehicle charging station in a certain village. Therefore, he needs to select an electric vehicle charging station for charging electric vehicles through the site selection system. Then Xiao Zhang issues a site selection and capacity determination instruction, and Xiao Zhang confirms the site selection system. When Xiao Zhang selects a village in the site selection system, the site selection system provides one or more charging station site selection and capacity determination plans, and the charging station site selection and capacity determination plans can provide different charging station configuration plans according to their different locations, and provide them to Xiao Zhang for selection.

[0100] S2. After confirming receipt of the area planning instruction from the area planning unit, a residential location set is confirmed using the area planning instruction.

[0101] It is understandable that the regional drafting instruction is an instruction given by the person in charge in the site selection system, and the site selection area of ​​the charging station can be confirmed through the regional drafting instruction. For example: Xiao Zhang enters Huainan City as the regional drafting instruction in the regional drafting unit of the site selection system, and the regional drafting instruction can confirm the area corresponding to Huainan City in the electronic map, which is the site selection area.

[0102] It should be explained that the use of regional drafting instructions to identify the residential location set includes:

[0103] The regional drafting instruction is parsed to obtain a site selection area, and a reference vehicle set is obtained based on the site selection area, wherein the reference vehicle set includes multiple reference vehicles, and the following operations are performed on the reference vehicles in the reference vehicle set:

[0104] Obtain relevant information of a reference vehicle, perform an identification operation on the reference vehicle based on the relevant information, and obtain a first identified vehicle, wherein the relevant information includes: an actual location of the reference vehicle, a type of the reference vehicle, and an identification code of the reference vehicle, and the type of the reference vehicle includes: a pure electric vehicle and other vehicles, and the first identified vehicles are aggregated to obtain a first identified vehicle set;

[0105] Obtaining road information of the site selection area, wherein the road information is composed of intersections, road sections, and charging stations located in the road sections, and identifying the road sections as first road sections and second road sections according to whether there are charging stations in the road sections, wherein the first road section includes the charging station;

[0106] The target information of the target vehicle is monitored and recorded at each intersection, wherein the target information includes the intersection travel time, vehicle type and identification code of each intersection, and the vehicle type includes: pure electric vehicles and other vehicles. Based on the target information, an identification operation is performed on the target vehicle to obtain a second identified vehicle. When the vehicle type of the second identified vehicle is a pure electric vehicle, a conversion coefficient for reference is obtained, and the reference stay time is calculated using the second identified vehicle and the conversion coefficient. The calculation formula is as follows:

[0107] t=(β+α)(t1-t0)

[0108] Wherein, t is the reference stay time, t1 represents the travel time of the first intersection, t0 represents the travel time of the second intersection, wherein the first intersection and the second intersection are two adjacent intersections, α represents the conversion coefficient, and β represents the preset coefficient;

[0109] If the road section corresponding to the first intersection and the second intersection is the first road section, compare the reference stay time with a preset time threshold, and if the reference stay time is greater than or equal to the time threshold, confirm that the second identified vehicle is a target identified vehicle, and aggregate the target identified vehicles to obtain a target identified vehicle set;

[0110] A residential location set is obtained based on the first identified vehicle set and the target identified vehicle set.

[0111] It is understandable that the site selection area refers to the area where an electric vehicle charging station is desired to be built. For example, a village or county is selected as the site selection area. The reference area set is consistent with the administrative area adjacent to the site selection area and corresponding to the site selection area. The target vehicle set refers to vehicles whose locations are located in the site selection area. The difference between the target vehicle and the reference vehicle is that the reference vehicle's place of origin is not in the site selection area. Optionally, by querying the reference vehicle set in the local vehicle management office, other methods can achieve the same effect, which will not be repeated here. The purpose of performing an identification operation on the reference vehicle using relevant information is to distinguish different reference vehicles. For example, if there are multiple reference vehicles and the models of the reference vehicles are all the same, the reference vehicles can be identified as the first vehicle in place A, the second vehicle in place B, etc. through relevant information, so as to distinguish different reference vehicles and improve the accuracy of analyzing the reference vehicles. Here, the first vehicle and the second vehicle both refer to the vehicle identification code.

[0112] It should be understood that not all charging stations in the site selection area include monitoring probes, that is, not all reference vehicles can obtain the charging station exit time. Therefore, introducing a conversion factor can improve the accuracy of judging whether a pure electric vehicle is charging at a charging station.

[0113] Furthermore, the technique of marking a road section by using whether there is a charging station in the road section is the same as the technique of marking a reference vehicle by using relevant information, and can achieve the same effect, which will not be repeated here. Optionally, the monitoring probe at each intersection is combined with machine vision technology to monitor and record the target information of the target vehicle. Other methods can achieve the same effect, which will not be repeated here.

[0114] It should be understood that the actual location of the reference vehicle refers to the registered residence of the reference vehicle at the time of filing. Optionally, the license plate number is selected as the identification code. Other technologies can achieve the same effect, which will not be repeated here. Optionally, the Gaode Map APP is used to obtain road information concentrated in the reference area. Other technologies can achieve the same effect, which will not be repeated here. The intersection travel time refers to the time when the target vehicle passes through a certain intersection. Pure electric vehicles refer to vehicles that use a single battery as a power source for energy storage, and other vehicles refer to vehicles including fuel vehicles, hybrid vehicles and other non-pure electric vehicles. The method of obtaining the second-identified vehicle is the same as the method of obtaining the first-identified vehicle and can achieve the same effect. The reference stay time refers to the time the target vehicle stays in a certain section of the road.

[0115] It is understandable that the obtaining of the conversion coefficient for reference includes:

[0116] Acquire a driving-in charging data set of the vehicle, wherein the driving-in charging data set is composed of a plurality of reference charging data sets, and the reference charging data set includes a plurality of driving-in charging data, and the reference charging data set corresponds to the first road section one by one, wherein the driving-in charging data is composed of: a travel time at the first intersection, a charging distance, and a driving-out time of the charging station, and the road section corresponding to the driving-in charging data is the same first road section;

[0117] The following operations are performed on the reference charging dataset in the drive-in charging dataset:

[0118] The following operations are performed on the drive-in charging data in the reference charging dataset:

[0119] Acquire the driving-in time based on the driving-in charging data, wherein the driving-in time is composed of: the absolute difference between the travel time of the first intersection and the driving-out time of the charging station;

[0120] Summarizing the entry times to obtain an entry time set, and obtaining an entry mean and an entry variance based on the entry time set, wherein the entry mean is the mean of the entry times in the entry time set, and the entry variance is the variance of the entry times in the entry time set;

[0121] The entry variance is compared with a preset variance threshold. If the entry variance is greater than the variance threshold, the following operations are performed on the entry times in the entry time concentration:

[0122] Calculate the absolute difference between the entry time and the entry mean to obtain a reference difference, summarize the reference differences to obtain a reference difference set, and perform a sorting operation on the reference differences in the reference difference set in descending order to obtain a reference difference sequence;

[0123] Extract reference difference values ​​from the reference difference value sequence in sequence, and perform the following operations on the extracted reference difference values:

[0124] The entry time corresponding to the reference difference is eliminated from the entry time set, the retained entry time is summarized to obtain an updated time set, the updated time set is used as the entry time set, and the step of obtaining the entry mean and the entry variance based on the entry time set is returned until the entry variance is less than or equal to the variance threshold, the entry time is summarized to obtain a first charging data set, the multiple first charging data sets are summarized to obtain a target charging data set, and the conversion coefficient is calculated based on the target charging data set.

[0125] Furthermore, the driving-in charging data set refers to a set of data corresponding to the distance traveled by different pure electric vehicles at different time periods and different intersections when entering the charging station. The reference charging data set refers to a set of data corresponding to different pure electric vehicles driving from the same intersection to the same charging station at the same section and different time periods. Therefore, the driving-in charging data set includes multiple reference charging data sets, and the reference charging data set corresponds to the first section one by one. The first intersection passing time refers to the time corresponding to the pure electric vehicle passing a certain intersection, and the pure electric vehicle is about to enter the first section. The charging distance refers to the distance from the intersection to the charging station in the first section. The charging station exit time refers to the time when the pure electric vehicle exits the charging station in the first section.

[0126] For example, a pure electric vehicle passes through a certain T-junction at 8:00 a.m. and enters the first section. 8:00 a.m. is the passing time of the first section. It exits the charging station in the first section at 10:05 a.m., and 10:05 a.m. is the exit time of the charging station. The distance between the T-junction and the charging station in the first section is 200 m, and 200 m is the charging distance. Within a certain period of time, there are multiple pure electric vehicles passing through the T-junction and entering the first section and going to the charging station in the first section for charging. Then, the corresponding entry charging data of the multiple pure electric vehicles are summarized to obtain a reference charging data set. The reference charging data set concentrated in the reference area is summarized to obtain an entry charging data set.

[0127] It is understandable that different pure electric vehicles corresponding to different time periods may be affected by factors such as actual road conditions, traffic conditions, and vehicle density during actual driving. Therefore, it is necessary to eliminate the entry time that is obviously inconsistent with expectations in the entry time set, thereby improving the accuracy of the analysis of the entry time set. For example, due to a traffic accident in the first road section, there are entry times in the entry time set corresponding to the first road section that are obviously inconsistent with the actual situation.

[0128] Further, the first charging data set is a screened reference charging data set.

[0129] It should be explained that the conversion coefficient is calculated based on the target charging data set, and the calculation formula is as follows:

[0130]

[0131] Among them, T l represents the lth entry time in the first charging data set, m represents the total number of entry times in the first charging data set, S i represents the i-th charging distance in the target charging data set, S jrepresents the jth charging distance in the target charging data set, and n represents that there are n charging distances in the target charging data set.

[0132] It should be explained that the step of obtaining the residential location set based on the first identified vehicle set and the target identified vehicle set includes:

[0133] First identified vehicles whose reference vehicle type is a pure electric vehicle are sequentially extracted from the first identified vehicle set, and the following operations are performed on the extracted first identified vehicles:

[0134] Based on the extracted first identification vehicle, one or more out-of-town times are obtained, and the out-of-town frequency is calculated using the one or more out-of-town times. The calculation formula is as follows:

[0135]

[0136] Among them, Q represents the frequency of going out, Y h represents the hth outgoing time among one or more outgoing times, and f represents that there are a total of f outgoing times among the one or more outgoing times;

[0137] Compare the outgoing frequency with the preset outgoing threshold;

[0138] If the outgoing frequency is less than or equal to the outgoing threshold, confirming that the extracted first identified vehicle is the target charging vehicle;

[0139] Extract the second-identified vehicles from the target-identified vehicle set in sequence, and perform the following operations on the extracted second-identified vehicles:

[0140] Acquire one or more entry times based on the extracted second-identified vehicle, calculate the entry frequency based on the one or more entry times, compare the entry frequency with a preset entry threshold, and if the entry frequency is greater than or equal to the entry threshold, confirm that the extracted second-identified vehicle is a target charging vehicle, aggregate the target charging vehicles, and obtain a target charging vehicle set;

[0141] A residential location set is acquired based on the identification code corresponding to the target charging vehicle in the target charging vehicle set, wherein the residential location set includes multiple residential locations.

[0142] It is understandable that the first-identified vehicle is not necessarily located at the place of residence. Therefore, it is necessary to use the first-identified vehicle to confirm the target charging vehicle in order to improve the accuracy of the site selection and capacity determination of the charging station. The out-of-office time refers to the time difference when the first-identified vehicle leaves the site selection area. For example: a pure electric vehicle leaves the site selection area on January 10 and returns to the site selection area on January 15, then the out-of-office time is 5 days. When the out-of-office frequency is greater than or equal to the out-of-office threshold, it can be determined that the extracted vehicle type is the first-identified vehicle of a pure electric vehicle, and its main activity range is not within the site selection area. Therefore, the first-identified vehicle is not representative.

[0143] Furthermore, the entry time refers to the time difference when the second identified vehicle enters the site selection area, and the entry time and the exit time are obtained in the same way and can achieve the same effect, and the entry frequency and the exit frequency are obtained in the same way and can achieve the same effect, which will not be repeated here. When the entry frequency is greater than or equal to the entry threshold, it can be considered that the second identified vehicle, its main activity range is within the site selection area, therefore, the second identified vehicle can be considered as the object of consideration for the site selection and capacity determination of the charging station, and the object of consideration is defined as the target charging vehicle.

[0144] It is understandable that each target charging vehicle corresponds to an identification code, and the vehicle identification code corresponds to an ID number of the owner, and the residence location can be confirmed through the ID number of the owner.

[0145] S3. Acquire multiple target charging areas using the residential location set, acquire target energy consumption using the target charging areas, and acquire one or more charging station configuration solutions based on the target energy consumption.

[0146] It should be understood that the method of obtaining multiple target charging areas by using the residential location set includes:

[0147] The elbow fitting curve and the silhouette coefficient polyline are obtained by using the pre-constructed elbow method, the pre-constructed silhouette coefficient method, the preset cluster value threshold, the pre-constructed K-means clustering method and the residential location set, wherein the abscissa of the elbow fitting curve is the cluster value and the ordinate is SSE, and the abscissa of the silhouette coefficient polyline is the cluster value and the ordinate is the silhouette coefficient;

[0148] Obtain one or more local peaks in the silhouette coefficient curve, wherein the local peaks correspond to the silhouette coefficients one by one, and perform a sorting operation on the local peaks in order from large to small to obtain a local peak sequence;

[0149] Obtain multiple local derivatives in the elbow fitting curve, wherein the local derivatives correspond to the cluster values ​​one by one;

[0150] Extract local peaks from the local peak sequence in sequence, and perform the following operations on the extracted local peaks:

[0151] Based on the cluster value corresponding to the local peak, the target local derivative is identified from multiple local derivatives, and the comprehensive evaluation value is calculated based on the extracted local peak and the target local derivative. The calculation formula is as follows:

[0152]

[0153] Among them, Z represents the comprehensive evaluation value, F(K a ) represents the extracted local peak value, K a Represents the cluster value corresponding to the local peak, N(K a )′ represents the target local derivative, ω are all preset coefficients;

[0154] Summarizing the comprehensive evaluation values ​​to obtain a comprehensive evaluation value set, and confirming a target cluster value based on the comprehensive evaluation value set, wherein the target cluster value is a cluster value corresponding to the largest comprehensive evaluation value in the comprehensive evaluation value set;

[0155] Dividing the residential location set into M charging area clusters using the target cluster value and the K-means clustering method, wherein M is the same as the target cluster value;

[0156] Extract charging area clusters from the M charging area clusters in sequence, and perform the following operations on the extracted charging area clusters:

[0157] The charging area is obtained by using the extracted charging area cluster, wherein the charging area is circular, and when the charging area does not include a charging station, the charging area is confirmed as a target charging area, and the target charging areas are aggregated to obtain multiple target charging areas.

[0158] Furthermore, the elbow method, the contour coefficient method, and the K-means clustering method are all existing technologies and will not be described in detail here. The cluster value threshold refers to the upper limit of the cluster value when the elbow method and the K-means clustering method are used to fit the elbow fitting curve, and the cluster value threshold is the upper limit of the cluster value when the contour coefficient method and the K-means clustering method are used to construct the contour coefficient polyline. For example: if the cluster value threshold is 10, 10 numerical points can be obtained using the elbow method and the K-means clustering method, wherein each numerical point is composed of a cluster value and the corresponding SSE value. Optionally, the elbow fitting curve can be fitted using a polynomial and 10 numerical points, and other technologies can achieve the same effect, which will not be described in detail here. When the cluster value threshold is 10, the silhouette coefficient method and K-means clustering method can obtain 10 numerical points for constructing the silhouette coefficient polyline. These 10 numerical points are composed of the cluster value and the silhouette coefficient, and the silhouette coefficient polyline is constructed through these 10 numerical points.

[0159] It should be understood that in the embodiment of the present invention, the local peak refers to the value of a certain point in the contour coefficient polyline that is higher than the value of its neighboring point, and the technology for obtaining the local peak from the contour coefficient polyline is prior art and will not be described in detail here. For example, if there are 10 cluster values ​​in the elbow fitting curve, 10 local derivatives can be obtained through the elbow fitting curve.

[0160] It should be explained that in the silhouette coefficient curve with a cluster value of 10, the number of local peaks is less than 10. Therefore, the target local derivative refers to the local derivative with the same cluster value as the extracted local peak. For example, if the cluster value corresponding to the extracted local peak is 3, the cluster value corresponding to the target local derivative is also 3.

[0161] It is understandable that the target cluster value refers to the number of regions that can be divided into regions by the K-means clustering method under ideal conditions, and the SSE value of the charging area cluster after division is the smallest, and the method of dividing the residential location set into M charging area clusters by the target cluster value and the K-means clustering method is a prior art and will not be described in detail here. Among them, the SSE value is the standard error square sum, and the acquisition of the SSE value is a prior art and will not be described in detail here.

[0162] Furthermore, obtaining the charging area using the charging area cluster means using the smallest circle to contain all the residential locations in the charging area cluster. Optionally, by converting the problem of obtaining the charging area using the charging area cluster into solving the problem of solving the smallest covering circle, and obtaining the charging area using a deep learning model, other technologies can achieve the same effect, which will not be repeated here.

[0163] It is understandable that the method of obtaining the target energy consumption by using the target charging area includes:

[0164] The following operations are performed for each of the multiple target charging areas:

[0165] Acquire one or more target charging positions according to the target charging area, identify a target charging vehicle set in the target charging area, extract target charging positions from the one or more target charging positions in sequence, and perform the following operations on the extracted target charging positions:

[0166] Acquire a fitting path using the residential locations corresponding to the target charging vehicles in the target charging vehicle set and the extracted target charging locations;

[0167] Acquire a fitted distance according to the fitted path, acquire an existing charging station based on the residential location, and acquire an existing distance using the existing charging station and the residential location;

[0168] Obtain the energy consumption data of existing charging stations, where the energy consumption data includes: the type of charging pile and the number of existing charging piles, where the type of charging pile corresponds to the number of existing charging piles. Calculate the target energy consumption using the energy consumption data, the existing distance and the fitted distance. The calculation formula is as follows:

[0169]

[0170] Among them, u represents the target energy consumption of the fitted charging station, q represents the number of residential locations corresponding to the target charging vehicle set, and L p1 represents the existing distance corresponding to the pth target vehicle in the target charging vehicle set, L p0 represents the fitting distance corresponding to the pth target vehicle in the target charging vehicle set, w s represents the number of existing charging piles corresponding to the sth charging pile type, d represents the total number of charging pile types in the existing charging station, g s Represents the average energy consumption of the sth type of charging pile in the existing charging stations.

[0171] Further, obtaining one or more target charging positions in the target charging area means retrieving one or more positions that can be used to develop charging stations in the circle corresponding to the target charging area. Optionally, the method for obtaining one or more target charging positions in the target charging area is: using Amap to retrieve one or more positions to be developed in the target charging area. Other technologies can achieve the same effect, which will not be repeated here.

[0172] It is understandable that the target charging vehicle set refers to the set of target charging vehicles included in the target charging area. The fitting path refers to the shortest path from the residential location to the extracted target charging location. Optionally, the fitting path is obtained by an ant colony algorithm, and other technologies can achieve the same effect, which will not be repeated here. The fitting distance refers to the distance corresponding to the fitting path. The existing charging station refers to the charging station closest to the residential location. The difference between an existing charging station and a fitting charging station is that the fitting charging station has not yet been built, while the existing charging station has been built.

[0173] Furthermore, the type of charging pile refers to the type corresponding to the charging pile, and the types of charging piles include: slow charging piles, fast charging piles and ultra-fast charging piles, etc. The number of existing charging piles refers to the number of charging piles corresponding to the type of charging piles.

[0174] It is understandable that the acquiring one or more charging station configuration solutions based on the target energy consumption includes:

[0175] Acquire a fitting energy consumption data set for fitting, wherein the fitting energy consumption data set includes a plurality of fitting energy consumption data, and the fitting energy consumption data is composed of: a fitting charging pile type of a fitting charging pile and a fitting average energy consumption of the fitting charging pile;

[0176] One or more charging station configuration solutions are obtained based on the fitted energy consumption data set and the pre-built charging station constraint relationship, where the charging station constraint relationship is as follows:

[0177]

[0178] Among them, O means there are O types of charging piles in the fitted charging station, R I In the fitting charging station, the first type of fitting charging pile in the fitting energy consumption data set is selected, and the number of corresponding fitting charging piles is H I It indicates that in the fitting charging station, the first fitting charging pile in the fitting energy consumption dataset is selected, and its corresponding fitting average energy consumption.

[0179] It should be explained that one or more charging station configuration schemes refer to one or more schemes for configuring charging piles in the charging station when the charging station is to be built in the extracted target charging location, and each charging station configuration scheme corresponds to a different type or number of charging piles. The type of charging piles refers to multiple types of charging piles that can be used for construction.

[0180] It should be explained that the method of obtaining the fitted average energy consumption includes:

[0181] When there is a charging station in the charging area, an existing energy consumption data set of the charging station is obtained, and the existing energy consumption data set is summarized to obtain a fitting energy consumption data set, wherein the fitting energy consumption data set includes a plurality of existing energy consumption data sets;

[0182] The existing energy consumption data set includes a plurality of existing energy consumption data, wherein the existing energy consumption data is composed of: the type of existing charging piles, the number of existing charging piles and the energy consumption of the existing charging piles;

[0183] The existing energy consumption data in the existing energy consumption data set are respectively summarized by using the existing charging pile types to obtain one or more fitting data sets, wherein the existing charging pile types corresponding to the same fitting data set are the same;

[0184] Extracting fitting data sets from the one or more fitting data sets in sequence, and performing the following operations on the extracted fitting data sets:

[0185] The fitted average energy consumption is calculated using the extracted fitting data set and the pre-constructed fitting equilibrium relationship, where the fitting equilibrium relationship is as follows:

[0186]

[0187] Among them, P U represents the average energy consumption of the U-th type of charging pile, D A represents the number of U-th type of fitting charging piles corresponding to the A-th existing energy consumption data set in the fitting energy consumption data set, E represents that there are E existing energy consumption data sets in the fitting energy consumption data set including the U-th type of fitting charging pile, D K represents the number of U-th type of fitting charging piles corresponding to the K-th existing energy consumption data set in the fitting energy consumption data set, P K Represents the energy consumption generated by all U-th fitting charging piles in the fitting energy consumption dataset.

[0188] For example, a certain area includes 10 charging areas, and there are 4 charging areas among these 10 charging areas, and these 4 charging areas all include charging stations. Then, 4 existing energy consumption data sets can be obtained at these 4 charging stations, and the fitting energy consumption data set is composed of these 4 existing energy consumption data sets.

[0189] Furthermore, the types of existing charging piles refer to the types of charging piles existing in the fitted energy consumption data set, the number of existing charging piles refers to the number of charging piles corresponding to the types of existing charging piles, and the energy consumption of existing charging piles refers to the energy consumption generated by the charging piles corresponding to the existing charging piles. Selecting a charging area in the site selection area can make the selected charging area more in line with the actual local situation, thereby improving the accuracy of the site selection and capacity determination of electric vehicle charging stations.

[0190] S4. Acquire a charging station configuration scheme sequence according to the one or more charging station configuration schemes.

[0191] It should be explained that the step of acquiring a charging station configuration scheme sequence according to the one or more charging station configuration schemes includes:

[0192] Extract charging station configuration schemes from the one or more charging station configuration schemes in sequence, and perform the following operations on the extracted charging station configuration schemes:

[0193] The comprehensive charging station energy consumption is calculated based on the extracted charging station configuration scheme and the pre-built comprehensive charging station energy consumption relationship, where the comprehensive charging station energy consumption relationship is as follows:

[0194]

[0195] Among them, M C represents the comprehensive charging station energy consumption corresponding to the Cth charging configuration scheme, G C represents the fixed site energy consumption corresponding to the Cth charging configuration scheme, W C represents the number of fitted charging piles corresponding to the Cth charging configuration scheme, X C represents the fixed configuration energy consumption of the fitted charging pile corresponding to the Cth charging configuration scheme, and B represents that there are B types of fitted charging piles in the extracted charging station configuration scheme;

[0196] Performing a labeling operation on the extracted charging station configuration scheme using the comprehensive charging station energy consumption to obtain a labeled charging station configuration scheme;

[0197] Summarizing the identified charging station configuration schemes to obtain an identified charging station configuration scheme set;

[0198] A charging station configuration scheme sequence is acquired based on the identified charging station configuration scheme set.

[0199] It should be understood that the operation of identifying the charging station configuration scheme using the comprehensive charging station energy consumption is a prior art and will not be described in detail here.

[0200] Further, the acquiring a charging station configuration scheme sequence based on the identified charging station configuration scheme set includes:

[0201] Extract the identified charging station configuration solutions from the identified charging station configuration solution set in sequence, and perform the following operations on the extracted identified charging station configuration solutions:

[0202] The comprehensive configuration evaluation value is calculated based on the extracted identified charging station configuration scheme and the pre-built comprehensive evaluation relationship, where the comprehensive evaluation relationship is as follows:

[0203] x=∈M C +θB

[0204] Among them, x represents the comprehensive configuration evaluation value, ∈ and θ are preset coefficients,

[0205] The comprehensive configuration evaluation values ​​are summarized to obtain a comprehensive configuration evaluation value set, and the comprehensive configuration evaluation values ​​in the comprehensive configuration evaluation value set are sorted in descending order to obtain a comprehensive evaluation sequence, and a charging station configuration scheme sequence is obtained based on the comprehensive evaluation sequence.

[0206] It is understandable that, when the energy consumption of the comprehensive charging stations corresponding to the identified charging station configuration schemes are the same, the more types of charging piles corresponding to the identified charging station configuration schemes, the wider its applicability. Therefore, the types of charging piles are considered here as a reference factor when considering the identified charging station configuration schemes, and then the comprehensive configuration evaluation values ​​of the relevant charging pile types are obtained.

[0207] S5. Using the site selection feedback unit, the charging station configuration scheme sequence is sent to the initiator of the site selection and capacity determination instruction to realize the site selection and capacity determination of the charging station.

[0208] Exemplarily, the site selection system can generate charging station configuration plans at different locations based on the area selected by Xiao Zhang, and sort and recommend the charging station configuration plans so that Xiao Zhang can better choose the configuration plan for the electric vehicle charging station. When recommending the configuration plan, the comprehensive charging energy consumption of the configuration plan is also identified in each configuration plan.

[0209] Compared with the problem described in the background technology, the present invention first receives a site selection and capacity determination instruction, and confirms a site selection system for site selection and capacity determination based on the site selection and capacity determination instruction, wherein the site selection system includes: an area planning unit and a site selection feedback unit. It can be seen that the site selection system confirmed by the present invention includes an area planning unit for planning an area, through which the area planning unit can be used to confirm the area in the site selection system where the area is desired to be sited and capacity determined, thereby improving the flexibility of site selection and capacity determination for electric vehicle charging stations. In addition, after the present invention confirms the reception of the area planning instruction from the area planning unit, the area planning instruction is used to confirm the residential location set. It can be seen that the present invention performs different processing on the first identification vehicle and the second identification vehicle in the site selection area, thereby making the processed first identification vehicle and the second identification vehicle more consistent with the situation of the pure electric vehicles included in the site selection area, thereby improving the accuracy of confirming the residential location set based on the first identification vehicle and the second identification vehicle. The present invention uses a residential location set to obtain multiple target charging areas, and performs the following operations on each of the multiple target charging areas: using the target charging area to obtain the target energy consumption, based on the target energy consumption, obtaining one or more charging station configuration schemes, and obtaining a charging station configuration scheme sequence according to the one or more charging station configuration schemes. It can be seen that the embodiment of the present invention not only considers the calculation of the target energy consumption required for the fitted charging station in combination with the existing charging station, but also fits one or more charging station configuration schemes according to the target energy consumption, and calculates the comprehensive configuration evaluation value according to the charging station configuration scheme, and obtains the charging station configuration scheme sequence according to the comprehensive configuration evaluation value, so that the given charging station configuration scheme sequence is more accurate and flexible. Therefore, the method, device, electronic device and computer-readable storage medium for site selection and capacity determination of electric vehicle charging stations based on big data proposed in the present invention mainly aim to solve the problem of poor accuracy and flexibility in site selection and capacity determination of charging stations.

[0210] Embodiment 2:

[0211] like Figure 2 , which is a schematic diagram of the structure of an electronic device for implementing a method for site selection and capacity determination of electric vehicle charging stations based on big data, provided by one embodiment of the present invention.

[0212] The electronic device 1 may include a processor 10, a memory 11, a bus 12 and a communication interface 13, and may also include a computer program stored in the memory 11 and executable on the processor 10, such as a big data-based site selection and capacity determination program for electric vehicle charging stations.

[0213] Among them, the memory 11 includes at least one type of readable storage medium, and the readable storage medium includes flash memory, mobile hard disk, multimedia card, card-type memory (for example: SD or DX memory, etc.), magnetic memory, disk, optical disk, etc. The memory 11 can be an internal storage unit of the electronic device 1 in some embodiments, such as a mobile hard disk of the electronic device 1. The memory 11 can also be an external storage device of the electronic device 1 in other embodiments, such as a plug-in mobile hard disk, a smart memory card (SmartMediaCard, SMC), a secure digital (SecureDigital, SD) card, a flash card (FlashCard), etc. equipped on the electronic device 1. Further, the memory 11 can also include both an internal storage unit of the electronic device 1 and an external storage device. The memory 11 can not only be used to store application software and various types of data installed in the electronic device 1, such as the code of the electric vehicle charging station site selection and capacity determination program based on big data, but also can be used to temporarily store data that has been output or is to be output.

[0214] The processor 10 may be composed of an integrated circuit in some embodiments, for example, a single packaged integrated circuit, or a plurality of packaged integrated circuits with the same or different functions, including one or more central processing units (CPUs), microprocessors, digital processing chips, graphics processors, and combinations of various control chips, etc. The processor 10 is the control core (Control Unit) of the electronic device, and uses various interfaces and lines to connect the various components of the entire electronic device, and executes or executes the programs or modules stored in the memory 11 (such as the site selection and capacity determination program for electric vehicle charging stations based on big data, etc.), and calls the data stored in the memory 11 to execute various functions of the electronic device 1 and process data.

[0215] The bus may be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus, etc. The bus may be divided into an address bus, a data bus, a control bus, etc. The bus is configured to realize connection and communication between the memory 11 and at least one processor 10, etc.

[0216] Figure 2 Only an electronic device with components is shown, and those skilled in the art will understand that Figure 2The structure shown does not constitute a limitation on the electronic device 1, and may include fewer or more components than shown in the figure, or combine certain components, or arrange the components differently.

[0217] For example, although not shown, the electronic device 1 may also include a power source (such as a battery) for supplying power to each component. Preferably, the power source may be logically connected to the at least one processor 10 through a power management device, so that the power management device can realize functions such as charging management, discharging management, and power consumption management. The power source may also include any components such as one or more DC or AC power sources, recharging devices, power failure detection circuits, power converters or inverters, power status indicators, etc. The electronic device 1 may also include a variety of sensors, Bluetooth modules, Wi-Fi modules, etc., which will not be repeated here.

[0218] Furthermore, the electronic device 1 may also include a network interface. Optionally, the network interface may include a wired interface and / or a wireless interface (such as a WI-FI interface, a Bluetooth interface, etc.), which is generally used to establish a communication connection between the electronic device 1 and other electronic devices.

[0219] Optionally, the electronic device 1 may further include a user interface, which may be a display (Display), an input unit (such as a keyboard (Keyboard)), and optionally, the user interface may also be a standard wired interface or a wireless interface. Optionally, in some embodiments, the display may be an LED display, a liquid crystal display, a touch-sensitive liquid crystal display, and an OLED (Organic Light-Emitting Diode) touch device, etc. The display may also be appropriately referred to as a display screen or a display unit, which is used to display information processed in the electronic device 1 and to display a visual user interface.

[0220] It should be understood that the embodiment is for illustration only and the scope of the patent application is not limited to this structure.

[0221] The electric vehicle charging station site selection and capacity determination program based on big data stored in the memory 11 of the electronic device 1 is a combination of multiple instructions. When running in the processor 10, it can achieve:

[0222] Receiving a site selection and capacity determination instruction, and confirming a site selection system for site selection and capacity determination based on the site selection and capacity determination instruction, wherein the site selection system includes: a region planning unit and a site selection feedback unit;

[0223] After confirming receipt of the regional planning instruction from the regional planning unit, a residential location set is confirmed using the regional planning instruction;

[0224] A plurality of target charging areas are obtained by using the residential location set, and the following operations are performed on each of the plurality of target charging areas:

[0225] Obtaining a target energy consumption using a target charging area, and obtaining one or more charging station configuration solutions based on the target energy consumption;

[0226] Acquire a charging station configuration scheme sequence according to the one or more charging station configuration schemes;

[0227] The charging station configuration scheme sequence is sent to the initiator of the site selection and capacity determination instruction by using the site selection feedback unit to realize the site selection and capacity determination of the charging station.

[0228] Specifically, the specific implementation method of the processor 10 for the above instructions can refer to Figure 1 to Figure 2 The description of the relevant steps in the corresponding embodiments will not be repeated here.

[0229] Furthermore, if the module / unit integrated in the electronic device 1 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. The computer-readable storage medium can be volatile or non-volatile. For example, the computer-readable medium can include: any entity or device capable of carrying the computer program code, a recording medium, a USB flash drive, a mobile hard disk, a magnetic disk, an optical disk, a computer memory, and a read-only memory (ROM).

[0230] The present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor of an electronic device, the computer program can implement:

[0231] Receiving a site selection and capacity determination instruction, and confirming a site selection system for site selection and capacity determination based on the site selection and capacity determination instruction, wherein the site selection system includes: a region planning unit and a site selection feedback unit;

[0232] After confirming receipt of the regional planning instruction from the regional planning unit, a residential location set is confirmed using the regional planning instruction;

[0233] A plurality of target charging areas are obtained by using the residential location set, and the following operations are performed on each of the plurality of target charging areas:

[0234] Obtaining a target energy consumption using a target charging area, and obtaining one or more charging station configuration solutions based on the target energy consumption;

[0235] Acquire a charging station configuration scheme sequence according to the one or more charging station configuration schemes;

[0236] The charging station configuration scheme sequence is sent to the initiator of the site selection and capacity determination instruction by using the site selection feedback unit to realize the site selection and capacity determination of the charging station.

[0237] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0238] In addition, each functional module in each embodiment of the present invention may be integrated into one processing unit, each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional modules.

[0239] It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention.

[0240] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. A method for site selection and capacity determination of electric vehicle charging stations based on big data, characterized in that: The method comprises: Receiving a site selection and capacity determination instruction, and confirming a site selection system for site selection and capacity determination based on the site selection and capacity determination instruction, wherein the site selection system includes: a region planning unit and a site selection feedback unit; After confirming receipt of the regional planning instruction from the regional planning unit, a residential location set is confirmed using the regional planning instruction; A plurality of target charging areas are obtained by using the residential location set, and the following operations are performed on each of the plurality of target charging areas: Obtaining a target energy consumption using a target charging area, and obtaining one or more charging station configuration solutions based on the target energy consumption; Acquire a charging station configuration scheme sequence according to the one or more charging station configuration schemes; The charging station configuration scheme sequence is sent to the initiator of the site selection and capacity determination instruction by using the site selection feedback unit to realize the site selection and capacity determination of the charging station.

2. The method for site selection and capacity determination of electric vehicle charging stations based on big data according to claim 1, characterized in that: The method of using the regional planning instruction to identify the residential location set includes: The regional drafting instruction is parsed to obtain a site selection area, and a reference vehicle set is obtained based on the site selection area, wherein the reference vehicle set includes multiple reference vehicles, and the following operations are performed on the reference vehicles in the reference vehicle set: Obtain relevant information of a reference vehicle, perform an identification operation on the reference vehicle based on the relevant information, and obtain a first identified vehicle, wherein the relevant information includes: an actual location of the reference vehicle, a type of the reference vehicle, and an identification code of the reference vehicle, and the type of the reference vehicle includes: a pure electric vehicle and other vehicles, and the first identified vehicles are aggregated to obtain a first identified vehicle set; Obtaining road information of the site selection area, wherein the road information is composed of intersections, road sections, and charging stations located in the road sections, and identifying the road sections as first road sections and second road sections according to whether there are charging stations in the road sections, wherein the first road section includes the charging station; The target information of the target vehicle is monitored and recorded at each intersection, wherein the target information includes the intersection travel time, vehicle type and identification code of each intersection, and the vehicle type includes: pure electric vehicles and other vehicles. Based on the target information, an identification operation is performed on the target vehicle to obtain a second identified vehicle. When the vehicle type of the second identified vehicle is a pure electric vehicle, a conversion coefficient for reference is obtained, and the reference stay time is calculated using the second identified vehicle and the conversion coefficient. The calculation formula is as follows: t=(β+α)(t1-t0) Wherein, t is the reference stay time, t1 represents the travel time of the first intersection, t0 represents the travel time of the second intersection, wherein the first intersection and the second intersection are two adjacent intersections, α represents the conversion coefficient, and β represents the preset coefficient; If the road section corresponding to the first intersection and the second intersection is the first road section, compare the reference stay time with a preset time threshold, and if the reference stay time is greater than or equal to the time threshold, confirm that the second identified vehicle is a target identified vehicle, and aggregate the target identified vehicles to obtain a target identified vehicle set; A residential location set is obtained based on the first identified vehicle set and the target identified vehicle set.

3. The method for site selection and capacity determination of electric vehicle charging stations based on big data as claimed in claim 2, characterized in that: The step of obtaining a conversion coefficient for reference includes: Acquire a driving-in charging data set of the vehicle, wherein the driving-in charging data set is composed of a plurality of reference charging data sets, and the reference charging data set includes a plurality of driving-in charging data, and the reference charging data set corresponds to the first road section one by one, wherein the driving-in charging data is composed of: a travel time at the first intersection, a charging distance, and a driving-out time of the charging station, and the road section corresponding to the driving-in charging data is the same first road section; The following operations are performed on the reference charging dataset in the drive-in charging dataset: The following operations are performed on the drive-in charging data in the reference charging dataset: Acquire the driving-in time based on the driving-in charging data, wherein the driving-in time is composed of: the absolute difference between the travel time of the first intersection and the driving-out time of the charging station; Summarizing the entry times to obtain an entry time set, and obtaining an entry mean and an entry variance based on the entry time set, wherein the entry mean is the mean of the entry times in the entry time set, and the entry variance is the variance of the entry times in the entry time set; The entry variance is compared with a preset variance threshold. If the entry variance is greater than the variance threshold, the following operations are performed on the entry times in the entry time concentration: Calculate the absolute difference between the entry time and the entry mean to obtain a reference difference, summarize the reference differences to obtain a reference difference set, and perform a sorting operation on the reference differences in the reference difference set in descending order to obtain a reference difference sequence; Extract reference difference values ​​from the reference difference value sequence in sequence, and perform the following operations on the extracted reference difference values: The entry time corresponding to the reference difference is eliminated from the entry time set, the retained entry time is summarized to obtain an updated time set, the updated time set is used as the entry time set, and the step of obtaining the entry mean and the entry variance based on the entry time set is returned until the entry variance is less than or equal to the variance threshold, the entry time is summarized to obtain a first charging data set, the multiple first charging data sets are summarized to obtain a target charging data set, and the conversion coefficient is calculated based on the target charging data set.

4. The method for site selection and capacity determination of electric vehicle charging stations based on big data as claimed in claim 3, characterized in that: The conversion coefficient is calculated based on the target charging data set, and the calculation formula is as follows: Among them, T l represents the lth entry time in the first charging data set, m represents the total number of entry times in the first charging data set, S i represents the i-th charging distance in the target charging data set, S j represents the jth charging distance in the target charging data set, and n represents that there are n charging distances in the target charging data set.

5. The method for site selection and capacity determination of electric vehicle charging stations based on big data as claimed in claim 4, characterized in that: The acquiring of the residential location set based on the first identified vehicle set and the target identified vehicle set includes: First identified vehicles whose reference vehicle type is a pure electric vehicle are sequentially extracted from the first identified vehicle set, and the following operations are performed on the extracted first identified vehicles: Based on the extracted first identification vehicle, one or more out-of-town times are obtained, and the out-of-town frequency is calculated using the one or more out-of-town times. The calculation formula is as follows: Among them, Q represents the frequency of going out, Y h represents the hth outgoing time among one or more outgoing times, and f represents that there are a total of f outgoing times among the one or more outgoing times; Compare the outgoing frequency with the preset outgoing threshold; If the outgoing frequency is less than or equal to the outgoing threshold, confirming that the extracted first identified vehicle is the target charging vehicle; Extract the second-identified vehicles from the target-identified vehicle set in sequence, and perform the following operations on the extracted second-identified vehicles: Acquire one or more entry times based on the extracted second-identified vehicle, calculate the entry frequency based on the one or more entry times, compare the entry frequency with a preset entry threshold, and if the entry frequency is greater than or equal to the entry threshold, confirm that the extracted second-identified vehicle is a target charging vehicle, aggregate the target charging vehicles, and obtain a target charging vehicle set; A residential location set is acquired based on the identification code corresponding to the target charging vehicle in the target charging vehicle set, wherein the residential location set includes multiple residential locations.

6. The method for site selection and capacity determination of electric vehicle charging stations based on big data as claimed in claim 5, characterized in that: The method of acquiring a plurality of target charging areas by using the residential location set includes: The elbow fitting curve and the silhouette coefficient polyline are obtained by using the pre-constructed elbow method, the pre-constructed silhouette coefficient method, the preset cluster value threshold, the pre-constructed K-means clustering method and the residential location set, wherein the abscissa of the elbow fitting curve is the cluster value and the ordinate is SSE, and the abscissa of the silhouette coefficient polyline is the cluster value and the ordinate is the silhouette coefficient; Obtain one or more local peaks in the silhouette coefficient curve, wherein the local peaks correspond to the silhouette coefficients one by one, and perform a sorting operation on the local peaks in order from large to small to obtain a local peak sequence; Obtain multiple local derivatives in the elbow fitting curve, wherein the local derivatives correspond to the cluster values ​​one by one; Extract local peaks from the local peak sequence in sequence, and perform the following operations on the extracted local peaks: Based on the cluster value corresponding to the local peak, the target local derivative is identified from multiple local derivatives, and the comprehensive evaluation value is calculated based on the extracted local peak and the target local derivative. The calculation formula is as follows: Among them, Z represents the comprehensive evaluation value, F(K a ) represents the extracted local peak value, K a Represents the cluster value corresponding to the local peak, N(K a )′ represents the target local derivative, ω are all preset coefficients; Summarizing the comprehensive evaluation values ​​to obtain a comprehensive evaluation value set, and confirming a target cluster value based on the comprehensive evaluation value set, wherein the target cluster value is a cluster value corresponding to the largest comprehensive evaluation value in the comprehensive evaluation value set; Dividing the residential location set into M charging area clusters using the target cluster value and the K-means clustering method, wherein M is the same as the target cluster value; Extract charging area clusters from the M charging area clusters in sequence, and perform the following operations on the extracted charging area clusters: The charging area is obtained by using the extracted charging area cluster, wherein the charging area is circular, and when the charging area does not include a charging station, the charging area is confirmed as a target charging area, and the target charging areas are aggregated to obtain multiple target charging areas.

7. The method for site selection and capacity determination of electric vehicle charging stations based on big data as claimed in claim 6, characterized in that: The method of obtaining the target energy consumption by using the target charging area includes: The following operations are performed for each of the multiple target charging areas: Acquire one or more target charging positions according to the target charging area, identify a target charging vehicle set in the target charging area, extract target charging positions from the one or more target charging positions in sequence, and perform the following operations on the extracted target charging positions: Acquire a fitting path using the residential locations corresponding to the target charging vehicles in the target charging vehicle set and the extracted target charging locations; Acquire a fitted distance according to the fitted path, acquire an existing charging station based on the residential location, and acquire an existing distance using the existing charging station and the residential location; Obtain the energy consumption data of existing charging stations, where the energy consumption data includes: the type of charging pile and the number of existing charging piles, where the type of charging pile corresponds to the number of existing charging piles. Calculate the target energy consumption using the energy consumption data, the existing distance and the fitted distance. The calculation formula is as follows: Among them, u represents the target energy consumption of the fitted charging station, q represents the number of residential locations corresponding to the target charging vehicle set, and L p1 represents the existing distance corresponding to the pth target vehicle in the target charging vehicle set, L p0 represents the fitting distance corresponding to the pth target vehicle in the target charging vehicle set, w s represents the number of existing charging piles corresponding to the sth charging pile type, d represents the total number of charging pile types in the existing charging station, g s Represents the average energy consumption of the sth type of charging pile in the existing charging stations.

8. The method for site selection and capacity determination of electric vehicle charging stations based on big data as claimed in claim 7, characterized in that: The acquiring one or more charging station configuration solutions based on the target energy consumption includes: Acquire a fitting energy consumption data set for fitting, wherein the fitting energy consumption data set includes a plurality of fitting energy consumption data, and the fitting energy consumption data is composed of: a fitting charging pile type of a fitting charging pile and a fitting average energy consumption of the fitting charging pile; One or more charging station configuration solutions are obtained based on the fitted energy consumption data set and the pre-built charging station constraint relationship, where the charging station constraint relationship is as follows: Among them, O means there are O types of charging piles in the fitted charging station, R I In the fitting charging station, the first type of fitting charging pile in the fitting energy consumption data set is selected, and the number of corresponding fitting charging piles is H I It indicates that in the fitting charging station, the first fitting charging pile in the fitting energy consumption dataset is selected, and its corresponding fitting average energy consumption.

9. The method for site selection and capacity determination of electric vehicle charging stations based on big data as claimed in claim 8, characterized in that: The acquiring a charging station configuration scheme sequence according to the one or more charging station configuration schemes comprises: Extract charging station configuration schemes from the one or more charging station configuration schemes in sequence, and perform the following operations on the extracted charging station configuration schemes: The comprehensive charging station energy consumption is calculated based on the extracted charging station configuration scheme and the pre-built comprehensive charging station energy consumption relationship, where the comprehensive charging station energy consumption relationship is as follows: Among them, M C represents the comprehensive charging station energy consumption corresponding to the Cth charging configuration scheme, G C represents the fixed site energy consumption corresponding to the Cth charging configuration scheme, W C represents the number of fitted charging piles corresponding to the Cth charging configuration scheme, X C represents the fixed configuration energy consumption of the fitted charging pile corresponding to the Cth charging configuration scheme, and B represents that there are B types of fitted charging piles in the extracted charging station configuration scheme; Performing a labeling operation on the extracted charging station configuration scheme using the comprehensive charging station energy consumption to obtain a labeled charging station configuration scheme; Summarizing the identified charging station configuration schemes to obtain an identified charging station configuration scheme set; A charging station configuration scheme sequence is acquired based on the identified charging station configuration scheme set.

10. The method for site selection and capacity determination of electric vehicle charging stations based on big data according to claim 9, characterized in that: The acquiring a charging station configuration scheme sequence based on the identified charging station configuration scheme set comprises: Extract the identified charging station configuration solutions from the identified charging station configuration solution set in sequence, and perform the following operations on the extracted identified charging station configuration solutions: The comprehensive configuration evaluation value is calculated based on the extracted identified charging station configuration scheme and the pre-built comprehensive evaluation relationship, where the comprehensive evaluation relationship is as follows: x=∈M C +θB Among them, x represents the comprehensive configuration evaluation value, ∈ and θ are preset coefficients, The comprehensive configuration evaluation values ​​are summarized to obtain a comprehensive configuration evaluation value set, and the comprehensive configuration evaluation values ​​in the comprehensive configuration evaluation value set are sorted in descending order to obtain a comprehensive evaluation sequence, and a charging station configuration scheme sequence is obtained based on the comprehensive evaluation sequence.