Energy storage power station dynamic strategy configuration method based on confidence theory
Through the method based on confidence theory, the capacity planning and optimization problems of energy storage power stations in uncertain environments are solved, the capacity confidence and grid stability of the new energy system are improved, and the cost-effective power system planning and run.
Patent Information
- Application Number
- CN202411104480.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-13
AI Technical Summary
The existing dynamic strategy configuration method for energy storage power stations is difficult to efficiently plan and optimize the transmission network in an uncertain environment, and fails to effectively consider the volatility and uncertainty of power generation when the capacity planning of new energy power stations, as well as investment costs. , operating costs and grid losses and other factors.
Using a method based on confidence theory, through data collection and analysis, a power balance model is constructed, the confidence capacity of wind and light generation is calculated, the capacity confidence of new energy systems is evaluated, the configuration strategy of energy storage power stations is formulated, and a robust optimization model is constructed. Two-stage robust optimization method, dynamically adjust the charging and discharging strategies of the energy storage system, monitor the operating status of the power grid and optimize the strategies.
It improves the capacity confidence of the new energy system, improves the flexibility and stability of the power grid, comprehensively considers investment costs, operation costs and grid losses, reduces the loss of energy storage equipment, and realizes the economic and reliability of the power system.
Smart Images

Figure BDA0004990333420000031 
Figure BDA0004990333420000032 
Figure BDA0004990333420000051
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system planning, and in particular to a dynamic strategy configuration method for an energy storage power station based on confidence theory. Background Art
[0002] As the proportion of renewable energy in the global energy structure continues to increase, the planning and operation of power systems face unprecedented challenges. The intermittent and uncertain nature of renewable resources has brought new complexities to traditional transmission networks. In addition, energy storage power stations, as a key technology that can balance fluctuations in power supply and demand, are increasingly being used in modern transmission networks. However, how to efficiently plan and optimize transmission networks in an uncertain environment remains a problem that needs to be solved.
[0003] The existing dynamic strategy configuration method for energy storage power stations has the following defects:
[0004] 1. In the patent document CN116345507B, the multi-objective optimal configuration of the capacity of energy storage power stations with variable energy storage cycles is mainly realized, which overcomes the limitation that the existing energy storage power station capacity optimization configuration method is only suitable for specific energy storage duration or specific energy storage cycle, and does not consider how to carry out efficient transmission network planning and capacity optimization in an uncertain environment;
[0005] 2. In the application document CN116706949A, the main consideration is how to achieve energy storage capacity configuration solutions for application scenarios with different power supply reliability and power supply guarantee requirements, but it does not take into account that the power generation of new energy power stations has certain volatility and uncertainty when planning the capacity;
[0006] 3. In the application document CN114336748A, the main consideration is how to obtain the optimal capacity configuration result of energy storage, and the impact of various factors such as investment cost, operating cost and grid loss on power planning is not considered;
[0007] 4. In patent document CN115001037B, the main consideration is how to optimize the energy storage operation in multiple objectives while ensuring the economy of the system, so as to improve the utilization efficiency of the energy storage system, but the problem of high operating cost of energy storage is not taken into consideration. Summary of the invention
[0008] The purpose of the present invention is to provide a method for dynamic strategy configuration of an energy storage power station based on confidence theory to solve the problems raised in the above background technology.
[0009] To achieve the above purpose, the present invention provides the following technical solution: a dynamic strategy configuration method for an energy storage power station based on confidence theory, the dynamic strategy configuration method for an energy storage power station is as follows:
[0010] S1. Introduction of confidence theory: Apply confidence theory to power system planning;
[0011] S2. Data collection and analysis: Collect historical data of wind and solar energy systems and energy storage systems, and analyze their output characteristics and volatility;
[0012] S3, power balance model: construct a power balance model;
[0013] S4. Calculation of wind and solar power output confidence capacity: Calculate the maximum power that wind and solar power generation can stably supply to the grid under a specific confidence level;
[0014] S5. Capacity confidence assessment: Use the capacity factor of a specific period and the equivalent reliable unit capacity as indicators to assess the capacity confidence of the wind and solar renewable energy system;
[0015] S6. Energy storage system output strategy: Formulate energy storage power station configuration strategy under high proportion of new energy access, and dynamically adjust the charging and discharging strategy of the energy storage system according to the confidence capacity of wind and solar power output and grid demand;
[0016] S7, Robust optimization model: Construct a robust optimization model that takes into account the uncertainty of renewable energy output;
[0017] S8, two-stage robust optimization: a two-stage robust optimization method is used. The first stage determines the output of renewable energy, and the second stage minimizes the total cost based on the given renewable energy output.
[0018] S9, model solving: Use column and constraint generation algorithms or other optimization algorithms to solve the robust optimization model and find the optimal energy storage power station configuration and charging and discharging strategy;
[0019] S10, Dynamic Adjustment: Dynamically adjust the strategy of energy storage power stations according to the real-time operation status of the power grid and the changes in the output of new energy, and continuously monitor the operation status of the power grid;
[0020] S11. Feedback and optimization: Provide feedback and further optimize the strategy based on implementation results and monitoring data.
[0021] Preferably, in S4, it further includes:
[0022] S4-1. In the power grid planning model, add power balance constraints. In the absence of wind and solar energy, the power balance constraint equation is as follows:
[0023]
[0024] Where t is time, P G,i (t) is the power generation of the i-th traditional generator in time period t, P L,j (t) is the power of the jth load, Ploss (t) is the network loss, P ESS (t) is the energy storage power, a positive value indicates discharge, and a negative value indicates charge;
[0025] S4-2. When a high proportion of new energy is connected to the power grid, the confidence capacity of wind and solar power generation is calculated based on the power balance of S4-1.
[0026] Preferably, in S5, it further includes:
[0027] S5-1. The capacity factor for a specific period refers to the period with higher load or higher probability of load loss selected in proportion. The new energy load rate corresponding to this period can be used as a good approximation of the new energy confidence capacity. The calculation formula of the capacity factor λ for a specific period is:
[0028]
[0029] Where: C LDC,t Indicates the value of the load duration curve at time t, C NLDC,t is the value of the net load continuity curve after the new energy to be evaluated is connected at time t, T p is the peak period of the selected load duration curve, C res Installed capacity for new energy sources;
[0030] S5-2. The proportion of equivalent reliable unit capacity refers to the proportion of capacity that can be replaced by completely reliable conventional units by the new energy system. That is, after the new energy system removes the resources to be evaluated and adds a certain capacity of conventional units with no outage rate, its reliability level is consistent with the reliability level of the new energy system including the resources to be evaluated. At this time, the proportion of equivalent conventional unit capacity to new energy installed capacity is the new energy capacity credibility, and its calculation formula is as follows:
[0031] R{(C g +C res );D}=R{(C EFC +C res );D}
[0032] χ=C EFC / C res
[0033] Where: R is the reliability index, C g and C res They represent the installed capacity of conventional units and new energy sources, D represents the load sequence, C EFC represents the installed capacity of conventional units added to achieve the same system reliability level, and χ is the capacity confidence of the corresponding assessment resource.
[0034] Preferably, in S6, the energy storage power station configuration strategy under high proportion of new energy access is as follows:
[0035] Set the power balance index θ
[0036] θ=P DG -P Load
[0037] Among them, P DG Contribute to new energy, Load For load,
[0038] When θ>0, the energy storage is charged to absorb the excess output of new energy; when θ<0, the energy storage is discharged to meet the load demand;
[0039] When θ<0, the power balance index θ must be within the following range: θ≤0.2*(P DG -P Load ).
[0040] Preferably, in S7, a robust optimization model is proposed to optimize the objective function f of the problem, hoping to minimize the cost:
[0041] f total =min(f i +f o +f c )
[0042] where f i is the investment cost, f o is the operating cost, f c The cost of curtailing wind and solar power.
[0043] Preferably, in S8, due to the strong uncertainty of the output of new energy, an intermediate variable is introduced to transform the robust optimization model into a two-stage robust optimization model;
[0044] Adding power balancing costs to traditional grid planning models:
[0045] f p =β(P DG -P Load )
[0046] Among them, β is the power balance penalty coefficient, P DG Contribute to new energy, Load For load;
[0047] The first stage of the two-stage robust optimization model takes the output of renewable energy as the decision variable of this stage, and takes the minimum cost of power supply balance under a certain confidence level as the objective function. The second stage takes the minimum total cost as the objective function. The model is as follows:
[0048]
[0049] Where g(x) is the relevant constraint condition in the first stage, and h(x) is the relevant constraint condition in the second stage.
[0050] Preferably, the two-stage robust optimization model is a min-max-min three-layer optimization model, which can be solved using a column and constraint generation algorithm.
[0051] Preferably, in S9, the robust optimization model solution idea is as follows:
[0052] S9-1, set the relaxation amount η and the initial solution, under the given η, determine the new energy output from the first stage and substitute it into the second stage;
[0053] S9-2, the second stage model is transformed into a solvable single-level linear programming model using the column and constraint generation algorithm for solution calculation to obtain the minimum total cost, which is then substituted back into the first stage;
[0054] S9-3, through multiple iterations, until the optimal solution is found.
[0055] Preferably, in S4-2, the confidence capacity calculation steps of wind and solar power generation are as follows:
[0056] (1) Obtain historical data on wind, solar and energy storage;
[0057] (2) At time t, the wind and solar power output P RE and energy storage system P ESS The output sum of the statistical output sum is greater than or equal to P;
[0058] (3) Under the condition of probability Pr(P RE (t)+P ESS Under the condition of (t)≥P)≥α, find the maximum value P REα ;
[0059] P REα =max{P|Pr(P RE (t)+P ESS (t)≥P)≥α}
[0060] Among them, α is the confidence probability, P REα It indicates the maximum power that can be stably supplied by wind and solar power under a certain confidence level, P RE is the power transmitted from the wind and solar energy system to the grid, P ESS is the power delivered by the energy storage system to the grid, and P is a fixed power value determined in advance;
[0061] Then P REα is the stable output that the wind, solar and energy storage systems can provide to the power grid system under the confidence probability α;
[0062] Therefore, the power balance constraint equation in S4-1 becomes:
[0063]
[0064] In the power balance model, generator constraints, energy storage constraints and network security constraints are considered:
[0065]
[0066] SOC min ≤SOC≤SOC max
[0067] in: and is the upper and lower limits of the i-th generator power, and is the upper and lower limits of energy storage power, V min With V max is the upper and lower limits of the power network voltage, V n (t) represents the voltage of the nth node, SOC is the state of charge of the energy storage, SOC min With SOC max are the upper and lower limits of the energy storage charge state, fl min With fl max is the upper and lower limits of the power network flow, fl n (t) represents the power flow of the nth line.
[0068] Compared with the prior art, the present invention has the following beneficial effects:
[0069] 1. The present invention considers the balance relationship between power generation, load demand and network loss, and on this basis, considers a high proportion of wind and solar energy, introduces the capacity confidence index, the capacity coefficient for a specific period of time and the equivalent reliable unit capacity, calculates its confidence capacity under the net load key scenario, and obtains the power balance equation constraint considering the confidence capacity theory, effectively improving the capacity confidence of the new energy system.
[0070] 2. The present invention determines its capacity and charge and discharge rate according to the load demand and the energy storage demand of the system, so that it can improve the flexibility and stability of the power grid under the premise of ensuring that the energy storage system effectively regulates power supply and demand. At the same time, when considering the capacity planning of new energy power stations, it is considered that power generation is affected by factors such as weather, and its power generation has certain volatility and uncertainty, so as to meet the reliability and stability requirements of the power grid.
[0071] 3. The present invention comprehensively considers factors such as investment cost, operating cost and grid loss, and comprehensively considers and weighs these factors to find the most cost-effective solution and provide effective support for the planning and operation of the power system.
[0072] 4. When formulating the charging and discharging strategy of the energy storage power station, the present invention needs to reduce the loss of the energy storage equipment by reducing the number of energy storage charging and discharging times, thereby reducing the energy storage operating cost to achieve the optimal system cost, while also considering the volatility and uncertainty of the access of a high proportion of new energy to the power grid. It is not possible to blindly increase the capacity of new energy and reduce the number of energy storage discharges, nor is it possible to install too few new energy sources, resulting in insufficient energy storage discharge to meet normal load demand. DETAILED DESCRIPTION
[0073] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0074] An embodiment provided by the present invention is a method for configuring a dynamic strategy of an energy storage power station based on confidence theory. The method for configuring a dynamic strategy of an energy storage power station is as follows:
[0075] S1. Introduction of confidence theory: Apply confidence theory to power system planning;
[0076] S2. Data collection and analysis: Collect historical data of wind and solar energy systems and energy storage systems, and analyze their output characteristics and volatility;
[0077] S3, power balance model: construct a power balance model;
[0078] S4. Calculation of wind and solar power output confidence capacity: Calculate the maximum power that wind and solar power generation can stably supply to the grid under a specific confidence level;
[0079] S5. Capacity confidence assessment: Use the capacity factor of a specific period and the equivalent reliable unit capacity as indicators to assess the capacity confidence of the wind and solar renewable energy system;
[0080] S6. Energy storage system output strategy: Formulate energy storage power station configuration strategy under high proportion of new energy access, and dynamically adjust the charging and discharging strategy of the energy storage system according to the confidence capacity of wind and solar power output and grid demand;
[0081] S7, Robust optimization model: Construct a robust optimization model that takes into account the uncertainty of renewable energy output;
[0082] S8, two-stage robust optimization: a two-stage robust optimization method is used. The first stage determines the output of renewable energy, and the second stage minimizes the total cost based on the given renewable energy output.
[0083] S9, model solving: Use column and constraint generation algorithms or other optimization algorithms to solve the robust optimization model and find the optimal energy storage power station configuration and charging and discharging strategy;
[0084] S10, Dynamic Adjustment: Dynamically adjust the strategy of energy storage power stations according to the real-time operation status of the power grid and the changes in the output of new energy, and continuously monitor the operation status of the power grid;
[0085] S11. Feedback and optimization: Provide feedback and further optimize the strategy based on implementation results and monitoring data.
[0086] Furthermore, by setting different confidence levels to evaluate the reliable power supply capacity of renewable energy power generation under different probabilities, we first comprehensively collect historical operating data of new energy systems such as wind power, photovoltaics, and energy storage systems, analyze these data, understand their output characteristics, such as daily changes, seasonal changes, volatility, and mutual correlation, and build a power balance model based on the load demand of the power grid, the power generation capacity of traditional energy, and the forecast of new energy power generation. Under a specific confidence level, we calculate the maximum power that wind and solar power generation can stably supply to the power grid, and use the capacity factor and equivalent reliable unit capacity of a specific period of time as evaluation indicators, so that we can quantitatively evaluate the capacity confidence of the new energy system and understand its reliability under different conditions. Then, according to the confidence capacity of the new energy output and the power grid demand, we formulate the configuration strategy of the energy storage power station and dynamically adjust the charging and discharging strategy of the energy storage system. , in order to balance the volatility of renewable energy power generation and the stability of the power grid, taking into account the uncertainty of renewable energy output, a robust optimization model is constructed. Under uncertain conditions, the operation strategy of the power grid is optimized to ensure the economy and reliability of the system. Then a two-stage robust optimization method is adopted. The first stage determines the optimal output plan of renewable energy. The second stage minimizes the total operating cost of the power grid based on the given renewable energy output. The robust optimization model is solved using column and constraint generation algorithms, mixed integer linear programming or other optimization algorithms to find the optimal energy storage power station configuration and charging and discharging strategy, provide guidance for the actual operation of the power grid, and continuously monitor the real-time operation status of the power grid and the changes in renewable energy output, so as to facilitate the dynamic adjustment of the energy storage power station strategy according to the monitoring data to cope with the uncertainty of renewable energy output and the emergency of the power grid, thereby improving the stability and economy of the power grid.
[0087] An embodiment provided by the present invention: a method for configuring a dynamic strategy of an energy storage power station based on confidence theory, in S4, further comprising:
[0088] S4-1. In the power grid planning model, add power balance constraints. In the absence of wind and solar energy, the power balance constraint equation is as follows:
[0089]
[0090] Where t is time, P G,i (t) is the power generation of the i-th traditional generator in time period t, P L,j (t) is the power of the jth load, P loss (t) is the network loss, P ESS (t) is the energy storage power, a positive value indicates discharge, and a negative value indicates charge;
[0091] S4-2. When a high proportion of new energy is connected to the power grid, the confidence capacity of wind and solar power generation is calculated based on the power balance of S4-1.
[0092] In S4-2, the confidence capacity calculation steps for wind and solar power generation are as follows:
[0093] (1) Obtain historical data on wind, solar and energy storage;
[0094] (2) At time t, the wind and solar power output P RE and energy storage system P ESS The output sum of the statistical output sum is greater than or equal to P;
[0095] (3) Under the condition of probability Pr(P RE (t)+P ESS Under the condition of (t)≥P)≥α, find the maximum value P REα ;
[0096] P REα =max{P|Pr(P RE (t)+P ESS (t)≥P)≥α}
[0097] Among them, α is the confidence probability, P REα It indicates the maximum power that can be stably supplied by wind and solar power under a certain confidence level, P RE is the power transmitted from the wind and solar energy system to the grid, P ESS is the power delivered by the energy storage system to the grid, and P is a fixed power value determined in advance;
[0098] Then P REα is the stable output that the wind, solar and energy storage systems can provide to the power grid system under the confidence probability α;
[0099] Therefore, the power balance constraint equation in S4-1 becomes:
[0100]
[0101] In the power balance model, generator constraints, energy storage constraints and network security constraints are considered:
[0102]
[0103] SOC min ≤SOC≤SOC max
[0104] in: and is the upper and lower limits of the i-th generator power, and is the upper and lower limits of energy storage power, V min With V max is the upper and lower limits of the power network voltage, V n (t) represents the voltage of the nth node, SOC is the state of charge of the energy storage, SOC min With SOC max are the upper and lower limits of the energy storage charge state, fl min With fl max is the upper and lower limits of the power network flow, fl n (t) represents the power flow of the nth line.
[0105] Furthermore, in the power grid planning model, power balance is a core constraint, which ensures the balance of supply and demand of the power grid in different time periods. When a high proportion of new energy (such as wind power and photovoltaic power) is connected to the power grid, this balance becomes more complicated because the output of new energy is uncertain. In order to deal with this uncertainty, the concept of confidence capacity is introduced and integrated into the power balance constraint. By considering the balance relationship between power generation and load demand and network loss, and on this basis, considering a high proportion of wind and solar new energy, the capacity confidence index, the capacity coefficient in a specific period and the equivalent reliable unit capacity are introduced, and the confidence capacity is calculated under the net load critical scenario. The power balance equation constraint considering the confidence capacity theory is obtained, which effectively improves the capacity confidence of the new energy system.
[0106] When the power grid is connected to a high proportion of renewable energy, the confidence capacity of wind and solar power generation needs to be considered on the basis of this power balance. This refers to the power or load that the wind farm and energy storage system can stably supply to the power grid under a certain confidence level. The output power of wind power and photovoltaic power is random and uncertain. By reasonably configuring energy storage equipment, the power output of the wind farm can be smoothed and its thermal power replacement capacity and load supply capacity can be improved.
[0107] An embodiment provided by the present invention: a method for configuring a dynamic strategy of an energy storage power station based on confidence theory, in S5, further comprising:
[0108] S5-1. The capacity factor for a specific period refers to the period with higher load or higher probability of load loss selected in proportion. The new energy load rate corresponding to this period can be used as a good approximation of the new energy confidence capacity. The calculation formula of the capacity factor λ for a specific period is:
[0109]
[0110] Where: C LDC,t Indicates the value of the load duration curve at time t, C NLDC,t is the value of the net load continuity curve after the new energy to be evaluated is connected at time t, T p is the peak period of the selected load duration curve, C res Installed capacity for new energy sources;
[0111] S5-2. The proportion of equivalent reliable unit capacity refers to the proportion of capacity that can be replaced by completely reliable conventional units by the new energy system. That is, after the new energy system removes the resources to be evaluated and adds a certain capacity of conventional units with no outage rate, its reliability level is consistent with the reliability level of the new energy system including the resources to be evaluated. At this time, the proportion of equivalent conventional unit capacity to new energy installed capacity is the new energy capacity credibility, and its calculation formula is as follows:
[0112] R{(C g +C res );D}=R{(C EFC +C res );D}
[0113] χ=C EFC / C res
[0114] Where: R is the reliability index, C g and C res They represent the installed capacity of conventional units and new energy sources, D represents the load sequence, C EFC represents the installed capacity of conventional units added to achieve the same system reliability level, and χ is the capacity confidence of the corresponding assessment resource.
[0115] Furthermore, in grid planning and new energy access assessment, the capacity factor for a specific period and the proportion of equivalent reliable unit capacity are two important concepts, which are used to evaluate the performance and reliability of new energy systems under different conditions, and determine their capacity and charging and discharging rates based on load demand and the system's energy storage requirements, so that they can improve the flexibility and stability of the grid while ensuring that the energy storage system effectively regulates power supply and demand. At the same time, when considering the capacity planning of new energy power stations, it is taken into account that power generation is affected by factors such as weather, and its power generation has certain volatility and uncertainty, so as to meet the reliability and stability requirements of the grid.
[0116] An embodiment provided by the present invention is a method for configuring a dynamic strategy of an energy storage power station based on confidence theory. In S6, the configuration strategy of the energy storage power station under high proportion of new energy access is as follows:
[0117] Set the power balance index θ
[0118] θ=PDG -P Load
[0119] Among them, P DG Contribute to new energy, Load For load,
[0120] When θ>0, the energy storage is charged to absorb the excess output of new energy; when θ<0, the energy storage is discharged to meet the load demand;
[0121] When θ<0, the power balance index θ must be within the following range: θ≤0.2*(P DG -P Load ).
[0122] Furthermore, according to the historical output data of new energy and load forecast, the total capacity of the energy storage power station is reasonably determined to ensure that there is sufficient energy storage capacity to smooth the fluctuation when the output of new energy fluctuates greatly. According to the charging and discharging rate requirements of the energy storage power station, that is, the amount of electricity that can be charged or discharged per unit time, the power configuration of the energy storage power station is determined to meet the grid's demand for rapid response capabilities. A detailed control strategy is formulated, including the charging and discharging logic of the energy storage power station, the charging and discharging priority, and the smooth adjustment of the charging and discharging power, to ensure that the energy storage power station can operate efficiently and stably and work in coordination with other equipment in the grid. The power balance index θ is calculated and set. When θ>0, the energy storage is charged to absorb the excess output of new energy. When θ<0, the energy storage is discharged to supply the load demand.
[0123] When formulating the charging and discharging strategy of energy storage power stations, on the premise of meeting load demand, it is necessary to reduce the loss of energy storage equipment by reducing the number of energy storage charging and discharging cycles, thereby reducing the energy storage operating costs to achieve optimal system costs. At the same time, it is necessary to consider the volatility and uncertainty brought about by the access of a high proportion of new energy to the power grid. It is not possible to blindly increase the capacity of new energy and reduce the number of energy storage discharges, nor is it possible to install too few new energy sources, resulting in insufficient energy storage discharge to meet normal load demand.
[0124] An embodiment provided by the present invention is a method for configuring a dynamic strategy of an energy storage power station based on confidence theory. In S7, a robustness optimization model is proposed to optimize the objective function f of the problem, hoping to minimize the cost:
[0125] f total =min(f i +f o +f c )
[0126] where f i is the investment cost, f o is the operating cost, f c The cost of curtailing wind and solar power.
[0127] Furthermore, an optimization model is proposed to solve the site selection, capacity and installation time of distributed generation (DG) after a high proportion of new energy is connected. The objective function f of the optimization problem contains f i Investment cost, f o Running costs and f c The cost of curtailing wind and solar power is expected to be minimized;
[0128] The investment cost and operating cost are as follows:
[0129]
[0130]
[0131] f c =αP c
[0132] Where: i and j represent the serial number of the busbar, and m and n represent the serial number of another group of buses. B , T , L and ψ CB represents the bus, year, load level and the set of connected network buses, t and l represent the planned year and load level index, r represents the reference bus, IC i With CC i They represent the capacity and investment cost of each DG unit installed on busbar i, dr represents the discount rate, α it With α i(t-1) Respectively represent the total number of DGs installed on bus i as of year t and year t-1, CR ij represents the reinforcement cost of the feeder between busbars i and j, β ijt With β ij(t-1) denote the reinforcement status of the feeder between busbars i and j in year t and t-1 respectively, β ijt =1 means reinforcement, β ijt =0 means no reinforcement, TD l Represents the power grid loss, EP tl It indicates the electricity price predicted for load level l in year t, GP rtl With GP itl They represent the active power generated by the DG on bus i and the active power of the network on the reference bus at load level l in year t, respectively. itl represents the DG operating cost of bus i at load level l in year t, VLL t represents the loss load value in year t, LS itl represents the load loss of bus i at load level l in year t, V itl It represents the voltage of bus i at load level l in year t, Vj+i represents the sum of the voltages of busbars i and j, β mnt represents the reinforcement status of the feeder between busbars m and n in year t, Y ij represents the node admittance between i and j, θ itl With θ jtl They represent the phase angles of busbars i and j at load level l in year t, Represents the phase angle between busbars i and j, DP itl represents the active power demand of bus i at load level l in year t, PL tl represents the power loss of the distribution network with load level l in year t, α is the penalty coefficient for wind and solar power abandonment, P c It is the abandoned wind and solar power.
[0133] An embodiment provided by the present invention is a method for configuring a dynamic strategy of an energy storage power station based on confidence theory. In S8, due to the strong uncertainty of the output of new energy, an intermediate variable is introduced to transform the robust optimization model into a two-stage robust optimization model.
[0134] Adding power balancing costs to traditional grid planning models:
[0135] f p =β(P DG -P Load )
[0136] Among them, β is the power balance penalty coefficient, P DG Contribute to new energy, Load For load;
[0137] The first stage of the two-stage robust optimization model takes the output of renewable energy as the decision variable of this stage, and takes the minimum cost of power supply balance under a certain confidence level as the objective function. The second stage takes the minimum total cost as the objective function. The model is as follows:
[0138]
[0139] Where g(x) is the relevant constraint condition in the first stage, and h(x) is the relevant constraint condition in the second stage.
[0140] The two-stage robust optimization model is a min-max-min three-level optimization model, which can be solved using the column and constraint generation algorithm.
[0141] In S9, the robust optimization model solution is as follows:
[0142] S9-1, set the relaxation amount η and the initial solution, under the given η, determine the new energy output from the first stage and substitute it into the second stage;
[0143] S9-2, the second stage model is transformed into a solvable single-level linear programming model using the column and constraint generation algorithm for solution calculation to obtain the minimum total cost, which is then substituted back into the first stage;
[0144] S9-3, through multiple iterations, until the optimal solution is found.
[0145] Furthermore, in order to deal with the uncertainty of renewable energy output, intermediate variables such as the forecast interval or scenario set of renewable energy output can be introduced to characterize this uncertainty. These intermediate variables will be used as parameters or decision variables in the model to build a robust optimization model.
[0146] Phase 1: Taking renewable energy output as the decision variable, the goal is to minimize the power supply balancing cost under a certain confidence level. Phase 2: Taking the total cost, including power balancing cost, energy storage cost, grid operation cost, etc., as the objective function, consider how to adjust other system resources such as conventional units and energy storage systems to meet load demand and minimize total cost based on the renewable energy output decided in Phase 1.
[0147] Set the relaxation amount η and the initial solution. Under the given η, solve the first stage model to obtain the new energy output decision. Substitute the new energy output obtained in the first stage into the second stage model and use the column and constraint generation algorithm to convert it into a solvable single-layer linear programming model for solution calculation to obtain the DG location, capacity and installation time, as well as the total cost. In each iteration, solve the second stage model to obtain the current minimum total cost, and update the decision of the first stage accordingly. Through multiple iterations, the first and second stage models are solved alternately until the optimal solution that meets the convergence conditions is found.
[0148] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be considered exemplary and non-restrictive in all respects, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention.
Claims
1. A method for configuring a dynamic strategy for an energy storage power station based on confidence theory, characterized in that: The dynamic strategy configuration method of the energy storage power station is as follows: S1. Introduction of confidence theory: Apply confidence theory to power system planning; S2. Data collection and analysis: Collect historical data of wind and solar energy systems and energy storage systems, and analyze their output characteristics and volatility; S3, power balance model: construct a power balance model; S4. Calculation of wind and solar power output confidence capacity: Calculate the maximum power that wind and solar power generation can stably supply to the grid under a specific confidence level; S5. Capacity confidence assessment: Use the capacity factor of a specific period and the equivalent reliable unit capacity as indicators to assess the capacity confidence of the wind and solar renewable energy system; S6. Energy storage system output strategy: Formulate energy storage power station configuration strategy under high proportion of new energy access, and dynamically adjust the charging and discharging strategy of the energy storage system according to the confidence capacity of wind and solar power output and grid demand; S7, Robust optimization model: Construct a robust optimization model that takes into account the uncertainty of renewable energy output; S8, two-stage robust optimization: a two-stage robust optimization method is used. The first stage determines the output of renewable energy, and the second stage minimizes the total cost based on the given renewable energy output. S9, model solving: Use column and constraint generation algorithms or other optimization algorithms to solve the robust optimization model and find the optimal energy storage power station configuration and charging and discharging strategy; S10, Dynamic Adjustment: Dynamically adjust the strategy of energy storage power stations according to the real-time operation status of the power grid and the changes in the output of new energy, and continuously monitor the operation status of the power grid; S11. Feedback and optimization: Provide feedback and further optimize the strategy based on implementation results and monitoring data.
2. According to claim 1, a method for configuring a dynamic strategy for an energy storage power station based on confidence theory is characterized in that: In S4, it also includes: S4-1. In the power grid planning model, add power balance constraints. In the absence of wind and solar energy, the power balance constraint equation is as follows: Where t is time, P G,i (t) is the power generation of the i-th traditional generator in time period t, P L,j (t) is the power of the jth load, P loss (t) is the network loss, P ESS (t) is the energy storage power, a positive value indicates discharge, and a negative value indicates charge; S4-2. When a high proportion of new energy is connected to the power grid, the confidence capacity of wind and solar power generation is calculated based on the power balance of S4-1.
3. The method for configuring a dynamic strategy for an energy storage power station based on confidence theory according to claim 1, characterized in that: In S5, also included: S5-1. The capacity factor for a specific period refers to the period with higher load or higher probability of load loss selected in proportion. The new energy load rate corresponding to this period can be used as a good approximation of the new energy confidence capacity. The calculation formula of the capacity factor λ for a specific period is: Where: C LDC,t Indicates the value of the load duration curve at time t, C NLDC,t is the value of the net load continuity curve after the new energy to be evaluated is connected at time t, T p is the peak period of the selected load duration curve, C res Installed capacity for new energy sources; S5-2. The proportion of equivalent reliable unit capacity refers to the proportion of capacity that can be replaced by completely reliable conventional units by the new energy system. That is, after the new energy system removes the resources to be evaluated and adds a certain capacity of conventional units with no outage rate, its reliability level is consistent with the reliability level of the new energy system including the resources to be evaluated. At this time, the proportion of equivalent conventional unit capacity to new energy installed capacity is the new energy capacity credibility, and its calculation formula is as follows: R{(C g +C res );D}=R{(C EFC +C res );D} x=C EFC / C res Where: R is the reliability index, C g and C res They represent the installed capacity of conventional units and new energy sources, D represents the load sequence, C EFC represents the installed capacity of conventional units added to achieve the same system reliability level, and χ is the capacity confidence of the corresponding assessment resource.
4. The method for configuring a dynamic strategy for an energy storage power station based on confidence theory according to claim 1, characterized in that: In S6, the energy storage power station configuration strategy under high proportion of new energy access is as follows: Set the power balance index θ θ=P DG -P Load Among them, P DG Contribute to new energy, Load For load, When θ>0, the energy storage is charged to absorb the excess output of new energy; when θ<0, the energy storage is discharged to meet the load demand; When θ<0, the power balance index θ must be within the following range: θ≤0.2*(P DG -P Load ).
5. The method for configuring a dynamic strategy for an energy storage power station based on confidence theory according to claim 1, characterized in that: In S7, a robust optimization model is proposed to optimize the objective function f of the problem, hoping to minimize the cost: f total =min(f i +f o +f c ) where f i is the investment cost, f o is the operating cost, f c The cost of curtailing wind and solar power.
6. The method for configuring a dynamic strategy for an energy storage power station based on confidence theory according to claim 5 is characterized in that: In S8, due to the strong uncertainty of the output of renewable energy, intermediate variables are introduced to transform the robust optimization model into a two-stage robust optimization model; Adding power balancing costs to traditional grid planning models: f p =β(P DG -P Load ) Among them, β is the power balance penalty coefficient, P DG Contribute to new energy, Load For load; The first stage of the two-stage robust optimization model takes the output of renewable energy as the decision variable of this stage, and takes the minimum cost of power supply balance under a certain confidence level as the objective function. The second stage takes the minimum total cost as the objective function. The model is as follows: Where g(x) is the relevant constraint condition in the first stage, and h(x) is the relevant constraint condition in the second stage.
7. The method for configuring a dynamic strategy for an energy storage power station based on confidence theory according to claim 6 is characterized in that: The two-stage robust optimization model is a min-max-min three-level optimization model, which can be solved using the column and constraint generation algorithm.
8. The method for configuring a dynamic strategy for an energy storage power station based on confidence theory according to claim 6, characterized in that: In S9, the robust optimization model solution is as follows: S9-1, set the relaxation amount η and the initial solution, under the given η, determine the new energy output from the first stage and substitute it into the second stage; S9-2, the second stage model is transformed into a solvable single-level linear programming model using the column and constraint generation algorithm for solution calculation to obtain the minimum total cost, which is then substituted back into the first stage; S9-3, through multiple iterations, until the optimal solution is found.
9. The method for configuring a dynamic strategy for an energy storage power station based on confidence theory according to claim 2, characterized in that: In S4-2, the confidence capacity calculation steps for wind and solar power generation are as follows: (1) Obtain historical data on wind, solar and energy storage; (2) At time t, the wind and solar power output P RE and energy storage system P ESS The output sum of the statistical output sum is greater than or equal to P; (3) Under the condition of probability Pr(P RE (t)+P ESS Under the condition of (t)≥P)≥α, find the maximum value P REα ; P REα =max{P|Pr(P RE (t)+P ESS (t)≥P)≥α} Among them, α is the confidence probability, P REα It indicates the maximum power that can be stably supplied by wind and solar power under a certain confidence level, P RE is the power transmitted from the wind and solar energy system to the grid, P ESS is the power delivered by the energy storage system to the grid, and P is a fixed power value determined in advance; Then P REα is the stable output that the wind, solar and energy storage systems can provide to the power grid system under the confidence probability α; Therefore, the power balance constraint equation in S4-1 becomes: In the power balance model, generator constraints, energy storage constraints and network security constraints are considered: SOC min ≤SOC≤SOC max in: and is the upper and lower limits of the i-th generator power, and is the upper and lower limits of energy storage power, V min With V max is the upper and lower limits of the power network voltage, V n (t) represents the voltage of the nth node, SOC is the state of charge of the energy storage, SOC min With SOC max are the upper and lower limits of the energy storage charge state, fl min With fl max is the upper and lower limits of the power network flow, fl n (t) represents the power flow of the nth line.
Citation Information
Patent Citations
Power energy storage system capacity calculation method based on time sequence production simulation
CN114336748A
A multi-objective and multi-time scale coordinated energy storage system scheduling and operation method
CN115001037B
Multi-objective optimization configuration method and system for capacity of energy storage power stations adapted to variable energy storage cycles
CN116345507B
New energy system energy storage optimization configuration method, system, equipment and medium
CN116706949A
Energy storage parameter configuration optimization method and device, equipment and storage medium
CN115204510A
Cited By
A wind, solar and storage configuration method and system for a pure new energy transmission base
CN119765412A
Distribution and storage capacity measuring and calculating method and device, electronic equipment and storage medium
CN119831224A
New energy high-proportion area voltage stabilization hybrid energy storage supporting method and system
CN120999725A
New energy high proportion area voltage stability hybrid energy storage support method and system
CN120999725B
Agricultural machine mobile energy storage cooperation method and system for rural roof photovoltaic absorption
CN121282913A