Coal mine construction benefit evaluation method and device, electronic equipment and storage medium

By establishing a comprehensive evaluation index system and mathematical model for the benefits of intelligent construction in underground coal mines, the problem of the inability to comprehensively evaluate the benefits of intelligent construction in underground coal mines under existing technologies has been solved. This has enabled a systematic and quantitative benefit assessment and provided a basis for construction optimization.

CN119026967AInactive Publication Date: 2024-11-26CCTEG COAL IND PLANNING INSTITUTE CO LTD

Patent Information

Application Number
CN202410172375.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-02-07
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technologies cannot qualitatively or quantitatively evaluate the benefits of intelligent construction in underground coal mines in a comprehensive manner, cannot consider the correlation between different dimensions, and rely on human experience to judge the quality of benefits.

Method used

A comprehensive evaluation index system for the benefits of intelligent construction in underground coal mines was established. Time series analysis was used to process the data, and the weights of the indicators were determined by combining the analytic hierarchy process. A comprehensive evaluation mathematical model was constructed to calculate the benefit score of intelligent construction.

Benefits of technology

It enables a systematic and objective evaluation of the intelligent construction of underground coal mines, and provides a basis for optimizing construction by conducting a comprehensive assessment from four dimensions: production, safety, economy, and society.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026967A_ABST
    Figure CN119026967A_ABST
Patent Text Reader

Abstract

The invention discloses a coal mine construction benefit evaluation method and device, electronic equipment and a storage medium. The coal mine construction benefit evaluation method comprises the following steps: S1, acquiring data related to underground coal mine intelligent construction benefits; s2, establishing an underground coal mine intelligent construction benefit comprehensive evaluation index system; s3, determining a numerical value and a weight corresponding to each evaluation index in the comprehensive evaluation index system; s4, constructing an underground coal mine intelligent construction benefit comprehensive evaluation mathematical model; s5, based on the underground coal mine intelligent construction benefit comprehensive evaluation mathematical model, combining the numerical value and the weight corresponding to each evaluation index in the comprehensive evaluation index system; and S6, determining an underground coal mine intelligent construction benefit evaluation result. The intelligent construction benefit of the coal mine is comprehensively evaluated from four dimensions of production, safety, economy and society, the defect that the intelligent construction benefit of the underground coal mine cannot be qualitatively and quantitatively evaluated comprehensively in the prior art is effectively overcome, and an evaluation basis is provided for optimization of the intelligent construction benefit of the underground coal mine.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of coal mine construction evaluation, and in particular to a method, device, electronic equipment and storage medium for evaluating the benefits of intelligent construction of underground coal mines. Background Art

[0002] Intelligent coal mines are the core technical support for the high-quality development of the coal industry. The construction of intelligent coal mines is an important task facing coal enterprises in the new era and has become an irreversible development trend. In recent years, with the application of information technologies such as big data, 5G technology, and the Internet, a large number of intelligent underground coal mines have been built across the country. However, after the intelligent underground coal mines are built and put into use, how to evaluate the benefits of their intelligent construction is a key issue in further promoting and guiding the construction of intelligent coal mines. However, the evaluation of the benefits of intelligent construction of underground coal mines is a complex system project, involving the production, safety, economy, society and other aspects of the entire underground coal mine. At present, there is a lack of research on the evaluation of the benefits of intelligent construction of underground coal mines. Most of the research focuses on "classification and grading evaluation of intelligent coal mines", "classification and grading evaluation index system for intelligent coal mining working faces", and "acceptance index system for intelligent construction of coal mines". At present, the evaluation method that can be realized is manual experience evaluation, that is, manual recording of production effects and economic inputs before and after intelligent construction for comparative analysis to judge the final benefits of intelligent construction.

[0003] The existing technology mainly relies on manual experience judgment, and it is impossible to qualitatively and quantitatively evaluate and analyze the benefits of intelligent construction of underground coal mines in an all-round way; in addition, the existing technical means can only simply consider the benefit impact of a single aspect, and it is impossible to evaluate the benefits from different dimensions, nor to fully consider the correlation between different benefits. Therefore, it is necessary to provide an effective evaluation method for the benefits of intelligent construction of underground coal mines, and it is very necessary to comprehensively evaluate the effects of intelligent construction. Summary of the invention

[0004] In view of the above technical problems in the related technologies, the present invention provides a method, device, electronic equipment and storage medium for evaluating the benefits of intelligent construction of underground coal mines, which can solve the above problems.

[0005] To achieve the above technical objectives, the technical solution of the present invention is implemented as follows:

[0006] A method for evaluating the benefits of coal mine construction comprises the following steps:

[0007] S1. Obtain data related to the benefits of intelligent construction of underground coal mines and perform data analysis and processing on the acquired data;

[0008] S2. Determine the key evaluation indicators of the benefits of intelligent construction of underground coal mines and establish a comprehensive evaluation indicator system for the benefits of intelligent construction of underground coal mines;

[0009] S3. Determine the value and weight corresponding to each evaluation indicator in the comprehensive evaluation indicator system;

[0010] S4. Construct a mathematical model for comprehensive evaluation of the benefits of intelligent construction of underground coal mines;

[0011] S5. Based on the comprehensive evaluation mathematical model of the benefits of intelligent construction of underground coal mines, and combined with the corresponding values ​​and weights of each evaluation indicator in the comprehensive evaluation indicator system, calculate the score of the comprehensive evaluation indicator;

[0012] S6. Determine the benefit evaluation results of the intelligent construction of underground coal mines.

[0013] Furthermore, in step S1, data related to the benefits of intelligent construction of underground coal mines are obtained from the underground coal mine intelligent management system, and the time series analysis method is used to perform data analysis and processing on the obtained relevant data.

[0014] Furthermore, the key evaluation indicators in the comprehensive evaluation index system for the benefits of intelligent construction of underground coal mines described in step S2 include primary evaluation indicators, secondary evaluation indicators and tertiary evaluation indicators.

[0015] Furthermore, there are production benefit evaluation indicators, safety benefit evaluation indicators, economic benefit evaluation indicators, and social benefit evaluation indicators; among them, the production benefit evaluation indicators include the following secondary evaluation indicators: tunneling benefit, comprehensive mining benefit, main transportation benefit, auxiliary transportation benefit, ventilation and compressed air benefit, power supply and drainage benefit; among them, the safety benefit evaluation indicators include the following secondary evaluation indicators: safety monitoring benefit, geological guarantee benefit, information security guarantee benefit, safe operation and management benefit, disaster and accident reduction benefit; among them, the economic benefit evaluation indicators include the following secondary evaluation indicators: operating income change benefit, operating cost change benefit, financial profitability change benefit, government economic subsidy change benefit; among them, the social benefit evaluation indicators include the following secondary evaluation indicators: enterprise visibility improvement benefit, mining area image improvement benefit, national demonstration benefit; the third-level evaluation indicators include: excellent, good, medium, poor, and extremely poor.

[0016] Furthermore, the specific steps of the value and weight of each evaluation index in the comprehensive evaluation index system described in step S3 include:

[0017] S3-1. Determination of the values ​​of evaluation indicators. The values ​​of the first-level evaluation indicators and the third-level evaluation indicators are assigned by objective assignment method, and the values ​​of the second-level evaluation indicators are assigned by expert scoring method. The values ​​of the first-level evaluation indicators are assigned by percentage principle according to the importance of the indicators to the benefits of intelligent construction of underground coal mines; the values ​​of the third-level evaluation indicators are assigned as follows: 0.9≤excellent≤1, 0.8≤good<0.9, 0.7≤medium<0.8, 0.6≤poor<0.7, 0≤extremely poor<0.6;

[0018] S3-2. Determination of evaluation index weights. The weights of evaluation indexes are calculated using the analytic hierarchy process. The specific steps include:

[0019] S3-2-1. Construct a judgment matrix to represent the relative importance of each evaluation index;

[0020] S3-2-2, calculate the maximum eigenvalue of each judgment matrix and the corresponding eigenvector, normalize the eigenvector, and obtain the relative weight of the evaluation index in each level;

[0021] S3-2-3. Perform consistency check on the obtained weight values.

[0022] Furthermore, a mathematical model for comprehensive evaluation of the benefits of intelligent construction of underground coal mines was constructed and calculated using the following formula:

[0023] E 总 =E 生产 +E 安全 +E 经济 +E 社会

[0024]

[0025]

[0026]

[0027]

[0028] Where E 总 E is the total score of the benefit evaluation of the intelligent construction of underground coal mines; 生产 、E 安全 、E 经济 、E 社会 Respectively represent the benefit evaluation scores of intelligent construction of underground coal mines in production, safety, economy and society; A i 、a 1i 、a 2i 、a 3i are the value corresponding to the i-th item of the production benefit evaluation index, the weight of the first-level index, the weight of the second-level index and the weight of the third-level index; Bj 、b 1j 、b 2j 、b 3j are the corresponding value of the jth item of the safety benefit evaluation index, the first-level index weight, the second-level index weight and the third-level index weight; C k 、c 1k 、c 2k 、c 3k are the value corresponding to the kth item of economic benefit evaluation index, the weight of the first-level index, the weight of the second-level index and the weight of the third-level index; D l d 1l d 2l d 3l are the corresponding value of the social benefit evaluation index item 1, the first-level index weight, the second-level index weight and the third-level index weight; N A , N B , N C , N D They respectively represent the total number of secondary evaluation indicators included in the production benefit evaluation index, safety benefit evaluation index, economic benefit evaluation index and social benefit evaluation index; A, B, C and D respectively represent the numerical values ​​assigned to the production benefit evaluation index, safety benefit evaluation index, economic benefit evaluation index and social benefit evaluation index.

[0029] Furthermore, the benefit evaluation result of the intelligent construction of underground coal mines is determined according to the total score of the benefit evaluation of the intelligent construction of underground coal mines, where 90≤E 总 ≤100 means good construction efficiency, 80≤E 总 <90 means the construction benefit is good, 70≤E 总 <80 means the construction benefit is average, 60≤E 总 <70 means the construction benefit is poor, 0≤E 总 <60 indicates that the construction benefit is extremely poor.

[0030] A coal mine construction benefit evaluation device, comprising:

[0031] The data calling module is used to call the data required for benefit evaluation from the underground coal mine intelligent management system;

[0032] A data processing module is used to analyze and process the called data;

[0033] The benefit evaluation module is used to calculate the value and weight of the evaluation indicators, and to construct a mathematical model for comprehensive evaluation of the benefits of intelligent construction of underground coal mines. The total score of the benefit evaluation of intelligent construction of underground coal mines is calculated through the mathematical model for comprehensive evaluation of the benefits of intelligent construction of underground coal mines;

[0034] The result output module outputs the benefit evaluation results of the intelligent construction of underground coal mines.

[0035] An electronic device comprises a memory and a processor, wherein the memory stores a computer program and the processor implements a method for evaluating the benefits of coal mine construction when executing the program.

[0036] A computer-readable storage medium stores a computer program, which implements a method for evaluating the benefits of coal mine construction when executed by a processor.

[0037] The beneficial effects of the present invention are as follows: After the intelligent construction of an underground coal mine has been in operation for a period of time, the present invention conducts a systematic and objective analysis and evaluation of the execution process, benefits, effects and impacts of the intelligent construction, thereby realizing a comprehensive evaluation of the benefits of the intelligent construction of coal mines from four dimensions: production, safety, economy and society. This effectively overcomes the defect that the prior art cannot qualitatively and quantitatively conduct an all-round evaluation of the benefits of the intelligent construction of underground coal mines, and provides a basis for judging the optimization of the benefits of the intelligent construction of underground coal mines. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0039] The present invention is further described in detail below with reference to the accompanying drawings.

[0040] Figure 1 is a flow chart of a method for evaluating the benefits of coal mine construction according to an embodiment of the present invention;

[0041] Figure 2 It is a schematic diagram of a comprehensive evaluation index system for the benefits of intelligent construction of underground coal mines according to an embodiment of the present invention;

[0042] Figure 3 is a flow chart of calculating the weight of evaluation indexes by the analytic hierarchy process according to an embodiment of the present invention;

[0043] Figure 4 is a schematic diagram of a coal mine construction benefit evaluation device according to an embodiment of the present invention;

[0044] Figure 5 It is a schematic diagram of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0045] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.

[0046] like Figure 1-5 As shown, according to the present invention, a method for evaluating the benefits of coal mine construction is disclosed, comprising the following steps: S1, obtaining information related to the benefits of intelligent construction of underground coal mines and performing data analysis and processing on the obtained information; S2, determining key evaluation indicators of the benefits of intelligent construction of underground coal mines, and establishing a comprehensive evaluation index system for the benefits of intelligent construction of underground coal mines; S3, determining the numerical value and weight corresponding to each evaluation indicator in the comprehensive evaluation index system; S4, constructing a mathematical model for comprehensive evaluation of the benefits of intelligent construction of underground coal mines; S5, based on the mathematical model for comprehensive evaluation of the benefits of intelligent construction of underground coal mines, and combining the numerical value and weight corresponding to each evaluation indicator in the comprehensive evaluation index system, calculating the score of the comprehensive evaluation index; S6, determining the evaluation result of the benefits of intelligent construction of underground coal mines. A coal mine construction benefit evaluation device is also disclosed, including: a data calling module, used to call the data required for benefit evaluation from the underground coal mine intelligent management system; a data processing module, used to analyze and process the called data; a benefit evaluation module, used to calculate the value and weight of the evaluation index, and to build a mathematical model for comprehensive evaluation of the benefits of underground coal mine intelligent construction, and calculate the total score of the benefit evaluation of underground coal mine intelligent construction through the mathematical model for comprehensive evaluation of the benefits of underground coal mine intelligent construction; a result output module, outputting the benefit evaluation result of underground coal mine intelligent construction. In addition, an electronic device disclosed in this application can be a computing device such as a desktop computer, a notebook, a handheld computer, and a cloud server, including but not limited to a memory and a processor, for example, also includes a communication bus, a power supply, a communication interface, an input / output interface, and the like.

[0047] Embodiment 1:

[0048] In this application, data related to the benefits of intelligent construction of underground coal mines are obtained from the intelligent management system of underground coal mines, wherein the intelligent management system of underground coal mines is connected to each operating subsystem of underground coal mines, and the intelligent management system of underground coal mines manages each operating subsystem of underground coal mines and receives and saves relevant operating data. Each operating subsystem of underground coal mines includes geological support system, tunneling system, coal mining system, main coal flow transportation system, auxiliary transportation system, ventilation and compressed air system, power supply and drainage system, safety monitoring system, safety operation management system, enterprise operation statistics system, etc. The relevant data can be directly called and obtained from the intelligent management system of underground coal mines; and the time series analysis method is used to analyze and process the acquired data, which specifically includes the following steps: Data preparation: sort and clean the acquired data to ensure the integrity and accuracy of the data. Check whether the data has missing values, outliers or erroneous data, and perform necessary processing, such as filling missing values ​​or deleting outliers. Determine the time series model: select a suitable time series model according to the characteristics and objectives of the data. Commonly used time series models include stationary models (such as ARIMA models), trend models (such as exponential smoothing models), and seasonal models (such as seasonal ARIMA models). Choosing a suitable model requires considering the characteristics of the data, such as trend, periodicity, and randomness. Model fitting: Fit the data using the selected time series model. Estimate the coefficients and error terms of the model by calculating the model parameters. Model fitting can be achieved using statistical software or programming languages ​​(such as the statsmodels library in Python). Model diagnosis: Diagnose the fitted time series model to evaluate the goodness of fit and rationality of the model. Residual analysis can be performed to check whether the residual sequence of the model meets some basic assumptions, such as stationarity, independence, and normality. If there are problems with the model, the model may need to be adjusted or another model may be selected. Model prediction: Based on the fitted time series model, future data predictions are made. The model parameters and historical data can be used to predict future observations. Note that the prediction results need to be interpreted and evaluated in combination with model diagnosis and actual conditions. Result interpretation and application: Interpret the results of time series analysis and apply them according to actual needs. The predictive ability and reliability of the model can be displayed and evaluated through charts and statistical indicators (such as mean square error, mean absolute error, etc.).

[0049] Embodiment 2:

[0050] The key evaluation indicators in the comprehensive evaluation index system for the benefits of intelligent construction of underground coal mines described in this application include 4 first-level evaluation indicators, 18 second-level evaluation indicators and 5 third-level evaluation indicators. Among them:

[0051] There are a total of four first-level evaluation indicators, including: production benefit evaluation index (A), safety benefit evaluation index (B), economic benefit evaluation index (C), and social benefit evaluation index (D).

[0052] A total of 18 secondary evaluation indicators include:

[0053] The first-level evaluation index of production efficiency includes 6 second-level evaluation indicators: tunneling efficiency (A1), comprehensive mining efficiency (A2), main transportation efficiency (A3), auxiliary transportation efficiency (A4), ventilation and compressed air efficiency (A5), and power supply and drainage efficiency (A6).

[0054] The first-level safety benefit evaluation index includes five second-level evaluation indicators: safety monitoring benefit (B1), geological protection benefit (B2), information security protection benefit (B3), safety operation and management benefit (B4), and disaster accident reduction benefit (B5).

[0055] The first-level evaluation index of economic benefits includes four second-level evaluation indicators: the benefits of changes in operating income (C1), the benefits of changes in operating costs (C2), the benefits of changes in financial profitability (C3), and the benefits of changes in government economic subsidies (C4).

[0056] The first-level evaluation index of social benefits includes three second-level evaluation indicators: the benefit of improving enterprise reputation (D1), the benefit of improving the image of the mining area (D2), the national demonstration benefit (D3),

[0057] There are a total of five three-level evaluation indicators including: excellent, good, medium, poor and extremely poor.

[0058] Embodiment three:

[0059] The specific method for determining the value and weight of each evaluation indicator in the comprehensive evaluation indicator system described in this application is as follows:

[0060] (1) Method for determining the numerical value of evaluation index

[0061] The method for determining the numerical value of the evaluation index adopts a method that combines objective assignment and expert scoring. Among them, the first-level evaluation indicators and the third-level indicators adopt the objective assignment method, and the second-level indicators adopt the expert scoring method.

[0062] The numerical values ​​of the first-level evaluation indicators are assigned on a percentage basis according to the importance of the indicators to the benefits of intelligent construction of underground coal mines, for example: production benefit evaluation index (40 points), safety benefit evaluation index (30 points), economic benefit evaluation index (20 points), and social benefit evaluation index (10 points).

[0063] The three-level evaluation indexes are assigned numerical values, for example: excellent (0.9-1), good (0.8-0.9), medium (0.7-0.8), poor (0.6-0.7), and extremely poor (0-0.6).

[0064] The values ​​of the secondary evaluation indicators are assigned using the expert scoring method. The specific process is:

[0065] ① Establish a parameter set consisting of 18 secondary evaluation indicators

[0066] Φ={Φ 1 ,Φ 2 ,L,Φ n}={A 1 ,A 2 ,A 3 ,A 4 ,A 5 ,A 6 ,B 1 ,B 2 ,B 3 ,B 4 ,B 5 ,C 1 ,C 2 ,C 3 ,C 4 ,D 1 ,D 2 ,D 3}, n = 18; where Φ represents the set of secondary evaluation index parameters; Φ 1 :Φ 6 Respectively represent parameter A 1 :A 6 ; Φ 7 :Φ 11 Respectively represent parameter B 1 :B 5 ; Φ 12 :Φ 15 Respectively represent the parameter C 1 :C 4 ; Φ 16 :Φ 18 Respectively represent the parameter D 1 :D 3 .

[0067] ② Assuming there are m evaluation experts, the scoring result of each expert on the secondary evaluation index can be: F = {F 优 ,F 良 ,F 中 ,F 差 ,F 极差}, where 0.9≤F 优 ≤1, 0.8≤F 良 <0.9, 0.7≤F 中<0.8, 0.6≤F 差 <0.7, 0≤F 极差 <0.6.

[0068] ③ Calculate the value of the secondary evaluation index based on the following formula

[0069] Where j represents the number of experts who gave excellent scores; k represents the number of experts who gave good scores; l represents the number of experts who gave medium scores; w represents the number of experts who gave poor scores; v represents the number of experts who gave extremely poor scores; j+k+l+w+v=m.

[0070] (2) The method for determining the weight of evaluation indicators is as follows

[0071] ① Establish a comparison matrix: Use the hierarchical analysis method to select the same-level indicators under the same level indicators (such as the second-level evaluation indicator A under the first-level evaluation indicator of production efficiency 1 ,A 2 ,A 3 ,A 4 ,A 5 ,A 6 ), compare the relative importance of evaluation indicators pairwise, and establish the comparison matrix H of evaluation indicators

[0072] Among them, e i is the importance judgment parameter vector; h ij is the parameter vector of the comparison matrix H, and its value can be calculated using the three-scaling method.

[0073] ②Determine the elements in the comparison matrix:

[0074] <![CDATA[e i With e j Importance of]]> <![CDATA[e i E j Important]]> <![CDATA[e i With e j Equally important]]> <![CDATA[e j E i Important]]> <![CDATA[h ij ]]> 2 1 0

[0075] ③Construct the judgment matrix based on the range method, and the calculation formula is as follows:

[0076] Among them, e ij is the consistency judgment matrix; r i is the sum of the elements in each row of matrix H, r j is the sum of the elements in each column of the matrix H; e b is the relative importance of a given pair of extreme elements; R = r max -r min is the extreme value, r max = {r 1 ,r 2 ,…,r n}, r min = {r 1 ,r 2 ,…,r n}.

[0077] ④ Determine the weight of each layer of evaluation indicators: Calculate the judgment matrix e ij The maximum eigenvalue λ max and its corresponding eigenvector U, we get the weight vector U = {u 1 ,u 2 ,…,u n}, and normalizing it can obtain the relative weight of each evaluation indicator at a certain level with respect to the indicator at the previous level

[0078] ⑤Consistency test: The weight values ​​obtained by applying the hierarchical analysis method need to be checked for consistency. Calculate the maximum eigenvalue λ max , and introduce the compatibility index Ψ to test the consistency of the judgment matrix: When Ψ<0.1, the judgment matrix is ​​considered to have satisfactory consistency; when Ψ≥0.1, the judgment matrix should be appropriately modified and the consistency test should be performed again after correction.

[0079] Embodiment 4:

[0080] The idea of ​​constructing the mathematical model for the benefit evaluation of the intelligent construction of underground coal mines in this application is based on the principle of hierarchical analysis method. The detailed steps are: first, determine the mathematical model of the first-level evaluation index: Then, the mathematical models for determining the secondary evaluation indicators are: Again, the mathematical models for determining the three-level evaluation indicators are: Finally, based on the mathematical models of the primary, secondary and tertiary evaluation indicators, a mathematical model for evaluating the benefits of intelligent construction of underground coal mines was constructed. It is calculated by the following formula:

[0081] E 总 =E 生产 +E 安全 +E 经济 +E 社会

[0082]

[0083]

[0084]

[0085]

[0086] In the formula, E 总 E is the total index of benefit evaluation of intelligent construction of underground coal mines; 生产 、E 安全 、E 经济 、E社会 Respectively represent the benefit evaluation index of intelligent construction of underground coal mines in production, safety, economy and society; A i 、a li 、a 2i 、a 3i are the value corresponding to the i-th item of the production benefit evaluation index, the weight of the first-level index, the weight of the second-level index and the weight of the third-level index; B j 、b 1j 、b 2j 、b 3j are the corresponding value of the jth item of the safety benefit evaluation index, the first-level index weight, the second-level index weight and the third-level index weight; C k 、c 1k 、c 2k 、c 3k are the value corresponding to the kth item of economic benefit evaluation index, the weight of the first-level index, the weight of the second-level index and the weight of the third-level index; D l d 1l d 2l d 3l are the corresponding value of the social benefit evaluation index item 1, the first-level index weight, the second-level index weight and the third-level index weight; N A , N B , N C , N D They respectively represent the total number of secondary evaluation indicators included in the production benefit evaluation indicators, safety benefit evaluation indicators, economic benefit evaluation indicators, and social benefit evaluation indicators.

[0087] Embodiment five:

[0088] In this application, the benefit evaluation result of the intelligent construction of underground coal mines is determined according to the total score of the benefit evaluation of the intelligent construction of underground coal mines, where 90≤E 总 ≤100 means good construction efficiency, 80≤E 总 <90 means the construction benefit is good, 70≤E 总 <80 means the construction benefit is average, 60≤E 总 <70 means the construction benefit is poor, 0≤E 总 <60 indicates that the construction benefit is extremely poor.

[0089] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for evaluating the benefits of coal mine construction, characterized in that: The steps include: S1. Obtain data related to the benefits of intelligent construction of underground coal mines and perform data analysis and processing on the acquired data; S2. Determine the key evaluation indicators of the benefits of intelligent construction of underground coal mines and establish a comprehensive evaluation indicator system for the benefits of intelligent construction of underground coal mines; S3. Determine the value and weight corresponding to each evaluation indicator in the comprehensive evaluation indicator system; S4. Construct a mathematical model for comprehensive evaluation of the benefits of intelligent construction of underground coal mines; S5. Based on the comprehensive evaluation mathematical model of the benefits of intelligent construction of underground coal mines, and combined with the corresponding values ​​and weights of each evaluation indicator in the comprehensive evaluation indicator system, calculate the score of the comprehensive evaluation indicator; S6. Determine the benefit evaluation results of the intelligent construction of underground coal mines.

2. A method for evaluating the benefits of coal mine construction according to claim 1, characterized in that: In step S1, data related to the benefits of intelligent construction of underground coal mines are obtained from the underground coal mine intelligent management system, and the time series analysis method is used to perform data analysis and processing on the obtained relevant data.

3. A method for evaluating the benefits of coal mine construction according to claim 1, characterized in that: The key evaluation indicators in the comprehensive evaluation index system for the benefits of intelligent construction of underground coal mines described in step S2 include primary evaluation indicators, secondary evaluation indicators and tertiary evaluation indicators.

4. A method for evaluating the benefits of coal mine construction according to claim 3, characterized in that: The first-level evaluation indicators include: production benefit evaluation indicators, safety benefit evaluation indicators, economic benefit evaluation indicators, and social benefit evaluation indicators; among them, the production benefit evaluation indicators include the following second-level evaluation indicators: tunneling benefit, comprehensive mining benefit, main transportation benefit, auxiliary transportation benefit, ventilation and compressed air benefit, power supply and drainage benefit; among them, the safety benefit evaluation indicators include the following second-level evaluation indicators: safety monitoring benefit, geological guarantee benefit, information security guarantee benefit, safe operation and management benefit, disaster and accident reduction benefit; among them, the economic benefit evaluation indicators include the following second-level evaluation indicators: operating income change benefit, operating cost change benefit, financial profitability change benefit, government economic subsidy change benefit; among them, the social benefit evaluation indicators include the following second-level evaluation indicators: enterprise visibility improvement benefit, mining area image improvement benefit, national demonstration benefit; the third-level evaluation indicators include: excellent, good, medium, poor, and extremely poor.

5. A method for evaluating the benefits of coal mine construction according to claim 4, characterized in that: The specific steps of calculating the value and weight of each evaluation index in the comprehensive evaluation index system described in step S3 include: S3-1. Determination of the values ​​of evaluation indicators. The values ​​of the first-level evaluation indicators and the third-level evaluation indicators are assigned by objective assignment method, and the values ​​of the second-level evaluation indicators are assigned by expert scoring method. The values ​​of the first-level evaluation indicators are assigned by percentage principle according to the importance of the indicators to the benefits of intelligent construction of underground coal mines; the values ​​of the third-level evaluation indicators are assigned as follows: 0.9≤excellent≤1, 0.8≤good<0.9, 0.7≤medium<0.8, 0.6≤poor<0.7, 0≤extremely poor<0.6; S3-2. Determination of evaluation index weights. The weights of evaluation indexes are calculated using the analytic hierarchy process. The specific steps include: S3-2-1. Construct a judgment matrix to represent the relative importance of each evaluation index; S3-2-2, calculate the maximum eigenvalue of each judgment matrix and the corresponding eigenvector, normalize the eigenvector, and obtain the relative weight of the evaluation index in each level; S3-2-3. Perform consistency check on the obtained weight values.

6. A method for evaluating the benefits of coal mine construction according to claim 1, characterized in that: A mathematical model for comprehensive evaluation of the benefits of intelligent construction of underground coal mines is constructed and calculated using the following formula: AND 总 =And 生产 +E 安全 +E 经济 +E 社会 Where E 总 E is the total score of the benefit evaluation of the intelligent construction of underground coal mines; 生产 、E 安全 、E 经济 、E 社会 Respectively represent the benefit evaluation scores of intelligent construction of underground coal mines in production, safety, economy and society; A i 、a 1i 、a 2i 、a 3i are the value corresponding to the i-th item of the production benefit evaluation index, the weight of the first-level index, the weight of the second-level index and the weight of the third-level index; B j 、b 1j 、b 2j 、b 3j are the corresponding value of the jth item of the safety benefit evaluation index, the first-level index weight, the second-level index weight and the third-level index weight; C k 、c 1k 、c 2k 、c 3k are the value corresponding to the kth item of economic benefit evaluation index, the weight of the first-level index, the weight of the second-level index and the weight of the third-level index; D l d 1l d 2l d 3l are the corresponding value of the social benefit evaluation index item 1, the first-level index weight, the second-level index weight and the third-level index weight; N A ,N B ,N C ,N D They respectively represent the total number of secondary evaluation indicators included in the production benefit evaluation index, safety benefit evaluation index, economic benefit evaluation index and social benefit evaluation index; A, B, C and D respectively represent the numerical values ​​assigned to the production benefit evaluation index, safety benefit evaluation index, economic benefit evaluation index and social benefit evaluation index.

7. A method for evaluating the benefits of coal mine construction according to claim 6, characterized in that: The benefit evaluation result of the intelligent construction of underground coal mines is determined according to the total score of the benefit evaluation of the intelligent construction of underground coal mines, where 90≤E 总 ≤100 means good construction efficiency, 80≤E 总 <90 indicates good construction benefits, 70≤E 总 <80 means the construction benefit is average, 60≤E 总 <70 means the construction benefit is poor, 0≤E 总 <60 indicates that the construction benefit is extremely poor.

8. A coal mine construction benefit evaluation device, characterized in that: include: The data calling module is used to call the data required for benefit evaluation from the underground coal mine intelligent management system; A data processing module is used to analyze and process the called data; The benefit evaluation module is used to calculate the value and weight of the evaluation indicators, and to construct a mathematical model for comprehensive evaluation of the benefits of intelligent construction of underground coal mines. The total score of the benefit evaluation of intelligent construction of underground coal mines is calculated through the mathematical model for comprehensive evaluation of the benefits of intelligent construction of underground coal mines; The result output module outputs the benefit evaluation results of the intelligent construction of underground coal mines.

9. An electronic device comprising a memory and a processor, wherein a computer program is stored in the memory, wherein: When the processor executes the program, the method according to any one of claims 1 to 7 is implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Comprehensive evaluation method and system for mine construction project design scheme

    CN105488611A

  • Power transmission network operating efficiency and benefit detection method considering new energy access

    CN106056290A

  • Sustainable development-based iron ore tailing resource comprehensive utilization benefit evaluation method

    CN111967754A

  • Coal-fired unit intelligent power plant construction post-evaluation index system

    CN114330979A

  • Power distribution network comprehensive benefit evaluation method and system

    CN115481861A

Cited By

  • Method and apparatus for evaluating benefits of coal mine construction, and electronic device and storage medium

    WO2025167694A1