Park integrated energy system planning method based on P2G two-stage cooperation

Through the two-stage coordinated campus comprehensive energy system planning method based on P2G, the energy system configuration and carbon emission management are optimized, and the challenges of investment costs and carbon trading resource allocation in the park's comprehensive energy system are solved, and efficient energy utilization and low-carbon development are achieved. .

CN119027271APending Publication Date: 2024-11-26杭州市电力设计院有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411042357.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing comprehensive energy system in the park has challenges in the uncertainty of investment costs of wind power and photovoltaic equipment, as well as the allocation and operational cost control of carbon trading resources, and it is difficult to achieve the goals of low-carbon development and "dual carbon".

Method used

The comprehensive energy system planning method of the park based on P2G two-stage collaboration is adopted. By establishing an energy conversion equipment model and energy storage equipment model, the comprehensive energy system in the park is optimized, and the minimum comprehensive cost is the goal, the energy system configuration and carbon emission management are optimized.

Benefits of technology

It improves energy utilization efficiency, enhances the flexibility and reliability of energy supply, reduces operating costs, and achieves effective carbon emission management and achieves the "dual carbon" goal.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119027271A_ABST
    Figure CN119027271A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of integrated energy system planning, and particularly discloses a park integrated energy system planning method based on P2G two-stage collaboration, comprising the following steps: S1, establishing a park integrated energy system model; s2, establishing an energy conversion equipment model; s3, establishing an energy storage equipment model; and S4, optimizing the park comprehensive energy system model by taking the minimum comprehensive cost as a target to obtain a planning scheme. The method has the advantage that scientific and reasonable technical reference is provided for energy system planning of the park.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of integrated energy system planning, and in particular to a park integrated energy system planning method based on P2G two-stage collaboration. Background Art

[0002] Park-level integrated energy system (PIES) has the characteristics of high energy consumption and high energy density, and has the potential to integrate and utilize various types of renewable energy. It is one of the important carriers for achieving my country's "dual carbon" goals. The low-carbon development of PIES can be achieved by participating in carbon trading and developing renewable clean energy. PIES's participation in carbon trading means that carbon emission rights are bought and sold as freely traded commodities in the carbon trading market, and the carbon emissions of PIES are controlled by market means, and profits are made from it. In addition, PIES can configure large-scale renewable clean energy to help achieve the "dual carbon" goals. At the same time, the large-scale development of renewable clean energy also gives PIES a good profit space when participating in carbon trading. The planning and development of the existing park integrated energy system faces the difficulties of the uncertainty of the investment costs of wind power, photovoltaic and other equipment, as well as how to reasonably allocate carbon trading resources in the market and reduce operating costs. Summary of the invention

[0003] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a park comprehensive energy system planning method based on P2G two-stage collaboration.

[0004] The purpose of the present invention is achieved through the following technical solution: a park integrated energy system planning method based on P2G two-stage collaboration, characterized in that it includes the following steps:

[0005] Step S1: Establish a comprehensive energy system model for the park;

[0006] Step S2, establishing an energy conversion device model;

[0007] Step S3, establishing an energy storage device model;

[0008] Step S4: Optimize the park comprehensive energy system model with the goal of minimizing the comprehensive cost to obtain a planning solution.

[0009] Specifically, the energy conversion device model in step S2 includes the following models:

[0010] EL (Electrolyzer) equipment model:

[0011]

[0012] Where Pe,EL (t) is the electric energy input to EL during period t; is the hydrogen energy output by EL during period t; η EL is the energy conversion efficiency of EL; is the upper limit of the electric energy of the input EL;

[0013] MR equipment (Methane Reactor) model:

[0014]

[0015] In the formula, P is the hydrogen energy of MR input during period t; g,MR (t) is the natural gas power output by MR during period t; η MR is the energy conversion efficiency of MR; is the upper limit of hydrogen energy input to MR;

[0016] HFC (Hydrogen Fuel Cell) unit equipment model:

[0017]

[0018] In the formula, is the hydrogen energy input into HFC during period t; η HFC,e is the conversion efficiency of HFC to convert hydrogen into electricity; η HFC,h P is the conversion efficiency of HFC to convert hydrogen into thermal energy; HFC,e (t) is the electric energy output by HFC during period t; P HFC,h (t) is the heat energy output by HFC during period t; and They are the upper and lower limits of HFC heat-to-power ratio respectively;

[0019] GB device model:

[0020]

[0021] Where P g,GB (t) is the gas power input to GB during period t; η GB is the energy conversion efficiency of GB; is the upper limit of the power input to GB;

[0022] Combined Heat and Power Plant Model:

[0023]

[0024] Where P g,CHP (t) is the natural gas power input to CHP during period t; η e,CHP , η h,CHPare the energy conversion efficiencies of CHP into electrical energy and thermal energy, respectively; is the upper limit of the power input to CHP; and They are the upper and lower limits of the thermal-to-electricity ratio of CHP, respectively;

[0025] ER Equipment Model:

[0026]

[0027] Where P c,ER (t) is the cooling power output by ER at time t; η ER P is the conversion efficiency of the electric refrigerator; e,ER (t) is the electrical power input to ER at time t; is the upper limit of the electric power input to ER.

[0028] AC Equipment Model:

[0029]

[0030] Where P c,AC (t) is the cooling power output by AC at time t; η AC P is the conversion efficiency of absorption refrigeration; h,AC (t) is the thermal power input to AC at time t; It is the upper limit of the thermal power of the input AC.

[0031] Specifically, the energy storage device model is:

[0032]

[0033] Where i∈Ω,Ω={ES,HS,GS,H2S} is the set of electricity storage, heat storage, gas storage and hydrogen storage; are the charging and discharging powers of the i-th energy storage device in period t respectively; and are the maximum power of a single charge and discharge of the i-th energy storage device; are the state parameters of charging and discharging of the i-th energy storage device in period t, which are binary variables; are the charging and discharging efficiencies of the energy storage device, respectively; and are respectively the upper limit and lower limit of the capacity of the i-th energy storage device.

[0034] Specifically, the actual carbon emissions of the park's comprehensive energy system are as follows:

[0035] E PIES=E e,buy +E GB +E CHP (32)

[0036]

[0037]

[0038]

[0039] In the formula, E PIES 、E e,buy 、E GB 、E CHP are the actual carbon emissions of the park's integrated energy system, purchased electricity, gas boilers, and cogeneration units; P e,buy P is the power purchased by the park comprehensive energy system from the upper power grid during period t; h,GB (t) is the heating power of the gas boiler during period t; P h,CHP (t), P e,CHP (t) are the heating and power supply of the cogeneration equipment in period t; μ e and μ h are the carbon emission intensity per unit of electricity and per unit of heat respectively; It is the conversion coefficient of the electricity generated by the cogeneration equipment to the heat generated; the carbon trading cost is calculated on an annual basis, and T is 8760.

[0040] The carbon quota calculation model of the park's comprehensive energy system is as follows:

[0041] E' PIES =E e ' ,buy +E' GB +E' CHP (36)

[0042] Where, E' PIES 、E e ' ,buy , E' GB , E' CHP They are the carbon emission quotas for the park’s integrated energy system, purchased electricity, gas boilers, and cogeneration units;

[0043] The trading carbon emissions of the park's comprehensive energy system after taking into account carbon quotas are:

[0044] E0=E PIES -E' PIES (37)

[0045] The cost of carbon trading is:

[0046] C CO2=λE0 (38)

[0047] In the formula, is the carbon trading cost; λ is the carbon benchmark price.

[0048] Specifically, the objective function for optimizing the park comprehensive energy system model in step S4 is:

[0049]

[0050] In the formula, C represents the present value of the park's cost; C inv C is the construction investment cost; ope , C main are the operation and maintenance costs of the park’s integrated energy system, For carbon trading costs;

[0051] The investment and construction cost of the park's comprehensive energy system is:

[0052] C inv =∑ j∈φ f j e j W j (17)

[0053] Among them, e j is the unit price of equipment j, RMB / kW; W j is the configuration capacity of device j, kW; φ is the equipment set including wind power, photovoltaic equipment, CHP, AC, ER, GB, EC, HFC, MR and various energy storage equipment; f j It is a Boolean variable with a value of 1 or 0;

[0054] The operating cost of the park's comprehensive energy system is:

[0055]

[0056]

[0057]

[0058] Among them, C buy (t) is the energy purchase cost of the park; P g,buy (t) is the natural gas purchase amount at time t, P e,buy (t) is the amount of electricity purchased at time t; a t , b t Represent the electricity price and gas price at time t in year n respectively; C w,cut (t) is the wind curtailment cost of the park’s comprehensive energy system, P w,cut (t) is the wind volume abandoned at time t; c t is the penalty cost for unit wind curtailment; Cope The operating cost of the park's comprehensive energy system includes energy purchase costs and wind curtailment costs. The energy purchase costs include electricity purchase costs and gas purchase costs.

[0059] Considering that the maintenance cost of the park's comprehensive energy system consists of the maintenance costs of wind power, photovoltaics, energy conversion, and various energy storage devices, which are determined by the actual output power of various devices during operation, the vector composed of the output power of various devices in the nth year and tth period is

[0060] The maintenance cost of the park's integrated energy system is:

[0061]

[0062] in, is the maintenance cost vector per unit power of each type of equipment to be planned; is the output power of the j-type device in the nth year and the tth period; if the j-type device represents an energy storage device, It represents the sum of the charging and discharging power of the energy storage device.

[0063] Specifically, the park comprehensive energy system model also includes the following constraints:

[0064] Renewable energy output constraints:

[0065]

[0066] Where P w,t , P pv,t They represent the power output of wind power and photovoltaic power in period t respectively; Respectively represent the upper limits of wind power and photovoltaic output power, Indicates the upper limit of wind power and photovoltaic capacity;

[0067] Electric power balance constraints:

[0068]

[0069] Where P e,load (t) represents the electric load power in period t, P w (t) represents the output power of wind power in period t, P pv (t) represents the photovoltaic output power during period t, P e,CHP (t) represents the output power of the cogeneration equipment during period t, P e,HFC (t) represents the output power of the HFC unit equipment during period t, P e,buy (t) represents the power purchased by the park integrated energy system from the upper power grid during period t, P c,ER(t) is the cooling power output by ER at time t, P e,EL (t) is the electric energy input to EL during period t; and They represent the discharge and charge power of the storage at time t respectively;

[0070] Thermal power balance constraints:

[0071]

[0072] Where P h,load (t) represents the heat load power during period t, P h,CHP (t) represents the thermal power output of the cogeneration equipment during period t, P h,GB (t) represents the thermal power output of GB equipment during period t, P h,HFC (t) represents the thermal power output of the HFC unit during period t, P h,AC (t) is the thermal power input to AC at time t; and They represent the heat release and charging power of the heat storage at time t respectively;

[0073] Gas power balance constraints:

[0074]

[0075] Where P g,load (t) represents the gas load power during period t, P g,buy (t) is the natural gas purchase during period t, P g,MR (t) is the natural gas power output by MR during period t, P g,GB (t) is the gas power input to GB during period t, P g,CHP (t) is the natural gas power input to the cogeneration equipment during period t; and They represent the deflation and inflation power of the gas storage at time t respectively;

[0076] The cooling power balance constraint can be expressed as:

[0077] P c,ER (t)+P c,AC (t) = P c,load (t) (44)

[0078] Where P c,load (t) represents the cooling load power during period t, P c,ER (t) is the cooling power output by ER at time t, P c,AC (t) is the cooling power output by AC at time t;

[0079] Hydrogen balance constraints:

[0080]

[0081] In the formula, represents the hydrogen energy output by the EL device during period t, Enter the hydrogen energy of MR for period t,

[0082] It represents the hydrogen energy input into the HFC unit equipment during period t; and They represent the degassing and charging powers of the hydrogen storage at time t respectively.

[0083] Specifically, considering that the energy storage equipment needs to return to the initial state of the dispatch after running one dispatch cycle, the following constraint conditions are further established on the basis of the original constraints:

[0084] S i (t0) = S i (t T ) (46)

[0085] In the formula, S i (t) is the capacity of the i-th energy storage device in time period t;

[0086] Carbon peak constraints:

[0087] E 0,x ≥E0 (22)

[0088] In the formula, x means that the carbon peak will be achieved in the xth year of the plan.

[0089] Specifically, after carbon emissions reach their peak, in order to ensure that carbon emissions fall back in an orderly and steady manner, it is set that in each year after the carbon peak, the traded carbon emissions must decrease year by year at a fixed rate of v%:

[0090] E 0,y+1 ≤(1-v%)·E 0,y ,y≥x (23)

[0091] In the formula, y represents the year after carbon peak

[0092] The present invention has the following advantages:

[0093] In the process of energy conversion, the combined cooling, heating and power (CCHP), electric refrigerator (ER) and gas boiler (GB) and other equipment improve the overall energy utilization efficiency through efficient energy conversion and utilization. In particular, the CCHP system further optimizes the energy utilization effect through the coordinated work of the gas turbine, waste heat boiler and absorption refrigerator (AC). At the load end, PIES can respond to various energy demands and demonstrate its strong energy supply flexibility and reliability. BRIEF DESCRIPTION OF THE DRAWINGS

[0094] Figure 1 This is a flow chart of the park integrated energy system planning method of the present invention;

[0095] Figure 2 This is a model diagram of the park comprehensive energy system of the present invention;

[0096] Figure 3 This is the optimization flow chart of the park integrated energy system model of the present invention. DETAILED DESCRIPTION

[0097] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention, that is, the embodiments described are only part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings herein can be arranged and designed in various different configurations.

[0098] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative work are within the scope of protection of the present invention.

[0099] It should be noted that relational terms such as "first" and "second" are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "including a..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0100] The present invention is further described below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following description. Figures 1 to 3As shown, a park integrated energy system planning method based on P2G two-stage collaboration includes the following steps: Step S1: Obtain the multi-energy load demand of the planned park integrated energy system, the load demand includes cooling load, electric load, heating load and gas load, and establish a park integrated energy system model (PIES) according to the load demand; the park integrated energy system model in this embodiment is as follows: Figure 1 , including cogeneration, electric refrigerators, methane reactors, hydrogen fuel cells, electrolyzers, gas boilers, photovoltaic and wind turbine equipment, and purchasing natural gas and electricity from outside the system, using energy conversion equipment in conjunction with electricity storage, hydrogen storage, heat storage and gas storage to meet users' electricity, heat, cold and gas load needs;

[0101] Step S2, establishing an energy conversion equipment model; in the process of energy conversion, equipment such as combined cooling, heating and power (CCHP), electric refrigerators (ER) and gas boilers (GB) improve the overall energy utilization efficiency through efficient energy conversion and utilization, especially the CCHP system, through the coordinated work of gas turbines, waste heat boilers and absorption refrigerators (AC), further optimizes the energy utilization effect, and at the load end, can respond to various energy demands, showing its strong energy supply flexibility and reliability; the energy conversion model includes two key stages: electricity to hydrogen and electricity to natural gas. The energy conversion equipment model in step S2 includes the following models:

[0102] The function of EL equipment is to convert electrical energy into hydrogen energy, which is then used in hydrogen fuel cells for thermoelectricity production. That is, the main function is to produce thermoelectricity, not to store energy. The EL equipment model is:

[0103]

[0104] Where P e,EL (t) is the electric energy input to EL during period t; is the hydrogen energy output by EL during period t; η EL is the energy conversion efficiency of EL; is the upper limit of the electric energy of the input EL;

[0105] MR device model:

[0106]

[0107] In the formula, P is the hydrogen energy of MR input during period t; g,MR (t) is the natural gas power output by MR during period t; η MR is the energy conversion efficiency of MR; is the upper limit of hydrogen energy input to MR;

[0108] The hydrogen fuel cell in the present invention is not an energy storage device, but combines the input hydrogen and oxygen, completes the electric and thermal coupling through the oxidation reaction with hydrogen as the medium, and achieves "zero" carbon emissions at the same time. The HFC unit equipment model is:

[0109]

[0110] In the formula, is the hydrogen energy input into HFC during period t; η HFC,e is the conversion efficiency of HFC to convert hydrogen into electricity; η HFC,h P is the conversion efficiency of HFC to convert hydrogen into thermal energy; HFC,e (t) is the electric energy output by HFC during period t; P HFC,h (t) is the heat energy output by HFC during period t; and They are the upper and lower limits of HFC heat-to-power ratio respectively;

[0111] GB device model:

[0112]

[0113] Where P g,GB (t) is the gas power input to GB during period t; η GB is the energy conversion efficiency of GB; is the upper limit of the power input to GB;

[0114] Combined Heat and Power Plant Model:

[0115]

[0116] Where P g,CHP (t) is the natural gas power input to CHP during period t; η e,CHP , η h,CHP are the energy conversion efficiencies of CHP into electrical energy and thermal energy, respectively; is the upper limit of the power input to CHP; and They are the upper and lower limits of the thermal-to-electricity ratio of CHP, respectively;

[0117] ER Equipment Model:

[0118]

[0119] Where P c,ER (t) is the cooling power output by ER at time t; η ER P is the conversion efficiency of the electric refrigerator; e,ER (t) is the electrical power input to ER at time t; is the upper limit of the electric power input to ER.

[0120] AC Equipment Model:

[0121]

[0122] Where P c,AC (t) is the cooling power output by AC at time t; η AC P is the conversion efficiency of absorption refrigeration; h,AC (t) is the thermal power input to AC at time t; is the upper limit of the thermal power input to AC;

[0123] Step S3: Establish an energy storage device model; the energy storage device model is:

[0124]

[0125] Where i∈Ω,Ω={ES,HS,GS,H2S} is the set of electricity storage, heat storage, gas storage and hydrogen storage; are the charging and discharging powers of the i-th energy storage device in period t respectively; and are the maximum power of a single charge and discharge of the i-th energy storage device; are the state parameters of the charging and discharging of the i-th energy storage device in period t, which are binary variables. When When , the energy storage device is in the energy discharging state; are the charging and discharging efficiencies of the energy storage device, respectively; and are respectively the upper limit and lower limit of the capacity of the i-th energy storage device.

[0126] Step S4: Optimize the park comprehensive energy system model with the goal of minimizing the comprehensive cost to obtain a planning scheme. The actual carbon emissions of the park comprehensive energy system are as follows:

[0127] E PIES =E e,buy +E GB +E CHP (55)

[0128]

[0129]

[0130]

[0131] In the formula, E PIES 、E e,buy 、E GB 、E CHP are the actual carbon emissions of the park's integrated energy system, purchased electricity, gas boilers, and cogeneration units; P e,buy P is the power purchased by the park comprehensive energy system from the upper power grid during period t; h,GB (t) is the heating power of the gas boiler during period t; P h,CHP (t), P e,CHP (t) are the heating and power supply of the cogeneration equipment in period t; μ e and μ h are the carbon emission intensity per unit of electricity and per unit of heat respectively; It is the conversion coefficient of the electricity generated by the cogeneration equipment to the heat generated; the carbon trading cost is calculated on an annual basis, and T is 8760.

[0132] The carbon quota calculation model of the park's comprehensive energy system is as follows:

[0133] E' PIES =E e ' ,buy +E' GB +E' CHP (59)

[0134] Where, E' PIES 、E e ' ,buy , E' GB , E' CHP They are the carbon emission quotas for the park’s integrated energy system, purchased electricity, gas boilers, and cogeneration units;

[0135] The trading carbon emissions of the park's comprehensive energy system after taking into account carbon quotas are:

[0136] E0=E PIES -E' PIES (60)

[0137] By setting different carbon emission ranges, the difference between the actual carbon emissions of the system and the quota value is determined. The sign of the value.

[0138] When the system carbon emissions are lower than the quota, is negative; otherwise, is positive; the carbon trading cost is:

[0139]

[0140] In the formula, is the carbon trading cost; λ is the carbon benchmark price.

[0141] The objective function for optimizing the park's integrated energy system model is:

[0142]

[0143] In the formula, C represents the present value of the park's cost; C inv C is the construction investment cost; ope , C main are the operation and maintenance costs of the park’s integrated energy system, For carbon trading costs;

[0144] The investment and construction cost of the park's comprehensive energy system is:

[0145] C inv =∑ j∈φ f j e j W j (17)

[0146] Among them, e j is the unit price of equipment j, RMB / kW; W j is the configuration capacity of device j, kW; φ is the equipment set including wind power, photovoltaic equipment, CHP, AC, ER, GB, EC, HFC, MR and various energy storage equipment; f j It is a Boolean variable with a value of 1 or 0;

[0147] The operating cost of the park's comprehensive energy system is:

[0148]

[0149]

[0150]

[0151] Among them, C buy (t) is the energy purchase cost of the park; P g,buy (t) is the natural gas purchase amount at time t, P e,buy (t) is the amount of electricity purchased at time t; a t , b t Represent the electricity price and gas price at time t in year n respectively; C w,cut (t) is the wind curtailment cost of the park’s comprehensive energy system, P w,cut (t) is the wind volume abandoned at time t; c t is the penalty cost for unit wind curtailment; C ope The operating cost of the park's comprehensive energy system includes energy purchase costs and wind curtailment costs. The energy purchase costs include electricity purchase costs and gas purchase costs.

[0152] Considering that the maintenance cost of the park's comprehensive energy system consists of the maintenance costs of wind power, photovoltaics, energy conversion, and various energy storage devices, which are determined by the actual output power of various devices during operation, the vector composed of the output power of various devices in the nth year and tth period is

[0153] The maintenance cost of the park's integrated energy system is:

[0154]

[0155] in, is the maintenance cost vector per unit power of each type of equipment to be planned; is the output power of the j-type device in the nth year and the tth period; if the j-type device represents an energy storage device, It represents the sum of the charging and discharging power of the energy storage device.

[0156] The park integrated energy system model also includes the following constraints:

[0157] Renewable energy output constraints:

[0158]

[0159] Where P w,t , P pv,t They represent the power output of wind power and photovoltaic power in period t respectively; Respectively represent the upper limits of wind power and photovoltaic output power, Indicates the upper limit of wind power and photovoltaic capacity;

[0160] Since wind power and photovoltaic power have great randomness and volatility, in order to reduce the pressure on the main grid, the present invention does not consider the sale of electricity from the park integrated energy system to the superior power grid. Therefore, the power balance constraint is:

[0161]

[0162] Where P e,load (t) represents the electric load power in period t, P w (t) represents the output power of wind power in period t, P pv (t) represents the photovoltaic output power during period t, P e,CHP (t) represents the output power of the cogeneration equipment during period t, P e,HFC (t) represents the output power of the HFC unit equipment during period t, P e,buy (t) represents the power purchased by the park integrated energy system from the upper power grid during period t, P c,ER (t) is the cooling power output by ER at time t, P e,EL (t) is the electric energy input to EL during period t; and They represent the discharge and charge power of the storage at time t respectively;

[0163] Thermal power balance constraints:

[0164]

[0165] Where P h,load (t) represents the heat load power during period t, P h,CHP (t) represents the thermal power output of the cogeneration equipment during period t, P h,GB (t) represents the thermal power output of GB equipment during period t, P h,HFC (t) represents the thermal power output of the HFC unit during period t, P h,AC (t) is the thermal power input to AC at time t; and They represent the heat release and charging power of the heat storage at time t respectively;

[0166] The present invention does not consider the sale of natural gas from the park integrated energy system to the superior gas grid, and the gas power balance constraint is:

[0167]

[0168] Where P g,load (t) represents the gas load power during period t, P g,buy (t) is the natural gas purchase during period t, P g,MR (t) is the natural gas power output by MR during period t, P g,GB (t) is the gas power input to GB during period t, P g,CHP (t) is the natural gas power input to the cogeneration equipment during period t; and They represent the deflation and inflation power of the gas storage at time t respectively;

[0169] The cooling power balance constraint can be expressed as:

[0170] P c,ER (t)+P c,AC (t) = P c,load (t) (67)

[0171] Where P c,load (t) represents the cooling load power during period t, P c,ER (t) is the cooling power output by ER at time t, P c,AC (t) is the cooling power output by AC at time t;

[0172] Hydrogen balance constraints:

[0173]

[0174] In the formula, represents the hydrogen energy output by the EL device during period t, Enter the hydrogen energy of MR for period t,

[0175] It represents the hydrogen energy input into the HFC unit equipment during period t; and They represent the degassing and charging powers of the hydrogen storage at time t respectively.

[0176] Considering that the energy storage equipment needs to return to the initial state of the dispatch after running one dispatch cycle, the following constraint conditions are further established on the basis of the original constraints:

[0177] S i (t0) = S i (t T ) (69)

[0178] In the formula, S i (t) is the capacity of the i-th energy storage device in time period t;

[0179] Carbon peak constraints:

[0180] E 0,x ≥E0 (22)

[0181] In the formula, x means that the carbon peak will be achieved in the xth year of the plan.

[0182] After carbon emissions reach their peak, in order to ensure that carbon emissions fall back in an orderly and steady manner, it is set that in each year after the carbon peak, the traded carbon emissions must decrease year by year at a fixed rate of v%:

[0183] E 0,y+1 ≤(1-v%)·E 0,y ,y≥x (23)

[0184] In the formula, y represents the year after the carbon peak.

[0185] The above is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any technician familiar with the art can make many possible changes and modifications to the technical solution of the present invention by using the above-mentioned technical content without departing from the scope of the technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any changes, modifications, equivalent changes and modifications made to the above embodiments based on the technology of the present invention without departing from the content of the technical solution of the present invention belong to the protection scope of the present technical solution.

Claims

1. A park integrated energy system planning method based on P2G two-stage collaboration, Features: The following steps are involved: Step S1: Establish a comprehensive energy system model for the park; Step S2, establishing an energy conversion device model; Step S3, establishing an energy storage device model; Step S4: Optimize the park comprehensive energy system model with the goal of minimizing the comprehensive cost to obtain a planning solution.

2. According to the method for planning a comprehensive energy system for a park based on two-stage collaboration of P2G according to claim 1, Features: The energy conversion equipment model in step S2 includes the following models: EL (Electrolyzer) equipment model: Where P e,EL (t) is the electric energy input to EL during period t; is the hydrogen energy output by EL during period t; η EL is the energy conversion efficiency of EL; is the upper limit of the electric energy of the input EL; MR equipment (Methane Reactor) model: Where P H2 , MR (t) is the hydrogen energy input into MR during period t; Pg, MR (t) is the natural gas power output by MR during period t; η MR is the energy conversion efficiency of MR; is the upper limit of hydrogen energy input to MR; HFC (Hydrogen Fuel Cell) unit equipment model: In the formula, The hydrogen energy of HFC input for period t; η HFC,e The conversion efficiency of HFCs in converting hydrogen into electricity; η HFC,h P is the conversion efficiency of HFC to convert hydrogen into thermal energy; HFC,e (t) is the electric energy output by HFC during period t; P HFC,h (t) is the heat energy output by HFC during period t; and They are the upper and lower limits of HFC heat-to-power ratio respectively; GB device model: Where P g,GB (t) is the gas power input to GB during period t; η GB is the energy conversion efficiency of GB; is the upper limit of the power input to GB; Combined Heat and Power Plant Model: Where P g,CHP (t) is the natural gas power input to CHP during period t; η e,CHP , η h,CHP are the energy conversion efficiencies of CHP into electrical energy and thermal energy, respectively; is the upper limit of the power input to CHP; and They are the upper and lower limits of the thermal-to-electricity ratio of CHP, respectively; ER Equipment Model: Where P c,ER (t) is the cooling power output by ER at time t; η ER P is the conversion efficiency of the electric refrigerator; e,ER (t) is the electrical power input to ER at time t; is the upper limit of the electric power input to ER. AC Equipment Model: Where P c,AC (t) is the cooling power output by AC at time t; η AC P is the conversion efficiency of absorption refrigeration; h,AC (t) is the thermal power input to AC at time t; It is the upper limit of the thermal power of the input AC.

3. According to the method for planning a comprehensive energy system for a park based on two-stage collaboration of P2G according to claim 2, Features: The energy storage device model is: In the formula, i∈Ω,Ω={ES,HS,GS,H 2 S} is the collection of electricity storage, heat storage, gas storage and hydrogen storage; P i cha (t), P i dis (t) are the charging and discharging powers of the i-th energy storage device in time period t; and are the maximum power of a single charge and discharge of the i-th energy storage device; are the state parameters of charging and discharging of the i-th energy storage device in period t, which are binary variables; are the charging and discharging efficiencies of the energy storage device, respectively; and are respectively the upper limit and lower limit of the capacity of the i-th energy storage device.

4. According to claim 3, a method for planning a comprehensive energy system for a park based on two-stage collaboration of P2G, Features: The actual carbon emissions of the park's integrated energy system are as follows: AND PIES =And e,buy +E GB +E CHP (9) In the formula, E PIES 、E e,buy 、E GB 、E CHP are the actual carbon emissions of the park's integrated energy system, purchased electricity, gas boilers, and cogeneration units; P e,buy P is the power purchased by the park comprehensive energy system from the upper power grid during period t; h,GB (t) is the heating power of the gas boiler during period t; P h,CHP (t), P e,CHP (t) are the heating and power supply of the cogeneration equipment in period t; μ e and μ h are the carbon emission intensity per unit of electricity and per unit of heat respectively; It is the conversion coefficient of the electricity generated by the cogeneration equipment to the heat generated; the carbon trading cost is calculated on an annual basis, and T is 8760. The carbon quota calculation model of the park's comprehensive energy system is as follows: AND' PIES =And e ' ,buy +It's GB +It's CHP (13) Where, E' PIES 、E e ' ,buy , E' GB , E' CHP They are the carbon emission quotas for the park’s integrated energy system, purchased electricity, gas boilers, and cogeneration units; The trading carbon emissions of the park's comprehensive energy system after taking into account carbon quotas are: AND 0 =And PIES -AND' PIES (14) The cost of carbon trading is: In the formula, is the carbon trading cost; λ is the carbon benchmark price.

5. According to claim 4, a method for planning a comprehensive energy system for a park based on two-stage collaboration of P2G, Features: The objective function for optimizing the park integrated energy system model in step S4 is: In the formula, C represents the present value of the park's cost; C inv C is the construction investment cost; ope , C main are the operation and maintenance costs of the park’s integrated energy system, For carbon trading costs; The investment and construction cost of the park's comprehensive energy system is: C inv =∑ j∈φ f j e j W j (17) Among them, e j is the unit price of equipment j, RMB / kW; W j is the configuration capacity of device j, kW; φ is the equipment set including wind power, photovoltaic equipment, CHP, AC, ER, GB, EC, HFC, MR and various energy storage equipment; f j It is a Boolean variable, with a value of 1 or 0; The operating cost of the park's comprehensive energy system is: Among them, C buy (t) is the energy purchase cost of the park; P g,buy (t) is the natural gas purchase amount at time t, P e,buy (t) is the amount of electricity purchased at time t; a t 、b t Represent the electricity price and gas price at time t in year n respectively; C w,cut (t) is the wind curtailment cost of the park’s comprehensive energy system, P w,cut (t) is the wind volume abandoned at time t; c t is the penalty cost for unit wind curtailment; C ope The operating cost of the park's comprehensive energy system includes energy purchase costs and wind curtailment costs. The energy purchase costs include electricity purchase costs and gas purchase costs. Considering that the maintenance cost of the park's comprehensive energy system consists of the maintenance costs of wind power, photovoltaics, energy conversion, and various energy storage devices, which are determined by the actual output power of various devices during operation, the vector composed of the output power of various devices in the nth year and tth period is The maintenance cost of the park's integrated energy system is: in, is the maintenance cost vector per unit power of each type of equipment to be planned; is the output power of the j-type device in the nth year and the tth period; if the j-type device represents an energy storage device, It represents the sum of the charging and discharging power of the energy storage device.

6. According to claim 5, a method for planning a comprehensive energy system for a park based on two-stage collaboration of P2G, Features: The park integrated energy system model also includes the following constraints: Renewable energy output constraints: Where P w,t , P pv,t They represent the power output of wind power and photovoltaic power in period t respectively; Respectively represent the upper limits of wind power and photovoltaic output power, Indicates the upper limit of wind power and photovoltaic capacity; Electric power balance constraints: Where P e,load (t) represents the electric load power in period t, P w (t) represents the output power of wind power in period t, P pv (t) represents the photovoltaic output power during period t, P e,CHP (t) represents the output power of the cogeneration equipment during period t, P e,HFC (t) represents the output power of the HFC unit equipment during period t, P e,buy (t) represents the power purchased by the park integrated energy system from the upper power grid during period t, P c,ER (t) is the cooling power output by ER at time t, P e,EL (t) is the electric energy input to EL during period t; and They represent the discharge and charge power of the storage at time t respectively; Thermal power balance constraints: Where P h,load (t) represents the heat load power during period t, P h,CHP (t) represents the thermal power output of the cogeneration equipment during period t, P h,GB (t) represents the thermal power output of GB equipment during period t, P h,HFC (t) represents the thermal power output of the HFC unit during period t, P h,AC (t) is the thermal power input to AC at time t; and They represent the heat release and charging power of the heat storage at time t respectively; Gas power balance constraints: Where P g,load (t) represents the gas load power during period t, P g,buy (t) is the natural gas purchase amount in period t, P g,MR (t) is the natural gas power output by MR during period t, P g,GB (t) is the gas power input to GB during period t, P g,CHP (t) is the natural gas power input to the cogeneration equipment during period t; and They represent the deflation and inflation power of the gas storage at time t respectively; The cooling power balance constraint can be expressed as: P c,ER (t)+P c,AC (t)=P c,load (t) (21) Where P c,load (t) represents the cooling load power during period t, P c,ER (t) is the cooling power output by ER at time t, P c,AC (t) is the cooling power output by AC at time t; Hydrogen balance constraints: In the formula, represents the hydrogen energy output by the EL device during period t, Enter the hydrogen energy of MR for period t, It represents the hydrogen energy input into the HFC unit equipment during period t; and They represent the degassing and charging powers of the hydrogen storage at time t respectively.

7. According to claim 6, a method for planning a comprehensive energy system for a park based on two-stage collaboration of P2G, Features: Considering that the energy storage equipment needs to return to the initial state of the dispatch after running one dispatch cycle, the following constraint conditions are further established on the basis of the original constraints: S i (t 0 )=S i (t T ) (23) In the formula, S i (t) is the capacity of the i-th energy storage device in time period t; Carbon peak constraints: AND 0,x ≥E 0 (22) In the formula, x means that the carbon peak will be achieved in the xth year of the plan.

8. According to claim 7, a method for planning a comprehensive energy system for a park based on two-stage collaboration of P2G, Features: After carbon emissions reach their peak, in order to ensure that carbon emissions fall back in an orderly and steady manner, it is set that in each year after the carbon peak, the traded carbon emissions must decrease year by year at a fixed rate of v%: E 0,y+1 ≤(1-v%)·E 0,y ,y≥x (23) In the formula, y represents the year after the carbon peak.