Data monitoring system of power grid metering equipment based on Internet of Things technology
By using multi-mode communication switching algorithm, edge computing and cloud computing technologies in the data monitoring system of power grid metering equipment, the problems of wireless communication signal instability, equipment vulnerability and performance bottlenecks are solved, and data stability, security and Real-time monitoring improves the management and operation and maintenance efficiency of power grid metering equipment.
Patent Information
- Application Number
- CN202411136988.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Wireless communication signals are unstable in remote areas or underground environments, resulting in failure or delay in data transmission, IoT devices are vulnerable to network attacks, data leakage or tampering, and existing systems have serious performance bottlenecks when accessing large-scale devices and cannot be timely It reflects the operating status of the power grid, is difficult to maintain and manage, and it is difficult to achieve unified management of power grid metering equipment.
A data monitoring system for grid metering equipment based on Internet of Things technology is designed, including data acquisition module, communication module, data processing module, data storage module, security module and management and monitoring module, using multi-mode communication switching algorithm, edge computing and Cloud computing, distributed storage, end-to-end encryption technology and multi-layer identity authentication realize centralized management and automated operation and maintenance of data through a dedicated management network.
It improves the stability, security and real-time nature of data monitoring, ensures the reliability and security of data transmission, reduces delays, realizes unified management and automated operation and maintenance of power grid metering equipment, and improves the overall efficiency of the system.
Smart Images

Figure CN119030890A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of smart grid data processing, and in particular to a data monitoring system for grid metering equipment based on the Internet of Things technology. Background Art
[0002] Smart grid is to upgrade and transform the traditional power system by using advanced information and communication technologies, such as the Internet of Things, big data analysis, and cloud computing, so as to improve the efficiency, reliability, safety, and economy of the power system. This system can achieve precise management and operation optimization of the power grid through real-time monitoring, remote control, and data analysis, so as to better respond to the needs and challenges of energy management.
[0003] In the process of realizing the present invention, the inventors found that the prior art has the following defects: At present, in remote areas or underground environments, wireless communication signals may be unstable, resulting in data transmission failure or delay. In addition, IoT devices are vulnerable to network attacks during data transmission, which may lead to data leakage or tampering, and the existing system may encounter performance bottlenecks when facing large-scale device access, affecting the overall efficiency of the system. The system has delays in data collection and processing and cannot reflect the operation status of the power grid in a timely manner. Due to the wide variety of equipment and its wide distribution, the maintenance and management workload is large, and it is difficult to achieve unified management of power grid metering equipment. Summary of the invention
[0004] The present invention provides a data monitoring system for power grid metering equipment based on Internet of Things technology, so as to improve the stability, security and real-time performance of data monitoring.
[0005] According to one aspect of the present invention, a data monitoring system for power grid metering equipment based on Internet of Things technology is provided, wherein the data monitoring system for power grid metering equipment comprises: a power grid metering equipment data acquisition module, a communication module, a data processing module, a data storage module, a security module, and a management and monitoring module;
[0006] The power grid metering equipment data acquisition module is used to collect data from the power grid metering equipment, and to exchange data with the communication module through the multi-mode communication switching algorithm in the wireless communication technology.
[0007] The communication module is used to send the received power grid metering equipment data to the data processing module through wireless communication technology or wired network communication technology;
[0008] The data processing module is used to process the data of the power grid metering device through the pre-built edge computing node and cloud computing method to obtain the power grid metering device processing data, and transmit the power grid metering device processing data to the data storage module through the wired network communication technology;
[0009] The data storage module is used to store the received power grid metering equipment processing data through a pre-set distributed storage technology;
[0010] The security module is used to encrypt the acquired power grid metering equipment data or the power grid metering equipment processing data through a preset end-to-end encryption technology; the security module communicates with the power grid metering equipment data acquisition module, the communication module, the data processing module, the data storage module, and the management and monitoring module respectively;
[0011] The management and monitoring module is used to communicate with the data acquisition module, communication module, data processing module, data storage module and security module of the power grid metering equipment through a dedicated management network, so as to realize the centralized management and automated operation and maintenance of the data monitoring system data of the power grid metering equipment.
[0012] Furthermore, the collected power grid metering equipment data is interacted with the communication module through the multi-mode communication switching algorithm in the wireless communication technology, including: obtaining at least one wireless communication mode of the power grid metering equipment data acquisition module through the multi-mode communication switching algorithm in the wireless communication technology; obtaining the current signal strength and the preset signal strength threshold corresponding to each of the wireless communication modes; determining the target wireless communication mode through the preset wireless communication mode switching method according to each current signal strength and the signal strength threshold; and interacting the collected power grid metering equipment data with the communication module through the target wireless communication mode.
[0013] Furthermore, the target wireless communication mode is determined according to each current signal strength and the signal strength threshold through a preset wireless communication mode switching method, including: selecting a target current signal strength in each current signal strength in turn through the preset wireless communication mode switching method; judging whether the target current signal strength is greater than the signal strength threshold, if so, determining that the target current signal strength is the current over-threshold signal strength, and returning to execute the operation of selecting a target current signal strength in each current signal strength in turn until all current signal strengths are traversed; if not, discarding the target current signal strength; and determining the current over-threshold signal strength with the largest selected signal strength as the target wireless communication mode based on at least one current over-threshold signal strength obtained.
[0014] Furthermore, the received power grid metering device data is sent to the data processing module via wireless communication technology, including: the communication module is used to use the multi-mode communication switching algorithm in the wireless communication technology to obtain the signal strength and signal strength threshold corresponding to the target wireless communication mode, and to set the relay node through a preset relay node strength calculation method, so as to send the power grid metering device data to the data processing module.
[0015] Furthermore, the signal strength and signal strength threshold corresponding to the target wireless communication mode are obtained, and the relay node is set by a preset relay node strength calculation method, including: obtaining signal strength, signal strength threshold, path loss factor and relay node spacing; using the preset relay node strength calculation method, according to the formula To set up the relay node; where S0 represents the signal strength; T represents the signal strength threshold; n represents the path loss factor; d i represents the distance between relay nodes, one node corresponds to one relay node distance; S(d i ) represents the signal attenuation strength after the signal strength is attenuated by the relay node spacing.
[0016] Furthermore, according to the formula To set the relay node, including: if the signal attenuation strength of the current node is less than the signal strength threshold, then set the relay node at the current node; if the signal attenuation strength of the current node is greater than or equal to the signal strength threshold, then obtain the next node corresponding to the current node, and return to execute the preset relay node strength calculation method, according to the formula To perform relay node settings.
[0017] Furthermore, the data of the power grid metering equipment is processed by the pre-constructed edge computing node and cloud computing method to obtain the power grid metering equipment processing data, including: through the edge computing and cloud computing method, the data processing module identifies the data type of the power grid metering equipment data to obtain the data type identification result; wherein the data type identification result includes real-time data and non-real-time data; if the power grid metering equipment data is real-time data, the data anomaly detection processing is performed on the power grid metering equipment data by the edge computing node method to obtain the power grid metering equipment anomaly detection processing data; if the power grid metering equipment data is non-real-time data, the data in-depth analysis processing is performed on the power grid metering equipment data by the cloud computing method to obtain the power grid metering equipment in-depth analysis processing data; the power grid metering equipment processing data is determined according to the power grid metering equipment anomaly detection processing data or the power grid metering equipment in-depth analysis processing data.
[0018] Furthermore, the received power grid metering device processed data is stored in a data storage module by using a pre-set distributed storage technology, including: obtaining the number of storage nodes corresponding to the data storage module; the data storage module performs data block processing on the received power grid metering device processed data by using a pre-set distributed storage technology to obtain a plurality of power grid metering device processed block data; and each of the power grid metering device processed block data is stored in different storage nodes respectively; wherein, for each power grid metering device processed block data, a plurality of block data copies are stored in different storage nodes respectively.
[0019] Furthermore, it also includes: the security module is used to verify the data obtained from each module through a preset multi-layer identity authentication mechanism method.
[0020] Furthermore, the management and monitoring module includes a centralized management unit and an automated operation and maintenance unit; wherein the centralized management unit is used to obtain the power grid metering equipment status data corresponding to the power grid metering equipment data acquisition module, and perform status analysis on the power grid metering equipment status data, and update the power grid metering equipment status according to the status analysis results; the automated operation and maintenance unit is used to perform status monitoring of the power grid metering equipment through a preset automated operation and maintenance monitoring tool, and perform automated operation and maintenance or continue monitoring and processing of the power grid metering equipment according to the status monitoring results.
[0021] The technical solution of the embodiment of the present invention is that the data monitoring system of the power grid metering equipment includes a power grid metering equipment data acquisition module, a communication module, a data processing module, a data storage module, a security module, and a management and monitoring module; wherein the power grid metering equipment data acquisition module is used to collect data from the power grid metering equipment, and the collected power grid metering equipment data is exchanged with the communication module through the multi-mode communication switching algorithm in the wireless communication technology; the communication module is used to send the received power grid metering equipment data to the data processing module through the wireless communication technology or the wired network communication technology; the data processing module is used to process the power grid metering equipment data through the pre-built edge computing node and cloud computing method, obtain the power grid metering equipment processing data, and the power grid metering equipment processing data The data is transmitted to the data storage module through wired network communication technology; the data storage module is used to store the received power grid metering equipment processing data through pre-set distributed storage technology; the security module is used to encrypt the acquired power grid metering equipment data or power grid metering equipment processing data through pre-set end-to-end encryption technology; the security module communicates with the power grid metering equipment data acquisition module, communication module, data processing module, data storage module and management and monitoring module respectively; the management and monitoring module is used to communicate with the power grid metering equipment data acquisition module, communication module, data processing module, data storage module and security module respectively through a dedicated management network to realize the centralized management and automated operation and maintenance of the data monitoring system data of the power grid metering equipment. The problems of instability, insecurity and poor real-time performance of power grid data are solved, and the stability, security and real-time performance of data monitoring are improved.
[0022] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0024] Figure 1 It is a structural schematic diagram of a data monitoring system for power grid metering equipment based on Internet of Things technology provided according to Embodiment 1 of the present invention. DETAILED DESCRIPTION
[0025] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0026] It should be noted that the terms "target", "current", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0027] Embodiment 1
[0028] Figure 1 A structural schematic diagram of a data monitoring system for a power grid metering device based on the Internet of Things technology is provided in Example 1 of the present invention. The data monitoring system 100 for the power grid metering device includes: a power grid metering device data acquisition module 110, a communication module 120, a data processing module 130, a data storage module 140, a security module 150 and a management and monitoring module 160.
[0029] The power grid metering equipment data acquisition module 110 is used to collect data from the power grid metering equipment, and to exchange data with the communication module through the multi-mode communication switching algorithm in the wireless communication technology.
[0030] The communication module 120 is used to send the received power grid metering equipment data to the data processing module through wireless communication technology or wired network communication technology;
[0031] The data processing module 130 is used to process the data of the power grid metering device through the pre-built edge computing node and cloud computing method to obtain the power grid metering device processing data, and transmit the power grid metering device processing data to the data storage module through the wired network communication technology;
[0032] The data storage module 140 is used to store the received power grid metering device processed data through a pre-set distributed storage technology;
[0033] The security module 150 is used to encrypt the acquired power grid metering device data or the power grid metering device processing data through a preset end-to-end encryption technology; the security module communicates with the power grid metering device data acquisition module, the communication module, the data processing module, the data storage module, and the management and monitoring module respectively;
[0034] The management and monitoring module 160 is used to communicate with the data acquisition module, communication module, data processing module, data storage module and security module of the power grid metering equipment through a dedicated management network to achieve centralized management and automated operation and maintenance of the data monitoring system data of the power grid metering equipment.
[0035] In this embodiment, for the power grid metering device data acquisition module 110, it is necessary to collect and interactively process the power grid metering device data through a multi-mode communication switching algorithm in wireless communication technology.
[0036] Among them, the power grid metering equipment may include metering equipment such as electric meters and sensors. Specifically, the electric meters can be used to measure power parameters such as current, voltage and power; the sensors can be used to detect environmental factors such as temperature and humidity to assist in determining the operating status of power equipment.
[0037] In addition, the data acquisition module of the power grid metering equipment transmits data to the data processing module through the acquisition interface. In order to ensure the stability and reliability of data transmission, a multi-mode communication switching algorithm can be used, and the signal coverage can be enhanced through relay nodes in remote or weak signal areas. Among them, the multi-mode communication switching algorithm switches the communication mode in real time according to the signal strength and data transmission quality to ensure stable data transmission.
[0038] Optionally, the collected power grid metering device data is interacted with the communication module through a multi-mode communication switching algorithm in wireless communication technology, including: obtaining at least one wireless communication mode of the power grid metering device data acquisition module through a multi-mode communication switching algorithm in wireless communication technology; obtaining the current signal strength and a preset signal strength threshold corresponding to each of the wireless communication modes; determining the target wireless communication mode through a preset wireless communication mode switching method according to each current signal strength and signal strength threshold; and interacting the collected power grid metering device data with the communication module through the target wireless communication mode.
[0039] Specifically, the target wireless communication mode is determined according to each current signal strength and the signal strength threshold through a preset wireless communication mode switching method, including: selecting a target current signal strength in each current signal strength in turn through the preset wireless communication mode switching method; judging whether the target current signal strength is greater than the signal strength threshold, if so, determining that the target current signal strength is the current over-threshold signal strength, and returning to execute the operation of selecting a target current signal strength in each current signal strength in turn until all current signal strengths are traversed; if not, discarding the target current signal strength; and determining the current over-threshold signal strength with the largest selected signal strength as the target wireless communication mode based on at least one currently over-threshold signal strength obtained.
[0040] For example, it is assumed that the data acquisition module of the power grid metering equipment includes three wireless communication modes, namely NB-IoT, LoRa and Zigbee. NB-IoT To indicate the current signal strength of NB-IoT; S LoRa To indicate the current signal strength of LoRa; S Zigbee To indicate the current signal strength of Zigbee; T to indicate the signal strength threshold.
[0041] Furthermore, it is necessary to traverse NB-IoT, LoRa and Zigbee in turn. Assume that the current signal strength S corresponding to NB-IoT is selected first. NB-IoT , taking it as the current signal strength of the target, and judging S NB-IoT Is it greater than the signal strength threshold T? If so, then determine S LoRa and S Zigbee The relationship between the signal strength threshold T and the signal strength threshold T is as follows: NB-IoT and S LoRa Greater than the signal strength threshold.
[0042] Accordingly, we need to judge S NB-IoT and S LoRa The size relationship between them, assuming that S NB-IoT >S LoRa , it can be determined that the target wireless communication mode is NB-IoT.
[0043] A specific example is that in a power monitoring project in a remote mountain area, the signal strength fluctuates greatly due to terrain reasons. Through the multi-mode communication switching algorithm, the system can automatically select the optimal communication mode when the signal strength is weak to ensure the continuity and reliability of data transmission. For example, in the initial state, the system uses NB-IoT for data transmission by default. When the signal strength drops below the signal strength threshold due to terrain reasons, the LoRa signal strength exceeds the signal strength threshold, and the system automatically switches to LoRa for data transmission. When the NB-IoT signal strength recovers and exceeds the signal strength threshold, and the NB-IoT signal strength is greater than the LoRa signal strength, the system switches back to NB-IoT to ensure the optimal performance of data transmission. In this way, the multi-mode communication switching algorithm effectively solves the problem of data transmission in remote or weak signal areas, and ensures the reliable operation of the remote monitoring system of power grid metering equipment.
[0044] The communication module can also communicate through a multi-mode communication switching algorithm, and can also include setting multiple relay nodes to enhance signal coverage. The multi-mode communication switching algorithm of the communication module is the same as the principle of the power grid metering equipment data acquisition module, and will not be repeated here.
[0045] Optionally, the received power grid metering device data is sent to the data processing module via wireless communication technology, including: the communication module is used to use the multi-mode communication switching algorithm in the wireless communication technology to obtain the signal strength and signal strength threshold corresponding to the target wireless communication mode, and to set the relay node through a preset relay node strength calculation method, so as to send the power grid metering device data to the data processing module.
[0046] In this embodiment, relay nodes are deployed in areas with weak signals to enhance signal coverage and ensure continuity and reliability of data transmission.
[0047] Specifically, the signal strength and signal strength threshold corresponding to the target wireless communication mode are obtained, and the relay node is set by a preset relay node strength calculation method, including: obtaining signal strength, signal strength threshold, path loss factor and relay node spacing; using the preset relay node strength calculation method, according to the formula To set up the relay node; where S0 represents the signal strength; T represents the signal strength threshold; n represents the path loss factor; d i represents the distance between relay nodes, one node corresponds to one relay node distance; S(d i ) represents the signal attenuation strength after the signal strength is attenuated by the relay node spacing.
[0048] In detail, according to the formula To set the relay node, including: if the signal attenuation strength of the current node is less than the signal strength threshold, then set the relay node at the current node; if the signal attenuation strength of the current node is greater than or equal to the signal strength threshold, then obtain the next node corresponding to the current node, and return to execute the preset relay node strength calculation method, according to the formula To perform relay node settings.
[0049] In this embodiment, it is first necessary to calculate the signal attenuation strength of the signal corresponding to the current node after the signal strength is attenuated by the relay node distance through the signal strength, path loss factor and relay node distance, and then compare the size relationship between the signal attenuation strength and the signal strength threshold.
[0050] Specifically, if it is less than the signal strength threshold, it means that a relay node needs to be set up at the current node. Otherwise, the signal strength of the current node meets the signal strength threshold requirement, and there is no need to set up a relay node. Just obtain the next node corresponding to the current node and then make the above judgment.
[0051] As a specific example, in a power monitoring project in a mountainous area, signal transmission is obstructed due to complex terrain. The relay node strength calculation method can be used to deploy relay nodes in areas with weak signals. The system can effectively enhance signal coverage and ensure stable data transmission.
[0052] Optionally, the data of the power grid metering equipment is processed by a pre-built edge computing node and cloud computing method to obtain the power grid metering equipment processed data, including: through the edge computing and cloud computing methods, the data processing module identifies the data type of the power grid metering equipment data to obtain the data type identification result; wherein the data type identification result includes real-time data and non-real-time data; if the power grid metering equipment data is real-time data, the power grid metering equipment data is processed by an edge computing node method to obtain power grid metering equipment anomaly detection processing data; if the power grid metering equipment data is non-real-time data, the power grid metering equipment data is deeply analyzed and processed by a cloud computing method to obtain power grid metering equipment deeply analyzed and processed data; the power grid metering equipment processed data is determined according to the power grid metering equipment anomaly detection processing data or the power grid metering equipment deep analysis processing data.
[0053] In this embodiment, for the data processing module, edge computing nodes and cloud computing methods are used. The edge computing node method is used to perform real-time data processing, reduce data transmission delays, and improve the response speed of the system. The edge computing node method is responsible for preliminary data analysis and anomaly detection, and the cloud computing method performs complex deep data analysis and processing. Specifically, the edge computing node method can analyze and detect anomalies of real-time data; for non-real-time data, cloud computing methods are required to perform deep data analysis and processing.
[0054] Specifically, we first need to identify the data type of the power grid metering equipment data, and then we can get the specific data type of the power grid metering equipment data. Assuming that the power grid metering equipment data is real-time data, the edge computing node method can be used to analyze and detect anomalies in real-time data; otherwise, the cloud computing method can be used to perform in-depth data analysis and processing.
[0055] Specifically, for edge computing node methods that can analyze and detect anomalies in real-time data, the edge computing node method can set a real-time data analysis function and perform anomaly detection through the Z-Score algorithm. To judge the data anomaly, X is the current data value, μ is the data mean, and σ is the data standard deviation. If |Z|>3, the data is considered to be an outlier.
[0056] As a specific example, in a power monitoring project, the system uses edge computing node methods to perform real-time data processing and anomaly detection, and can use the Z-Score algorithm to identify abnormal values of current, voltage and other parameters, improving the system's response speed and accuracy. Furthermore, if abnormal fluctuations in current values are detected through data collection, the edge computing node method can be used to detect the anomaly in real time and immediately issue an alarm.
[0057] Correspondingly, non-real-time data needs to be forwarded to the cloud computing center. Through cloud computing methods, convolutional neural network models can be used for in-depth analysis and prediction, providing long-term trend analysis and decision support for the operation status of the power grid. Through edge computing and cloud computing methods, the processing efficiency and decision-making ability of the system can be effectively improved, ensuring the reliable operation of the data monitoring system of the power grid metering equipment.
[0058] Optionally, the received power grid metering device processed data is stored in a data storage module by using a pre-set distributed storage technology, including: obtaining the number of storage nodes corresponding to the data storage module; the data storage module performs data block processing on the received power grid metering device processed data by using a pre-set distributed storage technology to obtain multiple power grid metering device processed block data; and each of the power grid metering device processed block data is stored on different storage nodes respectively; wherein, for each power grid metering device processed block data, multiple copies of the block data are stored on different storage nodes respectively.
[0059] For the data storage module, the distributed storage technology is specifically to use Hadoop or other distributed storage systems to store massive data. Hadoop distributed file system is a distributed storage system with high reliability, high fault tolerance and high throughput, suitable for storing and processing large-scale data. Hadoop distributed file system stores data in blocks on multiple nodes, and each data block has copies on multiple nodes to ensure high availability and reliability of data. Hadoop distributed file system also supports dynamic redistribution and rebalancing of data blocks to cope with dynamic changes in nodes and load balancing.
[0060] In a specific example, the data storage module can process the received power grid metering device processing data in blocks through the distributed storage technology, assuming that 10 power grid metering device processing block data are obtained. Furthermore, the 10 power grid metering device processing block data can be stored in different storage nodes respectively, and each power grid metering device processing block data will store at least one copy in different nodes to ensure data availability.
[0061] The data storage module also includes the function of efficient data access. This function uses indexing and caching technology to achieve fast data access. For indexing, it is necessary to establish the relationship between different keys and the data block offsets corresponding to each key. For caching, it is necessary to save the relationship between keys and values to form key-value pairs to achieve efficient data access.
[0062] During data access, the system first needs to check whether the target data exists in the cache. If it does, the data is read directly from the cache. If it does not exist, the data block is located according to the index and read from the storage node. In order to improve access efficiency, the system will also dynamically adjust the cache content and save frequently accessed data in the cache. In this way, the system can achieve fast data access and meet the needs of large-scale data processing.
[0063] As a specific example, in a power monitoring project, the data storage module splits the current, voltage and power data collected every hour into several data blocks, and stores these data blocks on multiple nodes. Each data block can be set to have 3 copies. The system also uses indexing and caching technology to accelerate data access. Assuming that the system needs to query the current data of a certain period of time, it first checks whether the data exists in the cache. If it exists, it is read directly from the cache. If not, the data block is located according to the index, the data is read from the storage node and loaded into the cache.
[0064] Optionally, it also includes: the security module is used to verify the data obtained from each module through a preset multi-layer identity authentication mechanism method.
[0065] In this embodiment, the security module integrates a firewall and an intrusion detection system to ensure the overall security of the system.
[0066] For end-to-end encryption technology, encryption is performed during the data transmission process to ensure data security. The basic process of data encryption is as follows: Assuming that there is a public key (which can be represented by public_key) for encryption, the following variables are defined: D represents the data to be encrypted, and E represents the encrypted data. The encryption formula E=encrypt(D, public_key) can be used for end-to-end encryption processing, and the encryption algorithm can use an end-to-end encryption algorithm. For example, when sensitive data such as current and voltage are collected, the system first uses the public key to encrypt the data and then transmits it to the remote server; the receiver uses the private key to decrypt the data, thereby ensuring the confidentiality and integrity of the data during transmission.
[0067] For the security module, it also includes identity authentication. The system uses multi-factor authentication combined with digital certificates for user authentication. For example, when a user logs in to the system, he first enters his username and password for preliminary authentication. After the authentication is passed, the user needs to perform a secondary authentication based on the generated dynamic verification code. Finally, the system verifies the digital certificate of the user's device to ensure the legitimacy and security of the device. In this way, the multi-layer identity authentication mechanism effectively protects the system from unauthorized access and ensures the overall security of the data monitoring system of the power grid metering equipment.
[0068] Optionally, the management and monitoring module includes a centralized management unit and an automated operation and maintenance unit; wherein the centralized management unit is used to obtain the power grid metering equipment status data corresponding to the power grid metering equipment data acquisition module, and perform status analysis on the power grid metering equipment status data, and update the power grid metering equipment status according to the status analysis results; the automated operation and maintenance unit is used to perform status monitoring of the power grid metering equipment through a preset automated operation and maintenance monitoring tool, and perform automated operation and maintenance or continue monitoring and processing of the power grid metering equipment according to the status monitoring results.
[0069] In this embodiment, the centralized management unit is specifically a web-based management platform developed to achieve remote monitoring and management of the device. The functions of the centralized management unit may include real-time monitoring of device status, historical data recording, fault alarm, and remote control.
[0070] Furthermore, the automated operation and maintenance unit monitors the status of the power grid metering equipment through the automated operation and maintenance monitoring tool. If the status monitoring result is a fault state, the power grid metering equipment is automatically operated and maintained, that is, diagnosis and repair can be performed. If the status monitoring result is a normal state, the power grid metering equipment continues to be monitored.
[0071] As a specific example, in a power monitoring project, the system monitors the status of power grid equipment in real time through a centralized management platform. Assume that a certain device fails, and the system finds that the device status is faulty through real-time data monitoring. At this time, the automated operation and maintenance unit calls the diagnosis function to diagnose the fault, uses the decision tree model to analyze the device status data, and determines the type of fault. Then, the automated operation and maintenance unit calls the repair function to perform automated repair operations, such as restarting the device or replacing the faulty component. After the repair is completed, the device status returns to normal, and the system continues to monitor.
[0072] The technical solution of the embodiment of the present invention is that the data monitoring system of the power grid metering equipment includes a power grid metering equipment data acquisition module, a communication module, a data processing module, a data storage module, a security module, and a management and monitoring module; wherein the power grid metering equipment data acquisition module is used to collect data from the power grid metering equipment, and the collected power grid metering equipment data is exchanged with the communication module through the multi-mode communication switching algorithm in the wireless communication technology; the communication module is used to send the received power grid metering equipment data to the data processing module through the wireless communication technology or the wired network communication technology; the data processing module is used to process the power grid metering equipment data through the pre-built edge computing node and cloud computing method, obtain the power grid metering equipment processing data, and the power grid metering equipment processing data The data is transmitted to the data storage module through wired network communication technology; the data storage module is used to store the received power grid metering equipment processing data through pre-set distributed storage technology; the security module is used to encrypt the acquired power grid metering equipment data or power grid metering equipment processing data through pre-set end-to-end encryption technology; the security module communicates with the power grid metering equipment data acquisition module, communication module, data processing module, data storage module and management and monitoring module respectively; the management and monitoring module is used to communicate with the power grid metering equipment data acquisition module, communication module, data processing module, data storage module and security module respectively through a dedicated management network to realize the centralized management and automated operation and maintenance of the data monitoring system data of the power grid metering equipment. The problems of instability, insecurity and poor real-time performance of power grid data are solved, and the stability, security and real-time performance of data monitoring are improved.
[0073] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A data monitoring system for power grid metering equipment based on Internet of Things technology, characterized in that: The data monitoring system of the power grid metering equipment comprises: a power grid metering equipment data acquisition module, a communication module, a data processing module, a data storage module, a security module, and a management and monitoring module; The power grid metering equipment data acquisition module is used to collect data from the power grid metering equipment, and to exchange data with the communication module through the multi-mode communication switching algorithm in the wireless communication technology. The communication module is used to send the received power grid metering equipment data to the data processing module through wireless communication technology or wired network communication technology; The data processing module is used to process the data of the power grid metering device through the pre-built edge computing node and cloud computing method to obtain the power grid metering device processing data, and transmit the power grid metering device processing data to the data storage module through the wired network communication technology; The data storage module is used to store the received power grid metering equipment processing data through a pre-set distributed storage technology; The security module is used to encrypt the acquired power grid metering equipment data or the power grid metering equipment processing data through a preset end-to-end encryption technology; the security module communicates with the power grid metering equipment data acquisition module, the communication module, the data processing module, the data storage module, and the management and monitoring module respectively; The management and monitoring module is used to communicate with the data acquisition module, communication module, data processing module, data storage module and security module of the power grid metering equipment through a dedicated management network, so as to realize the centralized management and automated operation and maintenance of the data monitoring system data of the power grid metering equipment.
2. The system according to claim 1, characterized in that The collected power grid metering equipment data is interacted with the communication module through a multi-mode communication switching algorithm in wireless communication technology, including: Acquire at least one wireless communication mode of the data acquisition module of the power grid metering device through a multi-mode communication switching algorithm in wireless communication technology; Obtaining the current signal strength and the preset signal strength threshold corresponding to each of the wireless communication modes; Determine the target wireless communication mode by a preset wireless communication mode switching method according to each current signal strength and the signal strength threshold respectively; The collected data of the power grid metering equipment is exchanged with the communication module through the target wireless communication mode.
3. The system according to claim 2, characterized in that The method of determining the target wireless communication mode according to each current signal strength and the signal strength threshold by a preset wireless communication mode switching method includes: By using a preset wireless communication mode switching method, a target current signal strength is selected in turn from each current signal strength; Determine whether the target current signal strength is greater than the signal strength threshold, if so, determine that the target current signal strength is the current signal strength exceeding the threshold, and return to execute the operation of selecting one target current signal strength in turn from each current signal strength until all current signal strengths are traversed; If it is not greater than, the current signal strength of the target is discarded; According to the obtained at least one signal strength currently exceeding the threshold, the selected signal strength currently exceeding the threshold with the largest signal strength is determined as the target wireless communication mode.
4. The system according to claim 3, characterized in that The step of sending the received power grid metering device data to the data processing module via wireless communication technology comprises: The communication module is used to use the multi-mode communication switching algorithm in the wireless communication technology to obtain the signal strength and signal strength threshold corresponding to the target wireless communication mode, and to set the relay node through a preset relay node strength calculation method, so as to send the power grid metering equipment data to the data processing module.
5. The system according to claim 4, characterized in that The method of setting the relay node by using the signal strength and signal strength threshold corresponding to the acquired target wireless communication mode through a preset relay node strength calculation method includes: Obtain signal strength, signal strength threshold, path loss factor, and relay node spacing; Through the preset relay node strength calculation method, according to the formula To set up the relay node; Where S0 represents the signal strength; T represents the signal strength threshold; n represents the path loss factor; d i represents the distance between relay nodes, one node corresponds to one relay node distance; S(d i ) represents the signal attenuation strength after the signal strength is attenuated by the relay node spacing.
6. The system according to claim 5, characterized in that According to the formula To set up the relay node, including: If the signal attenuation strength of the current node is less than the signal strength threshold, a relay node is set at the current node; If the signal attenuation strength of the current node is greater than or equal to the signal strength threshold, the next node corresponding to the current node is obtained, and the preset relay node strength calculation method is returned to execute, according to the formula To perform relay node settings.
7. The system according to claim 6, characterized in that The method of processing the power grid metering device data by using the pre-built edge computing node and cloud computing method to obtain the power grid metering device processed data includes: Through the edge computing and cloud computing methods, the data processing module identifies the data type of the power grid metering equipment data and obtains the data type identification result; Wherein, the data type identification result includes real-time data and non-real-time data; If the power grid metering device data is real-time data, data anomaly detection processing is performed on the power grid metering device data through an edge computing node method to obtain power grid metering device anomaly detection processing data; If the power grid metering device data is non-real-time data, the power grid metering device data is subjected to in-depth data analysis and processing by a cloud computing method to obtain in-depth analysis and processing data of the power grid metering device; The power grid metering equipment processing data is determined based on the power grid metering equipment abnormality detection processing data or the power grid metering equipment in-depth analysis processing data.
8. The system according to claim 7, characterized in that The method of storing the received power grid metering device processed data by using the pre-set distributed storage technology includes: Obtain the number of storage nodes corresponding to the data storage module; Through the pre-set distributed storage technology, the data storage module performs data block processing on the received power grid metering device processing data to obtain multiple power grid metering device processing block data; The block data processed by each of the power grid metering devices are stored in different storage nodes respectively; Wherein, each power grid metering device processes block data and stores multiple copies of the block data on different storage nodes.
9. The system according to claim 8, characterized in that Also includes: The security module is used to verify the data obtained from each module through a preset multi-layer identity authentication mechanism method.
10. The system according to claim 9, characterized in that The management and monitoring module includes a centralized management unit and an automated operation and maintenance unit; The centralized management unit is used to obtain the power grid metering device status data corresponding to the power grid metering device data acquisition module, and perform status analysis on the power grid metering device status data, and update the power grid metering device status according to the status analysis result; The automated operation and maintenance unit is used to perform status monitoring on the power grid metering equipment through a preset automated operation and maintenance monitoring tool, and to perform automated operation and maintenance or continue monitoring and processing on the power grid metering equipment according to the status monitoring result.
Citation Information
Patent Citations
Power distribution equipment monitoring system based on Internet of Things technology
CN112815990A
Internet of vehicles switching decision algorithm based on hidden Markov
CN113950113A
Safety monitoring method for online operation state of electricity utilization information acquisition terminal
CN117833464A
Machine tool equipment data edge computing system
CN118051023A
Cited By
Radioactive source dynamic monitoring method and system, electronic equipment and storage medium
CN120217221A
Methods, systems, electronic devices and storage media for dynamic monitoring of radioactive sources
CN120217221B
