Novel coal gangue treatment process
By setting up barrier and hedging mechanisms in the desulfurization tower, extending the flue gas flow path and performing multiple spraying treatments, the problem of incomplete removal of flue gas pollutants in the prior art is solved, and a more efficient desulfurization and denitrification effect is achieved.
Patent Information
- Application Number
- CN202411173310.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-29
AI Technical Summary
The existing straight-through desulfurization and denitrification treatment devices are difficult to fully remove pollutants in the flue gas, and the nozzle installation method causes insufficient contact between the flue gas and the atomized liquid, which cannot meet the increasingly strict environmental protection emission standards.
A new coal gangue treatment process was designed. By setting up a barrier mechanism and hedging mechanism in the desulfurization tower, the flow path of flue gas is extended, and multiple spraying treatments are carried out through multiple groups of atomization spray heads to increase flue gas and spray liquid. contact opportunities and time form cross flow to improve removal efficiency.
It significantly improves the desulfurization and denitrification effect of flue gas, increases the contact area and number of times between flue gas and atomized liquid, achieves more thorough pollutant removal, and meets strict environmental protection emission standards.
Smart Images

Figure CN119034458A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal gangue processing, in particular to a novel coal gangue processing process. Background Art
[0002] Gangue is a solid waste discharged during the coal mining and coal washing process. It is a black-gray rock with a low carbon content and harder than coal that accompanies the coal seam during the coal formation process. With the progress of coal mining activities, the accumulation of gangue has increased significantly and has become one of the largest industrial residues. The accumulation of a large amount of gangue not only occupies land resources, but also causes environmental problems such as soil pollution, soil degradation, geological disasters and air pollution, threatening the surrounding ecological environment and people's lives and property safety. After the gangue is burned, the flue gas needs to be desulfurized and denitrified before being discharged into the atmosphere.
[0003] Most of the existing desulfurization and denitrification treatment devices are straight-through type, that is, there is only a single treatment area, which results in relatively short contact time and frequency between the flue gas and the spray liquid, making it difficult to fully remove pollutants in the gas, and the treatment effect may not reach an ideal state. Moreover, the straight-through desulfurization and denitrification treatment device can only perform a single desulfurization, and cannot achieve multiple cycles of desulfurization treatment of the flue gas, making it difficult to completely remove harmful substances in the flue gas, resulting in an unsatisfactory final desulfurization effect, which may not meet the increasingly stringent environmental emission standards;
[0004] Furthermore, the nozzles of most desulfurization and denitrification treatment devices are usually installed on a surface perpendicular to the flue gas for spraying treatment of the flue gas. This installation method can only spray the flue gas in a single direction, resulting in insufficient contact between the flue gas and the atomized droplets, thus affecting the removal effect of pollutants in the flue gas. In view of this, we propose a new coal gangue treatment process. Summary of the invention
[0005] The purpose of the present invention is to provide a novel coal gangue processing process to solve the problems raised in the above background technology.
[0006] To achieve the above object, the present invention provides a novel coal gangue treatment process, comprising the following steps:
[0007] S1: The gangue discharged from the coal preparation plant is crushed and then enters the self-stabilizing combustion boiler through a belt conveyor and a screw conveyor. The self-stabilizing combustion boiler is preheated in the outer furnace and stabilized in the inner furnace. The high-temperature flue gas from the combustion is first preheated in the outer furnace to preheat the gangue at a preheating temperature of 800-900℃.
[0008] S2: The high-temperature flue gas passes through the heat exchanger to generate steam, which is then passed through the air preheater for heat exchange;
[0009] S3: The flue gas after heat exchange is introduced into the desulfurization and denitrification treatment device through the dust collector and induced draft fan equipment to treat the flue dust, and finally discharged to the atmosphere;
[0010] S4: The ash produced by the self-stabilizing combustion boiler is conveyed to the crusher via a belt for crushing, and then conveyed to the fermentation storage bin via a belt conveyor for fermentation. A bacterial agent spraying device is provided at the top of the belt conveyor to assist the fermentation of the ash;
[0011] S5: After fermentation, the prepared soil is sealed in bags and sold for use in saline-alkali land improvement, desertification control, mining area ecological restoration, and landscaping;
[0012] The desulfurization and denitrification treatment device includes a base, a desulfurization tower is fixedly installed on the base, a barrier mechanism is rotatably provided inside the desulfurization tower, the barrier mechanism divides the internal space of the desulfurization tower, and a hedging mechanism is provided on the barrier mechanism, and the hedging mechanism is used to spray the gas in different directions to disperse the gas.
[0013] As a further improvement of the present technical solution, the barrier mechanism includes a rotating rod rotatably connected to the bottom of the desulfurization tower, a driving motor is fixedly installed inside the base, and the output end of the driving motor passes through the bottom of the desulfurization tower and is fixedly connected to the bottom of the rotating rod, two partitions are fixedly connected to the outer wall of the rotating rod, and one side of the partition is in contact with the inner wall of the desulfurization tower, a fixed plate is fixedly connected to the inner wall of the desulfurization tower, and the bottom of the fixed plate is rotatably connected to the top of the rotating rod, a ventilation groove is opened inside the rotating rod, and the ventilation groove is arranged through the top of the fixed plate.
[0014] As a further improvement of the technical solution, a plurality of atomizing nozzles are fixedly mounted on both sides of the two partitions, and a through hole is opened above the partition.
[0015] As a further improvement of the present technical solution, the hedging mechanism includes at least an arc-shaped plate fixedly connected to the two partitions on one side close to the inner wall of the desulfurization tower, the arc-shaped plate fits the inner wall of the desulfurization tower, and a plurality of atomizing nozzles are arrayed on one side of the two arc-shaped plates close to the rotating rod.
[0016] As a further improvement of the present technical solution, a connecting groove is provided inside the rotating rod, and the connecting groove is located outside the ventilation groove provided inside the rotating rod, the connecting groove is connected to two partitions and two arc plates, and a plurality of atomizing nozzles are fixedly installed in the ventilation groove of the rotating rod, one side of the atomizing nozzle is connected to the connecting groove, and an air inlet is provided on one side of the rotating rod.
[0017] As a further improvement of the technical solution, the two partitions are fixedly mounted with a plurality of baffles on both sides, a plurality of circular holes are arrayed on the baffles, and a plurality of protrusions are fixedly connected to the baffles.
[0018] As a further improvement of the technical solution, an arch plate is fixedly connected to the outer wall of the rotating rod, and a side of the arch plate away from the rotating rod is in contact with the inner wall of the desulfurization tower.
[0019] As a further improvement of the present technical solution, a liquid storage tank is fixedly installed on one side of the desulfurization tower, a water pump is fixedly installed on one side of the liquid storage tank, a connecting pipe is connected to one side of the water pump, and the connecting pipe passes through the desulfurization tower, the fixed plate and the rotating rod in sequence to be slidably connected to the connecting groove.
[0020] As a further improvement of the technical solution, a separation plate is fixedly connected to the inner wall of the desulfurization tower, and the separation plate is located above the fixed plate, and an exhaust fan is fixedly installed on the top of the desulfurization tower.
[0021] Compared with the prior art, the present invention has the following beneficial effects:
[0022] 1. In this new coal gangue treatment process, the interior of the desulfurization tower is divided by setting partitions and arc plates, so that the flue gas needs to flow through multiple areas, increasing its flow path in the desulfurization tower, thereby extending its residence time, giving the flue gas and the spray liquid more opportunities to react, and improving the desulfurization and denitrification effects.
[0023] 2. In the new coal gangue treatment process, the spray liquid is sprayed from multiple groups of atomizing nozzles to spray the flue gas. When the atomizing nozzles installed on the arc plate and the partition spray at the same time, the sprayed mist liquid impacts each other to form a cross force, which produces an impact and shearing effect on the flue gas in the middle, thereby changing the flow pattern and direction of the flue gas, and then breaking up the flue gas. The dispersed flue gas is more dispersed, which increases the contact area with the atomized liquid droplets and helps to remove harmful substances in the flue gas.
[0024] 3. In the new coal gangue treatment process, while prolonging the time that the flue gas stays inside the desulfurization tower, the flue gas is also subjected to a secondary spray treatment. The flue gas after the secondary spray treatment flows into the rotating rod through the air inlet, and the atomizing nozzle installed inside the rotating rod sprays the flue gas for the third time, realizing multiple spray treatments on the flue gas, improving the degree of flue gas purification, and making the emitted gas cleaner and more environmentally friendly. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure assembly of the present invention;
[0026] Figure 2 It is the overall half-section structure diagram of the present invention;
[0027] Figure 3 It is the overall cross-sectional structure diagram of the present invention;
[0028] Figure 4It is a cross-sectional structural diagram of the barrier mechanism of the present invention;
[0029] Figure 5 It is a structural diagram of the blocking mechanism and the hedging mechanism of the present invention;
[0030] Figure 6 This is an enlarged structural diagram of location A of the present invention;
[0031] Figure 7 It is an enlarged structural diagram of B of the present invention;
[0032] Figure 8 It is the overall half-section plan structure diagram of the present invention;
[0033] Fig. 9 The rotating plane structure diagram of the hedging mechanism of the present invention
[0034] Fig.10 It is a structural diagram of the coal gangue processing process of the present invention.
[0035] The meaning of each number in the figure is:
[0036] 100. base; 110. desulfurization tower;
[0037] 200, blocking mechanism; 210, rotating rod; 211, driving motor; 220, partition; 230, fixing plate; 240, atomizing nozzle; 241, through hole; 242, air inlet;
[0038] 300, hedging mechanism; 310, arc plate; 320, connecting groove;
[0039] 400, baffle; 410, convex block; 420, arch plate; 500, liquid storage tank; 510, connecting pipe; 600, separation plate; 610, exhaust fan. DETAILED DESCRIPTION
[0040] The following will be combined with the accompanying drawings in the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] See also Figure 1-Figure 10 As shown, this embodiment provides a new type of coal gangue processing process, comprising the following steps:
[0042] S1: The gangue discharged from the coal preparation plant is crushed and then enters the self-stabilizing combustion boiler through a belt conveyor and a screw conveyor. The self-stabilizing combustion boiler is preheated in the outer furnace and stabilized in the inner furnace. The high-temperature flue gas from the combustion is first preheated in the outer furnace to preheat the gangue at a preheating temperature of 800-900℃.
[0043] S2: The high-temperature flue gas passes through the heat exchanger to generate steam, which is then sold or used for other purposes, and then passes through the air preheater for heat exchange;
[0044] S3: The flue gas after heat exchange is introduced into the desulfurization and denitrification treatment device through dust collector, induced draft fan and other equipment, and finally discharged into the atmosphere;
[0045] S4: The ash produced by the self-stabilizing combustion boiler is conveyed to the crusher by a belt conveyor for crushing, and then conveyed to the fermentation storage bin by a belt conveyor for fermentation. A bacterial agent spraying device is provided at the top of the belt conveyor to assist fermentation;
[0046] S5: After fermentation, the prepared soil is sealed and sold, or used for saline-alkali land improvement, desertification control, mining area ecological restoration, and landscaping;
[0047] The desulfurization and denitrification treatment device includes a base 100, on which a desulfurization tower 110 is fixedly installed. A barrier mechanism 200 is rotatably provided inside the desulfurization tower 110. The barrier mechanism 200 divides the internal space of the desulfurization tower 110 and can extend the residence time of the flue gas in the desulfurization tower 110, so that the spraying treatment of the flue gas is more sufficient. A hedging mechanism 300 is provided on the barrier mechanism 200. The hedging mechanism 300 is used to spray the gas in different directions to break up the gas. The dispersed flue gas is more dispersed, which increases the contact area with the atomized droplets and is beneficial to removing harmful substances in the flue gas.
[0048] The present invention takes into account that the interior of the existing desulfurization and denitrification treatment devices is mostly straight-through, that is, there is only a single treatment area, which results in relatively short contact time and frequency between the flue gas and the spray liquid, making it difficult to fully remove pollutants in the gas, and the treatment effect may not reach an ideal state; therefore, after the barrier mechanism 200 is set to separate the interior of the desulfurization tower 110, the flue gas needs to pass through multiple areas, increasing its flow path in the desulfurization tower 110, thereby extending the residence time, so that the flue gas and the spray liquid have more sufficient reaction opportunities, and the desulfurization and denitrification effects are improved;
[0049] Considering that the nozzles of most desulfurization and denitrification treatment devices are usually installed on a surface perpendicular to the flue gas, and the flue gas is sprayed, this installation method can only spray the flue gas in a single direction, so that the contact between the flue gas and the atomized droplets is not sufficient, thereby affecting the removal effect of pollutants in the flue gas; therefore, the hedging mechanism 300 is set to make the sprayed mist liquid impact each other, forming a cross force, and producing an impact and shearing effect on the flue gas in the middle, thereby changing the flow form and direction of the flue gas, and then achieving the dispersion of the flue gas. The flue gas after dispersion is more dispersed, increasing the contact area with the atomized droplets, which is helpful to remove harmful substances in the flue gas;
[0050] In addition, the straight-through desulfurization and denitrification treatment device can only perform a single desulfurization and cannot achieve multiple-cycle desulfurization treatment of the flue gas, making it difficult to completely remove harmful substances in the flue gas, resulting in an unsatisfactory final desulfurization effect, which may not meet the increasingly stringent environmental emission standards; therefore, a barrier mechanism 200 and a hedging mechanism 300 are provided, and while the barrier mechanism 200 forms an obstacle to the flow of the flue gas, it cooperates with the hedging mechanism 300 to perform multiple spray treatments on the flue gas, thereby achieving a better effect of flue gas desulfurization and denitrification.
[0051] In order to divide the interior of the desulfurization tower 110 into multiple areas, the contact opportunity and time between the flue gas and the spray liquid are increased, such as Figure 3-Figure 5 As shown, the blocking mechanism 200 includes a rotating rod 210 rotatably connected to the bottom of the desulfurization tower 110, a driving motor 211 is fixedly installed inside the base 100, and the output end of the driving motor 211 passes through the bottom of the desulfurization tower 110 and is fixedly connected to the bottom of the rotating rod 210, two partitions 220 are fixedly connected to the outer wall of the rotating rod 210, and one side of the partition 220 is in contact with the inner wall of the desulfurization tower 110, a fixed plate 230 is fixedly connected to the inner wall of the desulfurization tower 110, and the bottom of the fixed plate 230 is rotatably connected to the top of the rotating rod 210, a ventilation slot is opened inside the rotating rod 210, and the ventilation slot passes through the top of the fixed plate 230, and the partition 220 is set The interior of the desulfurization tower 110 is divided into two areas, and a ventilation slot is provided inside the rotating rod 210 to form a third area. The flue gas inside the ventilation slot flows out from the interior of the rotating rod 210 through the ventilation slot. The flue gas flows in the three areas, increasing the contact opportunity and time between the flue gas and the spray liquid, making the desulfurization reaction more sufficient, thereby more effectively removing harmful substances in the flue gas and improving the desulfurization efficiency and quality; and starting the driving motor 211 can drive the rotating rod 210 to rotate, thereby driving the partition 220 to rotate, which can disturb the flue gas inside the desulfurization tower 110, so that the flue gas and the spray liquid are more fully mixed and contacted, thereby more effectively removing pollutants in the flue gas.
[0052] In order to carry out the second spraying treatment after the flue gas has been sprayed for the first time, such as Figure 4 As shown, a plurality of atomizing nozzles 240 are fixedly installed on both sides of the two partitions 220. The spray liquid is sprayed out through the atomizing nozzles 240 to spray the flue gas. A through hole 241 is opened above the partition 220. Since the partition 220 divides the interior of the desulfurization tower 110 into two areas, the flue gas after the first spray treatment passes through the through hole 241 and enters the other side for the second spray treatment.
[0053] In order to spray the flue gas in different directions, such as Figure 3-Figure 5As shown, the hedging mechanism 300 at least includes an arc plate 310 fixedly connected to one side of the two partitions 220 close to the inner wall of the desulfurization tower 110, the arc plate 310 fits with the inner wall of the desulfurization tower 110 to prevent the flue gas from overflowing from the corners of the desulfurization tower 110, and a plurality of atomizing nozzles 240 are arrayed on one side of the two arc plates 310 close to the rotating rod 210, the atomizing nozzles 240 installed on the arc plate 310 and the atomizing nozzles 240 installed on the partition 220 work at the same time, and the sprayed mist liquid impacts each other to form a cross force, which produces an impact and shearing effect on the flue gas in the middle, thereby changing the flow pattern and direction of the flue gas, and then achieving the dispersion of the flue gas. The flue gas after dispersion is more dispersed, which increases the contact area with the atomized liquid droplets, and helps to remove harmful substances in the flue gas;
[0054] While the flue gas is being desulfurized and denitrified, when the baffle 220 rotates, the arc plate 310 can be driven to rotate, as shown by arrow b. The rotation of the arc plate 310 can block the air inlet pipe of the desulfurization tower 110. By starting the drive motor 211 forward and reversely, the air inlet pipe of the desulfurization tower 110 is intermittently blocked to achieve intermittent air intake, thereby avoiding the situation in which the spray liquid is carried out of the spray tower before it has time to fully contact with the flue gas during continuous air intake, thereby improving the utilization efficiency of the spray liquid.
[0055] In order to carry out the third spraying treatment on the flue gas, Figure 2 and Figure 6 and Figure 8 As shown, a connecting groove 320 is provided inside the rotating rod 210, and the connecting groove 320 is located outside the ventilation groove provided inside the rotating rod 210, and the connecting groove 320 is connected with the two partitions 220 and the two arc-shaped plates 310, and a plurality of atomizing nozzles 240 are fixedly installed in the ventilation groove of the rotating rod 210, and one side of the atomizing nozzle 240 is connected with the connecting groove 320, and an air inlet 242 is provided on one side of the rotating rod 210, and the spray liquid inside the connecting groove 320 is sprayed by the air inlet 242 installed on the arc-shaped plates 310, the partitions 220 and the rotating rod 210. 10 is sprayed out by the atomizing nozzle 240 inside, and the smoke after the secondary spraying treatment, as shown by the arrow a, enters the ventilation groove inside the rotating rod 210 through the air inlet 242, and then passes through the atomizing nozzle 240 installed in the ventilation groove for a third spraying treatment, which increases the number and time of contact between the smoke and the spray liquid, can more fully remove pollutants in the smoke, and improve the degree of purification of the smoke. Since the ventilation groove runs through the top of the fixed plate 230, the smoke inside the rotating rod 210 passes through the ventilation groove and flows out from the top of the rotating rod 210.
[0056] When the spray liquid is sprayed out, it can splash around. Figure 5 and Figure 7As shown, the two partitions 220 are fixedly installed with multiple baffles 400 on both sides, and the baffles 400 are arrayed with multiple circular holes. The baffles 400 are fixedly connected with multiple protrusions 410, and the spray liquid falls on the top of the partition 220. The provision of the partition 220 can change the flow direction of the flue gas, increase the collision and contact opportunities between the flue gas and the spray liquid, and improve the treatment efficiency. When the flue gas passes through the partition 220, the contact between the flue gas and the spray liquid on the partition 220 can be increased, and the liquid collides with the protrusions 410, so that the surface tension of the spray liquid is broken, split into small droplets and scattered around, so that the spray liquid splashes wider, and the spray liquid can be more fully utilized, avoiding the situation where the local spray liquid is over-concentrated and insufficient in other areas, thereby contacting more flue gas and improving the efficiency of desulfurization and denitrification.
[0057] In order to increase the contact area between the spray liquid and the flue gas, Figure 3-Figure 4 As shown, an arch plate 420 is fixedly connected to the outer wall of the rotating rod 210, and the side of the arch plate 420 away from the rotating rod 210 is in contact with the inner wall of the desulfurization tower 110. The arch plate 420 is arranged not only to guide the flue gas to be more evenly distributed in the desulfurization tower 110, reduce the turbulence and eddy current of the air flow, and make the flue gas flow more smoothly, but also to increase the contact area between the spray liquid flowing on the arch plate 420 and the flue gas, which helps to improve the treatment of pollutants in the flue gas.
[0058] Considering the need to deliver spray liquid to the atomizing nozzle 240, Figure 3 As shown, a liquid storage tank 500 is fixedly installed on one side of the desulfurization tower 110, a water pump is fixedly installed on one side of the liquid storage tank 500, and a connecting pipe 510 is connected to one side of the water pump. The side of the connecting pipe 510 away from the water pump passes through the desulfurization tower 110, the fixed plate 230 and the rotating rod 210 in sequence and is slidably connected to the connecting groove 320. When the water pump is started, the spray liquid inside the liquid storage tank 500 is pumped into the connecting groove 320 through the connecting pipe 510, and then sprayed out from a plurality of groups of atomizing nozzles 240 installed inside the arc plate 310, the partition plate 220 and the rotating rod 210.
[0059] In order to realize the flue gas flow inside the desulfurization tower 110, Figure 3 As shown, a separation plate 600 is fixedly connected to the inner wall of the desulfurization tower 110, and the separation plate 600 is located above the fixed plate 230. The separation plate 600 can filter the water vapor contained in the gas. Filtering out the water vapor helps to improve the dryness and purity of the exhaust gas and reduce adverse effects on the environment. An exhaust fan 610 is fixedly installed on the top of the desulfurization tower 110. Start the exhaust fan 610 to discharge the treated gas inside the desulfurization tower 110, thereby increasing the flow rate of the flue gas in the desulfurization tower 110.
[0060] Working principle: The flue gas treated with desulfurization and denitrification is transported to the interior of the desulfurization tower 110 through the air inlet pipe connected to the desulfurization tower 110, and the water pump is started at the same time to draw the spray liquid in the liquid storage tank 500 into the connecting groove 320 through the connecting pipe 510, and then sprayed from multiple groups of atomizing nozzles 240. The atomizing nozzles 240 installed on the arc plate 310 and the atomizing nozzles 240 installed on the partition 220 work at the same time, and the sprayed mist liquids impact each other, forming a cross force, which produces an impact and shearing effect on the flue gas in the middle, thereby changing the flow pattern and direction of the flue gas, and then achieving the dispersion of the flue gas. The flue gas after dispersion is more dispersed, which increases the contact area with the atomized liquid droplets, and helps to remove harmful substances in the flue gas;
[0061] As shown by arrow a, the flue gas passes through the through hole 241 and is subjected to a second spraying treatment. The flue gas passing through the through hole 241 then flows into the interior of the rotating rod 210 through the air inlet 242. The atomizing nozzle 240 installed inside the rotating rod 210 sprays the flue gas for the third time. After three sprayings, the number and time of contact between the flue gas and the spray liquid are increased, and the pollutants in the flue gas can be more fully removed, thereby improving the degree of purification of the flue gas. The flue gas inside the rotating rod 210 flows out from the top of the rotating rod 210, and then flows out from the top of the desulfurization tower 110 after being filtered by the separation plate 600.
[0062] While the flue gas is being desulfurized and denitrified, the drive motor 211 is started, as shown by the arrow b, to drive the rotating rod 210 to rotate, thereby driving the partition 220 to rotate, and then driving the arc plate 310 to rotate. The rotation of the arc plate 310 can block the air inlet pipe of the desulfurization tower 110. By starting the drive motor 211 forward and reversely, the air inlet pipe of the desulfurization tower 110 is intermittently blocked to achieve intermittent air intake, thereby avoiding the situation in which the spray liquid is carried out of the spray tower before it has time to fully contact with the flue gas during continuous air intake, thereby improving the utilization efficiency of the spray liquid. Moreover, when the partition 220 and the arc plate 310 rotate, the flue gas inside the desulfurization tower 110 can be disturbed, so that the flue gas and the spray liquid are more fully mixed and contacted, thereby more effectively removing pollutants in the flue gas.
[0063] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A new type of coal gangue treatment process, characterized in that: The following steps are involved: S1: The gangue discharged from the coal preparation plant is crushed and then enters the self-stabilizing combustion boiler through a belt conveyor and a screw conveyor. The self-stabilizing combustion boiler is preheated in the outer furnace and stabilized in the inner furnace. The high-temperature flue gas from the combustion is first preheated in the outer furnace to preheat the gangue at a preheating temperature of 800-900℃. S2: The high-temperature flue gas passes through the heat exchanger to generate steam, which is then passed through the air preheater for heat exchange; S3: The flue gas after heat exchange is introduced into the desulfurization and denitrification treatment device through the dust collector and induced draft fan equipment to treat the flue dust, and finally discharged to the atmosphere; S4: The ash produced by the self-stabilizing combustion boiler is conveyed to the crusher via a belt for crushing, and then conveyed to the fermentation storage bin via a belt conveyor for fermentation. A bacterial agent spraying device is provided at the top of the belt conveyor to assist the fermentation of the ash; S5: After fermentation, the prepared soil is sealed in bags and sold for use in saline-alkali land improvement, desertification control, mining ecological restoration, and landscaping; The desulfurization and denitrification treatment device comprises a base (100), a desulfurization tower (110) is fixedly installed above the base (100), a blocking mechanism (200) is rotatably arranged inside the desulfurization tower (110), the blocking mechanism (200) divides the internal space of the desulfurization tower (110), and a hedging mechanism (300) is arranged on the blocking mechanism (200), and the hedging mechanism (300) is used to spray gas in different directions to disperse the gas.
2. The novel coal gangue treatment process according to claim 1 is characterized in that: The blocking mechanism (200) comprises a rotating rod (210) rotatably connected to the bottom of the desulfurization tower (110); a driving motor (211) is fixedly installed inside the base (100); and the output end of the driving motor (211) passes through the bottom of the desulfurization tower (110) and is fixedly connected to the bottom of the rotating rod (210); two partitions (220) are fixedly connected to the outer wall of the rotating rod (210), and one side of the partition (220) is in contact with the inner wall of the desulfurization tower (110); a fixed plate (230) is fixedly connected to the inner wall of the desulfurization tower (110), and the bottom of the fixed plate (230) is rotatably connected to the top of the rotating rod (210); a ventilation slot is provided inside the rotating rod (210), and the ventilation slot passes through the top of the fixed plate (230).
3. The novel coal gangue treatment process according to claim 2 is characterized in that: A plurality of atomizing nozzles (240) are fixedly mounted on both sides of the two partitions (220), and a through hole (241) is provided above the partitions (220).
4. The novel coal gangue treatment process according to claim 3 is characterized in that: The hedging mechanism (300) at least comprises an arc-shaped plate (310) fixedly connected to the two partitions (220) on one side close to the inner wall of the desulfurization tower (110), the arc-shaped plate (310) is in contact with the inner wall of the desulfurization tower (110), and a plurality of atomizing nozzles (240) are arrayed on one side of the two arc-shaped plates (310) close to the rotating rod (210).
5. The novel coal gangue treatment process according to claim 4 is characterized in that: A connecting groove (320) is provided inside the rotating rod (210), and the connecting groove (320) is located outside the ventilation groove provided inside the rotating rod (210); the connecting groove (320) is connected to the two partitions (220) and the two arc-shaped plates (310); a plurality of atomizing nozzles (240) are fixedly installed in the ventilation groove of the rotating rod (210); one side of the atomizing nozzles (240) is connected to the connecting groove (320); and an air inlet (242) is provided on one side of the rotating rod (210).
6. The novel coal gangue treatment process according to claim 2 is characterized in that: The two partitions (220) are both fixedly mounted with a plurality of baffles (400) on both sides, the baffles (400) are arrayed with a plurality of circular holes, and the baffles (400) are fixedly connected with a plurality of protrusions (410).
7. The novel coal gangue treatment process according to claim 2 is characterized in that: The outer wall of the rotating rod (210) is fixedly connected with an arched plate (420), and a side of the arched plate (420) away from the rotating rod (210) is in contact with the inner wall of the desulfurization tower (110).
8. The novel coal gangue treatment process according to claim 5 is characterized in that: A liquid storage tank (500) is fixedly mounted on one side of the desulfurization tower (110), a water pump is fixedly mounted on one side of the liquid storage tank (500), a connecting pipe (510) is connected to one side of the water pump, and a side of the connecting pipe (510) away from the water pump sequentially passes through the desulfurization tower (110), the fixed plate (230) and the rotating rod (210) and is slidably connected to the connecting groove (320).
9. The novel coal gangue treatment process according to claim 1 is characterized in that: A separation plate (600) is fixedly connected to the inner wall of the desulfurization tower (110), and the separation plate (600) is located above the fixed plate (230). An exhaust fan (610) is fixedly installed on the top of the desulfurization tower (110).