Multi-stage movable belt conveyor control system

Through the multi-stage movable belt conveyor control system, the Ethernet communication between the PLC central processing unit and the touch screen is used to solve the problem of large labor consumption and safety hazards of traditional belt conveyor control methods, and realize the multi-band conveyor Automated control reduces the cost of cable use and the difficulty of troubleshooting, and improves operating efficiency and safety.

CN119038086APending Publication Date: 2024-11-29HEIHE LOCKE MINING DEVELOPMENT CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411167777.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The traditional belt conveyor control method has problems such as high manpower consumption, low operating efficiency, high safety hazards, and numerous control cables, resulting in difficulty in troubleshooting, increased power consumption and serious mechanical wear.

Method used

Adopt a multi-stage movable belt conveyor control system, including PLC central processing unit, touch screen and automation control cabinet, through Ethernet communication connection, use 3*1.5 square control cable to realize the automatic control of multiple belt conveyors, reducing the Number of cables, increasing remote control and automation capabilities.

Benefits of technology

One-click automatic control of multi-strip conveyors is realized, reducing labor costs and safety hazards, reducing cable usage costs and troubleshooting difficulties, and improving operating efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119038086A_ABST
    Figure CN119038086A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-stage movable belt conveyor control system which comprises a multi-stage belt conveyor, an automatic control cabinet, a power feeder cabinet, a PLC central processing unit and a touch screen. And the PLC central processing unit is connected with the automatic control cabinet, the power supply feeder cabinet and the touch screen as a control module to control the work of the whole system. Mainstream PLC and touch screen automation equipment elements are introduced, remote control is carried out through system programming, and an Ethernet communication mode is adopted for connection, so that a multi-stage belt conveyor control circuit can complete one-key automatic control of a plurality of belt conveyors only by using 3 * 1.5 square control cables, an automatic control system is not influenced no matter whether the number of conveyors is increased or decreased or the number of conveyors is changed, and the system is convenient to operate. According to the control mode, only one operator is needed to control the multi-stage conveyor, the labor cost and the potential safety hazard of operation are greatly saved, in addition, a control loop adopts a 3 * 1.5 square control cable to complete a series of functions of starting, stopping, fault tripping, starting early warning and starting overtime of a plurality of belt conveyors, and the safety of the belt conveyors is greatly improved. And the use cost of the cable and the later fault maintenance difficulty are effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of conveyors, and in particular to a control system for a multi-stage movable belt conveyor. Background Art

[0002] Belt conveyors are frequently used equipment in mining production. At present, the conveying length of traditional purchased belt conveyors is severely limited, and can only be 25 meters, which cannot meet the transportation operation needs of mining areas. Therefore, multiple belt conveyors need to be combined and used in the actual production process. Since the control method of the belt conveyor body can only be operated on-site to control the start and stop of the belt conveyor body control box, the control method can only be started beside the machine. Since the belt conveyor is composed of multiple (commonly 13) belts of different lengths, it is more than 300 meters long. It takes one person 15 minutes to complete a start in sequence, and it takes a long time to start all one by one. This control method brings a lot of manpower expenditure to the operating personnel and has low operating efficiency.

[0003] In addition, when one of the belts stops due to a fault, the other belts are still running, which often results in material piles, greatly increasing the burden on the operators. The original design of the belt conveyor can only start and stop a single belt conveyor. Since frequent start and stop will bring great labor intensity to the personnel on duty, it must run 24 hours a day, which leads to increased power consumption and increased mechanical wear. In addition, the independent electronic control method also brings considerable safety risks. Since the length of the moving belt reaches more than 300 meters, in the event of sudden personal injury and equipment failure, all the running belts cannot be stopped in time, causing great safety hazards.

[0004] If the wiring is done according to the conventional PLC control principle, each belt conveyor PLC-IO point requires at least 9 points (see attached Figure 4As shown), that is to say, each belt needs 9 wires to complete the signal feedback and drive of a belt. If 13 belts are controlled together, 117 cables are needed to complete the automatic control of the belt conveyor. Under this control mode, it is difficult to implement for mobile equipment. Since each belt conveyor is not in a fixed position, it is almost difficult to perform PLC sampling. For example, if the No. 3 belt conveyor and the No. 8 belt conveyor are swapped, or N belt conveyors are removed, the belt conveyor cannot be started because the PIC sampling will be wrong. It can only be restarted after changing the PLC program. It is too difficult to implement in actual work; if 117 control wires are used, it will be even more difficult to disassemble and connect them, because the belt has to be changed every two days. If one of the wire cores fails, the belt conveyor will stop running. Especially when there are many wire cores, it will bring many difficulties to wiring, greatly extending the working hours of workers, and troubleshooting is also a big problem. Due to the large number of wire cores, the probability of failure is also very high, which brings instability to production and prolongs the time for fault finding and repair. Moreover, since the cable requires many wire cores, it also adds a lot of expenses to the procurement cost and increases the investment in production funds. Summary of the invention

[0005] The invention discloses a multi-stage movable belt conveyor control system, aiming to solve the technical problems raised in the background technology.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions:

[0007] A multi-stage movable belt conveyor control system, comprising a multi-stage belt conveyor, an automation control cabinet, a power feeder cabinet, a PLC central processor and a touch screen;

[0008] The PLC central processor is connected to the automation control cabinet, the power feeder cabinet and the touch screen as a control module to control the operation of the entire system;

[0009] The multi-stage belt conveyor can be set in multiple groups according to the conveying length and operation requirements, and can be increased or decreased and moved at any time;

[0010] The automation control cabinet is provided with a PLC, an intermediate relay and wiring terminals for completing the automation of conveyor equipment and process automation control;

[0011] The power feeder cabinet is connected to the automation control cabinet, the touch screen and the PLC central processor, and is used to distribute and provide power to the conveyor equipment.

[0012] Furthermore, the PLC central processor adopts a small PLC of Siemens, model S7-200SMART.

[0013] Furthermore, the touch screen adopts an AK display and control touch screen.

[0014] Furthermore, the PLC central processor and the touch screen are connected by Ethernet communication.

[0015] Furthermore, the main power circuit breaker in the power feeder cabinet uses an ABB630A intelligent circuit breaker, which can be remotely controlled to trip.

[0016] Furthermore, each belt conveyor device is equipped with an Omron H3CR time relay to individually control the start time of each unit.

[0017] Furthermore, the belt conveyor control circuit adopts 3*1.5 square control cables.

[0018] The present invention has the following beneficial effects:

[0019] The present invention introduces mainstream PLC and touch screen automation equipment components, performs remote control through the system, and adopts Ethernet communication connection, so that the multi-stage belt conveyor control line only uses 3*1.5 square control cables to complete one-key automatic control of multiple belt conveyors. Whether adding, reducing or replacing the conveyor position, it will not affect the automatic control system.

[0020] In terms of control method, only one operator is needed to complete the control of multi-stage conveyors, which greatly saves labor costs and operational safety hazards. In addition, the control loop uses 3*1.5 square control cables to complete a series of functions such as starting, stopping, fault tripping, start warning, and start timeout for multiple belt conveyors, effectively reducing the cost of cable use and the difficulty of subsequent fault inspection and repair. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a structural schematic diagram of the control system of the present invention.

[0022] Figure 2 It is a control circuit schematic diagram of the control system of the present invention.

[0023] Figure 3 It is the wiring diagram of the I / O points of the PLC controller of the present invention.

[0024] Figure 4 This is the current conventional PLC control principle wiring diagram mentioned in the background technology of the present invention. DETAILED DESCRIPTION

[0025] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application usually described and marked in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.

[0026] Example:

[0027] Reference Figure 1 , a multi-stage movable belt conveyor control system, comprising a multi-stage belt conveyor 1, an automation control cabinet 2, a power feeder cabinet 3, a PLC central processor 4 and a touch screen 5;

[0028] The PLC central processor 4 is connected to the automation control cabinet 2, the power feeder cabinet 3 and the touch screen 5 as a control module to control the operation of the entire system;

[0029] The multi-stage belt conveyor 1 can be set in multiple groups according to the conveying length and operation requirements, and can be increased or decreased and moved at any time;

[0030] The automation control cabinet 2 is provided with a PLC, an intermediate relay and a wiring terminal for completing the conveyor equipment automation and process automation control;

[0031] The power feeder cabinet 3 is connected to the automation control cabinet 2, the touch screen 5 and the PLC central processor 4, and is used to distribute and provide power to the conveyor equipment.

[0032] In this embodiment, the PLC central processor 4 is a small PLC of Siemens, model S7-200SMART.

[0033] In this embodiment, the touch screen 5 adopts an AK display and control touch screen.

[0034] In this embodiment, the PLC central processor 4 and the touch screen 5 are connected by Ethernet communication.

[0035] In this embodiment, the main power circuit breaker in the power feeder cabinet 3 uses an ABB630A intelligent circuit breaker, which can be remotely controlled to trip.

[0036] In this embodiment, each belt conveyor 1 is equipped with an Omron H3CR time relay to individually control the start time of each unit.

[0037] In this embodiment, the control line of the belt conveyor 1 adopts 3*1.5 square control cables.

[0038] Reference Figure 2 and Figure 3 , the control principle of the control system of the present invention is as follows:

[0039] 1. The control node KA001 is a one-button start node. This node is used regardless of the number of belts. It not only completes the unified start, but also the control power supply is a separate circuit, which is not connected to the control circuit of the belt conveyor body. It avoids the risk of phase short circuit caused by each control cabinet taking power separately, and greatly reduces the number of wire cores of the control cable.

[0040] 2. KA51-62 is the PLC sampling node, and the role of this node in each stage is analyzed through PLC programming.

[0041] (1) Start-up phase:

[0042] During the startup process of the belt conveyor, the status of this node will give a signal to the PLC, and the PLC will start calculating the startup time. The startup time is adjusted according to the number of belts. If the startup signal is not fed back within the startup time, the PLC will determine that the startup has failed, shut down and issue an alarm.

[0043] (2) Operation phase:

[0044] Through PLC programming, it is judged that the node is considered to be operating normally after the start time. If any belt fails during operation, this point will send a signal to the belt conveyor. After the belt conveyor recognizes the signal, it will sound an alarm and start delayed parking. The parking time is (10S). The purpose of delayed parking is to allow the operating personnel to check the position of the faulty belt and to prevent the material from being pressed onto the belt conveyor at the discharge port.

[0045] (3) Emergency stop:

[0046] There are two ways to perform an emergency stop. One is to directly send a signal to the PLC on the touch screen to stop the intelligent circuit breaker, so that all circuits can be powered off. The second is to use the emergency stop button on the control panel to stop all power supplies.

[0047] The present invention introduces mainstream PLC and touch screen automation equipment components, performs remote control through the system, and adopts Ethernet communication connection, so that the multi-stage belt conveyor control line only uses 3*1.5 square control cables to complete one-key automatic control of multiple belt conveyors. Whether adding, reducing or replacing the conveyor position, it will not affect the automatic control system.

[0048] In terms of power consumption, it used to run continuously for a long time, but through the introduction of automation in this system, it has now been changed to intermittent operation, which has greatly saved power consumption costs.

[0049] In terms of control methods, only one operator is needed to complete the control of multi-stage conveyors, which greatly saves labor costs and operational safety hazards. In addition, the control circuit uses 3*1.5 square control cables to complete the start, stop, fault tripping, start warning, start timeout and other functions of multiple belt conveyors, effectively reducing the cost of cable use and the difficulty of later fault repair. The entire system operation uses a touch screen host computer with simple and clear screens and clear button functions. It is very convenient to automatically start all belt conveyors in sequence with just one button and monitor them on the display.

[0050] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. The replacement may be a replacement of a part of the structure, device, method step, or a complete technical solution. Any equivalent replacement or change according to the technical solution and the inventive concept of the present invention shall be covered within the protection scope of the present invention.

Claims

1. A multi-stage movable belt conveyor control system, characterized in that: It includes multi-stage belt conveyor, automation control cabinet, power feeder cabinet, PLC central processor and touch screen; The PLC central processor is connected to the automation control cabinet, the power feeder cabinet and the touch screen as a control module to control the operation of the entire system; The multi-stage belt conveyor can be set in multiple groups according to the conveying length and operation requirements, and can be increased or decreased and moved at any time; The automation control cabinet is provided with a PLC, an intermediate relay and wiring terminals for completing the automation of conveyor equipment and process automation control; The power feeder cabinet is connected to the automation control cabinet, the touch screen and the PLC central processor, and is used to distribute and provide power to the conveyor equipment.

2. A multi-stage movable belt conveyor control system according to claim 1, characterized in that: The PLC central processor adopts a small PLC of Siemens, model S7-200SMART.

3. A multi-stage movable belt conveyor control system according to claim 1, characterized in that: The touch screen adopts AK display and control touch screen.

4. A multi-stage movable belt conveyor control system according to claim 1, characterized in that: The PLC central processor and the touch screen are connected by Ethernet communication.

5. A multi-stage movable belt conveyor control system according to claim 1, characterized in that: The main power circuit breaker in the power feeder cabinet uses an ABB630A intelligent circuit breaker, which can be remotely controlled to trip.

6. A multi-stage movable belt conveyor control system according to claim 1, characterized in that: Each belt conveyor device is equipped with an Omron H3CR time relay to individually control the start time of each unit.

7. A multi-stage movable belt conveyor control system according to claim 1, characterized in that: The belt conveyor control circuit adopts 3*1.5 square control cables.

8. A multi-stage movable belt conveyor control system according to claim 1, characterized in that: The PLC central processor sets a control node KA001 as a one-key start node. This node is used regardless of the number of belts, which completes the unified start. The control power supply is a separate circuit and is not connected to the belt conveyor body control circuit, avoiding the risk of phase short circuit caused by each control cabinet taking power separately, and greatly reducing the number of wire cores of the control cable; And set up multiple PLC sampling nodes, and analyze the role of the sampling nodes in each stage through PLC programming. The specific process is as follows: (1) Start-up phase: During the start-up process of the belt conveyor, the state of this node will give a signal to the PLC, and the PLC will start to calculate the start-up time. The start-up time is adjusted according to the number of belts. If the start-up signal is not fed back within the start-up time, the PLC will determine that the start-up has failed, shut down and issue an alarm. (2) Operation phase: Through PLC programming, it is judged that the node is considered to be operating normally after the start time. If any belt fails during operation, this point will send a signal to the belt conveyor. After the belt conveyor recognizes the signal, it will issue an alarm and start delayed parking. The parking time is (10S). The purpose of delayed parking is to allow the operator to check the location of the faulty belt and to prevent the material from pressing onto the belt conveyor at the discharge port. (3) Emergency stop: There are two ways to perform an emergency stop. One is to directly send a signal to the PLC on the touch screen to stop the intelligent circuit breaker, so that all circuits can be powered off. The second is to use the emergency stop button on the control panel to stop all power supplies.

Citation Information