Connecting structure of PC wall, curtain wall and steel structure and construction method of connecting structure
Through the matching structure of embedded parts and embedded components, the problem of cumbersome installation of steel structure skeletons is solved, efficient connection between PC walls and steel structures is achieved, construction efficiency and connection stability are improved, and the insulation and beauty of the building are ensured. sex.
Patent Information
- Application Number
- CN202411536701.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the prior art, during the connection between PC walls, curtain walls and steel structures, the installation of steel structure skeletons is cumbersome, which reduces construction efficiency and requires changing the structure of floor slabs and PC walls, affecting the construction quality and cost.
The matching structure of embedded parts and embedded components is adopted. The installation of steel beams is simplified by welding connection between embedded parts and lower steel beams at the upper end of the floor slab, and embedded components are set up at the upper and lower ends of the PC wall to fix the steel beams, curtain walls and Connect steel beams to avoid changing the floor slab and PC wall structures, and improve construction efficiency and connection accuracy.
It realizes efficient and reliable connection between PC walls and steel structures, improves construction efficiency, enhances the stability and reliability of connections, ensures the insulation performance and aesthetics of the building, and simplifies curtain wall keel construction and glass installation.
Smart Images

Figure CN119041602A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of construction, and in particular to a connection structure of a PC wall, a curtain wall and a steel structure and a construction method thereof. Background Art
[0002] In recent years, with the rapid development of the construction industry and the growth of social needs, the degree of building industrialization has continued to increase, and prefabricated buildings have been widely used as a new construction model. PC walls (precast concrete walls), curtain walls and steel structures are widely used in modern buildings due to their respective characteristics. PC walls have the advantages of high manufacturing precision and fast production efficiency, curtain walls are favored for their beauty and excellent thermal insulation performance, and steel structures have become the main choice for large-span buildings due to their light weight and high strength. However, the effective combination of the three has become an important link in construction projects, especially the need to solve the problem of efficient connection between them to improve construction quality and speed and reduce project costs.
[0003] At present, when connecting the PC wall, curtain wall and steel structure, usually after the floor is formed, a steel structure frame is set on the floor to fix the PC wall, and then the curtain wall frame is fixed on the PC wall to realize the installation of the curtain wall.
[0004] The above-mentioned related technologies have the following defects: the setting of the steel structure skeleton often requires changes to the structure of the floor slab and the PC wall to adapt to the installation of the steel structure skeleton. The installation of the steel structure skeleton is very cumbersome, which reduces the construction efficiency. Summary of the invention
[0005] In order to improve the connection construction efficiency of PC wall, curtain wall and steel structure, the present application provides a connection structure of PC wall, curtain wall and steel structure and a construction method thereof.
[0006] The present application provides a connection structure of a PC wall, a curtain wall and a steel structure and a construction method thereof using the following technical solutions: A connection structure of a PC wall, a curtain wall and a steel structure, comprising a PC wall, a curtain wall, an embedded part and a steel beam, wherein the embedded part is used to be installed on the upper end of a floor slab; the steel beam is used to be installed on the lower end of the floor slab and is connected to the embedded part; the upper and lower ends of the PC wall are both provided with embedded components, the embedded components comprising an embedded plate and an angle steel, the embedded plate is installed on the PC wall, and the first side plate of the angle steel is connected to the embedded plate; the second side plate of the angle steel at the upper end of the PC wall is connected to the embedded part; the second side plate of the angle steel at the lower end of the PC wall is connected to the steel beam; the curtain wall is arranged on a side of the PC wall away from the floor slab and is connected to the steel beam.
[0007] By adopting the above technical solution, during the pouring of the floor slab, the embedded parts are buried in the upper end of the floor slab, and the steel beam is fixed to the lower end of the floor slab by welding and other connection directions with the embedded parts. The installation of the steel beam is convenient and quick. When the PC wall is installed later, there is no need to change the structure of the floor slab, which improves the construction efficiency. During the pouring of the PC wall, the embedded plate is buried in the PC wall to fix the embedded components, and the angle steels at the upper and lower ends of the PC wall are respectively connected to the embedded parts and the steel beam to realize the installation of the PC wall. The curtain wall is set on the side of the PC wall away from the floor slab and connected to the steel beam, which not only ensures the thermal insulation performance of the building, but also facilitates the construction of the curtain wall keel and the installation of glass in the later stage. Furthermore, when installing the PC wall and the curtain wall in the present application, there is no need to perform steps such as grooving on the PC wall and the floor slab, which requires changing the structure of the PC wall and the floor slab. In addition, the embedded parts, embedded components and other steel structure connectors can be connected to their corresponding parts during the forming process of the PC wall and the floor slab, thereby improving the on-site construction efficiency and greatly increasing the processing accuracy of the materials, thereby ensuring the accuracy and reliability of the connection between the PC wall, the curtain wall, the embedded parts, the embedded components and the steel beams.
[0008] Preferably, the embedded component further includes a plurality of studs, and the plurality of studs are embedded in the PC wall and are all connected to the embedded plate.
[0009] By adopting the above technical solution, the number of studs in the embedded components is increased, and multiple studs are embedded in the PC wall and connected to the embedded plate, thereby enhancing the connection stability between the PC wall and the embedded plate, and further improving the safety and reliability of the overall structure.
[0010] Preferably, the end of the bolt with a smaller diameter is fixedly connected to the embedded plate.
[0011] By adopting the above technical solution, the end with a smaller diameter of the bolt is fixedly connected to the embedded plate, so that the bolt can hook the PC wall, which can effectively improve the connection strength and stability between the PC wall and the embedded parts, and ensure the reliability of the entire connection structure when subjected to external forces.
[0012] Preferably, the embedded plate is embedded in the PC wall, and a surface of the embedded plate away from the PC wall is coplanar with a surface of the PC wall.
[0013] By adopting the above technical solution, the embedded plate is embedded in the PC wall, and the side of the embedded plate away from the PC wall is coplanar with the surface of the PC wall, thereby improving the overall aesthetics of the PC wall and enhancing the connection stability between the embedded plate and the PC wall.
[0014] Preferably, the buried plate is provided with an air leakage hole.
[0015] By adopting the above technical solution, vent holes are set on the embedded plate, which can discharge internal gas during the PC wall processing process, preventing insufficient concrete density around the embedded parts due to the inability to discharge gas, thereby improving the overall quality of the PC wall and the installation accuracy of the embedded parts.
[0016] Preferably, the embedded component also includes a plurality of positioning steel bars, which are arranged along the length direction of the steel beam, and in the vertical direction, the plurality of positioning steel bars are spaced apart; the positioning steel bars are arranged between the PC wall and the embedded plate, and are connected to the PC wall; the embedded plate is provided with a plurality of positioning grooves, and the plurality of positioning grooves are arranged corresponding to the plurality of positioning steel bars, and the positioning steel bars are arranged in the corresponding positioning grooves.
[0017] By adopting the above technical solution, the positioning steel bars are arranged along the length direction of the steel beam and are spaced apart in the vertical direction, which can effectively improve the positioning accuracy of the embedded components in the PC wall and ensure the accurate installation position of the embedded parts, thereby improving the reliability and stability of the connection between the PC wall and the steel structure. The positioning steel bars are arranged in coordination with the positioning grooves on the embedded plate, which further enhances the fixing effect of the embedded components, avoids deviation during the construction process, and ensures the construction quality of the entire connection structure.
[0018] Preferably, the embedded plate is provided with a first mounting hole, the first side plate of the angle steel is provided with a second mounting hole, and the embedded component also includes bolts and nuts, and the bolts pass through the first mounting hole and the second mounting hole in sequence and are threadedly connected with the nuts.
[0019] By adopting the above technical solution, the connection between the embedded plate and the angle steel is connected by bolts and nuts, which enhances the connection stability between the PC wall and the steel structure, ensures the reliability and safety of the connection structure, and facilitates the disassembly and assembly of the PC wall.
[0020] Preferably, the embedded component further includes an elastic washer, and the elastic washer is sleeved on the bolt between the angle steel and the embedded plate.
[0021] By adopting the above technical solution, the elastic gasket in the embedded component is sleeved on the bolts between the angle steel and the embedded plate, which can effectively prevent the bolts from loosening due to vibration, improve the reliability of the connection between the PC wall and the embedded parts and the steel beam, and ensure the stability and safety of the entire building structure.
[0022] Preferably, the steel beam is provided with a plurality of steel plate reinforcing ribs, and the plurality of steel plate reinforcing ribs are distributed along the length direction of the steel beam.
[0023] By adopting the above technical solution, the multiple steel plate reinforcing ribs arranged on the steel beam are distributed along the length direction of the steel beam, thereby improving the overall stress performance of the steel beam, thereby enhancing the overall stability and reliability of the connection structure of the PC wall, curtain wall and steel structure.
[0024] A connection construction method of a PC wall, a curtain wall and a steel structure, based on the above-mentioned connection structure of a PC wall, a curtain wall and a steel structure, comprises the following steps: Installing the embedded parts on the upper end of the floor slab; Installing the steel beam at the lower end of the floor slab; Embedded components are installed at both the upper and lower ends of the PC wall; Welding the embedded component on the upper end of the PC wall to the embedded part; Welding the embedded components at the lower end of the PC wall to the steel beam; The curtain wall is installed on a side of the PC wall away from the floor slab, and the frame of the curtain wall is connected to the steel beam.
[0025] By adopting the above technical scheme, the connection construction method of the PC wall, curtain wall and steel structure provided by the present invention realizes efficient, economical and reliable connection between the PC wall, curtain wall and steel structure. Specifically, the embedded parts are installed at the upper end of the floor slab, and the steel beam is installed at the lower end of the floor slab and connected with the embedded parts, which enhances the stability of the entire structure; the embedded components are installed at the upper and lower ends of the PC wall, and the embedded components are welded with the embedded parts and steel beams through angle steels, providing a connection method of multi-point support and multi-layer welding, improving the fixing strength of the PC wall, and ensuring the stability and load-bearing capacity of the PC wall; the curtain wall is installed on the side of the PC wall away from the floor slab and connected with the steel beam, realizing the integrity and aesthetics of the structure, and facilitating the later curtain wall keel construction and glass installation.
[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. The connection structure provided by the present invention enables the PC wall and the steel structure to be efficiently and reliably connected through the cooperation of embedded parts and embedded components, thereby solving the problem of cumbersome installation of the steel structure skeleton in the prior art and improving the construction efficiency; 2. The embedded components in the present invention include embedded plates and angle steels, the first side plates of the angle steels are connected to the embedded plates, and the second side plates are connected to the embedded parts and the steel beams, respectively, to ensure a stable connection between the PC wall, the floor slab and the steel structure; 3. The present invention improves the positioning accuracy of embedded parts during PC wall processing and ensures the reliability of the connection structure by setting the studs and positioning steel bars in the embedded components. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0028] Figure 1 It is a schematic diagram of the overall structural section of the connection structure of the PC wall, curtain wall and steel structure; Figure 2 This is the main structural diagram of the PC wall and embedded components; Figure 3 It is a top view cross-sectional structural diagram of the PC wall and embedded components; Figure 4 It is a side view cross-sectional structural diagram of the PC wall and embedded components; Figure 5 The invention is a flowchart of the connection construction method of PC wall, curtain wall and steel structure.
[0029] Reference numerals: 1. Floor slab; 10. Embedded parts; 2. PC wall; 20. Embedded component; 21. Embedded plate; 2101. Vent hole; 2102. First mounting hole; 2103. Positioning groove; 22. Bolt; 23. Nut; 24. Elastic washer; 25. Stud; 26. Positioning steel bar; 27. Angle steel; 2701. Second mounting hole; 3. Steel beam; 31. Steel plate reinforcement rib; 4. Curtain wall; 41. Aluminum plate frame; 42. Glass; 43. Frame. DETAILED DESCRIPTION
[0030] The following is combined with Figure 1-5 This application is described in further detail.
[0031] The present application embodiment discloses a connection structure of a PC wall, a curtain wall and a steel structure and a construction method thereof. Figure 1A connection structure of a PC wall, a curtain wall and a steel structure, comprising a PC wall 2, a curtain wall 4, an embedded part 10 and a steel beam 3, wherein the embedded part 10 is used to be installed at the upper end of a floor slab 1. The steel beam 3 is used to be installed at the lower end of the floor slab 1 and is connected to the embedded part 10. The upper and lower ends of the PC wall 2 are both provided with embedded components 20, wherein the embedded components 20 include an embedded plate 21 and an angle steel 27, wherein the embedded plate 21 is installed on the PC wall 2, and the first side plate of the angle steel 27 is connected to the embedded plate 21. The second side plate of the angle steel 27 at the upper end of the PC wall 2 is connected to the embedded part 10, and in the present application, the second side plate of the angle steel 27 is connected to the embedded part 10 by multi-layer welding. The second side plate of the angle steel 27 at the lower end of the PC wall 2 is connected to the steel beam 3, and in the present application, the second side plate of the angle steel 27 is connected to the steel beam 3 by multi-layer welding. The curtain wall 4 is arranged on the side of the PC wall 2 away from the floor slab 1 and is connected to the steel beam 3. The curtain wall 4 is of prior art, and includes an aluminum plate frame 41, glass 42 and a frame 43. The steel beam 3 on the side of the PC wall 2 extends toward the curtain wall 4, the frame 43 is connected to the extended steel beam 3, the aluminum plate frame 41 is installed on the frame 43, and the glass 42 is installed on the aluminum plate frame 41.
[0032] Reference Figure 1 In the embodiment of the present application, during the pouring of the floor slab 1, the embedded parts 10 are buried in the upper end of the floor slab 1, and the steel beam 3 is fixed to the lower end of the floor slab 1 by welding or other connection directions with the embedded parts 10. The installation of the steel beam 3 is convenient and quick. When the PC wall 2 is installed later, there is no need to change the structure of the floor slab 1, which improves the construction efficiency. During the pouring of the PC wall 2, the embedded plate 21 is buried in the PC wall 2 to fix the embedded component 20, and the angle steels 27 at the upper and lower ends of the PC wall 2 are respectively connected to the embedded parts 10 and the steel beam 3 to realize the installation of the PC wall 2. The curtain wall 4 is arranged on the side of the PC wall 2 away from the floor slab 1 and is connected to the steel beam 3, which not only ensures the thermal insulation performance of the building, but also facilitates the construction of the curtain wall 4 keel and the installation of the glass 42 in the later stage. Furthermore, when installing the PC wall 2 and the curtain wall 4 in the present application, there is no need to perform steps such as grooving on the PC wall 2 and the floor slab 1, which requires changing the structure of the PC wall 2 and the floor slab 1. In addition, the embedded parts 10, embedded components 20 and other steel structure connectors can be connected to their corresponding parts during the forming process of the PC wall 2 and the floor slab 1, thereby improving the on-site construction efficiency and greatly increasing the processing accuracy of the materials, thereby ensuring the accuracy and reliability of the connection between the PC wall 2, the curtain wall 4, the embedded parts 10, the embedded components 20 and the steel beam 3.
[0033] Reference Figure 2 , Figure 3 and Figure 4The embedded component 20 further includes a plurality of studs 25, which are embedded in the PC wall 2 and connected to the embedded plate 21. In the embodiment of the present application, the number of studs 25 in the embedded component 20 is increased, and the plurality of studs 25 are embedded in the PC wall 2 and connected to the embedded plate 21, thereby enhancing the connection stability between the PC wall 2 and the embedded plate 21, and further improving the safety and reliability of the overall structure.
[0034] Reference Figure 2 , Figure 3 and Figure 4 , the end with a smaller diameter of the bolt 25 is fixedly connected to the embedded plate 21. In the embodiment of the present application, the end with a smaller diameter of the bolt 25 is fixedly connected to the embedded plate 21, so that the bolt 25 can hook the PC wall 2, which can effectively improve the connection strength and stability between the PC wall 2 and the embedded part 10, and ensure the reliability of the entire connection structure when subjected to external force.
[0035] Reference Figure 2 , Figure 3 and Figure 4 , the embedded plate 21 is embedded in the PC wall 2, and the side of the embedded plate 21 away from the PC wall 2 is coplanar with the surface of the PC wall 2. In the embodiment of the present application, the embedded plate 21 is embedded in the PC wall 2, and the side of the embedded plate 21 away from the PC wall 2 is coplanar with the surface of the PC wall 2, which improves the overall aesthetics of the PC wall 2 and enhances the connection stability between the embedded plate 21 and the PC wall 2.
[0036] Reference Figure 2 , Figure 3 and Figure 4 , the embedded plate 21 is provided with an air leakage hole 2101. In the embodiment of the present application, the air leakage hole 2101 on the embedded plate 21 is provided, which can discharge the internal gas during the processing of the PC wall 2, and prevent the concrete density around the embedded part 10 from being insufficient due to the inability to discharge the gas, thereby improving the overall quality of the PC wall 2 and the installation accuracy of the embedded part 10.
[0037] Reference Figure 2 , Figure 3 and Figure 4, the embedded component 20 also includes a plurality of positioning steel bars 26, which are arranged along the length direction of the steel beam 3, and in the vertical direction, the plurality of positioning steel bars 26 are spaced apart. The positioning steel bars 26 are arranged between the PC wall 2 and the embedded plate 21, and are connected to the PC wall 2. The embedded plate 21 is provided with a plurality of positioning grooves 2103, and the plurality of positioning grooves 2103 are arranged corresponding to the plurality of positioning steel bars 26, and the positioning steel bars 26 are arranged in the corresponding positioning grooves 2103. In the embodiment of the present application, the positioning steel bars 26 are arranged along the length direction of the steel beam 3, and are spaced apart in the vertical direction, which can effectively improve the positioning accuracy of the embedded component 20 in the PC wall 2, ensure the accurate installation position of the embedded part 10, and thus improve the reliability and stability of the connection between the PC wall 2 and the steel structure. The positioning steel bars 26 are arranged in coordination with the positioning grooves 2103 on the embedded plate 21, which further enhances the fixing effect of the embedded component 20, avoids displacement during the construction process, and ensures the construction quality of the entire connection structure.
[0038] Reference Figure 2 , Figure 3 and Figure 4 The embedded plate 21 is provided with a first mounting hole 2102, the first side plate of the angle steel 27 is provided with a second mounting hole 2701, and the embedded assembly 20 further includes a bolt 22 and a nut 23. The bolt 22 passes through the first mounting hole 2102 and the second mounting hole 2701 in sequence and is screwed with the nut 23. In the embodiment of the present application, the connection between the embedded plate 21 and the angle steel 27 by the bolt 22 and the nut 23 enhances the connection stability between the PC wall 2 and the steel structure, and ensures the reliability and safety of the connection structure. At the same time, it is convenient for the disassembly and assembly of the PC wall 2.
[0039] Reference Figure 1-Figure 4 The embedded component 20 further includes an elastic washer 24, which is sleeved on the bolt 22 between the angle steel 27 and the embedded plate 21. In the embodiment of the present application, the elastic washer 24 in the embedded component 20 is sleeved on the bolt 22 between the angle steel 27 and the embedded plate 21, which can effectively prevent the bolt 22 from loosening due to vibration, improve the reliability of the connection between the PC wall 2 and the embedded part 10 and the steel beam 3, and ensure the stability and safety of the entire building structure.
[0040] Reference Figure 1 and Figure 5 , a plurality of steel plate reinforcing ribs 31 are arranged on the steel beam 3, and the plurality of steel plate reinforcing ribs 31 are distributed along the length direction of the steel beam 3. In the embodiment of the present application, the plurality of steel plate reinforcing ribs 31 arranged on the steel beam 3 are distributed along the length direction of the steel beam 3, which improves the overall force bearing performance of the steel beam 3, thereby enhancing the overall stability and reliability of the PC wall 2, the curtain wall 4 and the steel structure connection structure.
[0041] A connection construction method of a PC wall, a curtain wall and a steel structure, based on the above-mentioned connection structure of a PC wall, a curtain wall and a steel structure, comprises the following steps: Install the embedded part 10 on the upper end of the floor slab 1; Install the steel beam 3 at the lower end of the floor slab 1; Embedded components 20 are installed at both the upper and lower ends of the PC wall 2; The embedded component 20 at the upper end of the PC wall 2 is welded to the embedded part 10; The embedded component 20 at the lower end of the PC wall 2 is welded to the steel beam 3; The curtain wall 4 is installed on the side of the PC wall 2 away from the floor 1 , and the frame 43 of the curtain wall 4 is connected to the steel beam 3 .
[0042] Reference Figure 1 and Figure 5 In the embodiment of the present application, the connection construction method of the PC wall, curtain wall and steel structure provided by the present invention realizes an efficient, economical and reliable connection between the PC wall 2, the curtain wall 4 and the steel structure. Specifically, the embedded part 10 is installed at the upper end of the floor slab 1, and the steel beam 3 is installed at the lower end of the floor slab 1 and connected to the embedded part 10, thereby enhancing the stability of the entire structure. The embedded components 20 are installed at the upper and lower ends of the PC wall 2, and the embedded components 20 are welded to the embedded parts 10 and the steel beam 3 through the angle steel 27, providing a connection method of multi-point support and multi-layer welding, thereby improving the fixing strength of the PC wall 2 and ensuring the stability and load-bearing capacity of the PC wall 2. The curtain wall 4 is installed on the side of the PC wall 2 away from the floor slab 1 and is connected to the steel beam 3, thereby realizing the integrity and aesthetics of the structure, while facilitating the later curtain wall 4 keel construction and glass 42 installation.
[0043] The implementation principle of a connection structure of a PC wall, a curtain wall and a steel structure and a construction method thereof in the embodiment of the present application is as follows: During the pouring process of the floor slab 1, the embedded parts 10 are buried in the upper end of the floor slab 1 to achieve the connection between the embedded parts 10 and the floor slab 1, and the steel beam 3 is fixed to the lower end of the floor slab 1 through welding or other connection directions with the embedded parts 10.
[0044] During the pouring process of the PC wall 2, the embedded plate 21 is embedded in the PC wall 2 to fix the embedded component 20, and the angle steels 27 at the upper and lower ends of the PC wall 2 are respectively connected to the embedded parts 10 and the steel beam 3 to install the PC wall 2. The curtain wall 4 is arranged on the side of the PC wall 2 away from the floor 1 and is connected to the steel beam 3, which not only ensures the thermal insulation performance of the building, but also facilitates the construction of the curtain wall 4 keel and the installation of the glass 42 in the later stage.
[0045] Unless otherwise defined, the technical terms or scientific terms used in this application should be understood by people with ordinary skills in the field to which this application belongs. The words "first", "second", "third" and similar words used in the specification and claims of this application do not indicate any order, quantity or importance, but are only used to distinguish different components. "One" or "one" and similar words do not indicate a quantitative limit, but indicate that there is at least one. "Include" or "comprise" and similar words mean that the elements or objects appearing before "include" or "comprise" include the elements or objects listed after "include" or "comprise" and their equivalents, and do not exclude other elements or objects. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0046] The above are all optional embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A connection structure of a PC wall, a curtain wall and a steel structure, characterized in that: It comprises a PC wall (2), a curtain wall (4), embedded parts (10) and a steel beam (3), wherein the embedded parts (10) are used to be installed on the upper end of a floor slab (1); The steel beam (3) is used to be installed at the lower end of the floor slab (1) and is connected to the embedded part (10); The upper and lower ends of the PC wall (2) are both provided with embedded components (20), the embedded components (20) comprising an embedded plate (21) and an angle steel (27), the embedded plate (21) being mounted on the PC wall (2), and the first side plate of the angle steel (27) being connected to the embedded plate (21); The second side plate of the angle steel (27) at the upper end of the PC wall (2) is connected to the embedded part (10); The second side plate of the angle steel (27) at the lower end of the PC wall (2) is connected to the steel beam (3); The curtain wall (4) is arranged on a side of the PC wall (2) away from the floor slab (1) and is connected to the steel beam (3).
2. A connection structure of a PC wall, a curtain wall and a steel structure according to claim 1, characterized in that: The embedded component (20) further comprises a plurality of studs (25), wherein the plurality of studs (25) are embedded in the PC wall (2) and are all connected to the embedded plate (21).
3. A connection structure of a PC wall, a curtain wall and a steel structure according to claim 2, characterized in that: The end of the bolt (25) with a smaller diameter is fixedly connected to the embedded plate (21).
4. The connection structure of a PC wall, a curtain wall and a steel structure according to claim 3, characterized in that: The embedded plate (21) is embedded in the PC wall (2), and a surface of the embedded plate (21) away from the PC wall (2) is coplanar with a surface of the PC wall (2).
5. The connection structure of a PC wall, a curtain wall and a steel structure according to claim 4, characterized in that: The buried plate (21) is provided with an air leakage hole (2101).
6. The connection structure of a PC wall, a curtain wall and a steel structure according to claim 4, characterized in that: The embedded component (20) further comprises a plurality of positioning steel bars (26), wherein the positioning steel bars (26) are arranged along the length direction of the steel beam (3), and in the vertical direction, the plurality of positioning steel bars (26) are distributed at intervals; The positioning steel bars (26) are arranged between the PC wall (2) and the embedded plate (21), and are connected to the PC wall (2); The embedded plate (21) is provided with a plurality of positioning grooves (2103), the plurality of positioning grooves (2103) being arranged corresponding to the plurality of positioning steel bars (26), and the positioning steel bars (26) being arranged in the corresponding positioning grooves (2103).
7. The connection structure of a PC wall, a curtain wall and a steel structure according to claim 4, characterized in that: The embedded plate (21) is provided with a first mounting hole (2102), the first side plate of the angle steel (27) is provided with a second mounting hole (2701), the embedded component (20) further comprises a bolt (22) and a nut (23), the bolt (22) sequentially passing through the first mounting hole (2102) and the second mounting hole (2701), and then being screwed to the nut (23).
8. The connection structure of a PC wall, a curtain wall and a steel structure according to claim 7, characterized in that: The embedded component (20) further comprises an elastic washer (24), wherein the elastic washer (24) is sleeved on the bolt (22) between the angle steel (27) and the embedded plate (21).
9. The connection structure of a PC wall, a curtain wall and a steel structure according to claim 1, characterized in that: The steel beam (3) is provided with a plurality of steel plate reinforcing ribs (31), and the plurality of steel plate reinforcing ribs (31) are distributed along the length direction of the steel beam (3).
10. A method for connecting a PC wall, a curtain wall and a steel structure, based on a connection structure of a PC wall, a curtain wall and a steel structure as claimed in any one of claims 1 to 9, characterized in that: The steps include: Installing the embedded part (10) on the upper end of the floor slab (1); Installing the steel beam (3) at the lower end of the floor slab (1); Embedded components (20) are installed at both the upper and lower ends of the PC wall (2); The embedded component (20) at the upper end of the PC wall (2) is connected to the embedded part (10) by welding; The embedded component (20) at the lower end of the PC wall (2) is connected to the steel beam (3) by welding; The curtain wall (4) is installed on a side of the PC wall (2) away from the floor slab (1), and the frame (43) of the curtain wall (4) is connected to the steel beam (3).
Citation Information
Patent Citations
Concrete embedded part
CN202284329U
Assembly type steel structure externally-hung wallboard connecting joint
CN210013340U
Steel structure assembly type residence outer envelope system
CN214786284U