Construction method for controlling large deformation of weak surrounding rock

Through the construction methods of surrounding rock partitioning and lengthened anchor rods, spray concrete and circumferential grouting reinforcement, the problem of weak stress in high ground in tunnel projects is solved, and the control of surrounding rock deformation rate and total amount is achieved, and the improvement of Construction safety and efficiency.

CN119041915APending Publication Date: 2024-11-29CHONGQING JIAOTONG UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410818505.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

In tunnel projects, weak stress on the high ground leads to excessive deformation of the supporting structure and reduced load-bearing capacity. It is difficult for the existing technology to effectively control the deformation rate and total deformation of the surrounding rock, affecting construction safety and efficiency.

Method used

By partitioning the surrounding rock into plastic residue zones and plastic softening zones, and using construction methods of extended anchor rods, jet concrete and circumferential grouting reinforcement, the implementation timing and scope of support structures and grouting reinforcement are coordinated to control the surrounding rock. Deformation rate and total deformation amount.

Benefits of technology

Effectively reduce the deformation rate and total deformation of surrounding rock, reduce deformation of support structures, improve the integrity of surrounding rock, ensure construction safety and efficiency, provide support resistance, and ensure surrounding rock stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041915A_ABST
    Figure CN119041915A_ABST
Patent Text Reader

Abstract

The invention relates to a construction method for controlling large deformation of weak surrounding rock, and belongs to the technical field of tunnel engineering construction. Comprising the steps that S1, a tunnel is excavated, and a lengthened anchor rod is constructed; s2, primary supporting is conducted, specifically, a reinforcing mesh and a steel arch are sequentially constructed, and concrete is sprayed; s3, the surrounding rock is subjected to circumferential grouting reinforcement; and S4, a secondary lining is constructed. Wherein the length RL of the lengthened anchor rod is at least larger than the radius Rp, Rp + 1.5 mlt, of the plastic softening area; rLlt; 1.25 Rp, 1.25 Rp; and the radius Rp of the plastic softening area is deduced by enabling the radial stress sigma Rp of the plastic softening area of the tunnel surrounding rock to be equal to the radial stress sigma Rb of the plastic residual area. The weak surrounding rock of the tunnel is reinforced in the mode of lengthening the anchor rod, spraying the concrete and annularly grouting, the surrounding rock pressure acting on a supporting structure is reduced, the deformation amount of the surrounding rock is controlled, and the deformation rate of the surrounding rock is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel engineering construction and relates to a construction method for controlling large deformation of soft surrounding rocks. Background Art

[0002] Large deformation of weak surrounding rock due to high ground stress is an engineering problem often encountered during the construction of underground projects such as highways, railways, and water conservancy projects. The deformation of the surrounding rock far exceeds the requirements of relevant specifications, and sometimes exceeds 50 cm, or even reaches about 1 m.

[0003] Large deformation of weak surrounding rock with high ground stress will cause excessive deformation of the support structure, which will in turn reduce the bearing capacity of the support structure and cause damage.

[0004] The distribution of geostress and rock properties of many tunnels show that the geostress is generally above 10MPa, and a few tunnels can reach above 20MPa; the rock types of the tunnels include phyllite, siltstone, metamorphic sandstone, and a few contain mudstone and sedimentary rock.

[0005] The results of the surrounding rock wave velocity test on multiple tunnels show that the wave velocity near the tunnel excavation contour is relatively small. With the increase of the measuring hole depth, the surrounding rock wave velocity rises rapidly and then stabilizes. This indicates that the surrounding rock near the tunnel excavation contour is in a loose state, loose and broken, with poor integrity and low self-bearing capacity.

[0006] After analyzing the tunnel surrounding rock based on the elastic-plastic theory, it can be seen that: after a certain section is excavated, the surrounding rock near the excavation contour is first in the elastic stage; when the rock mass enters the plastic soft rock stage, plastic softening deformation occurs, and the surrounding rock deformation in these two stages is both extrusion deformation; when the rock mass enters the plastic residual stage, plastic residual deformation occurs, that is, loose deformation.

[0007] According to the New Austrian Tunneling Method (NATM), which is commonly used in tunnel construction, the control ideas for large deformation of weak surrounding rock with high ground stress can be summarized as follows: the extrusion deformation during tunnel excavation and support needs to be released, and the loose deformation needs to be controlled, so as to give full play to the bearing capacity of the surrounding rock itself and reduce the pressure on the support structure.

[0008] According to the deformation mechanism of soft rock with high ground stress, controlling its deformation rate and total deformation is the key to ensuring the effect of deformation control. For large deformation of surrounding rock in soft rock tunnel, reasonable control of surrounding rock deformation rate and total deformation is of great significance to ensure construction safety, construction efficiency and reduce the occurrence of engineering disasters caused by large deformation. System anchors can improve the integrity of surrounding rock and appropriately reduce the deformation rate of surrounding rock. Grouting reinforcement is an important measure to control the loosening and deformation of surrounding rock. However, there is no clear conclusion on how to coordinate various support structures with grouting reinforcement measures and how to determine the timing of grouting reinforcement. Summary of the invention

[0009] In view of this, the purpose of the present invention is to provide a construction method for controlling large deformation of weak surrounding rock, which can improve the integrity of surrounding rock, reduce the deformation rate of surrounding rock, and coordinate the timing and scope of construction of support structure and grouting reinforcement.

[0010] In order to achieve the above object, the present invention provides the following technical solutions:

[0011] A construction method for controlling large deformation of weak surrounding rock, which divides the surrounding rock into zones, including a plastic residual zone and a plastic softening zone in the direction from the tunnel excavation section to the surrounding rock;

[0012] The construction method comprises the following steps:

[0013] S1, excavate the tunnel and install the extended anchor bolt;

[0014] S2, performing initial support: sequentially applying a steel mesh and a steel arch frame on the tunnel excavation section, and spraying concrete on the steel mesh and the steel arch frame;

[0015] S3, perform circumferential grouting reinforcement on the surrounding rock;

[0016] S4, constructing secondary lining on the initial supporting surface.

[0017] The lengthened anchor rod is inserted into the surrounding rock from the tunnel excavation section; in step S1, the length of the lengthened anchor rod R L Greater than the radius R of the surrounding rock plastic softening zone p .

[0018] Optionally, the length of the extended anchor rod R L The value range is: R p +1.5m <R L <1.25R p .

[0019] Optionally, the extended anchor rod is a fully bonded anchor rod.

[0020] Optionally, the radius R of the plastic softening zone p The calculation formula is:

[0021]

[0022] c″=c0-M c *(ε θ b -ε θ p )

[0023]

[0024] Among them, R0 is the tunnel excavation radius, P0 is the original rock stress, and p i The support resistance of the supporting structure; c0, are the cohesion and internal friction angle of the surrounding rock when it is in the elastic stage, k, M, N are the calculation parameters of the surrounding rock when it is in the elastic stage; c′, are the cohesion and internal friction angle of the surrounding rock when it is in the plastic softening stage, k′, M′, N′ are the calculation parameters of the surrounding rock when it is in the plastic softening stage; c″, are the cohesion and internal friction angle of the surrounding rock when it is in the plastic residual stage, k″, M″, N″ are the calculation parameters of the surrounding rock when it is in the plastic residual stage; M c is the cohesive softening modulus, is the softening modulus of internal friction angle, ε θ b is the strain accumulation value, ε p is the accumulated strain at the elastic-plastic interface.

[0025] Optionally, when the radial stress σ of the surrounding rock in the plastic softening zone R p Equal to the surrounding rock radial stress σ in the plastic residual zone R b When , the radius of the plastic softening zone R can be derived p The calculation formula of R p and σ R b The calculation formulas are:

[0026]

[0027] Optionally, in step S3, the tunnel face is advanced, and when the surrounding rock near the tunnel excavation contour is about to enter a plastic residual state, grouting reinforcement is performed on the surrounding rock.

[0028] Optionally, when the radius of the plastic residual zone R b When it is equal to the tunnel excavation radius R0, the surrounding rock is reinforced by grouting.

[0029] Optional, grouting range radius R g Equal to the radius of the plastic softening zone R p .

[0030] Optionally, the radius of the plastic residual zone R b The calculation formula is as follows:

[0031]

[0032] In the above formula, c” is the cohesion value of the surrounding rock in the plastic residual stage, σ Ris the radial stress of the surrounding rock at the elastic-plastic interface, G" is the shear modulus of the surrounding rock in the plastic residual stage, η1 is the expansion coefficient of the plastic softening zone, ε θ p , ε θ e All are strain accumulation values.

[0033] Optionally, in step S4, the tunnel face is advanced, and when the strength of the grouting surrounding rock reaches the design strength and the deformation of the surrounding rock is stable, the secondary lining is applied. The beneficial effects of the present invention are:

[0034] The present invention fully controls the deformation rate and total deformation of the soft surrounding rock during tunnel excavation through the construction method of "lengthened anchor rods + shotcrete (including steel arch frames) + circumferential (delayed) grouting", thereby reducing the surrounding rock pressure acting on the support structure and reducing the deformation of the support structure.

[0035] Through the construction method of the present invention, the deformation rate and the total deformation of the surrounding rock can be controlled, and support resistance can be provided after the initial support is applied to ensure the stability of the surrounding rock.

[0036] The present invention also defines a method for determining the length of the extended anchor rod, which facilitates the reasonable determination of the length of the extended anchor rod according to actual engineering conditions during the engineering design phase, and provides a theoretical basis for deformation control of weak surrounding rocks.

[0037] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:

[0039] Figure 1 It is a schematic diagram of the construction steps of the present invention;

[0040] Figure 2 The soft rock tunnel profile of the present invention is Figure 1 ;

[0041] Figure 3 The soft rock tunnel profile of the present invention is Figure 2 ;

[0042] Figure 4 This is a schematic diagram of the surrounding rock shotcrete (including steel arch frame) + lengthened anchor support for the soft rock tunnel of the present invention;

[0043] Figure 5 It is a schematic diagram of the circumferential (delayed) grouting of surrounding rock of a soft rock tunnel according to the present invention.

[0044] Reference numerals:

[0045] 1. Extended anchor rod, 2. Initial support, 3. Secondary lining, 4. Tunnel excavation section, 5. Surrounding rock grouting range, 6. Boundary line of plastic softening zone, 7. Surrounding rock. DETAILED DESCRIPTION

[0046] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.

[0047] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on the present invention. In order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of actual products. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.

[0048] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "front", "rear", etc. indicate the orientation or position relationship, they are based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as limiting the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0049] See also Figure 1 to Figure 5 , which is a construction method for controlling large deformation of weak surrounding rock, firstly, the surrounding rock 7 is divided into zones, which include a plastic residual zone, a plastic softening zone, and an elastic zone in the direction from the tunnel excavation section 4 to the surrounding rock 7;

[0050] The construction method comprises the following steps:

[0051] S1, excavate the tunnel and install the extended anchor 1;

[0052] The lengthened anchor rod 1 is inserted from the tunnel excavation section 4 into the surrounding rock 7; in step S1, the length R of the lengthened anchor rod 1 L It should be larger than the radius R of the plastic softening zone of the surrounding rock 7. p , and lengthen the anchor rod 1R L The radius R of the plastic softening zone of the surrounding rock 7 p The quantitative relationship between them is: R p +1.5m <R L <1.25R p ; When the density of the extended anchor rod 1 is larger, the deformation rate of the surrounding rock 7 is smaller and the deformation amount is smaller.

[0053] The extended anchor rod 1 adopts a fully bonded anchor rod, which is a type of anchor rod that uses high-performance polymer grouting material to directly consolidate the anchor rod in the rock or soil, forms a high-strength full bond between the anchor rod and the grouting material, and uses an anchor to firmly connect the anchor rod to the structural system. It has excellent tensile properties, can withstand large tensile stress, has good durability and corrosion resistance, and has excellent ductility and bonding properties. It can adapt to different deformation and stress environments and improve the safety and reliability of weak surrounding rock 7.

[0054] In the above step S1, it is necessary to first calculate the radius R of the plastic softening zone. p , and then through the radius R p Determine the length R of the extended anchor rod 1 L , radius R p The calculation process is as follows:

[0055] S11, first list the radial stress σ of the surrounding rock 7 in the tunnel plastic softening zone R p , radial stress σ of surrounding rock 7 in plastic residual zone R b , the calculation formulas are:

[0056]

[0057] c'=c0-M c *(εθ p -ε e )

[0058]

[0059] c″=c0-M c *(εθ p -ε e )

[0060]

[0061] Where k', M', N' are the calculation parameters of surrounding rock 7 in the plastic softening zone, k", M", N" are the calculation parameters of surrounding rock 7 in the plastic residual zone, c' and c" are the cohesion softening value and residual value; M is the softening value and residual value of the internal friction angle; c is the cohesive softening modulus, is the softening modulus of the internal friction angle, c0 is the cohesion of the surrounding rock 7 when it is in the elastic stage, is the internal friction angle of surrounding rock 7 when it is in the elastic stage, ε θ p is the strain accumulation value, ε e is the strain accumulation value at the elastic-plastic interface, R p is the radius of the plastic softening zone, and R0 is the tunnel excavation radius.

[0062] Then, the axial stress of the surrounding rock in the plastic softening zone of the tunnel and the radial stress of the surrounding rock in the plastic residual zone are equal, that is, σ R p =σ R b , the radius of the plastic softening zone R can be derived p , the calculation formula is as follows:

[0063]

[0064] In the above formula, P0 is the original rock stress, p i The supporting resistance provided by the supporting structure.

[0065] S12, according to the calculated radius R of the plastic softening zone p , combined with the reinforcement radius R of the extended anchor rod 1 L The radius R of the plastic softening zone of the surrounding rock 7 p The quantitative relationship between them is: R p +1.5m <R L <1.25R p , to determine the lengthening of the anchor rod 1R L Length.

[0066] S2, performing initial support 2: sequentially applying a steel mesh and a steel arch frame on the tunnel excavation section 4, and spraying concrete on the steel mesh and the steel arch frame;

[0067] The parameters and models of steel mesh, steel arch and shotcrete are designed and determined according to the actual project on site. The larger the parameters, the greater the support resistance p provided. i The bigger it is.

[0068] S3, after the tunnel face is continuously advanced, when the surrounding rock 7 near the tunnel excavation section 4 is about to enter the plastic residual stage, the plastic softening zone of the surrounding rock 7 is reinforced by circumferential grouting;

[0069] In the above step S3, the condition for judging that the surrounding rock 7 near the tunnel excavation section 4 enters the plastic residual stage is that the radius of the plastic residual zone R b = R0, the radius of the plastic residual zone b The calculation formula is as follows:

[0070]

[0071] In the above formula, c” is the cohesion value of surrounding rock 7 in the plastic residual stage, σ R is the radial stress of the surrounding rock 7 at the elastic-plastic interface, G" is the shear modulus of the surrounding rock 7 in the plastic residual stage, η1 is the expansion coefficient of the plastic softening zone, ε θ p , ε θ e All are strain accumulation values.

[0072] That is, when R b = R0, grouting reinforcement is performed on the surrounding rock 7 until the grouting range radius R g Equal to the radius of the plastic softening zone R p , the grouting is completed.

[0073] S4, after the tunnel face is advanced again, when the strength of the grouting surrounding rock 7 reaches the design strength, and the deformation of the surrounding rock 7 of the main tunnel is stable, and the deformation of the surrounding rock 7 no longer has an obvious growth rate (that is, the growth rate is close to 0), a secondary lining 3 is applied on the surface of the initial support 2.

[0074] The present invention fully controls the deformation rate and total deformation of the soft surrounding rock 7 during tunnel excavation through the construction method of "lengthening the anchor rod 1 + shotcrete (including steel arch frame) + circumferential (delayed) grouting", thereby reducing the pressure of the surrounding rock 7 acting on the support structure and reducing the deformation of the support structure.

[0075] Through the construction method of the present invention, the stress of the surrounding rock 7 during deformation can be released, and after the initial support 2 is applied, support resistance can be provided to ensure the stability of the surrounding rock 7.

[0076] The present invention also defines a method for determining the length of the extended anchor rod 1 , which facilitates the reasonable determination of the length of the extended anchor rod 1 according to actual engineering conditions during the engineering design phase, and provides a theoretical basis for deformation control of the weak surrounding rock 7 .

[0077] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.

Claims

1. A construction method for controlling large deformation of weak surrounding rock. Features: The surrounding rock (7) is divided into zones, which include a plastic residual zone and a plastic softening zone in the direction from the tunnel excavation section (4) to the surrounding rock (7); The construction method comprises the following steps: S1, excavating a tunnel and installing an extended anchor bolt (1); S2, performing initial support (2): sequentially applying a steel mesh and a steel arch frame on the tunnel excavation section (4), and spraying concrete on the steel mesh and the steel arch frame; S3, performing circumferential grouting reinforcement on the surrounding rock (7); S4, constructing a secondary lining (3) on the surface of the initial support (2). The extended anchor rod (1) is inserted from the tunnel excavation section (4) into the surrounding rock (7); in step S1, the length R of the extended anchor rod (1) is L Greater than the radius R of the plastic softening zone of the surrounding rock (7) p .

2. The construction method for controlling large deformation of weak surrounding rock according to claim 1, Features: The length R of the extended anchor rod (1) L The value range is: R p +1.5m <R L <1.25R p .

3. The construction method for controlling large deformation of weak surrounding rock according to claim 1, Features: The extended anchor rod (1) is a fully bonded anchor rod.

4. The construction method for controlling large deformation of weak surrounding rock according to claim 1, Features: The radius of the plastic softening zone R p The calculation formula is: Among them, R 0 is the tunnel excavation radius, P 0 is the original rock stress, p i The supporting resistance of the supporting structure, c 0 , are the cohesion and internal friction angle of the surrounding rock (7) when it is in the elastic stage, k, M, N are the calculation parameters of the surrounding rock (7) when it is in the elastic stage; c′, are the cohesion and internal friction angle of the surrounding rock (7) when it is in the plastic softening stage, k′, M′, N′ are the calculation parameters of the surrounding rock (7) when it is in the plastic softening stage; c″, are the cohesion and internal friction angle of the surrounding rock (7) when it is in the plastic residual stage, k″, M″, N″ are the calculation parameters of the surrounding rock (7) when it is in the plastic residual stage; M c is the cohesive softening modulus, is the softening modulus of internal friction angle, ε θ b is the strain accumulation value, ε p is the accumulated strain at the elastic-plastic interface.

5. The construction method for controlling large deformation of weak surrounding rock according to claim 4, Features: When the radial stress of the surrounding rock (7) in the plastic softening zone Equal to the radial stress σ of the surrounding rock (7) in the plastic residual zone R b When , the radius of the plastic softening zone R can be derived p The calculation formula of and σ R b The calculation formulas are:

6. The construction method for controlling large deformation of weak surrounding rock according to claim 1, Features: In step S3, the tunnel face is advanced, and when the surrounding rock (7) near the tunnel excavation contour line is about to enter a plastic residual state, grouting reinforcement is performed on the surrounding rock (7).

7. The construction method for controlling large deformation of weak surrounding rock according to claim 6, Features: When the radius of the plastic residual zone R b Equal to the tunnel excavation radius R 0 When the surrounding rock (7) is reinforced by grouting.

8. The construction method for controlling large deformation of weak surrounding rock according to claim 6, Features: Grouting range radius R g Equal to the radius of the plastic softening zone R p .

9. The construction method for controlling large deformation of weak surrounding rock according to claim 7, Features: Plastic residual zone radius R b The calculation formula is as follows: In the above formula, c” is the cohesion value of the surrounding rock (7) in the plastic residual stage, σ R is the radial stress of the surrounding rock (7) at the elastic-plastic interface, G" is the shear modulus of the surrounding rock (7) in the plastic residual stage, η 1 is the expansion coefficient of the plastic softening zone, ε θ e All are strain accumulation values.

10. The construction method for controlling large deformation of weak surrounding rock according to claim 1, Features: In step S4, the tunnel face is advanced, and when the strength of the grouting surrounding rock (7) reaches the designed strength and the deformation of the surrounding rock (7) is stable, the secondary lining (3) is applied.

Citation Information

Cited By

  • Prestress supporting method for soft rock tunnel

    CN120968658A