Non-contact real-time monitoring method for multipoint absolute displacement of roadway surrounding rock

By using non-magnetic hose and anchoring agent to fix the magnetic anchor ring in the surrounding rock of the tunnel, real-time monitoring is achieved in combination with sensors, the problem of complex installation and easy damage of magnetic anchor rings in the prior art is solved, and monitoring efficiency and accuracy are improved .

CN119041990APending Publication Date: 2024-11-29PANZHIHUA UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411166154.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The installation of existing tunnel surrounding rock multi-point displacement meter is complicated and inconvenient, the magnetic anchor ring is prone to damage and cannot achieve real-time monitoring.

Method used

采用不导磁软管进行分段标记,并在围岩安装部位钻孔,将磁性锚环穿设在标记位置上,使用锚固剂固定,结合钢绞线增强软管强度,并通过传感器与数据采集站连接,实现实时监测。

Benefits of technology

The installation process of magnetic anchor rings is simplified, the installation speed and efficiency are improved, the anchor ring damage is avoided, and real-time monitoring of surrounding rock displacement is achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041990A_ABST
    Figure CN119041990A_ABST
Patent Text Reader

Abstract

The invention discloses a roadway surrounding rock multipoint absolute displacement non-contact real-time monitoring method, and belongs to the technical field of monitoring. The method comprises the following steps of: a, marking the non-magnetic hose (8) in sections; b, drilling holes in the mounting part of the surrounding rock (6); c, a magnetic anchor ring (5) is arranged at the marked position of a non-magnetic hose (8) in a penetrating mode and fixed, and after a steel strand (11) is inserted into the non-magnetic hose (8), the non-magnetic hose (8) is sent into a drill hole of the surrounding rock (6); d, grouting from a gap between the magnetic anchor ring (5) and the drill hole; and e, after the anchoring agent (9) is fixed, the steel strand (11) is pulled out and penetrates into the measuring rod (4). According to the method, the magnetic anchor ring (5) is easy to install, the magnetic anchor ring (5) is not prone to being damaged by fixing the magnetic anchor ring (5) to the surrounding rock (6), and data are more accurate. The problems that in the prior art, magnetic anchor rings (5) are sequentially installed, and installation is complex; and the magnetic anchor ring (5) is easy to damage, so that the data is inaccurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention discloses a non-contact real-time monitoring method for multi-point absolute displacement of surrounding rocks in a tunnel, belonging to the technical field of monitoring. Background Art

[0002] The multi-point displacement meter of the sonic probe monitors the displacement data of the magnetic anchor ring installed in the surrounding rock of the tunnel to obtain surrounding rock displacement, stratum dislocation, range and depth of stratum damage or weak change, and other surrounding rock deformation and destruction characteristics. The multi-point displacement meter of the sonic probe is installed using 6 PVC plastic pipes, through which the magnetic ring is sent to the measuring point in the borehole. Its installation is extremely inconvenient and the magnetic ring cannot be installed to the measuring point at one time; the magnetic ring is easily damaged during installation and the subsequent surrounding rock movement process; the multi-point displacement meter can only be connected to the data acquisition instrument and cannot be monitored in real time. Multi-point displacement meter installation method:

[0003] 1 Mark the depth. Connect the 25mm diameter PVC plastic pipe and mark the depth in step (5) at the corresponding length position on the rod body. Use a marking pen to write the depth position and wrap the depth position with tape to prevent coal slime contamination and make it difficult to identify.

[0004] 2 Drilling. Drill a 42mm hole at the installation site of the surrounding rock, with a depth of no more than 10m (considering the deformation of the surrounding rock in the later stage, the recommended hole depth is 9.2m).

[0005] 3 Install the core tube. Bend the tail end of the core tube into a hook shape, and use tape to tie the hook shape so that its diameter is less than 40mm, and then send the core tube into the bottom of the drill hole from the hook end.

[0006] 4 Install the top fixed anchor point. Put the fixed anchor point on the exposed end of the core tube, and then insert the core tube into the 25mm diameter PVC plastic tube. While sending the 25mm diameter PVC plastic tube into the drill hole, continue to connect the 25mm PVC plastic tube until the fixed anchor point is pushed into the bottom of the drill hole to complete the core tube fixing process. Then pull the 25mm PVC plastic tube out of the drill hole. The exposed core tube cannot be cut off.

[0007] 5Install magnetic anchor rings. Select the installation depth range and spacing of magnetic anchor points according to the surrounding rock crushing depth and measurement range. A maximum of 20 magnetic anchor rings can be installed, and the recommended installation depths are 0m, 0.3m, 0.6m, 0.9m, 1.2m, 1.5m, 1.8m, 2.1m, 2.5m, 2.9m, 3.3m, 3.7m, 4.1m, 4.6m, 5.1m, 5.6m, 6.1m, 7.1m, 8.1m, and 9.1m.

[0008] 6Insert the sonic probe into the core tube and send it along the core tube to the bottom of the hole. Turn on the data acquisition instrument to display the depth data of all magnetic anchor points.

[0009] The existing methods have the following defects: the installation is complicated and the magnetic anchor rings need to be installed one by one; the magnetic anchor rings are easily damaged; and they cannot be directly connected to the monitoring station. Summary of the invention

[0010] The technical problem to be solved by the present invention is that the existing medical waste placement barrels are fixed in position, occupy a large space and are inconvenient to use.

[0011] The technical solution adopted by the present invention to solve the technical problem is: a non-contact real-time monitoring method for multi-point absolute displacement of surrounding rock in a tunnel, which is characterized by comprising the following steps:

[0012] a. Mark the non-magnetic hose in sections according to a certain length;

[0013] b. Drill holes in the surrounding rock installation area;

[0014] c. Insert the magnetic anchor ring into the marked position of the non-magnetic hose and fix it, insert the steel strand into the non-magnetic hose, and then send the non-magnetic hose into the surrounding rock borehole;

[0015] d. Use anchoring agent grouting from the gap between the magnetic anchor ring and the drill hole to fix the magnetic anchor ring and the surrounding rock together;

[0016] e. After the anchor is fixed, pull out the steel strand and insert it into the measuring rod.

[0017] Wherein, the drilling depth in step b of the above method should be greater than the marked length of the non-magnetic hose.

[0018] Wherein, in step c of the above method, a plurality of fixing portions with barb-like structures are arranged at intervals in the circumferential direction on the outer edge of the magnetic anchor ring.

[0019] Furthermore, the magnetic anchor ring in step c of the above method includes a magnet ring and a fixing ring, one end of the fixing ring is provided with a groove, the magnet ring is inserted into the groove and fixed to the fixing ring, and the fixing portion is arranged on the outer edge side wall of the fixing ring.

[0020] Wherein, in step c of the above method, a fixed anchor ring column is used to fix the magnetic anchor ring on the non-magnetic hose, and the fixed anchor ring column is a ring-shaped structure, and blocks are arranged at intervals on the outer side wall.

[0021] Wherein, the outer end of the measuring rod in step e of the above method is connected to a computer via a sensor and a data acquisition station.

[0022] Wherein, the measuring rod described in the above method is installed by drilling in the advance working face. When the working face is mined back, the measuring rod can be removed and steps a to e can be repeated in the advance working face.

[0023] Wherein, the steel strand described in the above method is formed by twisting three steel wires.

[0024] Wherein, at most 20 magnetic anchor rings are installed on the non-magnetic hose in the above method.

[0025] Furthermore, a magnetic anchor ring is installed on the non-magnetic hose in the above method, and the marking depths of the non-magnetic hose are 0.5m, 1.0m, 1.5m, 2.0m, 2.5m, 3.0m, 3.5m, 4.0m, 4.5m, 5.0m, 5.5m, 6.0m, 6.5m, 7.0m, 7.5m, 8.0m, 8.5m, 9.0m, 9.5m and 10.0m respectively.

[0026] The beneficial effects of the present invention are as follows: the method improves the complicated installation process of the magnetic anchor ring; the magnetic anchor ring is fixed to the surrounding rock after grouting, so as to prevent the magnetic anchor ring from falling due to the movement of the surrounding rock and being squeezed and damaged, resulting in no data at that position. The installation speed of the improved method can be 3 to 4 times faster than the original installation speed. The original installation takes 5 to 8 hours, and the improved installation takes 2 to 3 hours. Moreover, after the improvement, the magnetic anchor ring can be better fixed to the surrounding rock after grouting with the anchoring agent, and the magnetic anchor ring is not easily damaged. After installation, each magnetic anchor ring represents a point and data will be displayed. If the movement of the surrounding rock at that position will drive the magnetic anchor ring to move, the distance moved by the surrounding rock can be measured by the sensor. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 A schematic diagram of the monitoring structure for installing the present invention;

[0028] Figure 2 For the present invention Figure 1 The enlarged schematic diagram of the structure at position I in the middle;

[0029] Figure 3 It is a schematic diagram of the installation process of the present invention;

[0030] Figure 4 It is a structural schematic diagram of the magnetic anchor ring and the fixed anchor ring column of the present invention installed on the non-magnetic conductive hose;

[0031] Figure 5 It is a structural schematic diagram of the magnetic anchor ring of the present invention;

[0032] Figure 6 It is a schematic diagram of the cross-sectional structure of the magnetic anchor ring of the present invention;

[0033] Figure 7 It is a schematic diagram of the structure of the fixed anchor ring column of the present invention;

[0034] Figure 8 It is a schematic diagram of the cross-sectional structure of the steel strand of the present invention;

[0035] Fig. 9 For the present invention Figure 1 Schematic diagram of the monitoring structure after displacement occurs;

[0036] Fig.10 This is a schematic diagram of the displacement process of the present invention;

[0037] Fig.11 This is a schematic diagram of data before simulating rock stratum movement in the present invention;

[0038] Fig.12 This is a schematic diagram of data after simulating rock stratum movement in the present invention;

[0039] Fig.13 This is a multi-point displacement curve diagram of the 1# measuring station in Example 2 of the present invention;

[0040] Fig.14 This is a multi-point displacement curve diagram of the 3# measuring station in Example 2 of the present invention;

[0041] Fig.15 This is a multi-point displacement curve diagram of the 4# measuring station in Example 2 of the present invention;

[0042] Fig.16 It is a multi-point displacement curve diagram of a half-square measuring station in Example 2 of the present invention;

[0043] Fig.17 This is a multi-point displacement curve diagram of the 5# measuring station in Example 2 of the present invention;

[0044] Fig.18 This is a multi-point displacement curve diagram of the 6# measuring station in Example 2 of the present invention.

[0045] The markings in the figure are: 1. computer; 2. data acquisition station; 3. sensor; 4. measuring rod; 5. magnetic anchor ring; 6. surrounding rock; 7. fixed anchor ring column; 71. block; 8. non-magnetic hose; 9. anchor; 10. fixed ring; 101. fixing part; 11. steel strand; 12. magnetic anchor ring A. DETAILED DESCRIPTION

[0046] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0047] like Figures 1 to 18 As shown, the non-contact real-time monitoring method for multi-point absolute displacement of surrounding rock in a tunnel of the present invention is characterized by comprising the following steps:

[0048] a. Mark the non-magnetic hose 8 in sections according to a certain length;

[0049] b. Drill holes at the installation location of the surrounding rock 6;

[0050] c. Insert the magnetic anchor ring 5 into the marked position of the non-magnetic hose 8 and fix it, insert the steel strand 11 into the non-magnetic hose 8, and then send the non-magnetic hose 8 into the borehole of the surrounding rock 6;

[0051] d. Using anchoring agent 9 to inject grout from the gap between magnetic anchor ring 5 and the borehole to fix magnetic anchor ring 5 and surrounding rock 6 together;

[0052] e. After the anchoring agent 9 is fixed, pull out the steel strand 11 and insert it into the measuring rod 4. It can be understood by those skilled in the art that this method improves the complicated installation process of the magnetic anchor ring 5. The magnetic anchor ring 5 is actually fixed on the non-magnetic hose 8 according to the marked position, which ensures the fixed position of the magnetic anchor ring 5. In addition, this method can install the required magnetic anchor ring 5 at one time, which reduces the installation time and improves the installation efficiency. At the same time, the magnetic anchor ring 5 is fixed to the surrounding rock 6 after grouting (such as the attached Fig. 9 The dotted line in the middle indicates the original position of the magnetic anchor ring 5, and the solid line indicates the position of the magnetic anchor ring A12 after displacement), so as to avoid the magnetic anchor ring 5 from falling due to the movement and squeezing of the surrounding rock 6, resulting in no data at this position, thus ensuring the accuracy of the data. Step a mainly marks the magnetic anchor ring 5 on the non-magnetic hose 8 in advance, and the specific position can be marked according to actual needs. Step b can directly drill holes in the installation position of the surrounding rock 6 by a drilling machine for the installation of the magnetic anchor ring 5. Step c is to fix the magnetic anchor ring 5 on the non-magnetic hose 8 according to the marked position, and at the same time, insert the steel strand 11 into the non-magnetic hose 8, and then send the non-magnetic hose 8 into the borehole of the surrounding rock 6. The purpose of inserting the steel strand 11 is to increase the strength of the non-magnetic hose 8. Since the outer end of the magnetic anchor ring 5 will contact the inner wall of the borehole at intervals, the single non-magnetic hose 8 will be partially bent and cannot be sent to the bottom of the hole. This method preferably inserts the steel strand 11 to increase the strength of the non-magnetic hose 8, and the steel strand 11 can be bent appropriately to facilitate insertion into the borehole. Step d is to inject grout into the borehole so that the magnetic anchor ring 5 is combined with the inner wall of the borehole of the surrounding rock 6 through the anchor 9, so that the position of the magnetic anchor ring 5 is fixed to the surrounding rock 6 and is not easy to slide and damage. Step e is to extract the steel strand 11 and insert it into the measuring rod 4 for measuring data.

[0053] Preferably, the drilling depth in step b of the above method should be greater than the marked length of the non-magnetic hose 8. Those skilled in the art will appreciate that, in consideration of the deformation of the drilled portion of the surrounding rock 6, in order to ensure that the marked length of the non-magnetic hose 8 is fully penetrated, the drilling depth in step b of the method should preferably be greater than the marked length of the non-magnetic hose 8.

[0054] Preferably, in step c of the above method, a plurality of fixing parts 101 with barb-like structures are arranged at intervals on the outer edge of the magnetic anchor ring 5. It can be understood by those skilled in the art that, in order to ensure that the magnetic anchor ring 5 is tightly connected to the surrounding rock 6 after grouting, the present method preferably arranges a plurality of fixing parts 101 with barb-like structures at intervals on the outer edge of the magnetic anchor ring 5. The arrangement of the fixing parts 101 allows the magnetic anchor ring 5 to be inserted in one direction and is not easy to be pulled out.

[0055] Preferably, the magnetic anchor ring 5 in step c of the above method comprises a magnet ring and a fixing ring 10, a groove is provided at one end of the fixing ring 10, the magnet ring is inserted into the groove and fixed to the fixing ring 10, and the fixing portion 101 is provided on the outer edge side wall of the fixing ring 10. It can be understood by those skilled in the art that the present method further preferably comprises a structure of the magnetic anchor ring 5, specifically comprising a magnet ring and a fixing ring 10, a groove is provided at one end of the fixing ring 10, the magnet ring is inserted into the groove and fixed to the fixing ring 10, and can actually be fixed by bonding, and the fixing portion 101 is provided on the outer edge side wall of the fixing ring 10.

[0056] Preferably, in step c of the above method, a fixed anchor ring column 7 is used to fix the magnetic anchor ring 5 on the non-magnetic hose 8, and the fixed anchor ring column 7 is an annular structure, and blocks 71 are arranged at intervals on the outer wall. It can be understood by those skilled in the art that, in order to facilitate the fixation of the magnetic anchor ring 5, the present device preferably provides a fixed anchor ring column 7, and the fixed anchor ring column 7 is used to fix the magnetic anchor ring 5 on the non-magnetic hose 8, and the fixed anchor ring column 7 is an annular structure, and blocks 71 are arranged at intervals on the outer wall, and the fixed anchor ring column 7 is actually clamped on the non-magnetic hose 8. Due to the setting of the fixing part 101, when the non-magnetic hose 8 is inserted into the borehole, the borehole wall will reversely act on the fixing part 101 outside the magnetic anchor ring 5, so that the magnetic anchor ring 5 is in close contact with the fixed anchor ring column 7, thereby ensuring the position of the magnetic anchor ring 5.

[0057] Preferably, the outer end of the measuring rod 4 in step e of the above method is connected to the computer 1 through the sensor 3 and the data acquisition station 2. It can be understood by those skilled in the art that, in order to achieve real-time monitoring, the device preferably connects the outer end of the measuring rod 4 to the computer 1 through the sensor 3 and the data acquisition station 2, so that the data can be directly displayed on the screen of the computer 1.

[0058] Preferably, the measuring rod 4 in the above method is installed by drilling in the advance working face, and the measuring rod 4 can be removed when the working face is mined, and steps a to e are repeated at the advance working face. It can be understood by those skilled in the art that, in order to repeat the monitoring, the measuring rod 4 is installed by drilling in the advance working face in the present method, and the measuring rod 4 can be removed when the working face is mined, and steps a to e are repeated at the advance working face. The advance working face here is a part of the surrounding rock 6, specifically the two sides of the surrounding rock 6 and the top plate position.

[0059] Preferably, the steel strand 11 in the above method is twisted from 3 steel wires. Those skilled in the art will appreciate that in this method, the steel strand 11 is preferably twisted from 3 steel wires, that is, a 1x3 steel strand 11 is used.

[0060] Preferably, in the above method, at most 20 magnetic anchor rings 5 ​​are installed on the non-magnetic hose 8. Those skilled in the art will appreciate that in order to ensure the accuracy of the monitoring data, the method preferably adjusts the number of magnetic anchor rings 5, specifically, preferably at most 20 magnetic anchor rings 5 ​​are installed on the non-magnetic hose 8.

[0061] Preferably, 20 magnetic anchor rings 5 ​​are installed on the non-magnetic hose 8 in the above method, and the marking depths of the non-magnetic hose 8 are 0.5m, 1.0m, 1.5m, 2.0m, 2.5m, 3.0m, 3.5m, 4.0m, 4.5m, 5.0m, 5.5m, 6.0m, 6.5m, 7.0m, 7.5m, 8.0m, 8.5m, 9.0m, 9.5m and 10.0m respectively. Those skilled in the art will appreciate that in order to ensure data stability, the present method preferably installs 20 magnetic anchor rings 5 ​​on the non-magnetic hose 8, that is, the magnetic anchor rings 5 ​​are fixed on the non-magnetic hose 8 at marked depths of 0.5m, 1.0m, 1.5m, 2.0m, 2.5m, 3.0m, 3.5m, 4.0m, 4.5m, 5.0m, 5.5m, 6.0m, 6.5m, 7.0m, 7.5m, 8.0m, 8.5m, 9.0m, 9.5m, and 10.0m, respectively.

[0062] Example 1

[0063] After the experimental device was installed, the experiment was started. The simulated coal seam experiment started at 9022mm, and moved down 100mm to 8922mm. The simulated limestone experiment started at 9209mm, and moved down 100mm to 9109mm. The simulated sandstone experiment started at 9456mm, and moved down 100mm to 9356mm.

[0064] serial number Simulate the position of rock formation before movement Simulate the position of rock formation after movement Surrounding rock displacement difference Magnetic anchor ring displacement difference 1 9022mm 8922mm 100mm 100mm 2 9209mm 9109mm 100mm 100mm 3 9456mm 9356mm 100mm 100mm

[0065] Table 3-1 Experimental data

[0066] After the simulated rock layer moved 100mm, the three experimental data all changed by 100mm. This shows that the experiment can be used to measure the displacement of the surrounding rock of the mine, as shown in Table 3-1.

[0067] Example 2: Monitoring the deformation of the roof surrounding rock using magnetostrictive sensors

[0068] This part uses a high-density distributed magnetostrictive sensor system to monitor the deformation laws of the roof surrounding rock. 20 measuring points are arranged within 0.5m, 1.0m, 1.5m, 2.0m, 2.5m, 3.0m, 3.5m, 4.0m, 4.5m, 5.0m, 5.5m, 6.0m, 6.5m, 7.0m, 7.5m, 8.0m, 8.5m, 9.0m, 9.5m and 10.0m in the roof borehole, and six measuring stations are set up for data statistics. The measuring stations are set up step by step according to the mining process, so the time difference will be included in the attached figure.

[0069] The relative displacement of the multi-point displacement meter at 1# measuring station at 0.1m in the borehole is 4mm, and the larger displacement is at 0-2m of the top plate; the relative displacement of the multi-point displacement meter at 3# measuring station at 0.1m in the borehole is 7mm, and the larger displacement is at 0-2m of the top plate; the relative displacement of the multi-point displacement meter at 4# measuring station at 0.1m in the borehole is 6mm, and the larger displacement is at 0-1m of the top plate; the relative displacement of the multi-point displacement meter at Banfang measuring station at 0.1m in the borehole is 0mm; the relative displacement of the multi-point displacement meter at 5# measuring station at 0.1m in the borehole is 2mm, and the larger displacement is at 0-1m of the top plate; the relative displacement of the multi-point displacement meter at 6# measuring station at 0.1m in the borehole is 3mm, and the larger displacement is at 0-1m of the top plate.

[0070] In summary, a high-density distributed multi-point displacement meter system is used to monitor the deformation law of the roof surrounding rock 6. 20 measuring points are arranged at 0.5m, 1m, 1.5m, 2m, 2.5m, 3m, 3.5m, 4m, 4.5m, 5m, 5.5m, 6m, 6.5m, 7m, 7.5m, 8m, 8.5m, 9m, 9.5m, and 10m in the roof borehole. It can be seen from the monitoring data that the relative displacement of each measuring point on the roof is generally small, and the maximum displacement range is within the range of 0 to 3m from the roof.

Claims

1. Non-contact real-time monitoring method of multi-point absolute displacement of surrounding rock in tunnels, Features The steps include: a. Marking the non-magnetic hose (8) in sections according to a certain length; b. Drilling holes in the surrounding rock (6) at the installation location; c. Insert the magnetic anchor ring (5) into the marked position of the non-magnetic hose (8) and fix it, insert the steel strand (11) into the non-magnetic hose (8), and then send the non-magnetic hose (8) into the borehole of the surrounding rock (6); d. Using an anchoring agent (9) to inject grout into the gap between the magnetic anchor ring (5) and the drill hole to fix the magnetic anchor ring (5) and the surrounding rock (6) together; e. After the anchoring agent (9) is fixed, pull out the steel strand (11) and insert it into the measuring rod (4).

2. The method for real-time non-contact monitoring of multi-point absolute displacement of surrounding rock in tunnel according to claim 1, Features: The drilling depth in step b should be greater than the marked length of the non-magnetic hose (8).

3. The method for real-time non-contact monitoring of multi-point absolute displacement of surrounding rock in tunnel according to claim 1, Features: In the step c, a plurality of fixing portions (101) with barb-like structures are arranged at intervals in the circumferential direction on the outer edge of the magnetic anchor ring (5).

4. The method for real-time non-contact monitoring of multi-point absolute displacement of surrounding rock in tunnel according to claim 3, Features: In step c, the magnetic anchor ring (5) comprises a magnet ring and a fixing ring (10), one end of the fixing ring (10) is provided with a groove, the magnet ring is inserted into the groove and fixed to the fixing ring (10), and the fixing portion (101) is arranged on the outer edge side wall of the fixing ring (10).

5. The method for real-time non-contact monitoring of multi-point absolute displacement of surrounding rock in tunnel according to claim 1, Features: In the step c, a fixed anchor ring column (7) is used to fix the magnetic anchor ring (5) on the non-magnetic hose (8); the fixed anchor ring column (7) is an annular structure, and blocks (71) are arranged at intervals on the outer wall.

6. The method for real-time non-contact monitoring of multi-point absolute displacement of surrounding rock in a tunnel as claimed in claim 1, Features: The outer end of the measuring rod (4) in step e is connected to the computer (1) via the sensor (3) and the data acquisition station (2).

7. The method for real-time non-contact monitoring of multi-point absolute displacement of surrounding rock in tunnel according to claim 1, Features: The measuring rod (4) is installed by drilling at the leading working face. When the working face is mined, the measuring rod (4) can be removed and steps a to e can be repeated at the leading working face.

8. The method for real-time non-contact monitoring of multi-point absolute displacement of surrounding rock in tunnel according to claim 1, Features: The steel strand (11) is formed by twisting three steel wires.

9. The method for real-time non-contact monitoring of multi-point absolute displacement of surrounding rock in a tunnel as claimed in claim 1, Features: A maximum of 20 magnetic anchor rings (5) are installed on the non-magnetic hose (8).

10. The method for real-time non-contact monitoring of multi-point absolute displacement of surrounding rock in a tunnel as claimed in claim 9, Features: Twenty magnetic anchor rings (5) are installed on the non-magnetic hose (8), and the marking depths of the non-magnetic hose (8) are respectively 0.5m, 1.0m, 1.5m, 2.0m, 2.5m, 3.0m, 3.5m, 4.0m, 4.5m, 5.0m, 5.5m, 6.0m, 6.5m, 7.0m, 7.5m, 8.0m, 8.5m, 9.0m, 9.5m, and 10.0m.