Construction method of dome structure of space reticulated shell mechanism
Through three-dimensional simulation and Rhino modeling, combined with unit and segmented installation and high-precision total station measurement, the problems of drawing deepening, component processing and installation accuracy control in the construction of the dome of the space grid shell structure are solved, and the dome is realized The smooth, safe and precise construction of the structure improves construction efficiency and quality.
Patent Information
- Application Number
- CN202411158072.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-29
AI Technical Summary
The construction of the space mesh shell dome has large workload, high difficulty in processing components, high installation accuracy requirements, difficult deformation control, narrow construction site, complex concrete structure, large number of components, many post-repair parts, and welding quality control Difficulty and other problems.
Three-dimensional simulation and calculation software is used to simulate and analyze the entire construction process, Rhino modeling deepens modeling, unit-type and segmented installation, high-precision total station measurement, precise positioning based on deepening drawings and actual measurements during welding, and semi-automatic Welding technology, set up a weatherproof shelter to avoid overlapping welds, ensure clear component numbers, and analyze and reinforce crane stations.
The smooth, safe and precise construction of the space-shaped structural dome is achieved, which reduces deformation and welding deformation, improves installation efficiency and quality, and ensures the safety and reliability of the structure.
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of dome construction, and in particular to a construction method of a dome structure of a space lattice shell mechanism. Background Art
[0002] For the space lattice shell dome structure, since it is a special-shaped structure in space and the architectural appearance requires a draft, some components are bent and torsion hyperbolic structures. The conventional steel structure deepening software Tekla cannot meet the requirements, the workload of drawing deepening is large, the component processing is difficult, and the installation accuracy requirements are high.
[0003] In addition, its structural system is different from the frame and truss system, and it deforms greatly under the action of external force. How to control the position during the installation process is of paramount importance.
[0004] Secondly, the construction site is small, the concrete structure is complex, the number of components is large, there are almost no identical rods, and there are a lot of supplementary rods, which make installation difficult. The installation is carried out by on-site assembly, the number of pieces is large, and the components are easy to mix up. The steel material of this project is mainly Q355B. The supplementary rods and assembled rods are connected by welding, and the welding quality is difficult to control.
[0005] In view of this, those skilled in the art need to improve the existing construction methods. Summary of the invention
[0006] The main purpose of the present application is to provide a construction method for a spatial lattice shell dome structure, which ensures the smooth, safe and precise construction of the dome with a spatial special-shaped structure.
[0007] In order to achieve the above objectives, in a first aspect, the present application provides a construction method of a space lattice shell dome structure, comprising the following steps:
[0008] S1. Before the drawings are deepened, 3D simulation software is used to simulate and analyze the entire construction process, including calculating the deflection value of the lattice shell under different loads, performing 3D simulation calculations on each step of the hoisting, and simulating the construction of all concrete and steel structures to formulate the construction sequence;
[0009] S2, use Rhino modeling to carry out in-depth modeling, unfold the double-torsion member and draw a diagram, take its section at intervals of 1m to control its torsion posture, extract the coordinates of key points, and perform pre-arching in the deepening process based on the deflection value calculated in S1;
[0010] S3. Formulate the processing technology based on the detailed drawings formed after the detailed modeling in S2, and install the dome structure in a combination of unit-type and segmented installation. The components are segmented and numbered according to the detailed drawings before processing;
[0011] S4. The dome units of the dome structure are assembled on the ground, using HW300×300 steel as the ground beam, and the assembly frame is set at the hardened position. The main control points of the assembly unit are extracted using BIM software, and finally the total station is used to measure and place points;
[0012] S5. The processed dome units are hoisted and assembled in sequence according to the numbers. At the same time, three-dimensional simulation calculations are performed on each step of the hoisting. During the assembly process, a high-precision total station is used for measurement and observation, and the spatial posture of each rod is fine-tuned. The subsequent rods and assembly rods are connected by welding.
[0013] A further improvement is that in step S5, during welding, based on the three-dimensional spatial coordinates of key points in the detailed drawings and the precise positioning of the total station during construction, the lengths of the supplementary rods and assembled rods are corrected twice according to the actual measured lengths.
[0014] A further improvement is that in step S5, the welding adopts semi-automatic flux-cored wire gas shielded welding and / or semi-automatic solid wire gas shielded welding.
[0015] A further improvement is that in step S5, when high-altitude welding encounters windy and rainy weather, a wind and rainproof shed is set up at the joint for welding to ensure that the welding is not interrupted.
[0016] A further improvement is that in step S2, the overlapping rods in the detailed drawing are adjusted to avoid overlapping welds between the rods, so that welding cannot be performed at the locations where hidden welds appear.
[0017] As a further improvement, in step S3, the components are numbered by at least one of affixing a QR code, spraying coding on the upper surface, and stamping a number.
[0018] A further improvement is that in step S5, a stress analysis is performed on the crane station position under the most unfavorable working condition to calculate the foundation bearing capacity under the most unfavorable working condition. The station crane can only be hoisted after passing the test. If it does not meet the requirements, it will be reinforced.
[0019] The invention provides a construction method for a space lattice shell dome structure. Compared with the prior art, the invention has the following beneficial effects: before the drawings are deepened, a three-dimensional simulation calculation software is used to simulate and analyze the entire construction process, and the deformation is considered in advance. At the same time, a three-dimensional simulation calculation is performed on each step of the hoisting to ensure the deformation of the structure and the safety during the installation process. The Rhino modeling method is used for deepening the modeling, the double torsion member is unfolded and drawn, and its cross section is taken at intervals of 1m to control its torsion posture. At the same time, the coordinates of each control point are extracted for processing and retesting. A strict processing technology is formulated by deepening the drawings. The three-dimensional spatial positioning coordinates of the key points need to be extracted before processing. Real-time measurement and observation are performed during the project to reduce the deformation caused by welding deformation. DETAILED DESCRIPTION
[0020] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiment of the present application will be clearly and completely described below in combination with the embodiment of the present application. Obviously, the described embodiment is only a part of the embodiment of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work should fall within the scope of protection of the present application.
[0021] It should be noted that the terms "first", "second" etc. of the specification and claims of the present application are used to distinguish similar objects, and need not be used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged in appropriate circumstances, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, the process, method, system, product or equipment comprising a series of steps or units need not be limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or equipment.
[0022] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to specific circumstances.
[0023] In addition, the term "plurality" shall mean two or more.
[0024] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below in conjunction with the embodiments.
[0025] A construction method for a space lattice shell dome structure comprises the following steps:
[0026] S1. Before the drawings are deepened, 3D simulation software is used to simulate and analyze the entire construction process, including calculating the deflection value of the grid shell under different loads, performing 3D simulation calculations on each step of the hoisting, and simulating the construction of all concrete and steel structures to formulate a construction sequence to ensure the deformation of the structure and the safety during the installation process;
[0027] S2. Use Rhino modeling to carry out in-depth modeling, unfold the double-torsion member and draw the drawing, take its section at intervals of 1m to control its torsion posture, and extract the coordinates of key points. After the deepening is completed, the front and back sides of the bending-torsion member and the cutting direction of the view are reflected in the drawing. Pre-arching is carried out during the deepening process based on the deflection value calculated in S1, and the pre-arching scheme and other optimization measures are included in the construction drawings to ensure that the construction is carried out according to the optimized scheme, to ensure a smooth construction process, and to ensure that the final structure is safe and reliable;
[0028] S3. Formulate the processing technology based on the detailed drawings formed after the detailed modeling in S2, and install the dome structure in a combination of unit-type and segmented installation. The components are segmented and numbered according to the detailed drawings before processing;
[0029] S4. The dome units of the dome structure are assembled on the ground, using HW300×300 steel as the ground beam, and the assembly frame is set at the hardened position. The main control points of the assembly unit are extracted using BIM software, and finally the total station is used to measure and place points;
[0030] S5. The processed dome units are hoisted and assembled in sequence according to the numbers. At the same time, three-dimensional simulation calculations are performed on each step of the hoisting. During the assembly process, a high-precision total station is used for measurement and observation, and the spatial posture of each rod is fine-tuned. The subsequent rods and assembly rods are connected by welding.
[0031] The dome structure is a typical space lattice shell structure. The structural system is different from the frame and truss system. It deforms greatly under the action of external force. How to control the position during the installation process is of utmost importance. Therefore, step S1 and step S4 are used to control its deformation.
[0032] The installation is carried out by combining unit-type and segmented installation. The construction site is small, the concrete structure is complex, the number of components is large, there are almost no identical rods, and there are a lot of supplementary rods, which makes the installation difficult. Therefore, steps S1 and 5 are used to solve the above problems. In addition, the site is reasonably arranged according to the construction process, overall coordination, and scientific management. During the assembly process, high-precision total stations are used for measurement and observation, and the spatial posture of each rod is fine-tuned to ensure that the assembly deformation meets the design and specification requirements. For the management of components, advanced component information management technology (digital steel structure management system and component QR code identification system) is used to manage the production plan and progress monitoring, finished product management, packaging and shipment, and on-site receipt of components, so as to achieve traceability management of component information, so as to ensure the timely and accurate production and delivery of components of this project, so as to ensure the smooth progress of on-site installation. According to the on-site demand plan, a detailed production plan and transportation plan are formulated and updated in time, and the components are matched and supplied with margins. BIM technology is used to simulate the construction of all concrete and steel structures, and a reasonable and feasible construction sequence is formulated. After the dome embedded rods are accurately positioned by the total station, the length of the embedded rods is corrected for the second time according to the actual measured length. Ensure the smooth installation of the embedded rods;
[0033] The steel material of this project is mainly Q355B. The supplementary rods and assembled rods are connected by welding. It is difficult to control the welding quality. Therefore, the advantages of previous welding experience in similar projects and years of accumulated experience in steel structure welding technology are brought into play. According to the characteristics of this project, welding process assessment and welder qualification examination are carried out in accordance with the relevant provisions of the "Steel Structure Welding Code", WPS is formulated, and all welders are certified to work. The welding process is optimized: in the stage of deepening the drawing design, communication and coordination with the design are carried out to make appropriate fine adjustments to the overlapping rods to avoid overlapping welds between rods and the position where hidden welds cannot be welded. The optimization focus of the project welding process is "adopting a reasonable welding sequence and effectively controlling deformation". Welding methods and welding materials: According to the performance and technical requirements of the parent material and the equipment conditions of our company, the on-site welding of this project mainly adopts semi-automatic flux-cored wire gas shielded welding (FCAW) and semi-automatic solid wire gas shielded welding (GMAW). In order to ensure the quality of high-altitude welding, when high-altitude welding encounters wind and rain, a wind and rain shelter is set up at the joint for welding to ensure that the welding is not interrupted, so that the welding quality and installation progress are guaranteed.
[0034] The construction site is small, so the installation is carried out by hoisting in pieces. In order to facilitate quick installation, the components are processed in pieces and assembled on site. There are a large number of pieces, so the components are divided into sections according to the detailed drawings before processing. When the drawings are produced, they are numbered according to the sections, such as SD-1-×. At the same time, QR codes are affixed, the upper surface is sprayed with codes, and steel stamps are used before leaving the factory to ensure that the component numbers remain consistent, so as to avoid confusion on site and affect construction.
[0035] For construction sites that are relatively small, where the space for large machinery is relatively limited and the safety risk is relatively high, the response measures are: perform a force analysis on the crane station under the most unfavorable working conditions, calculate the foundation bearing capacity under the most unfavorable working conditions, and only after passing the test can the crane be hoisted. If it does not meet the requirements, reinforce it.
[0036] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A construction method for a space lattice shell dome structure, characterized in that: The following steps are involved: S1. Before the drawings are deepened, 3D simulation software is used to simulate and analyze the entire construction process, including calculating the deflection value of the lattice shell under different loads, performing 3D simulation calculations for each step of the lifting, and performing construction simulations on the concrete and steel structures to formulate the construction sequence; S2. Use Rhino modeling to conduct in-depth modeling. Expand the double-torsion member and draw a diagram. Take sections at 1m intervals to control its torsional posture. At the same time, extract the coordinates of key points. Based on the deflection value calculated in S1, perform pre-arching during the in-depth process. S3. Develop a processing technique based on the detailed drawings generated after the detailed modeling in S2. Install the dome structure using a combination of unitized and segmented installation methods. Divide the components into sections according to the detailed drawings and assign them numbers before processing. S4. The dome units of the dome structure are assembled on the ground. HW300×300 steel sections are used as ground beams. The assembly cradle is set in the hardened area. The main control points of the assembly units are extracted using BIM software, and finally a total station is used to measure and place the points. S5. The finished dome units are hoisted and assembled in sequence according to their numbers. At the same time, three-dimensional simulation calculations are performed on each step of the hoisting. A high-precision total station is used for measurement and observation throughout the assembly process to fine-tune the spatial posture of each rod. The subsequent rods and assembly rods are connected by welding.
2. The construction method of a spatial lattice shell dome structure according to claim 1, characterized in that: In step S5, during welding, based on the three-dimensional spatial coordinates of key points in the detailed drawings and the precise positioning of the total station during the construction process, the lengths of the supplementary rods and the assembled rods are corrected for a second time according to the actual measured lengths.
3. The construction method of a spatial lattice shell dome structure according to claim 1, characterized in that: In step S5, the welding is performed by semi-automatic flux-cored gas shielded welding and / or semi-automatic solid wire gas shielded welding.
4. The construction method of a spatial lattice shell dome structure according to claim 1, characterized in that: In step S5, when high-altitude welding is performed in windy and rainy weather, a wind and rainproof shed is set up at the joint to ensure that welding is not interrupted.
5. The construction method of a spatial lattice shell dome structure according to claim 1, characterized in that: In step S2, the overlapping members in the detailed drawing are adjusted to avoid overlapping welds between the members, so that welding cannot be performed at locations where hidden welds are present.
6. The construction method of a spatial lattice shell dome structure according to claim 1, characterized in that: In step S3, the components are numbered by at least one of affixing a QR code, spraying a code on the upper surface, and stamping a number.
7. The construction method of a spatial lattice shell dome structure according to claim 1, characterized in that: In step S5, the crane station position is subjected to stress analysis under the most unfavorable working conditions, and the foundation bearing capacity under the most unfavorable working conditions is calculated. The crane station can be hoisted only after the test is qualified. If it does not meet the requirements, it will be reinforced.