Virtual power plant optimal scheduling method and system based on adjustable capability aggregation of source-load-storage heterogeneous resources
Through the optimization of scheduling methods and systems of virtual power plants, massive source load storage heterogeneous resources are aggregated and dispatched, the problem of insufficient distributed resource regulation capabilities is solved, the flexibility and economicality of the power system are improved, and the construction of new power systems is supported.
Patent Information
- Application Number
- CN202411160268.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-29
AI Technical Summary
The existing technology is difficult to effectively aggregate and dispatch massive source and load storage heterogeneous resources, resulting in insufficient flexible regulation capabilities of distributed resources, and it is difficult to meet the needs of new energy consumption and stable supply of power systems.
Provide a virtual power plant optimization scheduling method and system based on the aggregation of adjustable capabilities of heterogeneous resources of source and load storage. By collecting resource physical characteristics parameters, predicting distributed wind power photovoltaic output and fixed load, determining resource operation characteristics, considering network constraints, and building Bid decision optimization model and optimize the scheduling strategy of virtual power plants.
It realizes efficient aggregation and scheduling of resources in virtual power plants, improves the flexibility and economy of the power system, and can provide optimization decisions in the scenario of massive source and load storage heterogeneous resources, and supports the construction of new power systems.
Smart Images

Figure CN119047641A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of aggregation and optimized scheduling of heterogeneous resources of sources, loads and storages, and in particular to a virtual power plant optimized scheduling method and system based on aggregation of adjustable capabilities of heterogeneous resources of sources, loads and storages. Background Art
[0002] With the deepening of the "dual carbon" strategy, the continuous increase in the proportion of new energy installed capacity makes it difficult to meet the requirements of new energy consumption and safe and stable power supply by relying solely on the regulation capacity of the power supply side. The balance characteristics of the power system have transitioned from "source follows load" to "source and load interact". Fully tapping and utilizing distributed resources has become an important task in the construction of a new power system. However, distributed resources have the characteristics of small capacity, large scale, and a wide variety. It is very difficult to directly conduct quantitative analysis and coordinated control on them, and it is difficult to fully tap the flexible regulation capabilities of wide-area heterogeneous resources. In order to improve the controllability and observability of distributed resources, the concept of virtual power plants has been proposed, that is, to aggregate a wide variety of distributed resources with different parameters on the source side, load side, and storage side of the power grid into a whole, which is uniformly controlled and managed by the virtual power plant operator to participate in power system dispatching and market clearing. However, how to aggregate massive heterogeneous resources of source, load, and storage and form a trading model that is symmetrical and compatible with the existing power market is a key problem in improving the virtual power plant construction system. Summary of the invention
[0003] The purpose of this application is to provide a virtual power plant optimization scheduling method and system based on the aggregation of adjustable capabilities of heterogeneous resources of source, load and storage, which can realize the aggregation of massive heterogeneous resources of source, load and storage, and provide a basis for the optimization decision-making of virtual power plant operators.
[0004] To achieve the above objectives, this application provides the following solutions:
[0005] In a first aspect, the present application provides a virtual power plant optimization scheduling method based on the aggregation of adjustable capacity of heterogeneous resources of source, load and storage, including:
[0006] Collect the physical characteristic parameters of various resources including source, load and storage within the jurisdiction of the virtual power plant;
[0007] Predict the distributed wind and photovoltaic output and fixed load of the regional power grid;
[0008] Determining the operating characteristics of the internal resources of the virtual power plant according to the physical characteristic parameters, the distributed wind power and photovoltaic outputs and the fixed load;
[0009] According to the operating characteristics of the internal resources of the virtual power plant and considering the network operation constraints, the feasible domain and cost of regulating power of the virtual power plant are determined;
[0010] According to the power regulation feasible domain and the regulation cost, a bidding decision optimization model for virtual power plants to participate in the energy-reserve joint market is constructed with the minimum total cost of the virtual power plant as the optimization goal;
[0011] The virtual power plant is optimally dispatched according to the bidding decision optimization model.
[0012] In the second aspect, the present application provides a virtual power plant optimization scheduling system based on the aggregation of adjustable capacity of heterogeneous resources of source, load and storage, including:
[0013] The acquisition module is used to collect the physical characteristic parameters of the source, load and storage resources within the jurisdiction of the virtual power plant;
[0014] Prediction module, used to predict the distributed wind and photovoltaic output and fixed load of the regional power grid;
[0015] An operation characteristic determination module, used to determine the operation characteristics of the internal resources of the virtual power plant according to the physical characteristic parameters, the distributed wind power and photovoltaic output and the fixed load;
[0016] A module for determining a feasible domain of control power and a control cost, which is used to determine the feasible domain of control power and the control cost of the virtual power plant according to the operating characteristics of the internal resources of the virtual power plant and taking into account the network operation constraints;
[0017] A bidding decision optimization model building module is used to build a bidding decision optimization model for a virtual power plant to participate in an energy-reserve joint market based on the power regulation feasible domain and the regulation cost and taking the minimum total cost of the virtual power plant as the optimization goal;
[0018] The optimization scheduling module is used to optimize the scheduling of the virtual power plant according to the bidding decision optimization model.
[0019] According to the specific embodiments provided in this application, this application discloses the following technical effects:
[0020] The present application provides a virtual power plant optimization scheduling method and system based on the aggregation of adjustable capabilities of heterogeneous resources of sources, loads and storages, which fully considers the random volatility of source, load and storage resources within the jurisdiction of the virtual power plant, while taking into account the physical characteristics of each resource, and determines the operating characteristics of the internal resources of the virtual power plant. Considering the operating characteristics of the internal resources of the virtual power plant and the network security operation constraints, the feasible domain and regulation cost of the virtual power plant's control power are determined, which can help the internal resources of the distribution network to formulate more reasonable market declaration strategies, while better protecting the privacy of users within the virtual power plant. A bidding decision optimization model for virtual power plants to participate in the energy-reserve joint market is constructed. The virtual power plant can dispatch internal resources according to the market clearing results, which can effectively improve the operating economy of the virtual power plant. The present application has strong applicability in the scenario of massive heterogeneous resources of sources, loads and storages, and can provide a reference for the optimization decision-making of virtual power plant operators, which is of great reference significance for accelerating the construction of new power systems. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1 A flow chart of a virtual power plant optimization scheduling method based on aggregation of adjustable capacity of heterogeneous resources of source, load and storage provided in one embodiment of the present application;
[0023] Figure 2 A schematic diagram of a computer device provided in accordance with an embodiment of the present invention DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0025] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, the present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0026] In an exemplary embodiment, Figure 1As shown, a virtual power plant optimization scheduling method based on the aggregation of adjustable capacity of heterogeneous resources of source, load and storage is provided. The method is executed by a computer device, and can be executed by a computer device such as a terminal or a server alone, or by a terminal and a server together. In the embodiment of the present application, the method is applied to a server as an example for explanation, including the following steps S1 to S6. Among them:
[0027] S1: Collect the physical characteristic parameters of each source, load and storage resource within the jurisdiction of the virtual power plant.
[0028] S2: Predict the distributed wind and photovoltaic output and fixed load of the regional power grid.
[0029] S3: Determine the operating characteristics of the internal resources of the virtual power plant according to the physical characteristic parameters, the distributed wind power and photovoltaic output and the fixed load.
[0030] S4: According to the operating characteristics of the internal resources of the virtual power plant and considering the network operation constraints, determine the feasible domain and regulation cost of the virtual power plant's regulation power.
[0031] S5: Based on the feasible domain of the control power and the control cost, a bidding decision optimization model for the virtual power plant to participate in the energy-reserve joint market is constructed with the minimum total cost of the virtual power plant as the optimization goal.
[0032] S6: Optimize the scheduling of the virtual power plant according to the bidding decision optimization model.
[0033] In another exemplary embodiment of the present application, step S1 specifically includes:
[0034] Collect the physical characteristic parameters of each resource within the jurisdiction of the virtual power plant, including the physical characteristic data of each resident's air-conditioning equipment (air-conditioning equipment parameters, outdoor temperature, house attributes, indoor temperature), the physical characteristic data of each resident's electric vehicle (electric vehicle equipment parameters, charging pile parameters, charging time, charging power), and the physical characteristic data of the energy storage system (capacity, efficiency, and upper and lower power limits, etc.).
[0035] In another exemplary embodiment of the present application, step S2 specifically includes:
[0036] The long short-term memory network (LSTM) algorithm is used to predict the distributed wind power and photovoltaic output (wind power output, photovoltaic output) and fixed load of the regional power grid. The calculation process of LSTM is as follows:
[0037] i t =σ(W xil x t +W hi h t-1 +W ei c t-1 +bi )
[0038] f t =σ(W xxf x t +W hf h t-1 +W cf c t-1 +b f )
[0039] c t =f t c t-1 +i t tanh(W xc x t +W he h t-1 +b c )
[0040] o t =σ(W xo x t +W ho h t-1 +W co c t +b o )
[0041] h t =o t tanh(c t )
[0042] Where: i t is the input gate, which is used to input the historical samples of distributed wind power and photovoltaic power output and fixed load; f t is the forget gate, which is used to delete unimportant information; c t is the cell state of the neuron; o t is the output gate, which is used to output the predicted distributed wind power and photovoltaic power output and fixed load; W xil , W hi and W ei is the weight coefficient matrix associated with the input gate; b i is the bias vector of the input gate; W xxf , W hf and W cf is the weight coefficient matrix associated with the forget gate; b f is the bias vector of the forget gate; W xc and W he is the weight coefficient matrix related to the neuron cell state; b c is the bias vector of the cell state; W xo , W ho and W cois the weight coefficient matrix associated with the output gate; b o is the output gate bias vector; σ and tanh are activation functions; h t is the hidden state at time t; h t-1 is the hidden state at time t-1.
[0043] In another exemplary embodiment of the present application, step S3 specifically includes:
[0044] The internal resources of the virtual power plant include: distributed new energy, distributed controllable units, energy storage systems, demand-side flexible loads, network resources and fixed loads.
[0045] Specifically, according to the different types of resources that provide different powers in the optimal scheduling, the internal resources of the virtual power plant are divided into four categories: 1) providing both active power and reactive power. The grid-connected characteristics of distributed power sources and energy storage based on inverters allow them to participate in reactive power regulation while transmitting active power to the distribution network, and have the advantages of fast response and continuous regulation; 2) only participating in active scheduling, such as demand-side flexible loads, can provide multi-dimensional flexibility for the power grid and improve the economy of system operation; 3) only participating in reactive scheduling, such as network resources such as on-line tap changer (OLTC) and static VAR compensators (SVC), which can stabilize the system node voltage and reduce operating network losses; 4) consuming both active power and reactive power, but the power cannot be adjusted, such as fixed loads.
[0046] (1) Operational characteristics of distributed renewable energy
[0047] Distributed power sources can be divided into distributed renewable energy generation and distributed controllable unit generation. Distributed renewable energy generation includes wind power and photovoltaic power generation, and the main considerations during operation are active and reactive output constraints.
[0048] The operating characteristics of distributed new energy are:
[0049]
[0050]
[0051]
[0052] in, and are the active and reactive outputs of wind and solar power at node i at time t respectively; P is the maximum available active power output of the wind and solar power at node i at time t; i Cur is the abandoned power of node i; is the power factor limit of the wind and solar power at node i.
[0053] In addition, since there is uncertainty in the output of distributed wind power and photovoltaic power, the actual output value is expressed as the sum of the predicted value (the distributed wind power and photovoltaic output predicted in step S2) and the prediction error:
[0054]
[0055] Where: and They are the maximum value, predicted value and predicted error of the new energy active output of node i respectively.
[0056] Uncertainty modeling of distributed wind and solar power output needs to consider the influence of environmental factors such as wind speed and solar radiation, and the random volatility is relatively large. A single probability distribution model cannot take into account the asymmetric and uneven characteristics of the probability density of wind and solar prediction errors. This application uses a Gaussian mixture model (GMM) to fit the probability distribution of wind and solar prediction errors. GMM is a mixture model that sets different weights for different Gaussian components and sums them. The GMM model for the multivariate random variable y is:
[0057]
[0058]
[0059] Where: Z is the number of Gaussian components; a z is the weight coefficient of the zth Gaussian component; is the probability density function of the zth Gaussian component, where μ z , are the expectation and variance of the zth Gaussian component respectively.
[0060] When using GMM, it is necessary to ensure that the wind and solar are independent of each other. First, determine the number of Gaussian components, and then solve for the three unknown parameters of the weight, expectation, and variance of each Gaussian component. Generally, the Expectation Maximum (EM) algorithm is used to solve the unknown parameters. The principle is to estimate the parameters through continuous iteration until the likelihood function value reaches the maximum value. However, since the parameters set by the EM algorithm initialization have strong subjective factors, improper settings will have a greater impact on the results. Therefore, the entropy of each Gaussian component is obtained to obtain an objective result. In the process of solving the problem, a penalty factor based on entropy is added to obtain the maximum likelihood function:
[0061]
[0062] Where: H is the total number of iterations; a z,h , μ z,h , μz,h are the weight, expectation and variance of the zth Gaussian component in the hth iteration respectively; v z is the correction factor of the zth Gaussian component; S z is the information entropy of the zth Gaussian component.
[0063] (2) Operational characteristics of distributed controllable units
[0064] Distributed controllable units are mainly fuel units such as micro gas turbines. In addition to considering active and reactive output constraints, they also need to consider climbing constraints during operation.
[0065] The operating characteristics of distributed controllable units are:
[0066]
[0067]
[0068] Where: are the active and reactive outputs of the generator at node i at time t respectively; and are the minimum and maximum active output of the generator at node i respectively; is the installed capacity of the generator at node i; P i UP and P i DN The upper and lower limits of the ramp rate of the generator at node i respectively.
[0069] (3) Operational characteristics of energy storage systems
[0070] The energy storage system needs to consider its own charging and discharging power constraints and state of charge constraints when performing charging and discharging flexibility regulation. In addition, the energy storage inverter uses its own surplus capacity and combines the power factor operating range to perform continuous dynamic reactive power compensation within the four-quadrant operating range.
[0071] The operating characteristics of the energy storage system are:
[0072]
[0073]
[0074] Where: and are the charging and discharging power of the energy storage station at node i at time t respectively; is the upper limit of charging and discharging power of node i; is an integer variable that restricts the energy storage station from charging and discharging simultaneously at node i at time t; is the power of the energy storage power station at node i at time t; is the charging and discharging efficiency of the energy storage power station at node i; and are the upper and lower limits of the power of the energy storage power station at node i respectively; is the reactive power of the energy storage power station at node i; is the energy storage inverter capacity of node i.
[0075] (4) Operational characteristics of demand-side flexible loads
[0076] Service providers such as smart communities or electric vehicle aggregators comprehensively consider factors such as the physical characteristics of equipment, natural environment characteristics, and user behavior habits, and use a general virtual battery model to characterize the adjustable capabilities of the load cluster, and make appropriate adjustments to the load without affecting user comfort or electricity demand.
[0077] The operating characteristics of the temperature control load cluster are as follows:
[0078]
[0079]
[0080]
[0081] Where: and are the power and energy of the temperature-controlled load cluster at node i at time t, respectively; and are the upper and lower limits of the power of the temperature-controlled load cluster of node i at time t, respectively; and are the upper and lower limits of the energy of the temperature-controlled load cluster of node i at time t; α TCL is the energy dissipation coefficient of the temperature-controlled load cluster.
[0082] Different from the temperature-controlled load, the grid-connected and off-grid behavior of a single electric vehicle will cause a step change in the electric energy in the virtual energy storage model of the electric vehicle cluster. Therefore, a correction term needs to be added to the model to describe the change process.
[0083] The operational characteristics of electric vehicle clusters are as follows:
[0084]
[0085] Where: and They are the upper and lower limits of the power of the electric vehicle cluster at node i at time t; and They are the upper and lower limits of the energy of the electric vehicle cluster at node i at time t; is the correction term of node i at time t; W n,t is a 0-1 variable that describes the grid connection status of the nth vehicle at time t.
[0086] (5) Operational characteristics of network resources
[0087] The network resources are on-load tap-changing transformers and static VAR compensators, and their operating characteristics are as follows:
[0088]
[0089] Where: T t tap , T t tap They are the OLTC tap positions at time t and time t+1 respectively; and are the maximum and minimum positions of the tap, respectively; K t is the OLTC transformation ratio at time t; K0 is the standard transformation ratio; ΔK is the transformation ratio step size; It is the maximum adjustable times of OLTC tap in the dispatching cycle.
[0090]
[0091] Where: is the reactive power compensated by SVC to node i at time t; and are the upper and lower limits of the compensation power respectively.
[0092] (6) Operating characteristics of fixed load
[0093] The load forecast error is a random variable, and the actual power value is the sum of the forecast value and the forecast error. The operating characteristics are as follows:
[0094]
[0095] Where: and ΔP i load are the actual value of the load active power of node i at time t, the predicted value of the load active power, and the prediction error; the predicted value of the load active power is the predicted fixed load, is the actual value of reactive power of load at node i at time t; is the load power factor of node i, which is a constant value.
[0096] Load changes have certain regularity and periodicity. The normal distribution can be used to describe the probability distribution of load forecast error. Its probability density function is:
[0097]
[0098] Where: ΔP i load is the load output prediction error of node i; The expected value and standard deviation of the load output prediction error of node i are respectively.
[0099] In another exemplary embodiment of the present application, step S4 specifically includes:
[0100] According to the operation status of the internal resources of the virtual power plant and considering the safe operation constraints of the internal network of the virtual power plant, the power feasible domain of the virtual power plant is characterized based on the vertex search mapping method, and a quantitative model for the aggregation of control power cost is established to characterize the nonlinear relationship between the control cost and the control power.
[0101] S41: Considering the output of internal resources of the virtual power plant and the network operation constraints, the feasible domain of the output power of the common coupling point between the virtual power plant and the upper-level network is solved based on the vertex search method to obtain the feasible domain of the control power.
[0102] Considering the internal resource output of the virtual power plant and the network operation constraints, the feasible domain of the output power of the common coupling point between the virtual power plant and the upper network is solved based on the vertex search method to characterize the active-reactive regulation capability of the virtual power plant. Taking the maximization of the regulation capability of the determined PQ under a specific power factor angle in the 2D plane as the objective function, different All boundary vertices of the lower FR are finally formed based on the convex hull of each vertex to obtain the feasible domain of the output power.
[0103] (1) Objective function
[0104]
[0105] Where: P t PCC and They are respectively the output active and reactive power of the virtual power plant at the common coupling point at time t.
[0106] (2) Constraints
[0107] There are two types of network operation constraints: control variable constraints and state variable constraints. The power flow constraints of the system are control variable constraints, also known as hard constraints, which are physically impossible to violate. The expression is as follows:
[0108]
[0109]
[0110]
[0111] Where: and are the active and reactive power of node j at time t respectively; and are the active and reactive power of line ij at time t; rij and x ij are the resistance and reactance of line ij respectively; I ij,t is the current of line ij; V i,t is the voltage of node i at time t.
[0112] State variable constraints are soft constraints, which allow state variables to fluctuate within a certain range, including node voltage and line current constraints. Affected by the random variables in the system, the power injected into nodes in the network will fluctuate within a certain confidence level, causing probabilistic characteristics of operating indicators such as node voltage and branch current in the distribution network. Therefore, this application uses the opportunity constraint method to relax the soft constraints containing random variables, which can avoid the problem of overly conservative optimization decision results in low-probability extreme scenarios, and take into account the robustness and economy of virtual power plant operation. The opportunity constraint form of the system network security operation constraint is:
[0113]
[0114] Where: V i,max and V i,min are the upper and lower limits of the voltage at node i respectively; I ij,max is the upper limit of the line ij current. r is the probability of constraint violation; γ∈(0,1) is the confidence level of the chance constraint.
[0115] To reflect a specific power factor angle The constraints on the adjustment capacity are set as follows:
[0116]
[0117] The above optimization model with chance constraints is difficult to solve directly and needs to be transformed. Construct the deterministic form of chance constraints:
[0118]
[0119] Where: ε1 and ε2 are conservative coefficients; μ0 and Σ0 are the expectation and standard deviation of the measurement error respectively; a is the coefficient vector; b is the limit.
[0120] The chance constraints on node voltages and line currents can be directly transformed into equivalent deterministic linear constraints:
[0121]
[0122] Where: μ s =e T μ0;e T (diag(Σ s ));e T a=1,0≤a≤1;ai is the i-th element of a;
[0123]
[0124] S42: Based on the power control feasible domain, taking the minimum control cost as the optimization goal, establishing a control power cost aggregation quantification model to determine the control cost.
[0125] Taking the interactive power of the common coupling point as a parameter, a quantitative model for the aggregation of control power cost is established, and a nonlinear relationship between the control cost and the control power is established, which is conducive to giving full play to the synergy of resources and helping virtual power plants to formulate more reasonable market declaration strategies.
[0126] First, calculate the two extreme points of the feasible region of power regulation and set:
[0127]
[0128]
[0129] Let the particle size be ΔP = 1MW, the number of particles For k = 0, 1, K, M P -1,M P , with the goal of minimizing the control cost, solve M P +1 optimal power flow problem, calculate the optimal control cost C corresponding to the control power ope .
[0130] The objective function of the optimal power flow problem is composed of the operating cost of renewable energy Controllable power supply operating costs Energy storage system operating costs Flexible load control cost Transformer on-load voltage regulation cost and reactive power compensation cost and network loss costs The composition is expressed as:
[0131]
[0132] in:
[0133]
[0134] Where: and is the power generation cost coefficient of the distributed controllable unit at node i; is the reactive auxiliary service compensation coefficient of the distributed controllable unit at node i; is the cost coefficient of renewable energy generation at node i; is the compensation coefficient of the new energy reactive auxiliary service unit at node i; is the penalty cost coefficient for abandonment of renewable energy at node i; is the unit charge and discharge depreciation coefficient of the energy storage power station at node i; is the depreciation coefficient of unit reactive power of energy storage at node i; Compensate the response cost of the electric vehicle cluster and the temperature control load cluster at node i; is the cost coefficient of on-load voltage regulation action at node i; is the SVC reactive power compensation cost coefficient of node i; Loss is the network loss cost coefficient.
[0135] In addition to the operation constraints of all resources contained in the virtual power plant, the network operation constraints, and the power balance constraints of the common coupling point between the virtual power plant and the upper network, the active power at the coupling node needs to be fixed in the following ways:
[0136]
[0137] Finally, the optimization results of the control power cost are combined into a piecewise function to obtain the corresponding relationship between the control cost and the control power.
[0138]
[0139]
[0140] Where: C(·) is the control cost function.
[0141] In another exemplary embodiment of the present application, step S5 specifically includes:
[0142] The optimization objective of the bidding decision optimization model for virtual power plants participating in the energy-reserve joint market is to minimize the total cost of the virtual power plant, which is expressed as follows:
[0143] F ul =minC ope -I EM -I RU -I RD
[0144]
[0145] Where: F ul is the total cost of the virtual power plant; I EM The transaction profit of the virtual power plant participating in the electric energy market; RU It is the sum of the revenue from bidding for increasing reserve capacity, the reward for successfully calling up reserve capacity, and the penalty for failing to call up reserve capacity; I RDis the sum of downward reserve benefits, rewards and penalties; C(·) is the regulation cost function, and are the electricity purchased and sold by the virtual power plant at time t; is the market price of electricity at time t; r t u,dso and r t d,dso They are the upward and downward reserve capacities bid by the virtual power plant at time t, respectively; and They are respectively the upward adjustment and downward adjustment of the reserve price at time t; and Provide the reserve reward and the penalty price when the reserve cannot be called at time t respectively; and They are the probability of the system calling up and down standby at time t respectively; is the probability that the bid reserve cannot be called at time t.
[0146] The constraints of the bidding decision optimization model include power market quotation constraints, reserve market quotation constraints, and virtual power plant constraints. The specific contents are listed as follows:
[0147] (1) Constraints on electricity market quotation
[0148]
[0149]
[0150] Where: and are the bids for selling and buying electricity in the kth segment of the virtual power plant at time t, respectively; and are the bids for selling and buying electricity in the k-1 segment of the virtual power plant at time t, respectively; and They are the upper and lower limits of the electricity sales quotation of the virtual power plant energy market; and They are respectively the upper and lower limits of the virtual power plant electricity market purchase quotations.
[0151] (2) Alternative market quotation constraints
[0152]
[0153]
[0154] Where: and They are the upward and downward reserve capacity quotations of the virtual power plant at time t; and They are the upper and lower limits of virtual power plants’ bids in the reserve market; and They are the upper and lower limits of the quotations made by virtual power plants in the reserve market.
[0155] (3) Virtual power plant operation constraints
[0156] When in the power purchasing state, the virtual power plant provides upper reserve by reducing the power purchasing power or switching from the power purchasing state to the power selling state, and provides lower reserve by increasing the power purchasing power; when the virtual power plant is in the power selling state, its upper reserve is achieved by increasing the power selling power, and the lower reserve is achieved by reducing the power selling power or switching from the power selling state to the power purchasing state.
[0157]
[0158] Where: and are the upper limits of electricity sales and purchases of the virtual power plant at time t; It is a 0-1 variable that restricts the virtual power plant from purchasing and selling electricity at the same time at time t.
[0159] In another exemplary embodiment of the present application, step S6 specifically includes:
[0160] The energy and reserve ancillary service market is managed by the system operator, which conducts joint clearing of the energy and reserve ancillary service market based on the declared information given to the participants with the goal of maximizing social welfare. The virtual power plant dispatches internal resources based on the clearing results of the energy-reserve joint market.
[0161] This application proposes a virtual power plant optimization method based on the aggregation of adjustable capabilities of heterogeneous resources of source, load and storage. The random volatility of source, load and storage resources within the jurisdiction of the virtual power plant is fully considered, while taking into account the physical characteristics of the equipment and the influence of human habits, and establishing an operating characteristic model of heterogeneous resources. Considering the internal resources and network security operation constraints of the virtual power plant, the power feasible domain of the virtual power plant is characterized based on the vertex search mapping method, providing a dispatchable power boundary for the coordinated operation of the system. A quantitative model for the cost of regulating power is established to characterize the nonlinear relationship between the cost of regulation and the power of regulation, which can help the internal resources of the distribution network to formulate a more reasonable market declaration strategy, while better protecting the privacy of users within the virtual power plant. A bidding decision optimization model for virtual power plants to participate in the energy-reserve joint market is constructed. The virtual power plant can dispatch internal resources according to the market clearing results, which can effectively improve the operating economy of the virtual power plant. This application has strong applicability in the scenario of massive heterogeneous resources of source, load and storage, and can provide a reference for the optimization decision of virtual power plant operators, which is of great reference significance for accelerating the construction of new power systems.
[0162] Based on the same inventive concept, the embodiment of the present application also provides a system for implementing the above-mentioned method for optimizing and dispatching a virtual power plant based on the aggregation of adjustable capabilities of heterogeneous resources of source, load and storage. The implementation scheme for solving the problem provided by the system is similar to the implementation scheme recorded in the above-mentioned method, so the specific limitations in one or more embodiments of the virtual power plant optimization and dispatching system based on the aggregation of adjustable capabilities of heterogeneous resources of source, load and storage provided below can be referred to the above limitations on the method for optimizing and dispatching a virtual power plant based on the aggregation of adjustable capabilities of heterogeneous resources of source, load and storage, and will not be repeated here.
[0163] In an exemplary embodiment, a virtual power plant optimization scheduling system based on aggregation of adjustable capabilities of heterogeneous resources of source, load and storage is provided, comprising:
[0164] The acquisition module is used to collect the physical characteristic parameters of various sources, loads and storage resources within the jurisdiction of the virtual power plant.
[0165] The prediction module is used to predict the distributed wind power and photovoltaic output and fixed load of the regional power grid.
[0166] The operating characteristic determination module is used to determine the operating characteristics of the internal resources of the virtual power plant according to the physical characteristic parameters, the distributed wind power and photovoltaic output and the fixed load.
[0167] The module for determining the feasible domain of control power and control cost is used to determine the feasible domain of control power and control cost of the virtual power plant according to the operating characteristics of the internal resources of the virtual power plant and taking into account the network operation constraints.
[0168] The bidding decision optimization model construction module is used to construct a bidding decision optimization model for the virtual power plant to participate in the energy-reserve joint market based on the feasible domain of the control power and the control cost, with the minimum total cost of the virtual power plant as the optimization goal.
[0169] The optimization scheduling module is used to optimize the scheduling of the virtual power plant according to the bidding decision optimization model. As an optional implementation,
[0170] In an exemplary embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above-mentioned method embodiments when executing the computer program. The computer device may be a server or a terminal, and its internal structure diagram may be as shown in FIG. Figure 2As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data to be processed. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a virtual power plant optimization scheduling method based on the aggregation of adjustable capabilities of heterogeneous resources of source, load and storage is implemented.
[0171] Those skilled in the art will understand that Figure 2 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components. In an exemplary embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above-mentioned method embodiments when executing the computer program.
[0172] In an exemplary embodiment, a computer-readable storage medium is provided, storing a computer program, and when the computer program is executed by a processor, the steps in the above method embodiments are implemented.
[0173] In an exemplary embodiment, a computer program product is provided, including a computer program, and when the computer program is executed by a processor, the steps in the above method embodiments are implemented.
[0174] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.
[0175] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM may be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).
[0176] The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. The non-relational database may include a distributed database based on blockchain, etc., but is not limited thereto. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but is not limited thereto.
[0177] The technical features of the above embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0178] This article uses specific examples to illustrate the principles and implementation methods of this application. The description of the above embodiments is only used to help understand the method and core ideas of this application. At the same time, for those skilled in the art, according to the ideas of this application, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting this application.
Claims
1. A virtual power plant optimization scheduling method based on the aggregation of adjustable capacity of heterogeneous resources of source, load and storage, characterized in that: include: Collect the physical characteristic parameters of various resources including source, load and storage within the jurisdiction of the virtual power plant; Predict the distributed wind and photovoltaic output and fixed load of the regional power grid; Determining the operating characteristics of the internal resources of the virtual power plant according to the physical characteristic parameters, the distributed wind power and photovoltaic outputs and the fixed load; According to the operating characteristics of the internal resources of the virtual power plant and considering the network operation constraints, the feasible domain and cost of regulating power of the virtual power plant are determined; According to the power regulation feasible domain and the regulation cost, a bidding decision optimization model for virtual power plants to participate in the energy-reserve joint market is constructed with the minimum total cost of the virtual power plant as the optimization goal; The virtual power plant is optimally dispatched according to the bidding decision optimization model.
2. The virtual power plant optimization scheduling method based on the aggregation of adjustable capacity of heterogeneous resources of source, load and storage according to claim 1 is characterized in that: The physical characteristic parameters of each source, load and storage resource within the jurisdiction of the virtual power plant include: the physical characteristic data of each resident's air conditioning equipment, the physical characteristic data of each resident's electric vehicle and the physical characteristic data of the energy storage system; The physical characteristics data of each resident’s air conditioning equipment include: air conditioning equipment parameters, outdoor temperature, house attributes, and indoor temperature; The physical characteristics data of each resident's electric vehicle include: electric vehicle equipment parameters, charging pile parameters, charging time and charging power; The physical characteristics data of the energy storage system include: capacity, efficiency, and upper and lower power limits.
3. The virtual power plant optimization scheduling method based on the aggregation of adjustable capacity of heterogeneous resources of source, load and storage according to claim 1 is characterized in that: Predict the distributed wind and photovoltaic output and fixed load of the regional power grid, including: The long short-term memory network algorithm is used to predict the distributed wind power and photovoltaic output and fixed load of the regional power grid.
4. The virtual power plant optimization scheduling method based on the aggregation of adjustable capacity of heterogeneous resources of source, load and storage according to claim 1 is characterized in that: The internal resources of the virtual power plant include: distributed new energy, distributed controllable units, energy storage systems, demand-side flexible loads, network resources and fixed loads; The operating characteristics of the distributed new energy are: in, and are the active and reactive outputs of wind and solar power at node i at time t respectively; P is the maximum available active power output of the wind and solar power at node i at time t; i Cur is the abandoned power of node i; is the power factor limit of the wind and solar power at node i; The operating characteristics of the distributed controllable unit are: in, are the active and reactive outputs of the generator at node i at time t respectively; and are the minimum and maximum active output of the generator at node i respectively; is the installed capacity of the generator at node i; P i UP and P i DN The upper and lower limits of the ramp rate of the generator at node i respectively; The operating characteristics of the energy storage system are: in, and are the charging and discharging power of the energy storage station at node i at time t respectively; is the upper limit of charging and discharging power of node i; is an integer variable that restricts the energy storage station from charging and discharging simultaneously at node i at time t; is the power of the energy storage power station at node i at time t; is the charging and discharging efficiency of the energy storage power station at node i; and are the upper and lower limits of the power of the energy storage power station at node i respectively; is the reactive power of the energy storage power station at node i; is the energy storage inverter capacity of node i; The operating characteristics of the demand-side flexible load are: in, and are the power and energy of the temperature-controlled load cluster at node i at time t, respectively; and are the upper and lower limits of the power of the temperature-controlled load cluster of node i at time t, respectively; and are the upper and lower limits of the energy of the temperature-controlled load cluster of node i at time t; α TCL is the energy dissipation coefficient of the temperature control load cluster; and are the power and energy of the electric vehicle cluster at node i at time t, respectively; and They are the upper and lower limits of the power of the electric vehicle cluster at node i at time t; and They are the upper and lower limits of the energy of the electric vehicle cluster at node i at time t; is the correction term of node i at time t; W n,t is a 0-1 variable describing the grid connection status of the nth vehicle at time t; The operational characteristics of the network resources are: K t =K0+T t tap ΔK Among them, T t tap , T t tap They are the OLTC tap positions at time t and time t+1 respectively; and are the maximum and minimum positions of the tap, respectively; K t is the OLTC transformation ratio at time t; K0 is the standard transformation ratio; ΔK is the transformation ratio step size; The maximum number of times the OLTC tap can be adjusted within the dispatch cycle; is the reactive power compensated by SVC to node i at time t; and are the upper and lower limits of the compensation power of node i respectively; The operating characteristics of the fixed load are: in, and ΔP i load are the actual value of the load active power of node i at time t, the predicted value of the load active power, and the prediction error; the predicted value of the load active power is the predicted fixed load, is the actual value of reactive power of load at node i at time t; is the load power factor of node i, which is a constant value.
5. The virtual power plant optimization scheduling method based on the aggregation of adjustable capacity of heterogeneous resources of source, load and storage according to claim 4 is characterized in that: According to the operating characteristics of the internal resources of the virtual power plant and considering the network operation constraints, the feasible domain and cost of the regulation power of the virtual power plant are determined, including: Considering the output of internal resources of the virtual power plant and the network operation constraints, the feasible domain of the output power of the common coupling point between the virtual power plant and the upper network is solved based on the vertex search method, and the feasible domain of the control power is obtained; Based on the power regulation feasible domain, taking the minimum regulation cost as the optimization goal, a regulation power cost aggregation quantification model is established to determine the regulation cost.
6. The virtual power plant optimization scheduling method based on the aggregation of adjustable capacity of heterogeneous resources of source, load and storage according to claim 5 is characterized in that: The network operation constraints include: power flow constraints and node voltage and line current constraints.
7. The virtual power plant optimization scheduling method based on the aggregation of adjustable capacity of heterogeneous resources of source, load and storage according to claim 5 is characterized in that: The expression of the control power cost aggregation quantification model is: Among them, C ope To control costs; is the operating cost of new energy for node i at time t; is the operating cost of the controllable power supply of node i at time t; is the operating cost of the energy storage system at node i at time t; is the flexible load control cost of node i at time t; is the on-load voltage regulation cost of transformer at node i at time t; is the reactive power compensation cost of node i at time t; is the network loss cost at time t; and is the power generation cost coefficient of the distributed controllable unit at node i; is the reactive auxiliary service compensation coefficient of the distributed controllable unit at node i; is the cost coefficient of renewable energy generation at node i; is the compensation coefficient of the reactive auxiliary service unit of new energy at node i; β i Cur is the penalty cost coefficient for abandonment of renewable energy at node i; is the unit charge and discharge depreciation coefficient of the energy storage power station at node i; is the depreciation coefficient of unit reactive power of energy storage at node i; Compensate the response cost of the electric vehicle cluster and the temperature control load cluster at node i; is the cost coefficient of on-load voltage regulation action at node i; is the SVC reactive power compensation cost coefficient of node i; Loss is the network loss cost coefficient.
8. The virtual power plant optimization scheduling method based on the aggregation of adjustable capacity of heterogeneous resources of source, load and storage according to claim 7 is characterized in that: The expression of the bidding decision optimization model is: F ul =minC ope -I EM -I RU -I RD Among them, F ul is the total cost of the virtual power plant; I EM The transaction profit of the virtual power plant participating in the electric energy market; RU It is the sum of the revenue from bidding for increasing reserve capacity, the reward for successfully calling up reserve capacity, and the penalty for failing to call up reserve capacity; I RD is the sum of downward reserve benefits, rewards and penalties; C(·) is the regulation cost function, and are the electricity purchased and sold by the virtual power plant at time t; is the market price of electricity at time t; r t u,dso and r t d,dso They are the upward and downward reserve capacities bid by the virtual power plant at time t, respectively; and They are respectively the upward adjustment and downward adjustment of the reserve price at time t; and Provide the reserve reward and the penalty price when the reserve cannot be called at time t respectively; and They are the probability of the system calling up and down standby at time t respectively; is the probability that the bid reserve cannot be called at time t.
9. The virtual power plant optimization scheduling method based on the aggregation of adjustable capacity of heterogeneous resources of source, load and storage according to claim 8 is characterized in that: The constraints of the bidding decision optimization model include power market quotation constraints, reserve market quotation constraints and virtual power plant operation constraints; The electricity market quotation constraints are: in, and are the bids for selling and buying electricity in the kth segment of the virtual power plant at time t, respectively; and are the bids for selling and buying electricity in the k-1 segment of the virtual power plant at time t, respectively; and They are the upper and lower limits of the electricity sales quotation of the virtual power plant energy market; and They are the upper and lower limits of the power purchase quotation in the virtual power plant energy market; The backup market quotation constraints are: in, and They are the upward and downward reserve capacity quotations of the virtual power plant at time t; and They are the upper and lower limits of virtual power plants’ bids in the reserve market; and They are the upper and lower limits of the bids of virtual power plants in the downward reserve market; The virtual power plant operation constraints are: in, and are the upper limits of electricity sales and purchases of the virtual power plant at time t; It is a 0-1 variable that restricts the virtual power plant from purchasing and selling electricity at the same time at time t.
10. A virtual power plant optimization dispatching system based on the aggregation of adjustable capacity of heterogeneous resources of source, load and storage, characterized in that: include: The acquisition module is used to collect the physical characteristic parameters of the source, load and storage resources within the jurisdiction of the virtual power plant; The prediction module is used to predict the distributed wind and photovoltaic output and fixed load of the regional power grid; An operation characteristic determination module, used to determine the operation characteristics of the internal resources of the virtual power plant according to the physical characteristic parameters, the distributed wind power and photovoltaic output and the fixed load; A module for determining a feasible domain of control power and a control cost, which is used to determine the feasible domain of control power and the control cost of the virtual power plant according to the operating characteristics of the internal resources of the virtual power plant and taking into account the network operation constraints; A bidding decision optimization model building module is used to build a bidding decision optimization model for a virtual power plant to participate in an energy-reserve joint market based on the power regulation feasible domain and the regulation cost and taking the minimum total cost of the virtual power plant as the optimization goal; The optimization scheduling module is used to optimize the scheduling of the virtual power plant according to the bidding decision optimization model.
Citation Information
Cited By
Market-oriented new energy power supply and distribution system resource modeling method and system
CN119417183A
Power distribution network distributed resource emergency voltage regulation method based on layered interactive multi-dimensional dynamic aggregation
CN119674985A
Personalized prediction method and system for virtual power plant behavior characteristics
CN119918869A
User side resource optimization scheduling method considering virtual energy storage and related device
CN119990712A
Method and related device for optimizing and scheduling user-side resources considering virtual energy storage
CN119990712B