Scientific and technological achievement conversion service method and system
By judging the standard parameters of technical projects, the three-dimensional body is generated, which solves the problem of uncertainty in the evaluation of enterprises when selecting technical projects, and realizes accurate screening and prioritization of projects, reduces decision-making risks, and promotes the effective transformation of scientific and technological achievements.
Patent Information
- Application Number
- CN202411126375.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When choosing technical projects, enterprises lack scientific, systematic and comprehensive assessment methods, resulting in high decision-making risks, and may miss high-quality projects or invest in projects with no potential.
By obtaining and judging the standard parameters of technical projects based on the functional requirements text uploaded by the enterprise, we generate the evaluation values of technical maturity, efficiency and risk resistance, form a three-dimensional body, accurately screen qualified and unqualified projects, and determine based on the evaluation values. The recommendation priority of the project, and the ultimate recommendation of the best project.
It has achieved accurate assessment and prioritization of technical projects, reduced corporate decision-making risks, and promoted the effective transformation of scientific and technological achievements.
Smart Images

Figure CN119047873A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of scientific and technological achievement transformation, and in particular to a scientific and technological achievement transformation service method and system. Background Art
[0002] At present, in today's rapidly developing scientific and technological environment, enterprises are facing tremendous pressure to update and upgrade technology. In order to maintain competitiveness, enterprises are constantly seeking new technology projects to improve product performance, reduce costs, improve production efficiency, and explore new market opportunities. However, when faced with many technical projects that meet their own technical requirements, how to choose the most suitable technical projects for the enterprise has become an urgent problem to be solved. Traditional evaluation methods often rely on the subjective judgment and experience of experts, lack of systematic quantitative standards and comprehensive evaluation dimensions, resulting in large uncertainty and deviation in the evaluation results. This not only increases the decision-making risk of enterprises, but also may cause enterprises to miss high-quality technical projects or mistakenly invest in projects that do not have potential. Therefore, a scientific, systematic and comprehensive technical project evaluation method is needed to accurately quantify the advantages and disadvantages of technical projects in terms of technical dimensions, benefit dimensions and risk resistance dimensions, so as to help enterprises accurately screen out qualified technical projects and determine the priority of recommendations, and ultimately achieve the effective transformation of scientific and technological achievements.
[0003] However, the existing technology transformation service methods and systems only use the Internet, television, offline and other multi-channel publicity methods to improve the popularity and attractiveness of the technology transformation service platform, and set up a registration technology achievement reward mechanism to further enhance the enthusiasm of universities, research institutes, enterprises and individuals for graded technology achievements, and regularly publish excellent technology achievements and technology promotion catalogs after investigation and verification, but do not consider how to accurately quantify the advantages and disadvantages of technology projects in terms of technology, benefit and risk resistance, and do not comprehensively consider the technology, benefit and risk resistance dimensions to quantify the recommendation priority of each qualified recommended technology project of the enterprise. For example, the patent with the publication number of "CN115829792A" and the patent name of "A technology transformation service cloud platform system" includes the following steps: customer service and background service, data exchange between customer service and background service, customer service including evaluation mechanism, technology achievement collection, technology achievement screening, technology achievement transaction, and background service including authority management. The present invention encourages all kinds of users to register in real name in the network system, register scientific and technological achievements, gradually incorporate high-quality scientific and technological resources from all over the country and even the world into the system, and improves the popularity and attractiveness of the scientific and technological achievement transformation service platform through multi-channel publicity methods such as the Internet, television, and offline, and sets up a registration of scientific and technological achievements reward mechanism to further enhance the enthusiasm of universities, research institutes, enterprises and individuals for graded scientific and technological achievements. The selected high-quality scientific and technological achievements will be recognized by more and more people, improve credibility, and regularly publish excellent scientific and technological achievements and technology promotion catalogs after investigation, research and verification. However, this patent only uses multi-channel publicity methods such as the Internet, television, and offline to improve the popularity and attractiveness of the scientific and technological achievement transformation service platform, and sets up a registration of scientific and technological achievements reward mechanism to further enhance the enthusiasm of universities, research institutes, enterprises and individuals for graded scientific and technological achievements, and regularly publish excellent scientific and technological achievements and technology promotion catalogs after investigation, research and verification, but does not consider how to accurately quantify the advantages and disadvantages of technical projects in terms of technical dimensions, benefit dimensions and risk resistance dimensions, and does not comprehensively consider the technical dimensions, benefit dimensions and risk resistance dimensions to achieve quantification of the recommendation priority of each qualified recommended technical project of the enterprise.
[0004] Therefore, the present invention proposes a technology achievement transformation service method and system. Summary of the invention
[0005] The present invention provides a technology transformation service method and system, which are used to accurately obtain all-dimensional evaluation values of all prepared recommended technology projects of the enterprise according to standard parameters of all-dimensional technical parameters of all prepared recommended technology projects of the enterprise, and realize quantification of the advantages and disadvantages of all prepared recommended technology projects of the enterprise in technology dimension, benefit dimension and risk resistance dimension, and then obtain the evaluation three-dimensional body of all prepared recommended technology projects of the enterprise according to the evaluation values of all-dimensional categories of all prepared recommended technology projects of the enterprise, so as to facilitate the subsequent accurate acquisition of all qualified recommended technology projects and all unqualified recommended technology projects of the enterprise, accurately obtain all qualified recommended technology projects and all unqualified recommended technology projects of the enterprise according to the evaluation three-dimensional body of all prepared recommended technology projects of the enterprise, and accurately obtain the recommended value of each qualified recommended technology project of the enterprise according to the evaluation values of all-dimensional categories of all qualified recommended technology projects of the enterprise and the evaluation values of all-dimensional categories of all unqualified recommended technology projects, realize quantification of the priority of recommendation after comprehensive technology dimension, benefit dimension and risk resistance dimension of each qualified recommended technology project of the enterprise, and finally obtain the best recommended technology project of the enterprise according to the recommendation values of all qualified recommended technology projects of the enterprise, realize more accurate technology project recommendation, and promote the effective transformation of scientific and technological achievements.
[0006] The present invention provides a technology achievement transformation service method, comprising:
[0007] S1: Based on the functional requirement text uploaded by the enterprise, all the prepared recommended technical projects of the enterprise are obtained, and based on all the prepared recommended technical projects and databases of the enterprise, standard parameters of all types of technical parameters of all the prepared recommended technical projects of the enterprise are obtained;
[0008] S2: Based on the standard parameters of all the class technical parameters of all the prepared recommended technical projects of the enterprise, all the class dimensional evaluation values of all the prepared recommended technical projects of the enterprise are obtained; based on the all the class dimensional evaluation values of all the prepared recommended technical projects of the enterprise, the evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise is obtained;
[0009] S3: Based on the evaluation three-dimensional body of all the preliminary recommended technical projects of the enterprise, all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise are obtained, and based on all the class-dimensional evaluation values of all the qualified recommended technical projects of the enterprise and all the class-dimensional evaluation values of all the unqualified recommended technical projects of the enterprise, the recommended value of each qualified recommended technical project of the enterprise is obtained, and based on the recommended values of all the qualified recommended technical projects of the enterprise, the best recommended technical project of the enterprise is obtained;
[0010] S4: Based on the enterprise’s best recommended technology projects, obtain the enterprise’s technology achievement transformation service results.
[0011] Preferably, the technology achievement transformation service method, S1: based on the functional requirement text uploaded by the enterprise, obtain all the enterprise's prepared recommended technology projects, and based on all the enterprise's prepared recommended technology projects and database, obtain the standard parameters of all types of technical parameters of all the enterprise's prepared recommended technology projects, including:
[0012] Receive the functional requirement text uploaded by the enterprise to the scientific and technological achievement transformation service system, and obtain the functional comparison results of all technical projects in the database based on the functional requirement text uploaded by the enterprise, the functional texts of all technical projects in the database and the functional comparison model;
[0013] The technical projects that are functionally compatible among all technical projects in the database are regarded as the enterprise's pre-recommended technical projects;
[0014] Based on all the enterprise's prepared recommended technical projects and database, standard parameters of all types of technical parameters of all the enterprise's prepared recommended technical projects are obtained.
[0015] Preferably, the technology achievement transformation service method obtains standard parameters of all types of technical parameters of all the prepared recommended technology projects of the enterprise based on all the prepared recommended technology projects and databases of the enterprise, including:
[0016] Based on the database, all historical enterprises that have completed the recommendation through the scientific and technological achievements transformation service system for each of the enterprise's prepared recommended technology projects will be regarded as reference enterprises for each of the enterprise's prepared recommended technology projects;
[0017] Obtain all technical parameters of all reference enterprises for each of the enterprise's prepared recommended technical projects, including task processing improvement, number of failures, recovery time, technical investment amount, cost reduction, revenue growth, rating star number, and failure loss amount;
[0018] The mean value of each type of technical parameter of all reference enterprises for each of the enterprise's prepared recommended technical projects shall be regarded as the standard parameter of each type of technical parameter for each of the enterprise's prepared recommended technical projects.
[0019] Preferably, the technology achievement transformation service method, S2: based on the standard parameters of all the technical parameters of all the prepared recommended technology projects of the enterprise, obtaining all the dimension evaluation values of all the prepared recommended technology projects of the enterprise, based on all the dimension evaluation values of all the prepared recommended technology projects of the enterprise, obtaining the evaluation three-dimensional body of all the prepared recommended technology projects of the enterprise, including:
[0020] Based on the standard parameters of all technical parameters of all the prepared recommended technical projects of the enterprise, all dimension evaluation values of all the prepared recommended technical projects of the enterprise are obtained, wherein all dimension evaluation values of all categories include technology maturity dimension evaluation value, benefit dimension evaluation value and risk resistance dimension evaluation value;
[0021] The technical maturity dimension evaluation value of each of the prepared recommended technical projects of the enterprise is used as the horizontal coordinate value of the horizontal coordinate axis point in the preset spatial rectangular coordinate system, the benefit dimension evaluation value is used as the vertical coordinate value of the vertical coordinate axis point in the preset spatial coordinate system, and the risk resistance dimension evaluation value is used as the vertical coordinate value of the vertical coordinate axis point in the preset spatial coordinate system, so as to obtain the horizontal coordinate axis points, vertical coordinate axis points and vertical coordinate axis points of all the prepared recommended technical projects of the enterprise;
[0022] The horizontal axis points, vertical axis points, vertical axis points and the origin of the preset space coordinate system of each of the enterprise's prepared recommended technical projects are connected in pairs to obtain a tetrahedron, and the tetrahedron is used as a three-dimensional evaluation body for the enterprise's corresponding prepared recommended technical projects.
[0023] Preferably, the technology achievement transformation service method obtains all-dimensional evaluation values of ...
[0024] Obtain all original basic parameters of the enterprise, including the original number of tasks processed, the original number of failures, the original recovery time, the original cost, the original income, the original rating star number, and the original failure loss amount;
[0025] Based on the standard parameters of all class technical parameters of each of the enterprise's prepared recommended technical projects and all the original basic parameters of the enterprise, the evaluation values of all class dimensions of all the enterprise's prepared recommended technical projects are obtained, namely:
[0026]
[0027] Among them, β is the evaluation value of the technology maturity dimension of the currently calculated prepared recommended technology project of the enterprise, γ is the evaluation value of the benefit dimension of the currently calculated prepared recommended technology project of the enterprise, δ is the evaluation value of the risk resistance dimension of the currently calculated prepared recommended technology project of the enterprise, a is the standard parameter of the task processing improvement number of the currently calculated prepared recommended technology project of the enterprise, A is the original task processing number of the enterprise, b is the standard parameter of the evaluation star number of the currently calculated prepared recommended technology project of the enterprise, B is the original evaluation star number of the enterprise, c is the standard parameter of the cost reduction amount of the currently calculated prepared recommended technology project of the enterprise, C is the original cost amount of the enterprise, and g is the enterprise The standard parameter for the income growth of the currently calculated prepared recommended technology project, G is the original income of the enterprise, u is the standard parameter for the technology investment amount of the currently calculated prepared recommended technology project of the enterprise, t is the standard parameter for the recovery time of the currently calculated prepared recommended technology project of the enterprise, T is the original recovery time of the enterprise, h is the standard parameter for the number of failures of the currently calculated prepared recommended technology project of the enterprise, H is the original number of failures of the enterprise, k is the standard parameter for the failure loss amount of the currently calculated prepared recommended technology project of the enterprise, K is the original failure loss amount of the enterprise, ln is the natural logarithm, and the value of the natural constant e is 2.718.
[0028] Preferably, the technology achievement transformation service method, S3: based on the evaluation three-dimensional body of all the prepared recommended technology projects of the enterprise, all qualified recommended technology projects and all unqualified recommended technology projects of the enterprise are obtained, and based on all the class dimension evaluation values of all the qualified recommended technology projects of the enterprise and all the class dimension evaluation values of all the unqualified recommended technology projects of the enterprise, the recommended value of each qualified recommended technology project of the enterprise is obtained, and based on the recommended values of all the qualified recommended technology projects of the enterprise, the best recommended technology project of the enterprise is obtained, including:
[0029] The technical maturity dimension evaluation value of each prepared recommended technical project of the enterprise is used as the horizontal coordinate value, the benefit dimension evaluation value is used as the vertical coordinate value, and the risk dimension evaluation value is used as the vertical coordinate value to obtain the reference coordinate point of each prepared recommended technical project of the enterprise, and the origin of the preset spatial coordinate system is used as the center of the sphere, and the distance between the reference coordinate point of each prepared recommended technical project of the enterprise and the origin of the preset spatial coordinate system is used as the radius of the sphere to obtain the reference three-dimensional body of each prepared recommended technical project of the enterprise;
[0030] Determine whether the quotient between the evaluation three-dimensional body and the reference three-dimensional body of each preliminary recommended technical project of the enterprise is greater than a preset threshold. If so, determine that the corresponding preliminary recommended technical project is a qualified recommended technical project of the enterprise; otherwise, determine that the corresponding preliminary recommended technical project is an unqualified recommended technical project of the enterprise.
[0031] Based on all the category dimension evaluation values of all the qualified recommended technical projects of the enterprise and all the category dimension evaluation values of all the unqualified recommended technical projects of the enterprise, the recommended value of each qualified recommended technical project of the enterprise is obtained;
[0032] Based on the recommendation values of all qualified recommended technology projects of the enterprise, the best recommended technology project of the enterprise is obtained.
[0033] Preferably, the technology achievement transformation service method obtains the recommended value of each qualified recommended technology project of the enterprise based on the evaluation values of all categories of all qualified recommended technology projects of the enterprise and the evaluation values of all categories of all unqualified recommended technology projects, including:
[0034]
[0035] Among them, τ is the recommended value of the enterprise's currently calculated qualified recommended technology projects, R is the sum of all the category dimension evaluation values of the enterprise's currently calculated qualified recommended technology projects, m is the total number of all qualified recommended technology projects of the enterprise, n is the total number of all unqualified recommended technology projects of the enterprise, S m The sum of all the category dimension evaluation values of all the qualified recommended technology projects of the enterprise, S n It is the sum of all category dimension evaluation values of all unqualified recommended technical projects of the enterprise. ln is the natural logarithm, and the value of the natural constant e is 2.718.
[0036] The preferred technology achievement transformation service method obtains the best recommended technology project of the enterprise based on the recommended values of all qualified recommended technology projects of the enterprise, including:
[0037] The qualified recommended technology project with the largest recommendation value among all the qualified recommended technology projects of the enterprise shall be regarded as the best recommended technology project of the enterprise.
[0038] Preferably, the technology achievement transformation service method, S4: based on the best recommended technology project of the enterprise, obtaining the technology achievement transformation service result of the enterprise, including:
[0039] Through the technology achievement transformation service system, the introduction text of the enterprise's best recommended technology project is sent to the backend of the corresponding enterprise.
[0040] The present invention provides a scientific and technological achievement transformation service system, which is used to execute any one of the scientific and technological achievement transformation service methods in Embodiments 1 to 9, including:
[0041] An acquisition module, used to obtain all the prepared recommended technical projects of the enterprise based on the functional requirement text uploaded by the enterprise, and to obtain the standard parameters of all types of technical parameters of all the prepared recommended technical projects of the enterprise based on all the prepared recommended technical projects and the database of the enterprise;
[0042] An evaluation module is used to obtain evaluation values of all class dimensions of all the prepared recommended technical projects of the enterprise based on standard parameters of all class technical parameters of all the prepared recommended technical projects of the enterprise, and to obtain an evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise based on the evaluation values of all class dimensions of all the prepared recommended technical projects of the enterprise;
[0043] A calculation module, for obtaining all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise based on the three-dimensional evaluation bodies of all prepared recommended technical projects of the enterprise, and obtaining the recommended value of each qualified recommended technical project of the enterprise based on all class-dimensional evaluation values of all qualified recommended technical projects of the enterprise and all class-dimensional evaluation values of all unqualified recommended technical projects of the enterprise, and obtaining the best recommended technical project of the enterprise based on the recommended values of all qualified recommended technical projects of the enterprise;
[0044] The recommendation module is used to obtain the enterprise's scientific and technological achievement transformation service results based on the enterprise's best recommended technology projects.
[0045] The beneficial effects of the present invention compared with the prior art are as follows: according to the standard parameters of all kinds of technical parameters of all the prepared recommended technical projects of the enterprise, the evaluation values of all kinds of dimensions of all the prepared recommended technical projects of the enterprise are accurately obtained, and the advantages and disadvantages of all the prepared recommended technical projects of the enterprise in the technical dimension, benefit dimension and risk resistance dimension are quantified, and then according to the evaluation values of all kinds of dimensions of all the prepared recommended technical projects of the enterprise, the evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise is obtained, which is convenient for the subsequent accurate acquisition of all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise, according to the evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise, all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise are accurately obtained, and according to the evaluation values of all kinds of dimensions of all the qualified recommended technical projects of the enterprise and the evaluation values of all kinds of dimensions of all the unqualified recommended technical projects, the recommended value of each qualified recommended technical project of the enterprise is accurately obtained, and the priority of recommendation after comprehensive technical dimension, benefit dimension and risk resistance dimension of each qualified recommended technical project of the enterprise is quantified, and finally according to the recommendation values of all qualified recommended technical projects of the enterprise, the best recommended technical project of the enterprise is obtained, and more accurate technical project recommendation is achieved, which promotes the effective transformation of scientific and technological achievements.
[0046] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structure specifically pointed out in the written application document.
[0047] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0049] Figure 1 A flow chart of a technology achievement transformation service method in an embodiment of the present invention;
[0050] Figure 2 Schematic diagram of a technology achievement transformation service system in an embodiment of the present invention. DETAILED DESCRIPTION
[0051] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0052] Embodiment 1:
[0053] The present invention provides a technology achievement transformation service method, referring to Figure 1 ,include:
[0054] S1: Based on the functional requirement text uploaded by the enterprise, all the prepared recommended technical projects of the enterprise are obtained, and based on all the prepared recommended technical projects and databases of the enterprise, standard parameters of all types of technical parameters of all the prepared recommended technical projects of the enterprise are obtained;
[0055] S2: Based on the standard parameters of all the class technical parameters of all the prepared recommended technical projects of the enterprise, all the class dimensional evaluation values of all the prepared recommended technical projects of the enterprise are obtained; based on the all the class dimensional evaluation values of all the prepared recommended technical projects of the enterprise, the evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise is obtained;
[0056] S3: Based on the evaluation three-dimensional body of all the preliminary recommended technical projects of the enterprise, all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise are obtained, and based on all the class-dimensional evaluation values of all the qualified recommended technical projects of the enterprise and all the class-dimensional evaluation values of all the unqualified recommended technical projects of the enterprise, the recommended value of each qualified recommended technical project of the enterprise is obtained, and based on the recommended values of all the qualified recommended technical projects of the enterprise, the best recommended technical project of the enterprise is obtained;
[0057] S4: Based on the enterprise’s best recommended technology projects, obtain the enterprise’s technology achievement transformation service results.
[0058] In this embodiment, the enterprise is an enterprise that uses the technology achievement transformation service system to obtain the most suitable technology projects it needs.
[0059] In this embodiment, the functional requirement text is a text uploaded by the enterprise to the application technology achievement transformation service system, and the content is the enterprise's requirements for the functions of the required technical projects.
[0060] In this embodiment, the prepared recommended technology projects are some technology projects in the database of the technology achievement transformation service system that meet the requirements of the enterprise and can be recommended to the enterprise.
[0061] In this embodiment, the database is a database of a scientific and technological achievement transformation service system, wherein the database contains a large number of technical projects and historical data for recommending each technical project.
[0062] In this embodiment, the standard parameters of all types of technical parameters are standard parameters obtained based on all the preliminary recommended technical projects and database of the enterprise, which can characterize the overall performance of each preliminary recommended technical project of the enterprise in all corresponding types of technical parameters in all recommended enterprises (quantitative indicators describing the characteristics, performance, functions, etc. of the technical projects).
[0063] In this embodiment, the evaluation values of all categories of dimensions are standard parameters based on all categories of technical parameters of all the prepared recommended technical projects of the enterprise, and are numerical values that can characterize the advantages and disadvantages of all the prepared recommended technical projects of the enterprise in terms of technical maturity dimension, benefit dimension and risk resistance dimension.
[0064] In this embodiment, the evaluation three-dimensional body is a three-dimensional body obtained based on all class dimension evaluation values of all the preliminary recommended technical projects of the enterprise, and is used to evaluate all the preliminary recommended technical projects of the enterprise, obtain all qualified recommended technical projects and all unqualified recommended technical project enterprises.
[0065] In this embodiment, the qualified recommended technology projects are three-dimensional evaluation bodies based on all the prepared recommended technology projects of the enterprise, and the technology projects that can be recommended are screened out from all the prepared recommended technology projects of the enterprise based on the comprehensive technology dimension, benefit dimension and risk resistance dimension.
[0066] In this embodiment, the unqualified recommended technical projects are the three-dimensional evaluation bodies based on all the prepared recommended technical projects of the enterprise, which are the technical projects that cannot be recommended screened out by comprehensive technical dimensions, benefit dimensions and risk resistance dimensions among all the prepared recommended technical projects of the enterprise.
[0067] In this embodiment, the recommendation value of each qualified recommended technical project is a numerical value obtained based on the evaluation values of all category dimensions of all qualified recommended technical projects of the enterprise and the evaluation values of all category dimensions of all unqualified recommended technical projects, which can characterize the priority of each qualified recommended technical project of the enterprise after comprehensive technical dimensions, benefit dimensions and risk resistance dimensions.
[0068] In this embodiment, the best recommended technology project is the qualified recommended technology project that is recommended with the highest priority based on the comprehensive technology dimension, benefit dimension and risk resistance dimension among all qualified recommended technology projects of the enterprise.
[0069] In this embodiment, the result of the technology transformation service is to send the introduction text of the enterprise's best recommended technology project to the backend of the corresponding enterprise through the technology transformation service system.
[0070] The beneficial effects of the above technology are as follows: according to the standard parameters of all categories of technical parameters of all the prepared recommended technical projects of the enterprise, the evaluation values of all categories of dimensions of all the prepared recommended technical projects of the enterprise are accurately obtained, and the advantages and disadvantages of all the prepared recommended technical projects of the enterprise in the technical dimension, benefit dimension and risk resistance dimension are quantified, and then according to the evaluation values of all categories of dimensions of all the prepared recommended technical projects of the enterprise, the evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise is obtained, which is convenient for the subsequent accurate acquisition of all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise, and according to the evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise, all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise are accurately obtained, and according to the evaluation values of all categories of dimensions of all the qualified recommended technical projects of the enterprise and the evaluation values of all categories of dimensions of all the unqualified recommended technical projects, the recommended value of each qualified recommended technical project of the enterprise is accurately obtained, and the priority of recommendation after comprehensive technical dimension, benefit dimension and risk resistance dimension of each qualified recommended technical project of the enterprise is quantified, and finally according to the recommendation values of all qualified recommended technical projects of the enterprise, the best recommended technical project of the enterprise is obtained, and more accurate technical project recommendation is achieved, which promotes the effective transformation of scientific and technological achievements.
[0071] Embodiment 2:
[0072] Based on Example 1, the technology achievement transformation service method, S1: based on the functional requirement text uploaded by the enterprise, obtain all the prepared recommended technology projects of the enterprise, and based on all the prepared recommended technology projects and the database of the enterprise, obtain the standard parameters of all types of technical parameters of all the prepared recommended technology projects of the enterprise, including:
[0073] Receive the functional requirement text uploaded by the enterprise to the scientific and technological achievement transformation service system, and obtain the functional comparison results of all technical projects in the database based on the functional requirement text uploaded by the enterprise, the functional texts of all technical projects in the database and the functional comparison model;
[0074] The technical projects that are functionally compatible among all technical projects in the database are regarded as the enterprise's pre-recommended technical projects;
[0075] Based on all the enterprise's prepared recommended technical projects and database, standard parameters of all types of technical parameters of all the enterprise's prepared recommended technical projects are obtained.
[0076] In this embodiment, the function comparison model takes the function requirement texts uploaded by a large number of enterprises and the function texts of technical projects in a large number of databases as model inputs, and manually marks whether the function requirement texts uploaded by each enterprise and the function texts of the technical projects in the database are consistent as model outputs. The trained model that can input the function requirement texts uploaded by the enterprise and the function texts of the technical projects in the database can output whether the function requirement texts uploaded by the input enterprise and the function texts of the technical projects in the database are consistent.
[0077] In this embodiment, the function comparison results include compliance and non-compliance.
[0078] The beneficial effects of the above technology are: based on the functional requirement text uploaded by the enterprise, all the enterprise's preliminary recommended technical projects are accurately obtained, which is convenient for the subsequent acquisition of standard parameters of all types of technical parameters of all the enterprise's preliminary recommended technical projects, and based on all the enterprise's preliminary recommended technical projects and databases, the standard parameters of all types of technical parameters of all the enterprise's preliminary recommended technical projects are obtained.
[0079] Embodiment 3:
[0080] On the basis of Example 2, the technology achievement transformation service method obtains the standard parameters of all types of technical parameters of all the prepared recommended technology projects of the enterprise based on all the prepared recommended technology projects and the database of the enterprise, including:
[0081] Based on the database, all historical enterprises that have completed the recommendation through the scientific and technological achievements transformation service system for each of the enterprise's prepared recommended technology projects will be regarded as reference enterprises for each of the enterprise's prepared recommended technology projects;
[0082] Obtain all technical parameters of all reference enterprises for each of the enterprise's prepared recommended technical projects, including task processing improvement, number of failures, recovery time, technical investment amount, cost reduction, revenue growth, rating star number, and failure loss amount;
[0083] The mean value of each type of technical parameter of all reference enterprises for each of the enterprise's prepared recommended technical projects shall be regarded as the standard parameter of each type of technical parameter for each of the enterprise's prepared recommended technical projects.
[0084] In this embodiment, the historical enterprise is an enterprise that has obtained the required technical projects through the scientific and technological achievement transformation service system and has carried out technical operations.
[0085] In this embodiment, the reference enterprises for each of the prepared recommended technology projects of the enterprise are all the historical enterprises for which the recommendation for each of the prepared recommended technology projects has been completed and technology operation has been carried out.
[0086] In this embodiment, the task processing improvement number is the increase in the average daily number of processed tasks after each reference enterprise of each preliminary recommended technical project of the enterprise runs the corresponding preliminary recommended technical project compared to before running the corresponding preliminary recommended technical project.
[0087] In this embodiment, the number of failures is the average number of failures (all problems that affect the normal operation of the enterprise or the reference enterprise) that occur per day after each reference enterprise of each preliminary recommended technical project of the enterprise runs the corresponding preliminary recommended technical project.
[0088] In this embodiment, the recovery time is the average time required for each reference enterprise of each prepared recommended technical project of the enterprise to recover to normal operation after each failure occurs after each reference enterprise runs the corresponding prepared recommended technical project.
[0089] In this embodiment, the technology investment amount is the total amount that each reference enterprise of each prepared recommended technology project of the enterprise needs to spend to operate the corresponding prepared recommended technology project.
[0090] In this embodiment, the cost reduction amount is the amount by which the average daily cost of each reference enterprise of each preliminary recommended technical project of the enterprise is reduced after the enterprise runs the corresponding preliminary recommended technical project compared to before running the corresponding preliminary recommended technical project.
[0091] In this embodiment, the revenue growth amount is the amount of increase in the average daily revenue of each reference enterprise of each preliminary recommended technology project of the enterprise after the enterprise runs the corresponding preliminary recommended technology project compared to before the enterprise runs the corresponding preliminary recommended technology project.
[0092] In this embodiment, the evaluation star number is the number of stars evaluated by each reference enterprise of each of the enterprise's prepared recommended technology projects through the technology achievement transformation service system, which can reflect the operating conditions of the reference enterprise (the enterprise itself), for example, 5 stars.
[0093] In this embodiment, the failure loss amount is the average amount lost each time a failure occurs after each reference enterprise of each of the prepared recommended technical projects of the enterprise runs the corresponding prepared recommended technical project.
[0094] The beneficial effects of the above technology are: based on all the preliminary recommended technical projects and databases of the enterprise, the reference enterprises of each preliminary recommended technical project of the enterprise are accurately obtained, the specific parameter items of all types of technical parameters of all reference enterprises of each preliminary recommended technical project of the enterprise are clarified, and based on each type of technical parameters of all reference enterprises of each preliminary recommended technical project of the enterprise, the standard parameters of each type of technical parameters of each preliminary recommended technical project of the enterprise are accurately obtained, which is convenient for the calculation of subsequent dimensional judgment values.
[0095] Embodiment 4:
[0096] Based on Example 1, the technology achievement transformation service method, S2: based on the standard parameters of all the class technical parameters of all the prepared recommended technology projects of the enterprise, obtain all the class dimensional evaluation values of all the prepared recommended technology projects of the enterprise, based on all the class dimensional evaluation values of all the prepared recommended technology projects of the enterprise, obtain the evaluation three-dimensional body of all the prepared recommended technology projects of the enterprise, including:
[0097] Based on the standard parameters of all technical parameters of all the prepared recommended technical projects of the enterprise, all dimension evaluation values of all the prepared recommended technical projects of the enterprise are obtained, wherein all dimension evaluation values of all categories include technology maturity dimension evaluation value, benefit dimension evaluation value and risk resistance dimension evaluation value;
[0098] The technical maturity dimension evaluation value of each of the prepared recommended technical projects of the enterprise is used as the horizontal coordinate value of the horizontal coordinate axis point in the preset spatial rectangular coordinate system, the benefit dimension evaluation value is used as the vertical coordinate value of the vertical coordinate axis point in the preset spatial coordinate system, and the risk resistance dimension evaluation value is used as the vertical coordinate value of the vertical coordinate axis point in the preset spatial coordinate system, so as to obtain the horizontal coordinate axis points, vertical coordinate axis points and vertical coordinate axis points of all the prepared recommended technical projects of the enterprise;
[0099] The horizontal axis points, vertical axis points, vertical axis points and the origin of the preset space coordinate system of each of the enterprise's prepared recommended technical projects are connected in pairs to obtain a tetrahedron, and the tetrahedron is used as a three-dimensional evaluation body for the enterprise's corresponding prepared recommended technical projects.
[0100] In this embodiment, the preset spatial rectangular coordinate system is a spatial rectangular coordinate system that is preset to obtain the horizontal axis points, the vertical axis points, and the vertical axis points of all the prepared recommended technical projects of the enterprise.
[0101] In this embodiment, the abscissa axis point of each of the enterprise's prepared recommended technology projects is on the abscissa axis of a preset spatial rectangular coordinate system, and the abscissa value of the abscissa axis point is the technology maturity dimension judgment value of each of the enterprise's prepared recommended technology projects.
[0102] In this embodiment, the ordinate axis point of each of the enterprise's prepared recommended technology projects is a point on the ordinate axis of a preset spatial rectangular coordinate system, and the ordinate value of the ordinate axis point is the benefit dimension evaluation value of each of the enterprise's prepared recommended technology projects.
[0103] In this embodiment, the vertical coordinate axis point of each prepared recommended technical project of the enterprise is a point on the vertical coordinate axis of the preset spatial rectangular coordinate system, and the vertical coordinate value of the vertical coordinate axis point is the risk resistance dimension evaluation value of each prepared recommended technical project of the enterprise.
[0104] The beneficial effects of the above technology are: based on the standard parameters of all class technical parameters of all the enterprise's prepared recommended technical projects, all class dimensional evaluation values of all the enterprise's prepared recommended technical projects are accurately obtained, and then based on the all class dimensional evaluation values of all the enterprise's prepared recommended technical projects, a three-dimensional evaluation body of all the enterprise's prepared recommended technical projects is obtained, which is convenient for the subsequent accurate acquisition of all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise. This embodiment gives in detail a specific method for obtaining the three-dimensional evaluation body of all the enterprise's prepared recommended technical projects based on the all class dimensional evaluation values of all the enterprise's prepared recommended technical projects.
[0105] Embodiment 5:
[0106] On the basis of Example 4, the technology achievement transformation service method obtains all category dimension evaluation values of all category technical parameters of all category technical projects of the enterprise based on the standard parameters of all category technical parameters of all category technical projects of the enterprise, including:
[0107] Obtain all original basic parameters of the enterprise, including the original number of tasks processed, the original number of failures, the original recovery time, the original cost, the original income, the original rating star number, and the original failure loss amount;
[0108] Based on the standard parameters of all class technical parameters of each of the enterprise's prepared recommended technical projects and all the original basic parameters of the enterprise, the evaluation values of all class dimensions of all the enterprise's prepared recommended technical projects are obtained, namely:
[0109]
[0110] Among them, β is the evaluation value of the technology maturity dimension of the currently calculated prepared recommended technology project of the enterprise, γ is the evaluation value of the benefit dimension of the currently calculated prepared recommended technology project of the enterprise, δ is the evaluation value of the risk resistance dimension of the currently calculated prepared recommended technology project of the enterprise, a is the standard parameter of the task processing improvement number of the currently calculated prepared recommended technology project of the enterprise, A is the original task processing number of the enterprise, b is the standard parameter of the evaluation star number of the currently calculated prepared recommended technology project of the enterprise, B is the original evaluation star number of the enterprise, c is the standard parameter of the cost reduction amount of the currently calculated prepared recommended technology project of the enterprise, C is the original cost amount of the enterprise, and g is the enterprise The standard parameter for the income growth of the currently calculated prepared recommended technology project, G is the original income of the enterprise, u is the standard parameter for the technology investment amount of the currently calculated prepared recommended technology project of the enterprise, t is the standard parameter for the recovery time of the currently calculated prepared recommended technology project of the enterprise, T is the original recovery time of the enterprise, h is the standard parameter for the number of failures of the currently calculated prepared recommended technology project of the enterprise, H is the original number of failures of the enterprise, k is the standard parameter for the failure loss amount of the currently calculated prepared recommended technology project of the enterprise, K is the original failure loss amount of the enterprise, ln is the natural logarithm, and the value of the natural constant e is 2.718.
[0111] In this embodiment, all the original basic parameters of the enterprise are the basic parameters before the enterprise obtains the required technical projects (now).
[0112] In this embodiment, the original task processing number is the average number of tasks processed by the enterprise per day.
[0113] In this embodiment, the original number of failures is the average number of failures that occur in the enterprise per day.
[0114] In this embodiment, the original recovery time is the average time required for the enterprise to recover to normal operation after each failure.
[0115] In this embodiment, the original cost amount is the average daily cost of the enterprise operation.
[0116] In this embodiment, the original income amount is the average daily revenue of the enterprise.
[0117] In this embodiment, the original evaluation star number is the star number evaluated by the enterprise itself, which can reflect the business status of the enterprise.
[0118] In this embodiment, the original failure loss amount is the average amount of loss that the enterprise suffers each time a failure occurs.
[0119] The beneficial effects of the above technology are: based on the standard parameters of all types of technical parameters of all the company's prepared recommended technical projects, all types of dimensional evaluation values of all the company's prepared recommended technical projects are accurately obtained, and the advantages and disadvantages of all the company's prepared recommended technical projects in the technical dimension, benefit dimension and risk resistance dimension are quantified. This embodiment gives in detail a specific method for quantifying the advantages and disadvantages of each company's prepared recommended technical project in the technical dimension, benefit dimension and risk resistance dimension.
[0120] Embodiment 6:
[0121] On the basis of Example 4, the technology achievement transformation service method, S3: based on the evaluation three-dimensional body of all the prepared recommended technology projects of the enterprise, all qualified recommended technology projects and all unqualified recommended technology projects of the enterprise are obtained, and based on all the class dimension evaluation values of all the qualified recommended technology projects of the enterprise and all the class dimension evaluation values of all the unqualified recommended technology projects of the enterprise, the recommended value of each qualified recommended technology project of the enterprise is obtained, and based on the recommended values of all the qualified recommended technology projects of the enterprise, the best recommended technology project of the enterprise is obtained, including:
[0122] The technical maturity dimension evaluation value of each prepared recommended technical project of the enterprise is used as the horizontal coordinate value, the benefit dimension evaluation value is used as the vertical coordinate value, and the risk dimension evaluation value is used as the vertical coordinate value to obtain the reference coordinate point of each prepared recommended technical project of the enterprise, and the origin of the preset spatial coordinate system is used as the center of the sphere, and the distance between the reference coordinate point of each prepared recommended technical project of the enterprise and the origin of the preset spatial coordinate system is used as the radius of the sphere to obtain the reference three-dimensional body of each prepared recommended technical project of the enterprise;
[0123] Determine whether the quotient between the evaluation three-dimensional body and the reference three-dimensional body of each preliminary recommended technical project of the enterprise is greater than a preset threshold. If so, determine that the corresponding preliminary recommended technical project is a qualified recommended technical project of the enterprise; otherwise, determine that the corresponding preliminary recommended technical project is an unqualified recommended technical project of the enterprise.
[0124] Based on all the category dimension evaluation values of all the qualified recommended technical projects of the enterprise and all the category dimension evaluation values of all the unqualified recommended technical projects of the enterprise, the recommended value of each qualified recommended technical project of the enterprise is obtained;
[0125] Based on the recommendation values of all qualified recommended technology projects of the enterprise, the best recommended technology project of the enterprise is obtained.
[0126] In this embodiment, the preset threshold is a threshold that is preset to determine whether each preliminary recommended technology project is a qualified recommended technology project of the enterprise.
[0127] The beneficial effect of the above technology is: based on the evaluation three-dimensional body and reference three-dimensional body of all the preliminary recommended technical projects of the enterprise, all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise are accurately obtained. This embodiment gives in detail a specific method for obtaining all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise based on the evaluation three-dimensional body of all the preliminary recommended technical projects of the enterprise.
[0128] Embodiment 7:
[0129] On the basis of Example 6, the technology achievement transformation service method obtains the recommendation value of each qualified recommended technology project of the enterprise based on all the category dimension evaluation values of all qualified recommended technology projects of the enterprise and all the category dimension evaluation values of all unqualified recommended technology projects, including:
[0130]
[0131] Among them, τ is the recommended value of the enterprise's currently calculated qualified recommended technology projects, R is the sum of all the category dimension evaluation values of the enterprise's currently calculated qualified recommended technology projects, m is the total number of all qualified recommended technology projects of the enterprise, n is the total number of all unqualified recommended technology projects of the enterprise, S m The sum of all the category dimension evaluation values of all the qualified recommended technology projects of the enterprise, S n It is the sum of all category dimension evaluation values of all unqualified recommended technical projects of the enterprise. ln is the natural logarithm, and the value of the natural constant e is 2.718.
[0132] The beneficial effects of the above technology are: based on the evaluation values of all categories of dimensions of all qualified recommended technical projects of the enterprise and the evaluation values of all categories of dimensions of all unqualified recommended technical projects of the enterprise, the recommendation value of each qualified recommended technical project of the enterprise is accurately obtained, and the priority of recommendation after comprehensive technical dimensions, benefit dimensions and risk resistance dimensions of each qualified recommended technical project of the enterprise is quantified. This embodiment gives in detail a specific method for quantifying the priority of recommendation after comprehensive technical dimensions, benefit dimensions and risk resistance dimensions of each qualified recommended technical project of the enterprise.
[0133] Embodiment 8:
[0134] Based on Example 6, the technology achievement transformation service method is characterized in that the best recommended technology project of the enterprise is obtained based on the recommended values of all qualified recommended technology projects of the enterprise, including:
[0135] The qualified recommended technology project with the largest recommendation value among all the qualified recommended technology projects of the enterprise shall be regarded as the best recommended technology project of the enterprise.
[0136] The beneficial effect of the above technology is: according to the recommended values of all qualified recommended technical projects of the enterprise, the best recommended technical projects of the enterprise are obtained, and the most suitable technical projects for the enterprise are accurately selected.
[0137] Embodiment 9:
[0138] Based on Example 1, the technology achievement transformation service method, S4: based on the best recommended technology project of the enterprise, obtain the technology achievement transformation service result of the enterprise, including:
[0139] Through the technology achievement transformation service system, the introduction text of the enterprise's best recommended technology project is sent to the backend of the corresponding enterprise.
[0140] In this embodiment, the introduction text is a text that introduces information such as the features, technology, functions, and quotations of the technical project.
[0141] In this embodiment, the background is the background window of the enterprise on the technology achievement transformation service system.
[0142] The beneficial effects of the above technology are: based on the enterprise's best recommended technology projects, the enterprise's scientific and technological achievements transformation service results are obtained, more accurate technology project recommendations are achieved, and the effective transformation of scientific and technological achievements is promoted.
[0143] Embodiment 10:
[0144] The present invention provides a scientific and technological achievement transformation service system for executing any one of the scientific and technological achievement transformation service methods in embodiments 1 to 9, referring to Figure 2 ,include:
[0145] An acquisition module, used to obtain all the prepared recommended technical projects of the enterprise based on the functional requirement text uploaded by the enterprise, and to obtain the standard parameters of all types of technical parameters of all the prepared recommended technical projects of the enterprise based on all the prepared recommended technical projects and the database of the enterprise;
[0146] An evaluation module is used to obtain evaluation values of all class dimensions of all the prepared recommended technical projects of the enterprise based on standard parameters of all class technical parameters of all the prepared recommended technical projects of the enterprise, and to obtain an evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise based on the evaluation values of all class dimensions of all the prepared recommended technical projects of the enterprise;
[0147] A calculation module, for obtaining all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise based on the three-dimensional evaluation bodies of all prepared recommended technical projects of the enterprise, and obtaining the recommended value of each qualified recommended technical project of the enterprise based on all class-dimensional evaluation values of all qualified recommended technical projects of the enterprise and all class-dimensional evaluation values of all unqualified recommended technical projects of the enterprise, and obtaining the best recommended technical project of the enterprise based on the recommended values of all qualified recommended technical projects of the enterprise;
[0148] The recommendation module is used to obtain the enterprise's scientific and technological achievement transformation service results based on the enterprise's best recommended technology projects.
[0149] The beneficial effects of the above technology are as follows: according to the standard parameters of all categories of technical parameters of all the prepared recommended technical projects of the enterprise, the evaluation values of all categories of dimensions of all the prepared recommended technical projects of the enterprise are accurately obtained, and the advantages and disadvantages of all the prepared recommended technical projects of the enterprise in the technical dimension, benefit dimension and risk resistance dimension are quantified, and then according to the evaluation values of all categories of dimensions of all the prepared recommended technical projects of the enterprise, the evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise is obtained, which is convenient for the subsequent accurate acquisition of all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise, and according to the evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise, all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise are accurately obtained, and according to the evaluation values of all categories of dimensions of all the qualified recommended technical projects of the enterprise and the evaluation values of all categories of dimensions of all the unqualified recommended technical projects, the recommended value of each qualified recommended technical project of the enterprise is accurately obtained, and the priority of recommendation after comprehensive technical dimension, benefit dimension and risk resistance dimension of each qualified recommended technical project of the enterprise is quantified, and finally according to the recommendation values of all qualified recommended technical projects of the enterprise, the best recommended technical project of the enterprise is obtained, and more accurate technical project recommendation is achieved, which promotes the effective transformation of scientific and technological achievements.
[0150] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention, and the present invention is also intended to include these changes and modifications.
Claims
1. A technology achievement transformation service method, characterized in that: include: S1: Based on the functional requirement text uploaded by the enterprise, all the prepared recommended technical projects of the enterprise are obtained, and based on all the prepared recommended technical projects and databases of the enterprise, standard parameters of all types of technical parameters of all the prepared recommended technical projects of the enterprise are obtained; S2: Based on the standard parameters of all the class technical parameters of all the prepared recommended technical projects of the enterprise, all the class dimensional evaluation values of all the prepared recommended technical projects of the enterprise are obtained; based on the all the class dimensional evaluation values of all the prepared recommended technical projects of the enterprise, the evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise is obtained; S3: Based on the evaluation three-dimensional body of all the preliminary recommended technical projects of the enterprise, all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise are obtained, and based on all the class-dimensional evaluation values of all the qualified recommended technical projects of the enterprise and all the class-dimensional evaluation values of all the unqualified recommended technical projects of the enterprise, the recommended value of each qualified recommended technical project of the enterprise is obtained, and based on the recommended values of all the qualified recommended technical projects of the enterprise, the best recommended technical project of the enterprise is obtained; S4: Based on the enterprise’s best recommended technology projects, obtain the enterprise’s technology achievement transformation service results.
2. The technology achievement transformation service method according to claim 1, characterized in that: S1: Based on the functional requirement text uploaded by the enterprise, obtain all the enterprise's prepared recommended technical projects, and based on all the enterprise's prepared recommended technical projects and database, obtain the standard parameters of all types of technical parameters of all the enterprise's prepared recommended technical projects, including: Receive the functional requirement text uploaded by the enterprise to the scientific and technological achievement transformation service system, and obtain the functional comparison results of all technical projects in the database based on the functional requirement text uploaded by the enterprise, the functional texts of all technical projects in the database and the functional comparison model; The technical projects that are functionally compatible among all technical projects in the database are regarded as the enterprise's pre-recommended technical projects; Based on all the enterprise's prepared recommended technical projects and database, standard parameters of all types of technical parameters of all the enterprise's prepared recommended technical projects are obtained.
3. The technology achievement transformation service method according to claim 2, characterized in that: Based on all the enterprise's prepared recommended technical projects and databases, obtain the standard parameters of all types of technical parameters of all the enterprise's prepared recommended technical projects, including: Based on the database, all historical enterprises that have completed the recommendation through the scientific and technological achievements transformation service system for each of the enterprise's prepared recommended technology projects will be regarded as reference enterprises for each of the enterprise's prepared recommended technology projects; Obtain all technical parameters of all reference enterprises for each of the enterprise's prepared recommended technical projects, including task processing improvement, number of failures, recovery time, technical investment amount, cost reduction, revenue growth, rating star number, and failure loss amount; The mean value of each type of technical parameters of all reference enterprises for each of the enterprise's prepared recommended technical projects shall be taken as the standard parameter for each type of technical parameters for each of the enterprise's prepared recommended technical projects.
4. The technology achievement transformation service method according to claim 1, characterized in that: S2: Based on the standard parameters of all the class technical parameters of all the prepared recommended technical projects of the enterprise, all the class dimensional evaluation values of all the prepared recommended technical projects of the enterprise are obtained. Based on the all the class dimensional evaluation values of all the prepared recommended technical projects of the enterprise, the evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise is obtained, including: Based on the standard parameters of all technical parameters of all the prepared recommended technical projects of the enterprise, all dimension evaluation values of all the prepared recommended technical projects of the enterprise are obtained, wherein all dimension evaluation values of all categories include technology maturity dimension evaluation value, benefit dimension evaluation value and risk resistance dimension evaluation value; The technical maturity dimension evaluation value of each of the prepared recommended technical projects of the enterprise is used as the horizontal coordinate value of the horizontal coordinate axis point in the preset spatial rectangular coordinate system, the benefit dimension evaluation value is used as the vertical coordinate value of the vertical coordinate axis point in the preset spatial coordinate system, and the risk resistance dimension evaluation value is used as the vertical coordinate value of the vertical coordinate axis point in the preset spatial coordinate system, so as to obtain the horizontal coordinate axis points, vertical coordinate axis points and vertical coordinate axis points of all the prepared recommended technical projects of the enterprise; The horizontal axis points, vertical axis points, vertical axis points and the origin of the preset space coordinate system of each of the enterprise's prepared recommended technical projects are connected in pairs to obtain a tetrahedron, and the tetrahedron is used as a three-dimensional evaluation body for the enterprise's corresponding prepared recommended technical projects.
5. The technology achievement transformation service method according to claim 4, characterized in that: Based on the standard parameters of all technical parameters of all the enterprise's prepared recommended technical projects, all dimension evaluation values of all the enterprise's prepared recommended technical projects are obtained, including: Obtain all original basic parameters of the enterprise, including the original number of tasks processed, the original number of failures, the original recovery time, the original cost, the original income, the original rating star number, and the original failure loss amount; Based on the standard parameters of all class technical parameters of each of the enterprise's prepared recommended technical projects and all the original basic parameters of the enterprise, the evaluation values of all class dimensions of all the enterprise's prepared recommended technical projects are obtained, namely: Among them, β is the evaluation value of the technology maturity dimension of the currently calculated prepared recommended technology project of the enterprise, γ is the evaluation value of the benefit dimension of the currently calculated prepared recommended technology project of the enterprise, δ is the evaluation value of the risk resistance dimension of the currently calculated prepared recommended technology project of the enterprise, a is the standard parameter of the task processing improvement number of the currently calculated prepared recommended technology project of the enterprise, A is the original task processing number of the enterprise, b is the standard parameter of the evaluation star number of the currently calculated prepared recommended technology project of the enterprise, B is the original evaluation star number of the enterprise, c is the standard parameter of the cost reduction amount of the currently calculated prepared recommended technology project of the enterprise, C is the original cost amount of the enterprise, and g is the enterprise The standard parameter for the income growth of the currently calculated prepared recommended technology project, G is the original income of the enterprise, u is the standard parameter for the technology investment amount of the currently calculated prepared recommended technology project of the enterprise, t is the standard parameter for the recovery time of the currently calculated prepared recommended technology project of the enterprise, T is the original recovery time of the enterprise, h is the standard parameter for the number of failures of the currently calculated prepared recommended technology project of the enterprise, H is the original number of failures of the enterprise, k is the standard parameter for the failure loss amount of the currently calculated prepared recommended technology project of the enterprise, K is the original failure loss amount of the enterprise, ln is the natural logarithm, and the value of the natural constant e is 2.
718.
6. The technology achievement transformation service method according to claim 4, characterized in that: S3: Based on the evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise, all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise are obtained, and based on all the class dimension evaluation values of all the qualified recommended technical projects of the enterprise and all the class dimension evaluation values of all the unqualified recommended technical projects of the enterprise, the recommended value of each qualified recommended technical project of the enterprise is obtained, and based on the recommended values of all the qualified recommended technical projects of the enterprise, the best recommended technical project of the enterprise is obtained, including: The technical maturity dimension evaluation value of each prepared recommended technical project of the enterprise is used as the horizontal coordinate value, the benefit dimension evaluation value is used as the vertical coordinate value, and the risk dimension evaluation value is used as the vertical coordinate value to obtain the reference coordinate point of each prepared recommended technical project of the enterprise, and the origin of the preset spatial coordinate system is used as the center of the sphere, and the distance between the reference coordinate point of each prepared recommended technical project of the enterprise and the origin of the preset spatial coordinate system is used as the radius of the sphere to obtain the reference three-dimensional body of each prepared recommended technical project of the enterprise; Determine whether the quotient between the evaluation three-dimensional body and the reference three-dimensional body of each preliminary recommended technical project of the enterprise is greater than a preset threshold. If so, determine that the corresponding preliminary recommended technical project is a qualified recommended technical project of the enterprise; otherwise, determine that the corresponding preliminary recommended technical project is an unqualified recommended technical project of the enterprise. Based on all the category dimension evaluation values of all the qualified recommended technical projects of the enterprise and all the category dimension evaluation values of all the unqualified recommended technical projects of the enterprise, the recommended value of each qualified recommended technical project of the enterprise is obtained; Based on the recommendation values of all qualified recommended technology projects of the enterprise, the best recommended technology project of the enterprise is obtained.
7. The technology achievement transformation service method according to claim 6, characterized in that: Based on all the category dimension evaluation values of all qualified recommended technical projects of the enterprise and all the category dimension evaluation values of all unqualified recommended technical projects, the recommended value of each qualified recommended technical project of the enterprise is obtained, including: Where τ is the recommended value of the enterprise's currently calculated qualified recommended technology projects, R is the sum of all the category dimension evaluation values of the enterprise's currently calculated qualified recommended technology projects, m is the total number of all qualified recommended technology projects of the enterprise, n is the total number of all unqualified recommended technology projects of the enterprise, S m The sum of all the category dimension evaluation values of all the qualified recommended technology projects of the enterprise, S n It is the sum of all category dimension evaluation values of all unqualified recommended technical projects of the enterprise. ln is the natural logarithm, and the value of the natural constant e is 2.
718.
8. The technology achievement transformation service method according to claim 6, characterized in that: Based on the recommended values of all qualified recommended technology projects of the enterprise, the best recommended technology projects of the enterprise are obtained, including: The qualified recommended technology project with the largest recommendation value among all the qualified recommended technology projects of the enterprise shall be regarded as the best recommended technology project of the enterprise.
9. The technology achievement transformation service method according to claim 1, characterized in that: S4: Based on the enterprise's best recommended technology projects, obtain the enterprise's technology achievement transformation service results, including: Through the technology achievement transformation service system, the introduction text of the enterprise's best recommended technology project is sent to the backend of the corresponding enterprise.
10. A scientific and technological achievement transformation service system, characterized in that: A method for implementing a technology achievement transformation service method as described in any one of claims 1 to 9, comprising: An acquisition module, used to obtain all the prepared recommended technical projects of the enterprise based on the functional requirement text uploaded by the enterprise, and to obtain the standard parameters of all types of technical parameters of all the prepared recommended technical projects of the enterprise based on all the prepared recommended technical projects and the database of the enterprise; An evaluation module is used to obtain evaluation values of all class dimensions of all the prepared recommended technical projects of the enterprise based on standard parameters of all class technical parameters of all the prepared recommended technical projects of the enterprise, and to obtain an evaluation three-dimensional body of all the prepared recommended technical projects of the enterprise based on the evaluation values of all class dimensions of all the prepared recommended technical projects of the enterprise; A calculation module, for obtaining all qualified recommended technical projects and all unqualified recommended technical projects of the enterprise based on the three-dimensional evaluation bodies of all prepared recommended technical projects of the enterprise, and obtaining the recommended value of each qualified recommended technical project of the enterprise based on all class-dimensional evaluation values of all qualified recommended technical projects of the enterprise and all class-dimensional evaluation values of all unqualified recommended technical projects of the enterprise, and obtaining the best recommended technical project of the enterprise based on the recommended values of all qualified recommended technical projects of the enterprise; The recommendation module is used to obtain the enterprise's scientific and technological achievement transformation service results based on the enterprise's best recommended technology projects.
