Power grid line loss simulation training system

By designing a power grid line loss simulation training system, problems such as limitations of environmental simulation, lack of real-time and synchronization, insufficient interaction and flexibility in the existing technology have been solved, and simulation and enriched training scenarios of complex power grid environments have been realized, and the Employee skills and coping skills ensure the safety and effectiveness of training.

CN119049352APending Publication Date: 2024-11-29HENAN ZHUODA ELECTRIC CO LTD

Patent Information

Application Number
CN202411097184.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing grid line loss simulation training system has limitations in environmental simulation, lack of real-time and synchronization, insufficient interaction and flexibility, low system integration, insufficient security guarantees, and single training content, and cannot effectively simulate complex grid environments and provide The rich training scenarios limit employees' skills improvement and coping abilities.

Method used

A power grid line loss simulation training system was designed, including a line loss analysis simulation platform and line loss training device for interactive communication, and high-frequency data acquisition is adopted using HPLC technology. It is based on J2EE's multi-layer technical architecture and integrates the user's power consumption information acquisition system. The line loss analysis module provides modular design and safety leakage protection devices, supports simulation of multiple voltage levels, and realizes real-time interaction and automated work order management.

Benefits of technology

Able to simulate various line loss abnormalities, provide a comprehensive simulation environment, improve employee identification and processing capabilities, increase training flexibility and safety, meet different power grid needs, improve training pertinence and practicality, and ensure training safety Sex and effectiveness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119049352A_ABST
    Figure CN119049352A_ABST
Patent Text Reader

Abstract

The invention discloses a power grid line loss simulation training system, relates to the technical field of power training, and aims to solve the problem that a power supply department needs to be close to an actual working scene in practical operation, and the power grid line loss simulation training system comprises a line loss analysis simulation platform and a line loss training device which communicate with each other; the line loss analysis simulation platform receives and demonstrates line loss abnormal information sent by the line loss training device, and is used for training personnel to carry out a complete business processing process and standard training in a practical training room through business modules in combination with various simulation scenes; the parameter setting device is used for setting operation parameters and fault parameters of the line loss training device and sending the parameters to the control line loss training device; the line loss training device receives the operation parameters and the fault parameters of the line loss training device transmitted by the line loss analysis simulation platform, and simulates the line loss fault based on the parameters; and any line loss abnormal information found in the simulation process is transmitted to the line loss analysis simulation platform through communication connection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of electric power training, and in particular relates to a power grid line loss simulation training system. Background Art

[0002] Reducing line losses is not only a key energy-saving measure for power supply companies, but also an important way to improve energy efficiency and optimize grid operation. Through a detailed analysis of the main grid losses, power supply companies can gain a deep understanding of the current state of the grid, including its structural layout, equipment operating efficiency, the diversity of power demand, and the effectiveness of management strategies. This analysis helps to quickly identify abnormal factors that cause line losses, so that corresponding measures can be taken to reduce power losses and improve the economy and reliability of the grid.

[0003] However, in order to achieve this goal, the power supply department needs to improve the professional skills and coping capabilities of employees through training. This requires that the training should not only be easy to understand in theory, but also be close to the actual work scenario in practical operation. The existing technology has deficiencies in the following aspects, which need to be overcome through technological innovation:

[0004] (1) Limitations of environmental simulation: Existing technologies may not be able to fully simulate the operating status of the actual power grid in various complex environments, especially when there is peak power consumption or the power grid structure is complex and changeable.

[0005] (2) Lack of real-time and synchronization: In terms of real-time monitoring and exception handling, existing technologies may not be able to achieve synchronization with on-site grid operations, resulting in a mismatch between training results and actual operational requirements.

[0006] (3) Lack of interactivity and flexibility: The user interface and operating procedures may not be intuitive enough and lack flexibility, which limits employees' ability to adjust system parameters and the real experience of fault simulation during training.

[0007] (4) Low system integration: Relying on multiple separate devices and software, existing technologies may not provide a highly integrated solution, which not only increases the deployment and maintenance costs of the training system but also affects the user experience.

[0008] (5) Insufficient safety measures: When simulating power grid anomalies, existing technologies may lack necessary safety measures and cannot effectively prevent and control potential safety risks.

[0009] (6) Monotony of training content: Existing technologies may not be able to provide a rich variety of training scenarios and cases, which limits employees’ ability to respond to different situations and the cultivation of innovative thinking. Summary of the invention

[0010] In view of the shortcomings of the prior art, the present invention proposes a power grid line loss simulation training system, including an interactive communication line loss analysis simulation platform and a line loss training device;

[0011] The line loss analysis simulation platform receives the line loss abnormality information sent by the line loss training device and demonstrates it. Through various business modules and in combination with various simulation scenarios, it is used for training personnel to conduct complete business processing and standardized training in the training room; it is used to set the operating parameters and fault parameters of the line loss training device, and send the parameters to the line loss control training device;

[0012] The line loss training device receives the operating parameters and fault parameters of the line loss training device transmitted by the line loss analysis simulation platform, and simulates the line loss fault based on the above parameters; any abnormal line loss information found during the simulation is transmitted to the line loss analysis simulation platform through a communication connection; and HPLC technology is used to collect high-frequency data from the user table.

[0013] As a further improvement of the system of the present invention, the line loss analysis simulation platform also includes two subsystems, namely, a user electricity consumption information collection system and a line loss analysis related module SG186.

[0014] As a further improvement of the system of the present invention, the line loss analysis simulation platform adopts a multi-layer technical architecture based on J2EE, and uses a consistent and shareable data model to implement a multi-layer technical system design according to the interface display layer, interface control layer, application logic layer, public service layer, data resource layer, and infrastructure layer.

[0015] As a further improvement of the system of the present invention, the line loss analysis simulation platform further includes: a system basic support module, an equipment account management module, an interface data management module, a knowledge template management module, a line loss anomaly simulation module and a line loss work order processing module;

[0016] The system basic support module is used to uniformly manage basic information and permissions, and transmit basic information to the equipment ledger management module, wherein the basic information includes institutions, roles, and personnel;

[0017] The equipment account management module is used to manage the line loss training device account based on the user authority information transmitted from the system basic support module: query, modify and count the equipment information, and transmit it to the line loss work order processing module;

[0018] The interface data management module: automatically obtains line loss related data from the external module SG186 and the power consumption information collection system through the WebAPI interface technology; transmits the line loss related data to the knowledge template management module;

[0019] The knowledge template management module is used to collect and extract line loss related data transmitted from the interface data management module; it is used for knowledge integration and application, provides knowledge support for line loss abnormality simulation and work order processing, and transmits it to the line loss abnormality simulation module;

[0020] The line loss abnormality simulation module is used to support the knowledge transmitted from the knowledge template management module, manage line loss, technical line loss, high line loss, negative line loss and uncountable line loss; and simulate abnormal line loss conditions, provide early warning information, and transmit it to the line loss work order processing module;

[0021] The line loss work order processing module is used to automatically assign line loss abnormality work orders for the warning information transmitted from the line loss abnormality simulation module and the equipment information transmitted from the equipment ledger management module; it is used for the full process management of work orders, from work order generation, allocation, processing to closed loop, to achieve automation and process-based line loss management.

[0022] As a further improvement of the system of the present invention, the line loss training device also includes a line loss simulation cabinet, and the simulation cabinet is internally provided with a programmable power supply, a meter, a digital display, a fault simulator, a voice timer and a simulation acquisition terminal.

[0023] As a further improvement of the system of the present invention, the line loss training device is equipped with universal wheels and supporting feet.

[0024] As a further improvement of the system of the present invention, the line loss training device is provided with a leakage protection device, which can cut off the power supply to the operating surface and alarm when leakage occurs or the operator is electrocuted.

[0025] As a further improvement of the system of the present invention, the line loss training device uses wireless communication to interact with the line loss analysis simulation platform.

[0026] Beneficial effects of the present invention:

[0027] 1. It can simulate various types of line loss anomalies that may occur on site, including metering line loss, power data collection line loss, wire theft loss and technical line loss anomalies, which helps to improve the power system staff's ability to identify and handle abnormal situations.

[0028] 2. By integrating line loss technology software, computer control software, line loss fault simulator, simulated energy meter, simulated terminal and virtual load power supply, the system provides a comprehensive simulation environment that can simulate real power system operation and fault conditions.

[0029] 3. The simulated electric energy meter and the simulated terminal can read and modify parameters, such as meter address, meter number, electric energy indication, etc., which increases the flexibility of training and the experience of actual operation.

[0030] 4. The simulation equipment can simulate common internal faults of electric energy meters and concentrators, such as freezes, display failures, etc., so that trainees can learn and master fault diagnosis and repair skills in a safe environment.

[0031] 5. Modular design with unified type and electrical interface facilitates the expansion of simulation units according to new technologies and functional requirements, maintaining the advancement and adaptability of the training system.

[0032] 6. It can simulate line losses of different voltage levels (such as 35KV, 10KV, 0.4KV), making the training more comprehensive and able to meet the training needs of power grids of different voltage levels.

[0033] 7. By using virtual load power supply, the system can automatically reduce power output when power consumption is abnormal, effectively protecting the safety of personnel and equipment, while ensuring the smooth progress of training.

[0034] 8. Power companies can arrange training schedules based on actual production conditions, solving the problem of being unable to conduct training due to on-site production needs in the past and improving the feasibility and effectiveness of training.

[0035] 9. It is possible to truly restore "technical line loss" and "management line loss" in the training room, so that trainees can focus on learning and mastering line loss analysis and processing skills in an environment that is not affected by complex factors on site.

[0036] 10. The line loss fault simulator can be used to simulate various abnormal line loss conditions on site, meet the needs of different training scenarios and cases, and improve the pertinence and practicality of training. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 This is a structural diagram of a power grid line loss simulation training system of the present invention.

[0038] Figure 2 The present invention is a principle block diagram of a power grid line loss simulation training system. DETAILED DESCRIPTION

[0039] In order to facilitate the understanding of the present application, the present application will be described more fully below with reference to the relevant drawings. The embodiments described are given in the drawings. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present application more thoroughly and comprehensively understood.

[0040] In this embodiment, if Figure 1 As shown, a power grid line loss simulation training system includes an interactive communication line loss analysis simulation platform and a line loss training device;

[0041] The line loss analysis simulation platform receives the abnormal line loss information sent by the line loss training device and demonstrates it. Through various business modules and in combination with various simulation scenarios, it is used for training personnel to conduct complete business processing and standardized training in the training room; it is used to set the operating parameters and fault parameters of the line loss training device, and send the parameters to the control line loss training device; it also includes two subsystems, namely, the user power consumption information collection system and the line loss analysis related module SG186;

[0042] The line loss analysis simulation platform adopts a multi-layer technology architecture based on J2EE (Java 2 Platform Enterprise Edition) to improve the flexibility, scalability, security and concurrent processing capabilities of the system. At the same time, it uses a consistent and shareable data model to implement a multi-layer technology system design according to the interface display layer, interface control layer, application logic layer, public service layer, data resource layer, and infrastructure layer;

[0043] The interface display layer uses Hypertext 5.0HTML5, Adobe Flash (formerly Macromedia Flash, referred to as Flash; predecessor FutureSplash), FLEX (Flexible High Speed ​​Paging), ActiveX controls, and JSP (Java Server Pages) technologies to build the user interface; it provides users with an intuitive operation interface, and the application logic layer performs specific business processing;

[0044] The interface control layer: adopts the MVC (Model-View-Controller) framework design to achieve effective separation of data model, user interface and business logic. This separation not only helps to improve the manageability of the code, but also facilitates subsequent expansion and maintenance; the interface control layer is composed of multiple units, including an interface control unit, an interface operation unit, an interface unit and an agent unit; the agent unit interacts with the application logic layer to issue the required service request; the built-in interface controller component coordinates the FLEX component and the JSP web page component to ensure the smooth operation and correct display of the user interface; for businesses that require special display effects, special FLASH or ActiveX technology is used to process them to enhance the user experience;

[0045] The application logic layer is constructed according to the component design principle and includes multiple management modules, such as simulation training management, simulation assessment management, knowledge base management, teaching staff management, comprehensive query and system management. It is responsible for processing specific business logic and responding to service requests from the interface control layer. It uses the support services provided by the public service layer to complete the processing of business logic and transmit the processing results to the interface display layer.

[0046] The public service layer: based on the key data provided by the data resource layer and supported by the OSGI framework, constitutes a group of public components independent of the business; the public service layer provides support services for the five business modules of the application logic layer, including online analysis engine, task management, authority control, log management, service registration, report statistics and management, data persistence, data synchronization, exception management and interface services. Through the centralized management of the public service layer, the maintainability, scalability and modularity of the system can be improved.

[0047] The data resource layer: based on the database provided by the infrastructure layer, is responsible for storing all key data required for system operation and transmitting it to the public service layer. The key data includes but is not limited to system basic data, simulation training data, simulation assessment data, knowledge data, faculty and personnel data, and statistical analysis data, ensuring the integrity, consistency and security of the data, while providing fast and reliable data access services for upper-level applications.

[0048] The infrastructure layer: provides a stable operating environment and data security, and transfers the database to the data resource layer; the software and hardware infrastructure of this layer includes: network, platform, database, storage, and backup;

[0049] The line loss analysis simulation platform further includes: a system basic support module, an equipment account management module, an interface data management module, a knowledge template management module, a line loss anomaly simulation module and a line loss work order processing module;

[0050] The system basic support module is used to uniformly manage basic information and permissions, and transmit basic information to the equipment ledger management module, wherein the basic information includes institutions, roles, and personnel;

[0051] The equipment account management module is used to manage the line loss training device account based on the user authority information transmitted from the system basic support module: query, modify and count the equipment information, and transmit it to the line loss work order processing module;

[0052] The interface data management module: automatically obtains line loss related data from the external module SG186 system and the power consumption information collection system through the WebAPI interface technology; transmits the line loss related data to the knowledge template management module;

[0053] The knowledge template management module is used to collect and extract line loss related data transmitted from the interface data management module; it is used for knowledge integration and application, provides knowledge support for line loss abnormality simulation and work order processing, and transmits it to the line loss abnormality simulation module;

[0054] The line loss abnormality simulation module is used to support the knowledge transmitted from the knowledge template management module, manage line loss, technical line loss, high line loss, negative line loss and uncountable line loss; and simulate abnormal line loss conditions, provide early warning information, and transmit it to the line loss work order processing module;

[0055] The line loss work order processing module is used to automatically assign line loss abnormality work orders for the warning information transmitted from the line loss abnormality simulation module and the equipment information transmitted from the equipment ledger management module; it is used for the full process management of work orders, from work order generation, allocation, processing to closed loop, to achieve automation and process-based line loss management.

[0056] The line loss training device receives the operating parameters and fault parameters of the line loss training device transmitted by the line loss analysis simulation platform, and simulates the line loss fault based on the above parameters; any abnormal line loss information found during the simulation is transmitted to the line loss analysis simulation platform through a communication connection; and high-frequency data collection is performed on the user table using HPLC technology;

[0057] The line loss training device supports two main data interaction modes in uplink communication: Ethernet and GPRS. Ethernet provides a stable and high-speed data transmission method suitable for fixed network environments; while GPRS facilitates mobile or remote data transmission, ensuring effective data interaction with the master station system in different environments.

[0058] In terms of downlink communication, the line loss training device collects data with the master meter and the gateway meter through the RS485 communication protocol. RS485 is suitable for data transmission in industrial environments due to its reliability and anti-interference, ensuring the accuracy and stability of data collection.

[0059] In addition, the line loss training device uses HPLC (High-Precision Load Cell) technology to collect high-frequency data from user meters.

[0060] The HPLC method can provide high-precision data, which is crucial for monitoring and analyzing power consumption at the user end, and helps to achieve more sophisticated line loss management and analysis.

[0061] like Figure 2As shown, the line loss training device also includes a gateway metering line loss simulation cabinet, a high-supply high-metering line loss simulation cabinet, a high-supply low-metering line loss simulation cabinet, a public transformer metering line loss simulation cabinet and a low-voltage collection line loss simulation cabinet. The device is used to simulate the gateway metering of a 35KV gateway, a 10KV gateway, 2 high-supply high-metering users, 2 high-supply low-metering users, 4 public transformer users in a public transformer area and 15 single-phase users in a low-voltage collection area under a substation area; the power flow calculation method is used to simulate the line loss of each power flow point, including the line power Line loss caused by resistance, line loss caused by transformer, line loss caused by three-phase imbalance, line loss caused by reactive power, and line loss caused by step-down transformer position and user topology; each simulation cabinet adopts standardized design, unified type, unified electrical interface, and has power-on indication function; each simulation cabinet is equipped with leakage protection device, when the equipment leaks or the operator is electrocuted, it can quickly alarm and cut off the power supply to the operating surface to ensure the safety of the operator; the bottom of each simulation cabinet is equipped with steel universal wheels and feet to facilitate the movement and fixation of the equipment.

[0062] Each simulation cabinet is equipped with a program-controlled digital electronic source, which can output voltage and current according to the needs of training simulation, build the actual working conditions of the simulation scene, and meet the function of instantaneous power logic relationship buckle at all levels of the system;

[0063] A liquid crystal touch digital display is installed at the branch and bus entrance of each simulation cabinet to demonstrate the instantaneous power value of the current line loss of each section of the line. The wire model, line length, and transformer parameters of each section are set through the host computer, that is, the line loss analysis simulation platform. After the host computer calculates the line loss according to the line parameters, it controls the corresponding voltage value of the programmable power supply output to realize the simulation of each metering voltage difference caused by the line resistance factor;

[0064] Each switch in the simulation cabinet is equipped with a detection point. The status of the detection point is uploaded to the host computer through the simulation acquisition terminal to realize the system interlocking demonstration function.

[0065] The metering circuit of each meter in the simulation cabinet is equipped with a fault simulator of the metering circuit to simulate typical faults on the metering site;

[0066] Each simulation cabinet’s RS485 communication line is equipped with a fault simulator to simulate the communication line faults between the gateway simulation acquisition terminal and each meter, including: A disconnection, B disconnection, AB reverse connection, and AB short circuit;

[0067] Each simulation cabinet is equipped with reactive power compensation simulation circuit and access switch. When the switch is closed, the system demonstrates that the power factor at the user line entrance is close to 1.0. By demonstrating the change of line loss before and after reactive power compensation, the influence of adjusting the line power factor on improving line loss is demonstrated.

[0068] The single-phase user simulation area in the low-voltage line loss simulation cabinet can realize the host computer to automatically adjust the user's access phase and simulate the imbalance of the low-voltage power supply line. At the same time, according to the access status, the host computer calculates the instantaneous power value of the line loss generated by the current access status in real time, showing the impact of grid power supply balance on improving line loss.

[0069] In this embodiment, the gateway metering line loss simulation cabinet is composed of a 35KV gateway metering module, a 10KV gateway metering module and a voice timer, wherein the 35KV metering module is composed of a 35KV gateway meter (three-phase four-wire), a 35KV gateway simulation acquisition terminal (three-phase four-wire), a digital display and a secondary junction box, and the 10KV gateway metering module is composed of a 10KV gateway meter (three-phase four-wire), a 10KV gateway simulation acquisition terminal (three-phase four-wire), 2 digital displays, 2 electric energy metering junction boxes and a voice timer, wherein:

[0070] 35KV gateway meter: used to measure the electrical energy at 35KV;

[0071] 35KV gateway simulation acquisition terminal: used to collect the electric energy information of 35KV gateway meter;

[0072] 10KV gateway meter: used to measure the electrical energy at 10KV;

[0073] 10KV gateway simulation acquisition terminal: used to collect the electric energy information of 10KV gateway meter;

[0074] The first digital display: used to display user information at the 35KV gate;

[0075] The second digital display: used to display user information at the 10KV gate, including transformer, wire model and length;

[0076] Electric energy metering junction box: used for on-site inspection of electric energy meters, electrical instruments, leakage protection and other electrical equipment to ensure personal operation safety and improve on-site work efficiency;

[0077] Voice timer: can count down the start, end, last 5 minutes, and 90 minutes, which is convenient for test training.

[0078] In this embodiment, the high-supply high-meter line loss simulation cabinet also includes 2 high-supply high-meter dedicated transformer users and a voice timer, which are respectively composed of 2 dedicated transformer user meters (three-phase three-wire), 2 dedicated transformer gateway simulation acquisition terminals (three-phase three-wire), 4 digital display meters, 2 metering junction boxes and a voice timer, wherein:

[0079] The first special transformer meter: used to measure the electric energy of the first special transformer users;

[0080] The first dedicated transformer gateway simulation collection terminal: used for first collecting the power information of dedicated transformer users;

[0081] Second dedicated transformer meter: used to measure the electric energy of the second dedicated transformer users;

[0082] The second dedicated transformer gateway simulation collection terminal is used to collect the power information of the second dedicated transformer users;

[0083] The first digital display: used to display the electric energy information, transformer parameters, wire parameters, and wire length of the first special transformer user meter;

[0084] The second digital display: used to display the load information of the second dedicated transformer user;

[0085] Second digital display: used to display the electric energy information, transformer parameters, wire parameters and wire length of the second special transformer user meter;

[0086] Fourth digital display: used to display the load information of the second dedicated transformer user;

[0087] Electric energy metering junction box: used for on-site inspection of electric energy meters, electrical instruments, leakage protection and other electrical equipment to ensure personal operation safety and improve on-site work efficiency;

[0088] Voice timer: can count down the start, end, last 5 minutes, and 90 minutes, which is convenient for test training.

[0089] In this embodiment, the high-supply low-meter line loss simulation cabinet is composed of two high-supply low-meter dedicated transformer users and a voice timer, which are respectively composed of two dedicated transformer user meters (three-phase four-wire), two dedicated transformer gateway simulation acquisition terminals (three-phase four-wire), four digital display meters, two metering junction boxes and a voice timer, wherein:

[0090] The first special transformer meter: used to measure the electric energy of the first special transformer users;

[0091] The first dedicated transformer gateway simulation collection terminal is used to collect the power information of the first dedicated transformer users;

[0092] Second dedicated transformer meter: used to measure the electric energy of the second dedicated transformer users;

[0093] The second dedicated transformer gateway simulation collection terminal is used to collect the power information of the second dedicated transformer users;

[0094] The first digital display: used to display the electric energy information, transformer parameters, wire parameters and wire length of the first special transformer user meter;

[0095] The second digital display is used to display the load information of the first dedicated transformer user;

[0096] The third digital display is used to display the electric energy information, transformer parameters, wire parameters and wire length of the second special transformer user meter;

[0097] Fourth digital display: used to display the load information of the second dedicated transformer user;

[0098] Electric energy metering junction box: used for on-site inspection of electric energy meters, electrical instruments, leakage protection and other electrical equipment to ensure personal operation safety and improve on-site work efficiency;

[0099] Voice timer: can count down the start, end, last 5 minutes, and 90 minutes, which is convenient for test training.

[0100] In this implementation, the public transformer metering line loss simulation cabinet is composed of a public transformer master meter, a public transformer gateway simulation collection terminal, four public transformer users and a voice timer, wherein:

[0101] Public transformer total meter: used to measure the total electric energy of users;

[0102] Public transformer gateway simulation data collection terminal: used to collect the power of the public transformer master meter and four public transformer users;

[0103] The first public transformer user: used to simulate the public transformer large user (transformer type electric energy meter);

[0104] The second public transformer user: used to simulate the public transformer large user (transformer type electric energy meter);

[0105] The third public transformer user: used to simulate the public transformer power user (direct-type electric energy meter);

[0106] The fourth public transformer user: used to simulate the public transformer power user (direct-type electric energy meter);

[0107] The first digital display: used to display the power information of the public transformer master table, transformer parameters, wire parameters and wire length;

[0108] The second digital display: used to display the total load information of the public transformer users;

[0109] The third digital display is used to display the load information of the first public transformer user and the second public transformer user (the load can be set);

[0110] Fourth digital display: used to display the load information of the third public transformer user and the fourth public transformer user (the load can be set);

[0111] Electric energy metering junction box: used for on-site inspection of electric energy meters, electrical instruments, leakage protection and other electrical equipment to ensure personal operation safety and improve on-site work efficiency;

[0112] Voice timer: can count down the start, end, last 5 minutes, and 90 minutes, which is convenient for test training.

[0113] In this implementation, the low-voltage line loss simulation cabinet consists of 1 concentrator, 1 collector, 15 single-phase users, 1 digital display meter and voice timer, where:

[0114] Concentrator: used to collect power information of 15 single-phase users;

[0115] Public transformer gateway simulation data collection terminal: used to collect the power of the public transformer master meter and four public transformer users;

[0116] Single-phase users 1-15: used to simulate various types of residential users;

[0117] Digital display: used to display the load information of 15 residential users;

[0118] Voice timer: can count down the start, end, last 5 minutes, and 90 minutes, which is convenient for test training.

[0119] In this embodiment, the training principle of the system is: first confirm the line loss fault type to be trained, use the line loss analysis simulation platform to set the operating parameters and fault parameters of the simulation cabinet corresponding to the fault type, and the simulation cabinet performs fault simulation.

[0120] The above-mentioned embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A power grid line loss simulation training system, characterized in that: Including interactive communication line loss analysis simulation platform and line loss training device; The line loss analysis simulation platform receives the line loss abnormal information sent by the line loss training device and demonstrates it. Through various business modules and in combination with various simulation scenarios, it is used for training personnel to conduct complete business processing and standardized training in the training room. Used to set the operating parameters and fault parameters of the line loss training device, and send the parameters to the control line loss training device; The line loss training device receives the operating parameters and fault parameters of the line loss training device transmitted by the line loss analysis simulation platform, and simulates the line loss fault based on the above parameters; any abnormal line loss information found during the simulation is transmitted to the line loss analysis simulation platform through a communication connection; and HPLC technology is used to collect high-frequency data from the user table.

2. The power grid line simulation training system according to claim 1, characterized in that: The line loss analysis simulation platform also includes two subsystems, namely, a user electricity consumption information collection system and a line loss analysis related module SG186.

3. The power grid line simulation training system according to claim 2, characterized in that: The line loss analysis simulation platform adopts a multi-layer technical architecture based on J2EE, and uses a consistent and shareable data model to implement a multi-layer technical system design according to the interface display layer, interface control layer, application logic layer, public service layer, data resource layer, and infrastructure layer.

4. The power grid line simulation training system according to claim 3, characterized in that: The line loss analysis simulation platform further includes: a system basic support module, an equipment account management module, an interface data management module, a knowledge template management module, a line loss anomaly simulation module and a line loss work order processing module; The system basic support module is used to uniformly manage basic information and permissions, and transmit basic information to the equipment ledger management module, wherein the basic information includes institutions, roles, and personnel; The equipment account management module is used to manage the line loss training device account based on the user authority information transmitted from the system basic support module: query, modify and count the equipment information, and transmit it to the line loss work order processing module; The interface data management module: automatically obtains line loss related data from the external module SG186 and the power consumption information collection system through the WebAPI interface technology; transmits the line loss related data to the knowledge template management module; The knowledge template management module is used to collect and extract line loss related data transmitted from the interface data management module; it is used for knowledge integration and application, provides knowledge support for line loss abnormality simulation and work order processing, and transmits it to the line loss abnormality simulation module; The line loss abnormality simulation module is used to support the knowledge transmitted from the knowledge template management module, manage line loss, technical line loss, high line loss, negative line loss and uncountable line loss; and simulate abnormal line loss conditions, provide early warning information, and transmit it to the line loss work order processing module; The line loss work order processing module is used to automatically assign line loss abnormality work orders for the warning information transmitted from the line loss abnormality simulation module and the equipment information transmitted from the equipment ledger management module; it is used for the full process management of work orders, from work order generation, allocation, processing to closed loop, to achieve automation and process-based line loss management.

5. The power grid line loss simulation training system according to claim 4 is characterized in that: The line loss training device also includes a line loss simulation cabinet, and the interior of the simulation cabinet is provided with a programmable power supply, a meter, a digital display, a fault simulator, a voice timer and a simulation acquisition terminal.

6. The power grid line loss simulation training system according to claim 5, characterized in that: The line loss training device is equipped with universal wheels and supporting feet.

7. The power grid line loss simulation training system according to claim 6, characterized in that: The line loss training device is provided with a leakage protection device, which can cut off the power supply to the operating surface and alarm when leakage occurs or the operator is electrocuted.

8. The power grid line loss simulation training system according to claim 1, characterized in that: The line loss training device uses wireless communication to interact with the line loss analysis simulation platform.

Citation Information

Patent Citations

  • Analog and simulation training system for collecting power information

    CN106327979A

  • Distribution network line loss simulating training system

    CN108597291A

  • Acquisition, operation and maintenance closed-loop processing simulation system based on man-machine object fusion

    CN110032759A

  • Digital information electric power simulation training system

    CN114023134A

  • Power distribution network operation aided decision-making analysis system and method

    WO2020147349A1

Cited By

  • Simulation training system for line loss management in transformer area

    CN119479419A