Power cut and power transmission control equipment for coal preparation plant and use method of power cut and power transmission control equipment
By introducing multiple locking mechanisms and information verification into the power outage control equipment of the coal preparation plant, combined with wireless transmission and manual operation, the problem of unexpected equipment is solved, the safety of power outage and the convenience of unlocking is improved, and the selection is ensured. Coal plant production safety.
Patent Information
- Application Number
- CN202411074486.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-29
AI Technical Summary
The existing coal preparation plant power supply control equipment lacks a multiple locking protection mechanism, which is prone to accidental opening of the equipment due to misoperation or external interference, threatening production safety.
A device including a power outage control cabinet, a locking part, an electromagnetic control part and a mechanical power outage part is designed. The security of power outage and power outage operations is ensured through multiple locking mechanisms and information verification, and wireless transmission and manual operation are used. The control is carried out in a combined manner to ensure that the equipment performs power outage and power transmission operations under safe conditions.
It effectively avoids accidental opening of equipment caused by misoperation, improves the safety of power outages and the convenience of unlocking, and ensures the safety of coal preparation plants production and the service life of equipment.
Smart Images

Figure CN119050820A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of electrical operation control, and in particular relates to a power outage control device for a coal preparation plant and a use method thereof. Background Art
[0002] With the rapid development of the coal industry, the production efficiency and safety of coal preparation plants, as an important part of coal processing, have received extensive attention. In the production process of coal preparation plants, the stability and safety of power supply are crucial. In order to ensure the normal operation of coal preparation plant equipment and the safety of personnel, the power outage control system is particularly important.
[0003] Most of the common power outage control devices on the market currently use simple electrical or mechanical control methods. Although these methods can achieve power outage control to a certain extent, they still have many shortcomings in practical applications. Existing equipment generally lacks multiple locking protection mechanisms, which can easily cause the equipment to be accidentally turned on due to misoperation or external interference, thereby threatening the production safety of coal preparation plants.
[0004] For example, the Chinese patent with announcement number CN221009574U discloses a reciprocating power isolation system for pushing and pulling drawers of distribution cabinets. It does not have an effective mechanical locking method when the power is cut off. The power-off locking mode is relatively simple and lacks multiple locking protection mechanisms. It is easy for the equipment to be accidentally opened due to misoperation or external interference. Summary of the invention
[0005] The purpose of the present invention is to provide a power outage control device for a coal preparation plant, which can avoid accidental opening of the equipment due to misoperation through multiple locking mechanisms, thereby ensuring the production safety of the coal preparation plant.
[0006] The technical solution adopted by the present invention is as follows:
[0007] A power outage control device for a coal preparation plant, comprising:
[0008] A power outage control cabinet, wherein a cabinet door is installed on one side of the power outage control cabinet, a key lock is installed on the side of the cabinet door away from the power outage control cabinet, a warning light is installed on the upper end of the power outage control cabinet, a control terminal is installed inside the power outage control cabinet, and the warning light is electrically connected to the control terminal;
[0009] A locking part, the locking part is installed on the side of the cabinet door close to the power outage control cabinet and is located below the key lock, the locking part is electrically connected to the control terminal, a door lock part is installed on the side of the cabinet door close to the power outage control cabinet, and the door lock part is connected to the locking part, and the locking part is used to drive the door lock part to operate and lock the power outage control cabinet and the cabinet door;
[0010] An electromagnetic control unit, which is installed on the side of the cabinet door close to the power outage control cabinet and is located between the locking unit and the key lock. The electromagnetic control unit is electrically connected to the locking unit and the control terminal. When the key lock drives the electromagnetic control unit to operate, the locking unit is controlled to disconnect the electrical connection with the control terminal, and the door lock unit cancels the locking between the power outage control cabinet and the cabinet door.
[0011] The mechanical power-off unit, the electromagnetic control unit is installed on one side of the cabinet door close to the power outage control cabinet and close to the locking unit. The mechanical power-off unit is electrically connected to the power outage control cabinet. When the locking unit drives the door lock unit to operate, it also drives the mechanical power-off unit to operate.
[0012] In a preferred embodiment, the locking part includes an electromagnet, a magnetic block and a spur gear a. The electromagnet is fixed on a side of the cabinet door close to the power outage control cabinet and is located below the key lock. The electromagnet is electrically connected to the control terminal. The magnetic block is slidably connected to a side of the cabinet door close to one side and is located below the electromagnet. The spur gear a is rotatably connected to a side of the cabinet door close to the power outage control cabinet and is located below the magnetic block. A rack a is fixed to the lower end of the magnetic block. The rack a is meshed with the spur gear a. A round rod a is fixed to the lower end of the rack a. The round rod a is slidably connected to the cabinet door. A spring is installed on the outside of the round rod a and below the power outage control cabinet.
[0013] In a preferred embodiment, the door lock part includes a spur gear b, which is fixed on the side of the spur gear a away from the cabinet door, and the two sides of the spur gear b are meshed and connected with racks b, which are slidably connected to the cabinet door, and a locking rod is installed at the end of the rack b, which is slidably connected to the cabinet door.
[0014] In a preferred embodiment, the electromagnetic control unit includes a fixed block a, which is fixed on one side of the cabinet door close to the power outage control cabinet and is located between the electromagnet and the key lock. The upper end of the fixed block a is slidably connected to a top block, and a compression spring a is arranged inside the fixed block a and below the top block. A conductive ring a is installed at the upper end of the fixed block a, and the conductive ring a is electrically connected to the electromagnet. A conductive ring b is installed at the lower end of the outer side of the top block, and the conductive ring b is electrically connected to the control terminal.
[0015] In a preferred embodiment, the mechanical power-off part includes a rack c, which is slidably connected to the side of the cabinet door close to the power outage control cabinet, and the rack c is located on the side of the spur gear a away from the rack a, and the rack c is meshingly connected with the spur gear a. A round rod b is fixed to the lower end of the rack c, and the round rod b is slidably connected to the cabinet door. The lower end of the round rod b is slidably connected to a top rod, and the lower end of the round rod b is slidably connected to a fixed block b, and the fixed block b is fixedly connected to the cabinet door. A conductive strip is fixed to the lower end of the top rod, and the conductive strip is electrically connected to the power outage control cabinet. A conductive ring c is fixed to the upper end of the fixed block b and located above the conductive strip. The conductive ring c is electrically connected to the power outage control cabinet, and a compression spring b is provided inside the fixed block b and located below the conductive strip.
[0016] The present invention also provides a method for using a power outage control device for a coal preparation plant, which is used for the power outage control device for the coal preparation plant, comprising:
[0017] Controlling the operation of the locking part through the control terminal;
[0018] The locking part drives the door lock part to operate, which will lock the power outage control cabinet and the cabinet door;
[0019] While the locking part drives the door lock part to operate, the driving mechanical power-off part is disconnected from the electrical connection, so that the power-off control cabinet is powered off and locked;
[0020] When the lock of the power-off control cabinet and the cabinet door is canceled, the key lock is turned to drive the electromagnetic control unit to operate;
[0021] The electromagnetic control unit will control the locking unit to return to its original position;
[0022] The door lock part will be driven to return to its original position, so that the door lock part cancels the lock on the power outage control cabinet and the cabinet door, and the mechanical power-off part will be restored to electrical connection, so that the power outage control cabinet is powered on and unlocked.
[0023] In a preferred embodiment, the step of shutting down the power supply control device of the coal preparation plant includes:
[0024] Obtain information on applying for power outage;
[0025] Obtain the corresponding power distribution cabinet information based on the power outage application information;
[0026] Determine whether the power outage application information corresponding to the power distribution cabinet information is consistent with the power outage application information;
[0027] If the power outage application information corresponding to the power distribution cabinet information does not conform to the power outage application information, the power outage application information corresponding to the power distribution cabinet information is determined to be abnormal, and the power outage application information is rejected;
[0028] If the power outage application information corresponding to the distribution cabinet information is consistent with the power outage application information, the power outage application information corresponding to the distribution cabinet information is determined to be abnormal and normal, and a power outage permission information is issued;
[0029] Obtain the operating status of the equipment controlled by the power distribution cabinet corresponding to the power outage information allowed;
[0030] Determine whether the equipment is in a power-off state;
[0031] If the equipment is in a power-off state, the power distribution cabinet lock information is issued and marked as equipment power-off information;
[0032] If the equipment operation state is not a power-off state, the equipment controlled by the power distribution cabinet will be powered off, and the power distribution cabinet lock information will be issued, and it will be marked as equipment power-off information.
[0033] In a preferred embodiment, the step of stopping the power supply of the power supply control device of the coal preparation plant includes:
[0034] Obtain information on applying for power transmission;
[0035] Obtain the corresponding equipment power outage information based on the power supply application information;
[0036] Determine whether the power supply application information corresponding to the equipment power outage information is consistent with the power supply application information;
[0037] If the power supply application information corresponding to the equipment power outage information does not conform to the power supply application information, the power supply application information corresponding to the equipment power outage information is determined to be abnormal, and the power supply application information is rejected;
[0038] If the power supply application information corresponding to the equipment power outage information meets the power supply application information, it is determined that the power supply application information corresponding to the equipment power outage information is normal, and a power supply permission information is issued;
[0039] Get the power distribution cabinet lock status corresponding to the power supply permission information;
[0040] Determine whether the lock status of the power distribution cabinet is unlocked;
[0041] If the lock state of the power distribution cabinet is unlocked, the operation power supply information is judged to be issued;
[0042] If the lock state of the power distribution cabinet is unlocked, the lock of the power distribution cabinet is released and the operation power supply information is issued.
[0043] The present invention also provides a coal preparation plant power supply stop control circuit, and a method for using the above-mentioned coal preparation plant power supply stop control device, comprising:
[0044] The main circuit includes circuit breakers QF, O2, current limiting protector FR and coal preparation plant equipment M. The incoming line terminals of the circuit breaker QF are respectively connected to L1 line, L2 line and L2 line. Port 1 of the circuit breaker QF is connected to L1 line, port 2 of the circuit breaker QF is connected to L2 line, port 3 of the circuit breaker QF is connected to L3 line, port 4 of the circuit breaker QF is connected to port 1 of the first normally open contact of the contactor KM, port 5 of the circuit breaker QF is connected to port 2 of the first normally open contact of the contactor KM. Port is connected, port 6 of the circuit breaker QF is connected to port 3 of the first normally open contact of the contactor KM, port 4 of the first normally open contact of the contactor KM is connected to port 1 of the current limiting protector FR, port 5 of the first normally open contact of the contactor KM is connected to port 2 of the current limiting protector FR, port 6 of the first normally open contact of the contactor KM is connected to port 3 of the current limiting protector FR, and ports 4, 5 and 6 of the current limiting protector FR are all connected to the coal preparation plant equipment M;
[0045] The control circuit includes a control switch SA, a control switch SA, a push button switch SB1, a push button switch SB2, a contactor KM, a contactor KA1, a contactor KA2, a PLC control switch P1 and a PLC control switch P2, one end of the control switch SA is connected to the L3 line, the other end of the control switch SA is connected to one end of the indicator light HL, the other end of the indicator light HL is connected to one end of the push button switch SB1, the other end of the push button switch SB1 is connected to one end of the push button switch SB2, one end of the second normally open contact of the contactor KM, one end of the normally open contact of the contactor KA1 and one end of the PLC control switch P1 End is connected, the other end of the PLC control switch P1 is connected to one end of the contactor KA1 coil, the other end of the push button switch SB2 is connected to the other end of the second normally open contact of contactor KM, the other end of the normally open contact of contactor KA1, one end of the normally closed contact of contactor KA2, and one end of the PLC control switch P2, the other end of the normally closed contact of contactor KA2 is connected to one end of the contactor KM coil, the other end of the PLC control switch P2 is connected to one end of the contactor KA2 coil, the other end of the contactor KA1 coil is connected to the other end of the contactor KM coil, the other end of the contactor KA2 coil and the N line.
[0046] And, a coal preparation plant power outage control terminal, comprising:
[0047] one or more processors;
[0048] a storage device having one or more programs stored thereon;
[0049] When the one or more programs are executed by the one or more processors, the one or more processors implement the power outage control device of the coal preparation plant.
[0050] The technical effects achieved by the present invention are:
[0051] The present invention, when the control terminal receives the locking instruction through wireless transmission, controls the locking part to be energized, and controls the warning light to operate, so that the locking part operates, which will drive the door lock part to operate, so that the door lock part closes and locks the power-off control cabinet and the cabinet door, avoiding the cabinet door from being opened due to external mistaken touch, and protecting the internal components and switches of the power-off control cabinet. When the locking part drives the operation of the door lock part, it will drive the mechanical power-off part to operate, so that the mechanical power-off part controls the power-off of the equipment connected to the coal preparation plant inside the power-off control cabinet, and realizes mechanical locking power-off, avoiding the situation that the power cannot be cut off due to abnormal electric shock of the control terminal and PLC, and improving the safety of power-off. The multiple locking mechanisms avoid accidental opening of the equipment due to misoperation, and ensure the production safety of the coal preparation plant.
[0052] The present invention, when the key lock is turned manually to cancel the unlocking of the power outage control cabinet and the cabinet door, the key lock will drive the electromagnetic control part to operate, so that the locking part is powered off, so that the locking part returns to the initial position, and will drive the door lock part to return to the initial position, so that the door lock part will cancel the locking between the power outage control cabinet and the cabinet door, which can be conveniently opened by wireless control. When the locking part drives the door lock part to return to the initial position, it will drive the mechanical power-off part to return to the initial position, so that the mechanical power-off part controls the equipment connected to the coal preparation plant inside the power outage control cabinet to cancel the mechanical locking and power outage, so as to ensure the power supply of the equipment connected to the coal preparation plant inside the power outage control cabinet. When the wireless communication control cannot solve the control of the equipment connected to the coal preparation plant inside the power outage control cabinet, the door can be unlocked manually, which improves the convenience of unlocking and ensures the diversity of control.
[0053] The present invention ensures the accuracy and safety of power outage and power supply operations through multi-level information verification and status confirmation, avoids safety hazards caused by misoperation, automatically compares and verifies power outage and power supply applications with actual distribution cabinet information, reduces human errors, improves the accuracy of power outage and power supply operations, performs status confirmation and feedback at each step, ensures that power outage and power supply operations are performed only under safe conditions, reduces operational risks, and the automated verification and control process reduces human intervention, improves the efficiency and response speed of power outage and power supply operations, and performs power outage, locking and power supply, and locking operations in an orderly manner, protects equipment from damage during the power outage and power supply process, and extends the service life of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0055] Figure 2 It is a structural schematic diagram of the cabinet door of the present invention canceling the locking of the power outage control cabinet;
[0056] Figure 3 It is a structural schematic diagram of the cabinet door of the present invention;
[0057] Figure 4 It is a structural schematic diagram of the key lock, locking part, door lock part, electromagnetic control part and mechanical power-off part of the present invention;
[0058] Figure 5 It is a structural schematic diagram of the back of the key lock, locking part, door lock part, electromagnetic control part and mechanical power-off part of the present invention;
[0059] Figure 6 It is a schematic diagram of the structure of the door lock part and the locking part separated from each other in the present invention;
[0060] Figure 7 It is a structural schematic diagram of the locking part and the door lock part of the present invention;
[0061] Figure 8 It is a structural schematic diagram of the electromagnetic control unit driven by the key lock of the present invention;
[0062] Fig. 9 It is a structural schematic diagram of the mechanical power-off portion of the present invention;
[0063] Fig.10 It is a flow chart of the power outage method provided by the present invention;
[0064] Fig.11 is a flow chart of the power transmission method provided by the present invention;
[0065] Fig.12 This is the control circuit provided by the present invention.
[0066] In the accompanying drawings, the names of the components represented by the reference numerals are as follows:
[0067] 1. Power outage control cabinet; 2. Cabinet door; 3. Key lock; 4. Warning light; 5. Control terminal;
[0068] 10. Locking part; 11. Electromagnet; 12. Magnetic block; 13. Spur gear a; 14. Rack a; 15. Round rod a; 16. Spring;
[0069] 20. Door lock unit; 21. Spur gear b; 22. Rack b; 23. Lock rod;
[0070] 30. Electromagnetic control unit; 31. Fixed block a; 32. Top block; 33. Compression spring a; 34. Conductive ring a; 35. Conductive ring b;
[0071] 40. Mechanical power-off unit; 41. Rack c; 42. Round rod b; 43. Push rod; 44. Fixed block b; 45. Conductive strip; 46. Conductive ring c; 47. Compression spring b. DETAILED DESCRIPTION
[0072] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0073] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0074] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure or characteristic that may be included in at least one implementation of the present invention. The phrase "in a preferred embodiment" that appears in different places in this specification does not refer to the same embodiment, nor is it a separate or selective embodiment that is mutually exclusive with other embodiments.
[0075] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the embodiments of the present invention in detail, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0076] Embodiment 1
[0077] Please see attached Figures 1 to 9As shown, it is the first embodiment of the present invention, which provides a power outage control device for a coal preparation plant, including a power outage control cabinet 1, a locking part 10, an electromagnetic control part 30 and a mechanical power off part 40. A cabinet door 2 is installed on one side of the power outage control cabinet 1, a key lock 3 is installed on the side of the cabinet door 2 away from the power outage control cabinet 1, a warning light 4 is installed on the upper end of the power outage control cabinet 1, a control terminal 5 is installed inside the power outage control cabinet 1, and the warning light 4 is electrically connected to the control terminal 5. The locking part 10 is installed on the side of the cabinet door 2 close to the power outage control cabinet 1 and is located below the key lock 3. The locking part 10 is electrically connected to the control terminal 5. A door lock part 20 is installed on the side of the cabinet door 2 close to the power outage control cabinet 1, and the door lock part 20 is connected to the locking part 10. The locking part 10 is used to drive the door lock part 20 to operate and lock the power outage control cabinet 1 and the cabinet door 2. The electromagnetic control part 30 is installed on the side of the cabinet door 2 close to the power outage control cabinet 1 and is located between the locking part 10 and the key lock 3. The electromagnetic control part 30 is electrically connected to the locking part 10 and the control terminal 5. When the key lock 3 drives the electromagnetic control part 30 to operate, it controls the locking part 10 to disconnect the electrical connection with the control terminal 5, and makes the door lock part 20 cancel the lock between the power outage control cabinet 1 and the cabinet door 2. The electromagnetic control part 30 is installed on the side of the cabinet door 2 close to the power outage control cabinet 1 and close to the locking part 10. The mechanical power-off part 40 is electrically connected to the power outage control cabinet 1. When the locking part 10 drives the door lock part 20 to operate, it also drives the mechanical power-off part 40 to operate.
[0078] Specifically, when the control terminal 5 receives the locking instruction through wireless transmission, the control terminal 5 controls the locking part 10 to be powered, and controls the warning light 4 to operate, so that the locking part 10 operates, which will drive the door lock part 20 to operate, so that the door lock part 20 closes and locks the power outage control cabinet 1 and the cabinet door 2, to avoid opening the cabinet door 2 due to external accidental touch, and to protect the internal components and switches of the power outage control cabinet 1. When the locking part 10 drives the operation of the door lock part 20, it will drive the mechanical power-off part 40 to operate, so that the mechanical power-off part 40 controls the power outage control cabinet 1 to disconnect the equipment connected to the coal preparation plant, and the mechanical locking power-off is realized, so as to avoid the situation that the power cannot be disconnected due to abnormal electric shock of the control terminal 5 and the PLC, and improve the safety of power off.
[0079] When the control terminal 5 receives the unlocking instruction through wireless transmission, the control terminal 5 controls the locking part 10 to cut off the power, so that the locking part 10 returns to the initial position, which will drive the door lock part 20 to return to the initial position, so that the door lock part 20 will cancel the lock between the power outage control cabinet 1 and the cabinet door 2, and the cabinet door 2 can be opened conveniently through wireless control. When the locking part 10 drives the door lock part 20 to return to the initial position, it will drive the mechanical power-off part 40 to return to the initial position, so that the mechanical power-off part 40 controls the coal preparation plant equipment connected inside the power outage control cabinet 1 to cancel the mechanical lock and power off, so as to ensure the power supply of the coal preparation plant equipment connected inside the power outage control cabinet 1;
[0080] When the key lock 3 is manually turned to cancel the unlocking of the power outage control cabinet 1 and the cabinet door 2, the key lock 3 will drive the electromagnetic control part 30 to operate, so that the locking part 10 is powered off, and the locking part 10 returns to its initial position, which will drive the door lock part 20 to return to its initial position, so that the door lock part 20 will cancel the lock between the power outage control cabinet 1 and the cabinet door 2, and the cabinet door 2 can be opened conveniently through wireless control. When the locking part 10 drives the door lock part 20 to return to its initial position, it will drive the mechanical power-off part 40 to return to its initial position, so that the mechanical power-off part 40 controls the coal preparation plant equipment connected inside the power outage control cabinet 1 to cancel the mechanical lock and power off, so as to ensure the power supply of the coal preparation plant equipment connected inside the power outage control cabinet 1. When the wireless communication control cannot solve the control of the coal preparation plant equipment connected inside the power outage control cabinet 1, the unlocking can be performed manually, which improves the convenience of unlocking and ensures the diversity of control.
[0081] In a preferred embodiment, please refer to Figures 2 to 7 The locking part 10 includes an electromagnet 11, a magnetic block 12 and a spur gear a13. The electromagnet 11 is fixed to a side of the cabinet door 2 close to the power outage control cabinet 1 and is located below the key lock 3. The electromagnet 11 is electrically connected to the control terminal 5. The magnetic block 12 is slidably connected to a side of the cabinet door 2 close to one side and is located below the electromagnet 11. The spur gear a13 is rotatably connected to a side of the cabinet door 2 close to the power outage control cabinet 1 and is located below the magnetic block 12. A rack a14 is fixed to the lower end of the magnetic block 12. The rack a14 is meshed with the spur gear a13. A round rod a15 is fixed to the lower end of the rack a14. The round rod a15 is slidably connected to the cabinet door 2. A spring 16 is installed on the outer side of the round rod a15 and below the power outage control cabinet 1.
[0082] In this embodiment, when the control terminal 5 controls the locking part 10 to be powered on, the electromagnet 11 is energized to generate magnetic force, which attracts the magnetic block 12 to move upward, drives the rack a14 to move upward, and compresses the spring 16 to generate elastic force. When the rack a14 moves upward, the spur gear a13 will rotate accordingly, thereby driving the door lock part 20 to lock the power outage control cabinet 1 and the cabinet door 2, and the mechanical power-off part 40 is operated, so that the coal preparation plant equipment connected to the power outage control cabinet 1 is mechanically powered off. When the control terminal 5 controls the locking part 10 to power off, the elastic force of the spring 16 will drive the rack a14 to return to its initial position, so that the spur gear a13 follows and returns to its initial position, so that the door lock part 20 cancels the lock between the power outage control cabinet 1 and the cabinet door 2, and the mechanical power-off part 40 controls the coal preparation plant equipment connected to the power outage control cabinet 1 to restore mechanical power.
[0083] Next, please refer to Figures 2 to 7The door lock part 20 includes a spur gear b21, which is fixed on the side of the spur gear a13 away from the cabinet door 2. The two sides of the spur gear b21 are meshed with racks b22, and the rack b22 is slidably connected to the cabinet door 2. A locking rod 23 is installed at the end of the rack b22, and the locking rod 23 is slidably connected to the cabinet door 2.
[0084] In this embodiment, when the spur gear a13 rotates, it drives the spur gear b21 to rotate accordingly, so that the spur gear b21 drives the rack b22 to move, and drives the locking rod 23 to move accordingly, so that the locking rod 23 moves inside the power outage control cabinet 1 to achieve mechanical locking between the power outage control cabinet 1 and the cabinet door 2, and avoid the opening of the power outage control cabinet 1 and the cabinet door 2 due to accidental touch. When the spur gear a13 returns to its initial position, the spur gear a13 will rotate in the opposite direction, driving the spur gear b21 to rotate in the opposite direction, so that the rack b22 drives the locking rod 23 to return to its initial position, so that the locking rod 23 moves out from the inside of the power outage control cabinet 1 to cancel the mechanical locking between the power outage control cabinet 1 and the cabinet door 2.
[0085] Secondly, please also refer to Figures 2 to 6 as well as Figure 8 The electromagnetic control unit 30 includes a fixed block a31, which is fixed to a side of the cabinet door 2 close to the power outage control cabinet 1 and is located between the electromagnet 11 and the key lock 3. The upper end of the fixed block a31 is internally slidably connected with a top block 32. A compression spring a33 is provided inside the fixed block a31 and below the top block 32. A conductive ring a34 is installed at the upper end of the fixed block a31, and the conductive ring a34 is electrically connected to the electromagnet 11. A conductive ring b35 is installed at the lower end of the outer side of the top block 32, and the conductive ring b35 is electrically connected to the control terminal 5.
[0086] In this embodiment, when the key lock 3 is manually turned to cancel the unlocking of the power outage control cabinet 1 and the cabinet door 2, a key is inserted into the interior of the key lock 3 and the key lock 3 is rotated, so that the key lock 3 pushes the top block 32 to move downward, so that the compression spring a33 is compressed, and the conductive ring a34 is separated from the conductive ring b35, so that the electromagnet 11 is powered off, so as to manually power off the electromagnet 11, restore the locking part 10 to its initial state, and restore the door lock part 20 and the mechanical power-off part 40 to their initial states, thereby realizing the mechanical locking between the power outage control cabinet 1 and the cabinet door 2, and connecting the internal part of the power outage control cabinet 1 to the coal preparation plant equipment to restore mechanical power.
[0087] Secondly, please also refer to Figures 2 to 6 as well as Fig. 9The mechanical power-off part 40 includes a rack c41, which is slidably connected to the side of the cabinet door 2 close to the power outage control cabinet 1, and the rack c41 is located on the side of the spur gear a13 away from the rack a14, the rack c41 is meshed with the spur gear a13, and a round rod b42 is fixed to the lower end of the rack c41, and the round rod b42 is slidably connected to the cabinet door 2, and a top rod 43 is slidably connected to the lower end of the round rod b42, and a fixed block b44 is slidably connected to the lower end of the round rod b42, and the fixed block b44 is fixedly connected to the cabinet door 2, and a conductive strip 45 is fixed to the lower end of the top rod 43, and the conductive strip 45 is electrically connected to the power outage control cabinet 1, and a conductive ring c46 is fixed to the upper end of the fixed block b44 and located above the conductive strip 45, and the conductive ring c46 is electrically connected to the power outage control cabinet 1, and a compression spring b47 is provided inside the fixed block b44 and located below the conductive strip 45.
[0088] In this embodiment, when the spur gear a13 rotates, it will drive the rack c41 to move downward, so that the round rod b42 follows and moves downward. During the movement, the round rod b42 moves downward on the outside of the top rod 43. When the top end of the round rod b42 contacts the top rod 43, it will push the top rod 43 to move downward, so that the conductive strip 45 is separated from the conductive ring c46, so as to cancel the electrical connection between the conductive strip 45 and the conductive ring c46, so as to control the internal connection of the coal preparation plant equipment in the power outage control cabinet 1 to perform mechanical power-off locking. At the same time, the compression spring b47 will be compressed. When the spur gear a13 rotates in the opposite direction, the initial position will be restored through the round rod b42, so that the round rod b42 cancels the push on the top rod 43 and pushes the elasticity of the compression spring b47, so that the top rod 43 moves upward and the conductive strip 45 contacts the conductive ring c46 to achieve electrical connection, so as to control the internal connection of the coal preparation plant equipment in the power outage control cabinet 1 to restore mechanical power.
[0089] Embodiment 2
[0090] The second embodiment of the present invention provides a coal preparation plant power outage control device, which is used for the above-mentioned coal preparation plant power outage control device, and also includes
[0091] S1, controlling the operation of the locking part 10 through the control terminal 5;
[0092] S2, the locking part 10 drives the door lock part 20 to operate, so that the power outage control cabinet 1 and the cabinet door 2 are locked;
[0093] S3, while the locking part 10 drives the door lock part 20 to operate, the driving mechanical power-off part 40 is disconnected electrically, so that the power-off control cabinet 1 is powered off and locked;
[0094] S4, when the lock of the power outage control cabinet 1 and the cabinet door 2 is canceled, the key lock 3 is rotated to drive the electromagnetic control unit 30 to operate;
[0095] S5, the electromagnetic control unit 30 controls the locking unit 10 to return to its original position;
[0096] S6, the door lock part 20 is driven to return to its original position, so that the door lock part 20 cancels the locking of the power outage control cabinet 1 and the cabinet door 2, and the mechanical power-off part 40 is restored to be electrically connected, so that the power outage control cabinet 1 is powered on and unlocked.
[0097] As in the above steps S1 to S6, when the control terminal 5 receives the locking instruction through wireless transmission, the control terminal 5 controls the locking part 10 to be powered on, and controls the warning light 4 to operate, so that the locking part 10 operates, which will drive the door lock part 20 to operate, so that the door lock part 20 closes and locks the power outage control cabinet 1 and the cabinet door 2, to avoid opening the cabinet door 2 due to external accidental touch, and to protect the internal components and switches of the power outage control cabinet 1. When the locking part 10 drives the operation of the door lock part 20, it will drive the mechanical power-off part 40 to operate, so that the mechanical power-off part 40 controls the power outage control cabinet 1 to disconnect the equipment connected to the coal preparation plant, and the mechanical locking power-off is realized, so as to avoid the situation that the power cannot be disconnected due to abnormal electric shock of the control terminal 5 and the PLC, and improve the safety of power off;
[0098] When the control terminal 5 receives the unlocking instruction through wireless transmission, the control terminal 5 controls the locking part 10 to cut off the power, so that the locking part 10 returns to the initial position, which will drive the door lock part 20 to return to the initial position, so that the door lock part 20 will cancel the lock between the power outage control cabinet 1 and the cabinet door 2, and the cabinet door 2 can be opened conveniently through wireless control. When the locking part 10 drives the door lock part 20 to return to the initial position, it will drive the mechanical power-off part 40 to return to the initial position, so that the mechanical power-off part 40 controls the coal preparation plant equipment connected inside the power outage control cabinet 1 to cancel the mechanical lock and power off, so as to ensure the power supply of the coal preparation plant equipment connected inside the power outage control cabinet 1;
[0099] When the key lock 3 is manually turned to cancel the unlocking of the power outage control cabinet 1 and the cabinet door 2, the key lock 3 will drive the electromagnetic control part 30 to operate, so that the locking part 10 is powered off, and the locking part 10 returns to its initial position, which will drive the door lock part 20 to return to its initial position, so that the door lock part 20 will cancel the lock between the power outage control cabinet 1 and the cabinet door 2, and the cabinet door 2 can be opened conveniently through wireless control. When the locking part 10 drives the door lock part 20 to return to its initial position, it will drive the mechanical power-off part 40 to return to its initial position, so that the mechanical power-off part 40 controls the coal preparation plant equipment connected inside the power outage control cabinet 1 to cancel the mechanical lock and power off, so as to ensure the power supply of the coal preparation plant equipment connected inside the power outage control cabinet 1. When the wireless communication control cannot solve the control of the coal preparation plant equipment connected inside the power outage control cabinet 1, the unlocking can be performed manually, which improves the convenience of unlocking and ensures the diversity of control.
[0100] In a preferred embodiment, please refer to Fig.10 , and also includes the steps of shutting down the power supply control equipment of the coal preparation plant, including:
[0101] Step 101, obtain the information of applying for power outage;
[0102] Step 102, obtaining corresponding distribution cabinet information according to the power outage application information;
[0103] Step 103, determine whether the power outage application information corresponding to the power distribution cabinet information is consistent with the power outage application information;
[0104] If the power outage application information corresponding to the power distribution cabinet information does not conform to the power outage application information, the power outage application information corresponding to the power distribution cabinet information is determined to be abnormal, and the power outage application information is rejected;
[0105] If the power outage application information corresponding to the distribution cabinet information is consistent with the power outage application information, the power outage application information corresponding to the distribution cabinet information is determined to be abnormal and normal, and a power outage permission information is issued;
[0106] Step 104, obtaining the operating status of the equipment controlled by the power distribution cabinet corresponding to the power outage information allowed;
[0107] Step 105, determine whether the equipment is in a power-off state;
[0108] If the equipment is in a power-off state, the power distribution cabinet lock information is issued and marked as equipment power-off information;
[0109] If the equipment operation state is not a power-off state, the equipment controlled by the power distribution cabinet will be powered off, and the power distribution cabinet lock information will be issued, and it will be marked as equipment power-off information.
[0110] As in the above steps Step 101 to Step 105, the operator or system submits a power outage application, including specific information about the power outage, such as the power outage time, the scope of impact, etc., retrieves the distribution cabinet information related to the power outage application information from the database, including the specific location of the distribution cabinet, the controlled equipment, etc., compares the distribution cabinet information and the power outage application information to ensure that the application content is consistent with the actual situation. If the distribution cabinet information does not match the power outage application information, it is determined that the application information is abnormal and the power outage application is rejected to avoid erroneous operations. If the distribution cabinet information matches the power outage application information, it is determined that the application information is normal and a power outage permission message is issued. The current operating status of the relevant equipment is checked to determine whether it is safe to shut down and whether the equipment is already in a power outage state to avoid repeated operations or erroneous operations. If the equipment has been powered off, a distribution cabinet is issued to increase the power outage. Lock information and mark it as equipment power-off information to ensure safe power-off of the equipment. If the equipment is not powered off, first power off the equipment, then send the distribution cabinet locking information and mark it as equipment power-off information to ensure the correct order of equipment power-off and locking. Through multi-level information verification and status confirmation, the accuracy and safety of power-off operation are ensured to avoid safety hazards caused by misoperation. The power-off application is automatically compared and verified with the actual distribution cabinet information to reduce human errors and improve the accuracy of power-off operation. Status confirmation and feedback are performed at each step to ensure that power-off operation is performed only under safe conditions to reduce operational risks. The automated verification and control process reduces manual intervention and improves the efficiency and response speed of power-off operation. The orderly power-off and locking operations protect the equipment from damage during the power-off process and extend the service life of the equipment.
[0111] Next, please refer to Fig.11 , and also includes the steps of stopping the power supply of the power supply control equipment of the coal preparation plant, including:
[0112] Ste201, obtain the information of applying for power transmission;
[0113] Ste202, obtain the corresponding equipment power outage information according to the power supply application information;
[0114] Ste203, determine whether the power supply application information corresponding to the equipment power outage information is consistent with the power supply application information;
[0115] If the power supply application information corresponding to the equipment power outage information does not conform to the power supply application information, the power supply application information corresponding to the equipment power outage information is determined to be abnormal, and the power supply application information is rejected;
[0116] If the power supply application information corresponding to the equipment power outage information meets the power supply application information, it is determined that the power supply application information corresponding to the equipment power outage information is normal, and a power supply permission information is issued;
[0117] Ste204, obtain the distribution cabinet lock status corresponding to the power supply permission information;
[0118] Ste205, determine whether the power distribution cabinet lock state is unlocked;
[0119] If the lock state of the power distribution cabinet is unlocked, the operation power supply information is judged to be issued;
[0120] If the lock state of the power distribution cabinet is unlocked, the lock of the power distribution cabinet is released and the operation power supply information is issued.
[0121] As in the above steps Step 201 to Step 205, the operator or system submits a power supply application, including specific information about the power supply, such as the power supply time, the scope of influence, etc., retrieves equipment power outage information related to the power supply application information from the database, including the specific location of the distribution cabinet, the current status, etc., compares the equipment power outage information with the power supply application information to ensure that the application content is consistent with the actual situation. If the equipment power outage information does not match the power supply application information, the application information is determined to be abnormal and the power supply application is rejected to avoid erroneous operations. If the equipment power outage information matches the power supply application information, the application information is determined to be normal and a message allowing power supply is issued. The current lock status of the distribution cabinet is checked to determine whether power can be supplied safely and whether the distribution cabinet has been unlocked to perform the power supply operation. If the distribution cabinet is unlocked, the power supply operation is completed. The cabinet has been unlocked, and the operation power supply information is issued to start power supply. If the distribution cabinet is not unlocked, first release the lock status of the distribution cabinet, and then issue the operation power supply information to ensure safe power supply after the equipment is unlocked. Through multi-level information verification and status confirmation, the accuracy and safety of the power supply operation are ensured to avoid safety hazards caused by misoperation. The power supply application and actual equipment power outage information are automatically compared and verified to reduce human errors and improve the accuracy of power supply operations. Status confirmation and feedback are performed at each step to ensure that power supply operations are performed only under safe conditions, reducing operational risks. The automated verification and control process reduces manual intervention, improves the efficiency and response speed of power supply operations, and ensures orderly power supply operations, protecting equipment from damage during the power supply process and extending the service life of equipment.
[0122] Implementation Column 3
[0123] Please see attached Fig.12 As shown, the present invention also provides a coal preparation plant power supply stop control circuit, and a method for using the above-mentioned coal preparation plant power supply stop control device, including:
[0124] The main circuit includes circuit breakers QF, O2, current limiting protector FR and coal preparation plant equipment M. The incoming line terminals of the circuit breaker QF are respectively connected to L1 line, L2 line and L2 line. Port 1 of the circuit breaker QF is connected to L1 line, port 2 of the circuit breaker QF is connected to L2 line, port 3 of the circuit breaker QF is connected to L3 line, port 4 of the circuit breaker QF is connected to port 1 of the first normally open contact of the contactor KM, port 5 of the circuit breaker QF is connected to port 2 of the first normally open contact of the contactor KM. Port is connected, port 6 of the circuit breaker QF is connected to port 3 of the first normally open contact of the contactor KM, port 4 of the first normally open contact of the contactor KM is connected to port 1 of the current limiting protector FR, port 5 of the first normally open contact of the contactor KM is connected to port 2 of the current limiting protector FR, port 6 of the first normally open contact of the contactor KM is connected to port 3 of the current limiting protector FR, and ports 4, 5 and 6 of the current limiting protector FR are all connected to the coal preparation plant equipment M;
[0125] The control circuit includes a control switch SA, a control switch SA, a push button switch SB1, a push button switch SB2, a contactor KM, a contactor KA1, a contactor KA2, a PLC control switch P1 and a PLC control switch P2, one end of the control switch SA is connected to the L3 line, the other end of the control switch SA is connected to one end of the indicator light HL, the other end of the indicator light HL is connected to one end of the push button switch SB1, the other end of the push button switch SB1 is connected to one end of the push button switch SB2, one end of the second normally open contact of the contactor KM, one end of the normally open contact of the contactor KA1 and one end of the PLC control switch P1 End is connected, the other end of the PLC control switch P1 is connected to one end of the contactor KA1 coil, the other end of the push button switch SB2 is connected to the other end of the second normally open contact of contactor KM, the other end of the normally open contact of contactor KA1, one end of the normally closed contact of contactor KA2, and one end of the PLC control switch P2, the other end of the normally closed contact of contactor KA2 is connected to one end of the contactor KM coil, the other end of the PLC control switch P2 is connected to one end of the contactor KA2 coil, the other end of the contactor KA1 coil is connected to the other end of the contactor KM coil, the other end of the contactor KA2 coil and the N line.
[0126] Specifically, when starting the coal preparation plant equipment M, the circuit breaker QF is closed, the control switch SA is closed, and the button switch SB2 is pressed, so that the contactor KM coil is energized, the first normally open contact of the contactor KM is closed, so that the coal preparation plant equipment M is energized and works, and at the same time, the first normally open contact of the contactor KM is closed to achieve self-locking;
[0127] When receiving the power failure information of the equipment, the control terminal 5 controls the PLC to close the PLC control switch P2, so that the coil of the contactor KA2 is energized, and the normally closed contact of the contactor KA2 is disconnected, so that the coil of the contactor KM is de-energized, the first normally open contact of the contactor KM is disconnected, and the coal preparation plant equipment M is de-energized and stops running. At the same time, the second normally open contact of the contactor KM is disconnected, and the self-locking is canceled. When the control terminal 5 controls the PLC to close the PLC control switch P2, the control locking part 10 is operated to realize mechanical locking;
[0128] When the operation power supply information is received, the control terminal 5 controls the PLC to close the PLC control switch P1, so that the contactor KA1 coil is energized and the normally open contact of the contactor KA1 is closed. The control terminal 5 controls the PLC to open the PLC control switch P2, so that the contactor KA2 coil is de-energized, the normally closed contact of the contactor KA2 is closed, and the coil of the contactor KM is energized. At the same time, the first normally open contact of the contactor KM is closed, and the coal preparation plant equipment M is energized to work. At the same time, the second normally open contact of the contactor KM is closed to achieve self-locking. The control terminal 5 controls the PLC to open the PLC control switch P1, the contactor KA1 coil is de-energized, and the normally open contact of the contactor KA1 is opened. At the same time, the locking part 10 is controlled by the control terminal 5 to stop running and cancel the mechanical locking.
[0129] And, a coal preparation plant power outage control terminal, comprising:
[0130] one or more processors;
[0131] a storage device having one or more programs stored thereon;
[0132] When the one or more programs are executed by the one or more processors, the one or more processors implement the power outage control device of the coal preparation plant.
[0133] Among them, the coal preparation plant power outage control terminal is interconnected with the mobile phone APP through the local area network. The platform server realizes cross-platform data interaction between the mobile phone APP and the PLC through the IGS service, the opcda agent program and the abacus link server, realizes the control of the intelligent power outage mobile terminal, and realizes the opening and closing of the circuit breaker.
[0134] It can be implemented in a digital electronic circuit system, an integrated circuit system, a field programmable gate array (FPGA), an application specific integrated circuit (ASIC), an application specific standard product (ASSP), a system on a chip (SOC), a load programmable logic device (CPLD), computer hardware, firmware, software, and / or a combination thereof. These various embodiments may include: being implemented in one or more computer programs, which can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor, which can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0135] The above is only a preferred embodiment of the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made without departing from the principles of the present invention, and these improvements and modifications should also be considered as the protection scope of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to the conventional means in the art unless otherwise specified and limited.
Claims
1. A power outage control device for a coal preparation plant, characterized in that: include: A power outage control cabinet (1), wherein a cabinet door (2) is installed on one side of the power outage control cabinet (1), a key lock (3) is installed on the side of the cabinet door (2) away from the power outage control cabinet (1), a warning light (4) is installed on the upper end of the power outage control cabinet (1), a control terminal (5) is installed inside the power outage control cabinet (1), and the warning light (4) is electrically connected to the control terminal (5); A locking part (10), the locking part (10) being installed on a side of the cabinet door (2) close to the power outage control cabinet (1) and located below the key lock (3), the locking part (10) being electrically connected to the control terminal (5), a door lock part (20) being installed on a side of the cabinet door (2) close to the power outage control cabinet (1), and the door lock part (20) being connected to the locking part (10), the locking part (10) being used to drive the door lock part (20) to operate and lock the power outage control cabinet (1) and the cabinet door (2); An electromagnetic control unit (30), the electromagnetic control unit (30) being installed on a side of the cabinet door (2) close to the power outage control cabinet (1) and located between the locking unit (10) and the key lock (3), the electromagnetic control unit (30) being electrically connected to the locking unit (10) and the control terminal (5), and when the key lock (3) drives the electromagnetic control unit (30) to operate, the locking unit (10) is controlled to disconnect the electrical connection with the control terminal (5), and the door lock unit (20) cancels the locking between the power outage control cabinet (1) and the cabinet door (2); A mechanical power-off unit (40), wherein the electromagnetic control unit (30) is installed on a side of the cabinet door (2) close to the power-off control cabinet (1) and close to the locking unit (10); the mechanical power-off unit (40) is electrically connected to the power-off control cabinet (1); when the locking unit (10) drives the door lock unit (20) to operate, it also drives the mechanical power-off unit (40) to operate.
2. The power outage control device for a coal preparation plant according to claim 1, characterized in that: The locking portion (10) comprises an electromagnet (11), a magnetic block (12) and a spur gear a (13); the electromagnet (11) is fixed to a side of the cabinet door (2) close to the power outage control cabinet (1) and is located below the key lock (3); the electromagnet (11) is electrically connected to the control terminal (5); the magnetic block (12) is slidably connected to a side of the cabinet door (2) close to one side and is located below the electromagnet (11); the spur gear a (13) is rotatably connected to the cabinet door (2) close to one side and is located below the electromagnet (11); The door (2) is close to one side of the power outage control cabinet (1) and is located below the magnetic block (12); a rack a (14) is fixed to the lower end of the magnetic block (12); the rack a (14) is meshedly connected to a spur gear a (13); a round rod a (15) is fixed to the lower end of the rack a (14); the round rod a (15) is slidably connected to the cabinet door (2); a spring (16) is installed on the outer side of the round rod a (15) and below the power outage control cabinet (1).
3. The power outage control device for a coal preparation plant according to claim 2, characterized in that: The door lock part (20) comprises a spur gear b (21), the spur gear b (21) being fixed on a side of the spur gear a (13) away from the cabinet door (2), the two sides of the spur gear b (21) being meshedly connected with racks b (22), the racks b (22) being slidably connected to the cabinet door (2), the ends of the racks b (22) being mounted with locking rods (23), the locking rods (23) being slidably connected to the cabinet door (2).
4. The power outage control device for a coal preparation plant according to claim 2, characterized in that: The electromagnetic control unit (30) comprises a fixed block a (31), the fixed block a (31) being fixed to a side of the cabinet door (2) close to the power outage control cabinet (1) and being located between the electromagnet (11) and the key lock (3), the upper end of the fixed block a (31) being internally slidably connected to a top block (32), a compression spring a (33) being arranged inside the fixed block a (31) and below the top block (32), a conductive ring a (34) being installed at the upper end of the fixed block a (31), the conductive ring a (34) being electrically connected to the electromagnet (11), a conductive ring b (35) being installed at the lower end of the outer side of the top block (32), the conductive ring b (35) being electrically connected to the control terminal (5).
5. The power outage control device for a coal preparation plant according to claim 2, characterized in that: The mechanical power-off unit (40) comprises a rack c (41), the rack c (41) being slidably connected to a side of the cabinet door (2) close to the power-off control cabinet (1), and the rack c (41) being located on a side of the spur gear a (13) away from the rack a (14), the rack c (41) being meshedly connected to the spur gear a (13), a round rod b (42) being fixed to the lower end of the rack c (41), the round rod b (42) being slidably connected to the cabinet door (2), a top rod (43) being slidably connected to the lower end of the round rod b (42), and the round rod b (42) being The lower end of the fixing block b (44) is slidably connected to the fixing block b (44), the fixing block b (44) is fixedly connected to the cabinet door (2), the lower end of the interior of the top rod (43) is fixed with a conductive strip (45), the conductive strip (45) is electrically connected to the power outage control cabinet (1), the upper end of the interior of the fixing block b (44) and located above the conductive strip (45) is fixed with a conductive ring c (46), the conductive ring c (46) is electrically connected to the power outage control cabinet (1), and a compression spring b (47) is provided inside the fixing block b (44) and located below the conductive strip (45).
6. A method for using a power outage control device for a coal preparation plant, applied to the power outage control device for a coal preparation plant according to any one of claims 1 to 5, characterized in that: include: Controlling the operation of the locking part (10) through the control terminal (5); The locking part (10) drives the door locking part (20) to operate, thereby locking the power outage control cabinet (1) and the cabinet door (2); While the locking part (10) drives the door lock part (20) to operate, the driving mechanical power-off part (40) is disconnected from electrical connection, so that the power-off control cabinet (1) is powered off and locked; When the lock of the power-off control cabinet (1) and the cabinet door (2) is canceled, the key lock (3) is rotated to drive the electromagnetic control unit (30) to operate; The electromagnetic control unit (30) controls the locking unit (10) to restore the original position; The door lock part (20) is driven to return to its original position, so that the door lock part (20) cancels the locking of the power outage control cabinet (1) and the cabinet door (2), and the mechanical power disconnection part (40) is restored to electrical connection, so that the power outage control cabinet (1) is powered on and unlocked.
7. The method for using the power outage control device of a coal preparation plant according to claim 6, characterized in that: It also includes the steps of shutting down the power supply control equipment of the coal preparation plant, including: Obtain information on applying for power outage; Obtain the corresponding power distribution cabinet information based on the power outage application information; Determine whether the power outage application information corresponding to the power distribution cabinet information is consistent with the power outage application information; If the power outage application information corresponding to the power distribution cabinet information does not conform to the power outage application information, the power outage application information corresponding to the power distribution cabinet information is determined to be abnormal, and the power outage application information is rejected; If the power outage application information corresponding to the distribution cabinet information is consistent with the power outage application information, the power outage application information corresponding to the distribution cabinet information is determined to be abnormal and normal, and a power outage permission information is issued; Obtain the operating status of the equipment controlled by the power distribution cabinet corresponding to the power outage information allowed; Determine whether the equipment is in a power-off state; If the equipment is in a power-off state, the power distribution cabinet lock information is issued and marked as equipment power-off information; If the equipment operation state is not a power-off state, the equipment controlled by the power distribution cabinet will be powered off, and the power distribution cabinet lock information will be issued, and it will be marked as equipment power-off information.
8. The method for using the power outage control device of a coal preparation plant according to claim 6, characterized in that: The invention also includes the steps of stopping the power supply of the power supply control equipment of the coal preparation plant, including: Obtain information on applying for power transmission; Obtain the corresponding equipment power outage information based on the power supply application information; Determine whether the power supply application information corresponding to the equipment power outage information is consistent with the power supply application information; If the power supply application information corresponding to the equipment power outage information does not conform to the power supply application information, the power supply application information corresponding to the equipment power outage information is determined to be abnormal, and the power supply application information is rejected; If the power supply application information corresponding to the equipment power outage information meets the power supply application information, it is determined that the power supply application information corresponding to the equipment power outage information is normal, and a power supply permission information is issued; Get the power distribution cabinet lock status corresponding to the power supply permission information; Determine whether the lock status of the power distribution cabinet is unlocked; If the lock state of the power distribution cabinet is unlocked, the operation power supply information is judged to be issued; If the lock state of the power distribution cabinet is unlocked, the lock of the power distribution cabinet is released and the operation power supply information is issued.
9. A power outage control circuit for a coal preparation plant, applied to the method for using the power outage control device for a coal preparation plant according to any one of claims 6 to 8, characterized in that: include: The main circuit includes circuit breakers QF, O2, current limiting protector FR and coal preparation plant equipment M. The incoming line terminals of the circuit breaker QF are respectively connected to L1 line, L2 line and L2 line. Port 1 of the circuit breaker QF is connected to L1 line, port 2 of the circuit breaker QF is connected to L2 line, port 3 of the circuit breaker QF is connected to L3 line, port 4 of the circuit breaker QF is connected to port 1 of the first normally open contact of the contactor KM, port 5 of the circuit breaker QF is connected to port 2 of the first normally open contact of the contactor KM. Port is connected, port 6 of the circuit breaker QF is connected to port 3 of the first normally open contact of the contactor KM, port 4 of the first normally open contact of the contactor KM is connected to port 1 of the current limiting protector FR, port 5 of the first normally open contact of the contactor KM is connected to port 2 of the current limiting protector FR, port 6 of the first normally open contact of the contactor KM is connected to port 3 of the current limiting protector FR, and ports 4, 5 and 6 of the current limiting protector FR are all connected to the coal preparation plant equipment M; The control circuit includes a control switch SA, a control switch SA, a push button switch SB1, a push button switch SB2, a contactor KM, a contactor KA1, a contactor KA2, a PLC control switch P1 and a PLC control switch P2, one end of the control switch SA is connected to the L3 line, the other end of the control switch SA is connected to one end of the indicator light HL, the other end of the indicator light HL is connected to one end of the push button switch SB1, the other end of the push button switch SB1 is connected to one end of the push button switch SB2, one end of the second normally open contact of the contactor KM, one end of the normally open contact of the contactor KA1 and one end of the PLC control switch P1 End is connected, the other end of the PLC control switch P1 is connected to one end of the contactor KA1 coil, the other end of the push button switch SB2 is connected to the other end of the second normally open contact of contactor KM, the other end of the normally open contact of contactor KA1, one end of the normally closed contact of contactor KA2, and one end of the PLC control switch P2, the other end of the normally closed contact of contactor KA2 is connected to one end of the contactor KM coil, the other end of the PLC control switch P2 is connected to one end of the contactor KA2 coil, the other end of the contactor KA1 coil is connected to the other end of the contactor KM coil, the other end of the contactor KA2 coil and the N line.
10. A coal preparation plant power outage control terminal, characterized in that: include: one or more processors; a storage device having one or more programs stored thereon; When the one or more programs are executed by the one or more processors, the one or more processors implement the method for using the power outage control device of a coal preparation plant as described in any one of claims 6 to 8.
Citation Information
Cited By
Electric energy metering box and safety control system and control method thereof
CN120691236A
An electric energy metering box and a safety control system and control method thereof
CN120691236B