Cable bridge applied to petrochemical enterprises
By designing support members with balls and casings, layered isolation sheets and ground wire installation holes without special tools, the problems of inconvenience in construction, safety hazards of cable replacement and poor heat dissipation in the prior art are solved. Achieve more efficient and safe cable laying and faster construction progress.
Patent Information
- Application Number
- CN202310609777.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-29
- Publication Date
- 2024-11-29
AI Technical Summary
The existing cable tray is inconvenient to operate during construction, there are safety hazards for cable replacement, and the heat dissipation of multi-layer cables is poor, affecting long-term reliable and safe operation.
A cable tray including a bridge cover plate, a bridge side plate, a support member, a ground wire mounting hole and a removable isolation piece are designed. The support member adopts a ball and casing structure to reduce the friction of the cable outer sheath, and the isolation piece passes through the clamp and spring. The mechanism and limit columns are laid with cables in layers, and the ground wire installation hole uses fasteners and fixed column structures without special tools.
It improves the safety and efficiency of cable laying and replacement, reduces cable extrusion and heat dissipation problems, simplifies ground wire installation, and improves construction progress and long-term reliability of cables.
Smart Images

Figure CN119050913A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of petroleum processing and relates to cable tray technology, in particular to a cable tray used in petrochemical enterprises. Background Art
[0002] There are many cables and large-section cables in the production equipment of large petrochemical enterprises, and the underground pipe network inside the process equipment is complex. At present, the widely used method is to install a ladder-type cable tray in the pipeline corridor of the device system, and the cables are laid in the cable tray. This laying method has the advantages of flexible cable laying and saving space, but the cable tray currently used has the following problems. First, the cable tray chassis adopts a fixed chassis. The construction personnel need to operate carefully during the laying and pulling of the cable, otherwise it is very easy to scratch the cable sheath, causing irreversible damage to the cable. Second, in petrochemical enterprises, cables often need to be replaced due to the addition of some loads or device modifications. In traditional ladder-type cable trays, it is very inconvenient to find cables because the cables squeeze each other. Even if the cable is located, it can only be taken out from the inside of the cable tray manually. In the process of removing the cable, because other cables are energized, there are certain safety hazards during the operation. Third, according to the requirements of the specification, a grounding wire must be laid along the entire length of the cable bridge and laid along the same path as the cable bridge. At present, according to the construction drawing 14D504, the grounding wire is fixed to the side plate of the bridge by bolts or welded to the column of the fixed bridge. This construction method requires special welding tools and the welding points need to be treated with anti-corrosion, which affects the construction progress. Fourth, according to the requirements of GB50217, power cables and control cables should be laid in layers, or partitions should be installed in the middle of the bridge when laying in one layer. In traditional ladder-type bridges, partitions are usually installed in the middle of one layer to separate the power cables and control cables, resulting in a smaller space for the power cables, and the multi-layer cables are squeezed together, with poor heat dissipation, which in turn affects the long-term reliable and safe operation of the cables. Summary of the invention
[0003] In order to solve the problems of inconvenient construction, potential safety hazards in replacing cables, and poor heat dissipation of multi-layer cables in the prior art, the present invention provides a cable tray for use in petrochemical enterprises.
[0004] The present invention provides a cable bridge applied to petrochemical enterprises, wherein each section of the cable bridge is provided with a bridge cover plate and two bridge side plates, a support is provided between the two bridge side plates, one bridge side plate is provided with a grounding wire installation hole, the bridge side plates on both sides are provided with adjustment holes, a detachable isolation sheet is provided between the bridge side plates, and the isolation sheet is plugged and installed with the adjustment hole; the support comprises a support rod, a ball, and a sleeve, and the ball is located between the support rod and the sleeve; the grounding wire installation hole is composed of an upper fastener and a lower fastener, the upper fastener is provided with an embedded column, a fixed column is provided inside the embedded column, and a spring mechanism is contained inside the fixed column; the lower fastener is provided with a groove structure and a spring mechanism matched with the upper fastener.
[0005] As an improved solution, 2-6 support members are provided on each section of the bridge frame side plate, the spacing between each support member is 1.5-2m, and the spacing between the bottom and the bottom of the bridge frame side plate is 5-15mm.
[0006] As a further improved solution, the distance between the grounding installation holes is 1.5-2.5m, and the distance from the top of the bridge side plate is 10-30mm. The diameter of the grounding wire installation hole is 60mm, and the maximum allowed cross-sectional area of the grounding wire is 240 square meters, which can meet the requirements of petrochemical enterprises for grounding wires.
[0007] As a further improved solution, in order to prevent the grounding wire from being mechanically damaged, a silicone pad is provided on the surface of the lower fastener.
[0008] As a further improved solution, the adjustment holes have 2 to 5 different heights, the center distance between adjacent adjustment holes is 30 to 50 mm, the distance between the top adjustment holes and the top of the bridge cover plate is 25 to 45 mm, the width of the adjustment holes is 100 to 200 mm, and the height is 10 to 20 mm. The adjustment holes are grouped into groups of 2 to 5, and there are 2 to 4 groups in total. The spacing between each group is the same as the spacing between supports.
[0009] As a further improved solution, the isolation piece is composed of a clamp, a spring mechanism and a limit column, the width of the isolation piece is 100 to 200 mm, and the isolation piece and the adjustment hole are installed by plugging.
[0010] As a further improved solution, the isolation sheet is made of aluminum alloy.
[0011] As a further improved solution, the embedded column and the fixed column are cylindrical, and the groove structure is also cylindrical.
[0012] As a further improved solution, a button, a moving rod and a sliding block are also provided in the groove structure of the lower fastening member.
[0013] The present invention has the following beneficial effects:
[0014] (1) When the cable is pulled, the sleeve rotates around the support rod through the ball bearing, and there is rolling friction between the cable sheath and the sleeve. The sleeve will not scratch the cable sheath, thereby avoiding the phenomenon of scratching the cable sheath.
[0015] (2) Cable spacers are set up to lay cables in layers, which can reduce the mutual squeezing between cables and improve heat dissipation. When replacing cables, it is easy to locate the cables. In addition, since the friction between cables is small, a traction machine can be used to replace the cables. Only one end of the cable needs to be fixed on the traction machine for pulling. There is no risk of live working, which avoids the problems of manual cable replacement.
[0016] (3) By setting the grounding wire installation hole, no special installation tools are needed when installing the grounding wire, and the grounding wire can be installed conveniently and quickly, thereby improving construction efficiency and speeding up construction progress. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 is a top view of the cable bridge of the present invention;
[0018] Figure 2 is a cross-sectional view of the bridge side plate of the present invention taken along line AA;
[0019] Figure 3 is a schematic diagram of the support structure;
[0020] Figure 4 This is a schematic diagram of the ground wire installation hole structure;
[0021] Figure 5 Schematic diagram of the isolation plate structure.
[0022] In the figure: 1-bridge cover, 2-bridge side plate, 3-support, 4-ground wire mounting hole, 5-isolation plate, 21-adjustment hole, 31-support rod, 32-ball, 33-sleeve, 41-upper fastener, 42-lower fastener, 411-embedded column, 412-fixed column, 421-button, 422-moving rod, 423-sliding block, 51-card, 52-spring mechanism, 53-limiting column. DETAILED DESCRIPTION
[0023] The present invention is further described below in conjunction with the accompanying drawings.
[0024] like Figures 1 to 5A cable bridge suitable for petrochemical enterprises, the cable bridge comprising a bridge cover 1, the bridge cover 1 is connected to two bridge side plates 2, and the length of the bridge cover 1 and the bridge side plates 2 are both 6m per section. A support member 3 is provided between the two bridge side plates 2. Each support member 3 is provided with a support rod 31, and the two ends of the support rod 31 are respectively fixed to the two bridge side plates 2. Each support rod 31 is provided with a sleeve 33, and a ball 32 is provided between the support rod 31 and the sleeve 33. The cross-sectional shapes of the support rod 31 and the sleeve 33 are both circular. The bridge side plates 2 are provided with three support members 3, and the spacing t1 between each support member 3 is 1.5 to 2m, and they are arranged in the same vertical plane as the adjustment hole 21, and the spacing t2 between each support member 3 and the bottom of the bridge side plate 2 is 5 to 20mm. The grounding wire installation hole 4 is installed at the upper end of the bridge frame side plate 2, and there are 3 grounding wire installation holes 4. The center distance t3 of each grounding wire installation hole 4 is 1.5-2.5m, and the distance t4 between the top of the grounding wire installation hole 4 and the top of the bridge frame side plate 2 is 10-30mm. The grounding wire installation hole 4 is composed of an upper fastener 41 and a lower fastener 42. The lower fastener 42 is fixedly installed and cannot be moved, and the upper fastener 41 can be opened and closed by a concealed buckle structure. The diameter of the grounding wire installation hole 4 is 60mm, which can meet the maximum cable cross-sectional area of 240 square cables passing through, meeting the national standard requirements.
[0025] During construction, first open all the grounding wire installation holes 4, then put the grounding wire into the grounding wire installation hole 4, press the fixing column 412 after the wire is laid out, so that it is in a retracted state, and then insert it into the groove of the lower fastener 42 along with the embedded column 411. When inserted to the bottom of the groove, the fixing column 412 pops open, and the upper fastener 41 and the lower fastener 42 are connected together. When the grounding wire needs to be removed, press the button 421, push the fixing column 412 open by moving the rod 422 and the sliding block 423, open the upper fastener 41 and separate it from the lower fastener 42. One side of the bridge frame side plate 2 is provided with an adjustment hole 21 for plugging and installation with the isolation plate 5. There are 3 groups of adjustment holes 21 on the bridge frame side plate 2. Each group of adjustment holes 21 has 3 different heights. The center distance t5 between adjacent adjustment holes 21 is 30-50mm. The distance t6 between the top adjustment hole 21 and the top of the bridge frame side plate 2 is 25-45mm. The width of the adjustment hole 21 is 100-200mm and the height is 10-20mm. The center distance between the adjustment hole 21 and the two ends of the bridge frame side plate 2 is 1-2m, and the spacing between the adjustment holes 21 is 1-2m. Isolation plates 5 are set on the two bridge frame side plates 2. A clamp 51 and a spring mechanism 52 are provided at one end of the isolation plate 5, and a limit column 53 is provided at the other end. The width of the isolation plate 5 is 100-200mm.
[0026] When laying the cable, first put one end of the cable on the bridge support 3, and then use manual or traction machine to pull the cable. Because the support 3 is a rolling structure, it can be laid conveniently. After the first layer of cable is laid, install the isolation sheet 5, insert a section of the isolation sheet 5 with the clamp 51 into the adjustment hole 21 of the bridge side plate 2 on one side, and then insert it into the adjustment hole 21 of the bridge side plate 2 on the opposite side. After passing through, the clamp 51 is restored to its original state under the action of the spring mechanism 52, and the bridge side plate 2 is clamped. The other end of the isolation sheet 5 has a limit column 53 to ensure that the isolation sheet 5 is reliably fixed, and then the second layer of cable is laid on the upper part of the isolation sheet 5.
[0027] If you need to lay a third layer of cable, repeat the above steps.
[0028] The above description is only a typical embodiment of the present invention and does not impose any formal limitation on the present invention. Any changes or modifications made by any technician familiar with the profession using the above content without departing from the scope of the technical solution of the present invention should be regarded as equivalent examples of equivalent changes. Any equivalent changes made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention shall fall within the scope of the technical solution of the present invention.
Claims
1. A cable tray used in petrochemical enterprises, characterized by: The cable tray described in each section is provided with a tray cover plate and two tray side plates, a support is provided between the two tray side plates, one tray side plate is provided with a grounding wire installation hole, the two tray side plates are provided with adjustment holes, a detachable isolation plate is provided between the tray side plates, and the isolation plate is plugged and installed with the adjustment hole; the support comprises a support rod, a ball, and a sleeve, and the ball is located between the support rod and the sleeve; the grounding wire installation hole is composed of an upper fastener and a lower fastener, the upper fastener is provided with an embedded column, a fixed column is provided inside the embedded column, and a spring mechanism is contained inside the fixed column; the lower fastener is provided with a groove structure and a spring mechanism that cooperate with the upper fastener.
2. The cable tray used in petrochemical enterprises according to claim 1 is characterized in that: Each section of the bridge frame side plate is provided with 2-6 support members, the spacing between each support member is 1.5-2m, and the spacing between the bottom and the bottom of the bridge frame side plate is 5-15mm.
3. The cable tray used in petrochemical enterprises according to claim 1 is characterized in that: The grounding installation holes are spaced 1.5 to 2.5 m apart from each other and 10 to 30 mm apart from the top of the bridge side plate. The diameter of the grounding wire installation hole is 60 mm, and the maximum allowable cross-sectional area of the grounding wire is 240 square meters.
4. The cable tray used in petrochemical enterprises according to claim 1 is characterized in that: A silicone pad is arranged on the surface of the lower fastening member.
5. The cable tray used in petrochemical enterprises according to claim 1 is characterized in that: The adjustment holes have 2 to 5 different heights, the center distance between adjacent adjustment holes is 30 to 50 mm, the distance between the top adjustment hole and the top of the bridge cover is 25 to 45 mm, the width of the adjustment hole is 100 to 200 mm, and the height is 10 to 20 mm. Every 2 to 5 adjustment holes form a group, and there are 2 to 4 groups in total, and the spacing between each group is the same as the spacing between the support members.
6. The cable tray used in petrochemical enterprises according to claim 1 is characterized in that: The isolation piece is composed of a clamp, a spring mechanism and a limit column. The width of the isolation piece is 100-200 mm. The isolation piece and the adjustment hole are installed by plugging.
7. The cable tray used in petrochemical enterprises according to claim 6 is characterized in that: The isolation sheet is made of aluminum alloy.
8. The cable tray used in petrochemical enterprises according to claim 1 is characterized in that: The embedded column and the fixed column are cylindrical, and the groove structure is cylindrical.
9. The cable tray used in petrochemical enterprises according to claim 1, characterized in that: The lower fastening member groove structure is also provided with a button, a moving rod and a sliding block.
