Transaction method, device and equipment of virtual power plant and medium

Through the theory of interval uncertainty decision-making, the uncertainty factors in virtual power plants are solved, and the problems of traditional methods are difficult to cope with the prediction error of new energy generation and fluctuations in market demand are improved, and the operational benefits and new energy consumption of virtual power plants are improved. Susceptibility rate.

CN119050999APending Publication Date: 2024-11-29STATE GRID BEIJING ELECTRIC POWER CO +1

Patent Information

Application Number
CN202411145708.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

Traditional optimization methods are modeled based on determined parameters, making it difficult to effectively deal with uncertain factors such as new energy power generation forecast errors and market demand fluctuations in virtual power plants, resulting in poor decision-making results.

Method used

Using interval uncertainty decision theory (IGDT), we build an optimization model based on uncertainty, and through robust decision-making strategies, we combine the multi-objective optimization model with profit maximization and wind and light reduction minimization, handle uncertain parameters, and formulate Trading strategy.

Benefits of technology

Provide more robust decision-making support in an uncertain environment, improve the operational efficiency of virtual power plants and the absorption rate of new energy, and formulate a more scientific and reasonable trading strategy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119050999A_ABST
    Figure CN119050999A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of participation of a virtual power plant in an electric power auxiliary service transaction market, and particularly relates to a transaction method, device and equipment of a virtual power plant and a medium. In the transaction method, unit units of a virtual power plant at least comprise a gas unit, a wind and light unit and an electricity-hydrogen conversion unit; according to the method, the coupling conversion of electricity and hydrogen energy is considered, a multi-objective optimization model including income maximization and wind and light abandoning rate minimization is constructed, and a robust decision strategy is combined to realize effective processing of uncertain parameters, so that a more scientific and reasonable transaction strategy is formulated, and the operation benefit of the VPP and the consumption rate of new energy are improved. According to the virtual power plant transaction method considering electricity-hydrogen coupling and load uncertainty, the purposes of maximum income and new energy consumption are achieved, user side resources are encouraged to increase hydrogen energy unit construction, and the profitability of users participating in an auxiliary service market is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of virtual power plants participating in the power auxiliary service trading market, and specifically relates to a trading method, device, equipment and medium for virtual power plants, which are used to release demand-side economics and promote the development of the hydrogen production industry. Background Art

[0002] With the transformation of the global energy structure, the power industry is facing unprecedented challenges and opportunities. The rapid development of renewable energy such as wind and solar energy has greatly promoted the use of clean energy, but its inherent intermittent and random nature has also brought huge challenges to the stable operation of the power system. Especially when new energy power generation is connected to the grid on a large scale, how to effectively balance supply and demand, reduce wind and solar power abandonment, and increase the absorption rate of new energy has become an urgent problem to be solved in the current power industry.

[0003] As an innovative energy management system, Virtual Power Plant (VPP) aggregates multiple distributed energy sources (including traditional power generation resources, renewable energy, and energy storage systems, etc.), and uses advanced communication technology and intelligent control algorithms to achieve flexible scheduling and optimal configuration of resources, thereby enhancing the flexibility and reliability of the power system. In VPP, gas units provide stable basic loads, wind and solar units contribute clean energy, and electric-hydrogen conversion units achieve storage and conversion of electric energy through water electrolysis and fuel cell power generation, further improving the flexibility and economy of VPP. However, VPP faces many uncertain factors in actual operation, such as forecast errors of renewable energy power generation, market demand fluctuations, and sudden changes in grid dispatching instructions, which directly affect the trading strategy and operational benefits of VPP. Traditional optimization methods are often based on modeling based on certain parameters, which makes it difficult to effectively deal with these uncertainties, resulting in poor decision-making results in practical applications. Summary of the invention

[0004] The purpose of the present invention is to provide a trading method, device, equipment and medium for a virtual power plant to solve the problem that traditional optimization methods in the prior art are often modeled based on certain parameters, which makes it difficult to effectively deal with these uncertainties, resulting in poor decision-making results in practical applications.

[0005] In order to achieve the above object, the present invention adopts the following technical solution:

[0006] In a first aspect, the present invention provides a trading method for a virtual power plant, wherein the unit units of the virtual power plant at least include a gas unit, a wind-solar unit and an electric-hydrogen conversion unit, and the trading method comprises the following steps:

[0007] Determine various costs of the virtual power plant, determine the virtual power plant system operating costs based on the various costs; and determine various constraints for the operation of the virtual power plant;

[0008] Determine the total revenue of the virtual power plant system; construct a first objective function with maximum revenue as the optimization goal based on the operating cost of the virtual power plant system and the total revenue of the virtual power plant system; determine the amount of wind and solar power abandoned, and the total power generation of wind and solar power units; based on the amount of wind and solar power abandoned and the total power generation of wind and solar power units, construct a second objective function with minimum wind and solar power abandoned rate as the optimization goal;

[0009] Determining uncertain parameters in the first objective function and the second objective function;

[0010] Determine a variation range expression of the uncertain parameter;

[0011] Bringing the expression of the variation range of the uncertain parameters into the optimization model based on the IGDT theory to obtain a converted model;

[0012] According to the converted model, based on the robust decision-making strategy, a pessimistic decision-making model based on risk resistance and an optimistic decision-making model based on opportunity pursuit are respectively constructed;

[0013] Solve the pessimistic decision model based on risk mitigation and the optimistic decision model based on opportunity pursuit to obtain the upper and lower limits of the range of uncertain parameters;

[0014] Based on the upper and lower limits of the range of variation of the uncertain parameters and the various constraints, the first objective function and the second objective function are solved to obtain a final trading strategy.

[0015] Further, determining various costs of the virtual power plant, and determining the virtual power plant system operating cost based on the various costs, includes:

[0016] Determine the various costs of the virtual power plant as penalty costs for wind and solar power abandonment, penalty costs for load loss, electricity purchase costs, equipment start-up and shutdown costs, and equipment operating costs;

[0017] The above-mentioned costs are summed up to obtain the operating cost of the virtual power plant system.

[0018] Furthermore, various constraints for the operation of the virtual power plant are determined, including:

[0019] The various constraints for the operation of the virtual power plant are determined to be power balance constraints, spare capacity constraints, equipment output constraints, equipment start and stop constraints, peak load constraints, and hydrogen energy storage system constraints in the electric-hydrogen conversion unit.

[0020] Furthermore, the hydrogen energy storage system constraints include hydrogen energy storage system output constraints, hydrogen storage equipment cumulative hydrogen storage constraints and hydrogen energy storage system operation constraints.

[0021] Furthermore, the total benefits of the virtual power plant system are determined, including:

[0022] Determine the quotation of the virtual power plant operator to the ancillary services market, the electricity market, and the hydrogen market respectively;

[0023] Determine the time-based price information obtained by the virtual power plant operator in the ancillary service market and the electric energy market, as well as the market price of hydrogen;

[0024] Based on the various reported quantities and corresponding prices, the total revenue of the virtual power plant system is determined.

[0025] Furthermore, the first objective function and the second objective function are expressed as follows:

[0026] f1=max(I vpp -C vpp )

[0027]

[0028] Among them, f1 represents the maximum benefit objective function, f2 represents the minimum wind and solar power abandonment rate objective function; U c Indicates the actual amount of wind and solar power abandoned, U t Represents the total power generation of wind and solar units; I vpp and C vpp They respectively represent the operating cost of the virtual power plant system and the total revenue of the virtual power plant system.

[0029] Furthermore, the output constraints of the hydrogen energy storage system are as follows:

[0030] H m,t =αη p-h P e,t

[0031] P f,t =βη h-p H c,t

[0032] The cumulative hydrogen storage capacity H of the hydrogen storage equipment s,t Satisfy the following constraints:

[0033]

[0034] The operating constraints of the hydrogen energy storage system are:

[0035] P e,t ×P f,t =0

[0036] Where: H m,t is the amount of hydrogen produced, m 3 ; α is the coefficient of electro-to-hydrogen conversion; η p-h is the efficiency of electricity-to-hydrogen conversion; β is the coefficient of hydrogen-to-electricity conversion, which is 1; η h-p is the efficiency of hydrogen-to-electricity conversion, %; H c,t is the hydrogen consumption, m 3 ;P e,t is the actual power of the electrolytic cell; P f,t is the actual power of the fuel cell; are the rated power of the electrolyzer and the maximum discharge power of the fuel cell, kW; is the maximum hydrogen storage capacity of the hydrogen storage tank, m 3 ; The electrolyzer and fuel cell are not started at the same time.

[0037] In a second aspect of the present invention, a trading device for a virtual power plant is provided, wherein the unit units of the virtual power plant at least include a gas unit, a wind-solar unit and an electric-hydrogen conversion unit, and the trading device comprises the following steps:

[0038] A first determination module is used to determine various costs of the virtual power plant, determine the virtual power plant system operation cost based on the various costs; and determine various constraints for the operation of the virtual power plant;

[0039] The second determination module is used to determine the total revenue of the virtual power plant system; based on the operating cost of the virtual power plant system and the total revenue of the virtual power plant system, a first objective function is constructed with the maximum revenue as the optimization goal; the amount of wind and solar power abandoned, and the total power generation of wind and solar units are determined; based on the amount of wind and solar power abandoned and the total power generation of wind and solar units, a second objective function is constructed with the minimum wind and solar power abandonment rate as the optimization goal;

[0040] A third determination module, used to determine uncertain parameters in the first objective function and the second objective function;

[0041] A fourth determination module, used to determine a variation range expression of the uncertain parameter;

[0042] A model conversion module is used to bring the variation range expression of the uncertain parameter into the optimization model based on the IGDT theory to obtain a converted model;

[0043] A model building module, used to build a pessimistic decision model based on risk resistance and an optimistic decision model based on opportunity pursuit according to the converted model and based on a robust decision strategy;

[0044] A first solution module is used to solve the pessimistic decision model based on risk resistance and the optimistic decision model based on opportunity pursuit to obtain the upper and lower limits of the range of uncertain parameters;

[0045] The second solving module is used to solve the first objective function and the second objective function based on the upper and lower limits of the variation range of the uncertain parameters and the various constraints to obtain a final trading strategy.

[0046] According to a third aspect of the present invention, there is provided an electronic device, comprising a processor and a memory, wherein the processor is configured to execute a computer program stored in the memory to implement the transaction method as described above.

[0047] According to a fourth aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores at least one instruction, and when the at least one instruction is executed by a processor, the transaction method as described above is implemented.

[0048] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0049] In order to overcome the above problems, the present invention introduces the interval uncertainty decision making theory (IGDT). The IGDT theory considers the uncertainty range of parameters and constructs an optimization model based on uncertainty, which can provide more robust decision support in an uncertain environment. In the formulation of VPP trading strategies, the application of IGDT theory can fully consider uncertain factors such as new energy power generation forecast errors and market demand fluctuations, and formulate trading strategies that can both resist risks and seize opportunities. In view of the operational challenges currently faced by VPP in the context of large-scale grid connection of new energy, the present invention proposes a virtual power plant trading method based on IGDT theory, which constructs a multi-objective optimization model including revenue maximization and wind and solar power abandonment rate minimization, and combines robust decision-making strategies to achieve effective processing of uncertain parameters, thereby formulating a more scientific and reasonable trading strategy to improve the operating efficiency of VPP and the absorption rate of new energy. A virtual power plant trading device, electronic device and computer-readable storage medium provided by the present invention also solve the problems raised in the background technology section.

[0050] Since the current research on virtual power plants participating in ancillary service market transactions mainly focuses on traditional units, and rarely considers the participation of hydrogen energy units in the market transaction process, the coupled conversion of electricity and hydrogen energy will further promote the combination of the hydrogen energy market and the electricity ancillary service market and implement low-carbon goals. Therefore, the present invention aims to change the traditional ancillary service transactions that only consider economics to a trading method that considers the uncertainty of electricity consumption on the load side and the combination of electric-hydrogen coupled conversion and the ancillary service market. The present invention proposes a virtual power plant trading method that considers electric-hydrogen coupling and load uncertainty. Thereby achieving the goal of maximizing profits and absorbing new energy, and is conducive to encouraging user-side resources to increase the construction of hydrogen energy units and improve the profitability of users participating in the ancillary service market. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0052] Figure 1 This is a flow chart of a transaction method for a virtual power plant according to an embodiment of the present invention;

[0053] Figure 2 This is a structural block diagram of a trading device for a virtual power plant according to an embodiment of the present invention;

[0054] Figure 3 The present invention is a structural block diagram of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0055] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.

[0056] The following detailed description is an exemplary description, which is intended to provide further detailed description of the present invention. Unless otherwise specified, all technical terms used in the present invention have the same meaning as those generally understood by those skilled in the art to which the present application belongs. The terms used in the present invention are only for describing specific embodiments, and are not intended to limit exemplary embodiments according to the present invention.

[0057] VPPO, the abbreviation of Virtual Power Plant Operator, is a virtual power plant operator.

[0058] Example 1

[0059] like Figure 1As shown, an embodiment of the present invention provides a trading method for a virtual power plant, wherein the unit units of the virtual power plant include at least a gas unit, a wind-solar unit and an electric-hydrogen conversion unit, and the trading method includes the following steps:

[0060] S1. Determine various costs of the virtual power plant, determine the system operating cost of the virtual power plant based on the various costs; and determine various constraints for the operation of the virtual power plant;

[0061] Specifically, various costs of the virtual power plant are determined, and the system operating costs of the virtual power plant are determined based on the various costs, including: determining the various costs of the virtual power plant as penalty costs for wind and solar power abandonment, penalty costs for load loss, electricity purchase costs, equipment start-up and shutdown costs, and equipment operating costs; and summing up the various costs to obtain the system operating costs of the virtual power plant.

[0062] In an optional embodiment, the operating cost of the virtual power plant system is expressed as follows:

[0063]

[0064] Where: C VPP The operating cost of the virtual power plant system; The penalty costs for abandoning wind and solar power; The penalty cost for losing load; The cost of purchasing electricity; The cost of starting and stopping the equipment; Equipment operating costs; and They are the power abandonment penalty price, load loss penalty price and power purchase price, RMB / (kW·h); and They are abandoned power, lost load power and purchased power, kW. are the positive standby cost coefficient and negative standby cost coefficient of the system equipment respectively; α d,t It is the start and stop status of the equipment in period t. When the coefficient is 0, it indicates the shutdown state, and when it is 1, it indicates the start state. is the unit operating cost of the equipment, yuan / (kW·h); Output for the equipment, kW.

[0065] Specifically, various constraints for the operation of the virtual power plant are determined, including: determining the various constraints for the operation of the virtual power plant as power balance constraints, spare capacity constraints, equipment output constraints, equipment start and stop constraints, peak shaving constraints, and hydrogen energy storage system constraints in the electric-hydrogen conversion unit.

[0066] More specifically, the hydrogen energy storage system constraints include hydrogen energy storage system output constraints, hydrogen storage equipment cumulative hydrogen storage constraints and hydrogen energy storage system operation constraints.

[0067] In an optional embodiment, the power balance constraint, the spare capacity constraint, the equipment output constraint, the equipment start-stop constraint, and the peak load constraint are expressed as follows:

[0068] 1) The power balance constraint is:

[0069]

[0070] Where: P w,t , P pv,t , P f,t and P b,t are wind power generation power, photovoltaic power generation power, pumped storage power station power, fuel cell power generation power and purchased power, kW; P l,t , P e,t , P s,t and They are the adjusted flexibility load, electrolyzer power consumption, pumped storage power station power consumption, power sales power and power abandonment power, kW.

[0071] 2) Reserve capacity constraints

[0072] In order to fully absorb wind power and photovoltaic power, VPP reserves corresponding positive and negative reserves through pumped storage power stations and flexible loads to cope with the output deviation of wind power and photovoltaic power. The reserve capacity constraints are as follows:

[0073] R p,down,t +R fl,down,t ≥ΔP w+,t +ΔP pv+,t

[0074] R p,up,t +R fl,up,t ≥ΔP w-,t +ΔP pv-,t

[0075] Where: ΔP w+,t , ΔP pv+,t are the positive deviations of wind power and photovoltaic output, kW; ΔP w-,t , ΔP pv-,t are the negative deviations of wind power and photovoltaic output, kW; R p,up,t , R p,down,t are the positive reserve and negative reserve of the pumped storage power station, kW; R fl,up,t , R fl,down,t They are positive reserve and negative reserve of flexible load, kW respectively.

[0076] 3) Equipment output constraints

[0077] The wind power output constraints are as follows:

[0078]

[0079] Where: is the rated output power of wind power, kW; ν in , ν ra , ν out and ν t They are the system's access wind speed, rated wind speed, cut-off wind speed and actual wind speed, m / s.

[0080] The photovoltaic output constraints are as follows:

[0081] P pv,t =I×A×λ

[0082] Where: I is the solar radiation per unit area, kWim; A is the photovoltaic area, m; λ is the overall system efficiency, generally taken as 0.8.

[0083] Optionally, the virtual power plant may also include a pumped storage power station, wherein:

[0084] The output constraints of the pumped storage power station are as follows:

[0085]

[0086] Where: are the minimum and maximum technical outputs of the pumped storage power station under power generation conditions, kW.

[0087] The power consumption of the pumped storage power station is expressed as

[0088]

[0089] Where: η p,t is the working state variable of the pumped storage power station in period t under the pumping condition, which takes 0 or 1; is the rated pumping power of the pumped-storage power station, kW.

[0090] The output constraints of the pumped storage power station are:

[0091]

[0092] Pumped storage power stations do not pump water for storage and discharge it simultaneously.

[0093] 4) Equipment start and stop constraints

[0094] Frequent start and stop of equipment will not only increase costs, but also affect the normal use of equipment and increase equipment wear. Therefore, on a typical operating day, the number of starts and stops of the energy storage system needs to be kept within a reasonable range. The equipment start and stop constraints are:

[0095] 0≤n S-S ≤n s-smax

[0096] Where: n S-S is the number of times the equipment starts and stops; n s-smax The maximum number of starts and stops of the equipment in a typical day.

[0097] 5) Peak load constraints

[0098] For flexible loads, the following peak load constraints are met:

[0099]

[0100] Where: is the adjustable amount of flexible load, kW; is the maximum adjustable amount of flexible load, kW. Flexible loads participating in the peak-shaving market need to adjust their loads according to the time periods of the peak-shaving auxiliary service market, and the peak-shaving amount in other periods is 0.

[0101] The constraints of flexible load peak load regulation state are:

[0102]

[0103]

[0104] Where: ΔP l,vf,t , ΔP l,pf,t They are the peak loads of flexible load valley filling and peak load shaving, kW; u vf 、u pf They are respectively the valley filling peak shaving flag and the peak shaving peak shaving flag, which can be 0 or 1, but cannot be 1 at the same time.

[0105] Specifically, the output constraints of the hydrogen energy storage system are as follows:

[0106] H m,t =αη p-h P e,t

[0107] P f,t =βη h-p H c,t

[0108] The cumulative hydrogen storage capacity H of the hydrogen storage equipment s,t Satisfy the following constraints:

[0109]

[0110] The operating constraints of the hydrogen energy storage system are:

[0111] P e,t ×P f,t =0

[0112] Where: H m,t is the amount of hydrogen produced, m 3 ; α is the coefficient of electro-to-hydrogen conversion; η p-h is the efficiency of electricity-to-hydrogen conversion; β is the coefficient of hydrogen-to-electricity conversion, which is 1; η h-p is the efficiency of hydrogen-to-electricity conversion, %; H c,t is the hydrogen consumption, m 3 ;P e,t is the actual power of the electrolytic cell; P f,t is the actual power of the fuel cell; are the rated power of the electrolyzer and the maximum discharge power of the fuel cell, kW; is the maximum hydrogen storage capacity of the hydrogen storage tank, m 3 ; The electrolyzer and fuel cell are not started at the same time.

[0113] S2. Determine the total revenue of the virtual power plant system; based on the operating cost of the virtual power plant system and the total revenue of the virtual power plant system, construct a first objective function with maximum revenue as the optimization goal; determine the amount of wind and solar power abandoned, and the total power generation of wind and solar units; based on the amount of wind and solar power abandoned and the total power generation of wind and solar units, construct a second objective function with minimum wind and solar power abandoned rate as the optimization goal;

[0114] Specifically, determining the total revenue of the virtual power plant system includes: separately determining the virtual power plant operator's reported quantities for the ancillary service market, the electric energy market, and the hydrogen market; separately determining the time period price information obtained by the virtual power plant operator in the ancillary service market and the electric energy market, as well as the market price of hydrogen; and determining the total revenue of the virtual power plant system based on each of the reported quantities and the corresponding prices.

[0115] In an optional embodiment, the total revenue of the virtual power plant system is expressed as follows:

[0116]

[0117] Where: are the time-based price information obtained by VPPO in the ancillary service market and the electric energy market, RMB / (kW·h); is the market price of hydrogen, is a fixed price, yuan / m 3 ; They are the reported quantities of VPPO for the ancillary service market and the electric energy market, kW·h; is the volume reported by VPPO for the hydrogen market, m 3 .

[0118] Ancillary services are divided into peak shaving ancillary services and valley filling ancillary services. The ancillary service revenue can be expressed as:

[0119]

[0120] Where: p vf,t 、p pf,t They are the peak-shaving price for valley filling and peak-shaving, RMB / kW; q vfb,t is the peak-loading bidding capacity of VPPO, kW; q pfb,t is the peak shaving bidding capacity of VPPO, kW.

[0121] Specifically, the first objective function and the second objective function are expressed as follows:

[0122] f1=max(I vpp -C vpp )

[0123]

[0124] Among them, f1 represents the maximum benefit objective function, f2 represents the minimum wind and solar power abandonment rate objective function; U c Indicates the actual amount of wind and solar power abandoned, U t Represents the total power generation of wind and solar units; I vpp and C vpp They respectively represent the operating cost of the virtual power plant system and the total revenue of the virtual power plant system.

[0125] S3, determining uncertain parameters in the first objective function and the second objective function;

[0126] In this solution, solving the first objective function and the second objective function can obtain the optimal trading strategy, but when solving the objective function, there are uncertain parameters, such as uncertainty in weather data. Therefore, in this step, these uncertain parameters are determined according to the actual situation, and the upper and lower boundaries of these uncertain parameters are calculated in the subsequent steps to facilitate the solution of the objective function.

[0127] S4, determining a variation range expression of the uncertain parameter;

[0128] The range of uncertainty parameters is set as:

[0129]

[0130] Where, the subscript l represents the load; Y l Indicates uncertain parameters, Indicates that the range of the uncertain parameter deviation from the predicted value does not exceed α l represents the variation range of the uncertain parameters, Indicates the average value of load forecast output.

[0131] S5, bringing the expression of the variation range of the uncertain parameters into the optimization model based on the IGDT theory to obtain a converted model;

[0132] The converted model is expressed as:

[0133]

[0134]

[0135]

[0136]

[0137] z1 and z2 represent the optimization values ​​of the uncertainty model obtained by substituting the optimization values ​​of the deterministic model into the They represent equality constraints and inequality constraints respectively; d represents the decision variable; s represents the determination of the parameter value.

[0138] S6. Based on the converted model and the robust decision-making strategy, a pessimistic decision-making model based on risk resistance and an optimistic decision-making model based on opportunity pursuit are respectively constructed;

[0139] Specifically, a pessimistic decision model based on risk resistance is constructed according to the robust decision-making strategy, and the actual load demand is set as the minimum value of the predicted output deviation. Set the deviation degree β of the actual output disturbance affecting the objective function value i , i = 1, 2, then the maximum pessimistic values ​​of each target are (1-β1)y b1 , (1+β2)y b2 , the robust decision strategy for optimizing the running model is expressed as:

[0140]

[0141] According to the opportunity decision-making strategy, an optimistic decision-making model based on opportunity pursuit is constructed, and the actual load demand is set as the maximum value of the predicted output deviation. Then the opportunity decision strategy of the optimized running model is expressed as:

[0142]

[0143] F(Y,d) represents the objective function, β s and β aIndicates the degree of deviation from the predicted value. The robust decision value can ensure that the expected value does not exceed (1+β a )F0, for the chance decision value, there is at least one Y within the acceptable range so that the expected value does not exceed (1-β s )F0.

[0144] S7, solving the pessimistic decision model based on risk mitigation and the optimistic decision model based on opportunity pursuit to obtain the upper and lower limits of the range of uncertain parameters;

[0145] S8. Based on the upper and lower limits of the range of variation of the uncertain parameters and the various constraints, the first objective function and the second objective function are solved to obtain a final trading strategy.

[0146] Since the current research on virtual power plants participating in auxiliary service market transactions mainly focuses on traditional units, and rarely considers the participation of hydrogen units in the market transaction process, the coupled conversion of electricity and hydrogen energy will further promote the combination of the hydrogen energy market and the power auxiliary service market and implement the low-carbon goal. Therefore, the present invention aims to change the traditional auxiliary service transaction that only considers economics into a transaction method that considers the uncertainty of load-side electricity consumption and the combination of electricity-hydrogen coupled conversion and the auxiliary service market.

[0147] In an optional embodiment, the present invention proposes a virtual power plant trading method that takes into account electricity-hydrogen coupling and load uncertainty, thereby achieving the goal of maximizing revenue and absorbing new energy, and is conducive to encouraging user-side resources to increase the construction of hydrogen energy units and improve the profitability of users participating in the ancillary service market.

[0148] The present invention proposes a virtual power plant trading method that takes into account electricity-hydrogen coupling and load uncertainty. A virtual power plant participating in ancillary service trading model based on IGDT load uncertainty is established. At the same time, the addition of energy storage systems is considered. Under the goal of minimum cost and minimum wind and solar power abandonment rate, a system economic trading model including electricity-hydrogen coupling and load uncertainty is established. The transaction costs of ancillary services of virtual power plants with the participation of hydrogen storage systems are analyzed, providing support and assistance for encouraging user-side resources to increase the construction of hydrogen energy units and improving the profitability of users participating in the ancillary service market.

[0149] The present invention proposes a virtual power plant trading method that takes into account electricity-hydrogen coupling and load uncertainty. First, the virtual power plant system operation objective function and its constraints are established. Secondly, the hydrogen energy storage system is introduced under the condition of considering conventional units. Finally, a system economic trading model that includes electricity-hydrogen coupling and load uncertainty is established under the goal of minimum cost and minimum wind and solar power abandonment rate. Based on the IGDT model, a virtual power plant auxiliary service trading method with the participation of the hydrogen storage system is given.

[0150] Example 2

[0151] like Figure 2 As shown, based on the same inventive concept as the above embodiment, the present invention further provides a trading device for a virtual power plant, wherein the unit unit of the virtual power plant at least includes a gas unit, a wind-solar unit and an electric-hydrogen conversion unit, and the trading device includes the following steps:

[0152] A first determination module is used to determine various costs of the virtual power plant, determine the virtual power plant system operation cost based on the various costs; and determine various constraints for the operation of the virtual power plant;

[0153] The second determination module is used to determine the total revenue of the virtual power plant system; based on the operating cost of the virtual power plant system and the total revenue of the virtual power plant system, a first objective function is constructed with the maximum revenue as the optimization goal; the amount of wind and solar power abandoned, and the total power generation of wind and solar units are determined; based on the amount of wind and solar power abandoned and the total power generation of wind and solar units, a second objective function is constructed with the minimum wind and solar power abandonment rate as the optimization goal;

[0154] A third determination module, used to determine uncertain parameters in the first objective function and the second objective function;

[0155] A fourth determination module, used to determine a variation range expression of the uncertain parameter;

[0156] A model conversion module is used to bring the variation range expression of the uncertain parameter into the optimization model based on the IGDT theory to obtain a converted model;

[0157] A model building module, used to build a pessimistic decision model based on risk resistance and an optimistic decision model based on opportunity pursuit according to the converted model and based on a robust decision strategy;

[0158] A first solution module is used to solve the pessimistic decision model based on risk resistance and the optimistic decision model based on opportunity pursuit to obtain the upper and lower limits of the range of uncertain parameters;

[0159] The second solving module is used to solve the first objective function and the second objective function based on the upper and lower limits of the variation range of the uncertain parameters and the various constraints to obtain a final trading strategy.

[0160] Example 3

[0161] like Figure 3 As shown, the present invention also provides an electronic device 100 for implementing a virtual power plant trading method in the above embodiment;

[0162] The electronic device 100 includes a memory 101 , at least one processor 102 , a computer program 103 stored in the memory 101 and executable on the at least one processor 102 , and at least one communication bus 104 .

[0163] The memory 101 can be used to store a computer program 103 , and the processor 102 implements the steps of a virtual power plant trading method in Example 1 by running or executing the computer program stored in the memory 101 and calling the data stored in the memory 101 .

[0164] The memory 101 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data (such as audio data) created according to the use of the electronic device 100, etc. In addition, the memory 101 may include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices.

[0165] At least one processor 102 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The processor 102 may be a microprocessor or any conventional processor, etc. The processor 102 is the control center of the electronic device 100, and uses various interfaces and lines to connect various parts of the entire electronic device 100.

[0166] The memory 101 in the electronic device 100 stores a plurality of instructions to implement a trading method of a virtual power plant, and the processor 102 can execute the plurality of instructions to implement:

[0167] Determine various costs of the virtual power plant, determine the virtual power plant system operating costs based on the various costs; and determine various constraints for the operation of the virtual power plant;

[0168] Determine the total revenue of the virtual power plant system; construct a first objective function with maximum revenue as the optimization goal based on the operating cost of the virtual power plant system and the total revenue of the virtual power plant system; determine the amount of wind and solar power abandoned, and the total power generation of wind and solar power units; based on the amount of wind and solar power abandoned and the total power generation of wind and solar power units, construct a second objective function with minimum wind and solar power abandoned rate as the optimization goal;

[0169] Determining uncertain parameters in the first objective function and the second objective function;

[0170] Determine a variation range expression of the uncertain parameter;

[0171] Bringing the expression of the variation range of the uncertain parameters into the optimization model based on the IGDT theory to obtain a converted model;

[0172] According to the converted model, based on the robust decision-making strategy, a pessimistic decision-making model based on risk resistance and an optimistic decision-making model based on opportunity pursuit are respectively constructed;

[0173] Solve the pessimistic decision model based on risk mitigation and the optimistic decision model based on opportunity pursuit to obtain the upper and lower limits of the range of uncertain parameters;

[0174] Based on the upper and lower limits of the range of variation of the uncertain parameters and the various constraints, the first objective function and the second objective function are solved to obtain a final trading strategy.

[0175] Example 4

[0176] If the module / unit integrated in the electronic device 100 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. Computer-readable media may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory and read-only memory (ROM, Read-Only Memory).

[0177] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0178] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0179] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0180] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0181] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0182] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A virtual power plant trading method, wherein: The unit units of the virtual power plant at least include gas units, wind and solar units and electric-hydrogen conversion units, and the trading method includes the following steps: Determine various costs of the virtual power plant, determine the system operating cost of the virtual power plant based on the various costs; and determine various constraints for the operation of the virtual power plant; Determine the total revenue of the virtual power plant system; construct a first objective function with maximum revenue as the optimization goal based on the operating cost of the virtual power plant system and the total revenue of the virtual power plant system; determine the amount of wind and solar power abandoned, and the total power generation of wind and solar power units; based on the amount of wind and solar power abandoned and the total power generation of wind and solar power units, construct a second objective function with minimum wind and solar power abandoned rate as the optimization goal; Determining uncertain parameters in the first objective function and the second objective function; Determine a variation range expression of the uncertain parameter; Bringing the expression of the variation range of the uncertain parameters into the optimization model based on the IGDT theory to obtain a converted model; According to the converted model, based on the robust decision-making strategy, a pessimistic decision-making model based on risk resistance and an optimistic decision-making model based on opportunity pursuit are respectively constructed; Solve the pessimistic decision model based on risk mitigation and the optimistic decision model based on opportunity pursuit to obtain the upper and lower limits of the range of uncertain parameters; Based on the upper and lower limits of the range of variation of the uncertain parameters and the various constraints, the first objective function and the second objective function are solved to obtain a final trading strategy.

2. The virtual power plant transaction method according to claim 1, characterized in that: Determining various costs of the virtual power plant, and determining the virtual power plant system operating cost based on the various costs, including: Determine the various costs of the virtual power plant as penalty costs for wind and solar power abandonment, penalty costs for load loss, electricity purchase costs, equipment start-up and shutdown costs, and equipment operating costs; The above-mentioned costs are summed up to obtain the operating cost of the virtual power plant system.

3. The virtual power plant transaction method according to claim 1, characterized in that: Determine various constraints for the operation of the virtual power plant, including: The various constraints for the operation of the virtual power plant are determined to be power balance constraints, spare capacity constraints, equipment output constraints, equipment start and stop constraints, peak load constraints, and hydrogen energy storage system constraints in the electric-hydrogen conversion unit.

4. The virtual power plant transaction method according to claim 3, characterized in that: The hydrogen energy storage system constraints include hydrogen energy storage system output constraints, hydrogen storage equipment cumulative hydrogen storage constraints and hydrogen energy storage system operation constraints.

5. The virtual power plant transaction method according to claim 1, characterized in that: Determine the total benefits of the virtual power plant system, including: Determine the quotation of the virtual power plant operator to the ancillary services market, the electricity market, and the hydrogen market respectively; Determine the time-based price information obtained by the virtual power plant operator in the ancillary service market and the electric energy market, as well as the market price of hydrogen; Based on the various reported quantities and corresponding prices, the total revenue of the virtual power plant system is determined.

6. The transaction method of a virtual power plant according to claim 1, characterized in that: The first objective function and the second objective function are expressed as follows: f1=max(I vpp -C vpp ) Among them, f1 represents the maximum benefit objective function, f2 represents the minimum wind and solar power abandonment rate objective function; U c Indicates the actual amount of wind and solar power abandoned, U t Represents the total power generation of wind and solar units; I vpp and C vpp They respectively represent the operating cost of the virtual power plant system and the total revenue of the virtual power plant system.

7. The virtual power plant transaction method according to claim 3, characterized in that: The output constraints of the hydrogen energy storage system are as follows: H m,t =ai p-h P e,t P f,t =βη h-p H c,t The cumulative hydrogen storage capacity H of the hydrogen storage equipment s,t Satisfy the following constraints: The operating constraints of the hydrogen energy storage system are: P e,t ×P f,t =0 Where: H m,t is the amount of hydrogen produced, m 3 ; α is the coefficient of electro-to-hydrogen conversion; η p-h is the efficiency of electricity-to-hydrogen conversion; β is the coefficient of hydrogen-to-electricity conversion, which is 1; η h-p is the efficiency of hydrogen-to-electricity conversion, %; H c,t is the hydrogen consumption, m 3 ;P e,t is the actual power of the electrolytic cell; P f,t is the actual power of the fuel cell; are the rated power of the electrolyzer and the maximum discharge power of the fuel cell, kW; is the maximum hydrogen storage capacity of the hydrogen storage tank, m 3 ; The electrolyzer and fuel cell are not started at the same time.

8. A trading device for a virtual power plant, wherein: The unit units of the virtual power plant at least include gas units, wind and solar units and electric-hydrogen conversion units, and the trading device includes the following steps: A first determination module is used to determine various costs of the virtual power plant, determine the virtual power plant system operation cost based on the various costs; and determine various constraints for the operation of the virtual power plant; The second determination module is used to determine the total revenue of the virtual power plant system; based on the operating cost of the virtual power plant system and the total revenue of the virtual power plant system, a first objective function is constructed with the maximum revenue as the optimization goal; the amount of wind and solar power abandoned, and the total power generation of wind and solar units are determined; based on the amount of wind and solar power abandoned and the total power generation of wind and solar units, a second objective function is constructed with the minimum wind and solar power abandonment rate as the optimization goal; A third determination module, used to determine uncertain parameters in the first objective function and the second objective function; A fourth determination module, used to determine a variation range expression of the uncertain parameter; A model conversion module is used to bring the variation range expression of the uncertain parameter into the optimization model based on the IGDT theory to obtain a converted model; A model building module, used to build a pessimistic decision model based on risk resistance and an optimistic decision model based on opportunity pursuit according to the converted model and based on a robust decision strategy; A first solution module is used to solve the pessimistic decision model based on risk resistance and the optimistic decision model based on opportunity pursuit to obtain the upper and lower limits of the range of uncertain parameters; The second solving module is used to solve the first objective function and the second objective function based on the upper and lower limits of the variation range of the uncertain parameters and the various constraints to obtain a final trading strategy.

9. An electronic device, characterized in that: The method comprises a processor and a memory, wherein the processor is used to execute a computer program stored in the memory to implement the transaction method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores at least one instruction, and when the at least one instruction is executed by a processor, the transaction method according to any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Power system resource optimization scheduling method considering flexibility and terminal

    CN116780646A

  • Virtual power plant economic dispatching method and system considering source-load bilateral uncertainty

    CN117439186A

  • Energy system

    JP2018081657A

Cited By

  • Multi-target balance optimization method and system for virtual power plant power distribution network, equipment and medium

    CN119476647A