Method and system for checking and analyzing line power flow information of power system

By analyzing the monitoring data deviation of power equipment and generating multiple sets of trend calculation solutions, and choosing the optimal solution, the problem of trend calculation inaccuracy caused by the reliability differences in monitoring data of different equipment in the power system is solved, and the accuracy of trend calculation is improved.

CN119051043APending Publication Date: 2024-11-29STATE GRID JIANGSU ELECTRIC POWER CO LTD COMPREHENSIVE SERVICE CENTER +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411260891.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

In the power system, due to the difference in the reliability of monitoring data of different power equipment, the inaccuracy of the trend calculation results cannot be guaranteed.

Method used

By analyzing the deviation of the monitoring data of power equipment in historical trend calculation, data reliability is determined, and multiple sets of trend calculation schemes are generated, and the current calculation is performed based on the available calculation schemes of different data reliability, and the optimal calculation scheme is selected to reduce deviation , ensure the accuracy of trend calculation results.

Benefits of technology

Through the comparison and selection of multiple available calculation schemes and the optimal scheme, the deviation of calculation results is reduced, the accuracy of trend calculations is improved, and the impact of unreliable data equipment on the results is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119051043A_ABST
    Figure CN119051043A_ABST
Patent Text Reader

Abstract

The invention provides a power system line power flow information check analysis method and system, and belongs to the technical field of power systems, and the method specifically comprises the steps: carrying out the determination of an available calculation scheme in power flow calculation schemes based on the reliability of monitoring data of data reliable equipment of different power flow calculation schemes, determining alternative calculation schemes in the available calculation schemes on the basis of deviation conditions of load flow calculation results of different available calculation schemes in different power equipment, and determining alternative calculation schemes in the available calculation schemes on the basis of deviation conditions of load flow calculation results of different power equipment in different available calculation schemes. And determining unreliable power equipment in the power equipment, determining an optimal calculation scheme according to a matching result of the data reliable equipment corresponding to the alternative calculation scheme and the unreliable power equipment, and outputting a power flow settlement result of the power transmission line by utilizing the optimal calculation scheme, so that the accuracy of power flow calculation is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power systems, and in particular relates to a method and system for checking and analyzing power system line flow information. Background Art

[0002] In the power system, "power flow" also specifically refers to the distribution of voltage (including amplitude and phase angle), active power, reactive power, etc. at various points in the line. The distribution of power flow is something that the operation and dispatching units and maintenance departments must know in order to achieve power flow optimization of the power system and timely handling of equipment failures.

[0003] In order to analyze and process the line flow information in the power system, the invention patent application CN202311688645.4 "Engineering application method for quickly determining the feasibility of 10kV distribution line closing and power regulation" updates the line data in a timely manner, so that analysts can use professional flow calculation and analysis tools for rapid analysis, thereby improving the efficiency and accuracy of flow calculation. However, there are the following problems: When checking and analyzing the power flow information of power lines, the reliability of the monitoring equipment of different power equipment varies, which leads to differences in the reliability of the monitoring data of different power equipment. Therefore, if the reliability of the monitoring data of different power equipment is not considered when performing power flow calculations, the accuracy of the power flow calculation results cannot be guaranteed.

[0004] In view of the above technical problems, the present invention provides a method and system for checking and analyzing power system line flow information. Summary of the invention

[0005] To achieve the purpose of the present invention, the present invention adopts the following technical solutions: In order to solve the above technical problems, the present invention provides the following technical solutions to achieve the purpose of the present invention: According to one aspect of the present invention, a method for checking and analyzing power system line flow information is provided.

[0006] A method for checking and analyzing power system line flow information, specifically comprising: S1 determines the reliability of monitoring data of different power equipment and data reliable equipment based on the deviation between the monitoring data of power equipment in the transmission line and the calculation results in the historical power flow calculation; S2 takes the minimum data volume of the transmission line during power flow calculation as a constraint condition, generates multiple groups of power flow calculation schemes through the monitoring data of the data reliable device, and determines the available calculation schemes in the power flow calculation schemes based on the reliability of the monitoring data of the data reliable device of different power flow calculation schemes; S3: determining the power flow calculation result of the transmission line by using the available calculation scheme, and determining the alternative calculation scheme among the available calculation schemes based on the deviation of the power flow calculation results of different available calculation schemes in different power equipment; S4 determines the unreliable power equipment among the power equipment based on the deviation of the power flow calculation results of different power equipment in different available calculation schemes, determines the optimal calculation scheme based on the matching results of the data reliable equipment and the unreliable power equipment corresponding to the alternative calculation schemes, and uses the optimal calculation scheme to output the power flow settlement results of the transmission line.

[0007] The beneficial effects of the present invention are: 1. In the present application, the alternative calculation schemes among the available calculation schemes are determined based on the deviation of the flow calculation results of different available calculation schemes for different power equipment, thereby avoiding the technical problem of inaccurate calculation results caused by the use of a single flow calculation scheme. By comparing the flow calculation results of different available calculation schemes, the screening of alternative calculation schemes with lower deviations is achieved, which also lays the foundation for further determining the alternative calculation schemes.

[0008] 2. In the present application, the optimal calculation scheme is determined by the matching results of the data reliable equipment and the unreliable power equipment corresponding to the alternative calculation schemes, thereby realizing the determination of the optimal calculation scheme from multiple dimensions and ensuring the accuracy of the power flow calculation results. At the same time, the optimal calculation scheme is determined by the matching results with the unreliable power equipment, which also reduces the impact of the power equipment with unreliable data on the accuracy of the power flow calculation results and improves the accuracy of the power flow calculation results.

[0009] A further technical solution is that the deviation between the monitoring data and the calculation result in the historical power flow calculation includes the deviation between the monitoring data and the calculation result under different historical power flow calculation times.

[0010] A further technical solution is that the method for determining the reliability of the monitoring data of the power equipment is: Determine the monitoring data deviation amount in different historical power flow calculation times based on the deviation between the monitoring data of the power equipment and the calculation result in the historical power flow calculation; Determine the number of deviation calculations by using the monitoring data deviation in different historical power flow calculation times; The reliability of the monitoring data of the power equipment is determined by the proportion of the deviation calculation times in the historical power flow calculation times.

[0011] A further technical solution is that when the monitoring data deviation in the historical power flow calculation times is not within a preset deviation interval, the historical power flow calculation times are determined to be deviation calculation times.

[0012] A further technical solution is that the method for determining the optimal calculation solution is: Determine the unreliable power equipment matched with different alternative computing schemes based on the matching results of the data reliable equipment and the unreliable power equipment corresponding to the alternative computing schemes, and use them as the matched unreliable equipment; The alternative calculation scheme with the lowest total number of monitoring data deviation calculation schemes matching unreliable equipment is taken as the optimal calculation scheme.

[0013] In a second aspect, the present invention provides a computer system comprising: a memory and a processor that are communicatively connected, and a computer program stored in the memory and capable of running on the processor, wherein the processor executes the above-mentioned method for checking and analyzing line flow information of a power system when running the computer program.

[0014] Other features and advantages will be described in the following description, and partly become apparent from the description, or understood by practicing the invention. The purpose and other advantages of the invention are realized and obtained by the structures particularly pointed out in the description and the drawings.

[0015] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The above and other features and advantages of the present invention will become more apparent by describing in detail exemplary embodiments thereof with reference to the attached drawings.

[0017] Figure 1 It is a flow chart of a method for checking and analyzing power system line flow information; Figure 2 is a flow chart of a method for determining reliability of monitoring data of electric power equipment; Figure 3 is a flow chart of a method for determining available computational solutions; Figure 4 is a flow chart of a method for determining an alternative computing solution among available computing solutions; Figure 5 is a flow chart of a method for determining an unreliable power device. DETAILED DESCRIPTION

[0018] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that the present invention will be comprehensive and complete and fully convey the concepts of the example embodiments to those skilled in the art. The same reference numerals in the figures represent the same or similar structures, and thus their detailed description will be omitted.

[0019] The terms "a", "an", "the", and "said" are used to indicate the presence of one or more elements / components / etc.; the terms "comprising" and "having" are used to express an open-ended inclusive meaning and mean that additional elements / components / etc. may be present in addition to the listed elements / components / etc.

[0020] Example 1 To solve the above problems, according to one aspect of the present invention, Figure 1 According to one aspect of the present invention, a method for checking and analyzing power system line flow information is provided, which specifically includes: S1 determines the reliability of monitoring data of different power equipment and data reliable equipment based on the deviation between the monitoring data of power equipment in the transmission line and the calculation results in the historical power flow calculation; Furthermore, the deviation between the monitoring data and the calculation result in the historical power flow calculation includes the deviation between the monitoring data and the calculation result under different historical power flow calculation times.

[0021] It should be noted that if Figure 2 As shown, the method for determining the reliability of the monitoring data of the power equipment is: Determine the monitoring data deviation amount in different historical power flow calculation times based on the deviation between the monitoring data of the power equipment and the calculation result in the historical power flow calculation; Determine the number of deviation calculations by using the monitoring data deviation in different historical power flow calculation times; The reliability of the monitoring data of the power equipment is determined by the proportion of the deviation calculation times in the historical power flow calculation times.

[0022] Further, when the monitoring data deviation in the historical power flow calculation times is not within a preset deviation interval, the historical power flow calculation times are determined to be deviation calculation times.

[0023] It can be understood that when the reliability of the monitoring data of the electric power equipment is within a preset interval, the electric power equipment is determined to be a data reliable equipment.

[0024] It should also be noted that the method for determining the reliability of the monitoring data of the power equipment is: S11 determines the deviation of the monitoring data of the power equipment in the historical power flow calculation and the calculation result, and determines the deviation of the monitoring data in different historical power flow calculation times; S12 uses the number of historical flow calculations in which the monitoring data deviation does not meet the requirements as the number of deviation calculations, and determines the basic deviation coefficient based on the number of deviation calculations and the proportion of the number of deviation calculations in the number of historical flow calculations; S13 obtains the monitoring data deviation in different historical power flow calculation times, and determines the comprehensive data deviation based on the monitoring data deviation in different historical power flow calculation times, and determines the reliability of the monitoring data of the power equipment through the basic deviation coefficient and the comprehensive data deviation.

[0025] Furthermore, the specified interval is a preset deviation interval.

[0026] S2 takes the minimum data volume of the transmission line during power flow calculation as a constraint condition, generates multiple groups of power flow calculation schemes through the monitoring data of the data reliable device, and determines the available calculation schemes in the power flow calculation schemes based on the reliability of the monitoring data of the data reliable device of different power flow calculation schemes; It can be understood that multiple groups of power flow calculation schemes are generated, specifically including: Determine the lowest data dimension of the transmission line during power flow calculation, and generate multiple sets of solutions using the lowest data dimension; The solution in which all power equipment is data reliable equipment is used as the power flow calculation solution.

[0027] Specifically, Figure 3 As shown, the method for determining the available calculation scheme is: Based on the reliability of monitoring data of data reliable devices in the power flow calculation scheme, the data reliable devices are divided into different reliable device intervals; Based on the number of data reliable devices in different reliable device intervals, determining preset reliability coefficients corresponding to different reliable device intervals under the number of data reliable devices; The comprehensive reliability coefficient of the power flow calculation scheme is determined by the average value of the preset reliability coefficients corresponding to different reliable equipment intervals, and the comprehensive reliability coefficient is used to determine the available calculation schemes.

[0028] Furthermore, when the comprehensive reliability coefficient of the power flow calculation scheme is greater than a preset reliability threshold, the power flow calculation scheme is determined to be an available calculation scheme.

[0029] It should also be noted that the method for determining the available computing solutions includes steps S21-S23, specifically: S21 Obtaining the reliability of the monitoring data of the reliable data device in the power flow calculation scheme S22 regards the data reliable devices whose reliability of monitoring data is less than the reliability limit value as suspected risk devices, and determines the risk coefficient of the power flow calculation scheme based on the number of the suspected risk devices and the proportion of the suspected risk devices in the data reliable devices in the power flow calculation scheme; S23 divides the data reliable devices into different reliable device intervals based on the reliability of the monitoring data of the data reliable devices in the power flow calculation scheme, determines the preset reliability coefficients corresponding to the different reliable device intervals under the number of data reliable devices based on the reliability of the monitoring data of the data reliable devices in the different reliable device intervals, determines the comprehensive reliability coefficient of the power flow calculation scheme by the average value of the preset reliability coefficients corresponding to the different reliable device intervals, and uses the comprehensive reliability coefficient to determine the available calculation schemes.

[0030] Optionally, the above step S21 includes steps S211-S212, which are specifically: S211: obtaining the reliability of the monitoring data of the data reliable device in the power flow calculation scheme, and determining whether the average reliability of the monitoring data of the data reliable device in the power flow calculation scheme is within a preset reliability interval; if so, proceeding to the next step; if not, determining that the power flow calculation scheme does not belong to an available calculation scheme; S212 determines whether there is a reliable data device in the power flow calculation scheme whose monitoring data reliability is less than the reliability limit value. If so, proceed to the next step; if not, proceed to step S22.

[0031] Optionally, before entering step S23, it is also necessary to determine whether the risk coefficient of the flow calculation scheme meets the requirements. When the risk coefficient of the flow calculation scheme meets the requirements, it is determined that the flow calculation scheme does not belong to the available calculation scheme. When the risk coefficient of the flow calculation scheme does not meet the requirements, proceed to step S23.

[0032] Optionally, the above step S23 includes steps S231-S232, specifically: S231 divides the data reliable devices into different reliable device intervals based on the reliability of the monitoring data of the data reliable devices in the power flow calculation scheme, determines the preset reliability coefficients corresponding to the different reliable device intervals under the number of data reliable devices based on the number of data reliable devices, and determines whether the number of reliable device intervals whose preset reliability coefficients do not meet the requirements is within the preset number interval, if yes, proceeds to the next step, if no, determines that the power flow calculation scheme does not belong to the available calculation scheme; S232 determines the comprehensive reliability coefficient of the power flow calculation scheme by the average value of the preset reliability coefficients corresponding to different reliable equipment intervals, and uses the comprehensive reliability coefficient to determine the available calculation schemes.

[0033] S3: determining the power flow calculation result of the transmission line by using the available calculation scheme, and determining the alternative calculation scheme among the available calculation schemes based on the deviation of the power flow calculation results of different available calculation schemes in different power equipment; Specifically, Figure 4 As shown, the method for determining the alternative computing scheme in the available computing scheme is: Based on the power flow calculation result of the available calculation scheme, determine the deviation amount of the operation data of different power equipment between the available calculation scheme and other available calculation schemes, and based on the deviation amount of the operation data, determine the deviation between the available calculation scheme and other available calculation schemes for the power equipment; Determining a deviation coefficient of a power flow calculation result between the available calculation scheme and other available calculation schemes according to the number of the deviation power equipment; The calculation result deviation coefficients of different available calculation schemes are determined by averaging the deviation coefficients of the power flow calculation results with other available settlement schemes, and the calculation result deviation coefficients are used to determine the alternative calculation schemes among the available calculation schemes.

[0034] Furthermore, the deviation power equipment is a power equipment whose deviation amount of operation data is not within a preset deviation range.

[0035] It should also be noted that the deviation coefficient of the power flow calculation result is determined according to the ratio of the number of the deviation power equipment to the number of the power equipment in the transmission line.

[0036] It can be understood that the method for determining the alternative computing scheme in the available computing scheme includes steps S31-S33, specifically: S31 determines the deviation of the operation data of different power equipment between the available calculation scheme and other available calculation schemes based on the power flow calculation result of the available calculation scheme, and determines the deviation between the available calculation scheme and other available calculation schemes based on the deviation of the operation data of the power equipment; S32 obtains other available calculation schemes for the deviated power equipment and uses them as the deviated calculation scheme, and determines the deviation coefficient of the power flow calculation result between the available calculation scheme and other available calculation schemes according to the number of the deviated power equipment; S33 determines the calculation result deviation coefficients of different available calculation schemes by averaging the deviation coefficients of the power flow calculation results with other available settlement schemes, and uses the calculation result deviation coefficients to determine the alternative calculation schemes among the available calculation schemes.

[0037] Furthermore, the alternative calculation scheme is an available calculation scheme whose calculation result deviation coefficient is smaller than a preset deviation coefficient.

[0038] S4 determines the unreliable power equipment among the power equipment based on the deviation of the power flow calculation results of different power equipment in different available calculation schemes, determines the optimal calculation scheme based on the matching results of the data reliable equipment and the unreliable power equipment corresponding to the alternative calculation schemes, and uses the optimal calculation scheme to output the power flow settlement results of the transmission line.

[0039] Specifically, Figure 5 As shown, the method for determining the unreliable power equipment is: Determining the deviation of the monitoring data in different available calculation schemes based on the deviation between the monitoring data of the power equipment and the power flow calculation results in different available calculation schemes; Based on the monitoring data deviations in different available calculation schemes, an available calculation scheme whose monitoring data deviation is greater than a preset data deviation threshold is determined, and the scheme is used as the monitoring data deviation calculation scheme; The unreliable power devices among the power devices are determined by utilizing the number of monitoring data deviation calculation schemes.

[0040] Furthermore, the unreliable power equipment is a power equipment for which the number of monitoring data deviation calculation schemes does not meet the requirements.

[0041] It can be understood that the method for determining the optimal calculation solution is: Determine the unreliable power equipment matched with different alternative computing schemes based on the matching results of the data reliable equipment and the unreliable power equipment corresponding to the alternative computing schemes, and use them as the matched unreliable equipment; The alternative calculation scheme with the lowest total number of monitoring data deviation calculation schemes matching unreliable equipment is taken as the optimal calculation scheme.

[0042] It should be further explained that the above step S31 includes steps S311-S312, which are specifically: S311 determines the deviation of the operation data of different power equipment between the available calculation scheme and other available calculation schemes based on the power flow calculation result of the available calculation scheme, and determines whether there is a deviation power equipment between the available calculation scheme and other available calculation schemes based on the deviation of the operation data, if yes, proceeds to the next step, if not, determines that the available calculation scheme belongs to an alternative calculation scheme; S312 determines whether the total number of deviation power equipment between the available calculation scheme and other available calculation schemes meets the requirements. If so, proceed to the next step. If not, determine that the available settlement scheme does not belong to the alternative calculation scheme.

[0043] Optionally, the above step S32 includes steps S321-S323, specifically: S321: obtaining other available calculation schemes for the power equipment with deviation, and using them as the deviation calculation schemes, and judging whether the number of the deviation calculation schemes meets the requirement, if yes, proceeding to the next step, if no, proceeding to step S33; S322 determines whether the number of deviation power equipment in the deviation calculation scheme is less than the preset number of power equipment. If so, it is determined that the available settlement scheme belongs to the alternative calculation scheme. If not, proceed to the next step. S323 determines the deviation coefficient of the flow calculation results between the available calculation scheme and other available calculation schemes according to the number of the deviation power equipment, and judges whether there is a deviation calculation scheme whose deviation coefficient does not meet the requirements. If so, enters step S33; if not, determines that the available settlement scheme belongs to an alternative calculation scheme.

[0044] Example 2 In a second aspect, the present invention provides a computer system comprising: a memory and a processor that are communicatively connected, and a computer program stored in the memory and capable of running on the processor, wherein the processor executes the above-mentioned method for checking and analyzing line flow information of a power system when running the computer program.

[0045] Optionally, the above step S11 further includes: Determine the deviation of the monitoring data in different historical power flow calculation times based on the deviation of the monitoring data of the power equipment from the calculation result in the historical power flow calculation, and judge whether there is a historical power flow calculation time with the monitoring data deviation meeting the requirement, if so, proceed to step S12, if not, determine that the power equipment is not a reliable power equipment; Optionally, the above step S12 includes steps S121-S123, specifically: S121 takes the number of historical flow calculations in which the monitoring data deviation does not meet the requirements as the number of deviation calculations, and determines the basic deviation coefficient based on the number of deviation calculations and the proportion of the number of deviation calculations in the number of historical flow calculations, and judges whether the basic deviation coefficient meets the requirements. If so, proceed to step S123, if not, proceed to the next step; S122 determines whether there is a deviation calculation number in which the monitoring data deviation is greater than a preset deviation threshold. If so, it is determined that the power equipment is not a reliable power equipment. If not, proceed to the next step. S123 determines the number of deviation calculations within a specified interval based on the monitoring data deviation amount of different deviation calculation times, and judges whether the number of deviation calculations within the specified interval meets the requirements. If so, proceed to the next step; if not, determine that the power equipment is not a reliable power equipment.

[0046] Optionally, the above step S13 includes steps S131-S132, specifically: S131 obtains the monitoring data deviation in different historical power flow calculation times, and determines the comprehensive data deviation based on the monitoring data deviation in different historical power flow calculation times, and judges whether the comprehensive data deviation meets the requirements, if so, proceeds to the next step, if not, determines that the power equipment does not belong to the reliable power equipment; S132 determines the reliability of the monitoring data of the power equipment through the basic deviation coefficient and the comprehensive data deviation.

[0047] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, equipment, and non-volatile computer storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0048] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0049] The above description is only one or more embodiments of this specification and is not intended to limit this specification. For those skilled in the art, one or more embodiments of this specification may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of one or more embodiments of this specification shall be included in the scope of the claims of this specification.

Claims

1. A digital system intensive control and analysis method, It is characterized in that Specifically include: Based on the call data of different digital systems, a frequently called digital system among the digital systems is determined and used as a frequently called system; Acquire the associated data of different frequently called systems, determine the data volume of the associated data of different frequently called systems carried by the communication links with different associated data, and determine the data aggregation coefficient of the communication links and the centralized communication links by using the data volume of the associated data of different frequently called systems; Using the communication link that carries the association data of the frequently called system as an associated communication link, and using the usage data of the centralized communication link in the associated communication link to determine the link optimization system in the frequently called system; Determine candidate communication links of associated data of different link optimization systems in the centralized communication link, and determine the optimization processing strategy of the centralized communication link of the link optimization system according to the matching situation of the candidate communication links and the associated communication links.

2. The digital system intensive control and analysis method according to claim 1, It is characterized in that The call data includes the number of callers of the digital system, the number of calls by different callers, and the call durations of different call times.

3. The digital system intensive control and analysis method according to claim 1, It is characterized in that The method for determining the frequently called system is: Based on the call data of the digital system, determine the number of people who call the digital system on different dates, and determine the frequency of calls of the digital system on different dates in combination with the number of calls by different callers; Determining the frequent calling date of the digital system based on the calling frequency of different dates, and determining the frequent calling coefficient of the digital system by using the number ratio of the frequent calling dates of the digital system; It is determined whether the digitization system is a frequently called system based on the frequent calling coefficient.

4. The digital system intensive control and analysis method according to claim 3, It is characterized in that When the frequency of calling the digital system on the date is greater than a set threshold, the date is determined to be a frequently called date.

5. The digital system intensive control and analysis method according to claim 1, It is characterized in that The associated data of the frequently called system is determined according to the data required for the normal operation of the frequently called system, and specifically includes the input data and output data of the frequently called system.

6. The digital system intensive control and analysis method according to claim 1, It is characterized in that The communication link of the associated data is determined according to the communication link of the associated data from the Internet of Things monitoring module of the electric power equipment to the background server of the frequently called system.

7. The digital system intensive control and analysis method according to claim 1, It is characterized in that The method for determining the bearer data aggregation coefficient of the communication link is: Determine the frequently called system carried by the communication link according to the association data of different frequently called systems carried by the communication link, and use it as the bearer service system; Determine the data association coefficient between different bearer service systems and the communication link according to the quantity of associated data of different bearer service systems on the communication link and the data volume of different associated data; The bearer data aggregation coefficient of the communication link is determined based on data association coefficients between different bearer service systems and the communication link and the number of bearer service systems.

8. The digital system intensive control and analysis method according to claim 7, It is characterized in that The method for determining the data association coefficient between the bearer service system and the communication link is: The association coefficients of different associated data are determined by using the data amounts of different associated data, and the data association coefficients of the bearer service system and the communication link are determined by using the association coefficients of different associated data and the amounts of associated data.

9. A computer system, include: A memory and a processor that are communicatively connected, and a computer program stored in the memory and capable of running on the processor, characterized in that when the processor runs the computer program, a digital system intensive management and control analysis method as described in any one of claims 1-8 is executed.