Fault recovery method and device of power distribution network and electronic equipment

By dividing island areas and optimizing the fault recovery strategy using binary particle swarm algorithm, the problem of long-term failure recovery in the distribution network is solved, and the rapid recovery of important loads is achieved and the power supply and power supply reliability is improved.

CN119051054APending Publication Date: 2024-11-29STATE GRID BEIJING ELECTRIC POWER CO +2

Patent Information

Application Number
CN202411213661.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing distribution network fault recovery method takes a long time and cannot guarantee the rapid recovery of important loads.

Method used

By dividing the fault distribution network into multiple island areas, the load nodes in each island area are powered by the power generation node, the power consumption requirements of each load node are calculated to determine the objective function of the fault recovery strategy, and optimized using binary particle swarm algorithm Failure recovery policy, turn on the target contact switch for failure recovery.

Benefits of technology

While meeting the constraints on island operation, it quickly restores important loads, improving the power supply reliability and fault recovery efficiency of distribution networks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119051054A_ABST
    Figure CN119051054A_ABST
Patent Text Reader

Abstract

The invention discloses a fault recovery method and device of a power distribution network and electronic equipment. The power distribution network fault recovery method comprises the following steps: determining a load node, a power generation node and a fault area in a fault power distribution network; the fault power distribution network is divided into a plurality of island areas based on the fault areas and the power generation nodes, and the load nodes in each island area supply power through the power generation nodes in the island area; calculating the power consumption demand of each load node during the fault period of the power distribution network, and determining a target function of a fault recovery strategy through the power consumption demand of each load node; and by taking the target function as a fitness function of a binary particle swarm algorithm, optimizing the fault recovery strategy through the binary particle swarm algorithm to obtain a target fault recovery strategy, and executing the target fault recovery strategy on the fault power distribution network. According to the invention, the problem of long time consumption of power restoration of the power distribution network in related technologies is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of power distribution network fault recovery, and more specifically, to a method, apparatus and electronic equipment for power distribution network fault recovery. Background Technology

[0002] Fault recovery is an important means of achieving rapid power restoration in the distribution network. After a power outage occurs in a certain area due to a fault, timely isolation of the faulty area and timely restoration of power supply to the remaining normal areas are key measures to improve power supply reliability.

[0003] In related technologies, the fault recovery method for distribution networks involves isolating the faulty area and then restoring power to the remaining area using the main distribution network. Power restoration is achieved by closing tie switches and sectionalizing switches, which is time-consuming and cannot guarantee the rapid restoration of power to critical loads.

[0004] There is currently no effective solution to the problem of long power restoration time in power distribution networks in related technologies. Summary of the Invention

[0005] The main objective of this application is to provide a method, apparatus, and electronic equipment for fault recovery of power distribution networks, so as to solve the problem of long power supply recovery time in related technologies.

[0006] To achieve the above objectives, according to one aspect of this application, a fault recovery method for a distribution network is provided. The method includes: identifying load nodes, generator nodes, and fault regions in the faulty distribution network; dividing the faulty distribution network into multiple islanded regions based on the faulted regions and generator nodes, wherein load nodes within each islanded region are supplied with power through generator nodes within the islanded region; calculating the electricity demand of each load node during the distribution network fault, determining an objective function for a fault recovery strategy based on the electricity demand of each load node, wherein the fault recovery strategy is to activate a target tie switch in the faulty distribution network, the objective function is used to evaluate the recovery effect of the fault recovery strategy, and the faulty distribution network contains multiple tie switches; using the objective function as the fitness function of a binary particle swarm optimization algorithm, optimizing the fault recovery strategy using the binary particle swarm optimization algorithm to obtain a target fault recovery strategy, and executing the target fault recovery strategy on the faulty distribution network.

[0007] Optionally, calculating the electricity demand of each load node during a distribution network fault includes: for each load node, obtaining the probability density function of the load node; determining the fault start time and estimated recovery time of the distribution network; and integrating the probability density function based on the fault start time and estimated recovery time to obtain the electricity demand of the load node during the power grid fault.

[0008] Optionally, dividing the faulty distribution network into multiple island regions based on the fault area and generating nodes includes: for each generating node, traversing from the generating node as the root node to both sides of the root node until other generating nodes, or the end node of the faulty distribution network, or the fault area is reached, and then stopping the traversal, where other generating nodes are generating nodes in the faulty distribution network other than the root node; determining the region consisting of all load nodes traversed by the generating node and the generating nodes as the initial region; selecting a set of target load nodes that meet preset constraints from the initial region, and determining the set of target load nodes and the region where the generating nodes are located as an island region, where the preset constraints include at least one of the following: power constraints, node voltage constraints, branch capacity constraints, and radial network structure constraints; determining the island region to which each generating node belongs, resulting in multiple island regions.

[0009] Optionally, the objective function for determining the fault recovery strategy based on the power demand of each load node includes: determining the importance coefficient of each load node; calculating the load recovery amount based on the power demand and importance coefficient of each load node; calculating the number of tie switch operations based on the switch status in the fault recovery strategy, wherein the switch status includes the status of the tie switch during the fault and after the fault recovery; determining a first weight for the load recovery amount and a second weight for the number of tie switch operations; performing a weighted summation of the load recovery amount and the number of tie switch operations based on the first and second weights to obtain a comprehensive fault recovery term; obtaining the over-line penalty factor of the faulted distribution network; calculating the sum of the comprehensive fault recovery term and the over-line penalty factor to obtain the objective function, wherein the over-line penalty factor includes at least one of the following: low-voltage over-line penalty factor, high-voltage over-line penalty factor, and loop penalty factor.

[0010] Optionally, calculating the load restoration amount based on the electricity demand and importance coefficient of each load node includes: calculating the sum of the electricity demands of all load nodes to obtain the total electricity demand; calculating the product of the importance coefficient of each load node and the electricity demand to obtain the importance assessment value of the restored load node; calculating the sum of the importance assessment values ​​of all load nodes, and calculating the ratio of the sum to the total electricity demand to obtain the load restoration amount.

[0011] Optionally, calculating the number of tie switch operations through the switch states in the fault recovery strategy includes: determining the first switch state vector of all tie switches in the faulted distribution network during the fault, and determining the second switch state vector of all tie switches in the faulted distribution network after the fault is recovered; calculating the difference between the second switch state vector and the first switch state vector, and inputting the difference into the vector norm operator to obtain the number of tie switch operations.

[0012] Optionally, using the objective function as the fitness function of the binary particle swarm optimization (BSO) algorithm, the fault recovery strategy is optimized using the BSO algorithm to obtain the target fault recovery strategy. This includes: initializing the particle swarm parameters by treating each tie switch in the faulty distribution network as a particle; determining the target tie switch in the fault recovery strategy as the target particle, calculating the value of the fitness function of the fault recovery strategy, and obtaining the initial fitness evaluation value; performing multiple iterations of optimization on the fault recovery strategy using the BSO algorithm to obtain multiple optimized fault recovery strategies, wherein each iteration updates the position of the target particle in the particle swarm; calculating the fitness evaluation value of each optimized fault recovery strategy to obtain multiple fitness evaluation values, and determining the optimized fault recovery strategy corresponding to the minimum fitness evaluation value as the target fault recovery strategy.

[0013] To achieve the above objectives, according to another aspect of this application, a fault recovery device for a distribution network is provided. The device includes: a determining unit for determining load nodes, generating nodes, and fault areas in a faulty distribution network; a partitioning unit for dividing the faulty distribution network into multiple islanded areas based on the faulted areas and generating nodes, wherein load nodes in each islanded area are supplied with power through generating nodes within the islanded area; a calculation unit for calculating the electricity demand of each load node during a distribution network fault, determining an objective function for a fault recovery strategy based on the electricity demand of each load node, wherein the fault recovery strategy is to open a target tie switch in the faulty distribution network, the objective function is used to evaluate the recovery effect of the fault recovery strategy, and the faulty distribution network contains multiple tie switches; and an optimization unit for optimizing the fault recovery strategy using a binary particle swarm optimization algorithm with the objective function as the fitness function, obtaining a target fault recovery strategy, and executing the target fault recovery strategy on the faulty distribution network.

[0014] To achieve the above objectives, according to another aspect of this application, a computer program product is provided, including a computer program that, when executed by a processor, implements the steps of the power distribution network fault recovery method described in various embodiments of this application.

[0015] This application employs the following steps: identifying load nodes, generator nodes, and fault areas in a faulty distribution network; dividing the faulty distribution network into multiple islanded areas based on the faulted areas and generator nodes, wherein load nodes within each islanded area are powered through generator nodes within the islanded area; calculating the electricity demand of each load node during a distribution network fault, and determining the objective function of the fault recovery strategy based on the electricity demand of each load node, wherein the fault recovery strategy is to open a target tie switch in the faulty distribution network, and the objective function is used to evaluate the recovery effect of the fault recovery strategy, and the faulty distribution network contains multiple tie switches; using the objective function as the fitness function of a binary particle swarm optimization algorithm, optimizing the fault recovery strategy using the binary particle swarm optimization algorithm to obtain the target fault recovery strategy, and executing the target fault recovery strategy on the faulty distribution network, thus solving the problem of long power restoration time in related technologies. This application divides the faulty distribution network into islanded areas to ensure rapid power restoration for critical loads. While meeting islanded operation constraints, it restores as many critical loads as possible, ensuring the reliability of power supply to critical loads. The application utilizes a binary particle swarm optimization (PSO) algorithm, which strikes a balance between global and local optimization capabilities. This results in a strong global optimization capability in the early stages and a strong local optimization capability in the later stages, enabling the algorithm to quickly find the optimal fault restoration solution. This improves the convergence performance and search efficiency of the PSO algorithm, achieving better search results. Ultimately, this application effectively ensures rapid power restoration for critical loads, improves the reliability of the distribution network, and thus enhances the fault restoration efficiency of the distribution network. Attached Figure Description

[0016] The accompanying drawings, which form part of this application, are used to provide a further understanding of this application. The illustrative embodiments and descriptions of this application are used to explain this application and do not constitute an undue limitation of this application. In the drawings:

[0017] Figure 1 This is a flowchart of a power distribution network fault recovery method provided according to an embodiment of this application;

[0018] Figure 2 This is a flowchart of a method for determining a fault recovery strategy according to an embodiment of this application;

[0019] Figure 3 This is a structural diagram of an IEEE 69-node power distribution system including a distributed photovoltaic power generation system, provided according to an embodiment of this application.

[0020] Figure 4 This is a schematic diagram illustrating the execution of a fault recovery strategy according to an embodiment of this application;

[0021] Figure 5 This is a schematic diagram of the voltage at each node during a distribution network fault, provided according to an embodiment of this application.

[0022] Figure 6 This is a schematic diagram of a power distribution network fault recovery device provided according to an embodiment of this application;

[0023] Figure 7 This is a schematic diagram of an electronic device provided according to an embodiment of this application. Detailed Implementation

[0024] It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. This application will now be described in detail with reference to the accompanying drawings and embodiments.

[0025] To enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present application, and not all embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative effort should fall within the scope of protection of the present application.

[0026] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate for the embodiments of this application described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.

[0027] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for display, data used for analysis, etc.) involved in this disclosure are all information and data authorized by the user or fully authorized by all parties.

[0028] It should be noted that the information collected is information and data authorized by the user or fully authorized by all parties, and the collection, storage, use, processing, transmission, provision, disclosure and application of the relevant data all comply with the relevant laws, regulations and standards of the relevant regions, necessary confidentiality measures have been taken, and they do not violate public order and good morals. Corresponding operation portals are provided for users to choose to authorize or refuse.

[0029] The present invention will now be described in conjunction with preferred implementation steps. Figure 1This is a flowchart of a power distribution network fault recovery method provided according to an embodiment of this application, such as... Figure 1 As shown, the method includes the following steps:

[0030] Step S101: Determine the load nodes, generation nodes, and fault areas in the faulty distribution network.

[0031] Specifically, the faulty distribution network can be a distribution network of grid-type distributed photovoltaic and energy storage systems with voltage support capability. The load nodes can be the electrical loads in the faulty distribution network, the discharge nodes can be the grid-type distributed photovoltaic and energy storage systems, and the fault area can be the line between any two load nodes. In order to restore power supply to the faulty area in the faulty distribution network in a timely manner, it is necessary to determine the load nodes, generation nodes, and fault areas of the faulty distribution network.

[0032] It should be noted that grid-type distributed photovoltaic (PV) and energy storage systems supply power to the distribution network through photovoltaic power generation. The PV power output of such systems is influenced by numerous factors, with solar irradiance being the most significant meteorological factor. The relationship between solar irradiance and the power output of grid-type distributed PV and energy storage systems is as follows:

[0033] P pv =η pv AS;

[0034] Among them, P pv η is the predicted output power of the grid-type distributed photovoltaic and energy storage system at time t; pv Let S be the conversion efficiency of the photovoltaic power generation system in a grid-connected distributed photovoltaic and energy storage system; S be the area of ​​the photovoltaic module in the photovoltaic power generation system; and A be the solar irradiance of the photovoltaic module at time t. The charging and discharging model of the energy storage device in the grid-connected distributed photovoltaic and energy storage system is as follows:

[0035]

[0036] Among them, |P SOC,t | represents the charging or discharging power of the energy storage device at time t, when |P SOC,t When |<0, the energy storage device is in a charging state; when |P SOC,t |>0 indicates that the energy storage device is in a discharging state; P xmax For the maximum charging power of the energy storage device, P x1max E represents the maximum discharge power of the energy storage device. t E represents the remaining electrical charge of the energy storage device at time t. max E min These represent the maximum and minimum remaining energy capacity of the energy storage device, respectively; h represents the duration of charging or discharging the energy storage device.

[0037] Step S102: Based on the fault area and the generating node, the faulty distribution network is divided into multiple island areas, wherein the load nodes in each island area are powered through the generating nodes in the island area.

[0038] Specifically, an islanded region refers to an area in a distribution network where each generating node independently supplies power to surrounding connected load nodes after a fault occurs. Each generating node in the distribution network is used as the center to define an islanded region, which must meet certain constraints, such as power constraints and node constraints. In a faulty distribution network, multiple grid-connected distributed photovoltaic (PV) and energy storage systems may be connected together; in this case, these multiple connected grid-connected PV and energy storage systems are considered as a single generating node. When dividing the distribution network into islanded regions, depth-first search and breadth-first search algorithms can be used to traverse the faulty distribution network, thereby creating multiple islanded regions centered on each generating node.

[0039] Step S103: Calculate the power demand of each load node during the distribution network fault, and determine the objective function of the fault recovery strategy based on the power demand of each load node. The fault recovery strategy is to open the target tie switch in the faulty distribution network. The objective function is used to evaluate the recovery effect of the fault recovery strategy. The faulty distribution network contains multiple tie switches.

[0040] Specifically, the power demand of load nodes varies at different times, therefore it is necessary to determine the time-varying characteristics of load nodes, i.e., their power demand at different times. By calculating the power demand of each load node in the faulty distribution network, the load power restoration amount of the faulty distribution network can be determined. The fault recovery strategy refers to restoring power supply by operating pre-set tie switches in the faulty distribution network, thereby connecting the power-loss area with the generating nodes when a fault occurs in a certain area. Since there are multiple pre-set tie switches in the faulty distribution network, the fault recovery strategy needs to determine which target tie switches in the faulty distribution network should be activated to maximize the load restoration amount and minimize the number of switch operations to restore power. To find a more reasonable fault recovery strategy, an objective function is set to evaluate its recovery effect. The objective function can be set based on maximizing the load restoration amount and minimizing the number of switch operations.

[0041] Step S104: Using the objective function as the fitness function of the binary particle swarm optimization algorithm, the fault recovery strategy is optimized by the binary particle swarm optimization algorithm to obtain the target fault recovery strategy, and the target fault recovery strategy is executed on the faulty distribution network.

[0042] Specifically, to find a target fault recovery strategy that maximizes load restoration and minimizes the number of switching operations, an improved binary particle swarm optimization (BSO) algorithm can be used to solve the fault recovery strategy. For example, the objective function is used as the fitness function of the BSO algorithm, and each tie switch in the faulty distribution network is treated as a particle. The BSO algorithm adjusts the particle positions and performs iterative optimization calculations to calculate the fitness evaluation values ​​of different fault recovery strategies. The fault recovery strategy corresponding to the minimum fitness evaluation value is then selected as the target fault recovery strategy. The target fault recovery strategy is then implemented on the faulty distribution network, thereby maximizing load restoration and minimizing the number of switching operations during the faulty distribution network restoration process.

[0043] The fault recovery method for distribution networks provided in this application identifies load nodes, generator nodes, and fault areas in the faulty distribution network. Based on the fault areas and generator nodes, the faulty distribution network is divided into multiple isolated areas, where load nodes within each isolated area are powered by generator nodes within that area. The power demand of each load node during the distribution network fault is calculated, and the objective function of the fault recovery strategy is determined based on the power demand of each load node. The fault recovery strategy involves activating a target tie switch in the faulty distribution network. The objective function is used to evaluate the recovery effect of the fault recovery strategy, and the faulty distribution network contains multiple tie switches. Using the objective function as the fitness function of a binary particle swarm optimization algorithm, the fault recovery strategy is optimized to obtain the target fault recovery strategy. This target fault recovery strategy is then executed on the faulty distribution network, solving the problem of long power restoration time in related technologies. This application divides the faulty distribution network into islanded areas to ensure rapid power restoration for critical loads. While meeting islanded operation constraints, it restores as many critical loads as possible, ensuring the reliability of power supply to critical loads. The application utilizes a binary particle swarm optimization (PSO) algorithm, which strikes a balance between global and local optimization capabilities. This results in a strong global optimization capability in the early stages and a strong local optimization capability in the later stages, enabling the algorithm to quickly find the optimal fault restoration solution. This improves the convergence performance and search efficiency of the PSO algorithm, achieving better search results. Ultimately, this application effectively ensures rapid power restoration for critical loads, improves the reliability of the distribution network, and thus enhances the fault restoration efficiency of the distribution network.

[0044] To formulate a suitable fault recovery strategy, it is necessary to determine the power demand of each load node. Optionally, in the power distribution network fault recovery method provided in this application embodiment, calculating the power demand of each load node during the power distribution network fault includes: for each load node, obtaining the probability density function of the load node; determining the fault start time and the estimated recovery time of the power distribution network; and integrating the probability density function based on the fault start time and the estimated recovery time to obtain the power demand of the load node during the power grid fault.

[0045] Specifically, the time-varying characteristics of load nodes can be characterized by a normal distribution function, from which the probability density function of the load can be obtained as follows:

[0046]

[0047] Where μ is the expected value of the electricity consumption at the load node; σ is the standard deviation of the electricity consumption at the load node. The fault onset time is set as t, and the estimated recovery time is set as t+1. Integrating the probability density curve of the load node yields the electricity demand during the fault period as a function of time.

[0048]

[0049] Among them, L i,t Let f(x) be the load power demand of node i at time t; f(x) is the probability density function of the load node.

[0050] This application embodiment determines the power demand of load nodes during power grid faults, and then determines the objective function of the fault recovery strategy based on the power demand.

[0051] To facilitate the restoration of power supply to a faulty distribution network, it is necessary to divide the faulty distribution network into multiple isolated regions. Optionally, in the fault restoration method for the distribution network provided in this application embodiment, dividing the faulty distribution network into multiple isolated regions based on the faulty region and generating nodes includes: for each generating node, traversing from the generating node as the root node to both sides of the root node until other generating nodes, or the end node of the faulty distribution network, or the faulty region is reached, and then stopping the traversal, wherein other generating nodes are generating nodes in the faulty distribution network other than the root node; determining the region composed of all load nodes traversed by the generating node and the generating nodes as the initial region; selecting a set of target load nodes that meet preset constraints from the initial region, and determining the set of target load nodes and the region where the generating nodes are located as an isolated region, wherein the preset constraints include at least one of the following: power constraints, node voltage constraints, branch capacity constraints, and radial network structure constraints; determining the isolated region to which each generating node belongs, resulting in multiple isolated regions.

[0052] Specifically, this application embodiment utilizes depth-first search and breadth-first search algorithms to dynamically divide the faulty distribution network into islands, initially forming an island system that meets operational requirements, thereby enabling power restoration to the power-loss areas after fault isolation. For example, load nodes are numbered starting from the load node at the end of the fault area; the power supply direction from the load node closest to the end of the fault area points to one side of the end node, while the remaining load nodes are searched simultaneously to both sides; each load node is used as the root node, and the main power supply area of ​​each load node, i.e., the island area to which the load node belongs, is searched according to the above search direction; constraints such as power balance within the island area are determined, and the target matching node set contained in each island area is selected according to preset constraints, thus obtaining multiple island areas. For adjacent island systems with overlapping power supply areas, the power supply margin of the two power supply areas is checked, and the load in the overlapping area is allocated to the two power supply areas according to the margin ratio.

[0053] The power constraints are as follows:

[0054]

[0055] Among them, L i,t Let P be the power demand of the load at node i at time t; M is the total number of load nodes in the islanded system; loss P represents the total network loss power within the isolated system. pv,j This refers to a grid-connected photovoltaic inverter, i.e., the output power of a power generation node; N is the total number of power generation nodes; P SOC,k O represents the power output of the energy storage power station, i.e., the power released by the power generation node; O represents the total number of energy storage power stations.

[0056] The node voltage constraints are as follows:

[0057] U i,min ≤U i ≤U i,max ;

[0058] Among them, U i U is the voltage at load node i; i,min This represents the minimum node voltage, typically taken as 0.9 pu; U i,max This represents the maximum node voltage, typically set to 1.1 pu.

[0059] Branch capacity constraints are as follows:

[0060] |P l |≤P lmax ;

[0061] Among them, P l P represents the power capacity flowing through branch l within the isolated area; lmax This represents the maximum power capacity allowed to flow through branch l.

[0062] The constraints of the radial network structure are as follows:

[0063] g i ∈G;

[0064] Among them, g i G represents the system network within the isolated area; G is the radial network structure that the power distribution system is allowed to have.

[0065] This application embodiment divides the area into islanded regions and utilizes the voltage support of grid-type distributed photovoltaic and energy storage power stations to form islanded operation, ensuring the rapid restoration of power supply to critical loads. While meeting the constraints of islanded operation, it restores as many critical loads as possible, ensuring the reliability of power supply to critical loads.

[0066] Optionally, in the fault recovery method for the distribution network provided in this application embodiment, the objective function for determining the fault recovery strategy based on the power demand of each load node includes: determining the importance coefficient of each load node; calculating the load recovery amount based on the power demand and importance coefficient of each load node; calculating the number of tie switch operations based on the switch status in the fault recovery strategy, wherein the switch status includes the status of the tie switch during the fault and after the fault recovery; determining a first weight for the load recovery amount and a second weight for the number of tie switch operations; performing a weighted summation of the load recovery amount and the number of tie switch operations based on the first weight and the second weight to obtain a comprehensive fault recovery term; obtaining the line crossing penalty factor of the faulty distribution network; calculating the sum of the comprehensive fault recovery term and the line crossing penalty factor to obtain the objective function, wherein the line crossing penalty factor includes at least one of the following: low-voltage line crossing penalty factor, high-voltage line crossing penalty factor, and loop penalty factor.

[0067] Specifically, power systems generally classify load nodes into three categories, with primary load nodes having the most stringent power supply requirements and being the first to have their power supply guaranteed during power restoration. Furthermore, the differences in power demand among different load nodes at a given time should be considered. The daily power demand of primary load nodes is assumed to be constant at 5, while other types of load nodes are assigned different demand coefficients X based on their proportion at a given time. t (X t ∈[0, 5]). Therefore, the importance coefficient of the load node at time t can be obtained as follows:

[0068] G t =X t ε t ;

[0069] Among them, G t X is the importance coefficient of the load node at time t; t ε is the load demand factor at time t; tThe weights of the load nodes are assigned as 10, 1, and 0.1 for Level 1, Level 2, and Level 3 loads, respectively. Islanding should prioritize the restoration of critical loads; the selection formula for critical load nodes is as follows:

[0070]

[0071] Where maxf represents the critical load nodes within the islanded region, and M represents all load nodes within the islanded region; G i L is the importance coefficient of load node i; i,t Let y be the electricity demand of load i at time t; i The protocol demand factor is 1 when power needs to be supplied to load i, and 0 otherwise.

[0072] Furthermore, the formula for calculating the objective function is as follows:

[0073]

[0074] Among them, F Obj W is the objective function of the fault recovery strategy. Load The weight value of the objective function that maximizes the load recovery amount, i.e., the first weight; W Oprt The weights of the objective function for minimizing the number of switching operations are the second weights; norm() is the vector norm operator used to measure the number of switching operations before and after fault recovery; X0, X R T represents the set vector of switch states before and after the distribution network fault recovery; Umin T Umax These are the penalty factors for low-voltage and high-voltage overtravel, respectively; T Loop This is the loop penalty factor.

[0075] It should be noted that the objective function is established to maximize the load restoration amount and minimize the number of switching operations. A voltage over-limit penalty factor is also introduced into the objective function to limit voltage over-limit situations. The total scores for the voltage over-limit penalty factor and the loop penalty factor are as follows:

[0076] S = T Umin +T Umax +T Loop ;

[0077] Here, S represents the total penalty factor score. By assigning a larger value to the total S score for voltage or loop overruns, the score of the fault recovery strategy is reduced to prevent recovery schemes that do not meet the constraints from being executed.

[0078] This application embodiment determines the objective function to select a fault recovery strategy that maximizes the load recovery amount and minimizes the number of switching operations.

[0079] Optionally, in the power distribution network fault recovery method provided in this application embodiment, calculating the load recovery amount through the power demand and importance coefficient of each load node includes: calculating the sum of the power demand of all load nodes to obtain the total power demand; calculating the product of the importance coefficient of each load node and the power demand to obtain the importance assessment value of the restored load node; calculating the sum of the importance assessment values ​​of all load nodes, and calculating the ratio of the sum to the total power demand to obtain the load recovery amount.

[0080] Specifically, the formula for calculating the load restoration amount is as follows:

[0081]

[0082] Among them, L i,t Let L be the power demand of load node i at time t. ∑ For total electricity demand, G i G is the importance coefficient of load node i. i L i,t To restore the importance assessment value of load node i, That is, the load recovery amount.

[0083] This application characterizes the degree of power recovery of the faulted distribution network by calculating the load recovery amount in the objective function.

[0084] Optionally, in the fault recovery method for distribution networks provided in this application embodiment, calculating the number of tie switch operations through the switch states in the fault recovery strategy includes: determining the first switch state vector of all tie switches in the faulty distribution network during the fault, and determining the second switch state vector of all tie switches in the faulty distribution network after fault recovery; calculating the difference between the second switch state vector and the first switch state vector, and inputting the difference into the vector norm operator to obtain the number of tie switch operations.

[0085] Specifically, the formula for calculating the number of times the tie switch is operated is as follows:

[0086] norm(X R -X0);

[0087] Among them, X R That is, the second switch state vector, X0 is the first switch state vector, and norm() is the vector norm operator.

[0088] The embodiments of this application characterize the number of times the tie switch is operated by the fault recovery strategy in the objective function by calculating the number of tie switch operations.

[0089] After determining the objective function, the fault recovery strategy is optimized based on the objective function and the binary particle swarm optimization (BSO) algorithm. Optionally, in the fault recovery method for distribution networks provided in this application embodiment, the objective function is used as the fitness function of the BSO algorithm. Optimizing the fault recovery strategy using the BSO algorithm to obtain the target fault recovery strategy includes: initializing the particle swarm parameters with each tie switch in the faulty distribution network as a particle; determining the target tie switch in the fault recovery strategy as the target particle, calculating the value of the fitness function of the fault recovery strategy, and obtaining an initial fitness evaluation value; performing multiple iterative optimizations of the fault recovery strategy using the BSO algorithm to obtain multiple optimized fault recovery strategies, wherein each iteration updates the position of the target particle in the particle swarm; calculating the fitness evaluation value of each optimized fault recovery strategy to obtain multiple fitness evaluation values, and determining the optimized fault recovery strategy corresponding to the minimum fitness evaluation value as the target fault recovery strategy.

[0090] Specifically, the particle swarm parameters are initialized, including the inertia coefficient and particle swarm size; the objective function values ​​of each recovery strategy obtained in the initial particle swarm (i.e., fault recovery strategy) are calculated, which are also the initial fitness evaluation values. The objective function values ​​of each example in the particle swarm are compared and the optimal values ​​of the individual particles and the overall particle swarm are updated; the particle positions are updated according to the evolutionary equation of the improved binary particle swarm algorithm, and the iteration count is updated according to the improved binary particle swarm algorithm; it is determined whether the convergence condition of the iteration is met. If the convergence condition is not met, the iteration continues; if the convergence condition is met, the binary particle swarm algorithm ends, and the optimal value of the individual particle is output as the optimal solution of the scheme, i.e., the target fault recovery strategy. The convergence condition can be the minimum fitness evaluation value in the preset number of iterations, or the fitness evaluation value being less than a preset fitness evaluation value threshold.

[0091] This application's embodiments improve the binary particle swarm optimization algorithm, enabling it to find a balance between global and local optimization capabilities. This allows the algorithm to possess strong global optimization capabilities in the early stages and strong local optimization capabilities in the later stages, thus quickly finding the optimal solution for fault recovery strategies. This improves the convergence performance and search efficiency of the particle swarm optimization algorithm, achieving better search results. The comprehensive recovery strategy, which combines islanded operation with traditional fault recovery methods, not only effectively ensures the rapid restoration of power supply to critical loads but also fully leverages the positive role of distributed photovoltaic power grid integration, greatly improving the reliability of power supply in the distribution network.

[0092] According to another embodiment of this application, a method for determining a fault recovery strategy is also provided. Figure 2 This is a flowchart of a method for determining a fault recovery strategy according to an embodiment of this application. For example... Figure 2 As shown, the method includes:

[0093] Step S201: Establish a refined model for a grid-type distributed photovoltaic and energy storage system with voltage support capability, and model the load while considering the time-varying nature and importance of the load.

[0094] Step S202: Dynamic islanding is performed using depth-first search and breadth-first search algorithms to initially form an islanded system that can restore power to the power-loss area after fault isolation.

[0095] Step S203: Establish an objective function that maximizes the load recovery amount and minimizes the number of switching actions. At the same time, introduce a voltage over-limit penalty factor into the objective function to limit voltage over-limit situations. Use an improved binary particle swarm optimization algorithm to solve the integrated recovery strategy of the main network and islanding.

[0096] This application's embodiments utilize the voltage support of grid-connected distributed photovoltaic and energy storage power stations to form islanded operation through a fault recovery strategy determination method. This ensures rapid power restoration for critical loads, restoring as many critical loads as possible while meeting islanded operation constraints, thus guaranteeing the reliability of power supply to critical loads. An improved binary particle swarm optimization algorithm finds a balance between global and local optimization capabilities, giving the algorithm strong global optimization in the early stages and strong local optimization in the later stages, thereby quickly finding the optimal solution. This improves the convergence performance and search efficiency of the particle swarm optimization algorithm, achieving better search results. The comprehensive recovery strategy combining islanded operation with traditional fault recovery methods not only effectively ensures rapid power restoration for critical loads but also fully leverages the positive role of distributed photovoltaic grid integration, greatly improving the reliability of power supply to the distribution network.

[0097] It should be noted that the method for determining the fault recovery strategy proposed in the embodiments of this application is verified using the IEEE 69 (a power system standard) node distribution system structure diagram; Figure 3 This is a structural diagram of an IEEE 69-node power distribution system including a distributed photovoltaic power generation system, provided according to an embodiment of this application. Figure 3 As shown, each small circle represents a fault area, and only one fault area exists for each distribution network fault. The dashed lines connect tie switches, and those marked with photovoltaic power generation symbols represent distributed photovoltaic power generation systems in the distribution network.

[0098] Figure 4 This is a schematic diagram illustrating the execution of a fault recovery strategy according to an embodiment of this application, such as... Figure 4 As shown, the fault area is the line segment marked with a lightning symbol between load node 4 and load node 5. The target interconnection switches to be opened are the interconnection switch between load node 66 and load node 11, and the interconnection switch between load node 39 and load node 48.

[0099] Figure 5 This is a schematic diagram of the voltage at each node during a distribution network fault, provided according to an embodiment of this application. Figure 5 As shown, the upper line represents the node voltage of the load node after the fault recovery strategy is implemented, and the lower line represents the node voltage of the load node during the fault. As can be seen from the test results, the comprehensive fault recovery strategy combining islanded operation and traditional fault recovery provided in this application embodiment can not only effectively ensure the effective and reliable power supply of the load after the fault, but also effectively ensure that the voltage does not cross the line at the beginning and end of the fault recovery, thus ensuring the safe operation of the system.

[0100] The above description is only a preferred embodiment of the present invention. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the technical principles of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.

[0101] It should be noted that the steps shown in the flowchart in the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions, and although a logical order is shown in the flowchart, in some cases the steps shown or described may be executed in a different order than that shown here.

[0102] This application also provides a fault recovery device for a distribution network. It should be noted that the fault recovery device for a distribution network in this application can be used to execute the fault recovery method for a distribution network provided in this application. The fault recovery device for a distribution network provided in this application is described below.

[0103] Figure 6 This is a schematic diagram of a power distribution network fault recovery device provided according to an embodiment of this application. For example... Figure 6 As shown, the device includes:

[0104] The determination unit 601 is used to determine the load nodes, generation nodes and fault areas in the faulty distribution network;

[0105] The partitioning unit 602 is used to divide the faulty distribution network into multiple islanded areas based on the faulted area and the generating node, wherein the load node in each islanded area is powered through the generating node in the islanded area.

[0106] The calculation unit 603 is used to calculate the power demand of each load node during the distribution network fault, and to determine the objective function of the fault recovery strategy based on the power demand of each load node. The fault recovery strategy is to open the target tie switch in the faulty distribution network. The objective function is used to evaluate the recovery effect of the fault recovery strategy. The faulty distribution network contains multiple tie switches.

[0107] The optimization unit 604 is used to optimize the fault recovery strategy by using the objective function as the fitness function of the binary particle swarm algorithm, obtain the target fault recovery strategy, and execute the target fault recovery strategy on the faulty distribution network.

[0108] The fault recovery device for a distribution network provided in this application embodiment determines the load nodes, generator nodes, and fault areas in the faulty distribution network through a determination unit 601; a partitioning unit 602 divides the faulty distribution network into multiple islanded areas based on the faulted areas and generator nodes, wherein the load nodes in each islanded area are powered by generator nodes within the islanded area; a calculation unit 603 calculates the power demand of each load node during the distribution network fault, and determines the objective function of the fault recovery strategy based on the power demand of each load node, wherein the fault recovery strategy is to open a target tie switch in the faulty distribution network, and the objective function is used to evaluate the recovery effect of the fault recovery strategy, and the faulty distribution network contains multiple tie switches; an optimization unit 604 uses the objective function as the fitness function of a binary particle swarm optimization algorithm to optimize the fault recovery strategy, resulting in... This application proposes a target fault recovery strategy and applies it to the faulty distribution network, addressing the issue of long power restoration times in related technologies. By dividing the faulty distribution network into islanded areas, it ensures rapid power restoration for critical loads. While meeting islanded operation constraints, it restores as many critical loads as possible, guaranteeing power reliability for these loads. The application utilizes a binary particle swarm optimization (PSO) algorithm, striking a balance between global and local optimization capabilities. This results in a strong global optimization capability in the early stages and a strong local optimization capability in the later stages, enabling the algorithm to quickly find the optimal fault recovery solution. This improves the convergence performance and search efficiency of the PSO algorithm, achieving better search results. Ultimately, this approach ensures rapid power restoration for critical loads, improves the reliability of the distribution network, and thus enhances the efficiency of fault recovery in the distribution network.

[0109] Optionally, in the fault recovery device for the distribution network provided in the embodiments of this application, the calculation unit 603 includes: a first acquisition module, used to acquire the probability density function of each load node; and a first determination module, used to determine the fault start time and the estimated recovery time of the distribution network, and to integrate the probability density function based on the fault start time and the estimated recovery time to obtain the power demand of the load node during the power grid fault.

[0110] Optionally, in the fault recovery device for the distribution network provided in this application embodiment, the partitioning unit 602 includes: a traversal module, used to traverse from the root node to both sides of each generating node until other generating nodes, or the end node of the faulty distribution network, or the faulty area are traversed, and then stop traversing, wherein other generating nodes are generating nodes in the faulty distribution network other than the root node; a second determination module, used to determine the area composed of all load nodes traversed by the generating node and the generating nodes as an initial area; a third determination module, used to select a set of target load nodes that meet preset constraints from the initial area, and determine the set of target load nodes and the area where the generating nodes are located as an island area, wherein the preset constraints include at least one of the following: power constraints, node voltage constraints, branch capacity constraints, and radial network structure constraints; and a fourth determination module, used to determine the island area to which each generating node belongs, thereby obtaining multiple island areas.

[0111] Optionally, in the fault recovery device for the distribution network provided in this application embodiment, the calculation unit 603 includes: a fifth determining module, used to determine the importance coefficient of each load node, and calculate the load recovery amount through the power demand and importance coefficient of each load node; a calculation module, used to calculate the number of tie switch operations through the switch status in the fault recovery strategy, wherein the switch status includes the status of the tie switch during the fault and after the fault recovery; a sixth determining module, used to determine the first weight of the load recovery amount and the second weight of the number of tie switch operations; a summing module, used to perform a weighted summation of the load recovery amount and the number of tie switch operations based on the first weight and the second weight to obtain a comprehensive fault recovery term; and a second obtaining module, used to obtain the over-line penalty factor of the faulty distribution network, calculate the sum of the comprehensive fault recovery term and the over-line penalty factor to obtain the objective function, wherein the over-line penalty factor includes at least one of the following: low-voltage over-line penalty factor, high-voltage over-line penalty factor, and loop penalty factor.

[0112] Optionally, in the power distribution network fault recovery device provided in the embodiments of this application, the fifth determining module includes: a first calculation submodule, used to calculate the sum of the power demand of all load nodes to obtain the total power demand; a second calculation submodule, used to calculate the product of the importance coefficient of each load node and the power demand to obtain the importance assessment value of the restored load node; and a third calculation submodule, used to calculate the sum of the importance assessment values ​​of all load nodes, calculate the ratio of the sum to the total power demand, and obtain the load recovery amount.

[0113] Optionally, in the fault recovery device for the distribution network provided in this application embodiment, the calculation module includes: a determination submodule, used to determine the first switch state vector of all tie switches in the faulted distribution network during the fault, and to determine the second switch state vector of all tie switches in the faulted distribution network after the fault is recovered; and a fourth calculation submodule, used to calculate the difference between the second switch state vector and the first switch state vector, and input the difference into the vector norm operator to obtain the number of tie switch operations.

[0114] Optionally, in the fault recovery device for the distribution network provided in this application embodiment, the optimization unit 604 includes: an initialization module, used to initialize particle swarm parameters with each tie switch in the faulty distribution network as a particle; a seventh determination module, used to determine the target tie switch in the fault recovery strategy as the target particle, calculate the value of the fitness function of the fault recovery strategy, and obtain an initial fitness evaluation value; an optimization module, used to perform multiple iterative optimizations of the fault recovery strategy using a binary particle swarm algorithm to obtain multiple optimized fault recovery strategies, wherein each iteration updates the position of the target particle in the particle swarm; and an eighth determination module, used to calculate the fitness evaluation value of each optimized fault recovery strategy to obtain multiple fitness evaluation values, and determine the optimized fault recovery strategy corresponding to the minimum fitness evaluation value as the target fault recovery strategy.

[0115] The fault recovery device for the power distribution network includes a processor and a memory. The aforementioned determination unit 601, division unit 602, calculation unit 603, and optimization unit 604 are all stored in the memory as program units. The processor executes the aforementioned program units stored in the memory to realize the corresponding functions.

[0116] The processor contains a kernel, which retrieves the corresponding program units from memory. One or more kernels can be configured, and adjusting kernel parameters can improve the fault recovery efficiency of the power distribution network.

[0117] The memory may include non-permanent memory in computer-readable media, such as random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.

[0118] This invention provides a computer-readable storage medium storing a program that, when executed by a processor, implements a fault recovery method for a power distribution network.

[0119] This invention provides a processor for running a program, wherein the program executes a fault recovery method for a power distribution network.

[0120] Figure 7This is a schematic diagram of an electronic device provided according to an embodiment of this application. For example... Figure 7 As shown, electronic device 701 includes a processor, a memory, and a program stored in the memory and executable on the processor. When the processor executes the program, it performs the following steps: determining load nodes, generator nodes, and fault areas in the faulty distribution network; dividing the faulty distribution network into multiple islanded areas based on the faulted areas and generator nodes, wherein load nodes in each islanded area are powered through generator nodes within that islanded area; calculating the power demand of each load node during the distribution network fault, determining the objective function of the fault recovery strategy based on the power demand of each load node, wherein the fault recovery strategy is to open a target tie switch in the faulty distribution network, and the objective function is used to evaluate the recovery effect of the fault recovery strategy, wherein the faulty distribution network contains multiple tie switches; using the objective function as the fitness function of a binary particle swarm optimization algorithm, optimizing the fault recovery strategy using the binary particle swarm optimization algorithm to obtain the target fault recovery strategy, and executing the target fault recovery strategy on the faulty distribution network. The device in this paper can be a server, PC, PAD, mobile phone, etc.

[0121] This application also provides a computer program product, which, when executed on a data processing device, is suitable for executing an initialization program with the following method steps: determining load nodes, generator nodes, and fault areas in a faulty distribution network; dividing the faulty distribution network into multiple islanded areas based on the faulted areas and generator nodes, wherein load nodes in each islanded area are powered through generator nodes within the islanded area; calculating the electricity demand of each load node during a distribution network fault, determining the objective function of a fault recovery strategy based on the electricity demand of each load node, wherein the fault recovery strategy is to open a target tie switch in the faulty distribution network, the objective function is used to evaluate the recovery effect of the fault recovery strategy, and the faulty distribution network contains multiple tie switches; using the objective function as the fitness function of a binary particle swarm optimization algorithm, optimizing the fault recovery strategy using the binary particle swarm optimization algorithm to obtain a target fault recovery strategy, and executing the target fault recovery strategy on the faulty distribution network.

[0122] Those skilled in the art will understand that embodiments of this application can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0123] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of this application. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart... Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0124] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0125] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.

[0126] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0127] Memory may include non-persistent memory in computer-readable media, such as random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM. Memory is an example of computer-readable media.

[0128] Computer-readable media includes both permanent and non-permanent, removable and non-removable media that can store information using any method or technology. Information can be computer-readable instructions, data structures, modules of programs, or other data. Examples of computer storage media include, but are not limited to, phase-change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technologies, CD-ROM, digital versatile optical disc (DVD) or other optical storage, magnetic tape, magnetic disk storage or other magnetic storage devices, or any other non-transferable medium that can be used to store information accessible by a computing device. As defined herein, computer-readable media does not include transient computer-readable media, such as modulated data signals and carrier waves.

[0129] It should also be noted that the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus. Unless otherwise specified, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes that element.

[0130] Those skilled in the art will understand that embodiments of this application can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0131] The above are merely embodiments of this application and are not intended to limit the scope of this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the scope of the claims of this application.

Claims

1. A method for fault recovery of a distribution network, characterized in that: include: Determine the load nodes, generation nodes and fault areas in the faulty distribution network; Dividing the fault distribution network into a plurality of isolated island areas based on the fault area and the power generation node, wherein the load nodes in each isolated island area are powered by the power generation nodes in the isolated island area; Calculate the power demand of each load node during the distribution network fault, and determine the objective function of the fault recovery strategy through the power demand of each load node, wherein the fault recovery strategy is to open a target tie switch in the fault distribution network, and the objective function is used to evaluate the recovery effect of the fault recovery strategy, and the fault distribution network includes multiple tie switches; The objective function is used as the fitness function of the binary particle swarm algorithm, the fault recovery strategy is optimized by the binary particle swarm algorithm to obtain a target fault recovery strategy, and the target fault recovery strategy is executed on the faulty distribution network.

2. The method according to claim 1, characterized in that Calculating the power demand of each load node during a distribution network fault includes: For each load node, obtaining a probability density function of the load node; The fault start time and the estimated restoration time of the distribution network are determined, and the probability density function is integrated based on the fault start time and the estimated restoration time to obtain the power demand of the load node during the power grid fault.

3. The method according to claim 1, characterized in that Dividing the fault distribution network into a plurality of island areas based on the fault area and the power generation node comprises: For each power generation node, traverse from the power generation node as the root node to both sides of the root node until traversing to other power generation nodes, or traversing to the end node of the faulty distribution network, or traversing to the fault area, and then stop traversing, wherein the other power generation nodes are power generation nodes other than the root node in the faulty distribution network; Determine an area consisting of all load nodes traversed by the power generation node and the power generation node as an initial area; A target load node set that meets preset constraint conditions is selected from the initial area, and the target load node set and the area where the power generation node is located are determined as an island area, wherein the preset constraint conditions include at least one of the following: power constraint, node voltage constraint, branch capacity constraint, and radial network structure constraint; The island region to which each power generation node belongs is determined to obtain the plurality of island regions.

4. The method according to claim 1, characterized in that: The objective function of the fault recovery strategy determined by the power demand of each load node includes: Determine the importance coefficient of each load node, and calculate the load recovery amount according to the power demand of each load node and the importance coefficient; Calculating the number of tie switch operations by the switch state in the fault recovery strategy, wherein the switch state includes the state of the tie switch during the fault and after the fault is recovered; Determining a first weight of the load recovery amount and a second weight of the tie switch operation times; Based on the first weight and the second weight, weighted sum is performed on the load recovery amount and the tie switch operation times to obtain a comprehensive fault recovery item; Obtain the cross-line penalty factor of the faulty distribution network, calculate the sum of the comprehensive fault recovery item and the cross-line penalty factor, and obtain the objective function, wherein the cross-line penalty factor includes at least one of the following: a low-voltage cross-line penalty factor, a high-voltage cross-line penalty factor, and a loop penalty factor.

5. The method according to claim 4, characterized in that Calculating the load recovery amount by using the power demand and the importance coefficient of each load node includes: Calculate the sum of the power demand of all load nodes to obtain the total power demand; Calculating the product of the importance coefficient of each load node and the power demand to obtain an importance evaluation value for restoring the load node; The sum of the importance evaluation values ​​of all load nodes is calculated, and the ratio of the sum to the total power demand is calculated to obtain the load recovery amount.

6. The method according to claim 4, characterized in that Calculating the number of tie switch operations according to the switch state in the fault recovery strategy includes: Determine a first switch state vector of all tie switches in the fault distribution network during the fault period, and determine a second switch state vector of all tie switches in the fault distribution network after the fault is restored; The difference between the second switch state vector and the first switch state vector is calculated, and the difference is input into a vector norm operator to obtain the tie switch operation times.

7. The method according to claim 1, characterized in that The objective function is taken as the fitness function of the binary particle swarm algorithm, and the fault recovery strategy is optimized by the binary particle swarm algorithm, and the target fault recovery strategy includes: Taking each tie switch in the fault distribution network as a particle, initializing the particle swarm parameters; Determine the target contact switch in the fault recovery strategy as the target particle, calculate the value of the fitness function of the fault recovery strategy, and obtain an initial fitness evaluation value; The fault recovery strategy is optimized multiple times by using the binary particle swarm algorithm to obtain multiple optimized fault recovery strategies, wherein each iterative optimization updates the position of the target particle in the particle swarm; The fitness evaluation value of each optimized fault recovery strategy is calculated to obtain multiple fitness evaluation values, and the optimized fault recovery strategy corresponding to the minimum fitness evaluation value is determined as the target fault recovery strategy.

8. A fault recovery device for a distribution network, characterized in that: include: A determination unit, used for determining load nodes, generation nodes and fault areas in a faulty distribution network; A division unit, configured to divide the fault distribution network into a plurality of isolated island areas based on the fault area and the power generation node, wherein the load nodes in each isolated island area are powered by the power generation nodes in the isolated island area; A calculation unit, used to calculate the power demand of each load node during the distribution network fault, and determine the objective function of the fault recovery strategy through the power demand of each load node, wherein the fault recovery strategy is to open a target tie switch in the fault distribution network, and the objective function is used to evaluate the recovery effect of the fault recovery strategy, and the fault distribution network includes a plurality of tie switches; The optimization unit is used to use the objective function as the fitness function of the binary particle swarm algorithm, optimize the fault recovery strategy through the binary particle swarm algorithm, obtain a target fault recovery strategy, and execute the target fault recovery strategy on the faulty distribution network.

9. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the fault recovery method of the distribution network described in any one of claims 1 to 7 is implemented.

10. An electronic device, characterized in that: It includes one or more processors and a memory, wherein the memory is used to store one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement the distribution network fault recovery method described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Power distribution network power supply fault recovery method and device and terminal equipment

    CN113178864A

  • High-proportion new energy power distribution network fault recovery method based on IBPAO-SA algorithm

    CN116995644A

  • Power distribution network fault recovery and fault repair coordinated optimization algorithm and system

    CN117613872A

  • Method, system and equipment for recovering power distribution network fault under new energy access

    CN118432053A

Cited By

  • 10 kilovolt line load switching method and 10 kilovolt line load switching system

    CN119231549A

  • Power distribution network fault recovery method and system considering fault evolution in extreme weather

    CN120165381A

  • Distribution network fault recovery method and system considering fault evolution under extreme weather conditions

    CN120165381B

  • Ring main unit control method, device and equipment and storage medium

    CN120262695A