Self-propelled steel pipe welding platform
By designing a self-propelled steel pipe welding platform, the walking and height adjustment of the steel pipe is achieved using the mobile platform and clamping unit, the problem that the existing platform cannot adapt to different pipe diameters is solved, and construction safety and efficiency are improved.
Patent Information
- Application Number
- CN202411086117.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-12-03
AI Technical Summary
The existing steel pipe welding platform cannot be adjusted according to the height of the steel pipe position, which is troublesome and inconvenient to operation, and has poor adaptability to different pipe diameters, which affects construction safety and quality.
A self-propelled steel pipe welding platform including a first mobile platform and a second mobile platform arranged in parallel is designed. The walking of the steel pipe is realized through a clamping unit and a motor. The working platform is detachably arranged on the mobile platform, and the clamping unit and The motor switches the connection state between the fixing frame and the steel pipe, adapts to steel pipes of different diameters, and realizes the height adjustment and locking of the platform through the jacking cylinder and the telescopic cylinder.
It realizes flexible height adjustment and stable fixation of the steel pipe welding platform, improves construction safety and efficiency, adapts to steel pipes of different pipe diameters, and ensures construction quality and safety.
Smart Images

Figure CN119057330A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel pipe butt joint construction, in particular to a self-propelled steel pipe welding platform. Background Art
[0002] Bridge construction often requires the construction of steel supports as transportation channels or structural support frames. Steel pipes are widely used as vertical support materials in the construction of steel supports due to their high cross-sectional characteristics. However, in the actual construction process, due to the limited lifting height and weight of the equipment, multiple segmented docking and installation are required. The segmented construction sites are close to water and air. A high-quality and reliable work platform is a strong guarantee for the safety and quality of steel pipe construction.
[0003] Because the butt weld of the steel pipe is in the air, it cannot form a reliable passage with the existing platform. At present, most of the working platforms are made of simple hanging baskets made of steel sections, which are fixed to the steel pipes by welding. They cannot be used in a circular manner and have poor adaptability to different pipe diameters. They need to be dismantled repeatedly. The quality of platform welding depends on the welding technology level of the operators, and it is impossible to form a unified standard. It may even cause damage to the steel pipes and affect the structural stress safety.
[0004] Chinese patent document CN 115229396 A records a welding device and construction method for on-site construction of steel pipe piles. The device is relatively complex and cannot be self-propelled well. Chinese patent document CN 116748798 A records an automatic welding and repairing device for steel pipe piles, which also has the above problems and has defects in use and needs to be improved. Summary of the invention
[0005] The invention provides a self-propelled steel pipe welding platform, which solves the technical problems that the welding platform cannot be adjusted in height according to the position of the steel pipe, the adjustment is inconvenient, and the operation is troublesome.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: a self-propelled steel pipe welding platform, including a first mobile platform and a second mobile platform arranged in parallel, the first mobile platform and the second mobile platform are connected by a synchronization plate, the working platform is detachably arranged on the first mobile platform and the second mobile platform, the steel pipe is passed through the first mobile platform and the second mobile platform, and the first mobile platform and the second mobile platform cooperate to complete walking on the steel pipe.
[0007] In a preferred solution, the first mobile platform and the second mobile platform both include a clamping unit and a motor, the clamping unit includes a fixed frame and a follower frame, the fixed frame is hinged to the follower frame through a first shaft rod, the fixed frame and the follower frame are connected to form a space for clamping the steel pipe, the motor is connected to the first shaft rod through a push plate, a first waist circular hole is penetrated on the fixed frame, the first shaft rod is located in the first waist circular hole, and the motor is used to switch the connection state between the fixed frame and the steel pipe.
[0008] In the preferred solution, a straight extension plate is provided on one side of the fixed frame, and the lower part of the straight extension plate is connected to the follower frame through the second lifting cylinder. Two first lifting cylinders are provided in parallel on the upper side of the straight extension plate of the first movable platform. The working platform includes two relatively arranged track plates and parallel connecting plates. A convex plate is provided on one side of the track plate, and the convex plate is connected to the first lifting cylinder.
[0009] In the preferred solution, the second lifting cylinder includes a second push rod and an eccentric block, the eccentric block is provided with a second waist circular hole, a sleeve is sleeved on the middle part of the follower frame, a third shaft rod is provided on one side of the sleeve, and the third shaft rod is passed through the second waist circular hole, the first lifting cylinder includes a first push rod and a first clamping plate, a first clamping groove is provided at the lower part of the convex plate, and the first clamping plate and the first clamping groove are clamped.
[0010] In the preferred solution, a groove is provided in the middle of the follower frame, a second shaft rod is provided on the upper side of the groove, the second shaft rod is inserted into the sleeve, support platforms are provided on both sides of the sleeve, the third shaft rod is arranged between the two support platforms, a third lifting cylinder is provided on the support platform, the two opposite third lifting cylinders are connected by a second telescopic cylinder, a plurality of second slots are provided in parallel on the track plate, a second clamping plate is provided on the top of the third lifting cylinder, and the second clamping plate is clamped into the second slot.
[0011] In the preferred scheme, the third lifting cylinder includes a third push rod and a second clamping plate, a first screw is provided on the top of the third push rod, the first screw is passed through the second clamping plate, the first screw is connected to the second clamping plate through a nut, a locking pin is also provided on the second clamping plate, the second telescopic cylinder includes a second locking rod, a locking ring is provided at the end of the second locking rod, the locking ring is sleeved on the locking pin, and an arc surface is also provided on the second clamping plate.
[0012] In a preferred solution, two second screws are arranged in parallel on the outer side of the track plate, the second screws are passed through the parallel connection plate, and the parallel connection plate is connected to the second screws through nuts; Limit plates are provided on both sides of the push plate, a second through hole is provided on the limit plate, a threaded hole is provided in the middle of the push plate, an L-shaped plate is provided at the end of the fixing frame, the motor is fixed on the L-shaped plate, a first through hole is provided in the middle of the L-shaped plate, the drive shaft is fixed on the motor, a baffle is provided at the end of the drive shaft, the drive shaft is passed through the threaded hole and the first through hole, and the first shaft rod is passed through the second through hole.
[0013] In the preferred solution, support platforms are provided on both sides of the groove, and the support platforms are located on the lower side of the support platform. Two first lifting cylinders are provided in parallel on the upper side of the straight extension plate of the second mobile platform. A first telescopic cylinder is provided on the top of the first lifting cylinder. The first telescopic cylinder includes a first locking rod, and a convex plate is provided on the outer side of the track plate, and the first locking rod is passed through the convex plate.
[0014] In a preferred embodiment, a load-bearing plate is provided on the top of the first lifting cylinder, the first telescopic cylinder is arranged on the load-bearing plate, a conical head is provided on the end of the first locking rod, a third through hole is provided in the middle of the convex plate, and the first locking rod is located in the third through hole.
[0015] In the preferred solution, a patch is provided on the inner side of the fixing frame, a rounded surface is provided on the lower side of the following frame, a third screw is provided on the outer side of the following frame, the third screw is passed through the synchronous plate, and the third screw is connected to the synchronous plate through a nut. The beneficial effects of the present invention are as follows: by setting the first mobile platform and the second mobile platform, they can cooperate with each other, so as to complete the walking on the steel pipe by alternating operations. At the same time, the working platform provides a temporary fixing point for the staff, and a walking board is provided on the top of the working platform, which is convenient for manual safe, stable and fast operation, ensuring high construction efficiency and good quality. During construction, the first mobile platform and the second mobile platform fully lock the working platform to ensure the safety of the working platform. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 The overall structure of the present invention is shown in FIG. Figure 1 ; Figure 2 yes Figure 1 A schematic diagram of the front view of Figure 3 yes Figure 1 A schematic diagram of the left view of ; Figure 4 yes Figure 1 A schematic diagram of a top view; Figure 5 yes Figure 1 A schematic diagram of a right view of ; Figure 6 yes Figure 1 A schematic diagram of a bottom view of Figure 7 The overall structure of the present invention is shown in FIG. Figure 2 ; Figure 8 The overall structure of the present invention is shown in FIG. Figure 3 ; Fig. 9 yes Figure 1 Explosion hint Figure 1 ; Fig.10 yes Figure 1 Explosion hint Figure 2 ; Fig.11 yes Figure 1 Explosion hint Figure 3 ; Fig.12 yes Figure 1 Explosion hint Figure 4 ; Fig.13 The present invention uses process one; Fig.14 The present invention uses step 2; Fig.15 The present invention uses process three; Fig.16 The present invention uses step four; Fig.17 The present invention uses step five; Fig.18 The present invention uses process six; Fig.19 The present invention uses process seven; Fig. 20 The present invention uses step eight; Fig.21 The present invention uses process nine; Fig. 22 The present invention uses step ten; Fig.23 The present invention uses step eleven; Fig.24 This is step twelve of the present invention.
[0017] In the figure: the first moving platform 1; the second moving platform 2; the steel pipe 3; the synchronous plate 4; the working platform 5; the track plate 501; the flat plate 502; the convex plate 503; the third through hole 504; the first slot 505; the second slot 506; the second screw 507; the clamping unit 6; the fixed frame 601; the follower frame 602; the first shaft 603; the push plate 604; the driving shaft 605; the L-shaped plate 606; the limit plate 607; the baffle 608; the first waist hole 609; the first through hole 610; the second through hole 611; the threaded hole 612; the groove 613; the second shaft 614; the support 615; the sleeve 616; the support table 61 7; third shaft 618; patch 619; fillet surface 620; straight extension plate 621; third screw 622; motor 7; nut 8; first lifting cylinder 9; first push rod 901; first clamping plate 902; load-bearing plate 903; first telescopic cylinder 10; first locking rod 1001; conical head 1002; second lifting cylinder 11; second push rod 1101; eccentric block 1102; second waist hole 1103; third lifting cylinder 12; third push rod 1201; second clamping plate 1202; locking pin 1203; first screw 1204; arc surface 1205; second telescopic cylinder 13; second locking rod 1301; locking ring 1302. DETAILED DESCRIPTION
[0018] like Figure 1-12A self-propelled steel pipe welding platform is provided, including a first mobile platform 1 and a second mobile platform 2 arranged in parallel, the first mobile platform 1 and the second mobile platform 2 are connected by a synchronization plate 4, a working platform 5 is detachably arranged on the first mobile platform 1 and the second mobile platform 2, a steel pipe 3 is passed through the first mobile platform 1 and the second mobile platform 2, and the first mobile platform 1 and the second mobile platform 2 cooperate to complete walking on the steel pipe 3.
[0019] When working in water, the segmented steel pipe 3 needs to be hoisted and welded. Generally, a hanging basket made of steel sections and the steel pipe 3 are used for temporary fixation, and welding operations are performed manually on the hanging basket. The overall operation is relatively complicated, and the hanging basket needs to be matched according to the diameter of the steel pipe 3. As a result, when the diameter of the steel pipe 3 is different, the adaptability of the hanging basket is low, and the hanging basket needs to be disassembled repeatedly. Welding the hanging basket and the steel pipe 3 will have a certain impact on the outer wall of the steel pipe 3, and multiple welding of the hanging basket will cause the performance of the welding points at the same position to decrease. The present application sets a first mobile platform 1 and a second mobile platform 2, and the two work alternately and collaboratively to complete walking on the steel pipe 3. A walking board is set on the top of the working platform 5. The walking board is convenient for manual welding operations, and the overall construction is safe and efficient.
[0020] In the preferred solution, the first mobile platform 1 and the second mobile platform 2 both include a clamping unit 6 and a motor 7. The clamping unit 6 includes a fixed frame 601 and a follower frame 602. The fixed frame 601 is hinged to the follower frame 602 through a first shaft rod 603. The fixed frame 601 and the follower frame 602 are connected to form a space for clamping the steel pipe 3. The motor 7 is connected to the first shaft rod 603 through a push plate 604. A first waist hole 609 is penetrated on the fixed frame 601. The first shaft rod 603 is located in the first waist hole 609. The motor 7 is used to switch the connection state between the fixed frame 601 and the steel pipe 3.
[0021] The fixed frame 601 and the follower frame 602 are connected to form a space for clamping the steel pipe 3. At the same time, the first shaft 603 can change the size of the clamping space under the action of the motor 7, so as to adapt to the steel pipe 3 with a certain diameter change to meet the needs of use. A stable opening angle is formed between the fixed frame 601 and the follower frame 602. Through the change of the opening angle, the first mobile platform 1 and the second mobile platform 2 can be adjusted to the fixed and loose states of the steel pipe 3, which is convenient to adjust.
[0022] In the preferred embodiment, a straight extension plate 621 is provided on one side of the fixed frame 601, and the lower part of the straight extension plate 621 is connected to the follower frame 602 through the second lifting cylinder 11, and two first lifting cylinders 9 are provided in parallel on the upper side of the straight extension plate 621 of the first mobile platform 1. The working platform 5 includes two relatively arranged track plates 501 and a parallel plate 502, and a convex plate 503 is provided on one side of the track plate 501, and the convex plate 503 is connected to the first lifting cylinder 9.
[0023] The first lifting cylinder 9 located on the first mobile platform 1 adjusts the height of the working platform 5, thereby driving the second mobile platform 2 to move in height along the steel pipe 3, and repeats this process, thereby moving the second mobile platform 2 to the designed height, completing the self-climbing action of the second mobile platform 2, and the convex plate 503 and the first lifting cylinder 9 are firmly connected, the movement is stable, and the overall safety.
[0024] In the preferred embodiment, the second lifting cylinder 11 includes a second push rod 1101 and an eccentric block 1102, the eccentric block 1102 is provided with a second waisted circular hole 1103, the middle part of the follower frame 602 is sleeved with a sleeve 616, a third shaft rod 618 is provided on one side of the sleeve 616, and the third shaft rod 618 is passed through the second waisted circular hole 1103, the first lifting cylinder 9 includes a first push rod 901 and a first clamping plate 902, and a first clamping groove 505 is provided at the lower part of the convex plate 503, and the first clamping plate 902 and the first clamping groove 505 are clamped.
[0025] By changing the action of the second lifting cylinder 11, the angle between the follower frame 602 and the fixed frame 601 is changed, and the fixing state between the follower frame 602, the fixed frame 601 and the steel pipe 3 is changed. The lower part of the first clamping groove 505 is provided with a chamfer to facilitate the first clamping plate 902 to provide stable support. The first lifting cylinder 9 and the working platform 5 are in a detachable connection state, thereby ensuring that the working state of the first lifting cylinder 9 in different positions can be adjusted according to the needs of use to achieve different functions.
[0026] In the preferred embodiment, a groove 613 is provided in the middle of the follower frame 602, a second shaft rod 614 is provided on the upper side of the groove 613, the second shaft rod 614 is inserted into the sleeve 616, support platforms 617 are provided on both sides of the sleeve 616, a third shaft rod 618 is arranged between the two support platforms 617, a third lifting cylinder 12 is provided on the support platform 617, the two opposite third lifting cylinders 12 are connected by a second telescopic cylinder 13, a plurality of second slots 506 are provided in parallel on the track plate 501, a second clamping plate 1202 is provided on the top of the third lifting cylinder 12, and the second clamping plate 1202 is clamped with the second slot 506.
[0027] The third lifting cylinder 12 arranged on the support platform 617 can change the position and angle between the second clamping plates 1202 under the adjustment of the second telescopic cylinder 13, thereby completing the locking or disengagement of the working platform 5, thereby cooperating to complete the self-propelled function of the first mobile platform 1 or the second mobile platform 2. When the two mobile platforms are moved into place, the two second clamping plates 1202 are transferred into the second clamping slots 506 to complete the locking of the working platform 5. The overall connection is firm, ensuring the safety of the construction workers.
[0028] In the preferred embodiment, the third lifting cylinder 12 includes a third push rod 1201 and a second clamping plate 1202. A first screw 1204 is provided on the top of the third push rod 1201. The first screw 1204 is passed through the second clamping plate 1202. The first screw 1204 is connected to the second clamping plate 1202 through a nut 8. A locking pin 1203 is also provided on the second clamping plate 1202. The second telescopic cylinder 13 includes a second locking rod 1301. A locking ring 1302 is provided at the end of the second locking rod 1301. The locking ring 1302 is sleeved on the locking pin 1203. An arc surface 1205 is also provided on the second clamping plate 1202.
[0029] By changing the extension length of the second locking rod 1301, the positions of the two second clamping plates 1202 are synchronously adjusted, and the operation is convenient and efficient. The arc surface 1205 can ensure that the second clamping plate 1202 is better wedged into the second clamping groove 506. The third lifting cylinder 12 provides a stable supporting force for the working platform through the second clamping plate 1202. When the second mobile platform 2 is fixed and the first mobile platform 1 needs to be adjusted, the force is transmitted to the working platform 5 through the action of the third lifting cylinder 12, and then transmitted to the first mobile platform 1 to lift the whole. This process is repeated to move the first mobile platform 1 to the designed height.
[0030] In a preferred solution, two second screws 507 are arranged in parallel on the outer side of the track plate 501, and the second screws 507 are passed through the parallel connection plate 502, and the parallel connection plate 502 is connected to the second screws 507 through nuts 8; Limiting plates 607 are provided on both sides of the push plate 604, a second through hole 611 is provided on the limiting plate 607, a threaded hole 612 is provided in the middle of the push plate 604, an L-shaped plate 606 is provided at the end of the fixing frame 601, the motor 7 is fixed on the L-shaped plate 606, a first through hole 610 is provided in the middle of the L-shaped plate 606, a driving shaft 605 is fixed on the motor 7, a baffle 608 is provided at the end of the driving shaft 605, the driving shaft 605 is penetrated in the threaded hole 612 and the first through hole 610, and the first shaft rod 603 is penetrated in the second through hole 611.
[0031] The rotation direction of the motor 7 is changed to change the position of the push plate 604, and then the position of the first shaft rod 603 is changed. The inner side of the first shaft rod 603 is pressed against the outer wall of the steel pipe 3, and the position of the follower frame 602 is changed at the same time. After the fixed frame 603 initially clamps and fixes the steel pipe 3 through friction, the second lifting cylinder 11 is adjusted to press down the follower frame 602. The follower frame 602 opens a larger angle relative to the fixed frame 601 until it fits against the outer wall of the steel pipe 3. The steel pipe 3 is stably clamped by the fixed frame 601 and the follower frame 602. When it is necessary to release the fixation, the second lifting cylinder 11 is first retracted, and then the motor 7 is reversed. The fixed frame 601 releases the clamping between the steel pipe 3, so that it is convenient to change its own position under the force transmission of the working platform 5 to complete the self-walking process.
[0032] In the preferred solution, a support platform 615 is further provided on both sides of the groove 613, and the support platform 615 is located on the lower side of the support platform 617. Two first lifting cylinders 9 are provided in parallel on the upper side of the straight extension plate 621 of the second mobile platform 2. A first telescopic cylinder 10 is provided on the top of the first lifting cylinder 9. The first telescopic cylinder 10 includes a first locking rod 1001. A convex plate 503 is provided on the outer side of the track plate 501, and the first locking rod 1001 is penetrated into the convex plate 503.
[0033] When the second lifting cylinder 11 is extended to fix the follower frame 602 on the steel pipe 3, the support platform 615 is in a roughly horizontal state, and the support platform 615 further increases the contact area with the support platform 617. The overall force transmission effect is good and the force application is stable. At this time, the follower frame 602 and the steel pipe 3 are clamped more firmly, and the overall force is balanced. At this time, the first locking rod 1001 of the first telescopic cylinder 10 is changed to further lock the working platform 5, and safety protection is performed again, making the operation safer.
[0034] In the preferred embodiment, a load-bearing plate 903 is provided on the top of the first lifting cylinder 9, the first telescopic cylinder 10 is arranged on the load-bearing plate 903, a conical head 1002 is provided at the end of the first locking rod 1001, a third through hole 504 is provided in the middle of the convex plate 503, and the first locking rod 1001 is located in the third through hole 504.
[0035] When the second mobile platform 2 is fixed on the steel pipe 3, through the coordinated action of the third lifting cylinder 12 and the first lifting cylinder 9, the first locking rod 1001 and the second clamping plate 1202 complete the force application on the working platform 5, and then lift the first mobile platform 1, which is easy to operate.
[0036] In the preferred embodiment, a patch 619 is provided on the inner side of the fixed frame 601, a rounded surface 620 is provided on the lower side of the follower frame 602, and a third screw 622 is provided on the outer side of the follower frame 602. The third screw 622 is passed through the synchronization plate 4 and connected to the synchronization plate 4 through a nut 8. The patch 619 can increase the contact area with the side wall of the steel pipe 3, thereby improving the overall fixing effect. The rounded surface 620 on the follower frame 602 can adapt to the change of its own opening angle relative to the fixed frame 601, ensuring the overall full clamping. The synchronization plate 4 serves as a reference scale for the relative distance between the first mobile platform 1 and the second mobile platform 2, ensuring accurate installation and easy use.
[0037] like Figure 13-24 In the crawling process: 1. Construction phase After the first section of steel pipe 3 is sunk or stabilized in place, the first mobile platform 1 and the second mobile platform 2 are installed respectively. After they are in place, the second lifting cylinder 11 is lifted to increase the angle between the fixed frame 601 and the follower frame 602. The friction between the fixed frame 601 and the follower frame 602 and the steel pipe 3 is used to stabilize the entire platform. At the same time, the first clamping plate 902 on the first lifting cylinder 9 firmly fixes the working platform 5. At this time, the state of the second telescopic cylinder 13 is adjusted, and the second clamping plate 1202 of the third lifting cylinder 12 further locks the working platform 5.
[0038] 2. Mobile walking stage (1) Second mobile platform 2 upgrade Retract the second lifting cylinder 11, reduce the angle between the fixed frame 601 and the follower frame 602, release the anchoring of the lower platform, and release the connection between the second clamping plate 1202 on the third lifting cylinder 12 on the first mobile platform 1 and the working platform 5, lift the first lifting cylinder 9 on the first mobile platform 1, lift the working platform 5, and complete the one-step lifting of the second mobile platform 2; (2) Anchoring of the second mobile platform 2 Increase the angle between the fixed frame 601 and the follower frame 602, and use the friction between the fixed frame 601 and the follower frame 602 and the steel pipe 3 to fix and stabilize the second mobile platform 2; (3) Working platform 5 falls back The first lifting cylinder 9 on the first mobile platform 1 descends, driving the working platform 5 to descend, and the second clamping plate 1202 and the first locking rod 1001 on the second mobile platform 2 are locked with the working platform 5 again, and the content of step (1) is repeated again to complete the lifting of the second mobile platform 2 until it reaches the designed position, and then locked; (4) Lifting of the first mobile platform 1 The second clamping plate 1202 of the first mobile platform 1 and the working platform 5 are locked to release the fixing state between the first mobile platform 1 and the steel pipe 3. The second mobile platform 2 completes the lifting of the first mobile platform 1 through the working platform 5; (5) Anchoring of the first mobile platform 1 Increase the angle between the fixed frame 601 and the follower frame 602, and use the friction between the fixed frame 601 and the follower frame 602 and the steel pipe 3 to fix and stabilize the first mobile platform 1; (6) Working platform 5 falls back The first lifting cylinder 9 on the second mobile platform 1 descends, driving the working platform 5 to descend, and the second clamping plate 1202 and the first locking rod 1001 on the first mobile platform 2 are locked with the working platform 5 again, and the content of step (4) is repeated again to complete the lifting of the first mobile platform 1 until it reaches the designed position, and then lock it; (7) Alternating circular walking Repeat steps (1) to (6) to achieve alternating circular walking operation on the steel pipe 3.
[0039] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions described in the claims, including equivalent replacement solutions of the technical features in the technical solutions described in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A self-propelled steel pipe welding platform, characterized by: The invention comprises a first mobile platform (1) and a second mobile platform (2) which are arranged in parallel, wherein the first mobile platform (1) and the second mobile platform (2) are connected via a synchronization plate (4), a working platform (5) is detachably arranged on the first mobile platform (1) and the second mobile platform (2), a steel pipe (3) is inserted into the first mobile platform (1) and the second mobile platform (2), and the first mobile platform (1) and the second mobile platform (2) cooperate to complete walking on the steel pipe (3).
2. According to claim 1, the self-propelled steel pipe welding platform is characterized in that: The first mobile platform (1) and the second mobile platform (2) both include a clamping unit (6) and a motor (7). The clamping unit (6) includes a fixed frame (601) and a follower frame (602). The fixed frame (601) is hinged to the follower frame (602) via a first shaft (603). The fixed frame (601) and the follower frame (602) are connected to form a space for clamping the steel pipe (3). The motor (7) is connected to the first shaft (603) via a push plate (604). A first waist hole (609) is provided through the fixed frame (601). The first shaft (603) is located in the first waist hole (609). The motor (7) is used to switch the connection state between the fixed frame (601) and the steel pipe (3).
3. The self-propelled steel pipe welding platform according to claim 2 is characterized in that: A straight extension plate (621) is provided on one side of the fixed frame (601), and the lower part of the straight extension plate (621) is connected to the follower frame (602) via a second lifting cylinder (11). Two first lifting cylinders (9) are provided in parallel on the upper side of the straight extension plate (621) of the first mobile platform (1). The working platform (5) includes two track plates (501) and a parallel plate (502) arranged opposite to each other. A convex plate (503) is provided on one side of the track plate (501), and the convex plate (503) is connected to the first lifting cylinder (9).
4. The self-propelled steel pipe welding platform according to claim 3 is characterized in that: The second lifting cylinder (11) comprises a second push rod (1101) and an eccentric block (1102), the eccentric block (1102) is provided with a second waisted circular hole (1103), a sleeve (616) is sleeved in the middle of the follower frame (602), a third shaft rod (618) is provided on one side of the sleeve (616), and the third shaft rod (618) is inserted into the second waisted circular hole (1103), the first lifting cylinder (9) comprises a first push rod (901) and a first clamping plate (902), a first clamping groove (505) is provided at the lower part of the convex plate (503), and the first clamping plate (902) and the first clamping groove (505) are clamped.
5. The self-propelled steel pipe welding platform according to claim 3 is characterized in that: A groove (613) is provided in the middle of the follower frame (602), a second shaft (614) is provided on the upper side of the groove (613), the second shaft (614) is inserted into the sleeve (616), support platforms (617) are provided on both sides of the sleeve (616), a third shaft (618) is arranged between the two support platforms (617), a third lifting cylinder (12) is provided on the support platform (617), two opposite third lifting cylinders (12) are connected by a second telescopic cylinder (13), a plurality of second clamping grooves (506) are provided in parallel on the track plate (501), a second clamping plate (1202) is provided on the top of the third lifting cylinder (12), and the second clamping plate (1202) is clamped with the second clamping groove (506).
6. The self-propelled steel pipe welding platform according to claim 5 is characterized in that: The third lifting cylinder (12) comprises a third push rod (1201) and a second clamping plate (1202). A first screw rod (1204) is provided at the top of the third push rod (1201). The first screw rod (1204) is inserted into the second clamping plate (1202). The first screw rod (1204) is connected to the second clamping plate (1202) via a nut (8). A locking pin (1203) is also provided on the second clamping plate (1202). The second telescopic cylinder (13) comprises a second locking rod (1301). A locking ring (1302) is provided at the end of the second locking rod (1301). The locking ring (1302) is sleeved on the locking pin (1203). The second clamping plate (1202) is also provided with an arc surface (1205).
7. The self-propelled steel pipe welding platform according to claim 3 is characterized in that: Two second screw rods (507) are arranged in parallel on the outer side of the track plate (501), the second screw rods (507) are passed through the parallel connection plate (502), and the parallel connection plate (502) is connected to the second screw rods (507) via nuts (8); Limiting plates (607) are provided on both sides of the push plate (604), and a second through hole (611) is provided on the limiting plate (607). A threaded hole (612) is provided in the middle of the push plate (604). An L-shaped plate (606) is provided at the end of the fixing frame (601). The motor (7) is fixed on the L-shaped plate (606), and a first through hole (610) is provided in the middle of the L-shaped plate (606). The drive shaft (605) is fixed on the motor (7), and a baffle (608) is provided at the end of the drive shaft (605). The drive shaft (605) is inserted into the threaded hole (612) and the first through hole (610), and the first shaft rod (603) is inserted into the second through hole (611).
8. The self-propelled steel pipe welding platform according to claim 5 is characterized in that: Support platforms (615) are also provided on both sides of the groove (613), and the support platforms (615) are located at the lower side of the support platform (617). Two first lifting cylinders (9) are provided in parallel on the upper side of the straight extension plate (621) of the second mobile platform (2), and a first telescopic cylinder (10) is provided on the top of the first lifting cylinder (9). The first telescopic cylinder (10) includes a first locking rod (1001), and a convex plate (503) is provided on the outer side of the track plate (501), and the first locking rod (1001) is inserted into the convex plate (503).
9. The self-propelled steel pipe welding platform according to claim 8 is characterized in that: A load-bearing plate (903) is provided on the top of the first lifting cylinder (9), the first telescopic cylinder (10) is arranged on the load-bearing plate (903), a conical head (1002) is provided at the end of the first locking rod (1001), a third through hole (504) is provided in the middle of the convex plate (503), and the first locking rod (1001) is located in the third through hole (504).
10. The self-propelled steel pipe welding platform according to claim 2, characterized in that: A patch (619) is provided on the inner side of the fixed frame (601), a rounded surface (620) is provided on the lower side of the follower frame (602), a third screw rod (622) is provided on the outer side of the follower frame (602), the third screw rod (622) is passed through the synchronous plate (4), and the third screw rod (622) is connected to the synchronous plate (4) via a nut (8).