Modularized assembled pre-embedded tank body and construction method thereof

The modular pre-buried sewage treatment tank design addresses transportation issues and leakage by using a tank wall structure with overlapping panels and chemical anchor bolts, enhancing installation ease and preventing leakage for stable sewage discharge.

CN119059125AInactive Publication Date: 2024-12-03XINXIANG SCHUMANN TANK EQUIP CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411569401.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-05
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing pre-buried sewage treatment tanks are integrally formed, making transportation difficult and prone to leakage due to weak leak-proof performance and poor tightness between the tank body and foundation, leading to potential environmental pollution.

Method used

A modular assembled pre-buried tank body comprising a tank bottom, tank wall, and tank top, with overlapping wall panels bonded by sealant and reinforced by chemical anchor bolts and foundation angle steels, and sealed with a sealing plate to enhance water resistance and prevent leakage.

Benefits of technology

The modular design facilitates easy installation, improves water pressure resistance and sealing performance, and prevents leakage by reinforcing the tank wall and isolating the sewage from the concrete foundation, ensuring stable sewage discharge without environmental pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119059125A_ABST
    Figure CN119059125A_ABST
Patent Text Reader

Abstract

The invention discloses a modularized assembled pre-embedded tank body and a construction method thereof, and relates to the technical field of sewage treatment and organic solid waste treatment. A tank wall is fixed to the top of a tank bottom through sealant, the tank wall comprises a group of longitudinally-stacked wall plate groups, each wall plate group comprises a group of annularly-distributed arc-shaped wall plates, one group of arc-shaped wall plates in each wall plate group are in lap joint in the anticlockwise direction, and a tank top is fixed to the top of the tank wall. The tank wall adopts a modular splicing structure, can be quickly mounted on a construction site, is convenient to construct, and when the tank wall is spliced, splicing parts are firstly adhered and fixed by adopting sealant and then are reinforced by adopting screws, and then a circle of sealant is applied to the outer sealing edge after the sealant is adhered, so that the water pressure resistance of the tank wall can be enhanced, and the service life of the tank wall is prolonged. In addition, the diagonal connecting parts are further reinforced through the reinforcing layers, so that the water pressure resistance and the sealing performance of the tank wall are further improved, and the strength of the tank wall is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of sewage treatment and organic solid waste treatment, and in particular relates to a modular assembled pre-buried tank body and a construction method thereof. Background Art

[0002] Sewage treatment plants are key facilities for treating and purifying urban sewage. The pipe systems involved must ensure stable sewage discharge and no pollution to the environment. Therefore, sewage treatment plants will bury sewage pretreatment tanks underground to reduce the impact on the environment.

[0003] The existing sewage pre-buried tank is used for pre-treatment of sewage. For example, in the existing public document, CN206395841U, an underground pre-treatment tank for sewage treatment, is publicly provided with a vertical tank body; the tank body includes an integrally formed bottom plate, a surrounding wall and a top cover; an inspection port is provided on the top of the top cover, and the top of the inspection port is closed by a manhole cover; a sludge return pipe is fixed on the side wall of the inspection port. Although it can be used for sewage pre-treatment. However, most of the existing pre-buried tank bodies are integrally formed, and the transportation during the construction process is more troublesome. Moreover, the bottom of the existing pre-buried tank body is generally directly a concrete foundation. After long-term use, the concrete foundation will leak, causing the tank body to leak, and the leak-proof performance is not strong. In addition, the tightness between the existing pre-buried tank body and the foundation is not strong, and it is also prone to leakage. To this end, we provide a modular assembled pre-buried tank body and a construction method thereof to solve the above problems. Summary of the invention

[0004] The purpose of the present invention is to provide a modular assembled pre-buried tank body and a construction method thereof. Through the specific arrangement of the tank bottom and the tank wall, the problem that most of the existing pre-buried tank bodies are formed in one piece and are relatively troublesome to transport during the construction process is solved, and the bottom of the existing pre-buried tank body is generally directly a concrete foundation. After long-term use, the concrete foundation will leak, causing the tank body to leak, and the leak-proof performance is not strong. In addition, the tightness between the existing pre-buried tank body and the foundation is not strong, and it is also prone to leakage.

[0005] In order to solve the above technical problems, the present invention is achieved through the following technical solutions: The present invention is a modular assembled embedded tank body, comprising a tank bottom, a tank wall, a tank top and a sealing plate. The tank wall comprises a group of longitudinally stacked wall panels, the wall panel group comprises a group of annularly distributed arc wall panels, a group of arc wall panels in each wall panel group are overlapped in a counterclockwise direction, the overlapped parts of two connected arc wall panels in the wall panel group are bonded by a sealant, the overlapped parts of the upper and lower wall panel groups are bonded by a sealant, the overlapping connection holes at the overlapped parts of the tank wall are fixed by bolts, the top of the tank bottom is fixed to the tank wall by a sealant, A chemical anchor bolt group evenly distributed in a ring is fixed on the tank bottom, each chemical anchor bolt group contains two symmetrically arranged chemical anchor bolts, a foundation angle steel is fixed on the chemical anchor bolt group, the two chemical anchor bolts in each chemical anchor bolt group respectively cross the two mounting holes of one of the foundation angle steels, the gap between the two adjacent foundation angle steels is filled with sealant, the outer edge of the bottom wall plate group is fixed to the tank bottom through a group of annularly distributed foundation angle steels and chemical anchor bolts, and a circle of sealant is filled at the outer edge of the glue seal after the foundation angle steel and the tank bottom are bonded, and the bottom wall plate group is fixed to the tank bottom through a group of annularly distributed foundation angle steels and chemical anchor bolts, and the outer edge of the glue seal after the foundation angle steel and the tank bottom are bonded is filled with a circle of sealant, and the bottom wall plate group is fixed to the tank bottom through a group of annularly distributed foundation angle steels and chemical anchor bolts, and the outer edge of the glue seal after the foundation angle steel and the tank bottom are bonded is filled with a circle of sealant, and the bottom wall plate group is fixed to the tank bottom through a group of annularly distributed foundation angle steels and chemical anchor bolts, and the outer edge of the glue seal after the foundation angle steel and the tank bottom are bonded is filled with a circle of sealant, and the bottom wall plate group is fixed to the tank bottom through a group of annularly distributed foundation angle steels and chemical anchor bolts, and the outer edge of the glue seal after the foundation angle steel and the tank bottom are bonded is fixed ... The outer surface of the bottom peripheral side of the wall panel group at the bottom and the side of the anchor angle steel are bonded by sealant, and a circle of sealant is filled at the outer edge of the seal after the bottom wall panel group and the anchor angle steel are bonded. The tank top is fixed on the top of the tank wall. The tank top includes a top ring plate, a bottom ring plate, a beam plate and an eaves plate group. A group of annularly distributed beam plates are fixed between the top ring plate and the bottom ring plate. An eaves plate group is fixed between two adjacent beam plates. The eaves plate group includes No. 1 eaves plate, No. 2 eaves plate, No. 3 eaves plate and No. 4 eaves plate. No. 1 eaves plate, No. 2 eaves plate, No. 3 eaves plate and No. 4 eaves plate The bottom ring plate is overlapped with the wall plate group at the top of the tank wall through sealant overlap, the bottom surface of the bottom ring plate and the top surface of the wall plate group at the top are bonded and fixed by sealant, and the outer edge of the seal after the bottom ring plate and the top of the tank wall are bonded is filled with a circle of sealant, the inner surface of the bottom peripheral side of the wall plate group is bonded with a sealing plate through sealant, the bottom surface of the sealing plate is fixed on the tank bottom, and the outer edge of the seal after the sealing plate and the tank bottom are bonded is filled with a circle of sealant, and the outer edge of the seal after the bottom wall plate group and the sealing plate are bonded is filled with a circle of sealant.

[0006] The present invention is further configured such that sealant is applied on both sides of the outer surface of each curved wall panel, and gaps at overlapping parts of the wall panel group are filled with gap plates; the middle parts of every four curved wall panels after being spliced ​​in a "field" shape form a "cross" shaped diagonal, and the outside of the "cross" shaped diagonal in the tank wall is coated with a reinforcement layer, which is a sealant.

[0007] The present invention is further configured such that a bottom connecting hole group is provided at the bottom edge of the curved wall panel, a top connecting hole group is provided at the top edge of the curved wall panel, the bottom connecting hole group and the top connecting hole group are both composed of a group of connecting holes evenly distributed in a curve, side connecting hole groups are provided at both side edges of the curved wall panel, the side connecting hole group is composed of a group of connecting holes evenly distributed longitudinally; the side connecting hole groups of two connected curved wall panels in the wall panel group overlap one by one, and the bottom connecting hole groups and the top connecting hole groups in the overlapping parts of the upper and lower wall panel groups overlap one by one.

[0008] The present invention is further configured as follows: the top side of the No. 1 eaves board is bonded to the outer peripheral side of the top ring plate by sealant, the two side surfaces of the No. 1 eaves board are bonded to the beams on both sides by sealant, the top side of the No. 2 eaves board is bonded to the edge of the bottom outer surface of the No. 1 eaves board by sealant, the two side surfaces of the No. 2 eaves board are bonded to the beams on both sides by sealant, the top side of the No. 3 eaves board is bonded to the edge of the bottom outer surface of the No. 2 eaves board by sealant, the two side surfaces of the No. 3 eaves board are bonded to the beams on both sides by sealant, the top side of the No. 4 eaves board is bonded to the edge of the bottom outer surface of the No. 3 eaves board by sealant, the two side surfaces of the No. 4 eaves board are bonded to the beams on both sides by sealant, and the bottom side of the No. 4 eaves board is bonded to the inner surface wall of the bottom ring plate by sealant.

[0009] The present invention is further configured such that the hole group at the overlapping position of the No. 1 eaves board and the No. 2 eaves board, the hole group at the overlapping position of the No. 2 eaves board and the No. 3 eaves board, and the hole group at the overlapping position of the No. 3 eaves board and the No. 4 eaves board all overlap one by one, the outermost mounting holes at the overlapping position of the No. 1 eaves board and the No. 2 eaves board, the outermost mounting holes at the overlapping position of the No. 2 eaves board and the No. 3 eaves board, and the outermost mounting holes at the overlapping position of the No. 3 eaves board and the No. 4 eaves board respectively overlap one by one with the mounting holes on the beam plate, and the eave plate group and the beam plate are fixed by bolts in the corresponding overlapping mounting holes.

[0010] The present invention is further configured such that the tank bottom includes an embedded ring plate and a bottom plate, the embedded ring plate is a hollow columnar structure, the embedded ring plate is cast in the foundation by concrete, the top of the embedded ring plate protrudes from the foundation, the bottom plate is placed on the foundation in the central area of ​​the embedded ring plate, and the outer edge of the bottom plate is welded to the inner wall of the protruding part of the top of the embedded ring plate.

[0011] The present invention is further configured such that the bottom surface of the wall panel group located at the bottom is bonded to the top surface of the embedded ring plate by means of sealant, the bottom surface of the anchor angle steel is bonded to the top surface of the embedded ring plate by means of sealant, the chemical anchor bolt is fixed to the top surface of the embedded ring plate, and the sealing plate is placed on the top surface of the bottom plate.

[0012] The present invention is further configured such that the tank bottom includes a concrete foundation and an anti-corrosion layer, the top surface of the concrete foundation is coated with an anti-corrosion material to form the anti-corrosion layer, and the sealing plate is placed on the top surface of the anti-corrosion layer.

[0013] The present invention is further configured such that the bottom surface of the wall panel group located at the bottom is bonded to the top surface of the concrete foundation by sealant, the bottom surface of the anchor angle steel is bonded to the top surface of the concrete foundation by sealant, and the chemical anchor bolt is fixed to the top surface of the embedded ring plate.

[0014] The present invention also relates to a construction method for a modularly assembled pre-buried tank body, which is used for installing the modularly assembled pre-buried tank body. The specific installation includes the following steps: S1: Construction preparation; First, mark the location on site and drive in cement nails for permanent marking. Then, determine the location of the tank on the foundation according to the radius of the tank wall and draw the location on the foundation. Then, adjust the level and place the level at the center or periphery of the foundation to observe the location of the entire circle of measuring points. Calculate the elevation of the measuring points, save the data and make a record. If the local flatness is unqualified, immediately grind the unqualified area to the design requirements. Then, drill holes every - meters at the location of the tank, and the hole depth should be - centimeters. Insert steel scraps into the holes to prepare for the assembly of the first layer of tank walls. S2: Assembly of the first layer of wall panels; First determine the assembly starting point, overlap each arc wall panel counterclockwise, fix the overlapped part with sealant, and fix the matching hole position of the overlapped part with bolts to complete the assembly operation of the first layer of wall panel group; S3: Electric screw elevator lifts the first layer of wall panels; Place the electric screw lifters one by one to the appropriate position, so that the connection plate of the lifting platform in the electric screw lifter is close to one of the side connection hole groups in the first layer of wall panel group, so that the plate holes of the connection plate coincide with the hole positions of the side connection hole group, and then fix them with screws, and then start the electric screw lifter to drive the first layer of wall panel group to move up; S4: stacking and splicing to form the tank wall; Use sealant to overlap the arc-shaped wall panels of the second layer of wall panel group in the bottom position of the first layer of wall panel group in a counterclockwise manner, ensure that the bottom connection hole group and the top connection hole group at the overlapped position of the upper and lower wall panel groups overlap one by one, fix the overlapped position with sealant, and fix the hole position of the overlapped position with bolts, and complete the stacking operation of the second layer of wall panel group. After that, after each layer of wall panel group is installed, it is immediately moved up by an electric screw elevator, and then the next layer of wall panel group is stacked, and the tank wall assembly is completed in sequence; S5: Assembly of tank top; Use sealant to bond the first eaves board, the second eaves board, the third eaves board and the fourth eaves board step by step between the two beams, and then fix bolts in each pair of holes to form an eaves board group, and then install each eaves board group in turn between the two beams to complete the tank top assembly; S6: hoist the tank top to assemble it with the tank wall; Use lifting equipment to lift the assembled tank top to the top of the tank wall, then use sealant to seal the contact part between the tank top and the tank wall, and then fill a circle of sealant at the outer edge of the seal after the tank top and the tank wall are bonded, completing the splicing between the tank top and the tank wall; S7: Tank bottom sealing; Apply glue to the bottom of the tank wall and the connection part of the tank bottom surface, then place the tank wall on the tank bottom so that the bottom of the tank wall is bonded to the tank bottom, and then apply glue to the bottom and side of the anchor angle steel so that the bottom of the anchor angle steel is attached to the tank bottom, and the side of the anchor angle steel is directly bonded to the outer bottom edge of the tank wall. At the same time, ensure that the anchor angle steel is fixed on the pre-buried chemical anchor bolt to complete the external bottom sealing operation of the tank body, and then apply sealant to the bottom and outer side of the sealing plate so that the bottom of the sealing plate is bonded to the tank bottom, and the outer side of the sealing plate is bonded to the inner bottom edge of the tank wall to complete the internal bottom sealing operation of the tank body; S8: Full water test; Fill the assembled tank with water and perform a full water test.

[0015] The present invention has the following beneficial effects: 1. The tank wall of the present invention adopts a modular assembly structure, which can be quickly installed at the construction site, and is convenient for construction. When assembling the tank wall, the joints are first fixed with sealant and then reinforced with screws. Then, a circle of sealant is applied to the outer edge of the seal after the sealant is bonded, which can enhance the water pressure resistance of the tank wall. In addition, the diagonal connection is further reinforced by a reinforcement layer, which further improves the water pressure resistance and sealing performance of the tank wall and enhances the strength of the tank wall.

[0016] 2. The present invention applies glue to the bottom of the tank wall and the connection part of the tank bottom surface, and then places the tank wall on the tank bottom so that the bottom of the tank wall is bonded to the tank bottom, and then applies glue to the bottom and side surfaces of the anchor angle steel so that the bottom surface of the anchor angle steel is attached to the tank bottom, and the side surfaces of the anchor angle steel are directly bonded to the outer bottom edge of the tank wall, while ensuring that the anchor angle steel is fixed to the embedded chemical anchor bolts, so that the outer side of the bottom of the tank wall can be better sealed, and the bottom surface and outer side surface of the sealing plate are coated with sealant so that the bottom surface of the sealing plate is bonded to the tank bottom, so that the outer side surface of the sealing plate is bonded to the inner bottom edge of the tank wall, so that the inner side of the bottom of the tank wall can be sealed, thereby strengthening the sealing of the bottom of the tank body and improving the water pressure resistance of the bottom of the tank body.

[0017] 3. The tank bottom of the present invention is composed of a pre-buried ring plate and a bottom plate. The pre-buried ring plate is poured in the foundation by concrete, and the outer edge of the bottom plate is welded to the inner wall of the pre-buried ring plate. Through the arrangement of the bottom plate, the sewage does not directly contact the concrete foundation, which can further prevent leakage.

[0018] 4. The tank bottom of the present invention is composed of a concrete foundation and an anti-corrosion layer. An anti-corrosion layer is applied on the surface of the poured concrete foundation. Through the isolation effect of the anti-corrosion layer, the sewage does not directly contact the concrete foundation, which can further prevent leakage.

[0019] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0021] Figure 1 It is a structural schematic diagram of a modular assembled embedded tank.

[0022] Figure 2 The figure is a schematic diagram of the structure of a tank bottom when in use.

[0023] Figure 3 Schematic diagram of the structure in which the wall plate group is sealed on the tank bottom.

[0024] Figure 4 This is a schematic diagram of the structure after the wall panel group is spliced.

[0025] Figure 5 This is a schematic diagram of the tank top structure.

[0026] Figure 6 Schematic diagram of the structure in which the eaves panel group is installed on two beam panels.

[0027] Figure 7 This is a schematic diagram of the structure of the tank wall during the electric screw elevator lifting assembly.

[0028] Figure 8 This is a structural schematic diagram of the connection between the electric screw lift and the No. 2 wall panel group.

[0029] Fig. 9 It is a structural diagram of the connecting plate.

[0030] Fig.10 It is a structural schematic diagram of the construction process flow.

[0031] Fig.11 Schematic diagram of the distribution structure of the internal reinforcement layer of the tank wall.

[0032] Fig.12 It is a schematic diagram of the structure when another tank bottom is used.

[0033] Fig.13 for Fig.12 Schematic diagram of the structure in which the tank bottom is cast under the foundation.

[0034] In the accompanying drawings, the components represented by the reference numerals are listed as follows: 100, tank bottom; 110, embedded ring plate; 120, bottom plate; 130, concrete foundation; 140, anti-corrosion layer; 101, chemical anchor bolt; 102, anchor angle steel; 200, tank wall; 210, wall plate group; 211, curved wall plate; 220, reinforcement layer; 201, bottom connection hole group; 202, top connection hole group; 203, side connection hole group; 300, tank top; 310, top ring plate; 320, bottom ring plate; 330, beam plate; 340, eaves plate group; 341, No. 1 eaves plate; 342, No. 2 eaves plate; 343, No. 3 eaves plate; 344, No. 4 eaves plate; 400, sealing plate; 500, electric screw hoist; 510, connecting plate; 511, plate hole. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Example 1

[0036] See also Figure 1 , Figure 3 and Figure 4 The present invention is a modular assembled embedded tank body, comprising a tank bottom 100, a tank wall 200 and a tank top 300. The tank bottom 100 is fixed with the tank wall 200 on the top by a sealant. The tank wall 200 comprises a set of longitudinally stacked wall panels 210. The wall panel group 210 comprises a set of annularly distributed arc wall panels 211. A set of arc wall panels 211 in each wall panel group 210 are overlapped in a counterclockwise direction. The overlapped parts of two connected arc wall panels 211 in the wall panel group 210 are bonded by a sealant. The overlapped parts of the upper and lower wall panel groups 210 are bonded by a sealant. The overlapping connection holes at the overlapped parts of the tank wall 200 are fixed by bolts. The tank top 300 is fixed on the top of the tank wall 200. A group of chemical anchor bolts 101 uniformly distributed in an annular pattern is fixed to the tank bottom 100, each group of chemical anchor bolts 101 contains two symmetrically arranged chemical anchor bolts 101, and a foundation angle steel 102 is fixed to the chemical anchor bolt group 101. The two chemical anchor bolts 101 in each group of chemical anchor bolts 101 respectively cross the two mounting holes of one of the foundation angle steels 102, and the gap between two adjacent foundation angle steels 102 is filled with sealant; the outer edge of the bottom wall panel group 210 is fixed to the tank bottom 100 through a group of annularly distributed foundation angle steels 102 and chemical anchor bolts 101, and the foundation angle steels 102 and the tank bottom 100 are bonded with the sealant. The outer edge of the seal is filled with a circle of sealant, the outer surface of the bottom peripheral side of the bottom wall panel group 210 and the side of the anchor angle 102 are bonded by sealant, and the outer edge of the seal after the bottom wall panel group 210 and the anchor angle 102 are bonded is filled with a circle of sealant; the inner surface of the bottom peripheral side of the wall panel group 210 is bonded with a sealing plate 400 by sealant, and the bottom surface of the sealing plate 400 is fixed on the tank bottom 100, and the outer edge of the seal after the sealing plate 400 and the tank bottom 100 are bonded is filled with a circle of sealant, and the outer edge of the seal after the bottom wall panel group 210 and the sealing plate 400 are bonded is filled with a circle of sealant.

[0037] Specifically, a bottom connection hole group 201 is provided at the bottom edge of the arc-shaped wall panel 211, and a top connection hole group 202 is provided at the top edge of the arc-shaped wall panel 211. Both the bottom connection hole group 201 and the top connection hole group 202 are composed of a group of connection holes uniformly distributed in a curve. Both sides of the arc-shaped wall panel 211 are provided with a side connection hole group 203, and the side connection hole group 203 is composed of a group of connection holes uniformly distributed longitudinally. The side connection hole groups 203 of the two connected arc-shaped wall panels 211 in the wall panel group 210 overlap one by one, and the bottom connection hole groups 201 and the top connection hole groups 202 in the overlapping parts of the upper and lower wall panel groups 210 overlap one by one.

[0038] Furthermore, a bottom connection hole group 201 is provided at the bottom edge of the curved wall panel 211, and a top connection hole group 202 is provided at the top edge of the curved wall panel 211. Both the bottom connection hole group 201 and the top connection hole group 202 are composed of a group of connection holes uniformly distributed in a curve. Both sides of the curved wall panel 211 are provided with a side connection hole group 203, and the side connection hole group 203 is composed of a group of connection holes uniformly distributed longitudinally. The side connection hole groups 203 of the two connected curved wall panels 211 in the wall panel group 210 overlap one by one, and the bottom connection hole groups 201 and the top connection hole groups 202 in the overlapping parts of the upper and lower wall panel groups 210 overlap one by one.

[0039] The operation process of this embodiment is as follows: First, the arc-shaped wall panels 211 are lapped counterclockwise. The lapped parts are fixed with sealant, and the hole alignment positions of the lapped parts are fixed with bolts to complete the assembly operation of the first-layer wall panel group 210. Then, the electric screw hoists 500 are placed one by one in appropriate positions so that the connecting plates 510 of the lifting platforms in the electric screw hoists 500 are closely attached to one of the side connection hole groups 203 in the first-layer wall panel group 210, causing the plate holes 511 of the connecting plates 510 to correspond and coincide with the hole positions of the side connection hole groups 203, and then fixed with screws. Then, the electric screw hoists 500 are started to drive the first-layer wall panel group 210 to move upward. Then, using sealant, the arc-shaped wall panels 211 of the second-layer wall panel group 210 are successively lapped counterclockwise at the bottom position of the first-layer wall panel group 210, ensuring that the bottom connection hole groups 201 and the top connection hole groups 202 in the upper and lower two wall panel groups 210 at the lapped parts correspond and coincide one by one. The lapped parts are fixed with sealant, and the hole alignment positions of the lapped parts are fixed with bolts to complete the stacking operation of the second-layer wall panel group 210. After that, after each layer of the wall panel group 210 is installed, it is immediately lifted one layer by the electric screw hoist 500, and then the stacking of the next layer of the wall panel group 210 is carried out, and the assembly of the tank wall 200 is completed in sequence. Embodiment 2

[0040] Please refer to Fig.11 , on the basis of Embodiment 1, sealant is applied to both sides of the outer surface of each arc-shaped wall panel 211, and a spacer plate is stuffed into the gap at the lapped part of the wall panel group 210; a "cross" diagonal is formed in the middle part after every four arc-shaped wall panels 211 are spliced in a "field" shape, and a reinforcing layer 220 is applied to the outside of the "cross" diagonal in the tank wall 200, and the reinforcing layer 220 is sealant.

[0041] The operation process of this embodiment is as follows: Through the action of the reinforcing layer 220, the diagonal connection part is further strengthened, the water pressure resistance performance and the sealing performance of the tank wall 200 are improved, and the strength of the tank wall 200 is enhanced; In addition, when the arc-shaped wall panels 211 in the tank wall 200 are lapped and there are gaps, first apply sealant to the parts that need to be lapped, and then insert the spacer plate. By using the spacer plate and sealant, the lapped parts are made closer. Embodiment 3

[0042] Please refer to Figure 1 , Figure 3 , Figure 4 , Figure 5 and Figure 6On the basis of Example 1 and Example 2, the tank top 300 further includes a top ring plate 310, a bottom ring plate 320, a beam plate 330 and an eaves plate group 340, a group of annularly distributed beam plates 330 are fixed between the top ring plate 310 and the bottom ring plate 320, an eaves plate group 340 is fixed between two adjacent beam plates 330, the eaves plate group 340 includes a first eaves plate 341, a second eaves plate 342, a third eaves plate 343 and a fourth eaves plate 344, the first eaves plate 341, the second eaves plate 342, the third eaves plate 343 and the fourth eaves plate 344 are overlapped by sealant, the bottom ring plate 320 is overlapped on the wall plate group 210 at the top of the tank wall 200, the bottom surface of the bottom ring plate 320 is bonded and fixed to the top surface of the wall plate group 210 at the top by sealant, and a circle of sealant is filled at the outer edge of the glue seal after the bottom ring plate 320 and the top of the tank wall 200 are bonded.

[0043] Specifically, the top side of the No. 1 eaves plate 341 is bonded to the outer peripheral side of the top ring plate 310 by sealant, the two side surfaces of the No. 1 eaves plate 341 are bonded to the beam plates 330 on both sides by sealant, the top side of the No. 2 eaves plate 342 is bonded to the edge of the bottom outer surface of the No. 1 eaves plate 341 by sealant, the two side surfaces of the No. 2 eaves plate 342 are bonded to the beam plates 330 on both sides by sealant, the top side of the No. 3 eaves plate 343 is bonded to the edge of the bottom outer surface of the No. 2 eaves plate 342 by sealant, the two side surfaces of the No. 3 eaves plate 343 are bonded to the beam plates 330 on both sides by sealant, the top side of the No. 4 eaves plate 344 is bonded to the edge of the bottom outer surface of the No. 3 eaves plate 343 by sealant, the two side surfaces of the No. 4 eaves plate 344 are bonded to the beam plates 330 on both sides by sealant, and the bottom side of the No. 4 eaves plate 344 is bonded to the inner surface wall of the bottom ring plate 320 by sealant.

[0044] Furthermore, the hole group at the overlapping position of the No. 1 eaves board 341 and the No. 2 eaves board 342, the hole group at the overlapping position of the No. 2 eaves board 342 and the No. 3 eaves board 343, and the hole group at the overlapping position of the No. 3 eaves board 343 and the No. 4 eaves board 344 all overlap one by one, the outermost mounting holes at the overlapping position of the No. 1 eaves board 341 and the No. 2 eaves board 342, the outermost mounting holes at the overlapping position of the No. 2 eaves board 342 and the No. 3 eaves board 343, and the outermost mounting holes at the overlapping position of the No. 3 eaves board 343 and the No. 4 eaves board 344 respectively overlap one by one with the mounting holes on the beam plate 330, and the eaves plate group 340 and the beam plate 330 are fixed by bolts in the corresponding overlapping mounting holes.

[0045] The operation process of this embodiment is: use sealant to bond the first eaves board 341, the second eaves board 342, the third eaves board 343 and the fourth eaves board 344 step by step between the two beams 330, and then fix bolts in each hole to form an eaves board group 340, and then install each eaves board group 340 in turn between the two beams 330 to complete the assembly of the tank top 300, and then use hoisting equipment to hoist the assembled tank top 300 to the top of the tank wall 200, and then use sealant to seal and bond the contact part between the tank top 300 and the tank wall 200 to complete the splicing between the tank top 300 and the tank wall 200. Example 4

[0046] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 7 and Figure 8 On the basis of Example 1, Example 2 and Example 3, the tank bottom 100 includes a pre-embedded ring plate 110 and a bottom plate 120. The pre-embedded ring plate 110 is a hollow columnar structure. The pre-embedded ring plate 110 is cast in the foundation by concrete. The top of the pre-embedded ring plate 110 protrudes from the foundation. The bottom plate 120 is placed on the foundation in the center area of ​​the pre-embedded ring plate 110. The outer edge of the bottom plate 120 is welded to the inner wall of the protruding part of the top of the pre-embedded ring plate 110.

[0047] Specifically, the bottom surface of the wall panel group 210 located at the bottom is bonded to the top surface of the embedded ring plate 110 by sealant, the bottom surface of the anchor angle 102 is bonded to the top surface of the embedded ring plate 110 by sealant, the chemical anchor 101 is fixed to the top surface of the embedded ring plate 110, and the sealing plate 400 is placed on the top surface of the base plate 120.

[0048] The operation process of this embodiment is as follows: the bottom surface and the outer side surface of the sealing plate 400 are coated with sealant, so that the bottom surface of the sealing plate 400 is bonded to the bottom plate 120, and the outer side surface of the sealing plate 400 is bonded to the inner bottom edge of the tank wall 200, thereby completing the internal bottom sealing operation; Apply glue to the bottom of the tank wall 200 and the connecting parts of the surface of the embedded ring plate 110, and then place the embedded ring plate 110 on the tank wall 200 so that the bottom of the tank wall 200 is bonded to the embedded ring plate 110, and then apply glue to the bottom and side surfaces of the anchor angle steel 102 so that the bottom surface of the anchor angle steel 102 is attached to the embedded ring plate 110, and the side surfaces of the anchor angle steel 102 are directly bonded to the outer bottom edge of the tank wall 200, and at the same time ensure that the anchor angle steel 102 is fixed to the embedded chemical anchor bolt 101 to complete the external bottom sealing operation. Example 5

[0049] See also Fig.12 and Fig.13On the basis of Example 1, Example 2 and Example 3, the tank bottom 100 includes a concrete foundation 130 and an anti-corrosion layer 140. The top surface of the concrete foundation 130 is coated with an anti-corrosion material to form the anti-corrosion layer 140. The sealing plate 400 is placed on the top surface of the anti-corrosion layer 140. The anti-corrosion material used in the anti-corrosion layer 140 is a polymer anti-corrosion and waterproof coating.

[0050] Specifically, the bottom surface of the wall panel group 210 at the bottom is bonded to the top surface of the concrete foundation 130 by sealant, the bottom surface of the anchor angle 102 is bonded to the top surface of the concrete foundation 130 by sealant, and the chemical anchor 101 is fixed to the top surface of the embedded ring plate 110.

[0051] The operation process of this embodiment is as follows: the bottom surface and the outer side surface of the sealing plate 400 are coated with sealant, so that the bottom surface of the sealing plate 400 is bonded to the anti-corrosion layer 140 of the concrete foundation 130, and the outer side surface of the sealing plate 400 is bonded to the inner bottom edge of the tank wall 200, thereby completing the internal bottom sealing operation; Apply glue to the bottom of the tank wall 200 and the connecting parts on the surface of the concrete foundation 130, and then place the tank wall 200 on the concrete foundation 130 so that the bottom of the tank wall 200 is bonded to the concrete foundation 130, and then apply glue to the bottom and side surfaces of the anchor angle steel 102 so that the bottom surface of the anchor angle steel 102 is attached to the concrete foundation 130, and the side surfaces of the anchor angle steel 102 are directly bonded to the outer bottom edge of the tank wall 200, while ensuring that the anchor angle steel 102 is fixed to the pre-buried chemical anchor bolt 101, completing the external bottom sealing operation. Example 6

[0052] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 , Fig. 9 , Fig.10 , Fig.11 , Fig.12 and Fig.13 On the basis of Embodiment 1, Embodiment 2 and Embodiment 3, the present invention also relates to a construction method of a modular assembled pre-buried tank body, which is used for installing a modular assembled pre-buried tank body. The specific installation includes the following steps: S1: Construction preparation; First, mark the location on site and drive in cement nails for permanent marking. Then, determine the location of the tank on the foundation according to the 200 radius of the tank wall. Draw the location of the tank on the foundation. Then, adjust the level. Place the level at the center or periphery of the foundation to observe the location of the entire circle of measurement points. Calculate the elevation of the measurement points, save the data and form a record. If the local flatness is unqualified, immediately grind the unqualified area to the design requirements. Then, drill holes every 2-3 meters at the location of the tank. The hole depth should be 5-10 cm. Insert steel scraps into the holes to prepare for the assembly of the first layer of tank wall 200. S2: Assembling the first layer of wall panels 210; First, determine the assembly starting point, overlap each arc wall panel 211 counterclockwise, fix the overlapped part with sealant, and fix the hole position of the overlapped part with bolts, and complete the assembly operation of the first layer wall panel group 210; S3: The electric screw lifter 500 lifts the first layer of wall panel set 210; Place the electric screw lifters 500 one by one to the appropriate position, so that the connecting plate 510 of the lifting platform in the electric screw lifter 500 is close to one of the side connection hole groups 203 in the first layer wall panel group 210, so that the plate hole 511 of the connecting plate 510 coincides with the hole position of the side connection hole group 203, and then fix it with screws, and then start the electric screw lifter 500 to drive the first layer wall panel group 210 to move upward; S4: stacking and splicing to form a tank wall 200; By using sealant, the arc-shaped wall panels 211 of the second layer of wall panel group 210 are overlapped in a counterclockwise manner at the bottom position of the first layer of wall panel group 210 in turn, ensuring that the bottom connection hole group 201 and the top connection hole group 202 at the overlapped position of the upper and lower wall panel groups 210 overlap one by one, the overlapped position is fixed by sealant, and the hole positions at the overlapped position are fixed by bolts, and the stacking operation of the second layer of wall panel group 210 is completed. After that, after each layer of wall panel group 210 is installed, it is immediately moved up by the electric screw lifter 500, and then the next layer of wall panel group 210 is stacked, and the assembly of the tank wall 200 is completed in turn; S5: assembly of the tank top 300; Using sealant, the first eaves board 341, the second eaves board 342, the third eaves board 343 and the fourth eaves board 344 are bonded step by step between the two beams 330, and then bolts are fixed in the respective holes to form an eaves board group 340, and then the eaves board groups 340 are successively installed between the two beams 330 to complete the assembly of the tank top 300; S6: hoisting the tank top 300 to assemble it with the tank wall 200; Use the hoisting equipment to hoist the assembled tank top 300 to the top of the tank wall 200, and then use the sealant to seal the contact part between the tank top 300 and the tank wall 200, and then fill a circle of sealant at the outer edge of the glue seal after the tank top 300 and the tank wall 200 are bonded, so as to complete the splicing between the tank top 300 and the tank wall 200; S7: Tank bottom sealing; Apply glue to the bottom of the tank wall 200 and the surface connection parts of the tank bottom 100, and then place the tank wall 200 on the tank bottom 100, so that the bottom of the tank wall 200 is bonded to the tank bottom 100, and then apply glue to the bottom and side surfaces of the anchor angle steel 102, so that the bottom surface of the anchor angle steel 102 is attached to the tank bottom 100, and the side surface of the anchor angle steel 102 is directly bonded to the outer bottom edge of the tank wall 200, and at the same time, ensure that the anchor angle steel 102 is fixed to the pre-buried chemical anchor bolt 101, and the tank body external bottom sealing operation is completed, and then apply sealant to the bottom and outer side surfaces of the sealing plate 400, so that the bottom surface of the sealing plate 400 is bonded to the tank bottom 100, and the outer side surface of the sealing plate 400 is bonded to the inner bottom edge of the tank wall 200, and the tank body internal bottom sealing operation is completed; S8: Full water test; Fill the assembled tank with water and perform a full water test.

[0053] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0054] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A modular assembled pre-buried tank body, comprising a tank bottom (100), a tank wall (200), a tank top (300) and a sealing plate (400); characterized in that: The top of the tank bottom (100) is fixed with a tank wall (200) via a sealant, and the top of the tank wall (200) is fixed with a tank top (300); The tank wall (200) comprises a group of longitudinally stacked wall panels (210), the wall panel group (210) comprising a group of annularly distributed arcuate wall panels (211), a group of the arcuate wall panels (211) in each wall panel group (210) being overlapped in a counterclockwise direction; the overlapped portions of two connected arcuate wall panels (211) in the wall panel group (210) are bonded by a sealant, the overlapped portions of the upper and lower wall panel groups (210) are bonded by a sealant, and the overlapping connection holes at the overlapped portions of the tank wall (200) are fixed by bolts; A group of chemical anchor bolts (101) uniformly distributed in an annular pattern is fixed to the tank bottom (100), each group of chemical anchor bolts (101) contains two symmetrically arranged chemical anchor bolts (101), a foundation angle steel (102) is fixed to the group of chemical anchor bolts (101), the two chemical anchor bolts (101) in each group of chemical anchor bolts (101) respectively cross two mounting holes of one of the foundation angle steels (102), and a gap between two adjacent foundation angle steels (102) is filled with sealant; the outer edge of the wall panel group (210) at the bottom is fixed to the tank bottom (100) by a group of annularly distributed foundation angle steels (102) and chemical anchor bolts (101), and the foundation angle steel (102) and the tank bottom (100) are bonded. The outer edge of the seal after the sealing is filled with a circle of sealant, the outer surface of the bottom peripheral side of the wall panel group (210) at the bottom and the side surface of the anchor angle steel (102) are bonded by sealant, and the outer edge of the seal after the wall panel group (210) and the anchor angle steel (102) are bonded is filled with a circle of sealant; the inner surface of the bottom peripheral side of the wall panel group (210) is bonded with a sealing plate (400) by sealant, the bottom surface of the sealing plate (400) is fixed on the tank bottom (100), and the outer edge of the seal after the sealing plate (400) and the tank bottom (100) are bonded is filled with a circle of sealant, and the outer edge of the seal after the wall panel group (210) and the sealing plate (400) are bonded is filled with a circle of sealant; The tank top (300) includes a top ring plate (310), a bottom ring plate (320), beam plates (330) and an eave plate group (340). A group of annularly distributed beam plates (330) are fixed between the top ring plate (310) and the bottom ring plate (320), and an eave plate group (340) is fixed between two adjacent beam plates (330). The eave plate group (340) includes a first eave plate (341), a second eave plate (342), a third eave plate (343) and a fourth eave plate (344), and the first eave plate (341), the second eave plate (342), the third eave plate (343) and the fourth eave plate (344) are overlapped by sealant; the bottom ring plate (320) is placed on the top wall plate group (210) of the tank wall (200), and the bottom surface of the bottom ring plate (320) and the top surface of the top wall plate group (210) are adhesively fixed by sealant, and a circle of sealant is filled at the outer edge of the glue seal after the bottom ring plate (320) and the top of the tank wall (200) are bonded.

2. A modular assembled pre-buried tank according to claim 1, characterized in that: Sealant is applied to both sides of the outer surface of each arc-shaped wall plate (211), and a gap plate is stuffed in the gap at the overlapping part of the wall plate group (210); The middle part of every four arc-shaped wall plates (211) joined in a "field" shape forms a "cross" diagonal. A reinforcing layer (220) is applied to the outside of the "cross" diagonal in the tank wall (200), and the reinforcing layer (220) is sealant.

3. A modular assembled pre-buried tank according to claim 2, characterized in that: Bottom connection hole groups (201) are formed at the bottom edges of the arc-shaped wall plates (211), top connection hole groups (202) are formed at the top edges of the arc-shaped wall plates (211). Both the bottom connection hole groups (201) and the top connection hole groups (202) are composed of a group of connection holes evenly distributed in a curve. Side connection hole groups (203) are formed at both side edges of the arc-shaped wall plates (211), and the side connection hole groups (203) are composed of a group of connection holes evenly distributed longitudinally; The side connection hole groups (203) of two adjacent arc-shaped wall plates (211) in the wall plate group (210) coincide one by one, and the bottom connection hole groups (201) and the top connection hole groups (202) at the overlapping part of the upper and lower wall plate groups (210) coincide one by one.

4. A modular assembled pre-buried tank according to claim 3, characterized in that: The top side of the first eaves plate (341) is bonded to the outer peripheral side of the top ring plate (310) by means of sealant, the two side surfaces of the first eaves plate (341) are bonded to the beam plates (330) on both sides by means of sealant, the top side of the second eaves plate (342) is bonded to the outer edge of the bottom surface of the first eaves plate (341) by means of sealant, the two side surfaces of the second eaves plate (342) are bonded to the beam plates (330) on both sides by means of sealant, and the top side of the third eaves plate (343) is bonded to the outer edge of the bottom surface of the first eaves plate (341) by means of sealant. The second eaves plate (342) is connected to the bottom outer surface edge of the second eaves plate (342), the two side surfaces of the third eaves plate (343) are bonded to the beam plates (330) on both sides by means of sealant, the top side of the fourth eaves plate (344) is bonded to the bottom outer surface edge of the third eaves plate (343) by means of sealant, the two side surfaces of the fourth eaves plate (344) are bonded to the beam plates (330) on both sides by means of sealant, and the bottom side of the fourth eaves plate (344) is bonded to the inner surface wall of the bottom ring plate (320) by means of sealant.

5. The modular assembled pre-buried tank according to claim 4, characterized in that: The hole group at the overlapped portion of the first eaves plate (341) and the second eaves plate (342), the hole group at the overlapped portion of the second eaves plate (342) and the third eaves plate (343), and the hole group at the overlapped portion of the third eaves plate (343) and the fourth eaves plate (344) all overlap in a one-to-one correspondence; the outermost mounting holes at the overlapped portion of the first eaves plate (341) and the second eaves plate (342), the outermost mounting holes at the overlapped portion of the second eaves plate (342) and the third eaves plate (343), and the outermost mounting holes at the overlapped portion of the third eaves plate (343) and the fourth eaves plate (344) respectively overlap in a one-to-one correspondence with the mounting holes on the beam plate (330); the eaves plate group (340) and the beam plate (330) are fixed in the corresponding overlapping mounting holes by bolts.

6. The modular assembled pre-buried tank according to claim 1, characterized in that: The tank bottom (100) comprises a pre-embedded ring plate (110) and a bottom plate (120); the pre-embedded ring plate (110) is a hollow columnar structure; the pre-embedded ring plate (110) is cast in a foundation by concrete; the top of the pre-embedded ring plate (110) protrudes from the foundation; the bottom plate (120) is placed on the foundation in the center area of ​​the pre-embedded ring plate (110); and the outer edge of the bottom plate (120) is welded to the inner wall of the protruding portion of the top of the pre-embedded ring plate (110).

7. The modular assembled pre-buried tank according to claim 6, characterized in that: The bottom surface of the wall panel group (210) located at the bottom is bonded to the top surface of the embedded ring plate (110) by means of a sealant, the bottom surface of the anchor angle steel (102) is bonded to the top surface of the embedded ring plate (110) by means of a sealant, the chemical anchor bolt (101) is fixed to the top surface of the embedded ring plate (110), and the sealing plate (400) is placed on the top surface of the bottom plate (120).

8. The modular assembled pre-buried tank according to claim 1, characterized in that: The tank bottom (100) comprises a concrete foundation (130) and an anti-corrosion layer (140); the top surface of the concrete foundation (130) is coated with an anti-corrosion material to form the anti-corrosion layer (140); and the sealing plate (400) is placed on the top surface of the anti-corrosion layer (140).

9. The modular assembled pre-buried tank according to claim 8, characterized in that: The bottom surface of the wall panel group (210) located at the bottom is bonded to the top surface of the concrete foundation (130) by means of a sealant, the bottom surface of the anchor angle steel (102) is bonded to the top surface of the concrete foundation (130) by means of a sealant, and the chemical anchor bolt (101) is fixed to the top surface of the embedded ring plate (110).

10. A construction method for modularly assembled pre-buried tank, used for the modularly assembled pre-buried tank according to any one of claims 1 to 5, wherein the specific installation comprises the following steps: S1: Construction preparation; First, mark the location on site and drive in cement nails for permanent marking. Then, determine the location of the tank on the foundation according to the radius of the tank wall (200), and draw the location of the tank on the foundation. Then, adjust the level and place the level at the center or periphery of the foundation to observe the location of the entire circle of measurement points. Calculate the elevation of the measurement points, save the data and make a record. If the local flatness is unqualified, immediately grind the unqualified area to the design requirements. Then, drill holes every 2-3 meters at the location of the tank. The hole depth should be 5-10 cm. Insert steel scraps into the holes to prepare for the assembly of the first layer of tank wall (200); S2: Assembling the first layer of wall panels (210); First, determine the assembly starting point, overlap each arc-shaped wall panel (211) counterclockwise, fix the overlapped part with a sealant, and fix the hole position of the overlapped part with a bolt, so as to complete the assembly operation of the first layer wall panel group (210); S3: The electric screw lifter (500) lifts the first layer of wall panel group (210); The electric screw lifters (500) are placed one by one in suitable positions, so that the connection plate (510) of the lifting platform in the electric screw lifter (500) is closely attached to one of the side connection hole groups (203) in the first layer wall panel group (210), so that the plate hole (511) of the connection plate (510) and the hole position of the side connection hole group (203) are correspondingly overlapped, and then fixed with screws, and then the electric screw lifter (500) is started to drive the first layer wall panel group (210) to move upward; S4: stacking and splicing to form a tank wall (200); Using sealant, overlap each arc-shaped wall panel (211) of the second layer wall panel group (210) in a counterclockwise manner at the bottom position of the first layer wall panel group (210), ensure that the bottom connection hole group (201) and the top connection hole group (202) at the overlapped position of the upper and lower wall panel groups (210) correspond to each other and overlap one by one, fix the overlapped position by sealant, and fix the hole positions at the overlapped position by bolts, and complete the stacking operation of the second layer wall panel group (210), and then immediately move up one layer by an electric screw lifter (500) after each layer of wall panel group (210) is installed, and then stack the next layer of wall panel group (210), and complete the assembly of the tank wall (200) in sequence; S5: Assembly of the tank top (300); Using sealant, the first eaves plate (341), the second eaves plate (342), the third eaves plate (343) and the fourth eaves plate (344) are bonded step by step between the two beam plates (330), and then bolts are fixed in the respective holes to form an eaves plate group (340), and then the eaves plate groups (340) are sequentially installed between the two beam plates (330) to complete the assembly of the tank top (300); S6: hoisting the tank top (300) to assemble it with the tank wall (200); Using a lifting device, the assembled tank top (300) is lifted to the top of the tank wall (200), and then the contact portion of the tank top (300) and the tank wall (200) are sealed and bonded using a sealant, and then a circle of sealant is filled at the outer edge of the seal where the tank top (300) and the tank wall (200) are bonded, thereby completing the splicing between the tank top (300) and the tank wall (200); S7: Tank bottom sealing; Glue is applied to the bottom of the tank wall (200) and the connection part of the surface of the tank bottom (100), and then the tank wall (200) is placed on the tank bottom (100) so that the bottom of the tank wall (200) is bonded to the tank bottom (100), and then glue is applied to the bottom and side of the anchor angle steel (102) so that the bottom of the anchor angle steel (102) is bonded to the tank bottom (100) and the side of the anchor angle steel (102) is directly bonded to the bottom of the tank bottom (100). The outer bottom edge of the tank wall (200) is fixed to the anchor angle steel (102) on the pre-buried chemical anchor bolt (101) to complete the external bottom sealing operation of the tank body. Then, the bottom surface and the outer side surface of the sealing plate (400) are coated with sealant so that the bottom surface of the sealing plate (400) is bonded to the tank bottom (100) and the outer side surface of the sealing plate (400) is bonded to the inner bottom edge of the tank wall (200) to complete the internal bottom sealing operation of the tank body. S8: Full water test; Fill the assembled tank with water and perform a full water test.

Citation Information

Patent Citations

  • Anti-leakage construction method for bottomless bolt connection type water tank

    CN112922425A

  • Tank bottom foundation anti-corrosion packaging structure and construction method

    CN116674889A

  • Pin -connected panel tapered tank top

    CN207631860U

  • Method and structure for preventing corrosion at outside surface of bottom plate of steel tank

    JP1999180495A

  • Large-sized tank for disposal of livestock excreta and manufacture thereof

    JP2000079984A