Glass deep processing technology and installation technology

By using epoxy resin glue for sealing in vacuum glass and hollow glass, the problems of high seal durability and heat transfer coefficient are solved, achieving more efficient energy retention and reducing manufacturing complexity and cost.

CN119059744APending Publication Date: 2024-12-03吴淑环
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410191069.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2023-12-21
Filing Date
2024-02-21
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Existing vacuum glass and hollow glass have leakage rates, high heat transfer coefficient and short sealing durability in terms of sealing, resulting in high energy consumption and increased carbon emissions, and are complex in manufacturing and high cost, which affects the industrialization process.

Method used

Epoxy resin glue is used as a replacement for sealing of vacuum glass and hollow glass, including coating epoxy resin glue on the edges of the glass, eliminating the film removal requirement for Low-e coating, increasing the sealing durability, and through spray coating and high barrier adhesives improve sealing performance.

Benefits of technology

It significantly reduces the heat transfer coefficient of vacuum glass and hollow glass, extends the sealing durability period, improves the reliability and durability of seals, reduces manufacturing and use costs, and promotes the industrialization process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119059744A_ABST
    Figure CN119059744A_ABST
Patent Text Reader

Abstract

The invention relates to a glass deep processing technology and an installation technology, and aims to solve the problems that current vacuum glass, hollow glass and laminated glass are poor in sealing, poor in energy conservation and more in installation of glass thermal bridges, and installation of thin film type solar photovoltaic laminated glass on a building is not scientific. Firstly, the copper foil and the copper layer sprayed at the outer end of the glass are welded to seal the vacuum glass, or the vacuum glass is sealed by using a spraying layer or adhering an aluminum foil with an adhesive; secondly, epoxy resin glue is coated on the coating layer for bonding, and the coating layer does not need to be removed; the hollow glass spacing bars are coated with epoxy resin adhesive aluminum foils for sealing. And 3, mounting glass for eliminating the fixed heat dissipation bridge and the open heat dissipation bridge. And 4, sealing the gas permeation part of the laminated glass or sealing the laminated glass by using epoxy resin glue. And 5, installing the bonding cushion block between the photovoltaic laminated glass and the base layer to completely or partially replace the iron piece for installation and fixation. The invention solves the problems of poor sealing and poor durability in the current glass deep processing technology, eliminates the installation of a glass thermal bridge, and can install photovoltaic laminated glass on an outer wall and a roof.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to glass technology, in particular to glass deep processing technology and installation technology. Background Art

[0002] Currently, the investment in manufacturing vacuum glass in high-temperature kilns is large, the manufacturing is difficult, the energy consumption is high, the cost is high, and it is difficult to realize the industrialization of vacuum glass. Vacuum glass has many thermal bridges at the edge sealing, and it is difficult to achieve a low heat transfer coefficient. In addition, vacuum glass manufactured in high-temperature kilns may have a leakage rate.

[0003] The current regulations on the durability of insulating glass sealing are only 15 years, which does not meet the increasingly stringent requirements for energy conservation and emission reduction. It is impossible for buildings to replace insulating glass every 15 years because glass manufacturing itself is a high-energy consumption industry.

[0004] But in reality, most insulating glass has a lifespan of less than 15 years. As energy-saving standards continue to improve, it is found that the inert gas in the insulating glass with low heat transfer coefficient is lost, and the silver in the (Low-e) coating on the glass is oxidized, and the coating is damaged. Some people in the glass industry say that the coating on the glass will not last for 8 to 10 years, causing the heat transfer coefficient of the insulating glass to rise sharply. When the insulating glass with low heat transfer coefficient is put into production, it will rise to the value of the heat transfer coefficient of ordinary insulating glass (2.8 to 3)w / m 2 ·k, but the user cannot see or know it.

[0005] At present, the sealing technology of insulating glass is to use hot-melt butyl sealant to seal and fill the outer side of the spacer with silicone structural adhesive. According to the information, hot-melt butyl sealant (hereinafter referred to as butyl sealant) is a sealant processed from butyl rubber. It is one of the sealants with the largest consumption in the world. It has always been generally believed that butyl sealant has excellent weather resistance, heat resistance, acid and alkali resistance, excellent air tightness and electrical insulation properties. However, practice has proved that butyl sealant is difficult to ensure long-term sealing of insulating glass. Other adhesives such as silicone structural adhesive have poor sealing properties and are mainly suitable for sealing water, not for sealing gas. Some articles say that the barrier property of silicone structural adhesive is about 1 / 6 of that of butyl adhesive. The function of silicone structural adhesive is to bond with the glass on both sides and the spacer, which can increase the tensile strength between insulating glass materials.

[0006] Under the severe situation of controlling carbon emissions, only the manufacture of multi-cavity suspended film insulating glass can significantly reduce the heat transfer coefficient of insulating glass. However, the manufacture of multi-cavity suspended film insulating glass is troublesome, requires large investment, and is expensive. In addition, the poor sealing of the insulating glass has become an obstacle to the manufacture of multi-cavity suspended film insulating glass.

[0007] In addition, when manufacturing insulating glass, the Low-E film is not compatible with the silicone structural adhesive and butyl sealant used for edge sealing, which affects the bonding. A film removal wheel is needed to remove the Low-E film sealed on the edge of the glass, which increases the workload. And how to remove the Low-E film on the (PET) film? In addition, the film removal may not be clean and there may be sequelae of film removal, which will affect the service life of the insulating glass. This is another major obstacle to the promotion of multi-cavity suspended film insulating glass.

[0008] The above problems cause the heat transfer coefficient of insulating glass to remain high for a long time.

[0009] Glass is a big hole for heat loss in buildings. The energy it loses is tens of millions times that of cars, which is the cause of increasing fossil energy consumption. However, we do not see it and take it for granted, which leads to high global carbon emissions and is the most important reason why global climate change is difficult to control. It is necessary to increase the sealing durability of insulating glass and ensure the stability of heat transfer coefficient within the durability. It is necessary to promote the popularization of multi-cavity suspended film insulating glass.

[0010] At present, laminated glass, including solar photovoltaic laminated glass, has problems such as poor edge sealing and poor water vapor resistance. It is easy to debond in a humid environment for a long time. The life of laminated glass is short, which affects the output power of solar cell modules and may even cause leakage and short circuit, affecting the investment benefits of photovoltaic power generation. In addition, it is difficult to solve the problem of the impact of the output of photovoltaic power stations on the power grid. These problems restrict the development of the photovoltaic power generation industry.

[0011] In order to solve the above problems, the present invention provides a glass deep processing technology and installation technology. Summary of the invention

[0012] The purpose of the present invention is to provide a glass deep processing technology and installation technology to solve the problems described in the background technology.

[0013] One of the glass deep processing technology and installation technology is the external sealing technology of vacuum glass or insulating glass. The vacuum glass includes vacuum glass with possible leakage rate manufactured by the current high-temperature kiln, and also includes vacuum glass manufactured at room temperature; the spacing material of the insulating glass and the vacuum glass manufactured at room temperature is a spacing bar, which also includes glass and adhesive. The vacuum glass manufactured at room temperature is made by bonding the stainless steel spacing bar to the periphery of the two side glasses of the vacuum glass with epoxy resin glue; the periphery sealing of the vacuum glass or / and insulating glass adopts the following structure and method, which can be selected according to the needs:

[0014] 1) Spray a copper layer on the two side glasses of the vacuum glass or on the peripheral section of the vacuum glass made in the current high temperature kiln and which may have a leakage rate, and weld the pinhole-free copper foil and the copper layer sprayed on the glass with tin solder to seal;

[0015] 2) Use a spraying method to spray the material of the spray coating onto the peripheral section of the vacuum glass that may have a leak rate and is currently manufactured in a high-temperature kiln, or spray it onto the peripheral section of the end section of the assembled vacuum glass manufactured at room temperature for sealing;

[0016] 3) Use a spraying method to spray the material of the spray layer onto the periphery of the assembled insulating glass to increase the sealing of the insulating glass;

[0017] The sprayed layer meets the bonding requirements with glass and spacer materials.

[0018] A second glass deep processing technology and installation technology is a technology that does not require the removal of Low-e coating on the edge of the glass when manufacturing hollow glass, and does not require the removal of Low-e coating on the edge of the installed (PET) coating, or strengthens the sealing of the hollow glass and simultaneously cancels the removal of Low-e coating on the edge of the glass, and does not require the removal of Low-e coating on the edge of the installed (PET) coating, thereby increasing the durability of the sealing of the hollow glass; the glass of the hollow glass is ordinary glass, various safety glass, coated glass, or a coated (PET) film is also attached to the glass, or the two sides or one side of the hollow glass can also be replaced by an acrylic (PMMA) board, and the spacer of the hollow glass can be any spacer; or there is an interlayer in the hollow glass to manufacture double hollow or multi-cavity hollow glass, and the interlayer is glass or an acrylic (PMMA) board, or the interlayer is an acrylic (PMMA) hollow board, or / and the interlayer is (PET) suspended film, the suspended film can be a (PET) film coated with a Low-e film, or a (PET) film without a film; the technology of not having to remove the Low-e film on the edge of the glass, and not having to remove the Low-e film on the edge of the installed (PET) film is: coating epoxy resin glue on the Low-e film on the edge of the glass, and using epoxy resin glue to replace butyl glue to bond with the spacer, or coating epoxy resin glue on the butyl glue on the bonding surface of the Low-e film and the spacer for bonding, that is, all bonding surfaces with Low-e coating are bonded with epoxy resin glue and the Low-e coating; there is no need to remove the Low-e coating on the edge of the glass, and there is no need to remove the Low-e coating of the suspended film, and the epoxy resin glue should meet the high and low temperature resistance requirements of the use environment; no matter what technology is used to install the glass or install the suspended film, as long as epoxy resin glue is used to bond with the Low-e coating, there is no need to remove the Low-e coating on the glass and the (PET) film.

[0019] A third glass deep processing technology and installation technology is about a glass installation method, wherein the glass includes single-piece glass, hollow glass, vacuum glass or vacuum-hollow combination glass; the installation method is an installation method for eliminating the thermal bridge of a fixed fan or also canceling the fan material of an open fan to eliminate the thermal bridge of the fan material of an open fan, or also changing the open fan gap from convective air heat transfer to static air to reduce heat transfer, and an installation method for increasing the durability of silicone structural adhesive for curtain wall hollow glass when installing a glass curtain wall.

[0020] A fourth glass deep processing technology and installation technology is a sealing technology for laminated glass, wherein the laminated glass includes laminated glass installed on building doors and windows and curtain walls, and also includes solar photovoltaic laminated glass, wherein the solar photovoltaic laminated glass includes crystalline silicon cell type solar photovoltaic laminated glass and thin film cell type solar photovoltaic laminated glass; the sealing of the laminated glass is to introduce a high barrier adhesive to seal the laminated glass, wherein the high barrier adhesive is an epoxy resin adhesive that meets the requirements of high and low temperature resistance, or other adhesives that meet the requirements of high barrier properties; the weak parts of the laminated glass that may be gas permeable are coated with epoxy resin adhesive for sealing, or when one side of the solar photovoltaic laminated glass is a (PET) plastic backboard, the epoxy resin adhesive is coated on the ends of the plastic backboard and the glass. The gap around the head; or / and shorten the film in the middle of the laminated glass by a certain width at the periphery, inject epoxy resin glue into the gap at the edge of the laminated glass, or / and use epoxy resin glue to stick the vapor barrier film to a certain width on the side of the laminated glass to block ultraviolet rays, or use epoxy resin glue to stick the edging aluminum alloy to the side of the solar photovoltaic laminated glass to block ultraviolet rays; or apply epoxy resin glue on the outside or inside of the transparent back plate of the solar photovoltaic laminated glass, or when the solar photovoltaic laminated glass is hit by hail or other external forces and cracks appear, apply epoxy resin glue to penetrate into the cracks for repair; or spray the section around the laminated glass to form a spray layer, apply epoxy resin glue on the spray layer, and then bond the vapor barrier film to the periphery of the solar photovoltaic laminated glass for sealing.

[0021] A fifth glass deep processing technology and installation technology is about the installation method of solar photovoltaic laminated glass, the solar photovoltaic laminated glass includes thin film battery type photovoltaic laminated glass and crystalline silicon photovoltaic laminated glass, it includes a base layer, solar photovoltaic laminated glass, adhesive and a pad; the installation of solar photovoltaic laminated glass is to use silicone structural adhesive to bond the pad between the solar photovoltaic laminated glass and the base layer, and use the bonded pad to completely replace the iron parts for installation and fixation, or to combine the bonding pad and the iron parts for installation and fixation of the solar photovoltaic laminated glass, the pad It includes point-shaped pads and strip-shaped pads. The base layer is a non-transparent base layer, or the base layer is glass. The pads are bonded to the base layer with silicone structural adhesive, and then the silicone structural adhesive is coated on the upper surface of the pads to bond the solar photovoltaic laminated glass to the pads; or there are iron parts connecting the base layer or the pads and the photovoltaic laminated glass. After the solar photovoltaic laminated glass is installed, the gap around the edge of the solar photovoltaic laminated glass and the base layer is sealed, that is, the solar photovoltaic laminated glass is installed on the exterior wall or roof of the building to become a photovoltaic building integrated building.

[0022] The differences and technical effects of the present invention compared with the prior art are as follows:

[0023] 1. In Example 1, the peripheral sealing of vacuum glass is to weld copper foil, or spray a spray coating (such as aluminum) on the end of the manufactured vacuum glass, or coat the spray coating with epoxy resin glue for sealing, or bond a pinhole-free aluminum foil for sealing. This is both a vacuum sealing method and a vacuum sealing structure. Example 1 can be used to seal vacuum glass manufactured at room temperature, and can also be used to seal vacuum glass manufactured in current high-temperature kilns that may have leakage rates. Example 1 can also be used to seal insulating glass, but the sealing requirements can be appropriately reduced. Due to the trouble, it is not recommended to be used in insulating glass.

[0024] The spraying described in the first embodiment is arc spraying, aerodynamic spraying (i.e., supersonic spraying). At present, the spraying method is widely used in the fields of petrochemical, aerospace, transportation, papermaking, and machinery to improve the surface oxidation resistance, wear resistance, and restore the size of repair parts. However, the spraying technology has never been used in vacuum technology. The spraying layer 3 of the present invention can also be formed by chemical plating, and the sprayed copper layer 3 is replaced by a silver-plated layer, which is an equivalent replacement and is within the scope of protection of the present invention. However, chemical plating is polluting, troublesome, and has poor bonding strength, so it is not recommended by the present invention.

[0025] The coating on glass or on (PET) film described in the present invention is mainly physical vapor deposition coating. Currently, vacuum magnetic sputtering coating is widely used, such as off-line sputtering of Low-e film on glass or PET film.

[0026] Manufacturing vacuum glass at room temperature means that the surrounding environment is at room temperature when the vacuum glass is assembled. For example, the installation of spacers, the installation of supports, and the sealing and exhaust sealing of the vacuum glass are all carried out at room temperature, regardless of whether the glass is baked and exhausted.

[0027] Compared with the current high-temperature kiln melting low-melting-point solder (such as low-melting-point glass powder, low-melting-point metal), the vacuum glass edge sealing technology manufactured at room temperature has the following advantages:

[0028] 1) The edge sealing is simple and will not cause annealing of the tempered glass or damage the Low-e coating on the glass.

[0029] 2) The stainless steel hollow spacer + sprayed aluminum layer in vacuum glass manufactured at room temperature increases the heat transfer coefficient by about 0.035w / m 2 k, and the installation of acrylic (PMMA) supports increases the heat transfer coefficient by 0.07w / m 2 (Calculated based on the support diameter Φ6 spacing 70mm), compared with the vacuum layer height 0.1mm ~ 0.3mm high temperature kiln made vacuum glass edge sealing and support heat transfer, for 1.5m 2 Medium area vacuum glass, reduce the heat transfer coefficient of vacuum glass by 0.2w / m 2 ·k~0.3w / m 2 k, reducing heat transfer by about 25% to 30% compared with the existing high-temperature kiln for manufacturing vacuum glass.

[0030] 3) The vacuum glass manufactured at room temperature is installed with stainless steel hollow spacers. The height of its vacuum layer is dozens of times higher than that of the current low-melting-point glass powder vacuum layer. There is no resistance when evacuating the current narrow vacuum layer. It can be evacuated quickly, and the residual gas has little effect on the vacuum degree of the vacuum layer in the larger space, which is beneficial to ensuring the vacuum life.

[0031] 4) Ensure reliable sealing without leakage, while the current vacuum glass seal has leakage.

[0032] 5) Manufacturing vacuum glass at room temperature requires little investment, and does not require hundreds of millions of dollars. Manufacturing vacuum glass consumes less energy, which can promote the industrialization of vacuum glass and is of great significance to reducing greenhouse gas emissions and controlling climate change.

[0033] 2. The technical effects of adding the insulating glass sealing structure and installing the (PET) suspension film technology in Example 2 are:

[0034] 1) The introduction of epoxy resin glue in the insulating glass technology eliminates the obstacle of mechanically removing the Low-e coating in the manufacture of insulating glass. There is no need to remove the Low-e film on the glass and the Low-e film on the (PET) film. There is no risk of contamination of the Low-e film by film removal, and there is no risk of unreliable bonding due to unclean film removal, and the glass and the suspended film may fall off.

[0035] 2) Add a vapor barrier film 5 (anodized aluminum foil) to seal the insulating glass, and achieve absolute sealing of the insulating glass, ensuring that the insulating glass seal has a durability of 50 years or more. The heat transfer coefficient of the insulating glass is stable within the durability period, and there is no sequelae of unclean film removal.

[0036] The vapor barrier film 5-1 is bonded and sealed to the glass with epoxy resin glue at the outermost periphery of the insulating glass (because epoxy resin glue has good sealing and high bonding strength, epoxy resin glue is used to bond and seal the vapor barrier film 5-1 to the glass end), which can protect the silicone structural adhesive from corrosion by water vapor, oxygen, salt spray, sulfur dioxide, etc., eliminate the factors that cause the aging of the silicone structural adhesive, and extend the service life of the silicone structural adhesive to 50 years or more. If the vapor barrier film 5 is sealed but the outermost vapor barrier film 5-1 is not sealed, it will not damage the internal sealing of the insulating glass, but the durability of the silicone structural adhesive may not reach 50 years, such as in areas with high concentrations of water vapor and salt spray at the seaside.

[0037] The above sealing technology should be used for installing insulating glass in general building doors and windows. However, for insulating glass used in curtain walls, after installing the insulating glass in the curtain wall, the vapor barrier film 5-1 (black anodized aluminum foil) can be bonded to the gap with silicone structural adhesive on both the indoor and outdoor sides for sealing. It can also be bonded to the edge of the insulating glass in the curtain wall to prevent ultraviolet rays from irradiating the adhesive on the edge of the insulating glass in the curtain wall, thus ensuring the durability of the insulating glass in the curtain wall.

[0038] 3) Although the insulating glass has multiple sealing steps, coating and bonding are very easy, and the increased workload is much less than the workload of removing the Low-e film on the glass edge and the Low-e film on the (PET) film.

[0039] 4) It is proposed to combine the use of double-sided adhesive strips for quick bonding and fixation with epoxy resin glue for permanent bonding. A double-sided adhesive strip with a width of 4mm to 5mm can be used to immediately fix the (PET) suspended film on the outside of the spacer bar 2 to install the suspended film 8. The epoxy resin glue is on both sides of the double-sided adhesive tape. The epoxy resin glue permanently bonds the (PET) suspended film to the outer side of the spacer bar 2. The (PET) suspended film is fixed and installed quickly, and the installation is convenient, the bonding strength is high, and the durability is good. This overcomes the difficulty in installing the (PET) suspended film, and can promote the popularization of multi-cavity suspended film hollow glass with low heat transfer coefficient, which is of great significance to significantly reducing the energy lost through the glass.

[0040] 5) Epoxy resin glue has high bonding strength. The introduction of epoxy resin glue in the insulating glass technology is essential to ensure the bonding strength between various materials in the installation of multi-cavity suspended film insulating glass and to ensure the safety of the insulating glass structure. It also provides a safety guarantee for the third embodiment to cancel the opening sash material profile and directly install the opening sash glass.

[0041] Both PET film and aluminum foil have high tensile strength, epoxy resin adhesive and silicone structural adhesive work together to achieve high bonding strength, the spacer will not move, and the surrounding rigidity of the insulating glass is large, ensuring the reliability of the multi-cavity suspended film insulating glass structure.

[0042] At various temperatures, even if the minimum tensile shear strength between epoxy resin glue and glass is only 1MPa (experiments show that it is much higher than 1MPa), the bonding width at the oblique shoulder is 3.5mm, the tensile shear strength of silicone structural glue is 0.45MP, and the bonding width is 6mm, that is, along the bonding gap length of the insulating glass, the total tensile force of epoxy resin glue and silicone structural glue is 620kg / m, and the insulating glass cannot be subjected to such a large peeling force. Silicone structural glue has good elasticity, and the synergistic effect of silicone structural glue and epoxy resin glue can ensure the reliable connection between the layers of insulating glass.

[0043] In order to correct the uneven surface of the installed PET suspension film 8, several infrared lamps can be mounted on the flat plate. Once the uneven surface of the installed PET coating is irradiated with infrared lamps, the PET coating will be flattened due to heat shrinkage. The combined infrared lamp can be hung under the ceiling and put down when used.

[0044] In conclusion, the insulating glass technology of the second embodiment is an important technology for manufacturing insulating glass with good durability and low heat transfer coefficient. Moreover, the sealing technology of the second embodiment can be applied to a wide range of electronic industry sealing to improve the durability of electrical products.

[0045] 2. The glass installation structure of the third embodiment can solve the serious problem that the heat transfer coefficient of the current window profile is too high and a large amount of energy is lost. The heat transfer coefficient of the current window profile is too high, making the heat transfer coefficient 0.7w / m 2 The average heat transfer coefficient of the double insulating glass combined with the profile is as high as (1-1.2)w / m 2 ·k. The glass installation structure of the third embodiment can solve the above problems, eliminate the thermal bridge of the fixed window profile, and can also eliminate the thermal bridge of the open window profile, and change the air convected in the glass gap into static air, so that there is no or almost no heat transfer loss of the building components outside the glass, which plays an important role in reducing the heat loss of the window.

[0046] 4. Example 4 proposes a sealing structure and method for laminated glass using high-barrier epoxy resin glue or also pasting a gas barrier film, which can completely solve the problem of poor sealing of laminated glass (including solar photovoltaic laminated glass), greatly improve the durability of architectural laminated glass and solar photovoltaic laminated glass, and improve the efficiency of photovoltaic power generation.

[0047] 5. Embodiment 5 proposes to install solar photovoltaic laminated glass (also known as solar power generation glass) on the exterior walls and roofs of various buildings (including existing buildings and various new buildings, public buildings, residential buildings, industrial buildings and prefabricated buildings). The installation structure provides an almost endless installation site for installing solar photovoltaic laminated glass, and greatly reduces the cost of installing solar photovoltaic laminated glass. It can form distributed energy on buildings, and photovoltaic power generation is easy to manage and use nearby, without the loss of electricity in long-distance transmission, avoiding the impact of photovoltaic power generation on the large grid, so that the current problem of photovoltaic power generation impacting the large grid can be solved, and the development of the photovoltaic industry can be promoted.

[0048] The installation angle of thin-film solar photovoltaic laminated glass is basically unrestricted, and weak light can generate electricity, but there is currently no way to install power-generating glass on the exterior wall. A few application cases are that there is no exterior wall and the power-generating glass is used as a curtain wall instead of the exterior wall. This does not conform to the principle of "giving priority to reducing the consumption of the building itself" in building energy conservation, and the electricity generated by the power-generating glass is wasted. In order to resist wind pressure, the thickness of the double-sided glass needs to be 10mm to 20mm. Not only is the energy consumption of manufacturing glass several times that of 3.2mm thick glass, but the production efficiency is extremely low and the cost is high. In particular, long-term use is extremely unreasonable, because photovoltaic glass generates heat when generating electricity, and the power-generating glass curtain wall increases the power load of air conditioning in summer. The heat transfer coefficient of the power-generating glass curtain wall is very high. The heat generated in winter may not meet the indoor heating requirements. There is too much heat dissipation at night without power generation, which increases the indoor heating energy consumption and cannot reasonably utilize the photovoltaic power generation energy. Also, because most buildings need walls, it is extremely unscientific to install power-generating glass as a glass curtain wall to replace the wall.

[0049] The fifth embodiment proposes to install solar photovoltaic laminated glass by combining iron installation with bonding foamed polyester pads. The thickness of the solar photovoltaic laminated glass is only 3.2 mm, which reduces the energy consumption and carbon emissions of glass manufacturing. It is simple to manufacture, has high production efficiency, greatly reduces the manufacturing cost of photovoltaic power generation glass, is simple to install, is reasonable to use, and reduces installation costs. Its cost is 1 / 6 to 1 / 4 of the cost of installing solar photovoltaic laminated glass as a glass curtain wall to replace the exterior wall.

[0050] The glass deep processing technology of the present invention is first of all a sealing technology for glasses with different usage functions. The glass deep processing technology of the present invention is used in combination with the installation technology to solve the problem described in the background technology that "glass is a big hole for heat loss in buildings. The energy it loses and emits is tens of millions times that of a car. It is the main reason for the increasing consumption of fossil energy, and it is the most important reason for the difficulty in controlling global climate change." In addition, in Example 5, the installation structure and method of installing solar photovoltaic laminated glass on the exterior walls and roofs of buildings are used to form distributed energy. Zero-energy buildings can be built on the basis of nearly zero-energy buildings, which is of great significance to reducing fossil energy consumption, reducing carbon emissions, and controlling climate change. The present invention is the result of the patent applicant's research since April 5, 2002, which is nearly 22 years old. It is not only a cross-disciplinary research, but also a research result based on extensive cross-field research.

[0051] Without the sustainable development of society, other high technologies are useless. The present invention is of great significance to the sustainable development of society.

[0052] The current high barrier adhesive with engineering applicability is epoxy resin adhesive. The adhesive described in the present invention should meet the strength requirements, certain elasticity requirements, and durability requirements in high and low temperature use environments. The epoxy resin adhesive industry can provide epoxy resin adhesive that meets these requirements; silicone structural adhesive has good adaptability to high and low temperature performance, good elasticity, and low bonding strength, but can meet the use requirements of the present invention in bonding.

[0053] After curing, epoxy resin glue is a polymer with a three-dimensional network structure and good barrier properties, but the performance of epoxy resin glues with different molecular chains and different varieties varies. However, testing the barrier properties of epoxy resin glue is a complex issue. Bonding the air barrier film 5 on the outside of the epoxy resin glue will not be a problem in testing the barrier properties of epoxy resin glue, and it can ensure that external gas cannot penetrate into the hollow layer. Although there may be other high-barrier adhesives, the price is too high and not suitable for large-scale use in engineering, or it is still in the research stage. New adhesives are constantly emerging, and there may be other adhesives suitable for engineering use.

[0054] There is "chlorine" in the epoxy resin glue. The operating conditions of the epoxy resin glue in different embodiments are different, and the requirements for the allowable content of "hydrolyzed chlorine" are different. The specific standards need to be determined by experts. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1 The schematic diagram of the cross-sectional structure of the vacuum glass manufactured at room temperature of the first embodiment shows that a copper layer 3 is sprayed on the outer end section of the glass 1, a spacer bar 2 is installed, and a support 7 is installed; the copper foil 5 is welded to the copper layer 3 sprayed on the glass 1 with tin solder 4.

[0056] Figure 2It is a schematic diagram of the sealing cross-section of the end section of the assembled vacuum glass sprayed with the material of the spray layer 3 (such as aluminum) in Example 1.

[0057] Figure 3 yes Figure 2 An enlarged view of the left side of the vacuum glass shows that there is a bevel on the inner side of the outer end of the glass 1 of the vacuum glass, and there is also a bevel on the outer side of the stainless steel hollow spacer 2. There is also a small edge (or step) parallel to the outer end of the glass 1 near the root of the bonding surface of the vacuum glass assembly. A groove is formed between the bevel of the glass 1 and the bevel of the stainless steel hollow spacer 2, and there is a spray layer 3 in the groove. A high-barrier epoxy resin glue 6-2 is coated on the spray layer 3 to bond the air barrier film 5 for sealing.

[0058] Figure 4 A cross-sectional schematic diagram showing the installation of the exhaust pipe 9 for manufacturing vacuum glass at room temperature according to the first embodiment.

[0059] Figure 5 It is a cross-sectional structural diagram of the outer end of the double-layer vacuum glass of Example 1. There is a groove between the glass 1 and the spacer 2. The interlayer 8 installed in the middle of the double-layer vacuum glass is an acrylic (PMMA) plate. There is a stainless steel strip 8-1 on the outside of the acrylic (PMMA) plate. There is a spray layer 3 on the outer end of the stainless steel strip 8-1 and the inner side of the outer oblique edge of the stainless steel hollow spacer 2. A high barrier adhesive 6-2 is coated on the spray layer 3, and then a gas barrier film 5 (such as pinhole-free aluminum foil) is pasted to seal it.

[0060] Figure 6 This is a schematic diagram of the sealing structure of the vacuum box body of the first embodiment, in which the sealing technology and structure of the vacuum glass manufactured at room temperature are used. The edge of the opening door 10-1 and the edge of the opening of the stainless steel vacuum box 1* are sprayed with a copper layer 3. After the opening door 10-1 is inserted into the stainless steel vacuum box 1* according to the arrow in the figure, the copper layers 3 on both sides are welded and sealed with tin solder 4, and a vacuum box structure that can meet the requirements of high vacuum degree is formed. If the vacuum box is made of copper (preferably oxygen-free copper), there is no need to spray the copper layer, and the tin solder 4 is directly welded and sealed.

[0061] Figure 7 It is a single-layer insulating glass of Example 2, and the outer end of the spacer 2 has a high-barrier epoxy resin glue 6-2, and the epoxy resin glue 6-2 is used to replace the butyl glue 6-1 to bond with the glass 1. The epoxy resin glue 6-2 is also coated on the outer side of the spacer 2 and on the inner side of the glass 1, and the air barrier film 5 is bonded on the epoxy resin glue 6-2, and then the silicone structural glue 6-3 is filled to seal it, and then the air barrier film 5-1 is bonded to the end of the insulating glass to seal the silicone structural glue 6-3.

[0062] Figure 8This is a schematic diagram of the sealing of the laminated glass (including solar photovoltaic laminated glass) of Example 4, in the middle of the laminated glass is a film 8*, such as the film 8* is a PVB film or an EVA film, and a high barrier adhesive 6-2 is coated on the edge gaps of the two side glasses 1 of the laminated glass (or one side of the solar photovoltaic laminated glass can be a (PET) plastic back panel), which is a cross-sectional schematic diagram.

[0063] Fig. 9 yes Fig.10 The enlarged view of the node A is shown in FIG. 6 , where the edge of the suspended film 8 is bonded to the outside of the spacer strip 2 by combining the epoxy resin glue 6-2 with the quick-fix adhesive double-sided adhesive strip 6-4. Fig. 9 The middle indicates that the double-sided adhesive strip 6-4 is located in the middle of the outer side of the spacer strip 2; Fig. 9 It also shows that the upper and lower suspension films 8 are overlapped and glued. Epoxy resin glue 6-2 is also coated on the outside of the suspension film 8 and the inside of the glass 1 for gluing the vapor barrier film 5 (aluminum foil with no pinhole anodization), and the outside of the vapor barrier film 5 is silicone structural glue 6-3, and the end of the hollow glass is also glued to the vapor barrier film 5-1 for sealing.

[0064] Fig.10 This is a cross-sectional structural diagram of a four-cavity suspended film insulating glass in Example 2, in which four layers of spacers 2 are bonded and three layers of suspended films 8 are installed. Epoxy resin glue 6-2 is applied to the outside of the spacers 2, the outside of the suspended films 8, and the inside of the upper and lower glasses 1, and the air barrier film 5 is bonded to the epoxy resin glue 6-2; then the silicone structural glue 6-3 is filled to seal it, and then the air barrier film 5-1 is bonded around the end of the insulating glass to seal the silicone structural glue 6-3.

[0065] Fig.11 This is an enlarged view of the third embodiment where the fixed sash glass 1-1 is installed at the window insulation layer position. The fixed sash glass 1-1 wrapped with the foam rubber sponge 90 is clamped in the profile 60 separated on the indoor and outdoor sides and the fixed sash glass 5 is directly installed to eliminate the fixed sash profile thermal bridge. Fig.11 The glass 1-1 shown is a multi-cavity suspended film insulating glass with low heat transfer coefficient. Fig.11 The protective layer of the external insulation wall is a thin plaster insulation wall. Water glass fireproof adhesive or expansion fireproof coating is applied on the insulation window sill 100-3 and insulation decorative line 100-4 around the window to prevent the spread of fire. The external protective layer can also be aerated concrete board or external leaf concrete (such as Fig.13 , Fig.14 ) or cement mortar or other plaster protective layer.

[0066] Fig.12It is a cross-sectional schematic diagram of vacuum glass and double-cavity suspended film hollow composite glass of Example 2. The vacuum glass is first manufactured, sealed and evacuated, and then bonded to manufacture hollow glass. The outer end of the vacuum glass has a spray layer 3, and the spray layer 3 is coated with a high-barrier adhesive epoxy resin glue 6-2 to bond the air barrier film 5. The outer side of the hollow glass is glass 1 or acrylic (PMMA) board 1#, and the reinforcing strips 1-10 are bonded to the edge of the outer glass 1 of the vacuum-double hollow composite glass with epoxy resin glue to shield ultraviolet rays, ensure durability, and also strengthen the hollow glass.

[0067] Fig.13 It is a schematic diagram of the horizontal section of a window with glass installed in Example 3. The window fixed sash profile 60 and the center support profile 60-1 are installed in two parts, indoor and outdoor. There is a buffering and heat-insulating material foam sponge 90 (such as a U-shaped EPDM sponge) in the middle of the fixed sash profile 60 and the center support profile 60-1 on the indoor and outdoor sides. The fixed sash glass 1-1 of hollow glass, vacuum glass or vacuum-hollow combination glass is clamped in the fixed sash profile 60 on the indoor and outdoor sides, and the edge of the fixed sash glass 1-1 is sealed and buffered with a U-shaped EPDM sponge. It also shows that the opening sash glass 1-2 of hollow glass, vacuum glass or vacuum-hollow combination glass is installed in the opening sash profile 80, and the rotating shaft (hinge) 70 of the opening sash is connected to the pre-embedded steel plate 100-1 of the window side wall; the rotating fixing part 20 is installed in the indoor window middle bar 60-1, and the rotating fixing part 20 is used to clamp the opening sash glass window. Fig.11 The opening sash glass is installed in the opening sash profile. It is not recommended to use the opening sash profile due to heat transfer.

[0068] Fig.13 , Fig.14 It is an external insulation wall with an aerated concrete board protective layer installed on the external wall insulation layer, or an assembled concrete sandwich insulation wall; Fig.14 and Fig.13 The difference is that the opening fan profile 80 is cancelled and the opening fan glass 1-2 is installed. The rotating shaft (hinge) 70 of the opening fan glass 1-2 is connected with the pre-buried steel plate of the window side wall, which can eliminate the heat transfer of the opening fan profile. It is recommended to adopt.

[0069] Fig.11 , Fig.13 , Fig.14Both indicate that basalt fiber cloth 50, i.e., BFRP cloth, is pasted on the side wall of the window, and the BFRP cloth 50 contains an outdoor L-shaped embedded steel plate 100-1 and other embedded steel plates; both indicate that stress-bearing thermal insulation decorative lines 100-4 are installed on both sides of the window, an outdoor window sill 100-3 is installed, and an indoor embedded steel plate 100-2 is installed for installing indoor fixed fan profiles; both indicate that the indoor and outdoor separated fixed fan profiles 60 and the indoor and outdoor separated middle stile or cross brace profiles 60-1 are connected to the embedded steel plate in the window side wall BFRP cloth 50 (fixed with screws); the fixed fan glass 1-1 wrapped with a U-shaped EPDM foam rubber sponge 90 is clamped in the indoor and outdoor separated fixed fan profiles 60 and the middle stile or cross brace profiles 60-1 for installation; Fig.13 , Fig.14 It is also indicated that a rotating fixing member 20 is locally installed on the foamed sponge 90 of the indoor middle stile 60-1 to clamp the opening sash glass 1-2 or clamp the opening sash fan material 80 to fix it.

[0070] Fig.15 It is a top view of the fifth embodiment in which a pad 13 is bonded on a concrete base layer 11 and a photovoltaic laminated glass 12 is bonded on the pad 13 .

[0071] Fig.16 yes Fig.15 In the Ⅰ-Ⅰ cross-sectional view, since the installation pad 13 has many supporting points, it is convenient for people to inspect and repair the photovoltaic laminated glass 2.

[0072] Fig.17The base layer 11 of the fifth embodiment is a skylight roof glass 11, and a vertical cross-sectional schematic diagram of photovoltaic laminated glass 12 is installed on the roof glass 11. For example, the roof glass 11 is a multi-cavity suspended film hollow glass or a vacuum-hollow composite glass, which are collectively referred to as roof glass. The roof glass 11 is installed on the upper chord angle steel 11-1 of the steel roof frame, and the joints between adjacent roof glasses are filled with insulation material 19 (such as aerogel felt). The joints between adjacent roof glasses 11 are bonded and waterproofed with an adhesive to bond the metal plate 15 and the roof glass 11. When the roof slope is large and the negative wind pressure is large, a detachable self-tapping screw (hereinafter referred to as a screw) 18 is passed through the metal plate 15 and the angle steel 11-1 for anchoring. There should be a rubber buffer pad on the inside of the screw 18 (with aluminum foil bonded around it to prevent ultraviolet rays) to waterproof and seal the drilled gap. A pad is installed on the edge of the roof glass 11. The pad can be a strip-shaped foamed polyester (PET) pad 13-1. A point-shaped transparent polyester (PET) hollow pad 13 can be installed in the middle of the photovoltaic laminated glass 12. The pad is the support point of the photovoltaic laminated glass. When the hollow glass is prefabricated, the corresponding position should also be installed with a transparent plastic point support, or the glass thickness of the hollow glass is thicker, which can withstand the pressure transmitted by the support point of the photovoltaic laminated glass. This can reduce the thickness of the glass in the photovoltaic laminated glass 12 and reduce the cost of the photovoltaic laminated glass. This is essentially equivalent to forming a hollow glass with the photovoltaic laminated glass and the roof glass at the construction site. Because the height of the pad is much higher than the hollow layer of the hollow glass, the adverse effect of the heating of the photovoltaic laminated glass can be reduced, and it is convenient to install the heat collecting pipe or the ventilation pipe. The silicone structural adhesive can be used to bond and waterproof the joints of the adjacent photovoltaic laminated glass 12. The photovoltaic laminated glass installed on the transparent energy-saving and heat-insulating roof has a simple structure, is easy to disassemble and repair, has a good roof waterproof seal, and is energy-saving and heat-insulating.

[0073] Fig.18 The schematic diagram of the horizontal cross-section structure of the fifth embodiment is that the base layer 11 is a glass curtain wall, and photovoltaic laminated glass 12 is installed on the glass curtain wall. Fig.18 and Fig.17 The difference is that the roof is an inclined surface or close to a horizontal surface, and the glass curtain wall is a vertical surface. Screws 18 must be used to penetrate the metal plate 15 and anchor it to the steel keel 11-1 of the indoor curtain wall steel frame at a certain interval; it is also necessary to use silicone structural adhesive to bond the metal plate 17 to waterproof and seal at the adjacent joints of the photovoltaic laminated glass 12, and screws must be used to penetrate the metal plate 17 and anchor it to the metal plate 15 that has been installed inside, and a rubber buffer pad must be added to waterproof and seal the drilled gap. The metal plate 17 is usually a black metal plate with an inward depression, which serves as a decorative partition seam.

[0074] Fig.19 Embodiment 5 shows that Fig.14A cross-sectional schematic diagram of installing solar photovoltaic laminated glass 12 on an energy-saving and heat-insulating wall. BFRP cloth 50 is bonded on the window and the outside of the window, or BFRP cloth 50 is bonded on the entire exterior wall; foamed polyester (PET) heat-insulating decorative lines and foamed polyester (PET) heat-insulating window sill strips that can bear loads are installed around the window as strip-shaped pads 13-1. When there is an embedded steel plate on the pad 13 or strip-shaped pad 13-1, BFRP cloth 50 should be bonded on the pad 13. The embedded steel plate is located inside the BFRP cloth 50. The window strip-shaped pad 13-1 is screwed to the window L-shaped embedded steel plate. The steel plate 100-1 is fixed; the connecting iron parts of the solar photovoltaic laminated glass 12 are connected to the insulation decorative lines protruding from the wall and the embedded steel plates in the insulation window sill; the pad 13 is bonded to the outer wall with silicone structural adhesive, or the strip-shaped pad 13-1 and the pad 13 are bonded to the outer protective layer of the outer insulation wall with silicone structural adhesive, and then the photovoltaic laminated glass 12 is bonded to the pad 13 and the strip-shaped pad 13-1, forming a structure and method for installing the photovoltaic laminated glass on the outer wall by bonding and steel connection. Pads 13 or strip-shaped pads 13-1 are installed at a certain interval on the wall where there are no windows, and the photovoltaic laminated glass 12 is bonded to the pad 13 and the strip-shaped pad 13-1, and each photovoltaic laminated glass is connected to the pad 13 or the embedded steel plate on the strip-shaped pad 13-1 at two points along the horizontal or / and vertical direction.

[0075] Fig.13 , Fig.14 and Fig.19 Both indicate that the insulation layer is an organic insulation layer 200, and the insulation layer on the window side is a rock wool board 200-1, so as to increase the energy-saving and heat-insulating wall fireproof performance.

[0076] In the attached drawings, the air barrier film 5 and adhesives of various properties are drawn very thick, but in fact they are very thin. In the attached drawings, the spacer bars 2 selected for vacuum glass or insulating glass all represent stainless steel hollow spacer bars, but are not limited to stainless steel hollow spacer bars, which can be selected according to the use requirements. Example

[0077] Example 1: See Figure 1 to Figure 3, a glass deep processing technology and installation technology of the present embodiment is about the external sealing technology for vacuum glass or hollow glass, the vacuum glass includes vacuum glass manufactured by the current high-temperature kiln and may have a leakage rate, and also includes vacuum glass manufactured at room temperature; the hollow glass and vacuum glass manufactured at room temperature are composed of a spacing material 2 (including a spacing bar 2), glass 1, and epoxy resin glue 6-2. The spacing bar 2 of the vacuum glass manufactured at room temperature is a stainless steel spacing bar with a height of several tens of times the spacing material used for sealing the edge of vacuum glass manufactured by the current high-temperature kiln with a low melting point solder, such as a height of 10mm to 20mm; the vacuum glass manufactured at room temperature is to use epoxy resin glue 6-2 to bond the stainless steel spacing bar 2 to the periphery of the two side glasses 1 of the vacuum glass, and install the exhaust structure to be installed, and bond and install the support 7 on the glass 1 according to a certain rule (such as matrix arrangement), and the spacing of the support 7 is determined by structural calculation or / and test; the peripheral sealing of the hollow glass or / and vacuum glass adopts the following structure and method, which can be selected according to needs:

[0078] 1) Spray a copper layer 3 on the two side glasses 1 of the vacuum glass or on the peripheral section of the vacuum glass made in the current high temperature kiln and which may have a leakage rate, and weld the pinhole-free copper foil 5 with the copper layer 3 sprayed on the glass 1 with tin solder 4 to seal it. Since tin solder can only be welded with gold, silver and copper, see Figure 1 , Figure 2 The middle part of the copper foil 5 is bonded to the spacer strip 2 of the insulating glass or the vacuum glass manufactured at room temperature with epoxy resin glue 6-2; that is, this sealing technology can be used to make up for the leakage rate problem of the current vacuum glass, and can also be used for welding copper foil around the insulating glass and the vacuum glass manufactured at room temperature to seal;

[0079] 2) Use a spraying method to spray the material of the spray layer 3 onto the peripheral section of the vacuum glass manufactured by the current high-temperature kiln that may have a leak rate, or spray it onto the peripheral seal of the end section of the assembled vacuum glass manufactured at room temperature. If the spray layer 3 is aluminum or copper, see Figure 2 , Figure 3 ; That is, this sealing technology can be used to make up for the problem of poor peripheral sealing of vacuum glass that may have leakage rate. It is simpler than welding copper foil and saves tin solder;

[0080] 3) Spray the material of the spray layer 3 onto the spacer strips 2 and the glass 1 around the assembled vacuum glass or insulating glass by spraying, and the outer side of the spacer strips 2 of the insulating glass is not sealed with silicone structural adhesive;

[0081] The sprayed layer 3 meets the bonding requirements with the glass 1 and the spacer material 2 .

[0082] When spraying, the glass 1 or the vacuum glass semi-finished products that have been assembled with adhesive can be stacked together, and the outer peripheral ends of the glass 1 or the vacuum glass semi-finished products can be sprayed. Thick paper sheets need to be placed between the stacked glass 1 or the vacuum glass semi-finished products to allow them to protrude slightly to avoid the spray layers 3 being connected together. After spraying is completed, the protruding paper sheets are cut off or removed at high temperature.

[0083] Since "tin" is a minor metal, it is indispensable in the semiconductor industry and photovoltaic power generation. The reserves of tin are only enough for a few decades, and tin solder should be used sparingly. Therefore, the above-mentioned sealing technology 1) is not recommended.

[0084] Although this embodiment can be used for insulating glass sealing, it is troublesome and is not recommended.

[0085] It is recommended that the support 7 of the vacuum glass is an acrylic (PMMA) cylindrical support (for example, the support 7 is bonded with UV glue). There is a magnetron sputtered Low-e coating on the inner side of the glass 1 outside the vacuum glass chamber. The Low-e coating can shield most of the ultraviolet rays, and the raw material of the acrylic (PMMA) column should contain an ultraviolet absorber. The acrylic (PMMA) cylindrical support can meet the durability requirements.

[0086] Furthermore, the outer side of the spacer bar 2 of the insulating glass and the vacuum glass manufactured at room temperature has an inclined shoulder, the inner side of the glass 1 is an inclined surface, or the inclined shoulder and the inclined surface edge also have a small step parallel to the inner side of the spacer bar, see Figure 2 , Figure 3 , so that the sprayed layer 3 forms a triangular or trapezoidal cross-section between the glass 1 and the stainless steel spacer 2.

[0087] Furthermore, in order to further increase the durability of the seal and protect the spray layer 3 from damage due to bumps, a high-barrier adhesive 6-2 that meets the high and low temperature requirements of the use environment is coated entirely on the spray layer 3. The high-barrier adhesive 6-2 is an epoxy resin adhesive or other adhesive that meets the barrier requirements and strength requirements. Alternatively, the air barrier film 5 is bonded to the spray layer 3, or the air barrier film 5 is bonded to the edge of the vacuum glass with a side width not less than the width of the spacer strip, to prevent ultraviolet rays from damaging the adhesive 6-2 bonded to the spacer strip 2 and increase durability. The air barrier film 5 is an anodized pinhole-free aluminum foil or copper foil.

[0088] Glass 1 used in manufacturing vacuum glass at room temperature should be homogenous tempered glass. Tempered glass is prone to bursting because it contains nickel sulfide impurities. Homogenized tempered glass is tempered glass that has been homogenized for 2 hours at high temperature (290℃±10℃). It generally does not burst during use, and the water vapor and other gases in the tempered glass are baked out during the homogenization process, so that the residual gas in the vacuum glass can be controlled within the allowable range. When glass 1 of the vacuum glass is laminated glass, the inner side of the laminated glass must be homogenous tempered glass, or glass 1 is a composite glass of glass and acrylic plate, also referred to as glass 1.

[0089] The edge sealing technology of this embodiment can be used in the current high-temperature kiln to manufacture vacuum glass, and the technology of welding copper foil sealing or spraying aluminum layer and applying high barrier adhesive to bond gas barrier film sealing can be used.

[0090] The spacer material 2 of the vacuum glass is selected as follows:

[0091] 1) The spacer bar 2 of the vacuum glass is a stainless steel hollow spacer bar with a height of about 10 to 20 mm. The vacuum glass support 7 is an acrylic (PMMA) support 7 with good transparency and can meet the requirements of vacuum environment;

[0092] 2) The spacer material 2 is a narrow vacuum layer edge sealing material bonded to the edges of the two side glasses 1 (eg, 0.1mm-0.5mm high, about 12-15mm wide), and the vacuum glass inner support 7 is a point support such as stainless steel or ceramic.

[0093] Furthermore, when manufacturing double-layer or multi-layer vacuum glass, an interlayer 8 is added, and the interlayer 8 is installed between the two side glasses 1. The interlayer 8 is a glass or acrylic (PMMA) plate, and the interlayer 8 is one or more sheets. Figure 5 , Figure 5 The sandwich panel material of the double-layer vacuum glass is an acrylic (PMMA) plate, and there is a stainless steel strip 8-1 of the same thickness on the outer circle of the acrylic (PMMA) plate. The sandwich 8 and the stainless steel strip 8-1 are bonded to the stainless steel hollow spacer strips 2 on both sides with epoxy resin glue 6-2; when spraying the vacuum glass around the circle, the spray layer 3 is also sprayed to the outer end of the sandwich 8 of the glass, or when the sandwich 8 is an acrylic (PMMA) plate, it is sprayed to the outer end of the stainless steel strip 8-1; then the epoxy resin glue 6-2 is coated on the spray layer 3, and the air barrier film 5 is bonded; after the vacuum glass is evacuated, double or multi-layer vacuum glass is formed.

[0094] In order to speed up the vacuum glass exhaust speed, the stainless steel hollow spacer 2, the exhaust pipe 9 and the acrylic (PMMA) cylindrical support 7 should be placed in the vacuum box for pre-exhaustion.

[0095] Furthermore, the following structures and methods are used for evacuating vacuum glass manufactured at room temperature and sealing the evacuation port, which can be selected according to the use requirements:

[0096] 1) Use adhesive (such as epoxy resin glue 6-2) to glue the exhaust pipe 9 at the exhaust position of the vacuum glass spacer 2, and the outer end of the exhaust pipe 9 protrudes outside the vacuum glass. Figure 4 ; There are two options for the exhaust pipe 9, which can be selected according to the needs of use:

[0097] ① The exhaust pipe 9 is a thin-walled stainless steel pipe or an oxygen-free copper pipe, or a copper layer 3 is sprayed on the outer surface of the stainless steel exhaust pipe 9 outlet;

[0098] ② Or the exhaust pipe 9 is a thick-walled low-melting-point tin or tin alloy tube; when the exhaust pipe 9 is a thick-walled metal tube of tin or tin alloy tube and is connected to the vacuum pump, a copper flange that meets the vacuum technical requirements needs to be manufactured and welded to the low-melting-point thick-walled metal tube with ordinary solder, and then the copper flange is quickly connected to the stainless steel flange of the vacuum pump. It is better to have a wear-resistant layer on the surface of the copper flange to extend its service life;

[0099] The process of evacuating and sealing the exhaust pipe 9 is as follows: after welding and sealing the pinhole-free copper foil 5 to the glass 1 or to the copper layer 3 sprayed on the glass 1, use tin solder 4 to weld the pinhole-free copper foil 5 to the copper layer 3 sprayed on the stainless steel exhaust pipe 9, or weld it to the oxygen-free copper tube exhaust pipe 9, or weld it to the thick-walled tin or tin alloy exhaust pipe 9 to ensure that the exhaust pipe 9 is sealed reliably; after the vacuuming meets the requirements, activate the non-evaporable zirconium vanadium iron getter and then evacuate again until it meets the requirements, and close the vacuum pump valve; ① When the exhaust pipe 9 is a thin-walled stainless steel tube or an oxygen-free copper tube 9, clamp the outlet of the flattened thin-walled stainless steel tube or the oxygen-free copper tube 9, and use a welding machine to weld and cut off the outlet of the exhaust pipe 9. It is recommended to use a cold welding machine for continuous pressure point welding (that is, the latter welding point is pressed on the previous welding point to form a continuous sealed and leak-free welding). After the exhaust pipe 9 is welded and sealed, on the exhaust pipe 9 Apply high barrier adhesive 6-2, bond the air barrier film 5 to the exhaust pipe 9, bond it to the spray layer 3 on the glass 1 on both sides, overlap and seal it with the adjacent air barrier film 5, or apply tin solder to seal it and weld it to the copper layer 3 on the glass 1 on both sides of the exhaust pipe 9 and to the adjacent copper foil 5 (when the exhaust pipe 9 is an oxygen-free copper pipe); ② When the exhaust pipe 9 is a thick-walled low-melting-point exhaust pipe 9, heat and melt the low-melting-point thick-walled exhaust pipe 9 in the air (the epoxy resin glue 6--2 for bonding the spacer strip 2 is a high-temperature resistant epoxy resin glue), the low-melting-point thick-walled exhaust pipe 9 softens when heated and shrinks inward under the external atmospheric pressure to block the holes of the exhaust pipe 9 and seal it; after the exhaust pipe 9 is sealed, weld the pinhole-free copper foil 5 to the copper layer 3 on the glass 1 on both sides of the exhaust pipe 9 and to the adjacent copper foil 5 and the exhaust pipe 9; this exhaust method uses a vacuum pump to directly exhaust the vacuum glass and then seal it;

[0100] 2) The outer end of the exhaust pipe 9 installed on the spacer bar 2 does not protrude outside the vacuum glass, or the exhaust port of the vacuum glass is located on the surface of the glass 1 of the vacuum glass (such as at the corner), which is suitable for the edge sealing material of the narrow vacuum layer where the spacer material 2 and the glass 1 are bonded, and the figure is omitted;

[0101] The process of vacuuming and sealing is as follows: a copper layer 3 is sprayed on the outer surface of the exhaust pipe outlet in advance, or copper or silver is sprayed on the exhaust port edge of the glass 1 in advance; after welding a pinhole-free copper foil 5 around the vacuum glass or bonding a vapor barrier film 5 on the spray layer 3 to seal it, the vacuum glass being manufactured is placed in a vacuum box at room temperature for vacuuming. When the gas released during the activation process of the aforementioned non-evaporable zirconium vanadium iron getter can be ignored, or when the zirconium vanadium iron getter can be activated in the vacuum box by controlling a high-frequency induction heating device with a manipulator, this sealing method can be used to first activate the zirconium vanadium iron getter and then vacuumize to a vacuum degree that meets the requirements; after the vacuum degree meets the requirements, a soldering iron is used to melt tin solder to weld a copper sheet to the outer end of the exhaust pipe 9 sprayed with a copper layer 3, or a soldering iron is used to melt tin solder to weld the exhaust port on the surface of the glass 1 for sealing (a robot can be used to melt tin solder for welding in the vacuum box); this vacuuming method is to put the manufactured vacuum glass into a vacuum box for vacuuming and sealing.

[0102] This embodiment provides a variety of methods for evacuating and sealing vacuum glass, which can be selected according to usage needs.

[0103] Furthermore, the sealing technology and structure of vacuum glass manufactured at room temperature are used to seal the vacuum box (including various vacuum equipment): the vacuum box is made of copper (preferably oxygen-free copper), or a copper layer 3 of a certain width (such as about 10 mm) is sprayed on the side of the end of the vacuum box 1*. Figure 6 , a copper layer 3 of a certain width is also sprayed on the edge side of the opening door 10-1; the component to be evacuated is placed in the vacuum box 1* to be closed, the opening door 10-1 is inserted into the vacuum box 1*, and the hot-melt ordinary solder 4 is coated on the copper layers 3 on both sides at the joint between the opening door 10-1 and the vacuum box 1*, or the oxygen-free copper joint is welded and sealed to form a seal for the vacuum box, and the vacuum can be evacuated to the required vacuum degree; when the opening door 10-1 of the vacuum box needs to be opened, the weld of the joint between the opening door 10-1 and the vacuum box 1* is cut or / and desoldered with a soldering iron, the opening door 10-1 is pulled out, and the same is done when the next sealing is performed, that is, this vacuum box is coated with ordinary solder 4 and copper welded and sealed on the side of the joint to form a vacuum box that can achieve a high vacuum degree.

[0104] The vacuum box of this structure has the best sealing performance, and can be used to evacuate components or materials that need to be evacuated in a high vacuum environment. For example, when making semiconductor chips, it is necessary to avoid gas molecules from contaminating the chips. The high vacuum box of this embodiment can be used as a vacuum box for semiconductor chip production. It is simple to manufacture and has a high vacuum degree. For example, when making vacuum glass at room temperature, the stainless steel hollow spacers, acrylic cylindrical supports and exhaust pipes should be placed in the vacuum box in advance to evacuate and exhaust the air, so as to ensure that the vacuum degree in the vacuum glass can be maintained for a long time (not less than 25 years or longer). However, most of the current vacuum box opening doors are sealed with rubber, and the vacuum degree can only reach a few Pa to several hundred Pa.

[0105] When the vacuum box needs to be insulated, the outer wall and the opening door of the vacuum box should be made of insulation materials.

[0106] Embodiment 2: A glass deep processing technology and installation technology of this embodiment is a technology that does not need to remove the Low-e coating on the edge of the glass when manufacturing the insulating glass, and does not need to remove the Low-e coating on the edge of the installation (PET) coating, or strengthens the sealing of the insulating glass and simultaneously cancels the removal of the Low-e coating on the edge of the glass, and does not need to remove the Low-e coating on the edge of the installation (PET) coating, thereby increasing the durability of the sealing of the insulating glass, see Figure 7 , Fig. 9 , Fig.10 ; The glass 1 of the insulating glass is ordinary glass, various safety glass, coated glass (such as coating on the inner and outer side glass or one side glass), or a coated (PET) film is also pasted on the glass 1, or the two sides or one side glass 1 of the insulating glass can also be replaced by an acrylic (PMMA) plate 1#; the spacer 2 of the insulating glass can be any spacer (a desiccant such as 3A molecular sieve can be contained in the spacer to absorb moisture), and the outer side of the cross section of the spacer 2 of the insulating glass can have an oblique shoulder; or there is an interlayer 8 in the insulating glass to manufacture double hollow or multi-cavity insulating glass, and the interlayer 8 is a glass or acrylic (PMMA) plate, or the interlayer 8 is an acrylic (PMMA) hollow plate, or / and the interlayer 8 is a (PET) suspended film 8, see Fig. 9 , Fig.10The suspended film 8 is a (PET) film coated with a Low-e film, or a (PET) film without a coating, and the interlayer 8 can be transparent, translucent, or colored or frosted; the technology of not having to remove the Low-e film on the edge of the glass, and not having to remove the Low-e film on the edge of the installed (PET) film is: coating epoxy resin glue 6-2 on the Low-e film on the edge of the glass 1, and using epoxy resin glue 6-2 to replace butyl glue 6-1 to bond with the spacer 2 (that is, no butyl glue is used), or coating epoxy resin glue 6-2 on the butyl glue 6-1 on the bonding surface of the Low-e film and the spacer 2 for bonding (retaining butyl glue, but Epoxy resin glue is coated on the butyl glue for bonding), that is, all bonding surfaces with Low-e coating are bonded with epoxy resin glue; there is no need to remove the Low-e coating on the edge of the glass, and there is no need to remove the Low-e coating on the suspended film 8, which should meet the high and low temperature resistance requirements (strength requirements, etc.) of the use environment; as long as the Low-e coating is bonded with epoxy resin glue, there is no need to remove the Low-e coating on the glass, no matter what technology is used to install the suspended film 8, as long as the Low-e coating is bonded with epoxy resin glue, there is no need to remove the Low-e coating on the (PET) film, all of which belong to the protection scope of the present invention.

[0107] The installation of coated (PET) suspension film or uncoated (PET) suspension film in the insulating glass constitutes suspended film insulating glass. Even if the installation of uncoated (PET) suspension film can reduce the heat transfer coefficient of the insulating glass, the installation of Low-e coated (PET) film has better energy saving effect. Suspended film insulating glass is also light in weight, good in sound insulation, takes up less space, and has good UV blocking performance.

[0108] Furthermore, the following techniques are adopted to increase the sealing of insulating glass:

[0109] 1) Apply epoxy resin glue 6-2 to the outside of the spacer strip 2, to the outside of the installed suspension film 8 and to the inside of the end of the glass 1, and adhere the air barrier film 5 on the surface of the epoxy resin glue 6-2. The air barrier film 5 is an anodized aluminum foil, and the anodized aluminum foil is preferably a pinhole-free anodized aluminum foil (the two sides of the air barrier film 5 close to the glass 1 can be cut a little at the corner, and the corner glass can be partially not pasted with the air barrier film 5, or a small piece of the air barrier film 5 can be pasted separately), so as to form a fundamental seal of the hollow layer of the insulating glass with the anodized aluminum foil air barrier film 5; with the sealing of the pinhole-free anodized aluminum foil air barrier film 5, any gas such as external water vapor, oxygen and oil gas cannot enter the hollow layer, and it is impossible to damage the Low-e coating on the glass 1 or the suspension film 8; then fill the silicone structural adhesive 6-3, and adhere the silicone structural adhesive 6-3 to the U-shaped air barrier film 5 already installed in the insulating glass;

[0110] 2) Or when the inert gas is injected into the hollow glass, the sealing of the drilled holes is enhanced: the hollow glass is drilled, the holes are drilled through the silicone structural adhesive 6-3 and the air barrier film 5 inside it, and then through the epoxy resin adhesive 6-2 bonded to the inside of the air barrier film 5 and the spacer 2, or through the (PET) suspension film 8 pasted on the outer side of the spacer 2 (when the suspension film 8 is installed), and the inert gas is injected and the original gas in the hollow layer is extracted at the same time; after the inert gas is injected to meet the requirements, the holes where the inert gas is injected and the holes where the gas in the hollow layer is extracted are sealed with epoxy resin adhesive 6-2 or silicone structural adhesive 6-3 (temporary use of silicone structural adhesive to seal the holes is also acceptable), or the air barrier film 5 is partially pasted at the drilled holes for sealing;

[0111] The sealed insulating glass can be used for the curtain wall. When installing the insulating glass curtain wall, the pinhole-free anodized aluminum foil is installed on both the indoor and outdoor sides of the silicone structural adhesive filling the gap of the insulating glass curtain wall to block the gas seal, see Example 3;

[0112] 3) Alternatively, a high-barrier adhesive epoxy resin glue 6-2 is applied to the cross section of the end of the insulating glass, and the gas barrier film 5-1 is bonded and sealed to the cross section of the end of the glass 1, and bonded to the silicone structural glue 6-3 (the silicone structural glue does not necessarily need to be coated with epoxy resin glue, and the gas barrier film 5-1 can be directly bonded to the silicone structural glue), or the gas barrier film 5-1 is bonded to a certain width on the side of the insulating glass edge, and the gas barrier film 5-1 can be an anodized aluminum foil, or a plastic film or composite film with barrier properties that meet the requirements. Non-curtain wall insulating glass installed on the window should be sealed with a gas barrier film 5-1 to increase the durability of the silicone structural glue 6-3.

[0113] Furthermore, the sealing technology of bonding the vapor barrier film to the hollow glass can be used in the sealing of electronic products. The vapor barrier film is bonded to the adhesive surface of the potted electronic products to block water vapor, oxygen or other harmful gases from entering the electronic products, thereby increasing the durability of the electronic products. This is an equivalent substitution, that is, the hollow glass is replaced by the electronic products, and the sealing adhesive of the electronic products is epoxy resin glue, or other potting adhesives.

[0114] When installing the suspended film 8 in the insulating glass to manufacture the suspended film insulating glass, the suspended film 8 can be stretched manually. When manufacturing the insulating glass with a larger area, the following method can be used to stretch the suspended film 8: the side length of the suspended film 8 is greater than the length and width of the outer frame of the spacer bar 2; the suspended film 8 is clamped by relative electromagnetic plates (bars) for pulling (four sides or two sides).

[0115] Further, the suspension film 8 is bonded and installed by combining the quick bonding adhesive 6-4 with the epoxy resin glue 6-2, and the edge of the suspension film 8 is bonded to the upper surface of the spacer bar 2 and the outer side surface of the spacer bar 2. Fig. 9; A double-sided adhesive strip 6-4 of a quick-bonding adhesive is pre-installed on the outer side of the spacer bar 2. After the spacer bar 2 is bonded to the glass 1, when the Low-e coating is located below the suspended film 8, epoxy resin glue 6-2 is coated on the upper surface of the spacer bar 2 to bond it to the underside of the suspended film 8, or epoxy resin glue 6-2 is directly coated on the upper surface of the spacer bar 2 without butyl glue 6-1 for bonding; when there is no Low-e coating under the suspended film 8, epoxy resin glue 6-2 does not need to be coated on the spacer bar 2, and the suspended film 8 can be bonded to butyl glue 6-1 or epoxy resin glue 6-2; epoxy resin glue 6-2 is also applied to the side of the spacer bar 2, and then the double-sided adhesive strip 6-2 is torn off. The protective film on the surface of the adhesive strip 6-4 (the optional epoxy resin adhesive 6-2 is relatively viscous and will not flow onto the double-sided adhesive strip), stretch the suspension film 8, bond the suspension film 8 to the upper surface of the spacer strip 2, and then bend the suspension film 8 90 degrees, bond the suspension film 8 to the epoxy resin adhesive 6-2 on the upper half of the side of the spacer strip 2, to the double-sided adhesive strip 6-4 in the middle, and then to the epoxy resin adhesive 6-2 on the lower half of the side of the spacer strip 2, and the suspension film 8 can be quickly bonded and fixed immediately; according to the number of hollow layers of the insulating glass, install each layer of the spacer strip 2 and the suspension film 8 until the outer glass 1 is installed, and then use the aforementioned sealing technology to seal the insulating glass.

[0116] The first suspended film 8 bonded to the spacer 2 can be overlapped and pasted to the glass 1, and then the spacer 2 and the suspended film 8 are continued to be installed, and each layer of suspended film 8 is overlapped and pasted with the suspended film 8 bonded to the outer side of the lower spacer 2 until the top layer of suspended film 8 is installed, and then the top layer of spacer 2 is installed, and the glass 1 is installed; small holes should be punctured on each layer of suspended film 8 to ensure that the air pressure in each hollow layer is balanced when the inert gas is injected; then, on the top layer of spacer 2, a small hole ... inert gas is injected; then, on the top layer of spacer 2, a small hole should be punctured on each layer of suspended film 8 to ensure that the inert gas is injected; then, on the top layer of spacer 2, a small hole should be punctured on each layer of suspended film 8 to ensure that the inert gas is injected; then, on the top layer of spacer 2, a small hole should be punctured on each layer of suspended film 8 to ensure that the inert gas is injected; then, on the top layer of spacer 2, a small hole should be punctured on each layer of suspended film 8 to ensure that the inert gas is injected; then, on the top layer of spacer 2, a small hole should be punctured Epoxy resin glue 6-2 is coated on the suspended film 8 on the side and the outer side of each layer of the spacer strip 2 below and the inner surface of the end of the glass 1, and the vapor barrier film 5 (anodized aluminum foil without pinholes) is bonded to the epoxy resin glue 6-2; then the U-shaped section of the peripheral end of the insulating glass is filled with silicone structural glue 6-3 and bonded to the vapor barrier film 5, or the vapor barrier film 5-1 with better barrier properties is bonded to the outer end section of the insulating glass and the outer surface of the silicone structural glue 6-3, and the manufacturing of the suspended film insulating glass is completed.

[0117] If the installed suspension film 8 is not tightened and has an uneven surface, an infrared baking lamp can be used to bake the PET suspension film 8 to shrink, tighten and flatten it.

[0118] The recommended spacer 2 for insulating glass is a stainless steel hollow spacer. The stainless steel hollow spacer has high strength and rigidity, a linear expansion coefficient smaller than that of aluminum alloy, and a thermal conductivity coefficient only 1 / 14 to 1 / 12 of that of aluminum alloy. Its energy saving and heat preservation are no worse than those of warm edge spacers.

[0119] Because the existing building curtain wall hollow glass has no profile restrictions, the original hollow glass can be disassembled and manufactured into suspended film hollow glass as described above, which greatly reduces the heat transfer of the existing building glass curtain wall and reverses the current serious problem of high energy consumption of glass curtain wall. It can be manufactured at the project site or transported to the hollow glass enterprise workshop for manufacturing, because the suspended film hollow glass of this embodiment is simple to manufacture and does not require complex equipment and conditions.

[0120] The vacuum glass and the insulating glass are bonded together to make vacuum-insulating composite glass. The vacuum glass is vacuum glass made at room temperature or vacuum glass made in a high-temperature kiln. Fig.12 It is advisable to use a gas barrier film 5 (such as anodized aluminum foil) to bond the vacuum glass and the insulating glass periphery together, and overlap and bond the gas barrier film 5-1 bonding the insulating glass and the gas barrier film 5 bonding the vacuum glass to increase the connection strength between the layers.

[0121] Furthermore, strengthening measures are taken for the insulating glass or vacuum-insulating combined glass; the strengthening measures include the following three measures, one or more of which are selected according to the use requirements:

[0122] 1) When manufacturing insulating glass or vacuum glass or vacuum-insulating combined glass with larger specifications, a reinforcing strip is pasted with silicone structural adhesive at an appropriate position in the cavity of the vacuum glass or insulating glass, and the reinforcing strip is used as the waist beam (or reinforcing rib) of the insulating glass or vacuum glass for reinforcement; the vacuum glass is vacuum glass manufactured at room temperature, and the reinforcing strip is a hollow plastic strip (such as (PMMA) strip) or a stainless steel strip (such as an I-shaped thin-walled stainless steel strip), and the figure is omitted; the insulating glass or vacuum glass is divided into two or more areas, and the reinforcing strips separated from each other have holes, which helps to keep the air pressure on both sides of the large glass equal; the force of the insulating glass or vacuum glass under the action of wind pressure can be regarded as the force of a small piece of insulating glass or vacuum glass, which can reduce the thickness of the glass sheet of the insulating glass or vacuum glass, and the manufacturing and installation are simple, especially the vacuum glass should not have too many or too small specifications;

[0123] 2) Use epoxy resin glue or silicone structural glue to seal the outer side of insulating glass, vacuum glass or vacuum-insulating glass (all or part of the periphery, see Fig.12) / or at the waist beam (where the reinforcing strip is pasted in the cavity of the previous paragraph) the glass surface is reinforced by pasting reinforcing strips 1-10; the reinforcing strips 1-10 are stainless steel thin strips, aluminum alloy strips, wooden strips or other strips with higher strength, etc. The reinforcing strips at different positions can be made of different materials, and the decorative veneers on the outer surfaces of reinforcing strips of different materials should be coordinated; the materials are calculated and selected according to the bending moment and shear force borne by the insulating glass or vacuum glass or vacuum-hollow combination glass, and the specifications of the pasted reinforcing strips are determined. The adhesive must meet the bonding strength to ensure the safety force requirements, or a component force test is also carried out to determine. Bonding reinforcing strips is essentially equivalent to reinforcing the inside and outside of the insulating glass or vacuum glass or vacuum-hollow combination glass, which can increase the bending stiffness and bending bearing capacity to form a composite component that is subjected to common force.

[0124] Frosting the glass where the reinforcing strips are bonded can increase the bonding strength. This strengthening technology can reduce or avoid the use of too thick glass to resist wind pressure, reduce the weight of the glass, and reduce the energy consumption of glass manufacturing.

[0125] Embodiment 3: This embodiment is a glass deep processing technology and installation technology, which is about the glass installation method, see Fig.11 , Fig.13 , Fig.14 , the glass includes single-piece glass, hollow glass, vacuum glass or vacuum-hollow combination glass, the vacuum glass includes vacuum glass manufactured at room temperature, and also includes vacuum glass manufactured in a high-temperature kiln, the glass also includes acrylic (PMMA) board or hollow acrylic (PMMA) board; the installation method is an installation method for eliminating the fixed fan thermal bridge or also canceling the opening fan material to eliminate the opening fan material thermal bridge, or also changing the opening fan gap from convective air heat transfer to static air to reduce heat transfer, and the installation method for increasing the durability of the silicone structural adhesive for the curtain wall hollow glass when installing the glass curtain wall, one or more of the following methods are selected according to the needs to install the glass:

[0126] 1) The location of installing windows (not recommended due to profile thermal bridges) or installing glass (no window profiles, recommended) is within the width of the insulation layer of the door and window sections, forming a continuous structure of window glass insulation and wall insulation layer; because low heat transfer coefficient glass is equivalent to an insulation layer, it reduces the impact of outdoor temperature on indoor temperature; use low heat transfer coefficient glass to insulate the indoor base wall 1 on the window side, eliminating the indoor base wall 1 thermal bridge;

[0127] 2) How to install fixed sash glass, see Fig.13 , Fig.14: Paste basalt fiber cloth 50 on the wall door and window, basalt fiber cloth is referred to as BFRP cloth, and there is an embedded steel plate in the BFRP cloth 50 that is bonded with epoxy resin glue or welded with steel bars; fix the outdoor fixed fan profile 60 to the embedded steel plate 100-1 outside the window with detachable self-drilling screws (hereinafter referred to as screws), and fix the indoor fixed fan profile 60 to the indoor window embedded steel plate 100-2 with screws, or / and install the fixed fan profile 60 with epoxy resin glue, and the indoor and outdoor embedded steel plates should not be connected; connect the two end steel plates of the indoor and outdoor middle brace profile or cross brace profile 60-1 with the embedded steel plate in the BFRP cloth 50 with screws, or also bond with epoxy resin glue; between the fixed fan profile 60 and the middle brace profile or cross brace profile 60-1 separated inside and outside There is a foam rubber sponge 90, such as a U-shaped EPDM sponge or other sponges that meet the use requirements, which plays a role in buffering and heat insulation and sealing. It is recommended to thicken the outer foam rubber sponge in heating areas to reduce the impact of outdoor temperature on the edge of the hollow glass. The fixed fan glass 1-1 with the foam rubber sponge 90 wrapped around the periphery is clamped in the fixed fan profile 60 separated inside and outside and the middle brace or cross brace profile 60-1 separated inside and outside for installation; silicone sealant is applied on the outdoor edge of the foam rubber sponge 90 for waterproofing, and silicone sealant or glass glue is applied indoors for sealing; the foam rubber sponge 90 is used to replace the current multiple EPDM rubber sealing strips for sealing, and the convective air between the current EPDM sealing strips is changed into static air of the foam rubber sponge, thereby greatly reducing the heat loss through the window gaps;

[0128] 3) Method for installing the opening sash glass: The opening sash glass 1-2 can be installed in the opening sash profile 80 (not recommended), see Fig.13 , or cancel the opening sash material and install the opening sash glass 1-2 (recommended), see Fig.14; Use epoxy resin glue to glue and install hinges (or shafts) 70 on the opening sash glass 1-2 and glue and install the opening sash window handle, or install hinges (or shafts) 70 on the opening sash fan material 80 and glue and install the opening sash window handle; Use screws to connect the hinges (or shafts) 70 of the opening sash glass 1-2 or the hinges 70 installed on the opening sash fan material 80 to the indoor embedded steel plate 100-2 on the window side. The indoor and outdoor embedded steel plates should not be connected. Decorative strips can be pasted on the inside of the opening sash glass 1-2. In heating areas, thermal insulation decorative strips should be pasted. For example, the thermal insulation decorative strips are PVC foam imitation wood grain thermal insulation decorative strips, and the edges of the decorative strips cover the opening sash glass 1-2. The gap between the opening sash and the fixed sash is formed by pasting a water strip on the outdoor side of the opening sash glass 1-2 to guide the rainwater to flow out; a rotating fixing member 20 is installed inside or outside the indoor central support or cross bracing profile 60-1 to clamp the opening sash when closing the opening sash window or the opening sash glass 1-2; a foam rubber sponge 90 (such as EPDM sponge) is installed at the gap around the opening sash window or the opening sash glass 1-2 for sealing; the foam rubber sponge 90 is used to replace the current multiple EPDM rubber sealing strips for sealing, and the air convected between the current EPDM sealing strips is changed into static air of the foam rubber sponge, thereby greatly reducing the heat loss from the window gap;

[0129] As described in Example 2, the total tensile force of epoxy resin glue and silicone structural glue is 620kg / m. Adding epoxy resin glue bonding and sealing can firmly connect the inner and outer two sheets of insulating glass together, and the glass cannot be separated and fall off. Therefore, the opening fan profile can be cancelled and the opening fan glass is safe; therefore, it is recommended to use Fig.14 The structure of installing glass by opening the fan profile can greatly reduce the heat transfer coefficient of the window.

[0130] The above glass installation method makes the thickness of the installed insulating glass or the thickness of the insulating-vacuum combination glass unrestricted, and provides conditions for installing thicker multi-cavity suspended film insulating glass with low heat transfer coefficient;

[0131] 4) When the hollow glass is installed as a glass curtain wall, an air-isolating film 5-1 is pasted on both sides of the silicone structural adhesive filling the gap in the glass curtain wall. The air-isolating film 5-1 is a black anodized aluminum foil, which can be used for decoration. The air-isolating film 5-1 is used to protect the silicone structural adhesive filling the gap in the curtain wall and the silicone structural adhesive around the hollow glass from being corroded by water vapor, oxygen, salt spray, sulfur dioxide, etc., or the air-isolating film 5-1 is also pasted to the side of the edge of the hollow glass to cover the adhesive of the bonding spacer strip 2 and protect the adhesive of the curtain wall hollow glass from being damaged by ultraviolet rays. If the reinforcing strips 1-10 are pasted around the hollow glass of the curtain wall, it is not necessary to paste the air-isolating film 5-1 to the side of the edge of the hollow glass.

[0132] When installing insulating glass or vacuum glass or vacuum-insulating combination glass on the exterior wall facade of the horizontal row windows of the frame structure (most of the buildings with horizontal row windows exterior wall shape are public buildings), in order to reduce the number of drawings in this patent application document, Fig.13 , Fig.14 The horizontal section is rotated 90 degrees to show the vertical section of the installation of insulating glass or vacuum glass or vacuum-insulating glass combination on the exterior wall of the horizontal row window. Because there is a relative horizontal displacement between the upper and lower exterior wall panels of the high-rise building where the horizontal row window is installed, the insulating glass or vacuum glass or vacuum-insulating glass combination is hung on the upper part, and the lower part is installed in the groove on the lower wall. The groove contains silane-modified polyether glue, i.e. MS glue, which has good elasticity, good waterproofness and good sealing. The insulating glass or vacuum glass or vacuum-insulating glass combination hung on the upper part is bonded with MS glue to adapt to the larger horizontal displacement between the upper and lower layers; a steel frame (such as stainless steel) can also be installed indoors to extend the steel parts to carry the glass.

[0133] Fig.13 , Fig.14 BFRP cloth 50 is pasted and installed on the side wall of the window, and is also bonded to the indoor base wall and the external protective layer. The bonding width satisfies that the lateral tensile test value of the BFRP cloth is not less than the maximum shear force value borne by the window side corner. The tensile strength of BFRP cloth is 10 to 10 times that of steel, and the thermal conductivity is not higher than that of expanded polystyrene. It does not increase heat transfer when installed on the window. Embedded steel plates 100-1 are bonded inside the BFRP cloth 50 around the outer corner of the window, and the prefabricated insulation window sill 100-3 and insulation decorative lines 100-4 are bonded to the side wall of the window and connected to the embedded steel plates 100-1 around the window with screws. The insulation window sill and insulation decorative lines become insulation window sills that can be walked on and load-bearing and insulation decorative lines that can bear force. Fig.13 , Fig.14 The window stile and / or beam 60-1 profile can be connected to the load-bearing thermal insulation window sill installed on the outside of the main wall and the embedded steel plate in the thermal insulation decorative line that can bear the force. Installing the window stile and / or beam 60-1 on the outside of the window can ensure the structural safety.

[0134] Embodiment 4: A glass deep processing technology and installation technology of this embodiment is a sealing technology for laminated glass, wherein the laminated glass includes laminated glass installed on building doors and windows and curtain walls, and also includes solar photovoltaic laminated glass, wherein the solar photovoltaic laminated glass includes crystalline silicon cell type solar photovoltaic laminated glass and thin film cell type solar photovoltaic laminated glass; the sealing of the laminated glass is to introduce a high barrier adhesive to seal the laminated glass, wherein the high barrier adhesive is an epoxy resin glue 6-2 that meets the requirements of high and low temperature resistance, or other adhesives that meet the requirements of high barrier properties; the weak parts of the laminated glass that may leak air are coated with epoxy resin glue 6-2 for sealing, such as coating the gaps around the ends of the glass 1 on both sides of the laminated glass, or coating the gaps around the ends of the plastic backboard 1# and the glass 1 when one side of the solar photovoltaic laminated glass is a (PET) plastic backboard 1#; or / and shortening the film in the middle of the laminated glass by a certain width at the periphery, and injecting epoxy resin glue 6-2 into the gaps at the edges of the laminated glass, see Figure 8 , or / and use epoxy resin glue 6-2 to stick the vapor barrier film 5 to a certain width of the side of the laminated glass to block ultraviolet rays, or use epoxy resin glue 6-2 to stick the aluminum alloy with the edge to the side of the solar photovoltaic laminated glass to block ultraviolet rays; or apply epoxy resin glue 6-2 on the outside or inside of the transparent back plate of the solar photovoltaic laminated glass, or when the solar photovoltaic laminated glass is hit by hail or cracks due to other external forces, apply epoxy resin glue 6-2 to penetrate into the cracks for repair; or spray the peripheral section of the laminated glass to form a spray layer, apply epoxy resin glue 6-2 on the spray layer, and then bond the vapor barrier film 5 to the periphery of the solar photovoltaic laminated glass for sealing; the vapor barrier film 5 is an anodized aluminum foil or a composite film of aluminum foil, and pinhole-free anodized aluminum foil is preferably used. The epoxy resin glue 6-2 that meets the sealing requirements of hollow glass can be used for sealing laminated glass. When the epoxy resin glue 6-2 is applied to the outside or inside of the transparent back plate of the solar photovoltaic laminated glass, or when the solar photovoltaic laminated glass is cracked by hail or other external forces, the epoxy resin glue 6-2 is applied to penetrate into the crack for repair, and the content of easily saponifiable chlorine in the epoxy resin should be limited. This embodiment can be used for sealing laminated glass for new construction projects, and can also be used to increase the sealing of laminated glass put into production.

[0135] At present, the edge sealing of solar photovoltaic laminated glass is sealed with silicone sealant. For example, Article 5.9 of the Sichuan Provincial Engineering Construction Standard Atlas "Cadmium Telluride Power Generation Glass Building Integrated System Structure Sichuan 2021J153TJ" stipulates that the silicone sealant and sealing materials used in the power generation glass system should comply with the relevant provisions of the current standard "Silicone and Modified Silicone Building Sealant" GB / T14683. As shown in Example 2, the sealing of butyl glue is worse than that of epoxy resin glue, and the sealing of silicone sealant is only 1 / 6 of that of butyl glue, so the current photovoltaic laminated glass edge sealing is poor.

[0136] Furthermore, VIP vacuum insulation panels and STP vacuum insulation panels are used to replace laminated glass. After the VIP vacuum insulation panels and STP vacuum insulation panels are manufactured and the edges of the seams are hot-melt sealed, high-barrier adhesive epoxy resin glue 6-2 is also coated on the edges of the VIP vacuum insulation panels and STP vacuum insulation panels for sealing, or pinhole-free anodized aluminum foil is also pasted to strengthen the sealing. The epoxy resin glue meets the requirements of high and low temperature resistance.

[0137] Embodiment 5: A glass deep processing technology and installation technology of this embodiment is about the installation method of solar photovoltaic laminated glass, the solar photovoltaic laminated glass includes thin film battery type photovoltaic laminated glass and crystalline silicon photovoltaic laminated glass, which is composed of a base layer 11, a solar photovoltaic laminated glass 12, an adhesive and a pad 13; the installation of the solar photovoltaic laminated glass is to use silicone structural adhesive to bond the pad 13 between the solar photovoltaic laminated glass 12 and the base layer 11, and use the bonded pad 13 to completely replace the iron parts for installation and fixation, or bond the pad 13 and the iron parts to install and fix the solar photovoltaic laminated glass 12, the pad 13 includes a point-shaped pad 13, or also includes a strip-shaped pad 13-1, the base layer 11 is a non-transparent base layer, see Fig.15 , Fig.16 , such as concrete on the roof, or concrete slabs, metal plates or other plates on the support frame of a solar photovoltaic power station built in the wilderness or on the water, and concrete and masonry on the exterior walls, or the external protective layer of the external insulation wall or assembled sandwich insulation wall that meets fire safety requirements, see Fig.19 Or the base 11 is glass, such as roof glass or curtain wall glass or glass installed on the exterior wall, see Fig.17 , Fig.18It is recommended that the pad 13-1 installed on the non-transparent base layer 11 and on the edge of the transparent base layer 11 is a foamed polyester (PET) pad, and the pad 13 on the transparent base layer 11 is a transparent polyester (PET) pad. Polyester (PET) can meet the long-term working requirements in 120°C and low temperature environments. Foamed polyester (PET) has high strength, good durability and certain elasticity. When the base layer 11 is roof glass or glass curtain wall, the pad located at the edge of the roof glass or glass curtain wall is preferably a strip-shaped foamed polyester (PET) pad 13-1, and the middle part is a transparent hollow dot-shaped plastic pad 13; the pad 13 is bonded to the base layer 11 with silicone structural adhesive, and then the silicone structural adhesive is coated on the upper surface of the pad 13 to bond the solar photovoltaic laminated glass 12 to the pad 13 (that is, the back plate of the solar photovoltaic laminated glass 12 is bonded to the pad 13); the specifications and spacing of the installation pad 13 are determined according to the structural force calculation; or there is an iron connection between the base layer 11 or the pad 13 and the edge of the photovoltaic laminated glass 12, for example, the base layer 11 is a roof with a larger slope and a roof with a larger negative wind pressure, or the base layer 11 is a wall. Iron connection is also required, that is, the solar photovoltaic laminated glass is installed on the exterior wall or roof of the building to become a photovoltaic building integrated building. After installing the solar photovoltaic laminated glass, it is necessary to seal the gap around the edge of the solar photovoltaic laminated glass 12 and the base layer 11, such as using silicone structural adhesive to bond aluminum alloy, to avoid sand and dust pollution, prevent animals from entering, and do a good job of waterproofing and decoration.

[0138] At present, the power-generating glass is installed on a flat or inclined surface and fixed with iron parts, as shown in the Sichuan Provincial Engineering Construction Standard Atlas "Cadmium Telluride Power-Generating Glass Building Integrated System Structure Sichuan 2021J153TJ". The iron parts are dense and standing, and the stability of the iron parts is poor. The height of the iron parts needs to meet the larger distance (or space) required between the power-generating glass 12 and the base layer 11, and long-term corrosion protection is a problem.

[0139] Furthermore, the base layer 11 is a wall of a prefabricated corrugated steel plate insulation board installed in an assembled manner. When the insulation layer of the original prefabricated corrugated steel plate insulation board is relatively thin and does not meet the requirements and needs to be thickened; the organic insulation board is bonded and compounded with the autoclaved aerated concrete board that meets the fire resistance limit requirements to form a composite insulation board, and the nail-type plastic anchor bolts 9 are used to pass through the composite insulation board and through the original prefabricated corrugated steel plate insulation board (pre-drilled) and fixed to the concrete or steel plate of the main structure of the building. The length of the autoclaved aerated concrete board meets the installation requirements according to the floor height; or the nail-type plastic anchor bolts 9 are used to pass through the autoclaved aerated concrete board and through the original The prefabricated insulation board made of corrugated steel plate is directly fixed to the concrete or steel plate of the main structure of the building (when there is no need to thicken the insulation layer of the original prefabricated insulation board made of corrugated steel plate); pads 13 (including installation point pads 13 and strip-shaped pads 13-1) are bonded between the base layer 11 of the outer autoclaved aerated concrete board and the solar photovoltaic laminated glass 12, and the connecting iron parts for installing the solar photovoltaic laminated glass 12 are fixed to the pads 13 and / or the strip-shaped pads 13-1 with screws, that is, the solar photovoltaic laminated glass is installed on the wall of the prefabricated insulation board made of corrugated steel plate to form a photovoltaic building integrated building.

[0140] It may also be necessary to install light steel keels on the indoor side of the corrugated steel prefabricated insulation board according to the force requirements to increase the rigidity of the corrugated steel prefabricated insulation board. Because photovoltaic power generation generates heat, and when the original corrugated steel prefabricated insulation board has a thin insulation layer, the building energy consumption is high. The wall of the original corrugated steel prefabricated insulation board should be transformed into an insulation layer thickness that meets the requirements of near-zero energy consumption buildings, and then photovoltaic laminated glass 12 should be installed. Even if the insulation layer of the original corrugated steel prefabricated insulation board is an organic insulation layer, it can be transformed into a base layer that adapts to photovoltaic power generation and heat generation 11.

[0141] This installation structure can also install solar photovoltaic laminated glass on the exterior wall of the building with prefabricated insulation board made of corrugated steel plate, because many industrial plants have walls with prefabricated insulation board made of corrugated steel plate, and simple civil buildings also have such exterior walls. The heat emitted by solar photovoltaic laminated glass can be used as domestic hot water and as a heat source for winter heating, or / and a ventilation pipe or fan can be installed at the edge between the base 11 and the solar photovoltaic laminated glass 12, so that the heat emitted by the solar photovoltaic laminated glass can be dissipated when it is not needed.

[0142] The present invention does not advocate the installation of photovoltaic laminated glass on the window, especially in the sight position of people in front of the window, because its light transmittance is poor, it is inconvenient to repair photovoltaic laminated glass, and the window glass specifications are many, which affects the work efficiency of manufacturing photovoltaic laminated glass; and because the hollow layer is very small, the high temperature generated by the heat of photovoltaic laminated glass is not easy to dissipate. However, photovoltaic laminated glass can be installed on the roof of the skylight, because the light transmittance requirements of the roof can be reduced, and photovoltaic laminated glass can be installed on the transparent roof on site, and the distance between the photovoltaic laminated glass and the installed glass can be increased by installing the pad 13, thereby reducing the influence of heat generated by the photovoltaic laminated glass when generating electricity, and facilitating the installation of photovoltaic laminated glass.

[0143] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made under the inspiration of the present invention, regardless of any changes in details, should be included in the protection scope of the present invention.

Claims

1. A glass deep processing technology and installation technology, which is an external sealing technology for vacuum glass or hollow glass, wherein the vacuum glass includes vacuum glass manufactured by a current high-temperature kiln and may have a leakage rate, and also includes vacuum glass manufactured at room temperature; the hollow glass and vacuum glass manufactured at room temperature include a spacing material 2, glass 1, and epoxy resin glue 6-2, wherein the spacing bar 2 of the vacuum glass manufactured at room temperature is a stainless steel spacing bar with a height several tens of times higher than the spacing material used for sealing the edge of vacuum glass manufactured by a current high-temperature kiln with a low-melting-point solder, and the vacuum glass manufactured at room temperature is made by bonding the stainless steel spacing bar 2 to the periphery of the two side glasses 1 of the vacuum glass with epoxy resin glue 6-2, and installing the exhaust structure to be installed, and bonding and installing the support 7 on the glass 1 according to a certain rule; It is characterized in that The insulating glass or / and vacuum glass periphery seal adopts the following structures and methods, which can be selected according to the needs: 1) Spraying a copper layer 3 on the two side glasses 1 of the vacuum glass or on the peripheral section of the vacuum glass manufactured in the current high temperature kiln and having a possible leakage rate, and welding the pinhole-free copper foil 5 and the copper layer 3 sprayed on the glass 1 with tin solder 4 to seal; 2) Spray the material of the spray layer 3 onto the peripheral section of the vacuum glass manufactured by the current high-temperature kiln and which may have a leakage rate, or spray it onto the peripheral section of the end of the assembled vacuum glass manufactured at room temperature for sealing; 3) Spray the material of the spray layer 3 onto the spacer strips 2 and the glass 1 around the assembled vacuum glass or insulating glass by spraying, and the outer side of the spacer strips 2 of the insulating glass is not sealed with silicone structural adhesive; The sprayed layer 3 meets the bonding requirements with the glass 1 and the spacer material 2 .

2. A glass deep processing technology and installation technology according to claim 1, It is characterized in that A high barrier adhesive 6-2 that meets the high and low temperature requirements of the use environment is fully coated on the spray layer 3. The high barrier adhesive 6-2 is epoxy resin glue or other adhesives that meet the barrier requirements and strength requirements. Alternatively, an air barrier film 5 is also bonded to the spray layer 3. Alternatively, the air barrier film 5 is also bonded to the edge of the vacuum glass, and the side width is not less than the width of the spacer strip. The air barrier film 5 is a pinhole-free aluminum foil or copper foil.

3. A glass deep processing technology and installation technology according to claim 1 or 2, It is characterized in that The sealing technology and structure of vacuum glass manufactured at room temperature are used to seal the vacuum box: the vacuum box is made of copper, or a copper layer 3 of a certain width is sprayed on the side of the end of the vacuum box 1*, and a copper layer 3 of a certain width is also sprayed on the side of the edge of the opening door 10-1; the component to be evacuated is placed in the vacuum box 1* to be sealed, the opening door 10-1 is inserted into the vacuum box 1*, and hot-melt ordinary solder 4 is coated on the copper layers 3 on both sides at the joint between the opening door 10-1 and the vacuum box 1*, or the oxygen-free copper seam is welded and sealed to form a seal for the vacuum box, and the vacuum can be evacuated to the required vacuum degree; when the opening door 10-1 of the vacuum box needs to be opened, the weld of the joint between the opening door 10-1 and the vacuum box 1* is cut or / and desoldered with a soldering iron, the opening door 10-1 is pulled out, and the same is done when the next sealing is performed, that is, the vacuum box is coated with ordinary solder 4 and copper welded and sealed on the side of the joint to form a vacuum box that can achieve a high vacuum degree.

4. A glass deep processing technology and installation technology, which is a technology that does not need to remove the Low-e coating on the edge of the glass when manufacturing insulating glass, and does not need to remove the Low-e coating on the edge of the installation (PET) coating, or strengthens the sealing of the insulating glass and simultaneously eliminates the removal of the Low-e coating on the edge of the glass, and does not need to remove the Low-e coating on the edge of the installation (PET) coating, thereby increasing the durability of the sealing of the insulating glass; the glass 1 of the insulating glass is ordinary glass, various safety glass, coated glass, or the glass 1 is also In addition, a coated (PET) film is pasted, or the two sides or one side of the insulating glass 1 can also be replaced by an acrylic (PMMA) board 1#, and the spacer 2 of the insulating glass can be any spacer; or there is an interlayer 8 in the insulating glass to manufacture double-hollow or multi-cavity insulating glass, and the interlayer 8 is a glass or acrylic (PMMA) board, or the interlayer 8 is an acrylic (PMMA) hollow board, or / and the interlayer 8 is a (PET) suspended film 8, and the suspended film 8 can be a (PET) coated film coated with a Low-e film, or a (PET) film without a coating; It is characterized in that The technology of eliminating the need to remove the Low-e coating on the edge of the glass and eliminating the need to remove the Low-e coating on the edge of the (PET) coating is as follows: coating epoxy resin glue 6-2 on the Low-e film on the edge of the glass 1, and using the epoxy resin glue 6-2 to replace the butyl glue 6-1 for bonding with the spacer bar 2, or coating epoxy resin glue 6-2 on the butyl glue 6-1 on the bonding surface of the Low-e coating and the spacer bar 2 for bonding, that is, all bonding surfaces with the Low-e coating are bonded with the epoxy resin glue and the Low-e coating; there is no need to remove the Low-e coating on the edge of the glass, and there is no need to remove the Low-e coating on the suspended film 8, and the epoxy resin glue should meet the high and low temperature resistance requirements of the use environment; no matter what technology is used to install the glass 1 or install the suspended film 8, as long as the epoxy resin glue is used to bond the Low-e coating, there is no need to remove the Low-e coating on the glass and the (PET) film.

5. A glass deep processing technology and installation technology according to claim 4, It is characterized in that Adopt the following techniques to increase the sealing of insulating glass: 1) Apply epoxy resin glue 6-2 to the outside of the spacer 2, to the outside of the already installed suspension film 8 and to the inside of the end of the glass 1, and bond the air barrier film 5 on the surface of the epoxy resin glue 6-2. The air barrier film 5 is an anodized aluminum foil, so as to form a fundamental seal of the hollow layer of the insulating glass with the anodized aluminum foil air barrier film 5; then fill the silicone structural glue 6-3, and bond the silicone structural glue 6-3 to the U-shaped air barrier film 5 already installed in the insulating glass; 2) Or when the inert gas is injected into the hollow glass, the sealing of the drilled holes is enhanced: the hollow glass is drilled, the holes are drilled through the silicone structural adhesive 6-3 and the air barrier film 5 inside it, and then through the epoxy resin adhesive 6-2 bonded to the inside of the air barrier film 5 and the spacer 2, or through the (PET) suspension film 8 attached to the outer side of the spacer 2, and the inert gas is injected and the original gas in the hollow layer is extracted at the same time; after the inert gas is injected to meet the requirements, the holes where the inert gas is injected and the holes where the gas in the hollow layer is extracted are sealed with epoxy resin adhesive 6-2 or silicone structural adhesive 6-3, or the air barrier film 5 is partially attached at the drilled holes for sealing; 3) Alternatively, a high barrier adhesive epoxy resin glue 6-2 is applied to the cross section of the end of the insulating glass 1, and the air barrier film 5-1 is bonded and sealed to the cross section of the end of the glass 1, and bonded to the silicone structural adhesive 6-3, or the air barrier film 5-1 is bonded to a certain width on the side of the edge of the insulating glass. The air barrier film 5-1 can be an anodized aluminum foil, or a plastic film or composite film with barrier properties that meet the requirements.

6. A glass deep processing technology and installation technology according to claim 4 or 5, It is characterized in that The sealing technology of bonding the vapor barrier film to the hollow glass can be used in the sealing of electronic products. The vapor barrier film is bonded to the adhesive surface of the potted electronic products to prevent water vapor, oxygen or other harmful gases from entering the electronic products, thereby increasing the durability of the electronic products. That is, the hollow glass is replaced by the electronic products, and the sealing adhesive of the electronic products is epoxy resin glue, or other potting adhesives.

7. A glass deep processing technology and installation technology according to claim 4 or 5, It is characterized in that The suspension film 8 is bonded and installed by combining a quick bonding adhesive 6-4 with an epoxy resin glue 6-2, and the edge of the suspension film 8 is bonded to the top of the spacer bar 2 and the outer side of the spacer bar 2; a double-sided adhesive strip 6-4 of a quick bonding adhesive is pre-installed on the outer side of the spacer bar 2, and after the spacer bar 2 is bonded to the glass 1, when the Low-e coating is located below the suspension film 8, epoxy resin glue 6-2 is coated on the upper surface of the spacer bar 2 to bond it to the bottom of the suspension film 8, or epoxy resin glue 6-2 is directly coated on the upper surface of the spacer bar 2 without butyl glue 6-1 for bonding; when there is no Low-e coating under the suspension film 8, epoxy resin glue 6-2 does not need to be coated on the spacer bar 2, and the suspension film 8 can be bonded to the butyl glue 6-1. -1 bonding or bonding with epoxy resin glue 6-2; the epoxy resin glue 6-2 is also applied to the side of the spacer 2, and then the protective film on the surface of the double-sided adhesive strip 6-4 is torn off, the suspension film 8 is stretched, the suspension film 8 is bonded to the upper surface of the spacer 2, and then the suspension film 8 is bent 90 degrees, the suspension film 8 is bonded to the epoxy resin glue 6-2 on the upper half of the side of the spacer 2, and to the double-sided adhesive strip 6-4 in the middle, and then to the epoxy resin glue 6-2 on the lower half of the side of the spacer 2, and the suspension film 8 can be quickly bonded and fixed immediately; according to the number of hollow layers of the insulating glass, each layer of the spacer 2 and the suspension film 8 are installed until the outer glass 1 is installed, and then the insulating glass is sealed using the aforementioned sealing technology.

8. A glass deep processing technology and installation technology, which is about a glass installation method, wherein the glass includes single-piece glass, hollow glass, vacuum glass or vacuum-hollow combination glass, wherein the vacuum glass includes vacuum glass manufactured at room temperature and vacuum glass manufactured in a high-temperature kiln, and wherein the glass also includes an acrylic (PMMA) board or a hollow acrylic (PMMA) board; It is characterized in that The installation method is an installation method for eliminating the fixed fan thermal bridge or also eliminating the opening fan material to eliminate the opening fan material thermal bridge, or also changing the opening fan gap from convective air heat transfer to static air to reduce heat transfer, and an installation method for increasing the durability of the curtain wall insulating glass silicone structural adhesive when installing the glass curtain wall. One of the following methods or a combination of multiple methods are selected according to the needs to install the glass: 1) The location where the window or glass is installed is within the width of the insulation layer of the door and window section, forming a continuous structure of window glass insulation and wall insulation layer; using glass with low heat transfer coefficient to insulate the indoor base wall 1 on the window side, eliminating the thermal bridge of the indoor base wall 1; 2) Method for installing fixed sash glass: Paste BFRP cloth 50 on the wall door window, and there is an embedded steel plate in the BFRP cloth 50 which is bonded with epoxy resin glue or welded with steel bars; fix the outdoor fixed sash profile 60 to the embedded steel plate 100-1 outside the window with screws, and fix the indoor fixed sash profile 60 to the embedded steel plate 100-2 of the indoor window with screws; connect the two end steel plates of the indoor and outdoor middle brace profile or cross brace profile 60-1 to the embedded steel plate in the BFRP cloth 50 with screws, or bond them with epoxy resin glue; The fixed sash glass 1-1 with the periphery covered with foam rubber sponge 90 is clamped in the fixed sash profile 60 separated inside and outside and the middle brace or cross brace profile 60-1 separated inside and outside to be installed; silicone sealant is applied on the outdoor edge of the foam rubber sponge 90 for waterproofing, and silicone sealant or glass glue is applied indoors for sealing; the foam rubber sponge 90 is used to replace the current multiple EPDM rubber sealing strips for sealing, and the convection air between the current EPDM sealing strips is changed into static air in the foam rubber sponge, thereby greatly reducing the heat loss through the window gap; 3) Method for installing the opening sash glass: The opening sash glass 1-2 can be installed in the opening sash profile 80, or the opening sash material is removed to install the opening sash glass 1-2; the hinge 70 is bonded and installed on the opening sash glass 1-2 and the opening sash window handle is bonded and installed, or the hinge 70 is bonded and installed on the opening sash material 80 and the opening sash window handle is bonded and installed; the hinge 70 of the opening sash glass 1-2 or the hinge 70 installed on the opening sash material 80 is connected to the indoor embedded steel plate 100-2 on the window side with screws, and the opening sash glass 1-2 indoor A water strip is pasted on the outside to guide rainwater to flow out; a rotating fixing member 20 is installed inside or outside the indoor central support or horizontal support profile 60-1 to clamp the opening sash when closing the opening window or the opening glass 1-2; a foam rubber sponge 90 is installed to seal the gap around the opening window or the opening glass 1-2; the foam rubber sponge 90 is used to replace the current multiple EPDM rubber sealing strips for sealing, and the air convecting between the current EPDM sealing strips is changed into static air of the foam rubber sponge, thereby greatly reducing the heat loss from the window gap; 4) When the insulating glass is installed as a glass curtain wall, a gas barrier film 5-1 is pasted on both the indoor and outdoor sides of the silicone structural adhesive filling the gap in the glass curtain wall. The gas barrier film 5-1 is a black anodized aluminum foil. The gas barrier film 5-1 is used to protect the silicone structural adhesive filling the gap in the curtain wall and the silicone structural adhesive around the insulating glass from being corroded by water vapor, oxygen, salt spray, sulfur dioxide, etc., or the gas barrier film 5-1 is also pasted to the side of the edge of the insulating glass to cover the adhesive of the bonding spacer strip 2 and protect the adhesive bonding the curtain wall insulating glass from being damaged by ultraviolet rays.

9. A glass deep processing technology and installation technology, which is a sealing technology for laminated glass, wherein the laminated glass includes laminated glass installed on building doors and windows and curtain walls, and also includes solar photovoltaic laminated glass, which includes crystalline silicon cell solar photovoltaic laminated glass and thin film cell solar photovoltaic laminated glass; It is characterized in that The sealing of the laminated glass is to introduce a high barrier adhesive to seal the laminated glass, and the high barrier adhesive is an epoxy resin glue 6-2 that meets the requirements of high and low temperature resistance, or other adhesives that meet the requirements of high barrier properties; the epoxy resin glue 6-2 is applied to the weak parts of the laminated glass that may leak air, or when one side of the solar photovoltaic laminated glass is a (PET) plastic backboard 1#, it is applied to the peripheral gap between the plastic backboard 1# and the end of the glass 1; or / and the film in the middle of the laminated glass is shortened by a certain width at the periphery, and the epoxy resin glue 6-2 is injected into the edge gap of the laminated glass, or / and the vapor barrier film 5 is adhered to the epoxy resin glue 6-2 The side of the laminated glass has a certain width to block ultraviolet rays, or the aluminum alloy of the edge is pasted to the side of the solar photovoltaic laminated glass with epoxy resin glue 6-2 to block ultraviolet rays; or the epoxy resin glue 6-2 is applied to the outside or inside of the transparent back plate of the solar photovoltaic laminated glass, or when the solar photovoltaic laminated glass is hit by hail or cracks due to other external forces, the epoxy resin glue 6-2 is applied to penetrate into the cracks for repair; or the peripheral section of the laminated glass is sprayed to form a spray layer, and the epoxy resin glue 6-2 is applied on the spray layer, and then the vapor barrier film 5 is bonded to the periphery of the solar photovoltaic laminated glass for sealing; the vapor barrier film 5 is an anodized aluminum foil or a composite film of aluminum foil.

10. A glass deep processing technology and installation technology, which is about the installation method of solar photovoltaic laminated glass, the solar photovoltaic laminated glass includes thin film battery type photovoltaic laminated glass and crystalline silicon photovoltaic laminated glass, which includes a base layer 11, solar photovoltaic laminated glass 12, adhesive, It is characterized in that It also includes a pad 13; the installation of the solar photovoltaic laminated glass is to use silicone structural adhesive to bond the pad 13 between the solar photovoltaic laminated glass 12 and the base layer 11, and use the bonded pad 13 to completely replace the iron parts for installation and fixation, or bond the pad 13 and iron parts to install and fix the solar photovoltaic laminated glass 12, the pad 13 includes a point-shaped pad 13, or also includes a strip-shaped pad 13-1, the base layer 11 is a non-transparent base layer, or the base layer 11 is glass, the pad 13 is bonded to the base layer 11 with silicone structural adhesive, and then the silicone structural adhesive is coated on the upper surface of the pad 13 to bond the solar photovoltaic laminated glass 12 to the pad 13; or there are iron parts connected between the base layer 11 or the pad 13 and the photovoltaic laminated glass 12, after the installation of the solar photovoltaic laminated glass is completed, the gap around the edge of the solar photovoltaic laminated glass 12 and the base layer 11 is sealed, that is, the solar photovoltaic laminated glass is installed on the exterior wall or roof of the building to become a photovoltaic building integrated building.

Citation Information