Differential settlement control structure for road and bridge transition section in permafrost region and construction method of differential settlement control structure

By adopting combined structures such as stone extrusion layers, prefabricated pipe piles, and ventilation bricks in the road and bridge transition section of the permafrost area, the problem of uneven settlement of the road and bridge transition section of the permafrost area is solved, and the roadbed temperature regulation and stability are achieved Improvement ensures the safety of vehicle driving.

CN119061752APending Publication Date: 2024-12-03SOUTH CHINA UNIV OF TECH

Patent Information

Application Number
CN202411567177.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-05
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The road and bridge transition section in the permafrost area has uneven settlement due to thermal disturbances of the abutment and roadbed to the permafrost below, causing road collapse, cracking and safety hazards. The existing prevention and control measures are difficult to effectively deal with.

Method used

It adopts a combination structure such as stone extrusion layer, prefabricated pipe piles, ventilation bricks, L-shaped hot rods, composite geogrids and drainage ditches, and is filled with transverse drainage slopes, anti-seepage geotextiles, insulation layers and foam light soil. A multi-layer protection system is formed to regulate temperature and stress and reduce the impact of freeze-thaw cycle on the roadbed.

Benefits of technology

It effectively reduces the temperature inequality of the roadbed, reduces the settlement and displacement caused by freeze-thaw, enhances the stability and safety of the road and bridge transition section, and extends the service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061752A_ABST
    Figure CN119061752A_ABST
Patent Text Reader

Abstract

The invention relates to a structure for controlling differential settlement of a road-bridge transition section in a permafrost region. The structure comprises a conventional roadbed, an asphalt pavement, a bridge abutment and a road-bridge transition section roadbed. A block stone extrusion layer is arranged below the road-bridge transition section roadbed; the bottom surface of the block stone extrusion layer is a transverse drainage slope, a prefabricated pipe pile is arranged at the bottom, and anti-seepage geotechnical cloth I is laid on the bottom surface of the block stone extrusion layer; anti-seepage geotechnical cloth II is laid on the slope surface of the road-bridge transition section roadbed, and a heat preservation layer I and a composite geogrid are laid in the middle; permeable geotextile is laid at the joint of the road and bridge transition section roadbed and the block stone extrusion layer; laying a thermal insulation layer II on the slope surface of the abutment protection cone; ventilation bricks are laid on the road-bridge transition section roadbed slope surface and the outer layer of the bridge abutment protection cone, and a plurality of L-shaped hot rods are inserted into the ventilation bricks. U-shaped drainage ditches are formed in the surfaces of the movable layers on the two sides of the road and bridge transition section roadbed, and water seepage blind ditches are formed in the lower portions of the U-shaped drainage ditches; the water seepage blind ditch is connected with the block stone extrusion layer through a guide pipe. The invention further discloses a construction method of the structure. According to the invention, collapse, cracking and differential settlement of the pavement can be avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of subgrade temperature and settlement control in permafrost regions, and in particular to a structure for controlling uneven settlement of a road-bridge transition section in permafrost regions and a construction method thereof. Background Art

[0002] The Qinghai-Tibet Plateau is located in the mid-latitude region. Due to its high altitude characteristics and unique climatic conditions, unstable high-temperature permafrost is widely distributed. The stability of these high-temperature permafrost is easily affected by changes in external environmental temperature. The demand for the construction of transportation infrastructure such as roads and bridges is increasing, and accordingly, a large number of road-bridge transition sections will be generated. Unlike inland areas, the construction of transportation infrastructure on the Qinghai-Tibet Plateau will significantly change the original thermal balance state of the surface and cause permafrost degradation. In turn, the constructed transportation infrastructure will also face settlement problems caused by permafrost degradation. Therefore, the construction of road-bridge transition sections in permafrost areas urgently needs to consider the uneven settlement caused by the different thermal disturbances of the permafrost below by the abutments and roadbeds.

[0003] After the completion of the transition section between the road and bridge, the thermal equilibrium state of the original natural surface is broken, and the abutment and roadbed will cause thermal disturbance to the lower permafrost, which will expand the thickness of the active layer of permafrost and cause a large permanent settlement, and cause the strength of the degraded part of the permafrost to drop significantly in the subsequent freeze-thaw cycles. The periodic freeze-thaw cycle of the active layer of permafrost will also cause periodic vertical displacement changes on the surface. Studies have shown that in the process of interannual temperature changes in the active layer, the pore water of the surface soil freezes in winter, and the water migrates to the freezing front under the action of the temperature gradient to form an ice lens. In summer, the ice lens will hinder the discharge of water from the upper part, resulting in mud turning and reduced soil strength. In addition, the temperature field of the fill behind the abutment also shows periodic uneven changes such as temperature lag under the influence of the external environmental temperature. At the same time, under the action of the interannual freeze-thaw cycle, the fill behind the abutment will produce expansion cracks between the abutment and the fill, resulting in external water infiltration and erosion of the roadbed fill. Therefore, due to the special environmental conditions in permafrost areas, it is easy to cause misalignment and uneven settlement between the road surface and the abutment.

[0004] As the key part connecting the abutment and the roadbed, the road-bridge transition section is a key position to ensure the smooth and safe operation of vehicles. The current prevention and control measures for uneven settlement of road-bridge transition sections in permafrost areas are limited to replacing roadbed fill, active cooling measures and passive adaptation settlement measures. However, these measures are still difficult to effectively adapt to the large number of aforementioned problems caused by engineering construction. Based on this, in order to control the uneven settlement of road-bridge transition sections in permafrost areas and ensure vehicle driving safety, it is necessary to develop a new structure to ensure the long-term safe and stable operation of road-bridge transition sections in permafrost areas. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide an uneven settlement control structure for a road-bridge transition section in permafrost areas, which can avoid road collapse, cracking and uneven settlement problems caused by uneven temperature field inside the roadbed.

[0006] Another technical problem to be solved by the present invention is to provide a construction method for the uneven settlement control structure of the road-bridge transition section in permafrost areas.

[0007] In order to solve the above problems, the structure for controlling uneven settlement of the transition section of a road bridge in permafrost areas described in the present invention comprises a conventional roadbed, an asphalt pavement, a bridge abutment and a roadbed of the transition section of the road bridge, and is characterized in that: a block stone extrusion layer is provided below the roadbed of the transition section of the road bridge, and the block stone extrusion layer is buried in the surface of the active layer; the bottom surface of the block stone extrusion layer is a herringbone lateral drainage slope inclined to both sides by 4%, and prefabricated pipe piles are provided at the bottom, and an impermeable geotextile I is laid on the bottom surface of the block stone extrusion layer; an impermeable geotextile II is laid on the slope surface of the roadbed of the transition section of the road bridge, and an insulation layer I and a composite geogrid are laid in the middle; a permeable geotextile is laid at the junction of the roadbed of the transition section of the road bridge and the block stone extrusion layer; the roadbed of the transition section of the road bridge and the conventional Gravel soil is provided between the roadbeds; planks are provided behind the abutment and at the bottom of the asphalt pavement, respectively, and the planks are overlapped on the abutment and the roadbed of the road-bridge transition section, respectively; a bridge abutment guard cone is provided at the front of the abutment, and the slope surface of the bridge abutment guard cone is paved with insulation layer II; the slope surface of the roadbed of the road-bridge transition section and the outer layer of the abutment guard cone are randomly paved with ventilation bricks of varying thicknesses, and a plurality of L-shaped heat rods are inserted; U-shaped drainage ditches are provided on the surface of the active layer on both sides of the roadbed of the road-bridge transition section, and a seepage blind ditch is provided at the bottom of the U-shaped drainage ditch; water-retaining soil is piled up on the surface of the active layer on the side of the U-shaped drainage ditch away from the roadbed of the road-bridge transition section; the seepage blind ditch is connected to the block stone extrusion layer through a conduit.

[0008] The active layer is the area from the surface of the permafrost zone to the upper limit of the permafrost zone.

[0009] The upper surface of the block stone extrusion layer is flush with the surface of the active layer.

[0010] The prefabricated pipe piles are cast together by a pile cap and pipe piles; the upper surface of the pile cap supports the bottom surface of the block stone extrusion layer; the pipe piles penetrate the active layer and extend into the permafrost by an upper limit of not less than 2.0 m, and the length of the prefabricated pipe piles decreases successively as they move away from the abutment.

[0011] The abutment guard cone and the roadbed of the transition section of the road bridge are both filled with foam lightweight soil. The cross-section of the roadbed of the transition section of the road bridge is an isosceles trapezoid with a slope of 1:1.5, and the longitudinal section is an inverted right-angled trapezoid with a multi-step slope in contact with the gravel soil.

[0012] The insulation layer I is buried no less than 0.8 m below the road shoulder, and a 0.2 m thick medium-coarse sand cushion layer is provided above and below it.

[0013] The composite geogrid is arranged at intervals of 0.9 m. The first layer is arranged 0.7 m below the asphalt pavement and is wrapped 2.0 m at the edge of the roadbed slope of the road-bridge transition section.

[0014] The ventilation bricks are in a concave shape, with the sunny side painted white, the thickness of the sunny slope being twice that of the shady slope, the top being flush with the asphalt pavement, and the bottom being connected with the block stone extrusion layer and the top surface of the active layer.

[0015] A plurality of L-shaped heat rods are inserted at the left and right slope feet of the roadbed of the transition section of the road bridge and the abutment cones, with a direction perpendicular to the direction of the roadbed of the transition section of the road bridge, and are obliquely buried in the active layer and the block stone extrusion layer. The evaporation section penetrates 1.0 to 2.5 m below the upper limit of the permafrost, and the condensation section is vertically arranged and exposed to the air.

[0016] The directions of the U-shaped drainage ditch and the seepage blind ditch are parallel to the direction of the roadbed of the road-bridge transition section.

[0017] The top of the U-shaped drainage ditch is flush with the surface of the active layer. The U-shaped drainage ditch is built with C30 precast concrete blocks, and the exposed lines are chamfered with 5 mm. Anti-seepage geotextile III is laid on both sides of the ditch wall and the bottom of the ditch, and a cement mortar cushion layer is poured on both sides of the ditch wall and the bottom of the ditch.

[0018] The upper part of the seepage blind ditch is connected to the bottom of the U-shaped drainage ditch, and the center is on the same vertical line as the U-shaped drainage ditch; the bottom of the seepage blind ditch is poured with a C20 concrete cushion layer and filled with coarse granular fillers, and an anti-seepage geotextile IV is set on the ditch wall and bottom.

[0019] The conduit is buried on the lower surface of the block stone extrusion layer, has the same slope as the lower surface of the block stone extrusion layer, and is connected to the water seepage blind ditch.

[0020] The construction method of the uneven settlement control structure of the transition section of a road and bridge in permafrost regions as described above comprises the following steps: ⑴ A spiral pile driver is used on the active layer to sink the prefabricated pipe pile body. The rotary pile driver is constructed by adding a spiral drill bit in the prefabricated pile. The spiral drill bit is connected to a high-strength alloy steel rod, which is pre-buried in the prefabricated pipe pile and connects the concave pile head to the hexagonal steel plate. (2) Use the drilling anchoring method to fix the reinforcement of the prefabricated pipe pile cap; pour concrete and vibrate with an inserted vibrator; ⑶ When the concrete strength of the precast pipe pile reaches the design value, the block stone extrusion layer is excavated. After excavation to the specified elevation, the bottom of the block stone extrusion layer is compacted, and the bottom surface is made into a herringbone with a 4% horizontal drainage slope on both sides, and a conduit is set at the same time; (4) Lay a layer of anti-seepage geotextile I on the bottom of the block stone extrusion layer, and then roll and backfill in layers; ⑸After rolling, check the elevation and flatness, add fillers to the low-lying areas, and then lay permeable geotextiles; (6) Fill gravel soil and foam lightweight soil in layers, widen the roadbed on both sides of the road-bridge transition section by 20-30 cm; lay insulation layer I and composite geogrid when filling to the designed elevation; ⑺ Use foam lightweight soil to fill the abutment cone from bottom to top in layers, with the filling width exceeding the slope foot line by 50cm; ⑻ Carry out moisture content detection and control it within the allowable moisture content range for construction, and use heavy-duty vibratory rollers to compact the roadbed in the road-bridge transition section along the longitudinal direction of the line; ⑼ Use bulldozers for initial leveling and graders for final leveling. The principle is that the embankment surface should have no obvious local bumps. The flat surface should be made into a 4% horizontal drainage slope on both sides. After laying the slabs, the asphalt pavement should be laid. ⑽ Artificially lay a layer of sand cushion on the slope of the abutment cone, and then overlap and lay the insulation layer II; ⑾Long the entire longitudinal section of the roadbed slope of the road-bridge transition section, lay anti-seepage geotextile II; then lay ventilation bricks in a disorderly manner from bottom to top on both sides and the abutment cone slope; after the slope protection is laid, paint the side of the ventilation bricks exposed to the air white; ⑿ After leveling the site, conduct L-shaped hot rod drilling every 3 m along the roadbed direction of the road-bridge transition section; during drilling, put mud balls into the holes and use alloy drill bits to stir and coat the hole walls; ⒀Use the annular groove on the top cover of the L-shaped hot rod as the force point for hanging, and then backfill the gap between the L-shaped hot rod and the hole with sand; ⒁ Use trenching machines and excavators in frozen soil areas to excavate blind seepage ditches and U-shaped drainage ditches; ⒂ Lay anti-seepage geotextile IV on the left and right sides of the seepage blind ditch; pour C20 concrete cushion at the bottom of the seepage blind ditch, lay a layer of anti-seepage geotextile IV after sealing the bottom, and then fill the seepage blind ditch with coarse granular filler; finally, apply anti-seepage geotextile III on the top of the seepage blind ditch; ⒃ Lay anti-seepage geotextile III on the wall of the U-shaped drainage ditch, then pour the cement mortar cushion layer, and assemble the overall prefabricated block U-shaped drainage ditch on site; ⒄Pile the excavated soil into water-retaining soil piles.

[0021] Compared with the prior art, the present invention has the following advantages: 1. The present invention uses the "thermal semiconductor" characteristics of the rocks in the rock squeeze layer to cool the permafrost below. In winter, the cold air in the rock squeeze layer sinks to generate convection, transferring the external cold energy to the permafrost layer to achieve the purpose of cooling the permafrost; in summer, the air convection in the rock squeeze layer weakens or even disappears, and the heat transfer in the rock squeeze layer can only rely on the heat conduction between the rocks and the air, which reduces the heat transfer to the permafrost layer in summer.

[0022] 2. The present invention utilizes ventilation bricks laid on the roadbed of the transition section of the road bridge and the slope of the abutment cone to reduce the heat transfer into the roadbed and the permafrost below. In winter, counterclockwise air convection will be generated in the ventilation bricks, bringing cold energy from the external environment into the roadbed and the permafrost layer below; in summer, clockwise air convection will be generated in the ventilation bricks, blocking the heat energy from the external environment from being transferred into the roadbed and the permafrost layer below. At the same time, the surface of the ventilation bricks exposed to the air is painted white to reduce the absorption of solar radiation by the roadbed. In addition, ventilation bricks with asymmetric thickness can regulate the yin and yang slope effects of the roadbed, and even out the temperature on both sides of the roadbed to control the vertical displacement difference.

[0023] 3. The insulation layer I laid in the middle of the roadbed of the road-bridge transition section in the present invention will have an insulation effect on the permafrost below. In summer, the insulation layer I blocks the heat transferred from the external environment to the permafrost through the road surface and the bridge abutment cones. In winter, the insulation layer I can also prevent the cold energy generated by the L-shaped heat rod from being transferred to the outside world. The insulation layer I gathers most of the heat in the upper part of the roadbed, and cooperates with the crushed stone soil to evenly distribute the temperature field of the roadbed, thereby achieving the purpose of reducing uneven settlement of the road surface.

[0024] 4. The L-shaped heat rods installed at the roadbed of the road-bridge transition section and the slope foot of the abutment cone in the present invention can realize active cooling of the roadbed and the permafrost below. At the same time, the combination of the block stone extrusion layer and the L-shaped heat rod can well achieve the effect of uniform temperature distribution, effectively block the heat from continuing to conduct to the permafrost below the roadbed, reduce the fluctuation range of the inter-annual permafrost temperature, and solve the problem of thawing settlement caused by permafrost degradation.

[0025] 5. In the present invention, the abutment guard cone and the roadbed of the transition section of the road bridge are filled with foam lightweight soil. The foam lightweight soil has the characteristics of light weight and high strength, which can effectively reduce the additional stress of the roadbed on the lower foundation and reduce the impact of the freeze-thaw cycle on the roadbed of the transition section of the road bridge.

[0026] 6. The present invention is provided with a composite geogrid, the interlocking effect of which can absorb part of the strain energy of soil frost heave and thaw settlement, reduce the horizontal displacement of the shoulder, and strengthen the integrity of the roadbed in the transition section between the road and the bridge.

[0027] 7. In the present invention, the slab connects the roadbed and the abutment of the road-bridge transition section, thereby avoiding misalignment caused by uneven settlement of the roadbed and abutment and slowing down the transition slope.

[0028] 8. The prefabricated pipe piles in the present invention transfer the upper load to the permafrost layer with higher strength, solving the strength reduction problem caused by the melting of the active layer in summer. At the same time, the pull-out resistance of the prefabricated pipe piles is used to resist the frost heave force generated by the active layer in winter.

[0029] 9. In the present invention, a deformation coordinated transition section is formed in the roadbed fill behind the abutment by means of slabs, composite geogrids, crushed stone soil and prefabricated pipe piles of variable length, so as to achieve the purpose of overall regulation of uneven settlement of the road-bridge transition section.

[0030] 10. The present invention utilizes U-shaped drainage ditches and gravel blind ditches to drain surface water and active layer groundwater in layers, thereby reducing the adverse effects of water accumulation on the roadbed and abutment cones of the transition section of the road and bridge. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The specific implementation modes of the present invention are further described in detail below in conjunction with the accompanying drawings.

[0032] Figure 1 It is a cross-sectional view of the roadbed of the road bridge transition section in the present invention.

[0033] Figure 2 It is a longitudinal section view of the roadbed of the transition section of the road bridge in the present invention.

[0034] Figure 3 It is a top view of the roadbed of the transition section of the road bridge in the present invention.

[0035] Figure 4 It is a half-width bottom view of the roadbed of the transition section of the road bridge in the present invention.

[0036] Figure 5 It is a cross-sectional view of the U-shaped drainage ditch and seepage blind ditch structure in the present invention.

[0037] Figure 6 It is a three-dimensional diagram of the ventilation brick in the present invention.

[0038] Figure 7 It is a three-dimensional diagram of the prefabricated pipe pile in the present invention.

[0039] Figure 8 It is a schematic diagram of burying the L-shaped heat rod in the present invention.

[0040] Fig. 9 It is a schematic diagram of the buried composite geogrid in the present invention.

[0041] Fig.10 It is a schematic diagram of the connection of the composite geogrid in the present invention.

[0042] Fig.11 The invention relates to a construction method for a uneven settlement control structure of a road-bridge transition section in a permafrost region.

[0043] Fig.12 This is the temperature field distribution diagram of the cross section of the roadbed in the transition section of the road bridge in the present invention.

[0044] Fig.13 This is the temperature field distribution diagram of the longitudinal section of the roadbed in the transition section of the road bridge in the present invention.

[0045] In the figure: 1—active layer; 2—permafrost upper limit; 3—conventional roadbed; 4—asphalt pavement; 5—bridge abutment; 6—bridge abutment cone; 7—road-bridge transition section roadbed; 8—block extrusion layer; 9—prefabricated pipe piles; 10—L-shaped heat rod; 11—ventilation brick; 12—insulation layer I; 13—composite geogrid; 14—medium-coarse sand cushion layer; 15—foam lightweight soil; 16—gravel soil; 17—duct; 18—U-shaped drainage ditch; 19—seepage blind ditch; 20—impermeable geotextile I; 21—permeable geotextile; 22—impermeable geotextile II; 23—impermeable geotextile III; 24—impermeable geotextile IV; 25—C20 concrete cushion layer; 26—coarse granular filler; 27—cement mortar cushion layer; 28—C30 concrete prefabricated block; 29—water-retaining soil twist; 30—insulation layer II; 31—boarding. DETAILED DESCRIPTION

[0046] like Figures 1 to 10 As shown, the structure for controlling uneven settlement of the road-bridge transition section in permafrost areas includes a conventional roadbed 3, an asphalt pavement 4, an abutment 5 and a road-bridge transition section roadbed 7. A block stone extrusion layer 8 is provided below the road-bridge transition section roadbed 7, and the block stone extrusion layer 8 is buried in the surface of the active layer 1; the bottom surface of the block stone extrusion layer 8 is a herringbone lateral drainage slope inclined to both sides by 4%, and a prefabricated pipe pile 9 is provided at the bottom, and an anti-seepage geotextile I 20 is laid on the bottom surface of the block stone extrusion layer 8; an anti-seepage geotextile II 22 is laid on the slope surface of the road-bridge transition section roadbed 7, and an insulation layer I 12 and a composite geogrid 13 are laid in the middle; a permeable geotextile 21 is laid at the junction of the road-bridge transition section roadbed 7 and the block stone extrusion layer 8; crushed stone soil 16 is provided between the road-bridge transition section roadbed 7 and the conventional roadbed 3; and a slab 3 is provided behind the abutment 5 and at the bottom of the asphalt pavement 4, respectively. 1, the bridging plate 31 is overlapped on the abutment 5 and the road-bridge transition section roadbed 7 respectively; the front part of the abutment 5 is provided with an abutment cone 6, and the slope surface of the abutment cone 6 is paved with an insulation layer II 30; the slope surface of the road-bridge transition section roadbed 7 and the outer layer of the abutment cone 6 are randomly paved with ventilation bricks 11 of varying thicknesses, and a plurality of L-shaped heat rods 10 are inserted; the surface of the active layer 1 on both sides of the road-bridge transition section roadbed 7 is provided with a U-shaped drainage ditch 18, and the lower part of the U-shaped drainage ditch 18 is provided with a seepage blind ditch 19; the surface of the active layer 1 on the side of the U-shaped drainage ditch 18 away from the road-bridge transition section roadbed 7 is piled with water retaining soil 29; the seepage blind ditch 19 is connected to the block stone extrusion layer 8 through a conduit 17.

[0047] Among them: Active layer 1 is the area from the surface of the permafrost zone to the upper limit of permafrost 2.

[0048] The upper surface of the rock squeeze layer 8 is flush with the surface of the active layer 1. The thickness of the rock squeeze layer 8 is 1.5-2.0 m, the rock particle size is 150-300 mm, the minimum side length is greater than 150 mm, the slenderness ratio is less than 3, the strength is not less than 30 MPa, the crushing value is not more than 25%, and the porosity is not less than 25%; preferably: the thickness of the rock squeeze layer 8 is 2.0 m, the rock particle size is 200 mm, the minimum side length is 250 mm, the slenderness ratio is 2, the strength is 40 MPa, the crushing value is 15%, and the porosity is 35%.

[0049] The prefabricated pipe pile 9 is cast together with the pile cap and the pipe pile; the upper surface of the pile cap supports the bottom surface of the block stone extrusion layer 8; the pipe pile penetrates the active layer 1 and extends into the upper limit 2 of the permafrost by no less than 2.0 m, and the length of the prefabricated pipe pile 9 decreases with the distance from the abutment 5, preferably by 0.5 m. The pile top of the prefabricated pipe pile 9 is preferably provided with a pile cap with a side length of 1200 mm and a thickness of 300 mm, and the pile position is arranged in an equilateral triangle or square. The pile diameter of the prefabricated pipe pile 9 is 40 cm, and the pile center spacing is 3~4 m, preferably 3.5 m.

[0050] The abutment cone 6 and the roadbed 7 of the transition section of the bridge are both filled with foam lightweight soil 15. The cross-section of the roadbed 7 of the transition section of the bridge is an isosceles trapezoid with a slope of 1:1.5, and the longitudinal section is an inverted right-angled trapezoid with a multi-step slope in contact with the gravel soil 16.

[0051] The overall shape of the crushed stone soil 16 is a step-like shape with a constant thickness, and the preferred thickness is 0.9 m. There is no requirement for the shape of the stone pieces in the crushed stone soil 16, but the thickness in the middle should not be less than 150 mm, preferably 200 mm. The stone pieces used for veneer should have a flat surface and a large size, with an edge thickness of not less than 150 mm, preferably 200 mm; the length and width of the stone pieces should not be less than the thickness.

[0052] The slab 31 is cast with concrete, with an overlap length of 1.5-2.0 m on the abutment 5 and a overlap length of 2.0-3.0 m on the roadbed 7 of the road-bridge transition section, and an asphalt pavement 4 is laid thereon.

[0053] The insulation layer I12 is buried at least 0.8 m below the shoulder, and a 0.2 m thick medium-coarse sand cushion layer 14 is provided above and below it. The thermal conductivity of the insulation layer I12 should be less than 0.025 W / (m·K), the water absorption rate should be less than 0.5%, and the density should be greater than 43 kg / m 3 The compressive strength should be greater than 500 kPa, the thickness should be 60~80 mm; the preferred thermal conductivity is 0.020 W / (m·K), the water absorption is 0.4%, and the density is 75 kg / m 3, compressive strength is 1000 kPa, thickness is 70 mm. Insulation layer Ⅰ12 can be made of molded polystyrene foam (EPS).

[0054] The thermal insulation layer II30 may be made of XPS thermal insulation board.

[0055] The composite geogrid 13 is set at every 0.9 m interval, the first layer is set 0.7 m below the asphalt pavement 4, and is wrapped 2.0 m at the edge of the slope of the roadbed 7 in the road-bridge transition section. The node thickness of the composite geogrid 13 is 3.5 mm, the aspect ratio of the middle rib is ≥1.0, the radial tensile secant modulus at 2% strain is ≥130 kN / m, the oxidation resistance strength retention rate is ≥90%, the ultraviolet resistance strength retention rate is ≥90%, and the acid and alkali resistance strength retention rate is ≥90%. U-shaped steel bars are used for connection, and the steel bar spacing is 2 m.

[0056] The ventilation brick 11 is concave in shape, and the sunny side is painted white. The thickness of the sunny slope is twice that of the shady slope. The top is flush with the asphalt pavement 4, and the bottom is connected with the block stone extrusion layer 8 and the top surface of the active layer 1.

[0057] Multiple L-shaped heat rods 10 are inserted at the left and right slope feet of the roadbed 7 and the abutment cone 6 of the road-bridge transition section, with a strike perpendicular to the strike of the roadbed 7 of the road-bridge transition section, and are 3 m apart and obliquely buried in the active layer 1 and the block stone squeeze layer 8. The evaporation section is 1.0-2.5 m below the upper limit 2 of the permafrost, and the condensation section is vertically set and exposed to the air. The working fluid of the L-shaped heat rod 10 is liquid ammonia, the tube shell is made of carbon steel or stainless steel, and the condenser is made of spiral fin tubes or spiral toothed fin tubes, with a service life of not less than 30 years.

[0058] The directions of the U-shaped drainage ditch 18 and the blind seepage ditch 19 are parallel to the direction of the roadbed 7 of the road-bridge transition section. Preferably, a U-shaped drainage ditch 18 and a blind seepage ditch 19 are respectively arranged on both sides of the roadbed 7 of the road-bridge transition section.

[0059] The top of the U-shaped drainage ditch 18 is flush with the surface of the active layer 1. The U-shaped drainage ditch 18 is built with C30 concrete prefabricated blocks 28, and the exposed lines are chamfered with 5 mm. The anti-seepage geotextile III 23 is laid on both sides of the ditch wall and the bottom of the ditch, and a cement mortar cushion layer 27 is poured on both sides of the ditch wall and the bottom of the ditch.

[0060] The upper part of the seepage blind ditch 19 is connected to the bottom of the U-shaped drainage ditch 18, and the center is on the same vertical line as the U-shaped drainage ditch 18; the bottom of the seepage blind ditch 19 is poured with a C20 concrete cushion layer 25 and filled with coarse granular filler 26, and an anti-seepage geotextile IV 24 is set on the ditch wall and bottom.

[0061] The conduit 17 is buried on the lower surface of the block stone squeeze layer 8, has the same slope as the lower surface of the block stone squeeze layer 8, and is connected to the seepage blind ditch 19. The conduit 17 can be made of HPPE pipe or sandless concrete pipe.

[0062] like Fig.11 As shown, the construction method of the uneven settlement control structure of the road-bridge transition section in permafrost areas includes the following steps: (1) A spiral pile driver is used to carry out pile sinking construction of the prefabricated pipe pile 9 on the active layer 1. The rotary pile driver is achieved by adding a spiral drill bit in the prefabricated pile. The spiral drill bit is connected to a high-strength alloy steel rod, which is pre-buried in the prefabricated pipe pile 9 and connects the concave pile head to the hexagonal steel plate.

[0063] (2) Use drilling anchoring method to fix the prefabricated pipe pile 9 pile cap reinforcement; pour concrete and vibrate with an inserted vibrator.

[0064] ⑶ When the concrete strength of the prefabricated pipe piles 9 reaches the design value, the block stone squeeze layer 8 is excavated. After excavation to the specified elevation, the bottom of the block stone squeeze layer 8 is compacted, and the bottom surface is made into a herringbone with a 4% lateral drainage slope on both sides, and a conduit 17 is set at the same time.

[0065] ⑷ Lay a layer of anti-seepage geotextile I20 on the bottom of the block stone extrusion layer 8, and then roll backfill in layers. Before rolling with a heavy roller, fill the flat layer with smaller stones. Control the speed of the rolling machine, and after static pressing for 2 times, use strong vibration for 6-8 times. When the replacement material is too dry, sprinkle water to ensure good bonding between the upper and lower materials. Roll the straight section of the block stone first on both sides and then in the middle, and the curved section first on the inside and then on the outside, and roll repeatedly.

[0066] ⑸ After compaction, check the elevation and flatness, add filler to the low-lying areas, and then lay permeable geotextile 21.

[0067] ⑹ Fill gravel soil 16 and foamed lightweight soil 15 in layers, widening the roadbed 7 of the road-bridge transition section by 20~30cm on both sides during filling. For the embankment filled in sections, when filling at the junction of two sections at the same time, the layers should be overlapped and compacted. When filling at different times, the first-filled section should be made into steps with a height of no more than 1m and a width of no less than 1.5m. When filling to the designed elevation, lay the insulation layer I 12 and the composite geogrid 13.

[0068] ⑺ Use foam lightweight soil 15 to fill the abutment guard cone 6 cone in layers from bottom to top, and the filling width should exceed the slope foot line by 50 cm for easy compaction.

[0069] ⑻ Carry out moisture content detection and control it within the allowable moisture content range of construction, and use heavy-duty vibratory rollers to compact the roadbed 7 of the road-bridge transition section along the longitudinal direction of the line. The first pass is static compaction, and then from slow to fast, from weak vibration to strong vibration. When rolling, proceed from both sides to the middle, and overlap and compact the intersections of each section.

[0070] ⑼ Use bulldozer for initial leveling and grader for final leveling. The principle is that there should be no obvious local unevenness on the embankment surface. Make the flat surface into a 4% lateral drainage slope on both sides. After laying the slab 31, lay the asphalt pavement 4.

[0071] ⑽ Artificially lay a sand cushion layer on the slope surface of the abutment cone 6, and then overlap and lay the insulation layer II30.

[0072] ⑾ Lay anti-seepage geotextile II 22 along the entire longitudinal section of the slope of the roadbed 7 in the transition section between the road and the bridge; then lay ventilation bricks 11 in a disorderly manner from bottom to top on both sides and the slope of the abutment cone 6; after the slope protection is laid, paint the surface of the ventilation bricks 11 exposed to the air white with paint.

[0073] ⑿ After leveling the site, drill holes with an L-shaped hot rod 10 every 3 m along the roadbed 7 of the road-bridge transition section; during drilling, throw mud balls into the holes and use an alloy drill bit to stir and coat the hole walls.

[0074] ⒀ The annular groove on the top end cover of the L-shaped hot rod 10 is used as a force point for hanging. The main hoisting process is as follows: hoisting equipment is in place → hoisting → L-shaped hot rod (10) is in place in the hole → L-shaped hot rod 10 is aligned in the hole. Then, the gap between the L-shaped hot rod 10 and the hole is backfilled with sand, and the backfill must be dense.

[0075] ⒁ Use a trencher and excavator in the frozen soil area to excavate the seepage blind ditch 19 and the U-shaped drainage ditch 18.

[0076] ⒂ Lay anti-seepage geotextile IV 24 on the left and right sides of the seepage blind ditch 19; pour C20 concrete cushion layer 25 at the bottom of the seepage blind ditch 19, lay a layer of anti-seepage geotextile IV 24 after sealing the bottom, and then fill the seepage blind ditch 19 with coarse granular filler 26; finally, apply anti-seepage geotextile III 23 on the top of the seepage blind ditch 19.

[0077] ⒃An anti-seepage geotextile III 23 is laid on the wall of the U-shaped drainage ditch 18, followed by pouring of the cement mortar cushion layer 27, and assembling the integral prefabricated block U-shaped drainage ditch 18 on site.

[0078] ⒄Pile the excavated soil into a water retaining soil pile 29.

[0079] In order to verify the application effect of the uneven settlement control structure of the road-bridge transition section in permafrost areas of the present invention, numerical simulation and comparison of the ground temperature field of the roadbed of the present invention were carried out: like Fig.12As shown in the figure, after adopting the uneven settlement control structure of the road-bridge transition section in the permafrost region of the present invention, the upper limit 2 of the permafrost below the roadbed is lifted into the roadbed fill, and the upper limit 2 of the permafrost below the sunny shoulder, the center of the roadbed and the shady shoulder are located 1.15, 1.23 and 0.94 m below the road surface respectively. The upper limit 2 of the permafrost below the sunny shoulder and the shady shoulder is only 0.21 m different, and the permafrost temperature distribution line below the roadbed is symmetrical and flat. It can be seen from the cross-sectional temperature field distribution diagram of the roadbed 7 of the road-bridge transition section in the figure that the uneven settlement control structure of the road-bridge transition section in the permafrost region proposed by the present invention can not only effectively protect the permafrost below the roadbed, but also effectively reduce the lateral uneven settlement of the road-bridge transition section.

[0080] like Fig.13 As shown, after adopting the uneven settlement control structure of the road-bridge transition section in permafrost areas of the present invention, the permafrost upper limit 2 of the natural surface is located 2.81 m below the natural surface, the permafrost upper limit 2 below the top surface of the abutment cone 6, the slope foot of the abutment cone 6 and the road-bridge transition section roadbed 7 are located 1.70 m below the natural surface, 1.77 m above the natural surface and 2.06 m above the natural surface, respectively, and the ground temperature distribution line below the abutment is parallel to the cone section, and the ground temperature distribution line below the road-bridge transition section roadbed 7 is evenly distributed. It can be seen from the longitudinal section temperature field distribution diagram of the road-bridge transition section roadbed 7 in the figure that the uneven settlement control structure of the road-bridge transition section in permafrost areas proposed by the present invention can not only effectively protect the permafrost below the abutment and the transition section roadbed, but also effectively reduce the uneven settlement of the abutment and the transition section roadbed.

Claims

1. A structure for controlling uneven settlement of a road-bridge transition section in a permafrost region, comprising a conventional roadbed (3), an asphalt pavement (4), a bridge abutment (5) and a roadbed (7) of a road-bridge transition section, characterized in that: A block stone squeeze layer (8) is provided below the road-bridge transition section roadbed (7), and the block stone squeeze layer (8) is buried in the surface of the active layer (1); the bottom surface of the block stone squeeze layer (8) is a herringbone lateral drainage slope inclined at 4% to both sides, and a prefabricated pipe pile (9) is provided at the bottom, and an anti-seepage geotextile I (20) is laid on the bottom surface of the block stone squeeze layer (8); an anti-seepage geotextile II (22) is laid on the slope surface of the road-bridge transition section roadbed (7), and an insulation layer I (12) and a composite geogrid (13) are laid in the middle; a permeable geotextile (21) is laid at the junction of the road-bridge transition section roadbed (7) and the block stone squeeze layer (8); crushed stone soil (16) is provided between the road-bridge transition section roadbed (7) and the conventional roadbed (3); a slab (31) is provided behind the abutment (5) and at the bottom of the asphalt pavement (4), respectively, and the slab (31) are respectively overlapped on the abutment (5) and the road-bridge transition section roadbed (7); the front part of the abutment (5) is provided with an abutment cone (6), and the slope surface of the abutment cone (6) is paved with an insulation layer II (30); the slope surface of the road-bridge transition section roadbed (7) and the outer layer of the abutment cone (6) are randomly paved with ventilation bricks (11) of varying thicknesses, and a plurality of L-shaped heat rods (10) are inserted; the surface of the active layer (1) on both sides of the road-bridge transition section roadbed (7) is provided with a U-shaped drainage ditch (18), and the lower part of the U-shaped drainage ditch (18) is provided with a seepage blind ditch (19); the surface of the active layer (1) on the side of the U-shaped drainage ditch (18) away from the road-bridge transition section roadbed (7) is piled with water retaining soil twists (29); the seepage blind ditch (19) is connected to the block stone extrusion layer (8) through a conduit (17).

2. The uneven settlement control structure for the transition section of a road bridge in permafrost regions according to claim 1, characterized in that: The active layer (1) is the area from the surface of the permafrost zone to the upper limit of the permafrost (2).

3. The uneven settlement control structure for the transition section of a road bridge in permafrost regions according to claim 1, characterized in that: The upper surface of the block stone squeeze layer (8) is flush with the surface of the active layer (1).

4. The uneven settlement control structure for the transition section of a road bridge in permafrost regions according to claim 1, characterized in that: The prefabricated pipe pile (9) is cast together with a pile cap and a pipe pile; the upper surface of the pile cap supports the bottom surface of the block stone extrusion layer (8); the pipe pile penetrates the active layer (1) and extends into the upper limit of the permafrost (2) by not less than 2.0 m, and the length of the prefabricated pipe pile (9) decreases with the distance from the abutment (5).

5. The uneven settlement control structure for the transition section of a road bridge in permafrost regions according to claim 1, characterized in that: The abutment cone (6) and the road-bridge transition section roadbed (7) are both filled with foam lightweight soil (15). The cross section of the road-bridge transition section roadbed (7) is an isosceles trapezoid with a slope of 1:1.5, and the longitudinal section is an inverted right-angle trapezoid with a multi-stepped slope in contact with the gravel soil (16).

6. The uneven settlement control structure for the transition section of a road bridge in permafrost regions according to claim 1, characterized in that: The thermal insulation layer I (12) is buried at least 0.8 m below the road shoulder, and a 0.2 m thick medium-coarse sand cushion layer (14) is provided above and below it.

7. The uneven settlement control structure for the transition section of a road bridge in permafrost regions according to claim 1, characterized in that: The composite geogrid (13) is arranged in layers at intervals of 0.9 m, with the first layer being arranged 0.7 m below the asphalt pavement (4) and wrapping 2.0 m at the slope edge of the roadbed (7) at the road-bridge transition section.

8. The uneven settlement control structure for the transition section of a road bridge in permafrost regions according to claim 1, characterized in that: The ventilation bricks (11) are in a concave shape, with the sunny side painted white, the thickness of the sunny slope being greater than twice the thickness of the shady slope, the top being flush with the asphalt pavement (4), and the bottom being in contact with the block stone extrusion layer (8) and the top surface of the active layer (1).

9. The uneven settlement control structure for the transition section of a road bridge in permafrost regions according to claim 1, characterized in that: A plurality of L-shaped heat rods (10) are inserted at the left and right slope feet of the roadbed (7) of the road-bridge transition section and the abutment cone (6), with the direction perpendicular to the direction of the roadbed (7) of the road-bridge transition section, and are obliquely buried in the active layer (1) and the block stone squeeze layer (8), with the evaporation section extending 1.0 to 2.5 m below the upper limit of the permafrost (2), and the condensation section being arranged vertically and exposed to the air.

10. The uneven settlement control structure for the transition section of a road and bridge in permafrost regions according to claim 1, characterized in that: The directions of the U-shaped drainage ditch (18) and the water seepage blind ditch (19) are both parallel to the direction of the roadbed (7) of the road-bridge transition section.

11. The uneven settlement control structure for the transition section of a road bridge in permafrost regions according to claim 10, characterized in that: The top of the U-shaped drainage ditch (18) is flush with the surface of the active layer (1). The U-shaped drainage ditch (18) is built with C30 concrete prefabricated blocks (28), and the exposed lines are provided with a 5 mm chamfer. The sides of the ditch wall and the bottom of the ditch are paved with anti-seepage geotextile III (23), and cement mortar cushion layers (27) are poured on the sides of the ditch wall and the bottom of the ditch.

12. The uneven settlement control structure for the transition section of a road bridge in permafrost regions according to claim 10, characterized in that: The upper part of the seepage blind ditch (19) is connected to the bottom of the U-shaped drainage ditch (18), and the center is on the same vertical line as the U-shaped drainage ditch (18); a C20 concrete cushion layer (25) is poured at the bottom of the seepage blind ditch (19), and is filled with coarse granular filler (26); and an anti-seepage geotextile IV (24) is set on the ditch wall and the ditch bottom.

13. The uneven settlement control structure for the transition section of a road bridge in permafrost regions according to claim 1, characterized in that: The conduit (17) is buried on the lower surface of the block stone squeeze layer (8), has the same slope as the lower surface of the block stone squeeze layer (8), and is connected to the water seepage blind ditch (19).

14. The construction method of the uneven settlement control structure of the transition section of a road bridge in permafrost regions according to claim 1, comprising the following steps: (1) A spiral pile driver is used to sink the prefabricated pipe pile (9) on the active layer (1). The rotary pile driver is a device that adds a spiral drill bit to the prefabricated pile. The spiral drill bit is connected to a high-strength alloy steel rod that is pre-buried in the prefabricated pipe pile (9) and connects the concave pile head to the hexagonal steel plate. (2) Use the drilling anchoring method to fix the prefabricated pipe pile (9) pile cap reinforcement; pour concrete and vibrate with an inserted vibrator; (3) When the concrete strength of the prefabricated pipe pile (9) reaches the design value, the block stone squeeze layer (8) is excavated. After the excavation reaches the specified elevation, the bottom of the block stone squeeze layer (8) is compacted, and the bottom surface is made into a herringbone-shaped horizontal drainage slope of 4% on both sides, and a guide tube (17) is set at the same time; (4) Lay a layer of anti-seepage geotextile I (20) on the bottom surface of the block stone squeeze layer (8), and then roll and backfill in layers; (5) After compaction, check the elevation and flatness, add filler to the low-lying areas, and then lay the permeable geotextile (21); (6) Fill the gravel soil (16) and foamed lightweight soil (15) in layers, widening the roadbed (7) on both sides of the road-bridge transition section by 20 to 30 cm during filling; when filling to the designed elevation, lay the insulation layer I (12) and the composite geogrid (13); (7) Use foamed lightweight soil (15) to fill the cone of the abutment guard cone (6) in layers from bottom to top, with the filling width exceeding the slope foot line by 50 cm; ⑻ Carry out moisture content testing and control it within the allowable moisture content range for construction, and use a heavy-duty vibratory roller to compact the roadbed (7) of the road-bridge transition section along the longitudinal direction of the route; (9) Use a bulldozer to spread the initial leveling and a grader to level the surface. The principle is that the embankment surface has no obvious local unevenness. The flat surface is made into a 4% transverse drainage slope on both sides. After laying the slab (31), the asphalt pavement (4) is laid. ⑽ Artificially lay a sand cushion layer on the slope surface of the abutment cone (6), and then overlap and lay the insulation layer II (30); ⑾ Lay an anti-seepage geotextile II (22) along the entire longitudinal section of the slope surface of the roadbed (7) of the road-bridge transition section; then lay ventilation bricks (11) in a random manner from bottom to top on both sides and the slope surface of the abutment cone (6); after the slope protection is laid, paint the surface of the ventilation bricks (11) exposed to the air white; ⑿ After leveling the site, drill holes with an L-shaped hot rod (10) every 3 m along the road-bridge transition section roadbed (7); during drilling, throw mud balls into the holes and use an alloy drill bit to stir and coat the hole walls; ⒀ Using the annular groove of the top end cover of the L-shaped hot rod (10) as a force point for hanging, and then backfilling the gap between the L-shaped hot rod (10) and the hole with sand; ⒁ Use a ditching machine and an excavator in the frozen soil area to excavate the seepage blind ditch (19) and the U-shaped drainage ditch (18); ⒂Anti-seepage geotextile IV (24) is laid on the left and right sides of the seepage blind ditch (19); a C20 concrete cushion layer (25) is poured at the bottom of the seepage blind ditch (19); after sealing the bottom, a layer of anti-seepage geotextile IV (24) is laid, and then coarse granular filler (26) is filled into the seepage blind ditch (19); finally, an anti-seepage geotextile III (23) is applied on the top of the seepage blind ditch (19); ⒃ Laying an anti-seepage geotextile III (23) on the wall of the U-shaped drainage ditch (18), followed by pouring a cement mortar cushion layer (27), and assembling the integral prefabricated block U-shaped drainage ditch (18) on site; ⒄ The excavated soil is piled up to form a water retaining soil pile (29).

Citation Information

Patent Citations

  • Porous ventilation brick based on enhanced forced convective cooling effect and ventilation-course embankment

    CN108004865A

  • Frozen soil variable stiffness road and bridge transition structure and construction process thereof

    CN112982053A

  • High-latitude forest island-shaped frozen soil roadbed structure and construction method

    CN113250025A

  • Bridge abutment back composite structure for controlling post-construction settlement and construction method

    CN116180573A

  • Subgrade stabilization structure in ever-frozen tundra

    CN204224942U

Cited By

  • High-speed railway flaky stone pile plate structure roadbed in permafrost region and construction method of high-speed railway flaky stone pile plate structure roadbed

    CN119392555A