Shaping bucket extrusion type cast-in-place concrete ditch one-time forming construction method
Through the construction method of fixed-type cast-in-place concrete trench construction, the problems of over-excavation, under-excavation and formwork in the existing technology are solved, and efficient one-time molding and high-quality construction of the trench are achieved, reducing environmental pollution and construction. cost.
Patent Information
- Application Number
- CN202411509194.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-28
- Publication Date
- 2024-12-03
AI Technical Summary
The existing road trench construction methods have problems such as over-excavation, under-excavation, repeated positioning and disassembly of formwork, high labor intensity, low casting efficiency, and untight concrete. They also have high construction noise and serious environmental pollution.
The one-time molding construction method of a fixed bucket extruded cast-in-place concrete trench is adopted. The roads of the rolling block and the rolling box are crushed, and the precise control of the elevation and line shape of the trench is achieved by using a fixed excavation device and an extrusion forming equipment, combined with manual collection. The surface and vibration system ensures the concrete one-time molding and high quality.
The efficient molding of the ditch is achieved, the construction cost and labor intensity of workers are reduced, environmental pollution is reduced, the appearance quality and construction efficiency of concrete are improved, and the compactness and construction accuracy of concrete are ensured.
Smart Images

Figure CN119061765A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of road construction, and more specifically to a one-time forming construction method for a shaped bucket extrusion type cast-in-place concrete ditch. Background Art
[0002] At present, road ditches are usually excavated by ordinary excavators and manually trimmed, and cast in a multi-step process of erecting, dismantling, and pouring ordinary fixed formwork.
[0003] The excavator uses a small bucket shovel for excavation. After excavation, the ditch is a rectangle with the same bottom width. Then, slopes are repaired on both sides to form a trapezoidal ditch. Slope repair can easily cause over-excavation and under-excavation. The trapezoidal ditches are of different sizes and widths, and manual assistance is still required for slope repair. There is an error between the ditch slope and the designed slope. The backfill soil of the over-excavated part is easy to sink, and the line shape of the trapezoidal drainage ditch after masonry is not beautiful. The bottom plate and side walls are cast in batches, the formwork is repeatedly positioned, disassembled and transported, the labor intensity is high, the casting efficiency is low, and it is easy to miss vibration during vibration, resulting in loose concrete.
[0004] Standardized excavation equipment is manufactured according to the designed dimensions of the ditch. The ditch excavation process is formed in one step. The ditch elevation and line shape are precisely controlled by ditch extrusion cast-in-place forming equipment, and the ditch concrete pouring is formed in one step, thus forming a corresponding new construction technology.
[0005] The excavation construction of the ditch section usually uses excavators and jackhammers to break up the road surface. This process is noisy, pollutes the environment, and the strong vibration has a great impact on surrounding vehicles and pedestrians.
[0006] Therefore, the present invention proposes a one-time forming construction method of a shaped bucket extrusion type cast-in-place concrete ditch, which uses rolling blocks and rolling boxes to crush the hard rock in the ditch section or the existing road, thereby improving the crushing efficiency and achieving significant economic and social benefits. Summary of the invention
[0007] In order to overcome the above-mentioned defects of the prior art, the present invention provides a one-time forming construction method of a shaped bucket extrusion type cast-in-place concrete ditch to solve the problems existing in the above-mentioned background technology.
[0008] The present invention provides the following technical solution: a one-step forming construction method of a shaped bucket extrusion type cast-in-place concrete ditch, the construction process comprises the following steps: The site is leveled and compacted; Surveying and setting out; Concrete mix design; Ditch excavation and repair; Equipment installation; Concrete mixing, transportation and pouring; Artificial finishing and plastering; Settlement joints; Maintenance; Quality acceptance.
[0009] Preferably, the original ground of the ditch in the construction section is leveled before construction, the longitudinal drainage slope is adjusted according to the drainage direction, the foot of the slope and the range of 0.5 meters of the fence are cleaned manually, and the middle section is cleaned mechanically. When the surface soil is soft, improved soil and other fillers can be used for partial replacement, compacted and leveled to improve the bearing capacity of the site. After rolling, the compaction coefficient is tested according to the design requirements.
[0010] Preferably, according to the construction drawings, the center and side piles of the ditch in the construction section are staked out. To control the linear shape of the ditch, the straight line is staked out every 20m and the guide piles are made in time and the pile top elevation is marked. The ditch excavation line is sprinkled with white lime according to the control piles.
[0011] Preferably, the slump of the ditch concrete is guaranteed to be 60-100mm. If the slump is too large, the ditch cannot be formed; if the slump is too small, the concrete cannot be discharged from the hopper and the construction is difficult.
[0012] Preferably, a standardized excavation device is made according to the size of the ditch, and a standardized excavator bucket is used for one-time excavation and shaping. Finally, it is cleaned and leveled manually, and any deviations are promptly repaired to meet the design requirements. At the same time, a small dump truck is configured to transport the excavated earth in a timely manner.
[0013] Preferably, before excavation, the excavator's operating route is spread out according to the spread excavation line and the excavator's width. During operation, professional technicians direct the excavator to drive backward along the spread route to ensure that the trench has a beautiful line shape, and control the top elevation of the trench opened by the excavator with the help of a level according to the top elevation of the guide piles.
[0014] Preferably, after the excavated ditch size has been accepted, the equipment walking track is placed according to the excavation line and control piles. The track is laid with channel steel, and the laying is continuous and straight. After the track is laid, the lifting equipment is in place and debugged.
[0015] Preferably, concrete is mixed centrally and transported to the construction site by bucket trucks; it is hoisted into the mold by a crane and mixed a second time in the feed bin by a spiral device; the equipment moves by using the reaction force generated by squeezing the poured concrete with a hydraulic device, and its direction and elevation are controlled by tracks placed on both sides of the ditch. During the movement of the equipment, an attached vibrator vibrates continuously, and local corrections are made using a portable flat vibrator, and the ditch is cast and formed in one go.
[0016] Preferably, after the concrete is poured and formed, it is manually smoothed and the lines are modified at the same time to ensure that the straight lines are straight and the curved lines are round. The first time the surface is smoothed, the edges and corners are exposed; the second time the surface is precisely leveled and the edges and corners are clear; the third time the surface is pressed, the surface is smoothed and the local edges and corners are corrected.
[0017] Preferably, after the concrete is poured, in order to avoid cracking of the ditch due to uneven settlement, a settlement joint with a width of 2 cm is set every 10m. The settlement joint setting is divided into three steps: the first step is to manually cut out the settlement joint with a customized cutter and a hammer after the fine leveling is completed; the second step is to use a cutting machine to cut the concrete when the strength reaches 10MPa; the third step is to chisel out the excess concrete in the settlement joint and rinse it with water, fill the inner 10cm with asphalt hemp tendons, and fill the outer 10cm with M10 cement mortar and hook out the concave joint.
[0018] Technical effects and advantages of the present invention: The ditch extrusion cast-in-place forming equipment of this method is divided into four parts: concrete supply system, formwork system, vibration system, and walking system. The concrete supply system is a system in which the concrete is hoisted into the mold by a crane after being mixed centrally, and secondary mixing and extrusion are carried out in the feed bin through a propeller; the formwork system is composed of an integral standardized steel mold, with a built-in articulated support frame, which is easy to disassemble and recyclable; the vibration system is a system in which attached vibrators are respectively set in the middle of the side steel mold and the bottom steel mold, which can fully and evenly vibrate the concrete without vibration leakage, greatly improving the quality of the finished concrete product. The power system in the walking system uses a battery power device, which is green, environmentally friendly, and easy to replace; guide rollers are set on both sides of the top and bottom of the ditch, and are equipped with limit plates, which can enable the equipment to move accurately along the ditch, and the limit plates and roller wheels can also perform certain fine finishing on the ditch.
[0019] The abandoned soil from the ditch excavation in this construction method is directly transported out by the muck truck, which reduces the impact on the surrounding environment; the construction site does not need to install the formwork, avoiding the problem of repeated positioning, disassembly and assembly of the formwork and material stacking; the mechanization degree is high, and the operation can be carried out uninterruptedly, and the materials can be cleared after people leave, and there is no need to clean the site separately, which meets the environmental protection requirements; the elevation and line shape of the ditch can be accurately controlled, so that the ditch can be cast in one time, which greatly improves the appearance quality of the concrete, speeds up the project progress, reduces the construction cost, and reduces the labor intensity of the workers; This method uses a standardized excavation device to dig ditches, which can be adjusted according to the design size. The excavation process is formed in one step. The plane position is determined by measuring and laying out before construction. The longitudinal slope and elevation are ensured by precise measurement during the excavation process. The ditch extrusion cast-in-place molding equipment can accurately control the elevation and line shape of the ditch, so that the ditch can be cast in one step. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a construction process flow chart of the present invention. DETAILED DESCRIPTION
[0021] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the present invention. In addition, the forms of the various structures recorded in the following embodiments are only examples. The one-time forming construction method of the shaped bucket extrusion type cast-in-place concrete ditch involved in the present invention is not limited to the various structures recorded in the following embodiments. All other embodiments obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the present invention.
[0022] Reference Figure 1 The present invention provides a one-step forming construction method for a shaped bucket extrusion type cast-in-place concrete ditch, and the construction process includes the following steps: Site leveling and rolling Before construction, the original ground of the ditch in the construction section shall be leveled, and the longitudinal drainage slope shall be adjusted according to the drainage direction. The foot of the slope and the range of 0.5 meters of the fence shall be cleaned manually, and the middle section shall be cleaned mechanically. When the surface soil is soft, improved soil and other fillers can be used for partial replacement, compacted and leveled to improve the bearing capacity of the site. After the rolling is completed, the compaction coefficient shall be tested according to the design requirements.
[0023] Measurement and Stakeout According to the construction drawings, the center and side piles of the ditch in the construction section are marked out. To control the linear shape of the ditch, the straight segments are marked out every 20m (the curved segments have the spacing shortened according to the curve radius), and guide piles are made in time and the pile top elevations are marked. The ditch excavation line is marked out with white lime according to the control piles.
[0024] Concrete mix design The slump of ditch concrete is guaranteed to be 60-100mm. If the slump is too large, the ditch cannot be formed; if the slump is too small, the concrete cannot be discharged from the hopper and the construction is difficult.
[0025] Ditch excavation and repair According to the size of the ditch, a standardized excavation device is made, and the excavator uses a standardized bucket to excavate and shape it in one go. Finally, it is cleaned and leveled manually, and any deviations are promptly repaired to meet the design requirements. At the same time, a small dump truck is configured to transport the excavated earth in a timely manner.
[0026] Before excavation, the excavator's operating route is spread out according to the spread excavation line and the excavator's width. During operation, professional technicians direct the excavator to move backward along the spread route to ensure that the trench has a beautiful line shape. The top elevation of the trench opened by the excavator is controlled with the help of a level according to the top elevation of the guide piles (measurements are taken every 2 meters to meet the design accuracy requirements).
[0027] Equipment Installation After the excavated ditch dimensions have been accepted, the equipment travel track is placed according to the excavation line and control piles. The track is laid with channel steel, and the laying is continuous and straight. After the track is laid, the lifting equipment is in place and debugged.
[0028] Concrete mixing, transportation and pouring Concrete is mixed centrally and transported to the construction site by bucket trucks; it is hoisted into the mold by a crane and mixed a second time in the feed bin by a spiral device; the equipment moves by using the reaction force generated by squeezing the poured concrete with a hydraulic device, and its direction and elevation are controlled by tracks placed on both sides of the ditch. During the movement of the equipment, the attached vibrator vibrates continuously, and local corrections are made with a portable flat vibrator, and the ditch is cast and formed in one go.
[0029] Artificial finishing and plastering After the concrete is poured and formed, it is manually smoothed and the lines are modified at the same time to ensure that the straight lines are straight and the curved lines are round. The first smoothing is to smooth the edges and corners; the second smoothing is to make the edges and corners clear; the third pressing is to smooth the surface and correct the local edges and corners.
[0030] Settlement joints After the concrete is poured, a settlement joint with a width of 2 cm is set every 10 m to avoid cracking caused by uneven settlement. The settlement joint is set in three steps: the first step is to cut the settlement joint manually with a customized cutter and a hammer after the fine leveling is completed; the second step is to use a cutting machine to cut the concrete when the strength reaches 10 MPa (about 5 days); the third step is to chisel out the excess concrete in the settlement joint and rinse it with water, fill the inner 10 cm with asphalt hemp tendons, and fill the outer 10 cm with M10 cement mortar and hook out the concave joint.
[0031] Maintenance Within 6 hours after the concrete is poured and finished, cover it with plastic film to fully seal it and then sprinkle water for curing, and the curing time should be no less than 7 days.
[0032] Quality acceptance The laboratory tests the strength of the homogenized concrete test blocks; on-site core sampling is used to test the concrete thickness and compaction; the water flow slope is tested according to the on-site measured elevation and the designed drainage direction; and the geometric dimensions of the ditch are measured with a ruler.
[0033] Working principle of the present invention: This method uses a standardized excavation device to dig ditches, which can be adjusted according to the design size. The excavation process is formed in one step. The plane position is determined by measuring and laying out before construction. The longitudinal slope and elevation are ensured by precise measurement during the excavation process. The ditch extrusion cast-in-place forming device can accurately control the elevation and line shape of the ditch, so that the ditch can be cast in one step.
[0034] The trench is excavated and initially rolled using a small trenching machine, followed by a one-time leveling and finishing operation using an adjustable bucket, and finally the trench is laid using a slipform machine, allowing the trench to be quickly formed.
[0035] The front part of the trench excavation main machine is a trough-shaped excavation component for trenching. The diesel engine is connected in parallel with three hydraulic pumps through a belt. The hydraulic energy generated by the three hydraulic pumps is transmitted to the hydraulic motors at each working point to provide the energy required for moving, digging and discharging soil.
[0036] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or modifications within the technical scope disclosed by the present invention; according to the technical plan and its improved conception of the present invention, all of which should be included under the protection of the present invention.
Claims
1. The one-step forming construction method of cast-in-place concrete ditch by shaped bucket extrusion is characterized by: The construction process includes the following steps: The site is leveled and compacted; Surveying and setting out; Concrete mix design; Ditch excavation and repair; Equipment installation; Concrete mixing, transportation and pouring; Artificial finishing and plastering; Settlement joints; Maintenance; Quality acceptance.
2. The one-step forming construction method of cast-in-place concrete ditch by shaped bucket extrusion according to claim 1 is characterized by: Before construction, the original ground of the ditch in the construction section shall be leveled, the longitudinal drainage slope shall be adjusted according to the drainage direction, the foot of the slope and the range of 0.5 meters of the fence shall be cleaned manually, and the middle section shall be cleaned mechanically. When the surface soil is soft, improved soil and other filling materials can be used for partial replacement, compacted and leveled to improve the bearing capacity of the site. After the rolling is completed, the compaction coefficient shall be tested according to the design requirements.
3. The one-step forming construction method of cast-in-place concrete ditch by shaped bucket extrusion according to claim 1 is characterized by: According to the construction drawings, the center and side piles of the ditch in the construction section are marked out. In order to control the linear shape of the ditch, the straight sections are marked out every 20m and guide piles are made in time and the pile top elevations are marked. The ditch excavation line is marked out with white lime according to the control piles.
4. The one-step forming construction method of cast-in-place concrete ditch by shaped bucket extrusion according to claim 1 is characterized by: The slump of ditch concrete is guaranteed to be 60-100mm. If the slump is too large, the ditch cannot be formed; if the slump is too small, the concrete cannot be discharged from the hopper and the construction is difficult.
5. The one-step forming construction method of cast-in-place concrete ditch by shaped bucket extrusion according to claim 1 is characterized by: Standardized excavation equipment is made according to the size of the ditch, and the excavation is carried out in one go using a standardized excavator bucket. Finally, it is cleaned and leveled manually, and any deviations are promptly repaired to meet the design requirements. At the same time, small dump trucks are configured to transport the excavated earth in a timely manner.
6. The one-step forming construction method of cast-in-place concrete ditch by shaped bucket extrusion according to claim 1 is characterized by: Before excavation, the excavator's operating route is spread out according to the spread excavation line and the excavator's width. During operation, professional technicians direct the excavator to move backward along the spread route to ensure that the trench has a beautiful line shape, and use a level to control the top elevation of the trench opened by the excavator according to the top elevation of the guide piles.
7. The one-step forming construction method of cast-in-place concrete ditch by shaped bucket extrusion according to claim 1 is characterized by: After the excavated ditch dimensions have been accepted, the equipment travel track is placed according to the excavation line and control piles. The track is laid with channel steel, and the laying is continuous and straight. After the track is laid, the lifting equipment is in place and debugged.
8. The one-step forming construction method of cast-in-place concrete ditch by shaped bucket extrusion according to claim 1 is characterized by: Concrete is mixed centrally and transported to the construction site by bucket trucks; it is hoisted into the mold by a crane and mixed a second time in the feed bin by a spiral device; the equipment moves by using the reaction force generated by squeezing the poured concrete with a hydraulic device, and its direction and elevation are controlled by tracks placed on both sides of the ditch. During the movement of the equipment, the attached vibrator vibrates continuously, and local corrections are made with a portable flat vibrator, and the ditch is cast and formed in one go.
9. The one-step forming construction method of cast-in-place concrete ditch by shaped bucket extrusion according to claim 1 is characterized by: After the concrete is poured and formed, it is manually smoothed and the lines are modified at the same time to ensure that the straight lines are straight and the curved lines are round. The first time the surface is smoothed, the edges and corners are exposed; the second time the surface is precisely leveled and the edges and corners are clear; the third time the surface is pressed, smoothed and the local edges and corners are corrected.
10. The one-step forming construction method of cast-in-place concrete ditch by shaped bucket extrusion according to claim 1 is characterized by: After the concrete is poured, in order to avoid cracking caused by uneven settlement, a settlement joint with a width of 2 cm is set every 10m. The setting of the settlement joint is divided into three steps: the first step is to cut the settlement joint manually with a customized cutter and a hammer after the fine leveling is completed; the second step is to use a cutting machine to cut the concrete when the strength reaches 10MPa; the third step is to chisel out the excess concrete in the settlement joint and rinse it with water, fill the inner 10cm with asphalt hemp tendons, and fill the outer 10cm with M10 cement mortar and hook out the concave joint.