Construction machine and method for T-shaped piles made of fluid solidified soil
By using the construction machinery of fluid-cured soil T-shaped piles in pile foundation construction, and using the combination technology of cutting blades and double-helical drill bits, the problems of low bearing capacity and low material utilization in existing pile foundation construction are solved, and the problem of low load capacity and low material utilization in existing pile foundation construction is achieved. Efficient pile foundation reinforcement and environmentally friendly construction.
Patent Information
- Application Number
- CN202411130667.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-12-03
AI Technical Summary
The existing pile foundation construction methods have low bearing capacity, difficult construction quality to control, low material utilization in weak formations, and improper treatment of excavation waste soil generated may lead to waste of land resources and safety hazards.
The construction machinery of fluid-cured soil T-shaped piles is used to install open and closed cutting blades and double auger drill bits on the drill rod to control the drill hole diameter and soil cutting, and the auger drill rod and door are used to realize the fluid-forming soil. Pour and squeeze into piles to achieve single-time hole-forming piles.
It effectively eliminates the empty soil at the variable cross-section, improves the bearing capacity of the pile foundation, saves construction materials, and uses fluid solidified soil as pile body material to have low cost and environmental protection advantages, improving construction efficiency.
Smart Images

Figure CN119061871A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of pile foundation engineering, and in particular relates to a construction machine and a method for a fluidized solidified soil T-type pile. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] With the continuous growth of national economic conditions and the rapid advancement of urbanization, transportation projects such as highways and railways are becoming increasingly large. However, in the construction process of these projects, it is inevitable to pass through soft strata. In order to strengthen the soft foundation, in recent years, more and more methods have been adopted to form a composite foundation by setting columnar reinforcement bodies in soft soil foundations. Currently, the commonly used methods include gravel piles, compacted sand piles, lime piles, deep mixing piles, cement soil mixing piles and other methods, but these methods have the disadvantages of low bearing capacity, difficult to control construction quality, discrete pile body quality, and low material utilization rate. In addition, a large amount of excavated waste soil is generated during the construction process. If these waste soils are not handled properly, it is very easy to cause a waste of land resources. In severe cases, they may even cause disasters such as landslides and mudslides, endangering economic property and personal safety.
[0004] With the widespread application of pile foundations, the economy and environmental friendliness of pile foundation construction have become important issues of concern in the engineering field, based on the requirements of deformation and bearing capacity. The axial force, shear force, and bending moment of the foundation pile show a distribution characteristic of "thick on the top and small on the bottom". In view of this characteristic, scientists have invented a "T"-shaped pile. This type of pile saves pile body materials while meeting the bearing characteristics of the pile foundation, and has good economic and social benefits. However, the inventors found that the original "T"-shaped pile construction used drill rods with different upper and lower diameters to drill holes into piles, and the soil at the variable cross-section could not be fully rotated out, resulting in the existence of false soil at the variable cross-section, which affected the bearing capacity of the pile foundation. In addition, gravel, stone chips, sand, cement, etc. are generally used as pile body materials, which has little environmental significance. Summary of the invention
[0005] In order to solve the above problems, the present invention proposes a construction machine and method for fluidized solidified soil T-type piles. The present invention can not only eliminate the loose soil at the variable cross-section, but also consume the excavated waste soil while ensuring the good quality of the pile body and strong bearing capacity.
[0006] According to some embodiments, the present invention adopts the following technical solutions:
[0007] The first aspect of the present invention provides a construction machinery for fluidized solidified soil T-type piles, which controls the diameter of the hole formed by the drilling rig by installing an openable and closable cutting blade on the drill rod; the opening and closing of the cutting blade is achieved by utilizing the rotation direction of the drilling rig and the resistance of the soil, and a card slot is provided on the spiral drill rod to control the maximum opening and closing amplitude of the cutting blade; the hole is positioned by a double spiral drill bit, and a pick-shaped cutting tooth is installed at the bottom to achieve cutting of the soil; and an arc-shaped fan door is installed at the bottom of the drill bit to realize the injection and squeezing of fluidized modified waste soil into piles, thereby achieving one-time pile formation.
[0008] A construction machine for fluidized solidified soil T-type piles, comprising a drilling machine, the drilling machine comprising an auger rod, a plurality of cutting blades are arranged on the upper part of the auger rod, and the opening and closing angles of the cutting blades and the auger rod are adjustable;
[0009] A double-screw drill bit is provided at the bottom of the spiral drill rod, and a door that can be opened and closed is installed at the bottom of the double-screw drill bit;
[0010] The interior of the spiral drill rod is hollow, and a slurry pump pipe is connected to the top of the spiral drill rod;
[0011] The auger rod is connected to a bidirectional rotary machine to control the rotation of the auger rod.
[0012] As an optional implementation, a base is also provided on the top of the auger rod, and a plurality of counterweight blocks are provided on the base.
[0013] As a further feature, the counterweight blocks include a plurality of counterweight blocks, which are axially symmetrically distributed on the machine base with the auger rod as the axis of symmetry.
[0014] As a further feature, a grinding disc body is disposed on the machine base, and the machine base and the grinding disc body are rotatably connected.
[0015] As a further feature, the grinding disc body is connected to the bidirectional rotary machine.
[0016] As an optional embodiment, the cutting blades are multiple and arranged along the auger rod, arranged at the lower part of the spiral blades of the auger rod, and each cutting blade is connected to the auger rod through a deep groove bearing;
[0017] The cutting blade is in the shape of a magatama, has at least one convex surface and one concave surface, and the convex surface faces outward.
[0018] As a further feature, a protective box is provided on the outer side of the deep groove bearing.
[0019] As an optional embodiment, a plurality of slots are provided on the lower surface of the auger rod to control the opening and closing limit amplitudes of the corresponding cutting blades.
[0020] As an optional embodiment, a pouring hole is provided at the bottom of the auger rod, and the door is provided on the side of the pouring hole to cover or expose the pouring hole, and the door opens when the double auger drill head is pulled up.
[0021] As an optional embodiment, a plurality of pick-shaped cutting teeth are arranged at the bottom of the double-helix drill bit, and a plurality of knife-shaped cutting teeth are arranged at the bottom of the helical part of the helical drill rod.
[0022] The second part of the present invention provides a working method based on the above-mentioned construction machinery, comprising the following steps:
[0023] (1) Determine the location of the pile foundation according to the layout requirements, level the site, and place the drilling rig in place;
[0024] (2) Check the opening and closing of each cutting blade and whether the passage between the pump pipe, double spiral drill bit and spiral drill rod is unobstructed;
[0025] (3) Install the counterweight, start the bidirectional rotary machine, and rotate the auger rod in the forward direction. When the cutting blade contacts the soil, the convex surface is subjected to the passive earth pressure, and the cutting blade closes automatically.
[0026] (4) After drilling to the specified depth, the two-way rotary machine is changed in direction, the auger rod rotates in the opposite direction, the concave surface of the cutting blade is affected by the soil resistance, the cutting blade opens, and the construction of the thicker section above the T-type pile of the fluidized solidified soil is completed, and the two-way rotary machine is turned;
[0027] (5) Pump the fluidized solidified soil into the auger rod through the pump slurry pipe, slowly lift the bidirectional drill bit so that the bottom door of the bidirectional drill bit opens, and start pouring;
[0028] (6) After pouring a certain depth of fluidized solidified soil, move the drill up and down to squeeze and vibrate the soil, and repeat the operation until the top of the pile is reached.
[0029] Compared with the prior art, the present invention has the following beneficial effects:
[0030] (1) The fluidized solidified soil T-type pile of the present invention is a new type of pile that can be used to reinforce soft foundations. This pile type is more conducive to the bearing capacity of the pile foundation and can save construction materials while meeting the bearing capacity requirements.
[0031] (2) The pile body material of the present invention is fluidized solidified soil, which is composed of engineering waste soil, solidified soil and water. It has the advantages of low cost, ecological and environmental protection, and great social value.
[0032] (3) The drilling rig of the present invention can control the opening and closing of the cutting blades by controlling the rotation direction of the spiral drill rod. The operation is simple and it is easy to realize the geometric structure of the foundation pile that is "thick on the top and small on the bottom". The filling and extrusion vibration of the fluidized solidified soil are realized by the rising and falling of the drill rod. The drill rod does not need to be lifted out during the whole process, and the hole and pile are formed in one time. The quality of the pile body is guaranteed by extrusion vibration, and the construction efficiency is improved.
[0033] (4) The present invention first rotates the spiral drill rod forward to the bottom of the pile, and then rotates the spiral drill rod in the reverse direction to open the cutting blades after no soil is screwed out, thereby avoiding the problem of difficulty in removing the "lower small" section of soil, effectively eliminating the false soil at the cross-section change of the "T"-shaped pile, and further ensuring the quality of the pile body.
[0034] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0036] Figure 1 A schematic diagram of a fluidized solidified soil T-type pile according to an embodiment;
[0037] Figure 2 A schematic diagram of a drilling rig structure according to an embodiment;
[0038] Figure 3 A schematic diagram of the cutting blade structure of an embodiment;
[0039] Figure 4 A schematic diagram of a cutting blade of an embodiment when it is opened;
[0040] Figure 5 A schematic diagram of a cutting blade in a closed state according to an embodiment;
[0041] Figure 6 A schematic diagram of the double-helix drill bit structure according to an embodiment;
[0042] Figure 7 A schematic diagram of a double-helix drill bit structure during grouting in one embodiment;
[0043] Among them, 1. fluidized solidified soil; 2. pump slurry pipe; 3. counterweight block; 4. fixed rod; 5. grinding disc; 6. cutting blade; 7. auger rod; 8. double auger drill bit; 9. bidirectional turntable; 10. protection box; 11. deep groove bearing; 12. slot; 13. leaf door; 14. knife-shaped pick; 15. pick-shaped pick. DETAILED DESCRIPTION
[0044] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0045] It should be noted that the following detailed descriptions are all illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0046] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0047] In the absence of conflict, the embodiments in this application and the features in the embodiments may be combined with each other.
[0048] A construction machine suitable for T-type piles of fluidized solidified soil. First, the T-type piles of fluidized solidified soil are described. Figure 1 As shown in the figure, the fluidized solidified soil T-type pile is a T-shaped pile foundation with a large upper pile diameter and a small lower pile diameter. It is a new type of pile foundation that meets the pile foundation bearing capacity and can better exert the pile bearing characteristics. It can be used to reinforce weak foundations, saving materials while meeting the pile foundation bearing capacity. The pile body material is fluidized solidified soil, which is a solidified soil mixed with engineering slag, curing agent, and water. It has the characteristics of good fluidity and green environmental protection.
[0049] The construction machinery, such as Figure 2 As shown, the drilling rig includes a bidirectional rotary machine 9, an auger rod 7, a double auger drill bit 8 and a cutting blade 6.
[0050] The bidirectional rotary machine 9 is used to drive the auger rod 7 to rotate bidirectionally. The double auger drill bit 8 is arranged at the bottom of the auger rod 7 . There are multiple cutting blades 6 which are arranged in sequence at the upper part of the auger rod 7 .
[0051] A machine base is also provided on the upper part of the auger rod 7 , on which two sets of counterweights 3 are symmetrically provided, and a grinding disc 5 is also provided on the machine base. The machine base and the grinding disc 5 are rotatably connected, and the grinding disc 5 is connected to a bidirectional rotary machine 9 .
[0052] In this embodiment, the counterweight 3 can be arranged on the fixing rod 4 .
[0053] The inside of the spiral drill rod 7 is hollow, and the hollow passage is communicated with the slurry pump pipe 2, and the slurry pump pipe 2 is located at the upper end of the machine base.
[0054] like Figure 4As shown, the cutting blade 6 is connected to the auger rod 7 through a deep groove bearing, and a slot 12 is left on the auger rod 7 to control the maximum opening and closing distance of the cutting blade 6; each cutting blade 6 is installed on the spiral protrusion of the auger rod 7 and is located in the upper middle part of the auger rod 7, and each cutting blade 6 is connected to the auger rod 7 through a deep groove bearing 11, and a protective box 10 is arranged outside the deep groove bearing 11.
[0055] like Figure 3 As shown, the cutting blade 6 is set in a jade shape, and its opening and closing can be controlled by the deep groove bearing and the soil resistance. When the auger rod 7 rotates forward, Figure 4 As shown, the convex surface of the cutting blade 6 is closed by the soil resistance, and when the auger rod 7 rotates in the reverse direction, the concave surface of the cutting blade 6 can drive more soil, such as Figure 5 As shown, the soil resistance is much greater than the soil resistance on the convex surface of the cutting blade 6. When the cutting blade 6 is opened, it can cut the surrounding soil to carry out the "upper roughing" pile section construction.
[0056] More specifically, the rig is rotating forward as Figure 3 As shown, when the cutting blade 6 contacts the soil, due to the soil resistance P1 of the convex surface of the cutting blade 6, the cutting blade 6 closes, the drilling rig drills to the bottom of the hole, and the drilling rig starts to rotate in the opposite direction after no soil is rotated out, as shown in FIG. Figure 4 As shown, at this time, the concave surface of the cutting blade 6 is affected by the soil resistance P2. Since the concave surface can move more soil, the soil resistance it encounters is much greater than that of the convex surface. The cutting blade 6 is opened, and after the construction of the "upper coarse section" is completed, the fluidized solidified soil is pumped through the pumping pipe 1.
[0057] In some embodiments, the auger rod 7 is an expanded diameter auger rod.
[0058] The upper part of the spiral drill rod 7 is connected to a two-way drilling rig. Figure 6 As shown, the lower part of the auger rod 7 is connected to the double-auger drill bit 8 to realize the bidirectional rotation of the drilling rig and the injection of fluidized solidified soil; two doors 13 are arranged below the double-auger drill bit 8, which are respectively arranged at the through holes / openings connected to the hollow channel and the double-auger drill bit 8. After the drilling rig drills to the designed depth, the modified waste soil is pumped into the auger rod 7 and reaches the door 13 of the double-auger drill bit 8. Due to the effect of gravity, the drill bit is pulled up and the door 13 will open to realize the injection of modified waste soil. When the double-auger drill bit 8 moves downward, the door 13 will be closed due to squeezing. Figure 5 As shown, squeezing vibration is carried out to improve the bearing capacity of the pile foundation to meet the design requirements.
[0059] like Figure 6 and Figure 7 As shown, a plurality of pick-shaped cutting teeth are arranged at the bottom of the double spiral drill bit 8, and a plurality of knife-shaped cutting teeth 14 are arranged at the bottom of the spiral blade part of the spiral drill rod 7.
[0060] Embodiment 2
[0061] A working method for a construction machine suitable for fluidized solidified soil T-piles comprises the following steps:
[0062] (1) Determine the location of the pile foundation according to the principle of plum blossom layout, level the site, and place the new drilling rig in place;
[0063] (2) Check the opening and closing of the cutting blades and whether the pump pipe, drill bit and long spiral rod are unobstructed to ensure the smooth progress of the construction;
[0064] (3) Install the counterweight, start the bidirectional rotary machine, and rotate the auger rod in the forward direction. When the cutting blade contacts the soil, the convex surface is subjected to the passive earth pressure, and the cutting blade closes automatically.
[0065] (4) After drilling to the specified depth, the two-way rotary machine is changed to a different direction, the auger rod rotates in the opposite direction, the concave surface of the cutting blade is affected by the soil resistance, the cutting blade opens, and the rotary machine is closed after the "upper roughing" section is completed;
[0066] (5) Pump the fluidized solidified soil into the auger rod through the pump slurry pipe, slowly lift the bidirectional drill bit, open the door at the bottom of the bidirectional drill bit, and start pouring;
[0067] (6) After pouring a certain depth of fluidized solidified soil, the new drilling rig is pulled up and down to perform squeezing and vibration, and the operation is repeated until the top of the pile is reached.
[0068] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made by those skilled in the art within the spirit and principle of the present invention without creative labor shall be included in the protection scope of the present invention.
Claims
1. A construction machine for fluidized solidified soil T-type piles, characterized in that: The drilling rig comprises a spiral drill rod, a plurality of cutting blades are arranged on the upper part of the spiral drill rod, and the opening and closing angles of the cutting blades and the spiral drill rod are adjustable; A double-screw drill bit is provided at the bottom of the spiral drill rod, and a door that can be opened and closed is installed at the bottom of the double-screw drill bit; The interior of the spiral drill rod is hollow, and a slurry pump pipe is connected to the top of the spiral drill rod; The auger rod is connected to a bidirectional rotary machine to control the rotation of the auger rod.
2. A construction machine for fluidized solidified soil T-piles as claimed in claim 1, characterized in that: A base is also provided on the top of the auger rod, and a plurality of counterweight blocks are provided on the base.
3. A construction machine for fluidized solidified soil T-piles as claimed in claim 2, characterized in that: The counterweight blocks include a plurality of counterweight blocks, which are axially symmetrically distributed on the machine base with the auger rod as the symmetry axis.
4. A construction machine for fluidized solidified soil T-piles as claimed in claim 2 or 3, characterized in that: A grinding disc body is arranged on the machine base, and the machine base and the grinding disc body are rotatably connected; The grinding disc body is connected to the bidirectional rotary machine.
5. A construction machine for fluidized solidified soil T-piles as claimed in claim 1, characterized in that: There are multiple cutting blades, which are arranged along the auger rod and at the lower part of the spiral blades of the auger rod, and each cutting blade is connected to the auger rod through a deep groove bearing; The cutting blade is in the shape of a magatama, has at least one convex surface and one concave surface, and the convex surface faces outward.
6. A construction machine for fluidized solidified soil T-piles as claimed in claim 5, characterized in that: A protection box is sleeved on the outer side of the deep groove bearing.
7. A construction machine for fluidized solidified soil T-piles as claimed in claim 1, characterized in that: A plurality of slots are arranged on the lower surface of the auger rod to control the opening and closing limit amplitudes of the corresponding cutting blades.
8. The construction machine for fluidized solidified soil T-piles as claimed in claim 1, characterized in that: A pouring hole is arranged at the bottom of the spiral drill rod, and the door is arranged on the side of the pouring hole to cover or expose the pouring hole. The door is opened when the double spiral drill head is pulled up.
9. A construction machine for fluidized solidified soil T-piles as claimed in claim 1, characterized in that: The bottom of the double-helix drill bit is provided with a plurality of pick-shaped cutting teeth, and the bottom of the spiral part of the spiral drill rod is provided with a plurality of knife-shaped cutting teeth.
10. A working method of a construction machine according to any one of claims 1 to 9, characterized in that: The following steps are involved: (1) Determine the location of the pile foundation according to the layout requirements, level the site, and place the drilling rig in place; (2) Check the opening and closing of each cutting blade and whether the passage between the pump pipe, double auger bit and auger rod is unobstructed; (3) Install the counterweight, start the bidirectional rotary machine, and rotate the auger rod in the forward direction. When the cutting blade contacts the soil, the convex surface is subjected to the passive earth pressure, and the cutting blade closes automatically. (4) After drilling to the specified depth, the two-way rotary machine is changed in direction, the auger rod rotates in the opposite direction, the concave surface of the cutting blade is affected by the soil resistance, the cutting blade opens, and the construction of the thicker section above the T-type pile of the fluidized solidified soil is completed, and the two-way rotary machine is turned; (5) Pump the fluidized solidified soil into the auger rod through the pump slurry pipe, slowly lift the bidirectional drill bit, open the door at the bottom of the bidirectional drill bit, and start pouring; (6) After pouring a certain depth of fluidized solidified soil, move the drill up and down to squeeze and vibrate the soil, and repeat the operation until the top of the pile is reached.