Through the expansion self-locking anchor mechanism and lightweight modular design, the problem of insufficient transportation and anchoring force of construction site anchors in mountainous construction is solved, efficient and safe construction and recycling are achieved, and project costs and environmental pollution are reduced.

CN119061888APending Publication Date: 2024-12-03国网重庆市电力公司建设分公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411473857.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-22
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The existing construction site anchors are difficult to transport and arrange during mountain construction, and the anchoring force is insufficient, resulting in safety hazards and low construction efficiency, and difficult recycling, which increases project costs and environmental pollution.

Method used

The expansion self-locking anchoring mechanism is adopted to achieve reliable anchoring through the wedge-shaped step friction between the anchor rod and the expansion sleeve, reducing auxiliary construction volume, improving construction efficiency, and designing it as a lightweight modular structure for easy loading and unloading and transportation.

Benefits of technology

It effectively avoids ground anchor sliding or rock damage, reduces the risk of insufficient anchoring force, improves construction efficiency, reduces labor and costs, saves grouting liquid and equipment transportation costs, and reduces environmental impact.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061888A_ABST
    Figure CN119061888A_ABST
Patent Text Reader

Abstract

The invention discloses a portable power transmission line construction ground anchor and a construction method thereof, and relates to the technical field of construction ground anchors, the portable power transmission line construction ground anchor comprises an anchor rod, an expansion sleeve, a pressure boss and a compression nut, the construction ground anchor lifts the anchor rod by screwing the compression nut, and the expansion sleeve expands outwards under the action of a wedge-shaped step of the anchor rod; the friction force is generated by extrusion; under the combined action of the compression nut and the pull rope, the expansion sleeve extrudes the hole wall of the rock to generate friction force equivalent to tensile force, so that the whole ground anchor system achieves stress balance, and effective anchoring of the ground anchor is achieved. The whole device adopts a modular and lightweight design principle, and is convenient to load, unload and transport in complex terrains.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction ground anchors, and in particular to a portable power transmission line construction ground anchor and a construction method thereof. Background Art

[0002] Construction ground anchor is one of the important force-bearing devices in transmission line construction. It is widely used in transmission line tower assembly, line stringing and other operations. It is mainly used to enhance the stability of soil or rock and provide support in a limited space.

[0003] As my country's electricity demand gradually increases, more transmission towers need to be erected between mountains. With the gradual implementation of UHV transformer lines, the number of construction anchors deployed in mountainous areas will reach nearly 10,000. Due to the rugged mountain roads and complex terrain and geological conditions along the way, large-scale anchor construction equipment is difficult to transport and carry out. When it is difficult to deploy anchors in special terrain, it is easy to illegally bundle anchor cables, posing a serious safety hazard.

[0004] The ship-type anchors commonly used in power transmission line construction are large in size, heavy in weight, and have poor transportation performance. They require large mechanical equipment to assist in use, require a large amount of soil and rock excavation, and have relatively demanding construction environment requirements. They are not easy to transport and arrange in complex mountainous terrain, and terrain restrictions need to be considered during installation. The small and light grouting anchors occupy adjacent underground space, have slow anchoring force formation, and cannot be adjusted. The grouting liquid has a long hardening cycle, slow construction progress, low construction efficiency, and large grouting equipment. The construction environment requirements are also relatively demanding. At the same time, there will be a large number of abandoned anchors that are difficult to recycle, which increases project costs and is likely to cause serious waste of resources and environmental pollution. The movable anchor has good transportability and applicability, and is easy to recycle, but its own pull-out force has not been improved, which may not meet the project safety requirements when it needs to withstand large tension. This type of anchor unilaterally emphasizes anchor recovery and does not achieve the effect of increasing the bearing capacity of the anchor.

[0005] In order to ensure the stability of the ground anchor, the commonly used grouting anchoring scheme takes a long time because the solidification process of the grouting liquid takes a long time, which reduces the construction period of the entire ground anchor. Although the end expansion anchoring has a short anchoring time, the contact area between the sleeve and the rock wall is small, which reduces the anchoring force of the ground anchor and increases the stress of the rock wall, which is easy to damage the rock wall structure. The intermediate reinforcement anchor can improve the overall stability of the rock mass and enhance the bearing capacity of the rock mass, but it has high requirements for construction technology and requires corresponding reinforcement measures to ensure the installation quality of the anchor. The resin anchor and cement roll anchor of the bonding anchor also have a large bearing capacity, but the seismic performance is poor, and special paste materials must be used. The recovery rate is very low, and when there is coal and rock debris in the anchor hole, it is difficult for the anchor body to be inserted into the bottom of the anchor hole, which is easy to cause false construction, and the anchoring quality is not easy to guarantee, which brings many safety hazards. Summary of the invention

[0006] The purpose of the present invention is to provide a lightweight transmission line construction ground anchor and a construction method thereof, so as to solve the problems existing in the above-mentioned prior art, adopt an expansion self-locking anchoring mechanism, utilize the friction between the ground anchor and the rock hole wall to achieve reliable anchoring of the device, and avoid potential failure risks such as ground anchor sliding or rock damage; it can effectively avoid violations in ground anchor construction and reduce construction risks caused by insufficient anchoring force; it greatly reduces the amount of auxiliary construction, thereby improving construction efficiency as a whole.

[0007] To achieve the above object, the present invention provides the following solution: The present invention provides a portable ground anchor for power transmission line construction, comprising:

[0008] Anchor rod, expansion sleeve, pressure boss and clamping nut, the rod body of the anchor rod is distributed with multiple wedge-shaped steps, the expansion sleeve is sleeved on the outside of the anchor rod, and the inner wall shape of the expansion sleeve matches the outer wall shape of the anchor rod; the wedge-shaped step is used to provide radial thrust for the expansion sleeve; the pressure boss and clamping nut are installed on the top of the anchor rod, the anchor rod is lifted by turning the clamping nut, and the pull rope is tied at the pressure boss.

[0009] Preferably, four wedge-shaped steps are distributed on the rod body of the anchor rod from top to bottom, and the minimum diameter of the wedge-shaped steps is the same as the diameter of the anchor rod.

[0010] Preferably, the anchor rod comprises a rod head and multiple rod shafts, the top of the rod head is a threaded column, and the bottom of the rod head is provided with a threaded hole for connecting the rod shaft; the head of the rod shaft is also a threaded column structure, the middle part of the rod shaft is a wedge-shaped step, and the bottom of the rod shaft is provided with a threaded hole.

[0011] Preferably, the expansion sleeve is composed of two semicircular casings, the upper end of the casing is provided with a baffle, the diameter of the baffle is larger than the diameter of the hole drilled in the rock; the outer wall of the casing is processed by knurling process.

[0012] Preferably, the expansion sleeve comprises a sleeve head, a sleeve body and a wedge-shaped ring, the bottom of the sleeve head is connected to multiple sections of the sleeve body, and the connection between the sleeve head and the sleeve body and the connection between the sleeve bodies are connected and positioned by the wedge-shaped ring and then welded.

[0013] Preferably, the pressure boss is provided with a pressure platform, an anchor rod through-hole, a lifting ear hole and a base, the anchor rod passes through the pressure boss through the anchor rod through-hole, the pressure platform located on the top of the pressure boss is in contact with the clamping nut, and the lifting ear hole is used to pass the pull rope.

[0014] Preferably, the anchor rod, the compression nut and the pressure boss are made of 45# steel, and the expansion sleeve is made of 6061 aluminum alloy.

[0015] A construction method for a portable power transmission line construction anchor, applied to the above-mentioned portable power transmission line construction anchor, comprises the following steps:

[0016] Use a backpack drill to drill a hole in the rock, clean the floating debris on the hole wall, buckle the expansion sleeve on the anchor rod, put the pressure boss on the anchor rod, and screw in the compression nut; put the entire anchor rod into the pre-drilled hole, at this time, the step of the expansion sleeve contacts the minimum diameter position of the wedge-shaped step of the anchor rod; use a wrench to tighten the nut, drive the anchor rod to lift so that the maximum diameter of the wedge-shaped step of the anchor rod moves toward the step of the expansion sleeve, and the expansion sleeve squeezes the hole wall to generate friction; pass the pull rope through the lifting ear hole and tighten it to complete the anchoring of the ground anchor system;

[0017] When recovering the anchor rod, first remove the pull rope from the lifting ear hole, then loosen the compression nut, and then the entire anchor can be taken out to achieve the recovery of the anchor.

[0018] Compared with the prior art, the present invention has achieved the following beneficial technical effects:

[0019] The portable power transmission line construction ground anchor and the construction method thereof of the present invention adopt an expansion self-locking anchoring mechanism, and utilize the friction between the ground anchor and the rock hole wall to realize reliable anchoring of the device, thereby avoiding potential failure risks such as ground anchor sliding or rock damage. It can effectively avoid violations in ground anchor construction and reduce construction risks caused by insufficient anchoring force. During the construction process, only the drilling process is time-consuming, which greatly reduces the amount of auxiliary construction, thereby improving construction efficiency as a whole. The device is light in weight, only 13kg, and only one person is needed to meet the requirements of loading and unloading and construction, which greatly saves labor. It is easy to recycle and can be reused, saving the cost of the ground anchor. At the same time, the portable mountain ground anchor does not require grouting, which can save the cost of grouting liquid and grouting equipment transportation, and further reduce the environmental impact. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0021] Figure 1 This is a schematic diagram of the overall structure of a portable ground anchor for power transmission line construction;

[0022] Figure 2 is a schematic diagram of the pressure boss structure;

[0023] Figure 3 is a schematic diagram of the expansion sleeve structure;

[0024] Figure 4 It is a schematic diagram of a wedge-shaped ring structure;

[0025] Figure 5 It is a schematic diagram of the sleeve head structure;

[0026] Figure 6 It is a schematic diagram of the sleeve body structure;

[0027] Figure 7 It is a schematic diagram of the multi-section modular structure of the anchor rod;

[0028] Among them, 1. locking nut; 2. pressure boss; 3. anchor rod; 4. expansion sleeve; 5. baffle; 6. sleeve body; 7. wedge-shaped ring; 8. sleeve head; 9. sleeve body; 10. threaded column; 11. wedge-shaped step; 12. threaded hole. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] The purpose of the present invention is to provide a lightweight transmission line construction ground anchor and a construction method thereof, so as to solve the problems existing in the above-mentioned prior art, adopt an expansion self-locking anchoring mechanism, utilize the friction between the ground anchor and the rock hole wall to achieve reliable anchoring of the device, and avoid potential failure risks such as ground anchor sliding or rock damage; it can effectively avoid violations in ground anchor construction and reduce construction risks caused by insufficient anchoring force; it greatly reduces the amount of auxiliary construction, thereby improving construction efficiency as a whole.

[0031] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0032] like Figure 1-Figure 7As shown, the present invention provides a lightweight transmission line construction ground anchor, including an anchor rod 3, an expansion sleeve 4, a pressure boss 2 and a high-strength compression nut 1. The construction ground anchor lifts the anchor rod 3 by twisting the high-strength compression nut 1, and the expansion sleeve 4 expands outward under the action of the wedge-shaped step 11 of the anchor rod 3 until it fits and squeezes the hole wall to generate friction. Under the joint action of the high-strength compression nut 1 and the pull rope, the expansion sleeve 4 squeezes the rock hole wall to generate a friction force equivalent to the tension, so that the entire ground anchor system reaches a force balance, thereby realizing effective anchoring of the ground anchor. The overall device adopts modular and lightweight design principles, which is convenient for loading and unloading and transportation in complex terrain.

[0033] The total length of the anchor rod 3 is 1000mm and the diameter is 24mm. The rod body of the anchor rod 3 is distributed with 4 wedge-shaped steps 11, the minimum diameter is the same as the diameter of the anchor rod 3, the maximum diameter is 34mm, and the step height is 50mm. It cooperates with the expansion sleeve 4 to convert the axial tension of the anchor rod 3 into the radial thrust of the expansion sleeve 4 by the anchor rod 3, and provides the positive pressure required for the friction between the expansion sleeve 4 and the rock wall. The top of the anchor rod 3 is designed with threads, which is convenient for combining with the high-strength compression nut 1. The anchor rod 3 adopts a multi-section modular structure design, including a rod head and three rod shafts. The top of the rod head is an M27 threaded column 10, and the bottom has an M16 threaded hole 12 for connecting the rod shaft. The top of the rod shaft is an M16 threaded column 10, and the bottom is an M16 threaded hole 12. This design allows the threaded column 10 at the top to be tightly connected with the threaded hole 12 of the rod head or the threaded hole 12 of other rod shafts, thereby realizing flexible assembly and stable installation of the entire anchor rod 3.

[0034] The expansion sleeve 4 is two semicircular sleeves 6 with a length of 950mm; the inner diameter of the tube is 45mm, the outer diameter is 65mm, and the wall thickness is 10mm. A baffle 5 with a radius of 60mm is designed at the end of the sleeve 6 to prevent the anchor rod 3 from falling into the rock hole and being unable to be removed. The outer wall adopts a knurling process to enhance the friction contact with the rock wall and improve the fixing effect. A wedge-shaped ring 7 with an inner diameter of 30mm and an outer diameter of 47mm is designed at the end of the sleeve 6. It is fixed by screws and matches the wedge-shaped step 11 of the anchor rod 3 to provide horizontal positive pressure for the expansion sleeve 4. The expansion sleeve 4 adopts a multi-section modular design, including three parts: a sleeve head 8, a sleeve body 9 and a wedge-shaped ring 7. The sleeve head 8, the sleeve body 9 and the wedge-shaped ring 7 are connected and positioned with screws, and then each connection is welded to improve the strength of the entire expansion sleeve 4. The expansion sleeve 4 is cut 4mm radially on the cutting plane to achieve the expansion and contraction of the anchor.

[0035] The pressure boss 2 is used to connect the pull rope and the ground anchor device, and at the same time effectively transmit the fastening force of the high-strength compression nut 1 to the expansion sleeve 4. The key structures of the pressure boss 2 include the pressure platform, the anchor rod through hole, the lifting ear hole and the base. The anchor rod 3 passes through the boss through the anchor rod through hole to ensure a firm connection with the pressure boss 2. The pressure platform is in direct contact with the compression nut 1, and the force of the compression nut 1 when tightened is directly applied to the platform to ensure uniform transmission of force.

[0036] The construction process of ground anchor is as follows: Use a lightweight backpack drill to drill holes in the rock, clean the floating debris on the hole wall, and increase the friction of the hole wall. Buckle the two expansion sleeves 4 on the anchor rod 3, and insert the pressure boss 2 from one end of the threaded hole 12 of the anchor rod 3 into the anchor rod 3, and screw in the compression nut 1. Put the entire anchor rod 3 into the pre-drilled hole, tighten the bolts with a wrench, and make the expansion sleeve 4 squeeze the hole wall to generate sufficient friction. Pass the pull rope through the lifting ear and tighten it to complete the anchoring of the ground anchor system.

[0037] When the anchor rod 3 is recovered, the lifting lug is first screwed out, and then the compression nut 1 is loosened, and the entire ground anchor can be taken out, thereby realizing the rapid recovery of the ground anchor.

[0038] The anchor system is made of 45# steel and 6061 aluminum alloy, with densities of 7.85g / cm 2 and 2.75g / cm 2 Among them, the anchor rod 3, high-strength compression nut 1, and pressure boss 2 are the main tensile components, and the material is 45# steel. The expansion sleeve 4 is the main compressive component, and the 6061 aluminum alloy is used to meet the compressive requirements and reduce the weight of the entire device. The overall weight of the ground anchor device is 13.318kg, and the largest single component is the anchor rod 3, which weighs 4.65kg. Whether it is a single component or the entire ground anchor device, it can be carried and used by one construction worker.

[0039] When the ground anchor is inserted into the hole but not expanded, the hole diameter is 65mm, and the maximum diameter of the unexpanded ground anchor is 61.7mm, ensuring that the ground anchor can be smoothly placed in the hole. At this time, the step of the expansion sleeve 4 contacts the thinnest part of the anchor rod 3, and the minimum distance is 24mm. Tighten the clamping nut 1 to lift the anchor rod 3, and the expansion sleeve 4 expands outward under the action of the wedge-shaped step 11 of the anchor rod 3 until it fits against the hole wall and squeezes to generate friction. At this time, the diameter of the position where the wedge-shaped step 11 of the anchor rod 3 contacts the wedge-shaped ring 7 of the expansion sleeve 4 is 30mm, and the lifting distance of the anchor rod 3 is 30mm. The pitch of the M27 metric thread is 3, so the clamping nut 1 on the anchor rod 3 can be turned about 10 times to complete the fixing of the ground anchor.

[0040] The present invention designs a lightweight ground anchor for power transmission line construction, adopts an expansion self-locking anchoring mechanism, and utilizes the friction between the ground anchor and the rock hole wall to achieve reliable anchoring of the device, thereby avoiding potential failure risks such as ground anchor sliding or rock damage. It can effectively avoid violations in ground anchor construction and reduce construction risks caused by insufficient anchoring force. During the construction process, only the drilling process is time-consuming, which greatly reduces the amount of auxiliary construction, thereby improving construction efficiency as a whole. The device is light in weight, only 13kg, and only one person is needed for loading and unloading and construction, which greatly saves labor. It is easy to recycle and can be reused, saving the cost of the ground anchor. At the same time, the lightweight mountain ground anchor does not require grouting, which can save the cost of grouting liquid and grouting equipment transportation, and further reduce the environmental impact.

[0041] It should be noted that it is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and therefore it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any reference numerals in the claims should not be regarded as limiting the claims involved.

[0042] The present invention uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A portable ground anchor for power transmission line construction, characterized in that: include: Anchor rod, expansion sleeve, pressure boss and clamping nut, the rod body of the anchor rod is distributed with multiple wedge-shaped steps, the expansion sleeve is sleeved on the outside of the anchor rod, and the inner wall shape of the expansion sleeve matches the outer wall shape of the anchor rod; the wedge-shaped step is used to provide radial thrust for the expansion sleeve; the pressure boss and clamping nut are installed on the top of the anchor rod, the anchor rod is lifted by turning the clamping nut, and the pull rope is tied at the pressure boss.

2. The portable ground anchor for power transmission line construction according to claim 1 is characterized in that: Four wedge-shaped steps are distributed on the rod body of the anchor rod from top to bottom, and the minimum diameter of the wedge-shaped steps is the same as the diameter of the anchor rod.

3. The portable ground anchor for power transmission line construction according to claim 1 is characterized in that: The anchor rod comprises a rod head and multiple rod shafts, the top of the rod head is a threaded column, and the bottom of the rod head is provided with a threaded hole for connecting the rod shaft; the head of the rod shaft is also a threaded column structure, the middle of the rod shaft is a wedge-shaped step, and the bottom of the rod shaft is provided with a threaded hole.

4. The portable ground anchor for power transmission line construction according to claim 1 is characterized in that: The expansion sleeve is composed of two semicircular casings. A baffle is arranged at the upper end of the casing. The diameter of the baffle is larger than the diameter of the hole drilled on the rock. The outer wall of the casing is processed by a knurling process.

5. The portable ground anchor for power transmission line construction according to claim 4 is characterized in that: The expansion sleeve comprises a sleeve head, a sleeve body and a wedge-shaped ring. The bottom of the sleeve head is connected to multiple sections of the sleeve body. The connection between the sleeve head and the sleeve body and the connection between the sleeve bodies are connected and positioned by the wedge-shaped ring and then welded.

6. The portable ground anchor for power transmission line construction according to claim 1, characterized in that: The pressure boss is provided with a pressure platform, an anchor rod through-hole, a lifting ear hole and a base. The anchor rod passes through the pressure boss through the anchor rod through-hole. The pressure platform located on the top of the pressure boss is in contact with the clamping nut. The lifting ear hole is used to pass the pull rope.

7. The portable ground anchor for power transmission line construction according to claim 1 is characterized by: The material of the anchor rod, the clamping nut and the pressure boss is 45# steel, and the material of the expansion sleeve is 6061 aluminum alloy.

8. A construction method for a portable power transmission line construction anchor, applied to the portable power transmission line construction anchor as claimed in any one of claims 1 to 7, characterized in that: The following steps are involved: Use a backpack drill to drill a hole in the rock, clean the floating debris on the hole wall, buckle the expansion sleeve on the anchor rod, put the pressure boss on the anchor rod, and screw in the compression nut; put the entire anchor rod into the pre-drilled hole, at this time, the step of the expansion sleeve contacts the minimum diameter position of the wedge-shaped step of the anchor rod; use a wrench to tighten the nut, drive the anchor rod to lift so that the maximum diameter of the wedge-shaped step of the anchor rod moves toward the step of the expansion sleeve, and the expansion sleeve squeezes the hole wall to generate friction; pass the pull rope through the lifting ear hole and tighten it to complete the anchoring of the ground anchor system; When recovering the anchor rod, first remove the pull rope from the lifting ear hole, then loosen the compression nut, and then the entire anchor can be taken out to achieve the recovery of the anchor.