Method for eliminating drill bit clamping fault of screw drill

The method addresses inefficiencies in unsticking screw drill bits by leveraging screw drill rotation and vibration, expanding the annular space around the stuck point, thereby enhancing efficiency and reducing operational delays.

CN119062265APending Publication Date: 2024-12-03SINOPEC OILFIELD SERVICE CORPORATION +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310641729.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-01
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Existing methods for unsticking a stuck drill bit in screw drilling tools are inefficient, time-consuming, and require specialized tools like jars, which are not universally effective and add to operational delays.

Method used

A method utilizing the rotation and vibration of the screw drill during operation to unstuck the drill bit by determining fault type, applying controlled weight and movement sequences, releasing the brake, and circulating drilling fluid with controlled top drive rotation to expand the annular space around the stuck point.

Benefits of technology

The method effectively unblocks the drill bit without specialized tools, reduces waiting time, and is cost-effective, suitable for wide application in screw drilling operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062265A_ABST
    Figure CN119062265A_ABST
Patent Text Reader

Abstract

The invention discloses a method for eliminating a drill bit clamping fault of a screw drill, which comprises the following steps of: A, determining a fault type, if the fault type is that a drill bit is clamped during pulling out of a drill, sequentially pressing and lifting the drill for not less than 10 times, and if the fault type is that the drill bit is clamped during drilling, sequentially lifting and pressing the drill for not less than 10 times; step B, releasing a brake between the top drive and the turntable; c, the drilling tool is pressed down to enable the hanging load to be between a first value and a second value, the pump is started to enable the drilling fluid to circulate for at least preset time according to the preset pump output displacement, in the process of starting the pump to circulate the drilling fluid, the top drive is controlled to rotate anticlockwise, the rotating speed of the top drive is kept consistent with the rotating speed of a screw under the preset pump output displacement, the first value is smaller than the initial hanging load by 20 KN, and the second value is smaller than the initial hanging load by 20 KN; the second value is 50 KN smaller than the initial hanging load, and the initial hanging load is the hanging load when the fault occurs. According to the method provided by the invention, the drill bit is released by fully utilizing rotation and vibration during working of the screw drill, and the releasing efficiency when the drill bit with the screw drill is stuck is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of drilling operations, and in particular to a method for resolving a drill bit stuck fault in a screw drill. Background Art

[0002] With the progress of oil and gas exploration and development, the situation downhole has become more and more complicated. Drill stuck failures often occur due to geological reasons such as block falling due to well wall instability or operational reasons such as lifting and lowering too quickly. Generally speaking, drill stuck mostly occurs in the centralizer and drill bit. The location of the stuck drill can be determined by lifting and lowering operations combined with analysis of parameters such as pump pressure and torque.

[0003] At present, for the drill bit stuck, the processing method is usually to circulate the drilling fluid first, then vigorously move the drill bit, and if the fault is not resolved, use a jar to try to jar it out. However, the jar needs to be temporarily organized according to the downhole situation, which wastes time. At the same time, the jarring effect varies greatly according to the difficulty of the drill bit stuck. Therefore, it is necessary to formulate different unjamming methods according to the drill bit combination and the type of drill bit stuck. Especially at present, when the use of screw drilling tools is becoming more and more popular, it is urgent to design a method for unjamming screw drilling tools to improve work efficiency. Summary of the invention

[0004] In view of this, the present application provides a method for resolving a drill bit stuck in a screw drill, which method fully utilizes the rotation and vibration of the screw drill during operation to unstuck the drill bit, thereby improving the efficiency of unstuck when the drill bit is stuck in the screw drill.

[0005] In order to achieve the above objectives, this application provides the following technical solutions:

[0006] A method for resolving a drill bit stuck fault in a screw drill, characterized by comprising:

[0007] Step A, determining the fault type, if the fault type is the drill bit stuck when pulling out the drill, then the drill tool is pressed down and lifted up for no less than 10 times in sequence, if the fault type is the drill bit stuck when drilling down the drill, then the drill tool is lifted up and pressed down for no less than 10 times in sequence;

[0008] Step B, release the brake between the top drive and the turntable;

[0009] Step C, pressing down the drill bit so that the hanging weight is between the first value and the second value, starting the pump to circulate the drilling fluid for at least a preset time with a preset pump output displacement, and in the process of starting the pump to circulate the drilling fluid, controlling the top drive to rotate counterclockwise and making the rotation speed of the top drive consistent with the rotation speed of the screw at the preset pump output displacement, wherein the first value is 20KN less than the initial hanging weight, and the second value is 50KN less than the initial hanging weight, and the initial hanging weight is the hanging weight when the fault occurs.

[0010] Optionally, in the above method, step B further comprises: tightening all drill thread threads above the turntable surface to the maximum allowable make-up torque of the thread threads.

[0011] Optionally, in the above method, the preset time is 3 hours to 5 hours.

[0012] Optionally, in the above method, step A includes: if the fault type is the drill bit getting stuck during drilling, the hanging weight is between the drill weight and 0KN each time the drill tool is pressed down, and the hanging weight is not greater than a third value each time the drill tool is lifted up, and the third value is 50KN greater than the initial hanging weight.

[0013] Optionally, in the above method, step A includes: if the fault type is a drill bit stuck during drilling, the hanging weight is less than the maximum allowable bearing capacity of the drill each time the drill is lifted, and the hanging weight is not less than the initial hanging weight each time the drill is pressed down.

[0014] Optionally, the above method further includes step D: repeating step A and step C at least once.

[0015] Optionally, in the above method, the preset pump output displacement is any value within the displacement range corresponding to the screw speed range of 100 to 120 rpm.

[0016] Optionally, in the above method, in step C, after the pump is turned on, the pump stroke reading is increased at a rate of 10 to 15 strokes per 10 seconds until the pump volume reaches the preset pump output displacement.

[0017] The method for resolving a stuck drill bit fault in a screw drill provided in the present application has the following beneficial effects: the method is direct in unblocking, does not require the use of tools such as jars, has a short waiting time, is low in cost, and is suitable for wide promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.

[0019] Figure 1 It is a schematic diagram of the principle of the method provided by the present application for resolving a screw drill bit stuck fault.

[0020] The markings in the figure are:

[0021] 1-drill bit; 2-screw; 3-drill string; 4-wellbore; 5-rotary table; 6-top drive; 7-cuttings. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0023] See also Figure 1 During normal drilling, the top drive 6 rotates clockwise, transmits the torque to the screw 2 through the drill string 3, and the screw 2 rotates clockwise. At the same time, when the drilling fluid passes through the screw 2, the rotor of the screw 2 transmits the clockwise torque to the drill bit 1 through the transmission shaft assembly. It should be noted that the clockwise and counterclockwise in this article are both viewed from a top-down perspective, that is, from top to bottom.

[0024] After the drill bit is stuck (for example, the drill bit 1 cannot rotate due to the obstruction of rock cuttings 7), the pump is turned on to circulate the drilling fluid, and the screw 2 will still generate a clockwise torque. However, since the drill bit 1 cannot rotate, the torque of the transmission shaft assembly can only be transmitted in the opposite direction to the upper drilling tool, generating a counterclockwise torque on the upper drilling tool. At the same time, the screw drilling tool vibrates greatly when working. With the help of a proprietary operating method, the cross-sectional area of ​​the annulus adjacent to the stuck point can be increased, and the channel for the block to escape from the stuck point can be expanded, thereby improving the ability of the drill bit 1 to unblock and speeding up the handling of complex accidents.

[0025] The method for resolving a drill bit stuck fault in a screw drill provided by an embodiment of the present application comprises the following steps:

[0026] S1, determine the fault type. If the fault type is that the drill bit is stuck when drilling, press down and lift the drill bit for no less than 10 times in sequence. If the fault type is that the drill bit is stuck when drilling, lift and press down the drill bit for no less than 10 times in sequence.

[0027] The method of the present application is directed to two types of faults, one is the drill bit stuck during the drilling process, and the other is the drill bit stuck during the drilling process. The drill bit stuck during the drilling process will cause the suspended weight to decrease when the fault occurs, and the drill bit stuck during the drilling process will cause the suspended weight to increase when the fault occurs. Therefore, the initial suspended weight corresponding to these two types of faults, that is, the suspended weight when the fault occurs, is different. Regardless of the type of fault, the drill tool is first moved up and down at least 10 times. The difference is that if the drill bit is stuck during the drilling process, then each up and down movement is first pressed down and then lifted up. Conversely, if the drill bit is stuck during the drilling process, then each up and down movement is first lifted up and then pressed down. It should be noted that "drill tool up and down movement" refers to the lifting operation and the pressing operation. During the operation, some parts of the drill tool may not be displaced. For example, when implementing step S1, the drill bit 1 may be completely motionless, but because the drill tool as a whole has a certain degree of perturbability, the lifting and pressing operations will cause the drill tool as a whole to be stretched and bent.

[0028] S2, release the brake between the top drive 6 and the turntable.

[0029] For most drill bit stuck faults, simply moving the drill bit up and down is not enough to complete the unblocking. Therefore, after step S1, the brake between the top drive 6 and the turntable is released to ensure that the drill string 3 can rotate counterclockwise under the reaction force of the screw 2, thereby preparing for the implementation of subsequent steps.

[0030] S3, press down the drill bit so that the hanging weight is between the first value and the second value, start the pump to circulate the drilling fluid for at least the preset time with the preset pump output displacement, and in the process of starting the pump to circulate the drilling fluid, control the top drive 6 to rotate counterclockwise and keep the rotation speed of the top drive 6 consistent with the rotation speed of the screw 2 under the preset pump output displacement, wherein the first value is 20KN less than the initial hanging weight, and the second value is 50KN less than the initial hanging weight.

[0031] The hanging weight is controlled between the first value and the second value by pressing down, so as to make the drill tool bend to a certain extent as a whole, so that the drill tool rotates around the axis of the drill string 3 in the wellbore 4 and revolves around the axis of the wellbore 4 at the same time. The reverse and vibration characteristics of the screw drill tool are utilized to form the axial vibration and spiral swing of the drill tool above the drill bit 1. At the same time, the two ends of the drill bit 1 are driven to rotate around the stuck point when the drill tool revolves, and the annular space area on both sides of the stuck point is expanded while the drill bit 1 is gradually shaken and vibrated, which can not only grind and crush the objects that cause the drill to be stuck (such as rock chips 7), but also provide a migration channel for the objects that cause the drill to be stuck, and finally achieve the purpose of unblocking the drill bit 1.

[0032] If the downward pressure applied by the downward pressure operation is too small, the drill bit cannot be bent, and the subsequent drill bit cannot form a funnel-shaped annulus at both ends of the stuck point of the drill bit 1 through revolution when the drill bit is reversed, resulting in a failure to release the jam; if the downward pressure applied by the downward pressure operation is too large, the friction resistance is too large when the drill bit is reversed, which is easy to damage the screw 2, resulting in a failure to release the jam. Therefore, when implementing step S3, the drill bit is pressed down to control the hanging weight between the first value and the second value mentioned above.

[0033] The screw 2 rotates under the drive of the circulating drilling fluid, and its speed, that is, the number of revolutions per minute, is related to the pump capacity of the circulating pump. The speed of the screw 2 under the preset pump output displacement refers to the speed of the screw 2 when the pump capacity is the preset pump output displacement. In specific practical applications, the pump capacity is usually controlled to make the speed of the screw 2 between 100 rpm and 120 rpm, that is, the preset pump output displacement is generally set to any value in the displacement range corresponding to the speed range of 100 to 120 rpm of the screw 2. After the pump is turned on, in order to make the system run more smoothly and safely, the pump stroke reading can be increased at a rate of 10 to 15 strokes per 10 seconds until the pump capacity reaches the aforementioned preset pump output displacement. In order to obtain a better jam-releasing effect, the pump cycle time (i.e., time length) should not be less than the preset time, which is generally set to 3 hours to 5 hours, such as 3.5 hours, 4 hours or 4.5 hours.

[0034] In a preferred embodiment, the above step S1 includes: if the fault type is the drill bit stuck during drilling, the hanging weight is between the drilling weight and 0KN each time the drill tool is pressed down, and the hanging weight is not greater than a third value each time the drill tool is lifted up, and the third value is 50KN greater than the initial hanging weight. The drilling weight refers to the axial load indicated by the weight indicator in the drilling state when the drill bit 1 contacts the bottom of the well, that is, the pressing force during the pressing operation is set according to the drilling pressure in the normal drilling state before drilling, and this pressing force makes the hanging weight between the drilling weight and 0KN.

[0035] In a preferred embodiment, the above step S1 includes: if the fault type is a drill bit stuck during drilling, the hanging weight is less than the maximum allowable bearing capacity of the drill each time the drill is lifted, and the hanging weight is not less than the initial hanging weight each time the drill is pressed down. The maximum allowable bearing capacity of the drill refers to the axial load corresponding to the tensile strength of the drill.

[0036] In a preferred embodiment, the above step S2 further includes: tightening all the drill tool threads above the turntable surface 5 to the maximum allowable tightening torque of the threads. Step S2 is a preparatory work for subsequent steps. Tightening and reinforcing the threads in step S2 can make subsequent steps such as reversing the drill tool (i.e., rotating counterclockwise) safer.

[0037] In a preferred embodiment, the above step S3 further includes step S4: repeating step S1 and step S3 at least once. That is, if the jam is not successfully released after step S3, then step S1 and step S3 are repeated in sequence. The number of repetitions is flexibly determined according to the on-site conditions, and is usually set to be repeated up to 5 times. If the jam still cannot be released, other release methods (such as jar) are used to release the stuck drill bit fault.

[0038] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for resolving a drill bit stuck fault in a screw drill, characterized in that: include: Step A, determining the fault type, if the fault type is the drill bit stuck when pulling out the drill, then the drill tool is pressed down and lifted up for no less than 10 times in sequence, if the fault type is the drill bit stuck when drilling down the drill, then the drill tool is lifted up and pressed down for no less than 10 times in sequence; Step B, release the brake between the top drive and the turntable; Step C, pressing down the drill bit so that the hanging weight is between the first value and the second value, starting the pump to circulate the drilling fluid for at least a preset time with a preset pump output displacement, and in the process of starting the pump to circulate the drilling fluid, controlling the top drive to rotate counterclockwise and making the rotation speed of the top drive consistent with the rotation speed of the screw at the preset pump output displacement, wherein the first value is 20KN less than the initial hanging weight, and the second value is 50KN less than the initial hanging weight, and the initial hanging weight is the hanging weight when the fault occurs.

2. The method according to claim 1, characterized in that The step B also includes: tightening all the drill tool threads above the turntable surface to the maximum allowable make-up torque of the threads.

3. The method according to claim 1, characterized in that: The preset time is 3 hours to 5 hours.

4. The method according to claim 1, characterized in that: The step A comprises: if the fault type is the drill bit being stuck when starting drilling, the hanging weight is between the drill weight and 0 KN each time the drill tool is pressed down, and the hanging weight is not greater than a third value each time the drill tool is lifted up, and the third value is 50 KN greater than the initial hanging weight.

5. The method according to claim 4, characterized in that The step A comprises: if the fault type is a drill bit stuck during drilling, the hanging weight is less than the maximum allowable bearing capacity of the drill tool each time the drill tool is lifted, and the hanging weight is not less than the initial hanging weight each time the drill tool is pressed down.

6. The method according to claim 1, characterized in that The method further comprises step D: repeating step A and step C at least once.

7. The method according to any one of claims 1 to 6, characterized in that: The preset pump output displacement is any value within the displacement range corresponding to the screw speed range of 100 to 120 rpm.

8. The method according to claim 7, characterized in that In step C, after the pump is turned on, the pump stroke reading is increased at a rate of 10 to 15 strokes per 10 seconds until the pump volume reaches the preset pump output displacement.