Cyclic hot solvent extraction method for heavy oil reservoir

Through the circulating hot solvent extraction method, the combination of ground electric heating and underground electric heating is used to solve the problem of poor viscosity reduction effect of steam heating in heavy oil reservoir mining, and efficient heavy oil development and low carbon emissions are achieved, which significantly Improves recovery and reduces costs.

CN119062295APending Publication Date: 2024-12-03PETROCHINA CO LTD
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202310644259.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-01
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the existing heavy oil reservoir mining technology, the effect of simple steam heating to reduce viscosity is limited, resulting in low daily output, high-temperature steam costs and large carbon emissions, and lack of methods to effectively reduce carbon emissions and costs.

Method used

Using the cyclic hot solvent extraction method, the solvent is heated on the ground and the underground heating is electrically heated, light alkane solvent is injected into combination with water vapor, and the electric heater is used to maintain a constant surface temperature, reduce crude oil viscosity, reduce carbon emissions, and recycle solvents to reduce cost.

Benefits of technology

Significantly reduce crude oil viscosity, improve the lifting capacity and recovery rate of the output liquid, reduce carbon emissions and production costs, increase the recovery rate to more than 65%, reduce carbon emissions by 80%, and reduce ground treatment costs by 90%.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062295A_ABST
    Figure CN119062295A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of heavy oil reservoir exploitation, and discloses a circulating hot solvent extraction method for a heavy oil reservoir, which comprises the following steps: S1, selecting an oil reservoir; s2, well spacing; s3, a solvent injection pipe column is put into the injection well, and electric heaters are put into the horizontal section shaft of the injection well and the horizontal section shaft of the production well; s4, the injection well and the production well are preheated at the same time; s5, after the solvent is heated to the preset injection temperature, the solvent or the composition of the solvent and water vapor is continuously injected into the injection well, and secondary heating is conducted through an electric heater in the injection well; the production well performs continuous production, and an electric heater in the production well is kept to perform continuous heating; and S6, when the yield of the production well enters a decline stage, a mixture of the solvent and the non-condensed gas is injected into the injection well until production is finished. According to the method, through cyclic hot solvent extraction, the operation cost and the saturation degree of residual oil can be greatly reduced, the viscosity of crude oil and the exploitation temperature are reduced, the recovery efficiency and economic benefits are improved, and carbon emission is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of heavy oil reservoir exploitation, and in particular relates to a circulating hot solvent extraction method for heavy oil reservoirs. Background Art

[0002] Heavy oil has high viscosity and poor flowability, but crude oil viscosity is extremely sensitive to temperature. Therefore, thermal recovery is usually carried out by injecting high-temperature steam. The main methods of heavy oil steam injection recovery include steam stimulation, steam drive and steam-assisted gravity drainage (SAGD). SAGD was invented by Butler of Canada in 1978 and has been successfully applied in heavy oil reservoirs in Canada's oil sands mining area, Liaohe Oilfield in my country, Xinjiang Oilfield and other places. Its principle is to deploy horizontal wells stacked up and down in the same oil layer, and inject high-dryness steam into the upper injection well. Since the density of steam is much smaller than that of crude oil, it overlaps upward in the formation to form a steam cavity. With the continuous injection of steam, the steam cavity continues to expand upward and laterally, and heat exchanges with the crude oil in the oil layer; the viscosity of the heated crude oil decreases, and it flows downward with the condensed water under the action of gravity and is produced from the horizontal production well at the bottom of the oil layer.

[0003] The viscosity of the super-heavy oil developed by SAGD in China is relatively high at underground steam temperature (240-270℃), usually up to 20-50mPa.s, which is much higher than the viscosity of the oil sands developed by SAGD in Canada at the same temperature (10-20mPa.s). Therefore, the viscosity reduction effect of steam heating alone is limited, and the daily oil production is also limited. In order to significantly increase the daily production of SAGD wells, it is necessary to explore mining methods that further reduce the viscosity of crude oil. At the same time, high-temperature steam is required in the SAGD development process. The continuous production of high-temperature steam is costly and will result in a large amount of carbon emissions. The high-temperature liquid produced also requires high ground processing costs. Therefore, it has become particularly urgent to explore a method for heavy oil reservoir exploitation that significantly reduces carbon emissions and reduces mining costs.

[0004] Patent document CN103244089A discloses a method for producing heavy oil by microwave-assisted solvent extraction, which method comprises the following steps: setting a horizontal injection and production well network in the heavy oil reservoir production area, wherein the upper horizontal well is a solvent injection well and the lower horizontal well is a production well; using fracturing technology to create horizontal and vertical fractures at positions corresponding to the oil layer in the horizontal section of the upper horizontal well; injecting silicon carbide particles into the horizontal and vertical fractures; deploying microwave generating equipment at the wellhead and in the well of the upper horizontal well, and adjusting the power of the microwave generating equipment according to the temperature change along the horizontal section of the upper horizontal well; injecting a light alkane solvent into the upper horizontal well; and continuously producing oil from the lower horizontal production well. This method utilizes the advantages of efficient heat transfer and viscosity reduction of silicon carbide particle proppants in fractures, rapid oil dissolution and viscosity reduction by hot solvents, and rapid extraction by heating up hot solvents to achieve rapid solvent extraction of heavy oil based on a large range of oil layers by rapid microwave heating. It can effectively reduce the cost of heavy oil reservoir exploitation and increase oil production rate and recovery rate. However, this patent relies too much on the fracturing effect. It is difficult to evenly distribute the fracturing effect for heterogeneous reservoirs, which can easily aggravate the heterogeneity of the reservoir and cause the problem of uneven heating and uneven utilization of the horizontal section as a whole. In addition, this patent lacks effective countermeasures in the stage of production decline.

[0005] Patent document CN104453805A discloses a method for rapid start-up of heavy oil reservoirs by steam-assisted gravity drainage, which comprises the following steps: (1) high-power electric heating of the injection well and the production well; (2) injecting solvent into the long and short tubings of the injection well and the production well at the same time; (3) injecting a mixed fluid of solvent and steam into the long and short tubings of the injection well and injecting a mixed fluid of solvent and steam into the long tubing of the production well, and draining the short tubing of the production well; (4) turning off the electric heating, injecting pure steam into the long and short tubings of the injection well and draining the long and short tubings of the production well at the same time; the method of this patent saves more than 2 / 3 of the time compared with the conventional preheating start-up method, thereby greatly improving the utilization rate of thermal energy, realizing rapid preheating start-up of SAGD and accelerating the production speed of SAGD. In addition, through rapid expansion of solvent and injection of super-fracture pressure, a uniform oil drainage channel can be established to achieve the purpose of increasing production and recovery rate; however, the method of this patent only focuses on the preheating start-up stage, and lacks efficiency improvement measures and production increase methods for the production stage. Summary of the invention

[0006] The present invention aims to provide a circulating hot solvent extraction and production method to address the technical problems existing in the background technology. Through circulating solvent extraction, the operating cost is greatly reduced and the economic benefit of development is improved; through the miscibility of solvent with crude oil, the residual oil saturation is greatly reduced, and the recovery rate and economic benefit of heavy oil development are improved; through electrically heating the injection and production wells, the crude oil viscosity and production temperature are greatly reduced, further improving the recovery rate and reducing the operating cost; the entire process does not require water steam injection, which greatly reduces the carbon emissions generated by high-temperature steam combustion. At the same time, there is almost no water in the output fluid, realizing low-cost collection and treatment of the output fluid.

[0007] In order to achieve the above technical objectives, the present invention adopts the following technical solutions:

[0008] A method for producing heavy oil reservoirs by circulating hot solvent extraction, the method comprising the following steps:

[0009] Step S1: selecting an oil reservoir that meets solvent extraction conditions;

[0010] Step S2: well arrangement: deploying an injection-production well group in the oil layer, wherein the injection-production well group includes injection wells and production wells stacked up and down, with the injection wells at the top and the production wells at the bottom;

[0011] Step S3: completing the well, lowering the injection solvent string into the injection well, lowering an electric heater with a single-point or two-point temperature measurement function into the horizontal wellbore of the injection well and the production well; lowering evenly spaced and continuously distributed temperature measuring thermocouples into the horizontal sections of the injection well and the production well to measure the temperature of the fluid in the horizontal section;

[0012] Step S4: preheating start, using steam circulation, electric heating or solvent assistance to preheat the injection well and the production well at the same time;

[0013] Step S5: heating the solvent to a predetermined injection temperature using a boiler on the ground, then continuously injecting the solvent heated on the ground, or a combination of the solvent and water vapor, into the injection well, and performing secondary heating at a constant surface temperature using an electric heater in the injection well; the production well continuously produces, and the electric heater in the production well is maintained to continuously heat the produced fluid at a constant surface temperature;

[0014] Step S6: When the production of the production well enters a decline phase, a mixture of solvent and non-condensable gas is injected into the injection well until the production is completed.

[0015] Furthermore, in step S1, the solvent extraction conditions that the oil reservoir needs to meet are:

[0016] The permeability difference within the layer is less than 10, the thickness of the continuous oil layer is more than 10 meters, and the reservoir has no strong edge and bottom water; the horizontal permeability is more than 1000mD, and the vertical permeability needs to be greater than 500mD; the viscosity of the degassed crude oil at 50℃ is less than 100000mPa.s.

[0017] Furthermore, in step S1, the oil reservoir is an undeveloped oil reservoir that is suitable for deploying horizontal well development; or an oil reservoir that has been developed using ordinary horizontal wells but the steam chamber has not yet expanded to a radius of 35m; or an oil reservoir that has been developed using ordinary horizontal wells but the steam chambers adjacent to the wells have not yet been connected.

[0018] Furthermore, in step S2, the average vertical height difference between the injection well and the production well in the horizontal section is 4-5 meters, the plane well spacing is 60-100m, and the length of the horizontal section is 200-1500m.

[0019] Furthermore, in step S2, for an undeveloped heavy oil reservoir, an injection-production well group is deployed in the oil layer, wherein the injection-production well group includes injection wells and production wells stacked up and down, wherein the injection wells are at the top and the production wells are at the bottom;

[0020] For heavy oil reservoirs that have been developed using ordinary single horizontal wells, deploy another horizontal well parallel to the existing horizontal well, and use the upper horizontal well as an injection well and the lower horizontal well as a production well;

[0021] For heavy oil reservoirs that have been developed using dual horizontal well SAGD, the process directly proceeds to step S3.

[0022] Furthermore, in step S3, the heating section of the electric heater is the horizontal section of the entire injection well and the production well, and the maximum power per meter of the electric heater is 1500-2500W.

[0023] Furthermore, in step S4, the injection well and the production well are simultaneously preheated by electric heating, and the surface temperature of the electric heaters of the injection well and the production well is controlled at 250-300°C.

[0024] Furthermore, in step S5, the solvent is heated to a predetermined injection temperature by using a boiler on the ground, and the boiler is one of an electric boiler, a gas boiler or a coal-fired boiler; the predetermined injection temperature is 100-150°C.

[0025] Furthermore, in step S5, the electric heaters in both the injection well and the production well are heated by controlling the heating power to maintain a constant surface temperature.

[0026] Furthermore, in step S5, the solvent heated on the ground, or a composition of the solvent and water vapor mixed in a volume ratio of 4:1-9:1 is continuously injected into the injection well.

[0027] Furthermore, in step S5, the surface temperature of the electric heater in the injection well is controlled at 150-200°C during heating, and the surface temperature of the electric heater in the production well is controlled at 100-150°C during heating.

[0028] Furthermore, in step S5, the solvent injected into the injection well is a light alkane solvent or a mixture with a carbon number of 1-10, the solvent injection pressure P1 is 1.5-3Mpa, and the pressure difference between the injection pressure P1 and the production pressure P2 is 0.2-0.3Mpa.

[0029] Furthermore, after the solvent injected in step S5 is extracted during the production process, it is separated by a ground separator, compressed and re-liquefied by a compressor, and then re-injected into the well by a pump for recycling.

[0030] Further, in step S6, the volume ratio of the solvent to the non-condensable gas is 1:1-0:1.

[0031] Furthermore, in step S6, the non-condensable gas includes one or a combination of nitrogen, carbon dioxide, flue gas, methane or natural gas.

[0032] Compared with the prior art, the beneficial effects of the present invention are:

[0033] (1) The present invention adopts a method of electrically heating the solvent on the ground, and further, electrically heating the injection well downhole. Given that the molecular diffusion capacity of the solvent in crude oil at high temperature is much greater than that of water vapor, after the solvent is injected, it can be vaporized in the near-well zone of the injection well, and then quickly rise to the top of the oil layer through overburden and dissolve into the crude oil. At the same time, electrical heating is performed in the horizontal section of the production well, which can greatly increase the temperature of the produced fluid and reduce the viscosity of the crude oil. The viscosity of the crude oil is reduced by more than 90%, which significantly improves the lifting capacity of the produced fluid and achieves a higher oil drainage rate and oil production rate. The overall oil production rate is equivalent to that of SAGD. At the same time, the production temperature can be reduced from 240-350°C under steam injection conditions to 80-150°C, without the need for water vapor injection, which greatly reduces carbon emissions, and there is almost no water in the produced fluid, which reduces the collection and treatment costs of the produced fluid;

[0034] (2) The solvent of the present invention is completely soluble in crude oil and has a high oil displacement efficiency during the displacement process. The residual oil saturation is mainly affected by the asphalt content. Therefore, for heavy oil reservoirs with low asphalt content, the residual oil saturation can be reduced to below 10%, which is much lower than the residual oil saturation of water steam injection, thereby achieving a higher recovery factor and increasing the overall recovery factor from 40-50% of conventional SAGD to more than 65%;

[0035] (3) Compared with the existing steam injection technology, the circulating solvent injection mining technology provided by the present invention can significantly reduce the solvent injection cost by separating, compressing and re-injecting the solvent on the ground after extraction; it does not require carbon emissions generated by steam injection, and carbon emissions are reduced by more than 80%; it also does not require high-temperature steam production costs and high-temperature ground processing fees, and can reduce ground processing fees by more than 90%, which has good economic benefits;

[0036] (4) The present invention significantly reduces operating costs and improves development economic benefits through circulating solvent extraction; significantly reduces residual oil saturation and improves the recovery rate of heavy oil development through solvent miscibility with crude oil; significantly reduces crude oil viscosity and production temperature through electrical heating of injection and production wells, further improving recovery rate and reducing operating costs; the entire process does not require water steam injection, significantly reducing carbon emissions generated by high-temperature steam combustion, and at the same time, there is almost no water in the output fluid, achieving low-cost collection and treatment of the output fluid;

[0037] (5) The solvent of the present invention is a light alkane solvent with a carbon number of 1-10 or a mixture thereof. The solvent gas has low selectivity for lithology and physical properties and strong diffusion capacity. It is not only applicable to oil reservoirs suitable for SAGD development, but also can adapt to stronger heterogeneous oil reservoirs. The method is simple to operate and has strong versatility.

[0038] (6) The method of the present invention injects non-condensable gas in the middle and late stages of production to replace the solvent in the oil layer, which can significantly increase the solvent recovery rate to more than 95%, improve the economic efficiency of the solvent injection project, and is conducive to large-scale promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 Schematic diagram of the process of the embodiment of the present invention. DETAILED DESCRIPTION

[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0041] Combination Figure 1 As shown, the present invention provides a circulating hot solvent extraction method for heavy oil reservoirs, the method comprising the following steps:

[0042] Step S1: selecting an oil reservoir that meets solvent extraction conditions;

[0043] Specifically, the oil reservoir is an undeveloped oil reservoir suitable for deployment of horizontal wells; or an oil reservoir that has been developed by ordinary horizontal wells but the steam chamber has not yet expanded to a radius of 35m; or an oil reservoir that has been developed by ordinary horizontal wells but the steam chambers adjacent to each other have not yet been connected;

[0044] The solvent extraction conditions that the oil reservoir needs to meet are: the permeability difference within the layer is less than 10, the thickness of the continuous oil layer is more than 10 meters, and the oil reservoir has no strong edge and bottom water; the horizontal permeability is more than 1000mD, especially the vertical permeability needs to be greater than 500mD; the viscosity of the degassed crude oil at 50°C is less than 100000mPa.s.

[0045] Step S2: well layout: deploy an injection-production well group in the oil layer in the same well layout method as SAGD, and the injection-production well group includes injection wells and production wells stacked up and down, with the injection wells on the top and the production wells on the bottom; the average vertical height difference between the horizontal sections of the injection wells and the production wells is 4-5 meters, the vertical section plane well spacing is 60-100m, and the horizontal section length is 200-1500m.

[0046] Specifically, for undeveloped heavy oil reservoirs, an injection-production well group is deployed in the oil layer in the same well layout as SAGD; for heavy oil reservoirs that have been developed using an ordinary single horizontal well, another horizontal well is deployed above or below the existing horizontal well, parallel to it, with a vertical spacing of 4-5 meters, with the injection well above and the production well below; for heavy oil reservoirs that have been developed using dual horizontal well SAGD, directly proceed to step S3.

[0047] Step S3: completing the well, lowering the injection solvent string into the injection well, lowering an electric heater with a single-point or two-point temperature measurement function into the horizontal wellbore of the injection well and the production well; lowering evenly spaced and continuously distributed temperature measuring thermocouples into the horizontal sections of the injection well and the production well to measure the temperature of the fluid in the horizontal section.

[0048] The heating section of the electric heater is the horizontal section of the entire injection well and the production well, and the maximum power per meter of the electric heater is 1500-2500W.

[0049] Step S4: hot start, using steam circulation, electric heating, or solvent assistance (solvent soaking followed by steam circulation, and solvent and steam co-injection and co-circulation) to preheat the injection well and production well simultaneously to achieve preheat start.

[0050] Among them, the surface temperature of the electric heaters in the injection well and the production well is controlled at 250-300℃.

[0051] Step S5: The solvent is heated to a predetermined injection temperature by using a boiler on the ground, and then the solvent heated on the ground, or a combination of the solvent and water vapor, is continuously injected into the injection well, and secondary heating is performed using an electric heater in the injection well at a continuous constant surface temperature; the production well continuously produces, and the electric heater in the production well is maintained to continuously heat the produced fluid at a constant surface temperature.

[0052] Among them, the boiler for ground heating can be one of electric boilers, gas boilers or coal-fired boilers; after the solvent is heated to a predetermined injection temperature of 100-150°C by a boiler on the ground, the solvent is injected into the well and secondary heated by an electric heater in the well to compensate for heat loss along the way.

[0053] The electric heaters in the injection well and the production well continuously heat, and the surface temperature of the electric heater in the injection well is controlled at 150-200°C during heating, and the surface temperature of the electric heater in the production well is controlled at 100-150°C during heating.

[0054] The solvent is a light alkane solvent or a mixture having a carbon number of 1-10, the solvent injection pressure P1 is 1.5-3Mpa, and the pressure difference between the injection pressure P1 and the production pressure P2 is 0.2-0.3Mpa.

[0055] At the same time, the injected solvent has a good extraction effect on the heavy oil. Except for the asphalt residue oil, the other components in the heavy oil are extracted by the solvent and flow to the horizontal production well at the bottom. They are then produced during the production process and separated by the ground separator. The separated solvent enters the compressor for compression and re-liquefaction, and is re-injected into the well through a pump for recycling.

[0056] Step S6: When the production of the production well enters a decline phase, a mixture of solvent and non-condensable gas is injected into the injection well until the production is completed.

[0057] In step S6, the volume ratio of the solvent to the non-condensable gas is 1:1-0:1; the non-condensable gas includes one or a combination of nitrogen, carbon dioxide, flue gas, methane or natural gas.

[0058] In the later stage of SAGD production, non-condensable gas will enter the top of the reservoir after injection, displace the solvent in the oil layer, and play a role in energy enhancement and pressure maintenance, which can increase production. Its specific functions are as follows:

[0059] (1) Non-condensable gas is distributed in the upper part of the steam chamber to form an insulating layer, which reduces the demand for steam and solvent and the heat loss to the overlying rock formation, thereby improving the utilization rate of steam and solvent and the economic benefits of the system;

[0060] (2) The non-condensable gas accumulated in the upper part of the oil layer can maintain the system pressure, play the role of pushing the crude oil downward, and improve the oil drainage capacity of the reservoir;

[0061] (3) The non-condensable gas injected into the reservoir will preferentially occupy the oil pores in the porous medium, driving the originally bound crude oil out of the pores and turning it into flowable crude oil, thereby improving the oil drainage efficiency;

[0062] (4) According to the partial pressure principle, non-condensable gases play a role in reducing the partial pressure of steam, which can further expand the steam chamber under the same oil layer pressure.

[0063] Example 1

[0064] The present embodiment provides a circulating hot solvent extraction production method for a heavy oil reservoir, in which the oil layers between the horizontal sections of the injection and production wells of the well pair are all sand layers with the same thermal conductivity, a permeability gradient of 7 within the layer, a continuous oil layer thickness of 10 meters, and no strong edge and bottom water in the reservoir; the permeability reaches 1000mD, the viscosity of the degassed crude oil at 50°C is 10000mPa.s, the reservoir is undeveloped, and the conditions for solvent extraction are met.

[0065] The heavy oil reservoir circulating hot solvent extraction method provided in this embodiment includes the following specific steps:

[0066] (1) Well layout: The injection-production well group is deployed in the oil layer in the same way as SAGD; the injection wells and production wells are stacked up and down, with an average vertical height difference of 4 meters in the horizontal section, a well spacing of 60 meters in the vertical section, and a horizontal section length of 200 meters.

[0067] (2) Well completion: Lower the solvent injection string into the injection well, lower the electric heater with single-point or two-point temperature measurement function into the horizontal wellbore of the injection well and the production well; lower the temperature measuring thermocouples with uniform intervals and continuous distribution into the horizontal sections of the injection well and the production well to measure the temperature of the fluid in the horizontal section.

[0068] The heating section of the electric heater is the horizontal section of the entire injection well and the production well, and the maximum power of the heater per meter is 1500W.

[0069] (3) Preheating start: The injection well and production well are preheated simultaneously by means of steam circulation to achieve preheating start.

[0070] (4) An electric boiler is used on the ground to heat the solvent to a predetermined injection temperature of 100°C, and then the solvent is continuously injected into the injection well; the electric heater in the injection well performs secondary heating on the injected solvent at a continuous constant surface temperature to compensate for the heat loss along the way; the production well continuously produces, and the electric heater in the production well is maintained to heat the produced fluid at a continuous constant surface temperature.

[0071] The surface temperature of the injection well's electric heater during heating is controlled at 150°C; the surface temperature of the production well's electric heater during heating is controlled at 100°C.

[0072] The solvent is a mixture of light alkane solvents with carbon numbers of 5-8 in equal proportions. The injection pressure P1 of the solvent is 1.5 MPa, and the pressure difference between the injection pressure P1 and the production pressure P2 is 0.2 MPa.

[0073] The injected solvent has a good extraction effect on the heavy oil. Except for the asphalt residue oil, the other components in the heavy oil are extracted by the solvent and flow to the horizontal production well at the bottom. After being produced during the production process, they are separated by the ground separator. The separated solvent re-enters the compressor for compression and re-liquefaction, and is re-injected into the well through the pump for recycling.

[0074] (5) When the production of the production well enters the decline stage, a mixture of solvent and non-condensable gas is injected into the injection well until the production is completed.

[0075] The volume ratio of the solvent to the non-condensable gas is 1:1; the non-condensable gas is carbon dioxide.

[0076] The circulating hot solvent extraction production method of this embodiment realizes the uniform development and efficient development of the solvent cavity in the entire horizontal section. Compared with the adjacent SAGD well pairs, the scale of steam chamber development along the horizontal section reaches 98% (adjacent conventional SAGD: 50%), and the oil production rate reaches 70 tons / day (adjacent conventional SAGD: 20 tons / day).

[0077] Example 2

[0078] The present embodiment provides a circulating hot solvent extraction production method for a heavy oil reservoir, in which the oil layers between the horizontal sections of the injection and production wells of the well pair are all sand layers with the same thermal conductivity, a permeability difference of 5 within the layer, a continuous oil layer thickness of 12 meters, and no strong edge and bottom water in the reservoir; the permeability reaches 800mD, and the viscosity of the degassed crude oil at 50°C is less than 20000mPa.s; ordinary horizontal well development is adopted, but the steam chamber has not yet expanded to a radius of 5m, and adjacent steam chambers are not connected, which meets the reservoir conditions for solvent extraction.

[0079] The heavy oil reservoir circulating hot solvent extraction method provided in this embodiment includes the following specific steps:

[0080] (1) Well layout: deploy another horizontal well parallel to the existing horizontal well above or below it, and use the upper horizontal well as an injection well and the lower horizontal well as a production well; the vertical height difference between the injection well and the production well is 4 meters on average, the distance between the two wells in the vertical section is 5 meters, the distance between the well groups in the plane is 70 meters, and the length of the horizontal section is 300 meters.

[0081] (2) Well completion: For heavy oil reservoirs that have not been developed or have been developed using ordinary single horizontal wells, a solvent injection string is lowered into the injection well, and an electric heater with a single-point or two-point temperature measurement function is lowered into the horizontal wellbore of the injection well and the production well; and evenly spaced and continuously distributed temperature measuring thermocouples are lowered into the horizontal sections of the injection well and the production well to measure the temperature of the fluid in the horizontal section.

[0082] The heating section of the electric heater is the horizontal section of the entire injection well and the production well, and the maximum power of the heater per meter is 2000W.

[0083] (3) Preheating start: The injection well and the production well are preheated simultaneously by electric heating to achieve preheating start; the electric heating temperature of the injection well and the production well is 250°C.

[0084] (4) A gas boiler is used on the ground to heat the solvent to a predetermined injection temperature, and then a composition of 90% solvent and 10% water vapor is continuously injected into the injection well; the electric heater in the injection well performs secondary heating of the injected solvent at a continuous constant surface temperature to compensate for heat loss along the way; the production well continuously produces, and the electric heater in the production well is maintained to heat the produced fluid at a continuous constant surface temperature.

[0085] The surface temperature of the electric heater in the injection well is controlled at 250°C when heating, and the surface temperature of the electric heater in the production well is controlled at 100°C when heating.

[0086] The solvent is a mixture of light alkane solvents with carbon numbers ranging from 3 to 6 in equal proportions. The injection pressure P1 of the solvent is 2 Mpa, and the pressure difference between the injection pressure P1 and the production pressure P2 is 0.3 Mpa.

[0087] The injected solvent has a good extraction effect on the heavy oil. Except for the asphalt residue oil, the other components in the heavy oil are extracted by the solvent and flow to the horizontal production well at the bottom. After being produced during the production process, they are separated by the ground separator. The separated solvent re-enters the compressor for compression and re-liquefaction, and is re-injected into the well through the pump for recycling.

[0088] (6) When the production of the production well enters the decline stage, a mixture of solvent and non-condensable gas is injected into the injection well until the production is completed.

[0089] The volume ratio of the solvent to the non-condensable gas is 1:2; and the non-condensable gas is flue gas.

[0090] The circulating hot solvent extraction production method of this embodiment realizes the uniform development and efficient development of the solvent cavity in the entire horizontal section. Compared with the adjacent SAGD well pair, the scale of steam chamber development along the horizontal section reaches 93% (adjacent conventional SAGD: 44%), and the oil production rate reaches 65 tons / day (adjacent conventional SAGD: 18 tons / day).

[0091] Example 3

[0092] The present embodiment provides a circulating hot solvent extraction production method for a heavy oil reservoir, in which the oil layers between the horizontal sections of the injection and production wells of the well pair are all sand layers with the same thermal conductivity, a permeability difference of 5 within the layer, a continuous oil layer thickness of 15 meters, and no strong edge and bottom water in the reservoir; the permeability reaches 1500mD, the viscosity of the degassed crude oil at 50°C is 10000mPa.s, dual horizontal well SAGD development has been adopted but the steam chamber has not yet expanded to a radius of 35m, and the adjacent steam chambers between the wells have not yet been connected; the reservoir conditions for solvent extraction are met.

[0093] The heavy oil reservoir circulating hot solvent extraction method provided in this embodiment includes the following specific steps:

[0094] (1) Well completion: insert a solvent injection string into the injection well, and insert an electric heater with a single-point or two-point temperature measurement function into the horizontal wellbore of the injection well and the production well; and insert evenly spaced and continuously distributed temperature measuring thermocouples into the horizontal sections of the injection well and the production well to measure the temperature of the fluid in the horizontal section.

[0095] The heating section of the electric heater is the horizontal section of the entire injection well and the production well, and the maximum power of the heater per meter is 2500W.

[0096] (2) Preheating start: steam circulation, electric heating, or solvent-assisted preheating of the two wells is used to achieve preheating start. The solvent is diesel, and the surface heating temperature of the heating cables of the injection well and the production well is 300°C.

[0097] (3) A ground gas boiler is used to heat the solvent to a predetermined injection temperature of 150°C, and then the solvent is continuously injected into the injection well; the electric heater in the injection well performs secondary heating on the injected solvent at a continuous constant surface temperature to compensate for the heat loss along the way; the production well continuously produces, and the electric heater in the production well is maintained to heat the produced fluid at a continuous constant surface temperature.

[0098] The surface temperature of the injection well's electric heater during heating is controlled at 200°C, and the surface temperature of the production well's electric heater during heating is controlled at 150°C.

[0099] The solvent is liquefied petroleum gas, the solvent injection pressure P1 is 3 MPa, and the pressure difference between the injection pressure P1 and the production pressure P2 is 0.3 MPa.

[0100] The injected solvent has a good extraction effect on the heavy oil. Except for the asphalt residue oil, the other components in the heavy oil are extracted by the solvent and flow to the horizontal production well at the bottom. After being produced during the production process, they are separated by the ground separator. The separated solvent re-enters the compressor for compression and re-liquefaction, and is re-injected into the well through the pump for recycling.

[0101] (5) When the production of the production well enters the decline stage, a mixture of solvent and non-condensable gas is injected into the injection well until the production is completed.

[0102] The volume ratio of the solvent to the non-condensable gas is 1:9; and the non-condensable gas is natural gas.

[0103] The circulating hot solvent extraction production method of this embodiment realizes the uniform development and efficient development of the solvent cavity in the entire horizontal section. Compared with the adjacent SAGD well pairs, the scale of steam chamber development along the horizontal section reaches 99% (adjacent conventional SAGD: 55%), and the oil production rate reaches 80 tons / day (adjacent conventional SAGD: 35 tons / day).

[0104] The above description is only an embodiment of the present invention and is not intended to limit the present invention. Any modification, equivalent replacement and improvement made within the application scope of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for producing heavy oil reservoirs by circulating hot solvent extraction, characterized in that: The method comprises the following steps: Step S1: selecting an oil reservoir that meets solvent extraction conditions; Step S2: well arrangement: deploying an injection-production well group in the oil layer, wherein the injection-production well group includes injection wells and production wells stacked up and down, with the injection wells at the top and the production wells at the bottom; Step S3: completing the well, lowering the injection solvent string into the injection well, lowering an electric heater with a single-point or two-point temperature measurement function into the horizontal wellbore of the injection well and the production well; lowering evenly spaced and continuously distributed temperature measuring thermocouples into the horizontal sections of the injection well and the production well to measure the temperature of the fluid in the horizontal section; Step S4: preheating start, using steam circulation, electric heating or solvent assistance to preheat the injection well and the production well at the same time; Step S5: heating the solvent to a predetermined injection temperature using a boiler on the ground, then continuously injecting the solvent heated on the ground, or a combination of the solvent and water vapor, into the injection well, and performing secondary heating at a constant surface temperature using an electric heater in the injection well; the production well continuously produces, and the electric heater in the production well is maintained to continuously heat the produced fluid at a constant surface temperature; Step S6: When the production of the production well enters a decline phase, a mixture of solvent and non-condensable gas is injected into the injection well until the production is completed.

2. The method according to claim 1, characterized in that In step S1, the solvent extraction conditions that the oil reservoir needs to meet are: The permeability difference within the layer is less than 10, the thickness of the continuous oil layer is more than 10 meters, and the reservoir has no strong edge and bottom water; the horizontal permeability is more than 1000mD, and the vertical permeability needs to be greater than 500mD; the viscosity of the degassed crude oil at 50℃ is less than 100000mPa.s.

3. The method according to claim 2, characterized in that In step S1, the oil reservoir is an undeveloped oil reservoir that is suitable for deploying horizontal well development; or an oil reservoir that has been developed using ordinary horizontal wells but the steam chamber has not yet expanded to a radius of 35m; or an oil reservoir that has been developed using ordinary horizontal wells but the steam chambers adjacent to the wells have not yet been connected.

4. The method according to claim 1, characterized in that: In step S2, the average vertical height difference between the injection well and the production well in the horizontal section is 4-5 meters, the plane well spacing is 60-100m, and the length of the horizontal section is 200-1500m.

5. The method according to claim 4, characterized in that In step S2, for an undeveloped heavy oil reservoir, an injection-production well group is deployed in the oil layer, wherein the injection-production well group includes injection wells and production wells stacked up and down, wherein the injection wells are at the top and the production wells are at the bottom; For heavy oil reservoirs that have been developed using ordinary single horizontal wells, deploy another horizontal well parallel to the existing horizontal well, and use the upper horizontal well as an injection well and the lower horizontal well as a production well; For heavy oil reservoirs that have been developed using dual horizontal well SAGD, the process directly proceeds to step S3.

6. The method according to claim 1, characterized in that In step S3, the heating section of the electric heater is the horizontal section of the entire injection well and the production well, and the maximum power per meter of the electric heater is 1500-2500W.

7. The method according to claim 1, characterized in that In step S4, the injection well and the production well are preheated simultaneously by electric heating, and the surface temperature of the electric heaters of the injection well and the production well is controlled at 250-300°C.

8. The method according to claim 1, characterized in that In step S5, the solvent is heated to a predetermined injection temperature by using a boiler on the ground, wherein the boiler is an electric boiler, a gas boiler or a coal-fired boiler; the predetermined injection temperature is 100-150°C.

9. The method according to claim 8, characterized in that In step S5, the electric heaters in both the injection well and the production well are heated by controlling the heating power to maintain a constant surface temperature.

10. The method according to claim 8 or 9, characterized in that: In step S5, the solvent heated on the ground, or a composition of the solvent and water vapor mixed in a volume ratio of 4:1-9:1 is continuously injected into the injection well.

11. The method according to claim 10, characterized in that In step S5, the surface temperature of the electric heater in the injection well is controlled at 150-200°C, and the surface temperature of the electric heater in the production well is controlled at 100-150°C.

12. The method according to claim 11, characterized in that In step S5, the solvent injected into the injection well is a light alkane solvent or a mixture with a carbon number of 1-10, the solvent injection pressure P1 is 1.5-3Mpa, and the pressure difference between the injection pressure P1 and the production pressure P2 is 0.2-0.3Mpa.

13. The method according to claim 10, characterized in that The solvent injected in step S5 is extracted during the production process, separated by a ground separator, compressed and reliquefied by a compressor, and then re-injected into the well by a pump for recycling.

14. The method according to claim 1, characterized in that In step S6, the volume ratio of the solvent to the non-condensable gas is 1:1-0:

1.

15. The method according to claim 14, characterized in that In step S6, the non-condensable gas includes one or a combination of nitrogen, carbon dioxide, flue gas, methane or natural gas.

Citation Information

Cited By

  • SAGD (steam assisted gravity drainage) development method for single horizontal well

    CN120925822A

  • A single horizontal well SAGD development method