Pipe stabilizing device for natural gas long-distance pipeline construction

By designing a pipe stabilization device for the construction of a long-distance natural gas pipeline, including a U-shaped pipe buried passage and a landslide placement mechanism, the difficulty of long-distance construction and position debugging problems in the construction of natural gas pipelines has been solved, and the steady decentralization and precise placement of pipelines has been achieved, reducing the difficulty of pipelines. Manual operation pressure is achieved, and construction efficiency and safety are improved.

CN119062826APending Publication Date: 2024-12-03CCCC PETROLEUM PIPELINE ENGINEERING CO LTD +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411197121.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

During the construction of natural gas pipelines, long-distance construction is difficult, the pipeline is heavier and the pipe diameter is thick, which makes it difficult to carry and unload and precise placement by manpower alone. Moreover, the location debugging and docking of the pipelines in the tunnel is difficult, which can easily lead to deviation Move or collapse.

Method used

A pipe stabilization device for construction of long-distance natural gas pipelines is designed, including U-shaped pipe buried passage, landslide placement mechanism, pipe transfer mechanism and pipeline pulling mechanism. Through limit hooking, joint rollers, conveying plates, transmission balls and pneumatic Components such as press cylinder realize steady drop, precise placement and position adjustment of the pipeline, reducing manual operation pressure.

Benefits of technology

Effectively avoid the collapse of the pipeline due to weight, ensure the consistency of slope, improve the consistency and accuracy of construction, reduce the pressure of manual down-pipe and stabilization of pipes, realize the smooth transfer and fine-tuning of the pipelines in the tunnel, and improve the construction Efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062826A_ABST
    Figure CN119062826A_ABST
Patent Text Reader

Abstract

The invention relates to a pipe stabilizing device for natural gas long-distance pipeline construction, which comprises an underground tunnel, a landslide placing mechanism for slowly lowering a pipeline into the underground tunnel, and a pipe moving mechanism for rolling and displacing the pipeline back and forth in the underground tunnel, wherein the underground tunnel is a pipe burying channel dug from the earth surface of soil, and the natural gas pipeline is pre-buried and placed in the underground tunnel; the underground tunnel comprises a U-shaped pipe burying channel, a pipeline laying foundation is arranged at the bottom of the U-shaped pipe burying channel, protection slopes located on the two sides of the U-shaped pipe burying channel are stacked on the top of the pipeline laying foundation, retaining walls are laid on the tops of the protection slopes, and a pipeline is pre-buried in the U-shaped pipe burying channel. A pipe moving mechanism is connected into the U-shaped pipe burying channel in a sleeved mode, and a pipeline traction mechanism is placed on one side of the protection slope. The pipeline can be accurately placed in the tunnel, the position of the pipeline in the tunnel is convenient to adjust, the pipe connection quality is good, and the efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of natural gas pipeline construction, and in particular to a pipe stabilizing device for long-distance natural gas pipeline construction. Background Art

[0002] A natural gas pipeline is a pipeline that transports natural gas (including associated gas produced by oil fields) from the extraction site or processing plant to the city gas distribution center or industrial enterprise users. It is also called a gas transmission pipeline. Using natural gas pipelines to transport natural gas is a way to transport a large amount of natural gas on land. Natural gas pipelines account for about half of the total length of pipelines in the world.

[0003] The Chinese utility model patent with publication number CN217502798U discloses a pipe stabilizing device for the construction of a long-distance natural gas pipeline. The utility model provides a pipe stabilizing device for the construction of a long-distance natural gas pipeline, and relates to the technical field of pipeline construction. The pipe stabilizing device for the construction of a long-distance natural gas pipeline comprises a movable seat, four universal wheels are installed at the bottom of the movable seat, a rotating rod is rotatably connected to the top of the movable seat, a sleeve is sleeved on the outer side of the rotating rod, a fixed plate is fixedly connected to the outer side of the rotating rod, a support plate is fixedly connected to the top of the sleeve, and a support seat is fixedly connected to the top of the support plate. In the pipe stabilizing device for the construction of a long-distance natural gas pipeline, the movable block on the sliding rod also moves relatively, so that the rotating plate on the movable block lifts the support plate, and the sleeve slides up and down on the outer side of the rotating rod, so that the height of the support seat is adjusted, so that the pipe on the clamping plate is more accurate when docking and installing, avoiding manual lifting, and the operation is more convenient. When reproducing the above patent, there are still the following problems to be improved:

[0004] During the construction of natural gas pipelines, long-distance construction is difficult. Since natural gas pipelines are usually heavy and have a large diameter, when they are transferred and lowered, the weight of the pipes themselves is large. It is difficult to move and place them smoothly and accurately by manpower alone. Moreover, when placing them in the tunnels dug by the buried pipe, the specific position of the natural gas pipeline must be constantly fine-tuned. When debugging the pipes, frequent pipe transfer and stabilization are required. In addition, the construction of long-distance natural gas pipelines is a relatively large construction process. The natural gas pipeline is lifted by a crane, placed in the tunnels dug by the buried pipe, and then lowered into the tunnels due to landslides and finally displaced in the tunnels. The adjacent pipelines are matched and closed. Such steps not only require stable pipe placement, but also the continuity of the construction links during the period tests the construction personnel's proficiency in the operation of lowering and stabilizing the natural gas pipelines during the long-distance construction stage. In addition, stable operation of lowering the pipes to complete the construction is one of the evaluation criteria for measuring whether the construction is qualified.

[0005] In addition, for natural gas pipes placed in buried pipe tunnels, short-distance pipe transfer is also required for the docking between adjacent pipelines, so that the adjacent natural gas ports can be easily moved until they are closed for easy connection. However, it is difficult to align adjacent conventional natural gas pipe openings over long distances in the tunnel, which can easily cause the pipeline to shift or fall. Moreover, during the pipeline burial process, the tunnel is prone to collapse in various pipe opening placement areas and inconsistent placement inclinations due to different centers of gravity of the pipelines.

[0006] Therefore, without solving the above-mentioned problem, the present invention studies a pipe stabilizing device for long-distance natural gas pipeline construction. Summary of the invention

[0007] The present invention aims to solve the deficiencies of the prior art and provides a pipe stabilizing device for long-distance natural gas pipeline construction.

[0008] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a pipe stabilizing device for long-distance natural gas pipeline construction, comprising a tunnel, which is a buried pipe channel dug on the soil surface, and the natural gas pipeline is pre-buried and placed in the tunnel, and also includes a landslide placement mechanism for slowly lowering the pipeline into the tunnel, and a pipe moving mechanism for rolling and displacing the pipeline forward and backward in the tunnel;

[0009] The tunnel includes a U-shaped pipe-buried channel, a pipe-laying foundation is provided at the bottom of the U-shaped pipe-buried channel, a slope protection is stacked on the top of the pipe-laying foundation on both sides of the U-shaped pipe-buried channel, a retaining wall is arranged on the top of the slope protection, and the pipe is pre-buried in the U-shaped pipe-buried channel;

[0010] The landslide placement mechanism includes a limit hook placed at the edge slope position of the retaining wall, a first regulating joint roller is fitted on the back of the limit hook, a plurality of first conveying rollers are sleeved side by side on the surface of the first regulating joint roller, first fixed bearings are correspondingly installed at both ends of the first regulating joint roller, a conveying plate used as a guide pipe for lowering is fitted on the outer wall edges of the two first fixed bearings, a second movable regulating joint roller is provided in the middle of the conveying plate, a plurality of second conveying rollers are sleeved side by side on the surface of the second movable regulating joint roller, a plurality of roller embedded grooves corresponding to the first conveying roller and the second conveying roller shaft are provided on the conveying plate, the first conveying roller and the second conveying roller shaft are placed in the roller embedded grooves, second fixed bearings are embedded at both ends of the second movable regulating joint roller, the outer wall surfaces of the two second fixed bearings are respectively movably hinged with the side walls of the conveying plate, ear rods are installed at the two corners of the side wall of the conveying plate away from the tunnel, and the top of the rod body of the ear rod is connected with a hanging rope pulling buckle; a deflection support mechanism is provided on the bottom side of the conveying plate;

[0011] The U-shaped buried pipe channel is sleeved with a pipe transfer mechanism, which includes a plurality of annular pipe transfer brackets installed on the surface of the U-shaped buried pipe channel, one side of the pipe transfer bracket is provided with an opening, the middle of the pipe transfer bracket is hinged with an extended connecting strut, and the opening and closing angle is controlled by the extended connecting strut, a plurality of ball assembly grooves are evenly distributed on the circumference of the inner side wall of the pipe transfer bracket, and the groove positions of the ball assembly grooves are embedded with transmission balls for transportation, and a toughening mechanism is provided at the lower end of the opening of the pipe transfer bracket;

[0012] A pipeline pulling mechanism is placed on one side of the slope protection, and the pipeline pulling mechanism includes an access base installed on the side of the slope protection, a sleeve is installed on the top of the access base, a pad is installed on the top of the sleeve, a vertical pole is installed on the top of the pad, a concave toggle cross bar is installed on the top of the vertical pole, a first movable rod is installed laterally on one side of the concave toggle cross bar, a movable joint is installed at the end of the first movable rod away from the concave toggle cross bar, a joint driving motor is installed on the top of the movable joint, a second movable rod is installed laterally on the other side of the movable joint, a lifting and lowering cylinder is installed at the end of the second movable rod away from the movable joint, and a hook binding mechanism for hanging a pipe transfer bracket is installed at the telescopic end at the bottom of the lifting and lowering cylinder.

[0013] In particular, a pipe patch is installed at both ends of the pipeline, and a plurality of fastening screws are evenly installed on the circumference of the surface of the pipe patch. A pipe groove and a pipe convex ring are respectively provided at both ends of the pipeline. When two adjacent pipelines are butt-jointed, the pipe convex ring is inserted into the pipe groove, and two adjacent pipe patches are butt-jointed and locked by rotating nuts on the fastening screws. A plurality of toughening connecting strips are evenly distributed on the circumference of the outer wall of the pipeline, and the two ends of the toughening connecting strips are fixedly connected to the opposite surfaces of the two pipe patches.

[0014] In particular, the deflection support mechanism includes an external frame installed on the side of the U-shaped pipe buried channel, a fitting base is fitted on the top side of the external frame, a triangular toggle bracket is installed on the top of the fitting base, a bottom corner of the triangular toggle bracket is rotatably connected to a linkage strut through an assembly joint, an end of the linkage strut away from the triangular toggle bracket is rotatably connected to a connecting rod through an assembly joint, a first elastic buffer and a second elastic buffer hinged to each other are installed on the top of the connecting rod, and an electric pushing mechanism for driving the conveying plate to deflect is installed on the top of the external frame.

[0015] In particular, the electric pushing mechanism includes a cylinder base installed on the side of the fitting base, an angle rotating roller is installed on the top of the cylinder base, regulating sleeves are installed at both ends of the angle rotating roller, a pneumatic cylinder is installed on the top of the regulating sleeve, a telescopic connecting rod is installed at the end of the pneumatic cylinder, a triangular connecting bracket is movably installed on the top of the rod body of the telescopic connecting rod, the top of the triangular connecting bracket is installed on both sides of the bottom of the conveying plate, and the bottom of the triangular connecting bracket is movably installed on the top of the second elastic buffer.

[0016] In particular, the first elastic buffer includes a pair of first connecting seats, a first buffer spring, and a first buffer telescopic rod. The first buffer spring is connected between the opposite surfaces of the pair of first connecting seats, the first buffer telescopic rod is sleeved in the first buffer spring, and the bottom end of the fixed section of the first buffer telescopic rod is fixedly connected to the first connecting seat below, and the top end of the telescopic section is fixedly connected to the first connecting seat above; the second elastic buffer includes a pair of second connecting seats, a second buffer spring, and a second buffer telescopic rod. The second buffer spring is connected between the opposite surfaces of the pair of second connecting seats, the second buffer telescopic rod is sleeved in the second buffer spring, and the bottom end of the fixed section of the second buffer telescopic rod is fixedly connected to the second connecting seat below, and the top end of the telescopic section is fixedly connected to the second connecting seat above; the first connecting seat below is rotatably connected to a corner of the top of the triangular toggle bracket, the second connecting seat above is rotatably connected to the bottom of the triangular connecting bracket, and the first connecting seat above and the second connecting seat below are rotatably connected to the top of the connecting rod through an assembly joint.

[0017] In particular, the toughening mechanism includes a socket installed at the end position of the lower end of the opening of the pipe transfer bracket, a control platform is installed on the top of the socket, a connecting sleeve is installed through the socket, connecting sleeves are rotatably provided at both ends of the extended connecting struts, a half-J bracket is fitted on the back of the connecting sleeve, a ground bearing seat is installed at the bottom end of the half-J bracket, the ground bearing seat is located on the outside of one side of the slope protection and supports the slope protection on that side, a pressure base is installed on the top of the half-J bracket, a pressure cylinder is installed on the top of the pressure base, an assembly gasket is installed on the top of the piston rod of the pressure cylinder, and grooves corresponding to the extended connecting struts and the pressure base are provided on the slope protection.

[0018] In particular, the hook binding mechanism includes a lifting rod installed at the bottom end of the lifting cylinder piston rod, a regulating bracket is hung at the bottom of the lifting rod, a winch bracket is installed at the bottom of the regulating bracket, a winch is installed in the winch bracket, and a hook is installed at the end of the wire rope on the winch.

[0019] Particularly, a plurality of trapezoidal side plates are evenly distributed on the top circumference of the pad, an annular sleeve is sleeved on the inner bottom of the trapezoidal side plates, the vertical pole is located in the annular sleeve, and the inner wall of the trapezoidal side plate is fixedly connected to the outer wall of the vertical pole.

[0020] The beneficial effects of the present invention are:

[0021] 1. By setting up a U-shaped pipe buried channel and a pipeline laying foundation, effective support is provided after the pipeline is placed in it to prevent the natural gas pipeline from collapsing due to its own weight and to ensure that the slope of the pipeline is consistent; the slope protection and retaining wall used can protect the side of the tunnel where the natural gas transmission pipeline is pre-buried, and prepare for subsequent landfill. Combined with the limit hook to hook and suspend the conveying plate, the buried angle and pipe opening direction of the pipe fittings can be shifted, so that the natural gas pipeline that needs to be buried can be steadily moved down and accurately placed in the U-shaped pipe buried channel, ensuring that the construction can make adjustments to the terrain for the subsequent buried pipes and supporting pipes of the pipeline;

[0022] 2. The first fixed bearing and the second fixed bearing are used to adjust the flipping angle of the two regulating joint rollers, adapt to the angle suitable for the steady decline of the natural gas transmission pipeline, and finally limit the elevation angle slope of the conveying plate, so that the subsequent lowering process of the natural gas pipeline is smoother, and the coordination of the pipe burying and transportation links is more convenient. When the pipe is stabilized in long-distance construction, the continuity of the construction links is ensured; the output end of the pneumatic pressure cylinder is extended, and the deflection of the connecting rod and the linkage support rod is adapted to adjust the support height of the conveying plate when the pneumatic pressure cylinder is extended. When the starting pressure cylinder is shortened, the slope of the conveying plate is smoother. Combined with the actual excavated buried pipe channel pit depth, it is automatically adapted and adjusted to make the distance between the conveying plates more matched with the U-shaped buried pipe channel for burying pipes. There is enough support stress when lowering the pipe, and the pressure generated by the winch and the hook pulling the natural gas pipeline is also dispersed;

[0023] 3. When transferring the natural gas pipeline during the pipe laying stage, the first conveying roller and the second conveying roller rotate by themselves. At this time, the outer wall of the natural gas pipe contacts the first conveying roller and the second conveying roller rotates by themselves to realize rolling conveying. In addition, the slope falling guide ensures that the natural gas pipe rolls down from the high slope side to the low slope side, which just guides the natural gas pipeline into the U-shaped pipe burial channel, reducing the pressure during manual pipe laying and stabilization. During this period, the direct buffering and shock absorbing effect of the first elastic buffer and the second elastic buffer makes the transfer of the natural gas pipeline into the tunnel more stable and the pipe laying stability better;

[0024] 4. By setting up a pipe transfer mechanism, the transmission ball on the pipe transfer bracket contacts the outer wall of the natural gas transmission pipeline. The transmission ball rolls and then transmits the natural gas pipe to slide linearly until it moves to the appropriate position, reducing the pressure on pipe transportation. The in-situ sliding of the ball prompts the adjacent pipe ends to adjust the distance in the narrow tunnel, facilitating the connection operation of adjacent pipe openings, ensuring that when the natural gas pipeline is placed inside the tunnel, it can still be fine-tuned and transported and moved along the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a structural schematic diagram of the present invention;

[0026] Figure 2 The schematic diagram of the pipeline structure to be laid is as follows;

[0027] Figure 3 It is a schematic diagram of the tunnel structure of the present invention;

[0028] Figure 4 It is a schematic diagram of an angle structure of the landslide placement mechanism and toughening mechanism of the present invention;

[0029] Figure 5 It is another structural schematic diagram of the landslide placement mechanism and toughening mechanism of the present invention from another angle;

[0030] Figure 6 It is a schematic diagram of the structure of the pipe transfer mechanism of the present invention;

[0031] Figure 7 It is a schematic diagram of the structure of the pipeline pulling mechanism of the present invention;

[0032] Figure 8 for Figure 7 The enlarged schematic diagram at A in the middle;

[0033] Fig. 9 for Figure 7 The enlarged schematic diagram of point B in the middle;

[0034] Fig.10 It is a schematic diagram of the connection between the deflection support mechanism and the electric pushing mechanism of the present invention;

[0035] Fig.11 It is a schematic diagram of the structure of the deflection support mechanism of the present invention;

[0036] In the figure:

[0037] 1- tunnel; 11- U-shaped pipe buried channel; 12- pipe laying foundation; 13- slope protection; 14- retaining wall;

[0038] 2-slide placement mechanism; 21-limiting hook; 22-first regulating joint roller; 23-first conveying roller; 24-first fixed bearing; 25-conveying plate; 251-hanging ear rod; 252-hanging rope pulling buckle; 26-second movable regulating joint roller; 27-second conveying roller; 28-roller embedded slot; 29-second fixed bearing;

[0039] 3-pipe pulling mechanism; 31-access base; 32-casing; 33-pad; 331-trapezoidal side plate; 332-annular sleeve; 34-vertical rod; 35-concave toggle crossbar; 36-first movable rod; 37-movable joint; 371-joint drive motor; 38-second movable rod; 39-lifting and lowering cylinder;

[0040] 4-pipe transfer mechanism; 41-pipe transfer bracket; 42-extending connecting support rod; 43-ball assembly groove; 44-transmission ball;

[0041] 5-deflection support mechanism; 51-external frame; 52-fitting base; 53-triangular toggle bracket; 54-linkage support rod; 55-connecting rod; 56-first elastic buffer; 561-first connecting seat; 562-first buffer spring; 563-first buffer telescopic rod; 57-second elastic buffer; 571-second connecting seat; 572-second buffer spring; 573-second buffer telescopic rod;

[0042] 6-electric push mechanism; 61-cylinder base; 62-angle rotating roller; 63-regulating sleeve; 64-pneumatic cylinder; 65-telescopic connecting rod; 66-triangular connecting bracket;

[0043] 7-hook binding mechanism; 71-lifting rod; 72-regulating bracket; 73-winch bracket; 74-winch; 75-hook;

[0044] 8-toughening mechanism; 81-sleeve seat; 82-control console; 83-connecting sleeve; 84-semi-J-shaped bracket; 85-ground bearing seat; 86-pressure base; 87-pressure cylinder; 88-assembly gasket;

[0045] 9- pipe; 91- pipe patch; 92- fastening screw; 93- pipe slot; 94- toughening connecting strip;

[0046] The following is a detailed description of the embodiments of the present invention with reference to the accompanying drawings. DETAILED DESCRIPTION

[0047] The present invention will be further described below in conjunction with embodiments:

[0048] like Figure 1-Figure 11 As shown, a pipe stabilizing device for long-distance natural gas pipeline construction includes a tunnel 1, which is a buried pipe channel dug on the soil surface. The natural gas pipeline is pre-buried in the tunnel 1, and also includes a landslide placement mechanism 2 for slowly lowering the pipeline 9 into the tunnel 1, and a pipe moving mechanism 4 for rolling the pipeline 9 back and forth in the tunnel 1.

[0049] A pipe patch 91 is installed at both ends of the pipe 9, and a number of fastening screws 92 are evenly installed on the circumference of the surface of the pipe patch 91. A pipe groove 93 and a pipe convex ring are respectively provided at both ends of the pipe 9. When two adjacent pipes 9 are butt-jointed, the pipe convex ring is inserted into the pipe groove 93, and the two adjacent pipe patches 91 are butt-jointed and locked by rotating the nut on the fastening screw 92. A number of toughening connecting strips 94 are evenly distributed on the circumference of the outer wall of the pipe 9, and the two ends of the toughening connecting strip 94 are fixedly connected to the opposite surfaces of the two pipe patches 91.

[0050] The tunnel 1 includes a U-shaped pipe-buried channel 11, a pipe-laying foundation 12 is provided at the bottom of the U-shaped pipe-buried channel 11, and slope protection 13 located on both sides of the U-shaped pipe-buried channel 11 is stacked on the top of the pipeline-laying foundation 12. A retaining wall 14 is arranged on the top of the slope protection 13, and a pipe 9 is pre-buried in the U-shaped pipe-buried channel 11.

[0051] By setting up the U-shaped pipe burying channel 11 and the pipeline laying foundation 12, effective support is provided after the pipe 9 is placed therein, so as to prevent the pipe 9 from causing downward pressure and collapse on the soil of the tunnel 1 due to its own weight, and at the same time ensure that the slope of the pipe 9 is consistent; the slope protection 13 and retaining wall 14 used can protect the side of the tunnel where the pipe 9 is pre-buried, and prepare for subsequent landfill. In combination with the limit hook 21 to hook and suspend the conveying plate 25, the buried angle and the direction of the pipe opening can be shifted, so that the pipe 9 that needs to be buried can be steadily moved downward and accurately placed in the U-shaped pipe burying channel 11, ensuring that the construction aspect makes adjustments to the terrain for the subsequent buried pipes and matching pipes of the pipe 9.

[0052] The landslide placement mechanism 2 includes a limit hook 21 placed at the edge slope position of the retaining wall 14, a first regulating joint roller 22 is fitted on the back of the limit hook 21, a plurality of first conveying rollers 23 are sleeved side by side on the surface of the first regulating joint roller 22, first fixed bearings 24 are correspondingly installed at both ends of the first regulating joint roller 22, and a conveying plate 25 for guiding the lowering of the pipeline 9 is fitted on the outer wall edges of the two first fixed bearings 24, a second movable regulating joint roller 26 is provided in the middle of the conveying plate 25, and a plurality of second conveying rollers 23 are sleeved side by side on the surface of the second movable regulating joint roller 26 7. The conveying plate 25 is provided with a plurality of roller embedded slots 28 corresponding to the first conveying roller 23 and the second conveying roller 27. The first conveying roller 23 and the second conveying roller 27 are placed in the roller embedded slots 28. The two ends of the second movable regulating joint roller 26 are embedded with second fixed bearings 29. The outer wall surfaces of the two second fixed bearings 29 are respectively hinged to the side walls of the conveying plate 25. The side corners of the side wall of the conveying plate 25 away from the tunnel 1 are installed with ear rods 251. The top of the rod body of the ear rod 251 is connected with a hanging rope pulling buckle 252. The bottom side of the conveying plate 25 is provided with a deflection support mechanism 5.

[0053] By setting the first regulating joint roller 22 and the first conveying roller 23, the inclination angle of the conveying plate 25 can be appropriately fine-tuned according to the external terrain, so that the auxiliary personnel can have a large enough slope to roll and transmit the natural gas pipeline 9 when lowering the pipe. The second movable regulating joint roller 26 is used to implement angle deflection, making the lowering process more convenient; by using the ear rod 251 and the hanging rope pulling buckle 252, the conveying plate 25 can be pulled upward to change the curvature and height of the conveying plate 25.

[0054] The deflection support mechanism 5 includes an external frame 51 installed on the side of the U-shaped pipe buried channel 11, and a fitting base 52 is fitted on the top side of the external frame 51, and a triangular toggle bracket 53 is installed on the top of the fitting base 52. A bottom corner of the triangular toggle bracket 53 is rotatably connected to a linkage strut 54 through an assembly joint, and an end of the linkage strut 54 away from the triangular toggle bracket 53 is rotatably connected to a connecting rod 55 through an assembly joint. A first elastic buffer 56 and a second elastic buffer 57 hinged to each other are installed on the top of the connecting rod 55, and an electric pushing mechanism 6 for driving the conveying plate 25 to deflect is installed on the top of the external frame 51.

[0055] The electric pushing mechanism 6 includes a cylinder base 61 installed on the side of the fitting base 52, an angle rotating roller 62 is installed on the top of the cylinder base 61, regulating sleeves 63 are installed at both ends of the angle rotating roller 62, a pneumatic cylinder 64 is installed on the top of the regulating sleeve 63, a telescopic connecting rod 65 is installed on the end of the pneumatic cylinder 64, a triangular connecting bracket 66 is movably installed on the top of the rod body of the telescopic connecting rod 65, the top of the triangular connecting bracket 66 is installed on both sides of the bottom of the conveying plate 25, and the bottom of the triangular connecting bracket 66 is movably installed on the top of the second elastic buffer 57. The first elastic buffer 56 includes a pair of first connecting seats 561, a first buffer spring 562, and a first buffer telescopic rod 563. The first buffer spring 562 is connected between the opposite surfaces of the pair of first connecting seats 561. The first buffer telescopic rod 563 is sleeved in the first buffer spring 562, and the bottom end of the fixed section of the first buffer telescopic rod 563 is fixedly connected to the first connecting seat 561 below, and the top end of the telescopic section is fixedly connected to the first connecting seat 561 above. The second elastic buffer 57 includes a pair of second connecting seats 571, a second buffer spring 572, a second buffer telescopic rod 573, and a second buffer spring 572. The spring 572 is connected between the opposite surfaces of a pair of second connecting seats 571, the second buffer telescopic rod 573 is sleeved in the second buffer spring 572, and the bottom end of the fixed section of the second buffer telescopic rod 573 is fixedly connected to the second connecting seat 571 below, and the top end of the telescopic section is fixedly connected to the second connecting seat 571 above; the first connecting seat 561 below is rotatably connected to a corner of the top of the triangular toggle bracket 53, the second connecting seat 571 above is rotatably connected to the bottom of the triangular connecting bracket 66, and the first connecting seat 561 above and the second connecting seat 571 below are rotatably connected to the top of the connecting rod 55 through an assembly joint.

[0056] The second elastic buffer 57 and the first elastic buffer 56 are used to provide better support and shock absorption effects when the pipeline 9 is lowered. When the pressure of the pipeline 9 directly acts on the position of the conveying plate 25, the pressure is directly offset by the spring; the telescopic connecting rod 65 and the triangular connecting bracket 66 are used to deflect the angle of the conveying plate 25 under the action of the pneumatic cylinder 64.

[0057] The U-shaped buried pipe channel 11 is internally sleeved with a pipe transfer mechanism 4, which includes a plurality of annular pipe transfer brackets 41 installed on the surface of the U-shaped buried pipe channel 11, one side of the pipe transfer bracket 41 is provided with an opening, the middle part of the pipe transfer bracket 41 is hinged with an extended connecting strut 42, and the opening and closing angle is controlled by the extended connecting strut 42, a plurality of ball assembly grooves 43 are evenly distributed on the circumference of the inner side wall of the pipe transfer bracket 41, and the groove positions of the ball assembly grooves 43 are embedded with transmission balls 44 for conveying, and a toughening mechanism 8 is provided at the lower end of the opening of the pipe transfer bracket 41.

[0058] The toughening mechanism 8 includes a socket 81 installed at the lower end of the opening of the pipe transfer bracket 41, a control platform 82 is installed on the top of the socket 81, a connecting sleeve 83 is installed through the socket 81, and connecting sleeves are rotatably provided at both ends of the extended connecting strut 42, and a half-J bracket 84 is installed on the back of the connecting sleeve, and a ground bearing seat 85 is installed at the bottom end of the half-J bracket 84, and the ground bearing seat 85 is located on the outside of one side of the slope protection 13 and supports the slope protection 13 on that side, a pressure base 86 is installed on the top of the half-J bracket 84, and a pressure cylinder 87 is installed on the top of the pressure base 86, and an assembly gasket 88 is installed on the top of the piston rod of the pressure cylinder 87, and the slope protection 13 is provided with grooves corresponding to the extended connecting strut 42 and the pressure base 86.

[0059] The position of the pipeline 9 in the tunnel 1 is adjusted by the pipe transfer bracket 41, and the movement is transmitted by the rolling surface of the transmission ball 44. When the pipeline 9 is placed in the tunnel 1 but the movement of the pipeline 9 in the tunnel 1 still needs to be regulated, the transmission ball 44 can smoothly slide the pipeline 9 in a straight line to change the position of the natural gas pipeline 9 in the tunnel 1; the connection between the assembly gasket 88 and the slope protection 13 can avoid direct pressure on the pipe transfer bracket 41 when it is compressed by external forces, thereby preventing the position of the pipeline 9 from shifting.

[0060] A pipe pulling mechanism 3 is placed on one side of the slope protection 13. The pipe pulling mechanism 3 includes an access base 31 installed on the side of the slope protection 13. A sleeve 32 is installed on the top of the access base 31. A pad 33 is installed on the top of the sleeve 32. A vertical pole 34 is installed on the top of the pad 33. A plurality of trapezoidal side plates 331 are evenly distributed on the circumference of the top of the pad 33. An annular sleeve 332 is sleeved on the bottom of the inner side of the trapezoidal side plate 331. The vertical pole 34 is located in the annular sleeve 332. The inner wall of the trapezoidal side plate 331 is fixedly connected to the outer wall of the vertical pole 36. The vertical pole A concave toggle cross bar 35 is installed on the top of 34, a first movable rod 36 is installed laterally on one side of the concave toggle cross bar 35, a movable joint 37 is installed on the end of the first movable rod 36 away from the concave toggle cross bar 35, a joint driving motor 371 is installed on the top of the movable joint 37, a second movable rod 38 is installed laterally on the other side of the movable joint 37, a lifting and lowering cylinder 39 is installed on the end of the second movable rod 38 away from the movable joint 37, and a hook binding mechanism 7 for hanging the pipe transfer bracket 41 is installed at the telescopic end at the bottom of the lifting and lowering cylinder 39.

[0061] The hook binding mechanism 7 includes a lifting rod 71 installed at the bottom end of the piston rod of the lifting cylinder 39, a regulating bracket 72 is hung at the bottom of the lifting rod 71, a winch bracket 73 is installed at the bottom of the regulating bracket 72, a winch 74 is installed in the winch bracket 73, and a hook 75 is installed at the end of the wire rope on the winch 74.

[0062] The winch 74 is used to lift the pipe 9 for traction, the lifting cylinder 39 is used to adjust the lifting height of the pipe 9, and the joint drive motor 371 is used to adjust the direction of the pipe 9. The mechanized traction and lifting is more stable and convenient for connecting adjacent pipes.

[0063] When the present invention works, it comprises the following steps:

[0064] Step 1: Excavation of the placement area of ​​the pipeline 9;

[0065] First, a U-shaped pre-buried channel 11 is excavated to prepare for the placement of the pipeline 9 in the later stage, and the pipeline laying foundation 12 is compacted to prevent the tunnel 1 from collapsing when the pipeline 9 is placed, and the side slope protection 13 and retaining wall 14 are combined for protection;

[0066] Step 2: Pull down the pipeline 9;

[0067] The pipeline pulling mechanism 3 is operated to lower the pipeline 9, the output end of the joint driving motor 371 is turned on to adjust the direction of the single lifting mechanical arm (the second movable rod 38), and the wire rope is lowered by the hoist 74 to wind the pipeline 9 for lifting or the sling wrapped around the pipeline 9 is hooked by the hook 75. At this time, the pipeline 9 is suspended to prepare for the link of pulling and lifting or the subsequent lowering of the pipeline to the U-shaped pre-buried channel 11. In addition, the suspended pipeline 9 is also convenient for fine-tuning the lowering direction of the pipeline 9 at the pipe mouth later;

[0068] Step 3: fine-tune the angle at which the pipe 19 is placed in the tunnel 1;

[0069] First, the lifting and lowering cylinder 39 is started, and the cylinder body is pulled to adjust the overall height of the hook binding mechanism 7. The angle change of the movable joint 37 is regulated based on the driving state of the pipe segment driving motor 371 to ensure that the height of the suspended pipe can smoothly transfer the pipe into the tunnel 1.

[0070] Step 4: Steady the tube and lower it slowly;

[0071] The first thing to adjust is the slope of the conveying plate 25, find the designated limit hook 21, make the swing angle of the limit hook 21 close to the retaining wall 14, and then make the end of the limit hook 21 wedge into the internal soil of the retaining wall 14 to keep it fixed, and adjust the buffer degree of the slope of the overall landslide placement mechanism 2 as needed;

[0072] Then, the pneumatic cylinder 64 is turned on, and the output end of the pneumatic cylinder 64 is extended to control the forward and backward extension of the telescopic connecting rod 65, and finally the angle between the hinged flip of the linkage support rod 54 and the connecting rod 55 is continuously stretched. By extending the telescopic connecting rod 65, the angle of the triangular connecting bracket 66 is changed, thereby driving the angle of the conveying plate 25 to change.

[0073] The length of the telescopic connecting rod 65 is changed, so that the triangular connecting bracket 66 can realize the angle flipping of the angle of the inclined conveying plate 25, and the angle flipping is realized by the rotation state of the first movable joint roller 22, and the hinge spacing between the conveying plates 25 is changed in combination with the rotation of the second movable joint roller 26. At this moment, the pipeline 9 realizes stable sliding along the surface of the first conveying roller 23 until it is guided to slowly slide into the excavated U-shaped pipe buried channel 11;

[0074] Step 5: The position of the pipeline 9 in the tunnel 1 is transferred;

[0075] At this time, do not loosen the structure tied to the pipe 9, and slowly lower the pipe 9 by the traction of the winch 74. When there is a gap between the pipe 9 and the U-shaped pipe buried channel 11, stop. At this time, place the pipe transfer mechanism 4 into the U-shaped pipe buried channel 11, and turn the pipe transfer brackets 41 on both sides to engage based on the extended connecting rod 42 until the inner diameter of the pipe transfer bracket 41 is large enough to put down the pipe 9.

[0076] Step 6: Displace the pipe 9 transferred to the tunnel 1;

[0077] At this moment, the construction workers only need to roll the pipe 9 back and forth through the embedded rolling state of the ball assembly groove 43 and the transmission ball 44, move it back and forth along the surface of the U-shaped buried pipe channel 11, stop after moving to a specific position, and dock with the previously installed pipe 9.

[0078] The present invention can accurately place the pipeline 9 into the tunnel 1, and the position of the pipeline 9 in the tunnel 1 is easy to adjust, the pipe connection quality is good, and the efficiency is high.

[0079] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0080] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0081] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0082] The above is an exemplary description of the present invention. Obviously, the specific implementation of the present invention is not limited to the above-mentioned method. As long as various improvements are made using the method concept and technical solution of the present invention, or they are directly applied to other occasions without improvement, they are all within the protection scope of the present invention.

Claims

1. A pipe stabilizing device for long-distance natural gas pipeline construction, comprising a tunnel (1), the tunnel (1) being a pipe-burying passage dug on the soil surface, the natural gas pipeline being pre-buried in the tunnel (1), characterized in that: It also includes a landslide placement mechanism (2) for slowly lowering the pipe (9) into the tunnel (1), and a pipe moving mechanism (4) for rolling the pipe (9) forward and backward in the tunnel (1); The tunnel (1) comprises a U-shaped pipe-buried channel (11), a pipe-laying foundation (12) is provided at the bottom of the U-shaped pipe-buried channel (11), a slope protection (13) is stacked on the top of the pipe-laying foundation (12) and is located on both sides of the U-shaped pipe-buried channel (11), a retaining wall (14) is arranged on the top of the slope protection (13), and a pipe (9) is pre-buried in the U-shaped pipe-buried channel (11); The landslide placement mechanism (2) comprises a limit hook (21) placed at the edge slope position of the retaining wall (14); a first regulating joint roller (22) is fitted on the back of the limit hook (21); a plurality of first conveying rollers (23) are sleeved side by side on the surface of the first regulating joint roller (22); first fixed bearings (24) are correspondingly installed at both ends of the first regulating joint roller (22); a conveying plate (25) used as a guide pipe (9) is fitted on the outer wall edges of the two first fixed bearings (24); a second movable regulating joint roller (26) is provided in the middle of the conveying plate (25); a plurality of second conveying rollers (27) are sleeved side by side on the surface of the second movable regulating joint roller (26); The conveying plate (25) is provided with a plurality of roller embedded slots (28) corresponding to the first conveying roller (23) and the second conveying roller (27); the first conveying roller (23) and the second conveying roller (27) are placed in the roller embedded slots (28); both ends of the second movable regulating joint roller (26) are embedded with second fixed bearings (29); the outer wall surfaces of the two second fixed bearings (29) are respectively movably hinged to the side walls of the conveying plate (25); the side corners of the conveying plate (25) away from the tunnel (1) are both installed with hanging ear rods (251); the top end of the rod body of the hanging ear rod (251) is connected with a hanging rope pulling buckle (252); the bottom side of the conveying plate (25) is provided with a deflection support mechanism (5); The U-shaped buried pipe channel (11) is sleeved with a pipe transfer mechanism (4), which comprises a plurality of annular pipe transfer brackets (41) mounted on the surface of the U-shaped buried pipe channel (11), one side of the pipe transfer bracket (41) is provided with an opening, an extended connecting support rod (42) is hingedly connected to the middle of the pipe transfer bracket (41), and the opening and closing angle is controlled by the extended connecting support rod (42), a plurality of ball assembly grooves (43) are evenly distributed on the inner side wall of the pipe transfer bracket (41), and a transmission ball (44) for conveying is embedded in the groove position of the ball assembly groove (43), and a toughening mechanism (8) is provided at the lower end of the opening of the pipe transfer bracket (41); A pipeline pulling mechanism (3) is placed on one side of the slope protection (13), and the pipeline pulling mechanism (3) includes an access base (31) installed on the side of the slope protection (13), a sleeve (32) is installed on the top of the access base (31), a pad (33) is installed on the top of the sleeve (32), a vertical rod (34) is installed on the top of the pad (33), a concave toggle cross rod (35) is installed on the top of the vertical rod (34), and a first movable rod (36) is installed laterally on one side of the concave toggle cross rod (35). ), a movable joint (37) is installed at one end of the first movable rod (36) away from the concave toggle cross rod (35), a joint driving motor (371) is installed on the top of the movable joint (37), a second movable rod (38) is installed laterally on the other side of the movable joint (37), a lifting and lowering cylinder (39) is installed at one end of the second movable rod (38) away from the movable joint (37), and a hook binding mechanism (7) for hanging a pipe transfer bracket (41) is installed at the bottom telescopic end of the lifting and lowering cylinder (39).

2. A pipe stabilizing device for long-distance natural gas pipeline construction according to claim 1, characterized in that: Both ends of the pipe (9) are provided with pipe patches (91), and a plurality of fastening screws (92) are evenly distributed on the circumference of the surface of the pipe patch (91). Both ends of the pipe (9) are provided with pipe slots (93) and pipe convex rings, respectively. When two adjacent pipes (9) are butt-jointed, the pipe convex rings are inserted into the pipe slots (93), and two adjacent pipe patches (91) are butt-jointed and locked by rotating nuts on the fastening screws (92). A plurality of toughening connecting strips (94) are evenly distributed on the circumference of the outer wall of the pipe (9), and the two ends of the toughening connecting strips (94) are fixedly connected to the opposite surfaces of the two pipe patches (91).

3. A pipe stabilizing device for long-distance natural gas pipeline construction according to claim 1, characterized in that: The deflection support mechanism (5) comprises an external frame (51) installed on the side of the U-shaped buried pipe channel (11); a fitting base (52) is fitted on the top side of the external frame (51); a triangular toggle bracket (53) is installed on the top of the fitting base (52); a bottom corner of the triangular toggle bracket (53) is rotatably connected to a linkage support rod (54) through an assembly joint; an end of the linkage support rod (54) away from the triangular toggle bracket (53) is rotatably connected to a connecting rod (55) through an assembly joint; a first elastic buffer (56) and a second elastic buffer (57) hinged to each other are installed on the top of the connecting rod (55); and an electric pushing mechanism (6) for driving the conveying plate (25) to deflect is installed on the top of the external frame (51).

4. A pipe stabilizing device for long-distance natural gas pipeline construction according to claim 3, characterized in that: The electric pushing mechanism (6) comprises a cylinder base (61) mounted on the side of the fitting base (52), an angle rotating roller (62) is mounted on the top of the cylinder base (61), regulating sleeves (63) are mounted on both ends of the angle rotating roller (62), a pneumatic cylinder (64) is mounted on the top of the regulating sleeve (63), a telescopic connecting rod (65) is mounted on the end of the pneumatic cylinder (64), a triangular connecting bracket (66) is movably mounted on the top of the rod body of the telescopic connecting rod (65), the top of the triangular connecting bracket (66) is mounted on both sides of the bottom of the conveying plate (25), and the bottom of the triangular connecting bracket (66) is movably mounted on the top of the second elastic buffer (57).

5. A pipe stabilizing device for long-distance natural gas pipeline construction according to claim 4, characterized in that: The first elastic buffer (56) comprises a pair of first connecting seats (561), a first buffer spring (562), and a first buffer telescopic rod (563). The first buffer spring (562) is connected between opposite surfaces of the pair of first connecting seats (561). The first buffer telescopic rod (563) is sleeved in the first buffer spring (562). The bottom end of the fixed section of the first buffer telescopic rod (563) is fixedly connected to the first connecting seat (561) below, and the top end of the telescopic section is fixedly connected to the first connecting seat (561) above. The second elastic buffer (57) comprises a pair of second connecting seats (571), a second buffer spring (572), and a second buffer telescopic rod (573). The spring (572) is connected between the opposite surfaces of a pair of second connecting seats (571), the second buffer telescopic rod (573) is sleeved in the second buffer spring (572), and the bottom end of the fixed section of the second buffer telescopic rod (573) is fixedly connected to the second connecting seat (571) below, and the top end of the telescopic section is fixedly connected to the second connecting seat (571) above; the first connecting seat (561) below is rotatably connected to a corner of the top of the triangular toggle bracket (53), the second connecting seat (571) above is rotatably connected to the bottom of the triangular connecting bracket (66), and the first connecting seat (561) above and the second connecting seat (571) below are rotatably connected to the top of the connecting rod (55) through an assembly joint.

6. A pipe stabilizing device for long-distance natural gas pipeline construction according to claim 1, characterized in that: The toughening mechanism (8) comprises a sleeve seat (81) installed at the end position of the lower end of the opening of the pipe transfer bracket (41), a control platform (82) is installed at the top of the sleeve seat (81), a connecting sleeve (83) is installed through the sleeve seat (81), connecting sleeves are rotatably provided at both ends of the extended connecting support rod (42), a half-J-shaped bracket (84) is fitted on the back of the connecting sleeve, a ground bearing seat (85) is installed at the bottom end of the half-J-shaped bracket (84), the ground bearing seat (85) is located outside the slope protection (13) on one side and supports the slope protection (13) on the side, a pressure base (86) is installed at the top of the half-J-shaped bracket (84), a pressure cylinder (87) is installed at the top of the pressure base (86), an assembly gasket (88) is installed at the top of the piston rod of the pressure cylinder (87), and a groove corresponding to the extended connecting support rod (42) and the pressure base (86) is provided on the slope protection (13).

7. A pipe stabilizing device for long-distance natural gas pipeline construction according to claim 1, characterized in that: The hook binding mechanism (7) comprises a lifting rod (71) mounted at the bottom end of the piston rod of the lifting cylinder (39); a regulating bracket (72) is mounted at the bottom of the lifting rod (71); a hoist bracket (73) is mounted at the bottom of the regulating bracket (72); a hoist (74) is mounted in the hoist bracket (73); and a hook (75) is mounted at the end of a wire rope on the hoist (74).

8. The pipe stabilizing device for long-distance natural gas pipeline construction according to claim 1, characterized in that: A plurality of trapezoidal side plates (331) are evenly distributed on the circumference of the top end of the pad (33), an annular sleeve (332) is sleeved on the inner bottom of the trapezoidal side plates (331), the vertical rod (34) is located in the annular sleeve (332), and the inner wall of the trapezoidal side plate (331) is fixedly connected to the outer wall of the vertical rod (36).

Citation Information

Patent Citations

  • Natural gas long-distance pipeline construction pipe stabilizing device

    CN217502798U