Fuel gas filling odorizing device and odorizing method based on non-exhaust liquid supplementing
By using normal pressure and high pressure storage tanks, mixing tanks and booster tanks in the gas filling and odorizing device, combined with pressure sensors and liquid discharge mechanisms, the problems of liquid accumulation and accident risk of high pressure storage tanks are solved, and pressure stability and Safe odorizing process.
Patent Information
- Application Number
- CN202411450951.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-17
- Publication Date
- 2024-12-03
AI Technical Summary
In the gas filling and odorization device, due to the existence of the high-pressure container and the moisture contained in the gas, the liquid inside the high-pressure container is accumulated, the pressure increases, and it is easy to cause danger. In the prior art, the volume of the high-pressure storage tank is small, which requires Frequent infusions have problems with accident risks and polluted gas emissions.
Design a gas filling and odorizing device, including normal pressure and high pressure gas storage tanks, odorant storage tanks, mixing tanks and booster tanks, and control the pump to rehydrate liquid through pressure sensors, and maintain the gas pressure balanced communication pipe and liquid communication pipe. The air pressure is stable, and a liquid discharge mechanism and exhaust filter are installed to avoid liquid overflow and polluted gas emissions.
It effectively avoids complex operations and accident risks during high-pressure storage tank filling, reduces frequent infusion frequency, maintains the stability of the pressure inside the storage tank, avoids the emission of polluted gases, and improves safety and efficiency.
Smart Images

Figure CN119062901A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of gas filling, and in particular to a gas filling odorizing device and an odorizing method based on non-exhaust gas liquid replenishment. Background Art
[0002] Gas filling odorizing device is a device specially used to add odorant to gas so that people can detect gas leaks in time. This device usually includes a metering pump, a storage tank, a control system and an odorizing interface connected to the gas pipeline. The odorant is usually tetrahydrothiophene (THT), which can form a unique odor in the gas to help detect the leak point.
[0003] The odorization method based on non-gassing liquid replenishment is an efficient odorization technology. It automatically adjusts the injection amount of the odorant through the control system to maintain a stable concentration of the odorant in the gas. In this method, the odorization device automatically controls the metering pump according to the gas flow signal to ensure that the amount of odorant added is proportional to the gas flow. In addition, this method also involves the process of non-gassing liquid replenishment, that is, after the odorant is added, the system will refill the gas in the calibration cylinder into the main pipeline through the liquid replenishment solenoid valve, which can reduce gas loss and improve odorization efficiency.
[0004] Both the gas filling odorizing device and the odorizing method based on non-gassing liquid replenishment emphasize safety and efficiency. By accurately controlling the injection amount of the odorizer, environmental pollution and economic waste caused by excessive odorization can be avoided. At the same time, the design of non-gassing liquid replenishment helps to maintain the pressure balance of the system and ensure the continuity and stability of the odorizing process. The application of these technologies helps to improve the safety level of the gas supply system and prevent gas leakage accidents.
[0005] In actual gas filling and odorizing equipment, due to the existence of high-pressure containers and easily liquefied gases such as moisture contained in the gas, liquid accumulates at the bottom of the high-pressure container due to the high pressure in the high-pressure device. As the liquid accumulates, the internal storage space of the high-pressure container is reduced, the pressure increases, and danger may easily occur. Summary of the invention
[0006] In view of the deficiencies in the prior art, the present invention provides a gas filling odorizing device and an odorizing method based on non-gas exhaust and liquid replenishment.
[0007] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0008] A gas filling and odorizing device, comprising: a gas supply mechanism, an odorant supply mechanism, a mixing mechanism and a filling mechanism, wherein the gas supply mechanism comprises a normal-pressure gas storage tank and a high-pressure gas storage tank, and the odorant supply mechanism comprises a plurality of normal-pressure odorant storage tanks and a high-pressure odorant storage tank; the normal-pressure gas storage tank can supply gas to the high-pressure gas storage tank through a pump, and preliminarily pressurize the gas inside the high-pressure gas storage tank; a plurality of normal-pressure odorant storage tanks can supply odorant raw materials to the high-pressure odorant storage tank through pumps according to a proportion, and preliminarily mix and pressurize various odorant raw materials inside the high-pressure odorant storage tank; the mixing mechanism comprises a mixing tank and a pressurizing tank, the high-pressure gas storage tank and the The high-pressure odorant storage tank can provide preliminarily pressurized gas and various preliminarily mixed and pressurized odorant raw materials to the interior of the mixing tank from two opposite directions respectively; the mixing tank can supply the mixed gas and various odorant raw materials in the mixing tank to the boosting tank through a pump, and re-pressurize and store the mixed gas and various odorant raw materials in the boosting tank; the filling mechanism includes a filling support and a filling connector; the gas cylinder to be filled can be fixed in the filling support; the filling connector can be sealed with the gas cylinder to be filled; the boosting tank can fill the mixed gas and various odorant raw materials into the gas cylinder to be filled through the filling top cover by a pump.
[0009] Preferably, the bottom of the high-pressure gas storage tank, the high-pressure odorant storage tank and the boosting tank are all provided with a liquid discharge mechanism, and the liquid discharge mechanism is used to discharge the liquid at the bottom from the bottom of the corresponding high-pressure gas storage tank, the high-pressure odorant storage tank and the boosting tank respectively while ensuring the pressure inside the corresponding high-pressure gas storage tank, the high-pressure odorant storage tank and the boosting tank is stable.
[0010] Preferably, the liquid discharge mechanisms include a temporary storage tank, a liquid connecting pipe and an air pressure balance connecting pipe; the top of each of the temporary storage tanks can be connected to the top of the corresponding high-pressure gas storage tank, the high-pressure odorant storage tank and the boosting tank through each of the air pressure balance connecting pipes; each of the air pressure balance connecting pipes is used to maintain the corresponding air pressure inside each of the temporary storage tanks and the corresponding high-pressure gas storage tank, the high-pressure odorant storage tank and the boosting tank to be equal.
[0011] Preferably, the bottom of each of the temporary storage tanks can be connected to the bottom of the corresponding high-pressure gas storage tank, the high-pressure odorant storage tank and the boosting tank through each of the liquid connecting pipes; each of the liquid connecting pipes is used to guide the liquid inside the corresponding high-pressure gas storage tank, the high-pressure odorant storage tank and the boosting tank to the corresponding interior of each of the temporary storage tanks.
[0012] Preferably, the air pressure balance connecting pipe includes an external tube body and a movable piston, a piston groove is opened inside the external tube body, the movable piston is embedded in the piston groove, and the movable piston can move inside the piston groove according to the pressure difference at both ends of the movable piston; sealing rubber rings are respectively provided at both ends of the movable piston, and the sealing rubber rings can fill the gap between the movable piston and the inside of the piston groove and block the gas connection between the two ends of the movable piston.
[0013] Preferably, a drain port is provided in the middle of the temporary storage tank, and the liquid height inside the temporary storage tank is always higher than the drain port; each drain port is provided with a pressure valve, and each pressure valve is connected to a drain pipe at one end away from the corresponding drain port, and the maximum height of each drain pipe is not higher than the height of the corresponding drain port.
[0014] Preferably, the pressure valve includes a valve body, a movable valve core and a pressure spring, the movable valve core is arranged inside the valve body, and the two ends of the pressure spring are respectively fixed between the valve body and the movable valve core, and the movable valve core can move under the restriction of the pressure spring under the action of the pressure difference on both sides of the movable valve core to open and close the pressure valve; when each movable valve core opens the corresponding pressure valve, the magnitude of the elastic force of each movable valve core to overcome the corresponding pressure spring is greater than the corresponding air pressure at the top end of the high-pressure gas storage tank, the high-pressure odorant storage tank and the booster tank.
[0015] Preferably, the high-pressure gas storage tank and each normal-pressure odorant storage tank are respectively connected to the exhaust filter through an exhaust gas connecting pipe, and a flame arrester is provided at one end of the exhaust gas connecting pipe close to the exhaust filter; the tops of the high-pressure gas storage tank, the high-pressure odorant storage tank and the boosting tank are respectively provided with safety valves, the high-pressure gas storage tank is connected to the normal-pressure gas storage tank through the corresponding safety valve, the high-pressure odorant storage tank is connected to the exhaust filter through the corresponding safety valve and the exhaust connecting pipe, and the boosting tank is connected to the mixing tank through the corresponding safety valve.
[0016] Preferably, the filling connector comprises a sealing head and a filling valve, wherein the filling valve can control the on-off of the hose output from the booster tank to the sealing head, and the sealing head can be temporarily fixed to the air inlet of the gas cylinder to be filled, and seal the sealing head and the air inlet of the gas cylinder to be filled.
[0017] A method for odorizing based on non-gassing and liquid replenishment, the above-mentioned gas filling and odorizing device comprises the following steps: the gas first enters the high-pressure gas storage tank from the normal-pressure gas storage tank for preliminary pressurization, and various odorant raw materials can enter the high-pressure odorant storage tank from each normal-pressure odorant storage tank according to the proportion for preliminary mixing and pressurization; the preliminary pressurized gas and the preliminary mixed and pressurized various odorant raw materials enter the mixing tank for mixing, and are input into the boosting tank for re-pressurization and storage; the boosting tank can fill the mixed gas and various odorant raw materials into the gas cylinder to be filled through the filling top cover by a pump; when the gas pressure inside the high-pressure gas storage tank, the high-pressure odorant storage tank and the boosting tank is insufficient, gas can be replenished through the normal-pressure gas storage tank, each normal-pressure odorant storage tank and the mixing tank.
[0018] Compared with the prior art, the present invention provides a gas filling odorizing device and an odorizing method based on non-exhaust gas replenishment, which has the following beneficial effects:
[0019] 1. The gas filling and odorizing device detects the corresponding gas pressure by arranging pressure sensors inside the high-pressure gas storage tank, the high-pressure odorant storage tank and the booster tank, and can control the pumps at various positions through the detection data of the pressure sensors, thereby avoiding the conventional filling and odorizing device. Because the high-pressure gas storage tank, the high-pressure odorant storage tank and the booster tank all have a high-pressure environment, and the volume of the high-pressure storage tank is small, timely replenishment can be carried out through the corresponding pumps, and complex operations and emission of polluted gases can be avoided. Through the arrangement of the atmospheric pressure gas storage tank and each atmospheric pressure odorant storage tank, the volume of the atmospheric pressure storage tank can be made very large, and the filling frequency to the atmospheric pressure gas storage tank and each atmospheric pressure odorant storage tank can be reduced, and the need for exhaust during the filling of the conventional pressure storage tank can be effectively avoided. The exhaust operation process is complicated and a large amount of flammable odor is discharged, thereby avoiding frequent filling to each tank, and effectively reducing the risk of accidents caused by the filling process of the pressure storage tank.
[0020] 2. This gas filling and odorizing device can fill the gap between the movable piston and the inside of the piston groove by deformation through the sealing rubber ring of the air pressure balance connecting pipe, and block the gas connection at both ends of the movable piston, so that the movable piston can move inside the piston groove with the pressure difference at both ends of the movable piston. Under the joint action of liquid connection and the movable piston, the air pressure inside each temporary storage tank and the corresponding high-pressure gas storage tank, high-pressure odorant storage tank and booster tank can be maintained equal, and the water at the bottom of the high-pressure gas storage tank, high-pressure odorant storage tank and booster tank can be guided into the corresponding temporary storage tanks through the corresponding liquid connecting pipes.
[0021] 3. In the gas filling and odorizing device, inside each pressure valve, when each movable valve core opens the corresponding pressure valve, the elastic force of each movable valve core overcoming the corresponding pressure spring is greater than the air pressure at the top of the corresponding high-pressure gas storage tank, high-pressure odorant storage tank and booster tank, so that only when the liquid level inside each temporary storage tank exceeds the discharge port, the partial pressure inside each temporary storage tank exceeding the discharge port and the air pressure inside the corresponding storage tank can drive the pressure spring to deform, thereby pushing the corresponding movable valve core to move to open the corresponding pressure valve, so that only the part of the liquid exceeding the discharge port is discharged from the corresponding pressure valve into the corresponding discharge pipe, and then the corresponding pressure valve is closed, so that excessive liquid overflow can be avoided, and it can further ensure that the liquid in each temporary storage tank exceeds the discharge port, and each temporary storage tank can be isolated from the outside by liquid, which can effectively ensure that the excessive liquid is discharged while preventing the external gas from entering the corresponding high-pressure gas storage tank, high-pressure odorant storage tank and booster tank from each temporary storage tank, and avoiding the mixing of other gases into the high-pressure gas storage tank, high-pressure odorant storage tank and booster tank.
[0022] 4. This type of gas filling and odorizing device, through the setting of the exhaust gas filter, can guide the gas that exceeds the maximum carrying capacity of the high-pressure gas storage tank, the high-pressure odorant storage tank and the booster tank for filtering and other treatments before discharge or recovery, and can connect the booster tank with the mixing tank through the corresponding safety valve, and can recycle the excess mixed gas and various odorant raw materials for reuse, and through the setting of the flame arrester, can effectively avoid the exhaust gas filter treatment process and the sparks that may be generated at the rear end from being transmitted through the exhaust gas connecting pipe, thereby effectively avoiding the occurrence of greater secondary disasters; and through the filling valve, can control the connection and disconnection of the hose output from the booster tank to the sealing head, the sealing head can be temporarily fixed between the air inlet of the gas cylinder to be filled, and the sealing head and the air inlet of the gas cylinder to be filled are sealed, effectively ensuring the filling effect of the gas cylinder to be filled. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a schematic diagram of the process of a gas filling and odorizing device of the present invention;
[0024] Figure 2 It is a schematic flow chart of a gas supply mechanism and a corresponding liquid discharge mechanism of a gas filling and odorizing device of the present invention;
[0025] Figure 3 It is a schematic flow chart of an odorant supply mechanism and a corresponding liquid discharge mechanism of a gas filling and odorizing device of the present invention;
[0026] Figure 4 It is a schematic flow chart of a mixing mechanism, a corresponding liquid discharge mechanism and a filling mechanism of a gas filling and odorizing device of the present invention;
[0027] Figure 5 This is one of the three-dimensional structural schematic diagrams of a mixing mechanism, a corresponding liquid discharge mechanism and a filling mechanism of a gas filling and odorizing device of the present invention;
[0028] Figure 6 This is the second schematic diagram of the three-dimensional structure of a mixing mechanism, a corresponding liquid discharge mechanism and a filling mechanism of a gas filling and odorizing device of the present invention;
[0029] Figure 7 For the present invention Figure 6 A magnified view of part A;
[0030] Figure 8 It is a three-dimensional structural schematic diagram of a liquid discharge mechanism of a gas filling and odorizing device of the present invention;
[0031] Fig. 9 It is a schematic diagram of the internal structure of a liquid discharge mechanism of a gas filling and odorizing device of the present invention;
[0032] Fig.10 For the present invention Fig. 9 Enlarged view of part B.
[0033] In the figure: 1. gas supply mechanism; 11. normal pressure gas storage tank; 12. high pressure gas storage tank; 2. odorant supply mechanism; 21. normal pressure odorant storage tank; 22. high pressure odorant storage tank; 3. mixing mechanism; 31. mixing tank; 32. booster tank; 4. filling mechanism; 41. filling support; 42. filling connector; 421. sealing head; 422. filling valve; 5. liquid discharge mechanism; 51. temporary storage tank; 511. drain port; 52. liquid connecting pipe; 53. air pressure balance connecting pipe; 531. external pipe body; 532. movable piston; 533. piston groove; 534. sealing rubber ring; 54. pressure valve; 541. valve body; 542. movable valve core; 543. pressure spring; 55. drain pipe; 6. exhaust filter; 61. exhaust connecting pipe; 62. flame arrester; 7. safety valve. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] As introduced in the background technology, there are deficiencies in the prior art. In order to solve the above technical problems, the present application proposes a gas filling odorizing device and an odorizing method based on non-exhaust gas replenishment.
[0036] Embodiment 1:
[0037] See also Figure 1-Figure 10 A gas filling and odorizing device comprises: a gas supply mechanism 1, an odorant supply mechanism 2, a mixing mechanism 3 and a filling mechanism 4, the gas supply mechanism 1 comprises a normal-pressure gas storage tank 11 and a high-pressure gas storage tank 12, the odorant supply mechanism 2 comprises a plurality of normal-pressure odorant storage tanks 21 and a high-pressure odorant storage tank 22; the normal-pressure gas storage tank 11 can supply gas to the high-pressure gas storage tank 12 through a pump, and preliminarily pressurize the gas inside the high-pressure gas storage tank 12; the plurality of normal-pressure odorant storage tanks 21 can supply odorant raw materials to the high-pressure odorant storage tank 22 through pumps according to a proportion, and preliminarily mix and pressurize various odorant raw materials inside the high-pressure odorant storage tank 22; the mixing mechanism 3 comprises a mixing tank 31 and a pressurizing tank 32, the high-pressure gas The storage tank 12 and the high-pressure odorant storage tank 22 can provide initially pressurized gas and initially mixed and pressurized various odorant raw materials to the interior of the mixing tank 31 from two opposite directions respectively; the mixing tank 31 can supply the gas and various odorant raw materials mixed in the mixing tank 31 to the boosting tank 32 through a pump, and re-pressurize and store the mixed gas and various odorant raw materials in the boosting tank 32; the filling mechanism 4 includes a filling support 41 and a filling connector 42; the gas cylinder to be filled can be fixed inside the filling support 41; the filling connector 42 can be sealed with the gas cylinder to be filled; the boosting tank 32 can fill the mixed gas and various odorant raw materials into the gas cylinder to be filled through the filling top cover 42 through a pump.
[0038] During specific use, the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the booster tank 32 (the high pressure of the above-mentioned storage tanks is relative to the normal pressure, and the specific high pressure range is the standard setting in the prior art) are all provided with pressure sensors for detecting the internal gas pressure; when the pressure detected by the pressure sensor inside the high-pressure gas storage tank 12 is lower than the set minimum pressure of the high-pressure gas, the normal-pressure gas storage tank 11 supplies gas to the high-pressure gas storage tank 12 through a pump, until the pressure detected by the pressure sensor inside the high-pressure gas storage tank 12 is higher than the set maximum pressure of the high-pressure gas, at which point the normal-pressure gas storage tank 11 stops supplying gas to the high-pressure gas storage tank 12 through the pump; when the high-pressure When the pressure detected by the pressure sensor inside the odorant storage tank 22 is lower than the set minimum pressure of the high-pressure mixed odorant, a plurality of normal-pressure odorant storage tanks 21 supply odorant raw materials to the high-pressure odorant storage tank 22 through pumps according to the proportions, until the pressure detected by the pressure sensor inside the high-pressure odorant storage tank 22 is higher than the set maximum pressure of the high-pressure mixed odorant, at which point the plurality of normal-pressure odorant storage tanks 21 stop supplying odorant raw materials to the high-pressure odorant storage tank 22 through the pumps; when the pressure detected by the pressure sensor inside the boosting tank 32 is lower than the set minimum pressure of the high-pressure mixed gas, the mixing tank 31 can supply the gas and various gases mixed inside the mixing tank 31 to the boosting tank 32 through the pumps. The mixing tank 31 stops supplying the mixed gas and various odorant raw materials in the mixing tank 31 to the boosting tank 32 through the pump until the pressure detected by the pressure sensor in the boosting tank 32 is higher than the set maximum pressure of the high-pressure mixed gas. (The above-mentioned minimum pressure and maximum pressure are adaptive values for the corresponding storage tank capacity and pressure resistance, and can be adaptively set by technicians in this field according to the actual storage tank). In actual use, the data obtained by the pressure sensor can be used to control the pumps at various positions, thereby avoiding the problem of high-pressure gas storage tank 12 and high-pressure odorant storage tank in conventional filling and odorizing devices. The interiors of the pressure tanks 22 and 32 have a high-pressure environment, and the volumes of the high-pressure storage tanks are relatively small, and can be replenished in time through corresponding pumps, which can avoid complicated operations and the emission of polluted gases. By setting up the atmospheric pressure gas storage tank 11 and each atmospheric pressure odorant storage tank 21, the volume of the atmospheric pressure storage tank can be made very large, and the frequency of filling the atmospheric pressure gas storage tank 11 and each atmospheric pressure odorant storage tank 21 can be reduced, which can effectively avoid the need for exhaust during the filling of conventional pressure storage tanks. The exhaust operation process is complicated and a large amount of flammable odor is discharged, thereby avoiding frequent filling of each tank, and effectively reducing the risk of accidents caused by the filling process of the pressure storage tank.
[0039] Embodiment 2:
[0040] See also Figure 1-Figure 10The difference from the above-mentioned embodiment is that a liquid discharge mechanism 5 is provided at the bottom of the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32, and the liquid discharge mechanism 5 is used to discharge the liquid at the bottom from the bottom of the corresponding high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32 respectively while ensuring the pressure inside the corresponding high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32 is stable.
[0041] The liquid discharge mechanism 5 includes a temporary storage tank 51, a liquid connecting pipe 52 and an air pressure balance connecting pipe 53; the top of each temporary storage tank 51 can be connected to the top of the corresponding high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32 through each air pressure balance connecting pipe 53; each air pressure balance connecting pipe 53 is used to maintain the corresponding air pressure inside each temporary storage tank 51 and the corresponding high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32 to be equal.
[0042] The bottom of each temporary storage tank 51 can be connected to the bottom of the corresponding high-pressure gas storage tank 12, high-pressure odorant storage tank 22 and boosting tank 32 through each liquid connecting pipe 52; each liquid connecting pipe 52 is used to guide the liquid inside the corresponding high-pressure gas storage tank 12, high-pressure odorant storage tank 22 and boosting tank 32 to the corresponding temporary storage tank 51.
[0043] The air pressure balance connecting pipe 53 includes an external tube body 531 and a movable piston 532. A piston groove 533 is opened inside the external tube body 531. The movable piston 532 is embedded in the piston groove 533, and the movable piston 532 can move inside the piston groove 533 according to the pressure difference at both ends of the movable piston 532; sealing rubber rings 534 are respectively provided at both ends of the movable piston 532, and the sealing rubber rings 534 can fill the gap between the movable piston 532 and the inside of the piston groove 533, and block the gas connection at both ends of the movable piston 532.
[0044] A drain port 511 is provided in the middle of the temporary storage tank 51, and the liquid height inside the temporary storage tank 51 is always higher than the drain port 511; each drain port 511 is provided with a pressure valve 54, and one end of each pressure valve 54 away from the corresponding drain port 511 is connected to a drain pipe 55, and the maximum height of each drain pipe 55 is not higher than the height of the corresponding drain port 511.
[0045] The pressure valve 54 includes a valve body 541, a movable valve core 542 and a pressure spring 543. The movable valve core 542 is arranged inside the valve body 541. The two ends of the pressure spring 543 are respectively fixed between the valve body 541 and the movable valve core 542. The movable valve core 542 can move under the restriction of the pressure spring 543 under the action of the pressure difference on both sides of the movable valve core 542 to open and close the pressure valve 54; when each movable valve core 542 opens the corresponding pressure valve 54, the magnitude of the elastic force of each movable valve core 542 to overcome the corresponding pressure spring 543 is greater than the air pressure at the top of the corresponding high-pressure gas storage tank 12, high-pressure odorant storage tank 22 and booster tank 32.
[0046] Therefore, during use, due to the high pressure inside the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32, the water contained in the gas and various odorants will condense under high pressure inside the corresponding high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32, and finally gather at the bottom of the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32 (before use, it is necessary to pre-place a certain height of water inside the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32 and each temporary storage tank 51, and the height of the water is greater than the height of the corresponding drain port 511), so that the water at the bottom of the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32 gradually accumulates during use, and occupies the internal space of the corresponding storage tank, causing the capacity to decrease;
[0047] By setting the liquid discharge mechanism 5, the top of each temporary storage tank 51 is connected with the top of the corresponding high-pressure gas storage tank 12, high-pressure odorant storage tank 22 and booster tank 32 through each air pressure balance connecting pipe 53; thereby, the sealing rubber ring 534 through the air pressure balance connecting pipe 53 can fill the gap between the movable piston 532 and the inside of the piston groove 533 by deformation, and block the gas communication at both ends of the movable piston 532, so that the movable piston 532 can move in the piston groove 533 with the pressure difference at both ends of the movable piston 532, and then pass through each temporary storage tank 51. The bottom of the tank 51 can be connected with the bottom of the corresponding high-pressure gas storage tank 12, high-pressure odorant storage tank 22 and booster tank 32 through each liquid connecting pipe 52, so that under the joint action of the liquid connection and the movable piston 532, the gas pressure inside each temporary storage tank 51 and the corresponding high-pressure gas storage tank 12, high-pressure odorant storage tank 22 and booster tank 32 can be maintained equal, and the water at the bottom of the high-pressure gas storage tank 12, high-pressure odorant storage tank 22 and booster tank 32 can be guided into the corresponding temporary storage tank 51 through the corresponding liquid connecting pipes 52;
[0048] Then, through the arrangement of the drain port 511 in the middle of each temporary storage tank 51 and the arrangement of the pressure valve 54 and the drain pipe 55, the liquid passing through the pressure valve 54 can be discharged from the drain pipe 55 to the side away from the pressure valve 54 under the action of gravity for treatment, etc., wherein, inside each pressure valve 54, when each movable valve core 542 opens the corresponding pressure valve 54, the elastic force of each movable valve core 542 overcoming the corresponding pressure spring 543 is greater than the air pressure at the top of the corresponding high-pressure gas storage tank 12, high-pressure odorant storage tank 22 and booster tank 32, so that only when the liquid level inside each temporary storage tank 51 exceeds the drain port 511, the partial pressure inside each temporary storage tank 51 exceeding the drain port 511 and the air pressure inside the corresponding storage tank can drive the pressure The spring 543 is deformed, thereby pushing the corresponding movable valve core 542 to move to open the corresponding pressure valve 54, so that only part of the liquid exceeding the drain port 511 is discharged from the corresponding pressure valve 54 into the corresponding drain pipe 55, and then the corresponding pressure valve 54 is closed, thereby avoiding excessive liquid overflow, and further ensuring that the liquid in each temporary storage tank 51 exceeds the drain port 511, while maintaining the isolation of each temporary storage tank 51 from the outside world through liquid, which can effectively ensure that the excess liquid is discharged while avoiding external gas from entering the corresponding high-pressure gas storage tank 12, high-pressure odorant storage tank 22 and boosting tank 32 from each temporary storage tank 51, and avoiding the mixing of other gases into the high-pressure gas storage tank 12, high-pressure odorant storage tank 22 and boosting tank 32.
[0049] Embodiment three:
[0050] See also Figure 1-Figure 10 , which is different from the above-mentioned embodiment, is that the high-pressure gas storage tank 12 and each normal-pressure odorant storage tank 21 are respectively connected to the exhaust filter 6 through an exhaust gas connecting pipe 61, and a flame arrester 62 is provided at one end of the exhaust gas connecting pipe 61 close to the exhaust filter 6; the tops of the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32 are respectively provided with safety valves 7, the high-pressure gas storage tank 12 is connected to the normal-pressure gas storage tank 11 through the corresponding safety valve 7, the high-pressure odorant storage tank 22 is connected to the exhaust filter 6 through the corresponding safety valve 7 and the exhaust connecting pipe 61, and the boosting tank 32 is connected to the mixing tank 31 through the corresponding safety valve 7.
[0051] The filling connector 42 includes a sealing head 421 and a filling valve 422. The filling valve 422 can control the on / off of the hose output from the booster tank 32 to the sealing head 421. The sealing head 421 can be temporarily fixed to the air inlet of the gas cylinder to be filled, and seal the sealing head 421 and the air inlet of the gas cylinder to be filled.
[0052] Thus, when in use, the high-pressure odorant storage tank 22 is connected to the corresponding exhaust filter 6 through the safety valve 7 and the exhaust connection pipe 61, and the exhaust filter 6 can be set to guide the gas exceeding the maximum carrying capacity of the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the booster tank 32 (the maximum carrying capacity is greater than the respective maximum gas pressures set above) to be discharged or recovered after filtering and other treatments, and the booster tank 32 can be connected to the mixing tank 31 through the corresponding safety valve 7, so that the excess mixed gas and various odorants can be discharged. The raw materials are recycled and reused, and the flame arrester 62 is set to effectively prevent the sparks generated during the exhaust filter 6 treatment process and the rear end from being transmitted through the exhaust connecting pipe 61, thereby effectively avoiding greater secondary disasters; and the filling valve 422 can control the on-off of the hose output from the booster tank 32 to the sealing head 421, and the sealing head 421 can be temporarily fixed to the air inlet of the gas cylinder to be filled, and the sealing head 421 and the air inlet of the gas cylinder to be filled are sealed, thereby effectively ensuring the filling effect of the gas cylinder to be filled.
[0053] Embodiment 4:
[0054] See also Figure 1-Figure 4 A method for odorization based on non-exhaust gas replenishment, using a gas filling odorization device as described in any one of Embodiments 1 to 3, comprises the following steps:
[0055] The gas first enters the high-pressure gas storage tank 12 from the normal-pressure gas storage tank 11 for preliminary pressurization, and various odorant raw materials can enter the high-pressure odorant storage tank 22 from each normal-pressure odorant storage tank 21 according to the proportion for preliminary mixing and pressurization;
[0056] The initially pressurized gas and the initially mixed and pressurized various odorant raw materials enter the mixing tank 31 for mixing, and are input into the boosting tank 32 for re-pressurization and storage;
[0057] The booster tank 32 can be pumped through the filling top cover 42 to the gas cylinder to be filled, and the mixed gas and various odorant raw materials can be filled inside. The booster tank 32 can also be pumped into the gas pipeline.
[0058] Sensors are arranged inside the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32. The sensors may be pressure sensors or other sensors capable of detecting the air pressure (gas volume) inside the corresponding storage tanks. Each sensor may output a control signal of a corresponding pump. When the air pressure inside the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32 is insufficient, air can be replenished through the normal-pressure gas storage tank 11, each normal-pressure odorant storage tank 21 and the mixing tank 31, and air replenishment is stopped when the air pressure inside the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32 reaches a set upper limit.
[0059] Among them, during specific use, upper and lower liquid level sensors can be respectively set inside the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32 to detect the liquid level height inside the corresponding tank body. When the liquid level height inside the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32 reaches the lower liquid level sensor, the lower liquid level sensor sends a signal to the controller, and the controller controls the corresponding pump to start the normal pressure gas storage tank 11, each normal pressure odorant storage tank 21 and the mixing tank 31 to replenish the high pressure gas storage tank 12, the high pressure odorant storage tank 22 and the boosting tank 32. When the liquid level height inside the high pressure gas storage tank 12, the high pressure odorant storage tank 22 and the boosting tank 32 reaches the upper liquid level sensor, the upper liquid level sensor sends a signal to the controller, and the controller stops the corresponding pump from working, and stops replenishing the high pressure gas storage tank 12, the high pressure odorant storage tank 22 and the boosting tank 32 with gas.
[0060] Therefore, it is possible to avoid the problem in conventional filling and odorizing devices by automatically replenishing and stopping gas replenishment, because the interiors of the high-pressure gas storage tank 12, the high-pressure odorant storage tank 22 and the boosting tank 32 all have a high-pressure environment, and the volume of the high-pressure storage tanks is relatively small, and timely replenishment can be carried out through the corresponding pumps, thereby avoiding complicated operations and the emission of polluted gases. By setting the normal-pressure gas storage tank 11 and each normal-pressure odorant storage tank 21, the volume of the normal-pressure storage tank can be made very large, and the filling frequency to the normal-pressure gas storage tank 11 and each normal-pressure odorant storage tank 21 can be reduced, and the need for exhaust during the filling of conventional pressure tanks can be effectively avoided. The exhaust operation process is complicated and a large amount of flammable odor is discharged, thereby avoiding frequent filling of each tank, effectively reducing the risk of accidents generated during the filling process of the pressure tanks, and also reducing air pollution.
[0061] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A gas filling and odorizing device, characterized in that: include: A gas supply mechanism (1), an odorant supply mechanism (2), a mixing mechanism (3) and a filling mechanism (4), wherein the gas supply mechanism (1) comprises a normal-pressure gas storage tank (11) and a high-pressure gas storage tank (12), and the odorant supply mechanism (2) comprises a plurality of normal-pressure odorant storage tanks (21) and a high-pressure odorant storage tank (22); The atmospheric pressure gas storage tank (11) can supply gas to the high pressure gas storage tank (12) through a pump, and preliminarily pressurize the gas inside the high pressure gas storage tank (12); a plurality of atmospheric pressure odorant storage tanks (21) can supply odorant raw materials to the high pressure odorant storage tank (22) through pumps according to a proportion, and preliminarily mix and pressurize various odorant raw materials inside the high pressure odorant storage tank (22); The mixing mechanism (3) comprises a mixing tank (31) and a boosting tank (32); the high-pressure gas storage tank (12) and the high-pressure odorant storage tank (22) can respectively provide preliminarily pressurized gas and various preliminarily mixed and pressurized odorant raw materials to the interior of the mixing tank (31) from two opposite directions; the mixing tank (31) can supply the gas and various odorant raw materials mixed in the mixing tank (31) to the boosting tank (32) through a pump, and re-pressurize and store the mixed gas and various odorant raw materials in the boosting tank (32); The filling mechanism (4) comprises a filling support (41) and a filling connector (42); the gas cylinder to be filled can be fixed inside the filling support (41); the filling connector (42) can be sealed with the gas cylinder to be filled; and the booster tank (32) can fill the mixed gas and various odorant raw materials into the gas cylinder to be filled through the filling top cover (42) by means of a pump.
2. A gas filling and odorizing device according to claim 1, characterized in that: The bottom of the high-pressure gas storage tank (12), the high-pressure odorant storage tank (22) and the boosting tank (32) are all provided with a liquid discharge mechanism (5), and the liquid discharge mechanism (5) is used to discharge the liquid at the bottom from the bottom of the corresponding high-pressure gas storage tank (12), the high-pressure odorant storage tank (22) and the boosting tank (32) while ensuring the pressure inside the corresponding high-pressure gas storage tank (12), the high-pressure odorant storage tank (22) and the boosting tank (32) is stable.
3. A gas filling and odorizing device according to claim 2, characterized in that: The liquid discharge mechanism (5) comprises a temporary storage tank (51), a liquid connecting pipe (52) and a gas pressure balance connecting pipe (53); The top of each temporary storage tank (51) can be connected to the top of the corresponding high-pressure gas storage tank (12), the high-pressure odorant storage tank (22) and the boost tank (32) through each gas pressure balance connecting pipe (53); Each of the air pressure balancing connecting pipes (53) is used to respectively maintain the air pressure inside the corresponding temporary storage tank (51) and the corresponding high-pressure gas storage tank (12), the high-pressure odorant storage tank (22) and the boost tank (32) to be equal.
4. A gas filling and odorizing device according to claim 3, characterized in that: The bottom of each temporary storage tank (51) can be connected to the bottom of the corresponding high-pressure gas storage tank (12), the high-pressure odorant storage tank (22) and the boosting tank (32) through each liquid connecting pipe (52); Each of the liquid connecting pipes (52) is used to guide the liquid in the corresponding high-pressure gas storage tank (12), the high-pressure odorant storage tank (22) and the boost tank (32) to the corresponding temporary storage tank (51).
5. A gas filling and odorizing device according to claim 3, characterized in that: The air pressure balance connecting pipe (53) comprises an external tube body (531) and a movable piston (532); a piston groove (533) is provided inside the external tube body (531); the movable piston (532) is embedded in the piston groove (533); and the movable piston (532) can move inside the piston groove (533) according to the pressure difference at both ends of the movable piston (532); Sealing rubber rings (534) are respectively provided at both ends of the movable piston (532). The sealing rubber rings (534) can fill the gap between the movable piston (532) and the inside of the piston groove (533) and block the gas communication between the two ends of the movable piston (532).
6. A gas filling and odorizing device according to claim 3, characterized in that: A liquid discharge port (511) is provided in the middle of each temporary storage tank (51), and the height of the liquid inside the temporary storage tank (51) is always higher than the liquid discharge port (511); Each of the liquid discharge ports (511) is provided with a pressure valve (54), and one end of each of the pressure valves (54) away from the corresponding liquid discharge port (511) is respectively connected to a liquid discharge pipe (55), and the maximum height of each of the liquid discharge pipes (55) is not higher than the height of the corresponding liquid discharge port (511).
7. A gas filling and odorizing device according to claim 6, characterized in that: The pressure valve (54) comprises a valve body (541), a movable valve core (542) and a pressure spring (543); the movable valve core (542) is arranged inside the valve body (541); two ends of the pressure spring (543) are respectively fixed between the valve body (541) and the movable valve core (542); the movable valve core (542) can move under the restriction of the pressure spring (543) and under the action of the pressure difference on both sides of the movable valve core (542) to open and close the pressure valve (54); When each of the movable valve cores (542) opens the corresponding pressure valve (54), the magnitude of the elastic force of each of the movable valve cores (542) overcoming the corresponding pressure spring (543) is greater than the air pressure at the top of the corresponding high-pressure gas storage tank (12), the high-pressure odorant storage tank (22) and the boost tank (32).
8. A gas filling and odorizing device according to claim 1, characterized in that: The high-pressure fuel gas storage tank (12) and each normal-pressure odorant storage tank (21) are respectively connected to the exhaust gas filter (6) via an exhaust gas connecting pipe (61), and a flame arrester (62) is provided at one end of the exhaust gas connecting pipe (61) close to the exhaust gas filter (6); The top ends of the high-pressure gas storage tank (12), the high-pressure odorant storage tank (22) and the boost tank (32) are respectively provided with safety valves (7); the high-pressure gas storage tank (12) is connected to the normal-pressure gas storage tank (11) via the corresponding safety valve (7); the high-pressure odorant storage tank (22) is connected to the exhaust gas filter (6) via the corresponding safety valve (7) and the exhaust gas connecting pipe (61); and the boost tank (32) is connected to the mixing tank (31) via the corresponding safety valve (7).
9. A gas filling and odorizing device according to claim 1, characterized in that: The filling connector (42) comprises a sealing head (421) and a filling valve (422), wherein the filling valve (422) is capable of controlling the on / off of a hose output from the booster tank (32) to the sealing head (421), and the sealing head (421) is capable of being temporarily fixed to the air inlet of a gas cylinder to be filled, and sealing the sealing head (421) and the air inlet of the gas cylinder to be filled.
10. A method for odorization based on liquid replenishment without exhaust, characterized in that: The gas filling and odorizing device as claimed in any one of claims 1 to 9 is used, comprising the following steps: The gas first enters the high-pressure gas storage tank (12) from the normal-pressure gas storage tank (11) for preliminary pressurization, and various odorant raw materials can enter the high-pressure odorant storage tank (22) from various normal-pressure odorant storage tanks (21) according to their proportions for preliminary mixing and pressurization; The initially pressurized gas and the initially mixed and pressurized various odorant raw materials enter the mixing tank (31) for mixing, and are then input into the boosting tank (32) for re-pressurization and storage; The booster tank (32) can fill the mixed fuel gas and various odorant raw materials into the gas cylinder to be filled through the filling top cover (42) by means of a pump; When the gas pressure inside the high-pressure gas storage tank (12), the high-pressure odorant storage tank (22) and the boost tank (32) is insufficient, gas can be replenished through the normal-pressure gas storage tank (11), each normal-pressure odorant storage tank (21) and the mixing tank (31).