Multi-source all-in-one machine information management system and method based on big data

By analyzing the relationship between task completion time and resource usage, assigning task weights and adjusting resource allocation, the problem of uneven resource allocation in multi-source all-in-one machines is solved, and system performance and resource utilization efficiency are improved.

CN119065810AInactive Publication Date: 2024-12-03BLACK GOLD COMMERCIAL DISPLAY INTELLIGENT TECHNOLOGY (XINJIANG) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411102058.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When multi-source all-in-one machines handle multiple tasks, the system performance declines due to uneven resource allocation, which affects the task completion status.

Method used

By analyzing the relationship between task completion time and resource usage, assigning task weights, and adjusting the resource allocation ratio based on the system performance score, optimizing resource usage, and ensuring that resources are most effectively utilized.

Benefits of technology

It improves resource utilization efficiency, enhances system performance, avoids resource waste and competition, and improves system response speed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119065810A_ABST
    Figure CN119065810A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-source all-in-one machine information management system and method based on big data, and belongs to the technical field of artificial intelligence, and the method comprises the following steps: analyzing the relation between the task completion time of each type of task and the resource usage amount; task weights are distributed; analyzing the estimated completion time of each task in the current time period; analyzing the performance score of the system in the current time period; setting the task weight of each task in the current time period; analyzing the priority and the resource allocation proportion of each task in the current time period; analyzing the adjustment coefficient of each task in the current time period; adjusting the resource usage amount of each task in the current time period to obtain the actual resource usage amount of each task in the current time period; according to the method, the historical data and the real-time data of each task of the to-be-managed equipment are analyzed, so that the phenomena of resource waste and resource competition are avoided, the resource utilization efficiency is improved, and the system performance is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of artificial intelligence technology, and in particular to a multi-source all-in-one information management system and method based on big data. Background Art

[0002] The multi-source all-in-one machine is a high-performance device that integrates multiple functions and technologies. Through modular design, high openness and flexible configuration, it realizes functions such as environmental detection, liquid level monitoring, intrusion monitoring, abnormal alarm, data aggregation and transmission, and meets the needs of multi-scenario security management and intelligent operation and maintenance. This all-in-one machine is suitable for multiple scenarios such as integrated pipe corridors, fire protection industry, chemical industry, tunnel transportation, rail transportation, and water conservancy industry; Since the multi-source integrated machine needs to monitor multiple data sources at the same time, the system often needs to process multiple tasks at the same time. Different types of tasks may have different resource requirements, and different resource allocations will also affect the completion time of the task. If a task requires a large amount of resources, it may affect the completion of other tasks, resulting in unbalanced resource utilization and reduced system performance. Therefore, people are in urgent need of a multi-source integrated information management system based on big data to solve the above problems. Summary of the invention

[0003] The purpose of the present invention is to provide a multi-source integrated machine information management system based on big data to solve the problems raised in the above-mentioned background technology.

[0004] In order to solve the above technical problems, the present invention provides the following technical solutions: A multi-source integrated machine information management method based on big data, the method comprising the following steps: S1. According to the types of tasks in the devices to be managed, collect the task completion time of each type of task at different resource usage, analyze the relationship between the task completion time and resource usage of each type of task; collect the execution frequency of each type of task and assign task weights; S2. Collect the type and resource usage of each task in the current time period, and analyze the estimated completion time of each task in the current time period; S3. Analyze the performance score of the system in the current time period to determine whether the system needs to adjust resource allocation; if the system needs to adjust resource allocation, set the task weight of each task in the current time period according to the type of each task in the current time period; S4. Analyze the priority and resource allocation ratio of each task in the current time period according to the task weight of each task in the current time period; S5. Analyze the adjustment coefficient of each task in the current time period according to the total amount of resources of the device to be managed; adjust the resource usage of each task in the current time period according to the adjustment coefficient to obtain the actual resource usage of each task in the current time period.

[0005] According to the above technical solution, the specific process of step S1 is as follows: S1-1, record the b-th resource usage corresponding to the a-th type of task in the managed device as ; The task completion time of the a-th type of task in the managed device at the b-th resource usage is recorded as ; a∈[1, N1], N1 is a positive integer; b∈[1, N2], N2 is a positive integer; S1-2. Establish a linear regression equation to analyze the relationship between the task completion time and resource usage of each type of task. The formula is as follows: ; in, represents the dependent variable; X represents the independent variable; represents the intercept term; represents the slope coefficient; represents the error term; Match tasks of the same type to As the independent variable input, the corresponding tasks of the same type As the dependent variable output, a linear regression equation is trained to obtain the relationship between the task completion time and resource usage of this type of task; By analyzing the historical data of various types of tasks, we can obtain the relationship between the task completion time and resource usage of various types of tasks, which not only makes the data more valuable for reference, but also makes subsequent related data analysis more accurate; S1-3, the execution frequency of the ath type of task in the managed device is recorded as ;according to , calculate the frequency ratio of each type of task through the following formula: ; in, Indicates the frequency ratio of type a tasks; Corresponding tasks of different types Compare and obtain the frequency ratio of each type of task, and use the ratio as the weight of the corresponding type of task; Focusing resources on more frequent task types can ensure that resources are used most effectively, thereby improving overall efficiency; at the same time, more frequent task types may be more important, and by giving these tasks higher weights, you can ensure that these tasks are prioritized.

[0006] According to the above technical solution, the specific process of step S2 is as follows: S2-1, the current time period is recorded as Tt; the type of the i-th task in the current time period is recorded as ; The resource usage of the i-th task in the current time period is recorded as ;i∈[1, N3], N3 is a positive integer; S2-2, according to and , through the linear regression equation, the task type is obtained as , the resource usage is The estimated completion time corresponding to the time is recorded as .

[0007] According to the above technical solution, the specific process of step S3 is as follows: S3-1. According to and , the performance score of the system in the current time period is calculated by the following formula: ; in, Indicates the performance score of the system in the current time period; The purpose of the system's performance score is to reflect resource utilization efficiency and system performance by evaluating the relationship between task completion time and the amount of resources it obtains. A lower score means that the task is completed faster with fewer resources, reflecting higher resource utilization efficiency and system performance; a higher score means that the task takes more time to complete when more resources are obtained, reflecting lower resource utilization efficiency.

[0008] S3-2, if This means that the system does not need to adjust resource allocation. It is a fixed parameter preset by the system; like This means that the system needs to adjust the allocation of resources. It is a fixed parameter preset by the system; S3-3. If the system needs to adjust the allocation of resources, , set the weight of the i-th task in the current time period to .

[0009] According to the above technical solution, the specific process of step S4 is as follows: S4-1. According to the weight of the i-th task in the current time period , combined with the estimated completion time of the i-th task in the current time period , and the resource usage of the i-th task in the current time period , calculate the priority of each task in the current time period by the following formula: ; in, Indicates the priority of the i-th task in the current time period; S4-2. According to the priority of the i-th task in the current time period , the resource allocation ratio of each task in the current time period is calculated by the following formula: ; in, Indicates the resource allocation ratio of the i-th task in the current time period; By calculating the resource allocation ratio of each task in the current time period, uneven resource allocation can be effectively avoided.

[0010] According to the above technical solution, the specific process of step S5 is as follows: S5-1, the total amount of resources of the device to be managed is recorded as C; according to the resource usage of the i-th task in the current time period , calculate the adjustment coefficient of each task in the current time period through the following formula: ; in, Represents the adjustment coefficient of the i-th task in the current time period; S5-2, according to the adjustment coefficient of the i-th task in the current time period , the resource usage of the i-th task in the current time period Adjust to obtain the actual resource usage of each task in the current time period, and record the actual resource usage of each task in the current time period as ;in, .

[0011] A multi-source integrated machine information management system based on big data, the system includes an information collection module, an information processing module and an execution module; The information acquisition module is used to acquire the information required by the system; the information processing module is used to store, analyze and transmit the information of each module; and the execution module is used to execute the information of the information processing module.

[0012] According to the above technical solution, the information collection module includes a historical information unit and a real-time information unit; The historical information unit is used to collect historical data information of each task in the device to be managed, and the real-time information unit is used to collect real-time data information of each task in the device to be managed.

[0013] According to the above technical solution, the information processing module includes an information storage unit, an information analysis unit and an information transmission unit; The information storage unit is used to store the information acquired by the information acquisition module; the information analysis unit is used to analyze the information acquired by the information acquisition module; and the information transmission unit is used for information transmission of each module in the system.

[0014] According to the above technical solution, the execution module includes a display unit and an adjustment unit; The display unit is used to display data information of each task in the current time period in the device to be managed; the adjustment unit is used to adjust the resource usage of each task in the current time period.

[0015] Compared with the prior art, the beneficial effects achieved by the present invention are: The present invention analyzes the historical data and real-time data of each task of the managed device. On the one hand, according to the priority of the task, by dynamically allocating resources, the actual resource usage of each task is adjusted to avoid resource waste and resource competition and improve resource utilization efficiency; on the other hand, the system resource allocation and task execution are monitored in real time, resource allocation is adjusted in time, the response speed and overall performance of the system are improved, and the system performance is enhanced; at the same time, the system design is simple and easy to be integrated into the existing computer system, and it is suitable for resource management of various multi-task and multi-function integrated devices. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings: Figure 1 It is a flow chart of a multi-source integrated machine information management method based on big data of the present invention; Figure 2 It is a structural schematic diagram of a multi-source all-in-one information management system based on big data in the present invention. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] See also Figure 1 , the present invention provides a technical solution: A multi-source integrated machine information management method based on big data, the method comprising the following steps: S1. According to the types of tasks in the devices to be managed, collect the task completion time of each type of task at different resource usage, analyze the relationship between the task completion time and resource usage of each type of task; collect the execution frequency of each type of task and assign task weights; According to the above technical solution, the specific process of step S1 is as follows: S1-1, record the b-th resource usage corresponding to the a-th type of task in the managed device as ; The task completion time of the a-th type of task in the managed device at the b-th resource usage is recorded as ; a∈[1, N1], N1 is a positive integer; b∈[1, N2], N2 is a positive integer; Collect historical data of the equipment to be managed to provide a data basis for subsequent data analysis; S1-2. Establish a linear regression equation to analyze the relationship between the task completion time and resource usage of each type of task. The formula is as follows: ; in, represents the dependent variable; X represents the independent variable; represents the intercept term; represents the slope coefficient; represents the error term; Match tasks of the same type to As the independent variable input, the corresponding tasks of the same type As the dependent variable output, a linear regression equation is trained to obtain the relationship between the task completion time and resource usage of this type of task; By analyzing the historical data of various types of tasks, we can obtain the relationship between the task completion time and resource usage of various types of tasks, which not only makes the data more valuable for reference, but also makes subsequent related data analysis more accurate; S1-3, the execution frequency of the ath type of task in the managed device is recorded as ;according to , calculate the frequency ratio of each type of task through the following formula: ; in, Indicates the frequency ratio of type a tasks; Corresponding tasks of different types Compare and obtain the frequency ratio of each type of task, and use the ratio as the weight of the corresponding type of task; For example: It is known that there are N1=3 types of tasks for the devices to be managed, namely A, B, and C. The tasks of type A correspond to = 0.5, the corresponding task of type B = 0.3, the task type C corresponds to =0.2, and the corresponding By comparison, the frequency ratio of each type of task is : : =5:3:2; 5 is used as the weight of tasks of type A, 3 is used as the weight of tasks of type B, and 2 is used as the weight of tasks of type C; Assign task weights to provide a data basis for subsequent priority calculations; Focusing resources on more frequent task types can ensure that resources are used most effectively, thereby improving overall efficiency; at the same time, more frequent task types may be more important, and by giving these tasks higher weights, you can ensure that these tasks are prioritized.

[0019] S2. Collect the type and resource usage of each task in the current time period, and analyze the estimated completion time of each task in the current time period; According to the above technical solution, the specific process of step S2 is as follows: S2-1, the current time period is recorded as Tt; the type of the i-th task in the current time period is recorded as ; The resource usage of the i-th task in the current time period is recorded as ;i∈[1, N3], N3 is a positive integer; S2-2, according to and , through the linear regression equation, the task type is obtained as , the resource usage is The estimated completion time corresponding to the time is recorded as .

[0020] S3. Analyze the performance score of the system in the current time period to determine whether the system needs to adjust resource allocation; if the system needs to adjust resource allocation, set the task weight of each task in the current time period according to the type of each task in the current time period; According to the above technical solution, the specific process of step S3 is as follows: S3-1. According to and , the performance score of the system in the current time period is calculated by the following formula: ; in, Indicates the performance score of the system in the current time period; The purpose of the system's performance score is to reflect resource utilization efficiency and system performance by evaluating the relationship between task completion time and the amount of resources it obtains. A lower score means that the task is completed faster with fewer resources, reflecting higher resource utilization efficiency and system performance; a higher score means that the task takes more time to complete when more resources are obtained, reflecting lower resource utilization efficiency.

[0021] S3-2, if This means that the system does not need to adjust resource allocation. It is a fixed parameter preset by the system; like This means that the system needs to adjust the allocation of resources. It is a fixed parameter preset by the system; S3-3. If the system needs to adjust the allocation of resources, , set the weight of the i-th task in the current time period to .

[0022] S4. Analyze the priority and resource allocation ratio of each task in the current time period according to the task weight of each task in the current time period; According to the above technical solution, the specific process of step S4 is as follows: S4-1. According to the weight of the i-th task in the current time period , combined with the estimated completion time of the i-th task in the current time period , and the resource usage of the i-th task in the current time period , calculate the priority of each task in the current time period by the following formula: ; in, Indicates the priority of the i-th task in the current time period; S4-2. According to the priority of the i-th task in the current time period , the resource allocation ratio of each task in the current time period is calculated by the following formula: ; in, Indicates the resource allocation ratio of the i-th task in the current time period; For example: There are N3=3 tasks in the current time period, and the type of the i=1th task in the current time period is =A, then the weight of the i=1th task in the current time period =5; the type of the i=2nd task in the current time period =B, then the weight of the i=2th task in the current time period =3; the type of the i=3th task in the current time period =C, then the weight of the i=3th task in the current time period =2; Resource usage of task i=1 in the current time period =200, the resource usage of the i=2th task in the current time period =150; the resource usage of the i=3th task in the current time period =100; The estimated completion time of the i=1th task in the current time period =10, the estimated completion time of the i=2th task in the current time period =5; the estimated completion time of the i=3rd task in the current time period =8; The priority of each task in the current time period is calculated by the following formula: ; Get the priority of the i=1th task in the current time period =100, the priority of the i=2nd task in the current time period =90, the priority of the i=3rd task in the current time period =25; The resource allocation ratio of each task in the current time period is calculated by the following formula: ; Get the resource allocation ratio of the i=1th task in the current time period ≈0.465, the resource allocation ratio of the i=2th task in the current time period ≈0.419, the resource allocation ratio of the i=3th task in the current time period =≈0.116; By calculating the resource allocation ratio of each task in the current time period, uneven resource allocation can be effectively avoided.

[0023] S5. Analyze the adjustment coefficient of each task in the current time period according to the total amount of resources of the device to be managed; adjust the resource usage of each task in the current time period according to the adjustment coefficient to obtain the actual resource usage of each task in the current time period; According to the above technical solution, the specific process of step S5 is as follows: S5-1, the total amount of resources of the device to be managed is recorded as C; according to the resource usage of the i-th task in the current time period , calculate the adjustment coefficient of each task in the current time period through the following formula: ; in, Represents the adjustment coefficient of the i-th task in the current time period; S5-2, according to the adjustment coefficient of the i-th task in the current time period , the resource usage of the i-th task in the current time period Adjust to obtain the actual resource usage of each task in the current time period, and record the actual resource usage of each task in the current time period as ;in, ; For example: It is known that the total amount of resources of the devices to be managed is C=1000; Resource allocation ratio for task i=1 in the current time period ≈0.465, the resource allocation ratio of the i=2th task in the current time period ≈0.419, the resource allocation ratio of the i=3th task in the current time period =≈0.116; Resource usage of task i=1 in the current time period =200, the resource usage of the i=2th task in the current time period =150; the resource usage of the i=3th task in the current time period =100; The adjustment coefficient of each task in the current time period is calculated using the following formula: ; Get the adjustment coefficient of the i=1th task in the current time period ≈2.325, the adjustment coefficient of the i=2th task in the current time period ≈2.793; the adjustment coefficient of the i=3th task in the current time period ≈1.16; According to the adjustment coefficient of the i-th task in the current time period , the resource usage of the i-th task in the current time period Adjust to obtain the actual resource usage of the i=1th task in the current time period =465, the actual resource usage of the i=2th task in the current time period =419, the actual resource usage of the i=3rd task in the current time period =116.

[0024] See also Figure 2 , a multi-source integrated machine information management system based on big data, the system includes an information collection module, an information processing module and an execution module; The information acquisition module is used to acquire the information required by the system; the information processing module is used to store, analyze and transmit the information of each module; and the execution module is used to execute the information of the information processing module.

[0025] According to the above technical solution, the information collection module includes a historical information unit and a real-time information unit; The historical information unit is used to collect historical data information of each task in the device to be managed, and the real-time information unit is used to collect real-time data information of each task in the device to be managed.

[0026] According to the above technical solution, the information processing module includes an information storage unit, an information analysis unit and an information transmission unit; The information storage unit is used to store the information acquired by the information acquisition module; the information analysis unit is used to analyze the information acquired by the information acquisition module; and the information transmission unit is used for information transmission of each module in the system.

[0027] According to the above technical solution, the execution module includes a display unit and an adjustment unit; The display unit is used to display data information of each task in the current time period in the device to be managed; the adjustment unit is used to adjust the resource usage of each task in the current time period.

[0028] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0029] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A multi-source integrated machine information management method based on big data, characterized by: The method comprises the following steps: S1. Based on the types of tasks in the devices to be managed, collect the task completion time of each type of task at different resource usage levels, analyze the relationship between the task completion time and resource usage of each type of task; collect the execution frequency of each type of task and assign task weights; S2. Collect the type and resource usage of each task in the current time period and analyze the expected completion time of each task in the current time period; S3. Analyze the system's performance score in the current time period to determine whether the system needs to adjust resource allocation; if the system needs to adjust resource allocation, set the task weight of each task in the current time period based on the type of each task in the current time period; S4. Analyze the priority and resource allocation ratio of each task in the current time period based on the task weight of each task in the current time period; S5. Analyze the adjustment coefficient of each task in the current time period based on the total resources of the device to be managed; adjust the resource usage of each task in the current time period based on the adjustment coefficient to obtain the actual resource usage of each task in the current time period.

2. The multi-source integrated machine information management method based on big data according to claim 1, characterized in that: The specific process of step S1 is as follows: S1-1, record the bth type of resource usage corresponding to the ath type of task in the managed device as ; The task completion time of the a-th type of task in the managed device at the b-th resource usage is recorded as ; a∈[1, N1], N1 is a positive integer; b∈[1, N2], N2 is a positive integer; S1-2. Establish a linear regression equation to analyze the relationship between task completion time and resource usage for each type of task. The formula is as follows: ; in, represents the dependent variable; X represents the independent variable; represents the intercept term; represents the slope coefficient; represents the error term; Match tasks of the same type to As the independent variable input, the tasks of the same type are As the dependent variable output, train the linear regression equation to obtain the relationship between the task completion time and resource usage of this type of task; S1-3, record the execution frequency of the type a task in the managed device as ;according to , calculate the frequency ratio of each type of task using the following formula: ; in, Indicates the frequency ratio of tasks of type a; Match each type of task to Compare and obtain the frequency ratio of each type of task, and use the ratio as the weight of the corresponding type of task.

3. The multi-source integrated machine information management method based on big data according to claim 2, characterized in that: The specific process of step S2 is as follows: S2-1, the current time period is recorded as Tt; the type of the i-th task in the current time period is recorded as ;Record the resource usage of the i-th task in the current time period as ; i∈[1, N3], N3 is a positive integer; S2-2, according to and , through the linear regression equation, the task type is obtained as , the resource usage is The estimated completion time corresponding to the time, the estimated completion time of the i-th task in the current time period is recorded as .

4. The multi-source integrated machine information management method based on big data according to claim 3, characterized in that: The specific process of step S3 is as follows: S3-1, according to and , calculate the system performance score in the current time period using the following formula: ; in, Indicates the performance score of the system in the current time period; S3-2, if This means that the system does not need to adjust resource allocation. It is a fixed parameter preset by the system; like This means that the system needs to adjust the allocation of resources. It is a fixed parameter preset by the system; S3-3, if the system needs to adjust the allocation of resources, according to , set the weight of the i-th task in the current time period to .

5. The multi-source integrated machine information management method based on big data according to claim 4, characterized in that: The specific process of step S4 is as follows: S4-1. According to the weight of the i-th task in the current time period , combined with the estimated completion time of the i-th task in the current time period , and the resource usage of the i-th task in the current time period , calculate the priority of each task in the current time period using the following formula: ; in, Indicates the priority of the i-th task in the current time period; S4-2, according to the priority of the i-th task in the current time period , calculate the resource allocation ratio of each task in the current time period using the following formula: ; in, Indicates the resource allocation ratio of the i-th task in the current time period.

6. The multi-source integrated machine information management method based on big data according to claim 5, characterized in that: The specific process of step S5 is as follows: S5-1, the total amount of resources of the device to be managed is recorded as C; according to the resource usage of the i-th task in the current time period , calculate the adjustment coefficient of each task in the current time period using the following formula: ; in, Indicates the adjustment coefficient of the i-th task in the current time period; S5-2, according to the adjustment coefficient of the i-th task in the current time period , the resource usage of the i-th task in the current time period Adjust the amount of resources used by each task in the current time period and record the amount of resources used by each task in the current time period as ;in, .

7. A multi-source integrated machine information management system based on big data, as described in any one of claims 1 to 6, wherein: The system includes an information collection module, an information processing module and an execution module; The information acquisition module is used to acquire information required by the system; the information processing module is used to store, analyze and transmit information of each module; and the execution module is used to execute the information of the information processing module.

8. The multi-source integrated machine information management system based on big data according to claim 7, characterized in that: The information collection module includes a historical information unit and a real-time information unit; The historical information unit is used to collect historical data information of each task in the device to be managed, and the real-time information unit is used to collect real-time data information of each task in the device to be managed.

9. The multi-source integrated information management system based on big data according to claim 7, characterized in that: The information processing module includes an information storage unit, an information analysis unit and an information transmission unit; The information storage unit is used to store the information acquired by the information acquisition module; the information analysis unit is used to analyze the information acquired by the information acquisition module; and the information transmission unit is used for information transmission among various modules in the system.

10. The multi-source integrated machine information management system based on big data according to claim 7, characterized in that: The execution module includes a display unit and an adjustment unit; The display unit is used to display data information of each task in the current time period of the device to be managed; the adjustment unit is used to adjust the resource usage of each task in the current time period.