Urban solid waste resource utilization planning method and device based on deep learning

Through deep learning-based methods, the solid waste resource utilization planning has been optimized, and the problems of solid waste transportation and treatment resource planning have been solved, the solid waste treatment efficiency and resource utilization rate have been improved, and the transportation cost has been reduced.

CN119067305AActive Publication Date: 2024-12-03广州市广源物联科技有限公司
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411156830.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-12-03
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

The existing technology cannot reasonably plan the transportation and treatment resources of urban solid waste, resulting in low efficiency and high cost of solid waste treatment.

Method used

Adopting a deep learning-based urban solid waste resource utilization planning method, by obtaining the information of pending solid waste and multiple processing sites, using the resource utilization planning model to determine the target processing site, optimizing the transportation path and processing volume, adjusting transportation costs and The weight of resource characteristics ensures effective resource utilization of solid waste.

Benefits of technology

The reasonable transportation path planning and resource utilization of solid waste have been achieved, the efficiency and effect of solid waste resource utilization have been improved, and the transportation cost has been reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067305A_ABST
    Figure CN119067305A_ABST
Patent Text Reader

Abstract

The invention relates to the field of solid waste utilization management, and discloses an urban solid waste resource utilization planning method and device based on deep learning, and the method comprises the steps: obtaining to-be-processed solid waste information and multiple pieces of processing site information; wherein the to-be-treated solid waste information comprises the solid waste category, the solid waste weight and the solid waste position corresponding to the to-be-treated solid waste, and the multiple pieces of treatment station information comprise the station position corresponding to each treatment station, the treatment capacity of different types of solid waste and the treatment recycling rate of different types of solid waste; through the resource utilization planning model, according to the to-be-treated solid waste information and the multiple pieces of treatment station information, one or more pieces of target treatment station information corresponding to the to-be-treated solid waste information are determined, and each piece of target treatment station information corresponds to one target treatment station and the target solid waste treatment capacity corresponding to the target treatment station. According to the method, the solid waste transportation resources and the solid waste treatment resources can be reasonably planned, and the solid waste resource utilization effect is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of solid waste utilization management, and more specifically, to a method and device for urban solid waste resource utilization planning based on deep learning. Background Art

[0002] With the acceleration of urbanization and the continuous development of industrial production, the amount of urban solid waste (solid waste) is increasing. Urban solid waste includes solid wastes such as construction waste, domestic waste and industrial waste residues. Urban solid waste not only occupies a large amount of land resources, but also may cause environmental pollution if it is accumulated for a long time. Therefore, efficient resource utilization of urban solid waste is an important issue in urban development. In the prior art, when different types of solid waste are utilized as resources, it is necessary to first classify and collect the solid waste so as to facilitate the subsequent targeted treatment of different types of solid waste. Subsequently, the solid waste can be physically crushed and screened to increase the availability after reducing the volume of the solid waste. Then, the solid waste can be converted into reusable materials or energy by physical, chemical or biological methods. The treated solid waste is used in industries such as construction, roads, manufacturing, or for environmental protection disposal. In the prior art, it is not possible to rationally plan solid waste transportation resources and solid waste treatment resources in the process of solid waste resource utilization.

[0003] For example, patent application CN117893023A (application number: CN202410107495.1) provides a solid waste resource utilization supervision system, which evaluates the solid waste recycling and transportation risks based on the received customer order information by setting up an order feasibility assessment module, predicts the transportation cost based on the solid waste recycling and transportation risks, weight and transportation distance, and judges whether the order is feasible based on the transportation cost prediction results, thereby reducing the risk of long-distance transportation of high-risk solid waste, improving the safety of solid waste recycling and transportation to a certain extent, and reasonably controlling the transportation cost; setting up a solid waste transportation module and a solid waste treatment module to control the resource utilization process of solid waste from both the transportation and treatment aspects of solid waste, reducing transportation risks, improving the quality control accuracy of the treatment link, and improving the comprehensiveness of supervision. However, the solid waste resource utilization supervision in patent application CN117893023A cannot reasonably plan solid waste transportation resources and solid waste treatment resources. Summary of the invention

[0004] The purpose of this application is to provide a method and device for urban solid waste resource utilization planning based on deep learning, which solves the technical problem of not being able to reasonably plan solid waste transportation resources and solid waste treatment resources, and achieves the technical effect of reasonably planning solid waste transportation resources and solid waste treatment resources.

[0005] An embodiment of the present application provides a method for planning resource utilization of urban solid waste based on deep learning, the method comprising: obtaining information on solid waste to be processed and information on multiple processing sites; wherein the information on solid waste to be processed includes the solid waste category, solid waste weight and solid waste location corresponding to the solid waste to be processed, and the information on multiple processing sites respectively includes the site location corresponding to each processing site, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste; through a resource utilization planning model, according to the information on solid waste to be processed and the information on multiple processing sites, determining one or more target processing site information corresponding to the solid waste information to be processed, each target processing site information corresponding to a target processing site and a target solid waste processing volume corresponding to the target processing site.

[0006] In one possible implementation, one or more target processing site information corresponding to the solid waste information to be processed is determined based on the solid waste information to be processed and the information of multiple processing sites through a resource utilization planning model, including: determining the transportation cost characteristics corresponding to each processing site based on the transportation cost factor of the solid waste information to be processed, the location of the solid waste and the site location corresponding to each processing site; wherein one solid waste category corresponds to one transportation cost factor; and determining one or more target processing site information corresponding to the solid waste information to be processed based on the solid waste information to be processed, the transportation cost characteristics corresponding to each processing site, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste through a resource utilization planning model.

[0007] In another possible implementation, the method further includes: when the number of target processing site information is greater than or equal to 2, determining the target transportation cost characteristics and target resource characteristics corresponding to each target processing site information and the solid waste information to be processed; wherein the target transportation cost characteristics are obtained by multiplying the target solid waste treatment volume, the solid waste transportation distance and the solid waste transportation cost factor corresponding to the target processing site information, and the target resource characteristics are obtained by multiplying the target solid waste treatment volume and the treatment resource rate corresponding to the target processing site information; through the resource utilization planning correction model, according to the target transportation cost characteristics, the target resource characteristics corresponding to each target processing site information, the site location corresponding to each processing site corresponding to multiple processing site information, the processing capacity of different types of solid waste and the treatment resource rate of different types of solid waste, one or more corrected processing site information corresponding to each target processing site information is determined, each corrected processing site information corresponds to a corrected processing site and a corrected solid waste treatment volume corresponding to the corrected processing site, and the sum of all corrected solid waste treatment volumes is the target solid waste treatment volume; wherein the weight of the transportation cost characteristics and the weight of the target resource characteristics in the resource utilization planning correction model are adjusted according to the optimization requirements.

[0008] In another possible implementation, through the resource utilization planning correction model, according to the target transportation cost characteristics corresponding to each target processing site information, the target resource characteristics, the site location corresponding to each processing site corresponding to multiple processing site information, the processing capacity of different types of solid wastes and the processing resource utilization rate of different types of solid wastes, one or more corrected processing site information corresponding to each target processing site information is determined, including: obtaining the predicted solid waste generation in the target area where each target processing site is located within a preset time period; when the predicted solid waste generation is greater than the preset solid waste generation, increasing the weight of the transportation cost characteristics and reducing the weight of the target resource characteristics; through the resource utilization planning correction model, according to the target transportation cost characteristics, target resource characteristics corresponding to each target processing site information, The one or more revised processing site information corresponding to each target processing site information is determined according to the target transportation cost characteristics corresponding to each target processing site information, the target resource characteristics, the site locations corresponding to each processing site corresponding to multiple processing site information, the processing capacities of different types of solid waste and the processing resource utilization rates of different types of solid waste; when the predicted solid waste generation is less than or equal to the preset solid waste generation, the weight of the target transportation cost characteristics is reduced, and the weight of the target resource utilization characteristics is increased. Through the resource utilization planning correction model, according to the target transportation cost characteristics corresponding to each target processing site information, the target resource utilization characteristics, the site locations corresponding to each processing site corresponding to multiple processing site information, the processing capacities of different types of solid waste and the processing resource utilization rates of different types of solid waste, one or more revised processing site information corresponding to each target processing site information is determined.

[0009] In another possible implementation, the method also includes: obtaining one or more potential transfer sites around the target site corresponding to each target processing site information, and obtaining the potential transportation cost characteristics, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste of each potential transfer site; through the resource utilization planning supplementary model, according to the target transportation cost characteristics, target resource characteristics, the potential transportation cost characteristics corresponding to one or more potential transfer sites, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste corresponding to each target processing site information, determine one or more processing site subsets, each processing site subset corresponds to a target processing site, the target solid waste treatment volume corresponding to the target processing site, one or more potential transfer processing sites corresponding to the target processing site, and the potential solid waste treatment volume corresponding to each potential transfer processing site; wherein, when the target processing site fails, the solid waste of the target solid waste treatment volume corresponding to the target processing site is processed by one or more potential transfer processing sites in a processing site subset.

[0010] In another possible implementation, the method also includes: determining, among all potential transfer and treatment sites in a plurality of treatment site subsets, a plurality of first potential transfer and treatment sites with the smallest number of subordinate processing site subsets; determining, among the plurality of first potential transfer and treatment sites, one or more second potential transfer and treatment sites with the smallest potential transportation cost, and processing the target solid waste treatment volume corresponding to the target treatment site through the plurality of second potential transfer and treatment sites.

[0011] An embodiment of the present application also provides a deep learning-based urban solid waste resource utilization planning device, including a unit for executing any of the methods described above.

[0012] An embodiment of the present application also provides a deep learning-based urban solid waste resource utilization planning device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements any of the methods described above.

[0013] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method described in any one of the above items is implemented.

[0014] An embodiment of the present application also provides a computer program product, including a computer program, which implements the steps of any of the methods described above when executed by a processor.

[0015] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0016] The embodiment of the present application provides a method for planning the resource utilization of urban solid waste based on deep learning, and the method includes: obtaining information on solid waste to be processed and information on multiple processing sites; wherein the information on solid waste to be processed includes the solid waste category, weight and location corresponding to the solid waste to be processed, and the information on multiple processing sites includes the location of each processing site, the processing capacity of different types of solid waste and the resource utilization rate of different types of solid waste; through a resource utilization planning model, according to the information on solid waste to be processed and the information on multiple processing sites, one or more target processing site information corresponding to the solid waste to be processed is determined, and each target processing site information corresponds to a target processing site and a target solid waste processing volume corresponding to the target processing site. The embodiment of the present application can plan a reasonable transportation route for the solid waste information to be processed, and can ensure the resource utilization rate of solid waste treatment, and can improve the efficiency of solid waste resource utilization. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0018] Figure 1 A flowchart of a method for planning urban solid waste resource utilization based on deep learning provided in an embodiment of the present application;

[0019] Figure 2 A schematic diagram of a workflow of a method for planning urban solid waste resource utilization based on deep learning provided in an embodiment of the present application;

[0020] Figure 3 A schematic diagram of the workflow of another method for planning urban solid waste resource utilization based on deep learning provided in an embodiment of the present application;

[0021] Figure 4 A schematic diagram of the logical structure of a deep learning-based urban solid waste resource utilization planning device provided in an embodiment of the present application;

[0022] Figure 5 A schematic diagram of the physical structure of a deep learning-based urban solid waste resource utilization planning device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0023] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.

[0024] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0025] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.

[0026] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

[0027] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0028] The existing technology for the supervision of solid waste resource utilization cannot reasonably plan solid waste transportation resources and solid waste treatment resources.

[0029] Based on the above reasons, the embodiment of the present application provides a method for planning the resource utilization of urban solid waste based on deep learning, and the method includes: obtaining information on solid waste to be processed and information on multiple processing sites; wherein the information on solid waste to be processed includes the solid waste category, solid waste weight and solid waste location corresponding to the solid waste to be processed, and the information on multiple processing sites includes the site location corresponding to each processing site, the processing capacity of different types of solid waste and the resource utilization rate of different types of solid waste; through the resource utilization planning model, according to the information on solid waste to be processed and the information on multiple processing sites, one or more target processing site information corresponding to the solid waste to be processed is determined, and each target processing site information corresponds to a target processing site and a target solid waste processing volume corresponding to the target processing site. The embodiment of the present application can reasonably plan the transportation route for the solid waste information to be processed, and can ensure the resource utilization rate of solid waste treatment, and can improve the efficiency of solid waste resource utilization.

[0030] In some scenarios, a method for planning resource utilization of urban solid waste based on deep learning in an embodiment of the present application can be applied to the resource utilization of urban solid waste, can reasonably plan the resource utilization of urban solid waste, and can improve the resource utilization effect of urban solid waste.

[0031] The following is a detailed description of a method for urban solid waste resource utilization planning based on deep learning provided in an embodiment of the present application with reference to specific examples.

[0032] Figure 1 A flowchart of a method for planning urban solid waste resource utilization based on deep learning is provided in an embodiment of the present application, such as Figure 1As shown, the method includes S110 to S120, and the following is

[0033] S110, obtaining information on solid waste to be processed and information on multiple processing sites. The information on solid waste to be processed includes the solid waste category, weight and location of the solid waste to be processed, and the information on multiple processing sites includes the location of each processing site, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste.

[0034] When planning the resource utilization of solid waste, information on the solid waste to be processed and information on multiple processing sites can be obtained, and then planning can be carried out between the information on the solid waste to be processed and the information on multiple processing sites, so as to achieve resource utilization by planning the information on the solid waste to be processed to the processing sites corresponding to the multiple processing site information.

[0035] Exemplarily, the information on unprocessed solid waste may be the information on unprocessed solid waste obtained and recorded on-site by staff, and the information on unprocessed solid waste is sent through the front end to the urban solid waste resource utilization planning device based on deep learning, and the urban solid waste resource utilization planning device based on deep learning uses the urban solid waste resource utilization planning method based on deep learning to perform resource utilization planning.

[0036] Exemplarily, the information on solid waste to be processed collected and sorted on-site by the staff may include the solid waste category, solid waste weight and solid waste location corresponding to the solid waste to be processed.

[0037] For example, the first solid waste to be processed information may include the first solid waste category, the first solid waste weight, and the first solid waste location corresponding to the first solid waste to be processed.

[0038] Exemplarily, the multiple processing site information may be the multiple processing site information stored on the urban solid waste resource utilization planning device based on deep learning, and the multiple processing site information respectively include the site location corresponding to each processing site, the processing capacity of different types of solid waste and the processing resource rate of different types of solid waste.

[0039] For example, the first processing site information may include the first site location corresponding to the first processing site, the processing capacity of different types of solid waste corresponding to the first processing site, and the processing resource utilization rate of different types of solid waste at the first processing site.

[0040] S120. Determine one or more target processing site information corresponding to the solid waste information to be processed based on the solid waste information to be processed and the information of multiple processing sites through a resource utilization planning model. Each target processing site information corresponds to a target processing site and a target solid waste processing volume corresponding to the target processing site.

[0041] Figure 2A schematic diagram of a workflow of a method for planning urban solid waste resource utilization based on deep learning provided in an embodiment of the present application is shown in FIG. Figure 2 As shown, when planning the resource utilization of solid waste, the resource utilization planning model can be used to determine one or more target processing site information corresponding to the solid waste information and multiple processing site information, so that the solid waste to be processed corresponding to the solid waste information can be treated according to the processing sites corresponding to the one or more target processing site information.

[0042] After obtaining one or more target processing site information, each target processing site information corresponds to a target processing site and the target solid waste treatment volume corresponding to the target processing site, so that the solid waste to be treated corresponding to the solid waste information can be divided into multiple weights of solid waste, and the multiple weights of solid waste can be treated respectively in the target processing sites corresponding to multiple different target solid waste treatment volumes.

[0043] like Figure 2 As shown, multiple processing site information such as the solid waste information to be processed, the first processing site information, the second processing site information, and the third processing site information can be input into the resource utilization planning model. The resource utilization planning model can output one or more target processing site information corresponding to the solid waste information to be processed. The target processing site information corresponds to the target processing site and the target solid waste treatment volume corresponding to the target processing site, thereby being able to control the target processing site to perform solid waste treatment on the solid waste to be processed according to the target solid waste treatment volume.

[0044] Exemplarily, the number of target processing site information may be one or more, so that solid waste can be recycled through an appropriate number of target processing sites.

[0045] Exemplarily, the resource utilization planning model can be obtained by training sample data, and the sample data includes sample solid waste information to be processed, multiple sample processing site information, and one or more sample target processing site information corresponding to the sample solid waste information to be processed. The sample solid waste information to be processed includes the solid waste category, solid waste weight and solid waste location corresponding to the sample solid waste to be processed, and the multiple sample processing site information includes the site location corresponding to each sample processing site, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste.

[0046] During training, when training the resource utilization planning model, the resource utilization rates of different types of solid waste can be targeted, with the maximization of the resource utilization rate of each type of solid waste as the training goal, so as to achieve effective utilization of solid waste resources.

[0047] For example, when training a resource utilization planning model, it can be a multi-objective optimization task, and training can be performed with the optimization goals of ensuring that the solid waste treatment volume of the treatment site is less than the treatment capacity of different types of solid waste and maximizing the treatment resource utilization rate of different types of solid waste.

[0048] After obtaining the solid waste treatment volume of each treatment site, the remaining treatment capacity of different types of solid waste of each treatment site can be updated. In the subsequent treatment site planning, the treatment capacity of different types of solid waste of each treatment site can be updated to meet the needs of real-time planning of target site information.

[0049] When resource utilization is carried out, when the information of the solid waste to be processed corresponds to multiple target processing site information, it means that the solid waste to be processed corresponding to the information of the solid waste to be processed needs to be transported to multiple target processing sites corresponding to the multiple target processing site information for resource utilization and treatment.

[0050] The beneficial effect brought about by the above-mentioned implementation method is that it can plan the most suitable treatment site for the solid waste information to be treated, and combine the solid waste type, solid waste weight, solid waste location, site location corresponding to the treatment site, the treatment capacity of different types of solid waste at the treatment site and the treatment resource utilization rate of different types of solid waste at the treatment site to plan the corresponding target treatment site, thereby realizing the effective resource utilization of solid waste and improving the effect of solid waste resource utilization.

[0051] The beneficial effect brought about by the above-mentioned implementation method is that it can meet the processing capacity of different types of solid waste at the processing site, and can obtain the maximum processing resource utilization rate corresponding to the solid waste information to be processed, which can improve the utilization effect of solid waste.

[0052] In some implementations, in the above S120, through the resource utilization planning model, one or more target processing site information corresponding to the solid waste information to be processed is determined according to the solid waste information to be processed and the information of multiple processing sites, including S121 to S122. S121 to S122 are described in detail below.

[0053] S121. Determine the transportation cost characteristics corresponding to each processing site based on the transportation cost factor of the solid waste information to be processed, the location of the solid waste and the site location corresponding to each processing site; wherein one solid waste category corresponds to one transportation cost factor.

[0054] When solid waste is transported and processed, resource utilization sites can be planned based on the transportation costs. For example, the transportation cost characteristics corresponding to each processing site can be determined based on the solid waste type, solid waste location and site location corresponding to each processing site in the solid waste information to be processed. Then, the target processing site can be planned based on the transportation cost characteristics corresponding to each processing site.

[0055] Exemplarily, for the transportation cost factor of the first solid waste information to be processed, the solid waste location and the site location corresponding to each processing site, the transportation cost characteristics of each processing site corresponding to the first solid waste information to be processed can be determined.

[0056] Exemplarily, when determining the transportation cost characteristics, different transportation cost factors can be determined for different solid waste categories based on empirical values, and the transportation cost factors correspond to the transportation costs corresponding to different solid waste categories.

[0057] Exemplarily, when the transportation cost characteristics of each processing site corresponding to the first solid waste information to be processed are determined, the transportation cost determination module can be used to determine the transportation cost characteristics of each processing site corresponding to the first solid waste information to be processed.

[0058] Exemplarily, the transportation cost characteristic may be obtained by multiplying the solid waste transportation distance and the solid waste transportation cost factor, where the solid waste transportation distance is the planned transportation distance between the solid waste location and the site location corresponding to each treatment site.

[0059] S122. Determine one or more target processing site information corresponding to the solid waste information to be processed through a resource utilization planning model according to the solid waste information to be processed, the transportation cost characteristics corresponding to each processing site, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste.

[0060] When planning resource utilization, the resource utilization planning model can be used to determine one or more target processing site information corresponding to the solid waste information to be processed, based on the solid waste information to be processed, the transportation cost characteristics corresponding to each processing site, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste. One target processing site information corresponds to one target processing site, and the target processing site can take into account the transportation cost, the processing capacity of different types of solid waste of the target processing site, and the processing resource utilization rate of different types of solid waste. When processing solid waste, the purpose of low transportation cost, compliance with the different types of processing capacity of the target processing site and the maximum processing resource utilization rate can be met, thereby improving the resource utilization effect of solid waste.

[0061] Similarly, each target processing site information corresponds to a target processing site and the target solid waste treatment volume corresponding to the target processing site. When there are multiple target processing site information, the solid waste to be treated corresponding to the solid waste information can be divided into multiple weights of solid waste, and the multiple weights of solid waste can be treated separately in target processing sites corresponding to multiple different target solid waste treatment volumes.

[0062] Exemplarily, when training a resource utilization planning model, a multi-objective optimization task model can be used for training. Specifically, the optimization objectives can be minimizing transportation costs, ensuring that the solid waste treatment volume of the treatment site is less than the treatment capacity of different types of solid waste, and maximizing the treatment resource utilization rate of different types of solid waste.

[0063] The beneficial effect brought about by the above-mentioned implementation method is that when treating solid waste, it can meet the goals of low transportation costs, different types of treatment capacities in line with the target treatment site and maximum treatment resource utilization rate, thereby improving the resource utilization effect of solid waste.

[0064] In some scenarios, after obtaining the target treatment site information, the target treatment site information can be adjusted and corrected to achieve the best solid waste resource utilization planning effect.

[0065] In some implementations, the above method further includes S210 to S220, and S210 to S220 are described in detail below.

[0066] S210. When the number of target processing site information is greater than or equal to 2, determine the target transportation cost characteristics and target resource characteristics corresponding to each target processing site information and the solid waste information to be processed; wherein the target transportation cost characteristics are obtained by multiplying the target solid waste treatment volume, solid waste transportation distance and solid waste transportation cost factor corresponding to the target processing site information, and the target resource characteristics are obtained by multiplying the target solid waste treatment volume and treatment resource rate corresponding to the target processing site information.

[0067] After obtaining the target processing site information through the resource utilization planning model, when the number of target processing site information is greater than or equal to 2, it means that the number of target processing sites is greater than 2. At this time, the solid waste to be processed corresponding to the solid waste information needs to be transferred to at least 2 target processing sites for separate treatment, and one target processing site corresponds to one target solid waste treatment volume.

[0068] In order to improve the planning effect of the target site information, the target transportation cost characteristics and target resource characteristics corresponding to each target processing site information and the solid waste information to be processed can be determined, and then the target processing site information can be optimized according to the target transportation cost characteristics and target resource characteristics corresponding to each target processing site information, so as to improve the scientific nature and recycling efficiency of the entire resource utilization planning system.

[0069] It should be noted that when the number of target processing site information is 1, it means that the credibility of the target processing site information is relatively high, and the impact on the scientific nature and recycling efficiency of the entire resource utilization planning system is relatively small. At this time, resources can be utilized according to the planned target processing site information.

[0070] When determining the target transportation cost characteristics, the target transportation cost characteristics can be obtained by multiplying the target solid waste treatment volume, solid waste transportation distance and solid waste transportation cost factor corresponding to the target treatment site information.

[0071] When determining the target resource utilization characteristics corresponding to each target treatment site information and the solid waste to be treated information, it can be obtained by multiplying the target solid waste treatment volume and the treatment resource utilization rate corresponding to the target treatment site information. The target resource utilization characteristics represent the total amount of different types of solid waste in the solid waste to be treated that are recycled at different target treatment sites.

[0072] S220. Through the resource utilization planning correction model, according to the target transportation cost characteristics corresponding to each target processing site information, the target resource characteristics, the site location corresponding to each processing site corresponding to multiple processing site information, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste, determine one or more corrected processing site information corresponding to each target processing site information, each corrected processing site information corresponds to a corrected processing site and a corrected solid waste treatment volume corresponding to the corrected processing site, and the sum of all corrected solid waste treatment volumes is the target solid waste treatment volume; wherein, the weights of the transportation cost characteristics and the target resource characteristics in the resource utilization planning correction model are adjusted according to the optimization requirements.

[0073] When correcting the target processing site information, the resource utilization planning correction model can be used to optimize the target processing site information according to the target transportation cost characteristics, target resource characteristics, the site location of each processing site corresponding to multiple processing site information, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste. Then, one or more corrected processing site information corresponding to each target processing site information is determined, and each corrected processing site information corresponds to a corrected processing site and a corrected solid waste processing volume corresponding to the corrected processing site, thereby optimizing the target processing site information.

[0074] When the target processing site information is modified, the weights of the transportation cost characteristics and the target resource utilization characteristics in the resource utilization planning modification model are adjusted according to the optimization requirements, thereby being able to meet the resource utilization requirements in different scenarios.

[0075] After obtaining one or more corrected processing site information corresponding to each target processing site information, the sum of all corrected solid waste treatment volumes is the target solid waste treatment volume, and then the target solid waste treatment volume corresponding to each target processing site can be reallocated to the corrected solid waste treatment volume corresponding to one or more corrected processing sites according to demand, thereby realizing the reallocation of solid waste resource processing and utilization processes according to demand.

[0076] Exemplarily, the resource utilization planning correction model can be trained through sample transportation cost characteristics, sample resource characteristics corresponding to the sample processing site information and the solid waste information to be processed, and one or more sample corrected processing site information corresponding to the corresponding sample processing site information. The resource utilization planning correction model can output one or more sample corrected processing site information based on the sample transportation cost characteristics and sample resource characteristics corresponding to the sample processing site information and the solid waste information to be processed. The one or more sample corrected processing site information corresponds to the optimal processing site information after the sample transportation cost characteristics and sample resource characteristics corresponding to the sample processing site information and the solid waste information to be processed are corrected.

[0077] The beneficial effect brought about by the above-mentioned implementation method is that the target processing site information can be optimized according to the target transportation cost characteristics and target resource characteristics corresponding to each target processing site information and the solid waste information to be processed, so as to improve the scientific nature and recycling efficiency of the entire resource utilization planning system.

[0078] The beneficial effect brought about by the above-mentioned implementation method is that when the number of target processing site information is 1, it means that the credibility of the target processing site information is relatively high, and the impact on the scientific nature and recycling efficiency of the entire resource utilization planning system is relatively small. At this time, solid waste can be utilized as a resource according to the planned target processing site information, which can improve the planning efficiency of solid waste resource utilization.

[0079] The beneficial effect brought about by the above-mentioned implementation method is that after obtaining the target processing site information through S110 to S120, the transportation cost characteristics and resource characteristics can be determined for each target processing site, and the optimal revised processing site information can be re-determined based on the transportation cost characteristics and resource characteristics, thereby improving the effect of solid waste treatment.

[0080] When optimizing solid waste treatment, the solid waste treatment volume of the target treatment site can be adjusted by predicting the amount of solid waste generated to adapt to changes in the amount of solid waste generated.

[0081] In some implementations, in the above-mentioned S220, through the resource utilization planning correction model, according to the target transportation cost characteristics corresponding to each target processing site information, the target resource characteristics, the site location corresponding to each processing site of multiple processing site information, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste, one or more corrected processing site information corresponding to each target processing site information is determined, including S221 to S222. S221 to S222 are specifically described below.

[0082] S221. Obtain the predicted solid waste generation in the target area where each target treatment site is located within a preset time period.

[0083] When predicting the amount of solid waste generated, the predicted solid waste generation of the target area where each target treatment site is located within a preset time period can be obtained, and then the solid waste treatment volume of the target treatment site in the target area can be optimized and adjusted according to the predicted solid waste generation within the preset time period in the target area.

[0084] For example, the target area may be manually divided according to the distribution of the processing sites.

[0085] S222. When the predicted solid waste generation is greater than the preset solid waste generation, the weight of the transportation cost feature is increased, and the weight of the target resource feature is decreased. Through the resource utilization planning correction model, according to the target transportation cost feature corresponding to each target processing site information, the target resource feature, the site location corresponding to each processing site corresponding to the multiple processing site information, the processing capacity of different types of solid waste, and the processing resource rate of different types of solid waste, one or more corrected processing site information corresponding to each target processing site information is determined. When the predicted solid waste generation is less than or equal to the preset solid waste generation, the weight of the target transportation cost feature is decreased, and the weight of the target resource feature is increased. Through the resource utilization planning correction model, according to the target transportation cost feature corresponding to each target processing site information, the target resource feature, the site location corresponding to each processing site corresponding to the multiple processing site information, the processing capacity of different types of solid waste, and the processing resource rate of different types of solid waste, one or more corrected processing site information corresponding to each target processing site information is determined.

[0086] Figure 3 A schematic diagram of the workflow of another method for planning urban solid waste resource utilization based on deep learning provided in an embodiment of the present application is shown in FIG. Figure 3 As shown, when determining one or more corrected processing site information corresponding to each target processing site information, when the predicted solid waste generation is greater than the preset solid waste generation, it means that the solid waste generation in the target area will increase within the preset time period. At this time, the solid waste in the target area can be transported to a more distant solid waste treatment station for treatment to adapt to the increase in the solid waste generation in the target area. Therefore, the weight of the transportation cost feature can be increased, and the weight of the target resource utilization feature can be reduced to reduce the consideration of resource utilization in resource utilization planning, and increase the consideration of transportation cost to find a corrected processing site with a lower transportation cost.

[0087] After adjusting the weights of the transportation cost characteristics and the target resource utilization characteristics, the resource utilization planning correction model can be used to determine one or more corrected processing site information corresponding to each target processing site information based on the target transportation cost characteristics, target resource utilization characteristics, the site location of each processing site corresponding to multiple processing site information, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste, so as to optimize and adjust the target processing site information.

[0088] When determining one or more corrected processing site information corresponding to each target processing site information, when the predicted solid waste generation is less than or equal to the preset solid waste generation, it means that the solid waste generation in the target area within the preset time period is small, and the focus of resource utilization can be placed on how to make more efficient resource utilization of the solid waste to be processed. Therefore, the weight of the target transportation cost feature can be reduced, and the weight of the target resource feature can be increased, so as to reduce the consideration of the target transportation cost feature and increase the consideration of the target resource feature.

[0089] like Figure 3 As shown, after adjusting the weights of the transportation cost characteristics and the target resource characteristics, the resource utilization planning correction model can be used to determine one or more corrected processing site information corresponding to each target processing site information based on the target transportation cost characteristics, target resource characteristics, the site locations of each processing site corresponding to multiple processing site information, the processing capacity of different types of solid waste and the processing resource rates of different types of solid waste, so as to optimize and adjust the target processing site information.

[0090] It should be noted that when adjusting the weights of the transportation cost characteristics and the target resource utilization characteristics, this can be achieved by dynamically adjusting the weights of the resource utilization planning correction model.

[0091] The beneficial effect brought about by the above-mentioned implementation method is that the weights of the transportation cost characteristics and the weights of the target resource characteristics can be adjusted according to the amount of solid waste generated in the target area to meet different needs, thereby improving the effect of solid waste resource utilization.

[0092] The beneficial effect brought about by the above-mentioned implementation method is that when the predicted solid waste generation is greater than the preset solid waste generation, the solid waste in the target area can be transported to a more distant solid waste treatment station for treatment. By considering the increased transportation cost, a corrected treatment site with lower transportation cost can be found.

[0093] The beneficial effect brought about by the above-mentioned implementation method is that when the predicted solid waste generation is less than or equal to the preset solid waste generation, the focus of resource utilization can be placed on how to make more efficient resource utilization of the treated solid waste, which can increase the consideration of the target resource characteristics.

[0094] In the process of solid waste treatment, solid waste treatment sites may malfunction and stop working, so it is necessary to make reasonable plans for solid waste treatment in the event of a malfunction.

[0095] In some implementations, the above method further includes S310 to S320, and S310 to S320 are described in detail below.

[0096] S310. Obtain one or more potential transfer sites around the target site corresponding to each target processing site information, and obtain the potential transportation cost characteristics, processing capacity of different types of solid waste, and processing resource utilization rate of different types of solid waste of each potential transfer site.

[0097] When planning the backup site of the target processing site, one or more potential transfer sites around the target site corresponding to each target processing site information can be obtained. The potential transfer site is a processing site that can be transferred when the target site fails, and the potential transportation cost characteristics of each potential transfer site, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste are obtained. Then, the best processing site can be determined among the potential transfer sites based on the potential transportation cost characteristics of each potential transfer site, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste.

[0098] Exemplarily, when obtaining one or more potential transfer sites around the target site corresponding to each target processing site information, one or more potential transfer sites within a preset distance range around the target processing site corresponding to each target processing site information can be obtained.

[0099] S320. Through the resource utilization planning supplement model, according to the target transportation cost characteristics corresponding to each target processing site information, the target resource characteristics, the potential transportation cost characteristics corresponding to one or more potential transfer sites, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste, determine one or more processing site subsets, each processing site subset corresponds to a target processing site, the target solid waste treatment volume corresponding to the target processing site, one or more potential transfer processing sites corresponding to the target processing site and the potential solid waste treatment volume corresponding to each potential transfer processing site; wherein, when the target processing site fails, the solid waste of the target solid waste treatment volume corresponding to the target processing site is processed by one or more potential transfer processing sites in a processing site subset.

[0100] After determining one or more potential transfer sites, the resource utilization planning supplementary model can be used to determine one or more treatment site subsets based on the target transportation cost characteristics, target resource characteristics, potential transportation cost characteristics corresponding to one or more potential transfer sites, treatment capacities of different types of solid wastes, and treatment resource utilization rates of different types of solid wastes corresponding to each target treatment site information. Each treatment site subset corresponds to a target treatment site, the target solid waste treatment volume corresponding to the target treatment site, one or more potential transfer treatment sites corresponding to the target treatment site, and the potential solid waste treatment volume corresponding to each potential transfer treatment site.

[0101] Exemplarily, the resource utilization planning supplementary model can be trained through the sample transportation cost characteristics corresponding to the sample processing site information, the sample resource characteristics, the sample potential transportation cost characteristics corresponding to one or more sample potential transfer sites, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste, and the corresponding one or more sample processing site subsets. The sample processing site information corresponds to the sample processing site, and the one or more sample processing site subsets correspond to the set of best alternative processing sites for the sample processing site.

[0102] After obtaining one or more subsets of processing sites, when a target processing site fails, the target solid waste treatment volume corresponding to the target processing site can be processed by one or more potential transfer processing sites in a subset of processing sites to achieve the purpose of backup solid waste treatment for the target processing site.

[0103] Exemplarily, the target transportation cost characteristics and the target resource utilization characteristics may be calculated by the calculation method in S210 described above.

[0104] The beneficial effect brought about by the above-mentioned implementation method is that the subset of processing sites corresponding to the target processing site information can be determined based on the target transportation cost characteristics, target resource characteristics, potential transportation cost characteristics corresponding to one or more potential transfer sites, processing capacity of different types of solid waste and processing resource rates of different types of solid waste corresponding to each target processing site information, so as to achieve backup in the event of a failure in the target processing site, thereby improving the reliability of solid waste treatment.

[0105] The beneficial effect brought about by the above-mentioned implementation method is that after obtaining the processing site subset corresponding to the target processing site information, when a processing site in the processing site subset corresponding to the target processing site information fails, other processing sites in the processing site subset corresponding to the target processing site information can be used as alternative processing sites, thereby improving the reliability of solid waste treatment.

[0106] When a target treatment site fails, it is necessary to determine the best alternative treatment site to improve the failure response effect in solid waste treatment.

[0107] In some implementations, the above method further includes S410 to S420, and S410 to S420 are described in detail below.

[0108] S410. Among all potential transfer processing sites in a plurality of processing site subsets, determine a plurality of first potential transfer processing sites with the smallest number of being subordinate to the processing site subsets.

[0109] When a failure occurs at the target treatment site, in order to avoid excessive amounts of solid waste being transferred at potential transfer sites, multiple first potential transfer and treatment sites with the smallest number of subordinate processing site subsets can be determined among all potential transfer and treatment sites in multiple processing site subsets. The possibility of transferring solid waste to the multiple first potential transfer and treatment sites is minimized, and the possibility of solid waste accumulation at the first potential transfer and treatment sites can be avoided.

[0110] When determining the plurality of first potential transfer processing sites with the smallest number of subordinate processing site subsets, the plurality of first potential transfer processing sites with the smallest number of inclusions in the processing site subsets among all the potential transfer processing sites in the plurality of processing site subsets are determined.

[0111] When the number of the first potential transfer and treatment site is 1, when a failure occurs at the target treatment site, the solid waste can be directly transferred to the first potential transfer and treatment site for treatment.

[0112] S420. Determine one or more second potential transfer and processing sites with the lowest potential transportation cost among multiple first potential transfer and processing sites, and process the target solid waste treatment volume corresponding to the target treatment site through the multiple second potential transfer and processing sites.

[0113] After obtaining multiple first potential transfer and treatment sites, one or more second potential transfer and treatment sites with the lowest potential transportation cost can be determined among the multiple first potential transfer and treatment sites, and the solid waste of the target solid waste treatment volume corresponding to the target treatment site can be processed through the multiple second potential transfer and treatment sites to reduce the transportation cost of solid waste treatment.

[0114] Exemplarily, when determining one or more second potential transshipment processing sites with the lowest potential transportation cost, one or more second potential transshipment processing sites closest to the first potential transshipment processing site may be obtained.

[0115] The beneficial effect brought about by the above-mentioned implementation method is that by determining a plurality of first potential transfer and treatment sites with the smallest number of subordinate treatment site subsets, the possibility of solid waste accumulation at the first potential transfer and treatment sites can be avoided.

[0116] The beneficial effect brought about by the above-mentioned implementation method is that, among multiple first potential transshipment and processing sites, determining one or more second potential transshipment and processing sites with the lowest potential transportation cost can reduce the transportation cost during the transshipment process.

[0117] An embodiment of the present application also provides a deep learning-based urban solid waste resource utilization planning device, including a unit for executing any of the methods described above.

[0118] Figure 4 A logical structure diagram of a deep learning-based urban solid waste resource utilization planning device provided in an embodiment of the present application is as follows: Figure 4 As shown, the device 1 of this embodiment includes a processing unit 11, a storage unit 12 and a transceiver unit 13. The processing unit 11 is used to process data, the storage unit 12 is used to store data, and the transceiver unit 13 is used to send and receive data. The processing unit 11, the storage unit 12 and the transceiver unit 13 cooperate with each other to implement the above method. The beneficial effects brought about by the embodiment of the present application have been described in the above method and will not be repeated here.

[0119] An embodiment of the present application also provides a deep learning-based urban solid waste resource utilization planning device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements any of the methods described above.

[0120] Figure 5 A schematic diagram of the physical structure of a deep learning-based urban solid waste resource utilization planning device provided in one embodiment of the present application, such as Figure 5 As shown, the device 2 of this embodiment includes: at least one processor 20 ( Figure 5 Only one processor 20 is shown in the figure), a memory 21, and a computer program 22 stored in the memory 21 and executable on the at least one processor 20. When the processor 20 executes the computer program 22, the steps in any of the above-mentioned method embodiments are implemented. The beneficial effects brought about by the embodiments of the present application have been described in the above-mentioned methods and will not be repeated here.

[0121] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.

[0122] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0123] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.

[0124] An embodiment of the present application provides a computer program product. When the computer program product runs on a mobile terminal, the mobile terminal can implement the steps in the above-mentioned method embodiments when executing the computer program product.

[0125] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium can at least include: any entity or device that can carry the computer program code to the camera / terminal device, recording medium, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, RandomAccess Memory), electric carrier signal, telecommunication signal and software distribution medium. For example, a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.

[0126] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0127] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0128] In the embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0129] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0130] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A method for urban solid waste resource utilization planning based on deep learning, It is characterized in that The method comprises: Acquire information on solid waste to be processed and information on multiple processing sites; wherein the information on solid waste to be processed includes the solid waste category, solid waste weight and solid waste location corresponding to the solid waste to be processed, and the information on multiple processing sites includes the site location corresponding to each processing site, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste; Through the resource utilization planning model, based on the information of solid waste to be processed and multiple processing site information, one or more target processing site information corresponding to the solid waste information to be processed is determined, and each target processing site information corresponds to a target processing site and the target solid waste processing volume corresponding to the target processing site.

2. The method according to claim 1, It is characterized in that Through the resource utilization planning model, according to the information of the solid waste to be processed and the information of multiple processing sites, one or more target processing site information corresponding to the information of the solid waste to be processed is determined, including: Determine the transportation cost characteristics corresponding to each treatment site according to the transportation cost factor of the solid waste information to be treated, the location of the solid waste and the site location corresponding to each treatment site; wherein one solid waste category corresponds to one transportation cost factor; Through the resource utilization planning model, one or more target treatment site information corresponding to the solid waste information to be processed is determined according to the solid waste information to be processed, the transportation cost characteristics corresponding to each treatment site, the treatment capacity of different types of solid waste and the treatment resource utilization rate of different types of solid waste.

3. The method according to claim 2, It is characterized in that The method further comprises: When the number of target treatment site information is greater than or equal to 2, determine the target transportation cost characteristics and target resource characteristics corresponding to each target treatment site information and the solid waste information to be treated; wherein the target transportation cost characteristics are obtained by multiplying the target solid waste treatment volume, solid waste transportation distance and solid waste transportation cost factor corresponding to the target treatment site information, and the target resource characteristics are obtained by multiplying the target solid waste treatment volume and treatment resource rate corresponding to the target treatment site information; Through the resource utilization planning correction model, according to the target transportation cost characteristics corresponding to each target processing site information, the target resource characteristics, the site location corresponding to each processing site of multiple processing site information, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste, one or more corrected processing site information corresponding to each target processing site information is determined, each corrected processing site information corresponds to a corrected processing site and the corrected solid waste treatment volume corresponding to the corrected processing site, and the sum of all corrected solid waste treatment volumes is the target solid waste treatment volume; wherein, the weights of the transportation cost characteristics and the weights of the target resource characteristics in the resource utilization planning correction model are adjusted according to the optimization needs.

4. The method according to claim 3, It is characterized in that Through the resource utilization planning correction model, according to the target transportation cost characteristics corresponding to each target processing site information, the target resource characteristics, the site location corresponding to each processing site corresponding to the multiple processing site information, the processing capacity of different types of solid waste and the processing resource utilization rate of different types of solid waste, one or more corrected processing site information corresponding to each target processing site information is determined, including: Obtain the predicted solid waste generation in the target area where each target treatment site is located within a preset time period; When the predicted solid waste generation is greater than the preset solid waste generation, the weight of the transportation cost feature is increased, and the weight of the target resource feature is reduced. Through the resource utilization planning correction model, according to the target transportation cost feature corresponding to each target processing site information, the target resource feature, the site location corresponding to each processing site corresponding to multiple processing site information, the processing capacity of different types of solid waste and the processing resource rate of different types of solid waste, one or more corrected processing site information corresponding to each target processing site information is determined; when the predicted solid waste generation is less than or equal to the preset solid waste generation, the weight of the target transportation cost feature is reduced, and the weight of the target resource feature is increased. Through the resource utilization planning correction model, according to the target transportation cost feature corresponding to each target processing site information, the target resource feature, the site location corresponding to each processing site corresponding to multiple processing site information, the processing capacity of different types of solid waste and the processing resource rate of different types of solid waste, one or more corrected processing site information corresponding to each target processing site information is determined.

5. The method according to claim 4, It is characterized in that The method further comprises: Obtain one or more potential transfer sites around the target site corresponding to each target treatment site information, and obtain potential transportation cost characteristics, treatment capacity of different types of solid waste, and treatment resource utilization rate of different types of solid waste of each potential transfer site; Through the resource utilization planning supplementary model, one or more treatment site subsets are determined according to the target transportation cost characteristics corresponding to each target treatment site information, the target resource characteristics, the potential transportation cost characteristics corresponding to one or more potential transfer sites, the treatment capacity of different types of solid waste and the treatment resource utilization rate of different types of solid waste, each treatment site subset corresponds to a target treatment site, the target solid waste treatment volume corresponding to the target treatment site, one or more potential transfer treatment sites corresponding to the target treatment site and the potential solid waste treatment volume corresponding to each potential transfer treatment site; wherein, when the target treatment site fails, the solid waste of the target solid waste treatment volume corresponding to the target treatment site is treated by one or more potential transfer treatment sites in a treatment site subset.

6. The method according to claim 5, It is characterized in that The method further comprises: determining, among all potential transshipment processing sites in the plurality of processing site subsets, a plurality of first potential transshipment processing sites having a minimum number of subordinates to the processing site subsets; Among multiple first potential transfer and processing sites, one or more second potential transfer and processing sites with the lowest potential transportation cost are determined, and the solid waste of the target solid waste treatment volume corresponding to the target treatment site is processed through the multiple second potential transfer and processing sites.

7. A deep learning-based urban solid waste resource utilization planning device, It is characterized in that Comprising means for performing the method according to any one of claims 1 to 6.

8. A deep learning-based urban solid waste resource utilization planning device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the method according to any one of claims 1 to 6 is implemented.

9. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.

10. A computer program product comprising a computer program, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.

Citation Information

Patent Citations

  • Multi-level collaborative decision-making system for solid waste sorting transportation based on distributed computing

    CN108711028A

  • Method for establishing taxi stations based on genetic algorithm

    CN112926894A

  • Garbage centralized recovery point layout method and device

    CN115271190A

  • Kitchen garbage collection and transportation path dynamic optimization method based on adaptive collaboration mechanism

    CN115689081A

  • Transport network construction method, electronic equipment and storage medium

    CN117172655A