Determination method and system for coal operation scheme
By obtaining and weighted average calculations, the coal operation plan is automatically determined, which solves the problem of insufficient monitoring of port coal transportation efficiency and safety in the existing technology, and achieves the effect of real-time adjustment and improvement of transportation efficiency.
Patent Information
- Application Number
- CN202410974689.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-12-03
AI Technical Summary
The existing port coal information management technology lacks real-time monitoring of coal yard operating efficiency, storage safety and transportation efficiency, and cannot automatically adjust the coal transportation and sales plan, resulting in inefficient and safe transportation.
By obtaining operation efficiency parameters, storing safety parameters and transportation efficiency parameters, performing weighted average calculations to obtain the operation comprehensive index, comparing the index and reference comprehensive index, automatically determining the coal operation plan, and controlling the operation of transportation equipment to achieve adjustments.
Real-time monitoring and automatic adjustment of the port coal operating environment has been achieved, the efficiency and safety of coal transportation have been improved, and the smooth progress of the transportation process has been ensured.
Smart Images

Figure CN119067344A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of transportation management, and in particular to a determination and system of a coal operation plan. Background Art
[0002] As an important node in coal trade, ports not only play the role of coal distribution, storage and transportation, but also play an important role in coal trading. The efficiency, accuracy and real-time nature of their information management are crucial to ensuring the smooth transportation and sales of coal.
[0003] The operation plan of coal in ports is usually formulated in advance based on historical transportation and sales plans and port operation performance. However, among the existing port information management technologies, there is still a lack of a real-time monitoring and evaluation of coal yard operation efficiency, coal storage safety and coal transportation efficiency, and an automatic determination of coal transportation and sales adjustment plans based on the evaluation results. Summary of the invention
[0004] Based on this, it is necessary to provide a method, device, computer equipment and storage medium for determining a coal operation plan to address the above technical issues.
[0005] A method for determining a coal operation plan, comprising:
[0006] Obtaining operating efficiency parameters, storage safety parameters and transportation efficiency parameters; wherein the operating efficiency parameters are calculated based on a preset operating efficiency formula for space utilization parameters and loading and unloading time efficiency parameters, and the transportation efficiency parameters are calculated based on a preset transportation efficiency formula for historical transportation parameters;
[0007] Taking a weighted average based on the operation efficiency parameter, the storage safety parameter and the transportation efficiency parameter, a comprehensive operation index is obtained;
[0008] Based on the index scheme relationship, the operation comprehensive index and the reference comprehensive index are compared to determine the coal operation scheme; wherein the index scheme relationship is established according to the corresponding relationship between a plurality of the reference comprehensive indices and a plurality of coal operation schemes;
[0009] According to the control parameters of the coal operation plan, the transportation equipment is controlled to operate within the control parameters.
[0010] A system for determining a coal operation plan, comprising:
[0011] A parameter acquisition module, used to acquire operating efficiency parameters, storage safety parameters and transportation efficiency parameters; wherein, the operating efficiency parameters are calculated based on a preset operating efficiency formula for space utilization parameters and loading and unloading time efficiency parameters, and the transportation efficiency parameters are calculated based on a preset transportation efficiency formula for historical transportation parameters;
[0012] A comprehensive index module, used for performing weighted averaging based on the operation efficiency parameter, the storage safety parameter and the transportation efficiency parameter to obtain an operation comprehensive index;
[0013] A scheme determination module is used to compare the operation comprehensive index with the reference comprehensive index based on the index scheme relationship to determine the coal operation scheme; wherein the index scheme relationship is established according to the corresponding relationship between a plurality of the reference comprehensive indexes and a plurality of coal operation schemes;
[0014] The equipment control module is used to control the transportation equipment to operate according to the control parameters of the coal operation plan.
[0015] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and wherein the processor implements the steps of the method for determining a coal operation plan described in any of the above embodiments when executing the computer program.
[0016] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the method for determining a coal operation plan described in any of the above embodiments.
[0017] The above-mentioned method, device, computer equipment and storage medium for determining the coal operation plan obtains the operation efficiency parameters, storage safety parameters and transportation efficiency parameters in real time to monitor the operation environment of the port coal in real time. The operation efficiency parameters can be parameters such as the berthing time of the ship during loading and unloading or the utilization rate of the storage space, or can be calculated by the calculation formula constructed by the parameters such as the berthing time of the ship during loading and unloading and the utilization rate of the storage space; the storage safety parameters can be parameters such as the average number of safety accidents per month, and the transportation efficiency parameters can be parameters such as the punctuality rate or the load rate, or can be calculated by the calculation formula constructed by the parameters such as the punctuality rate or the load rate. The operation efficiency parameters, storage safety parameters and transportation efficiency parameters are weighted averaged to obtain the operation comprehensive index that can reflect the current operation environment of the port. According to the index scheme relationship, the operation comprehensive index is compared with the reference comprehensive index to determine the coal operation plan that matches the reference comprehensive index. The index scheme relationship constructs a correspondence between several reference comprehensive indexes and several coal operation schemes. The several coal operation schemes can be a plurality of pre-set operation schemes, and can be several operation schemes selected from the previous operation conditions of the port. The reference comprehensive index corresponding to each operation scheme is calculated respectively, so as to compare the operation comprehensive index. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 A schematic diagram of a flow chart of a method for determining a coal operation plan in one embodiment;
[0019] Figure 2It is a structural block diagram of a device for determining a coal operation plan in one embodiment;
[0020] Figure 3 is an internal structure diagram of a computer device in one embodiment;
[0021] Figure 4 is a flow chart of a method for determining a coal operation plan in one embodiment;
[0022] Figure 5 A flow chart of obtaining a storage space utilization evaluation coefficient and a loading and unloading time efficiency evaluation coefficient in a method for determining a coal operation plan in one embodiment;
[0023] Figure 6 A flowchart of obtaining a storage safety evaluation index and a transportation efficiency evaluation index in a method for determining a coal operation plan in one embodiment;
[0024] Figure 7 A flow chart of a method for determining a coal operation plan in one embodiment for obtaining a coal transportation and marketing adjustment plan. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0026] Embodiment 1
[0027] In this embodiment, Figure 1 As shown, a method for determining a coal operation plan is provided, which includes:
[0028] Step 110, obtaining operating efficiency parameters, storage safety parameters and transportation efficiency parameters; wherein the operating efficiency parameters are calculated based on a preset operating efficiency formula for space utilization parameters and loading and unloading time parameters, and the transportation efficiency parameters are calculated based on a preset transportation efficiency formula for historical transportation parameters.
[0029] In this embodiment, the operating efficiency parameter is used to measure the operating efficiency of the coal operation in the port yard. The operating efficiency can be measured by parameters such as the yard inventory, coal storage time, and ship berthing time. For example, the longer the ship berthing time is, the longer it takes to load and unload the ship, and the lower the corresponding operating efficiency parameter is. Therefore, these parameters can be comprehensively considered to construct a calculation formula for calculating the operating efficiency parameter. The storage safety parameter is used to measure the safety level of the coal stored in the port. The safety level can be measured by parameters such as the average number of safety accidents per month. For example, the larger the average number of safety accidents per month, the lower the safety level is, and the lower the corresponding storage safety parameter is. The transportation efficiency parameter is used to measure the efficiency of coal transportation in the port. The transportation efficiency can be measured by parameters such as punctuality or load rate. For example, the larger the punctuality is, the higher the transportation efficiency is, the more timely the transportation is, and the larger the corresponding transportation efficiency parameter is. Therefore, these parameters can be comprehensively considered to construct a calculation formula for calculating the transportation efficiency parameter.
[0030] Step 120, performing weighted averaging based on the operating efficiency parameter, the storage safety parameter and the transportation efficiency parameter to obtain an operation comprehensive index.
[0031] In this embodiment, in order to comprehensively consider parameters from different aspects as reference factors for selecting a coal operation plan, at least the operation efficiency parameters, storage safety parameters and transportation efficiency parameters are weightedly calculated. The weighting coefficients can be the same, or different weighting coefficients can be set according to actual needs. The weighted average is calculated to obtain a comprehensive operation index.
[0032] Step 130, based on the index-scheme relationship, compare the operation comprehensive index with the reference comprehensive index to determine the coal operation scheme; wherein the index-scheme relationship is established according to the correspondence between a number of the reference comprehensive indices and a number of coal operation schemes.
[0033] In this embodiment, the index scheme relationship is established based on the corresponding relationship between the reference comprehensive index and the coal operation scheme, so that each reference comprehensive index corresponds to at least one coal operation scheme. When the operation comprehensive index is calculated, the operation comprehensive index is compared with each reference comprehensive index to determine the reference comprehensive index that is the same as or closest to the operation comprehensive index, and then the coal operation scheme corresponding to the reference comprehensive index in the index scheme relationship is obtained.
[0034] Step 140, according to the control parameters of the coal operation plan, control the transportation equipment to operate with the control parameters.
[0035] In this embodiment, the coal operation plan includes the operating parameters of the operation equipment, so that the operating parameters are sent to the corresponding operation equipment, so that the operation equipment operates according to the operating parameters. The operation equipment can be a transportation equipment and a storage equipment. The operating parameters of the transportation equipment can be a transportation speed, a transportation start time or a transportation path. The storage device can be a storage capacity within a preset time period or a corresponding storage area within a preset time period.
[0036] In this embodiment, the method for determining the coal operation plan obtains the operation efficiency parameters, storage safety parameters and transportation efficiency parameters in real time to monitor the operation environment of the port coal in real time. The operation efficiency parameters can be parameters such as the berthing time of the ship during loading and unloading or the utilization rate of the storage space, or can be calculated by the calculation formula constructed by the parameters such as the berthing time of the ship during loading and unloading and the utilization rate of the storage space; the storage safety parameters can be parameters such as the average number of safety accidents per month, and the transportation efficiency parameters can be parameters such as the punctuality rate or the load rate, or can be calculated by the calculation formula constructed by the parameters such as the punctuality rate or the load rate. The operation efficiency parameters, storage safety parameters and transportation efficiency parameters are weighted averaged to obtain the operation comprehensive index that can reflect the current operation environment of the port. According to the index scheme relationship, the operation comprehensive index is compared with the reference comprehensive index to determine the coal operation plan that matches the reference comprehensive index. The index scheme relationship constructs a correspondence between several reference comprehensive indexes and several coal operation schemes. The several coal operation schemes can be a plurality of pre-set operation schemes, and can be several operation schemes selected from the previous operation conditions of the port. The reference comprehensive index corresponding to each operation scheme is calculated respectively, so as to compare the operation comprehensive index.
[0037] In one embodiment, the steps of obtaining the operating efficiency parameter, storing the safety parameter and the transport efficiency parameter include:
[0038] Obtaining the loading and unloading time efficiency parameters and the space utilization parameters of the coal storage;
[0039] Based on a preset operation efficiency calculation formula, the operation efficiency parameter is calculated according to the loading and unloading time efficiency parameter and the space utilization parameter to obtain the operation efficiency parameter; wherein the operation efficiency parameter is positively correlated with the loading and unloading time efficiency parameter and the space utilization parameter, respectively.
[0040] In this embodiment, in order to more accurately calculate the operating efficiency parameters, the loading and unloading time efficiency parameters and the space utilization parameters of the stored coal are used as input parameters of the preset operating efficiency calculation formula for calculating the operating efficiency parameters, and the operating efficiency parameters are calculated on the basis of considering these two parameters. The loading and unloading time efficiency parameters are used to measure the efficiency of loading and unloading coal. The larger the loading and unloading time efficiency parameters, the greater the efficiency of loading and unloading coal. The space utilization parameter is used to measure the space utilization rate of stored coal. The larger the space utilization parameter, the higher the utilization rate of the space for storing coal. In the preset operating efficiency calculation formula, the operating efficiency parameters are positively correlated with the loading and unloading time efficiency parameters and the space utilization parameters, respectively. When the loading and unloading time efficiency parameters and the space utilization parameters are larger, the efficiency of loading and unloading coal is greater, the utilization rate of the space for storing coal is higher, and the corresponding operating efficiency parameters are larger, which can more accurately measure the operating efficiency.
[0041] In one embodiment, the step of obtaining the loading and unloading time efficiency parameters and the space utilization parameters of the coal storage includes:
[0042] Obtain coal type distribution parameters, storage method parameters and material extraction time parameters;
[0043] Based on a preset space utilization calculation formula, the space utilization parameter is calculated according to the coal type distribution parameter, the storage method parameter and the material taking time parameter to obtain the space utilization parameter; wherein the space utilization parameter is positively correlated with the coal type distribution parameter and the storage method parameter, respectively, and the space utilization parameter is negatively correlated with the material taking time parameter.
[0044] In this embodiment, in order to more accurately calculate the space utilization parameter, the coal type distribution parameter, the storage method parameter and the material collection time parameter are used as input parameters of the preset space utilization calculation formula for calculating the space utilization parameter, and the space utilization parameter is calculated on the basis of at least considering these three parameters. The coal type distribution parameter can be used to measure the density of coal type distribution. The larger the coal type distribution parameter, the greater the efficiency of loading and unloading coal. The storage method parameter can be used to measure the space utilization rate of the coal storage method. Different coal storage methods have different space utilization rates. The storage method parameters are pre-set for different coal storage methods. The larger the storage method parameter, the higher the space utilization rate of the coal storage method. The material collection time parameter can be used to measure the storage time of coal. The longer the storage time of coal, the fewer batches of coal that can be stored, indicating that the utilization rate of the space for storing coal is lower. In the preset space utilization calculation formula, the space utilization parameter is positively correlated with the coal type distribution parameter and the storage method parameter, respectively. When the coal type distribution parameter and the storage method parameter are larger, the smaller the material collection time, the larger the corresponding space utilization parameter, so that the space utilization can be more accurately measured.
[0045] In one embodiment, the calculation formula of the space utilization parameter is as shown in formula (1):
[0046]
[0047] In formula (1), s c is the space utilization parameter of the storage space, f a is the distribution data of coal stacks, d s is the monitoring data of the stockpile method, t p is the material collection time data, α, β and γ are preset characteristic coefficients. In this embodiment, the specific values of the preset characteristic coefficients α, β and γ can be set according to the actual situation of the port, and the coal type stack position distribution data f a It can be the density of coal stack distribution, such as the weight of coal stored per unit space, storage method monitoring data s It can be the ratio of warehouse storage capacity to open-air storage capacity. Warehouse storage equipment can store coal more safely and densely, making greater use of storage space. The storage method monitoring data d s The larger it is, the greater the storage capacity of the warehouse is than that of the open air storage, and the storage space can be used more efficiently. p It can be the time between the coal taking time and the coal storage time. The taking time data t p The larger it is, the longer the coal is stored, the longer the space is occupied, the lower the space utilization rate is, and the smaller the space utilization parameter is.
[0048] In one embodiment, the step of obtaining the loading and unloading time efficiency parameters and the space utilization parameters of the coal storage includes:
[0049] Obtain loading and unloading machinery parameters, loading and unloading personnel parameters, loading and unloading process parameters and loading and unloading time parameters;
[0050] Based on a preset loading and unloading time efficiency calculation formula, the loading and unloading time efficiency parameters are calculated according to the loading and unloading machinery parameters, the loading and unloading personnel parameters, the loading and unloading process parameters and the loading and unloading time parameters to obtain the loading and unloading time efficiency parameters; wherein the loading and unloading time efficiency parameters are positively correlated with the loading and unloading machinery parameters, the loading and unloading personnel parameters and the loading and unloading process parameters, respectively, and the loading and unloading time efficiency parameters are negatively correlated with the loading and unloading time parameters.
[0051] In this embodiment, in order to more accurately calculate the loading and unloading time efficiency parameters, the loading and unloading machinery parameters, loading and unloading personnel parameters, loading and unloading process parameters and loading and unloading time parameters are used as input parameters of the preset loading and unloading time efficiency calculation formula for calculating the loading and unloading time efficiency parameters, and the space utilization parameters are calculated based on at least considering these four parameters. The loading and unloading machinery parameters can be used to measure the degree of participation of the loading and unloading machinery in the loading and unloading operation. The greater the degree of participation of the loading and unloading machinery in the loading and unloading operation, the more conducive to the loading and unloading work, and the greater the loading and unloading time efficiency. The loading and unloading personnel parameters can be used to measure the degree of participation of the loading and unloading personnel in the loading and unloading operation. The greater the degree of participation of the loading and unloading personnel in the loading and unloading operation, the more conducive to the loading and unloading work, and the greater the loading and unloading time efficiency. The loading and unloading process parameters can be used to measure the simplicity of the loading and unloading process. The greater the loading and unloading process parameters, the simpler the loading and unloading process, the easier the loading and unloading work is, and the greater the loading and unloading time efficiency. The loading and unloading time parameters can be used to measure the time required for loading and unloading. The greater the loading and unloading time parameters, the greater the time required for loading and unloading, and the shorter the loading and unloading time efficiency. In the preset loading and unloading time efficiency calculation formula, the loading and unloading time efficiency parameters are positively correlated with the loading and unloading machinery parameters, loading and unloading personnel parameters, and loading and unloading process parameters, and the loading and unloading time efficiency parameters are negatively correlated with the loading and unloading time parameters. When the loading and unloading machinery parameters, loading and unloading personnel parameters, and loading and unloading process parameters are larger, and the loading and unloading time parameters are smaller, the corresponding loading and unloading time efficiency parameters are larger, which can more accurately measure the loading and unloading time situation.
[0052] In one embodiment, the calculation formula of the loading and unloading time efficiency parameter is shown in formula (2):
[0053]
[0054] In formula (2), l m is the loading and unloading time parameter, m p Configuration data for loading and unloading machinery, p e Configure data for loading and unloading personnel, k l Set up data for loading and unloading processes, t m is the loading and unloading time data, χ, ε, δ, κ and μ are the preset characteristic coefficients. In this embodiment, the specific values of the preset characteristic coefficients χ, ε, δ, κ and μ can be set according to the actual situation of the port, and the loading and unloading machinery configuration data m p It can be the number of loading and unloading machines, loading and unloading personnel configuration data p e It can be the number of loading and unloading personnel, loading and unloading process setting data k l It can be the ease coefficient of loading and unloading process, loading and unloading time data t m It can be the average of historical loading and unloading time. When the number of loading and unloading machinery is larger, the loading and unloading machinery configuration data m p The larger the number of loading and unloading personnel, the larger the number of loading and unloading personnel configuration data p e The larger the loading and unloading process is, the greater the coefficient of the loading and unloading process setting data k lThe larger the value, the smaller the mean value of historical loading and unloading time, i.e., the loading and unloading machinery configuration data k l The smaller the loading and unloading time parameter l is, the m The larger it is, the more efficient the coal loading and unloading is.
[0055] In one embodiment, the steps of obtaining the operating efficiency parameter, storing the safety parameter and the transport efficiency parameter include:
[0056] Obtain the yard inventory, storage time and loading and unloading berthing time;
[0057] Based on the preset operation efficiency calculation formula, the operation efficiency parameter is obtained by calculating according to the field inventory, the storage time and the loading and unloading berthing time; wherein the operation efficiency parameter is inversely correlated with the field inventory, the storage time and the loading and unloading berthing time respectively. In this embodiment, in order to more accurately calculate the operation efficiency parameter, the field inventory, the storage time and the loading and unloading berthing time are obtained as input parameters of the preset operation efficiency calculation formula for calculating the operation efficiency parameter, and the operation efficiency parameter is calculated on the basis of at least considering these three parameters. The field inventory can be used to measure the amount of coal accumulation. The larger the amount of coal accumulation, the greater the workload of handling coal and the lower the operation efficiency. The storage time can be used to measure the duration of coal accumulation. The longer the duration of coal accumulation, the greater the workload of handling coal and the lower the operation efficiency. The loading and unloading berthing time can be used to measure the length of time a ship needs to berth when loading and unloading coal. The longer the length of time a ship needs to berth, the greater the workload of handling coal and the lower the operation efficiency. In the preset operating efficiency calculation formula, the operating efficiency parameters are negatively correlated with the on-site inventory, storage time and loading and unloading berthing time. The smaller the on-site inventory, storage time and loading and unloading berthing time, the larger the corresponding operating efficiency parameters, which can more accurately measure the operating efficiency.
[0058] Furthermore, the calculation formula of the operating efficiency parameter is shown in formula (3):
[0059]
[0060] In formula (3), R c is the operating efficiency parameter, c h is the field stock, t c is the storage time, t z is the loading and unloading berthing time, l m is the loading and unloading time parameter, s c are space utilization parameters, ψ, η, φ and is the preset characteristic coefficient.
[0061] In one embodiment, the steps of obtaining the operating efficiency parameter, storing the safety parameter and the transport efficiency parameter include:
[0062] Obtaining transportation cost parameters, transportation time parameters, cargo damage parameters, punctuality parameters, load factor parameters, and loading factor parameters;
[0063] Based on a preset transportation efficiency calculation formula, the transportation efficiency parameter is calculated according to the transportation cost parameter, the transportation time parameter, the cargo damage parameter, the punctuality parameter, the load factor parameter and the loading factor parameter to obtain the transportation efficiency parameter; wherein the transportation efficiency parameter is positively correlated with the punctuality parameter, the load factor parameter and the loading factor parameter, respectively; the transportation efficiency parameter is negatively correlated with the transportation cost parameter, the transportation time parameter and the cargo damage parameter, respectively.
[0064] In this embodiment, in order to more accurately calculate the transport efficiency parameters, the transport cost parameters, transport time parameters, cargo damage parameters, punctuality parameters, load factor parameters and loading factor parameters are used as input parameters of a preset transport efficiency calculation formula for calculating the transport efficiency parameters, and the transport efficiency parameters are calculated based on at least considering these six parameters.
[0065] The transportation cost parameter can be used to measure the unit cost or total cost of transporting coal, such as the vehicle transportation fee required to transport the remaining coal. The larger the transportation cost parameter, the greater the transportation cost of the corresponding coal operation plan. The transportation time parameter can be used to measure the time required to transport coal, such as the vehicle driving time required to transport the remaining coal. The larger the transportation time parameter, the greater the transportation time of the corresponding coal operation plan. The cargo damage parameter can be used to measure the amount of cargo damage in transporting coal, such as the amount of coal damaged due to the transportation of the remaining coal. The larger the cargo damage parameter, the greater the amount of cargo damage in the corresponding coal operation plan.
[0066] The punctuality rate parameter can be used to measure the punctuality of coal transportation, such as the proportion of coal delivered on time to the total amount of coal. The larger the punctuality rate parameter, the greater the punctuality of the corresponding coal operation plan. The loading rate parameter can be used to measure the proportion of coal transported in a single time or per unit time to the total amount of coal, such as the proportion of coal transported in a day to the total amount of coal. The larger the loading rate parameter, the greater the transportation efficiency of the corresponding coal operation plan. The loading rate parameter can be used to measure the weight of coal loaded on each transport equipment, such as the proportion of coal transported by a transport vehicle in a single transport to the total amount of coal. The larger the loading rate parameter, the greater the loading degree of the corresponding coal operation plan and the greater the transportation capacity.
[0067] In the preset transportation efficiency calculation formula, the transportation efficiency parameter is positively correlated with the punctuality parameter, the load rate parameter and the loading rate parameter, and the transportation efficiency parameter is negatively correlated with the transportation cost parameter, the transportation time parameter and the cargo damage parameter. When the punctuality parameter, the load rate parameter and the loading rate parameter are larger, the transportation cost parameter, the transportation time parameter and the cargo damage parameter are smaller, and the corresponding transportation efficiency parameter is larger, this can more accurately measure the transportation capacity of the coal operation plan.
[0068] Furthermore, the calculation formula of the transport efficiency parameter is shown in formula (4):
[0069]
[0070] In formula (4), F y is the transport efficiency parameter, x r is the transportation cost parameter, t w is the transport time parameter, h a is the cargo damage parameter, t g is the punctuality parameter, q w is the load factor parameter, z a are the loading rate parameters, σ1, σ2, σ3, λ1, λ2, λ3 and is the preset characteristic coefficient.
[0071] In one embodiment, based on the index-scheme relationship, the step of comparing the operation comprehensive index with the reference comprehensive index to determine the coal operation scheme includes:
[0072] Comparing the operation comprehensive index with a plurality of grading intervals to determine the grading interval in which the operation comprehensive index is located; wherein the endpoint value of each grading interval is determined by the reference comprehensive index;
[0073] Based on the index-scheme relationship, the coal operation scheme corresponding to the grading interval where the comprehensive operation index is located is determined; wherein each grading interval corresponds to the coal operation scheme.
[0074] In this embodiment, several grading intervals are obtained by dividing the comprehensive index axis by reference to the comprehensive index, and two adjacent reference comprehensive indexes can determine a grading interval. The operation comprehensive index is compared with the reference comprehensive indexes of several grading intervals to determine the reference comprehensive index adjacent to the operation comprehensive index, and then determine the corresponding grading interval. The index scheme relationship constructs a corresponding relationship between the grading interval and the coal operation scheme, and then the corresponding coal operation scheme can be determined according to the grading interval where the operation comprehensive index is located.
[0075] In one embodiment, the method further comprises:
[0076] Get coal supply parameters;
[0077] The coal supply parameters are input into the supply and demand forecasting model for forecasting to obtain a reserve forecast result; wherein the coal supply parameters include a reserve quantity influencing factor, and the reserve quantity influencing factor is calculated by a policy impact fluctuation parameter, a downstream demand fluctuation parameter and a seasonal supply and demand fluctuation parameter, wherein the reserve quantity influencing factor is positively correlated with the seasonal supply and demand fluctuation parameter and the downstream demand fluctuation parameter, respectively, and the reserve quantity influencing factor is negatively correlated with the policy impact fluctuation parameter, respectively.
[0078] In this embodiment, in order to accurately calculate the amount of coal required to be stored in the port and avoid coal accumulation in the port, a neural network model and other models are trained based on historical market supply and demand data and the demand data for coal in the port to obtain a supply and demand forecasting model. The current coal supply parameters are obtained, input into the supply and demand forecasting model, and the demand for coal in the port is obtained as a reserve forecasting result. Among them, the coal supply parameters include reserve influencing factors. In order to accurately measure the supply and demand situation, the policy impact fluctuation parameters, downstream demand fluctuation parameters and seasonal supply and demand fluctuation parameters are used as input data for calculating the reserve influencing factors. The seasonal supply and demand fluctuation parameters are used to measure the degree of change in coal supply and demand in seasonal changes. The larger the seasonal supply and demand fluctuation parameters, the greater the impact on coal reserves; the downstream demand fluctuation parameters are used to measure the degree of change in coal supply and demand in downstream demand changes. The larger the downstream demand fluctuation parameters, the greater the impact on coal reserves. The policy impact fluctuation parameters are used to measure the degree of change in coal supply and demand in policy changes. The larger the policy impact fluctuation parameters, the greater the impact on coal reserves. Among them, the policy impact fluctuation parameters can be obtained by establishing a relationship between the parameters of coal supply and demand adjustment in historical policy changes and the actual coal supply and demand fluctuation data in the market, so as to measure the impact of different policies on coal supply and demand.
[0079] In one embodiment, the calculation formula of the reserve impact factor is shown in formula (5):
[0080]
[0081] In formula (5), r s is the reserve impact factor, e p is the policy impact volatility parameter, n x is the downstream demand fluctuation parameter, a e is the seasonal supply and demand fluctuation parameter, θ and ξ are the preset characteristic coefficients.
[0082] In one embodiment, the step of obtaining coal supply parameters includes:
[0083] Obtain coal orders, coal prices, inventory data, and reserve influencing factors as coal supply parameters. In this embodiment, in order to more accurately establish a supply and demand forecasting model, data such as coal orders, coal prices, inventory data, and reserve influencing factors are collected to train models such as neural network models to obtain a supply and demand forecasting model.
[0084] In one embodiment, the method further includes: comparing the reserve prediction result with the current reserve data to obtain a reserve adjustment result. In this embodiment, the current reserve data is the amount of coal currently stored in the port, and the reserve prediction result is the demand for coal in the port predicted by the supply and demand prediction model within a period of time from the current time. When the current reserve data is greater than the reserve prediction result, it means that the port has stored more coal at the current time, and the current reserve is too large, and the reserve adjustment result of reducing the amount of coal purchased is obtained; when the current reserve data is equal to the reserve prediction result, it means that the coal stored in the port at the current time just meets the demand, and the current reserve is appropriate, and the reserve adjustment result of maintaining the current reserve data is obtained; when the current reserve data is less than the reserve prediction result, it means that the port has stored less coal at the current time, and the current reserve is too small, and the reserve adjustment result of increasing the amount of coal purchased is obtained.
[0085] It should be understood that although Figure 1 The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 1 At least part of the steps may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.
[0086] Embodiment 2
[0087] In this embodiment, Figure 4 As shown, a method for determining a coal operation plan is provided, which includes:
[0088] Step S11, obtaining coal yard monitoring data, including coal storage monitoring data, loading and unloading operation monitoring data and yard environment monitoring data;
[0089] Step S12, calculating based on the coal storage monitoring data and the loading and unloading operation monitoring data to obtain a storage space utilization evaluation coefficient, and calculating based on the loading and unloading operation monitoring data to obtain a loading and unloading time efficiency evaluation coefficient;
[0090] Step S13, calculating according to the coal storage monitoring data, the loading and unloading operation monitoring data, the loading and unloading time efficiency evaluation coefficient, and the storage space utilization evaluation coefficient to obtain a storage yard operation efficiency evaluation index;
[0091] Step S14, processing the yard environment monitoring data to obtain a storage safety evaluation index, and processing the coal historical transportation record data to obtain a transportation efficiency evaluation index;
[0092] Step S15, calculating according to the yard operation efficiency evaluation index, storage safety evaluation index and transportation efficiency evaluation index to obtain a comprehensive evaluation index for coal transportation and marketing, and matching a corresponding coal transportation and marketing adjustment plan according to the comprehensive evaluation index for coal transportation and marketing.
[0093] It should be noted that the present application conducts real-time monitoring and evaluation of yard operating efficiency, storage safety and transportation efficiency, adaptively matches the corresponding coal transportation and sales adjustment plan according to the evaluation results, and predicts the coal reserves according to the current coal market and current coal supply situation, thereby achieving the purpose of real-time adjustment of the coal transportation and sales plan and prediction of the port coal reserves.
[0094] In one embodiment, the coal yard monitoring data, including coal storage monitoring data, loading and unloading operation monitoring data and yard environment monitoring data, includes:
[0095] The coal stockpile monitoring data includes stack distribution data, coal type spatial arrangement data, stockpile mode monitoring data, coal yard inventory data and coal stockpile duration data;
[0096] The loading and unloading operation monitoring data includes material taking time data, loading and unloading machinery configuration data, loading and unloading personnel configuration data, loading and unloading process setting data, loading and unloading time data and loading and unloading vessel berthing time data;
[0097] The storage yard environment monitoring data includes natural environment monitoring data, temperature and humidity monitoring data, abnormal gas monitoring data and electrical equipment operation monitoring data.
[0098] In one embodiment, the calculation based on the coal storage monitoring data and the loading and unloading operation monitoring data to obtain the storage space utilization evaluation coefficient, and the calculation based on the loading and unloading operation monitoring data to obtain the loading and unloading time efficiency evaluation coefficient include:
[0099] Calculate based on the coal type stack distribution data, the storage method monitoring data and the material taking time data to obtain the storage space utilization assessment coefficient;
[0100] The loading and unloading time efficiency evaluation coefficient is obtained by performing calculations based on the loading and unloading machinery configuration data, loading and unloading personnel configuration data, loading and unloading process setting data and loading and unloading time data.
[0101] In one embodiment, the calculation based on the coal storage monitoring data, the loading and unloading operation monitoring data, the loading and unloading time efficiency evaluation coefficient, and the storage space utilization evaluation coefficient to obtain the yard operation efficiency evaluation index includes:
[0102] The yard operation efficiency evaluation index is obtained by calculating according to the coal yard inventory data, coal storage time data, loading and unloading ship berthing time data, loading and unloading time evaluation coefficient and the storage space utilization evaluation coefficient;
[0103] The calculation formula of the yard operation efficiency evaluation index is:
[0104]
[0105] Among them, R c is the yard operation efficiency evaluation index, c h is the coal yard inventory data, t c is the coal storage time data, t z is the berthing time data of the loading and unloading ship, l m is the loading and unloading time evaluation coefficient, s c are the storage space utilization assessment coefficients, ψ, η, φ and is the preset characteristic coefficient.
[0106] In one embodiment, the processing of the yard environment monitoring data to obtain a storage safety evaluation index and the processing of the coal historical transportation record data to obtain a transportation efficiency evaluation index include:
[0107] Inputting the natural environment monitoring data, temperature and humidity monitoring data, abnormal gas monitoring data and electrical equipment operation monitoring data into a preset coal storage safety assessment model for processing to obtain a storage safety assessment index;
[0108] Obtain historical coal transportation record data, and extract transportation cost data, transportation time data, cargo damage rate data, punctuality rate data, loading rate data, and loading rate data based on the historical coal transportation record data;
[0109] Processing the transportation cost data, transportation time data, cargo damage rate data, punctuality rate data, load factor data, and loading rate data to obtain a transportation efficiency evaluation index;
[0110] The calculation formula of the transport efficiency evaluation index is:
[0111]
[0112] Among them, F y is the transport efficiency evaluation index, x ris the transportation cost data, t w is the transportation time data, h a is the cargo damage rate data, t g is the punctuality data, q w is the load factor data, z a is the loading rate data, σ1, σ2, σ3, λ1, λ2, λ3 and is the preset characteristic coefficient.
[0113] In one embodiment, the calculation is performed based on the yard operation efficiency evaluation index, the storage safety evaluation index and the transportation efficiency evaluation index to obtain a comprehensive evaluation index for coal transportation and marketing, and the corresponding coal transportation and marketing adjustment plan is matched based on the comprehensive evaluation index for coal transportation and marketing, including:
[0114] Performing weighted average calculation on the yard operation efficiency evaluation index, storage safety evaluation index and transportation efficiency evaluation index according to preset weighting coefficients to obtain a comprehensive evaluation index for coal transportation and marketing;
[0115] Comparing the coal transportation and marketing comprehensive evaluation index with a preset coal transportation and marketing comprehensive evaluation index threshold, and determining the coal transportation and marketing comprehensive evaluation level according to the range level to which the threshold comparison result belongs;
[0116] The comprehensive assessment level of coal transportation and marketing is input into the coal transportation and marketing adjustment plan database in the preset port coal transportation and marketing digital monitoring platform for matching to obtain the coal transportation and marketing adjustment plan.
[0117] In one embodiment, the method further includes:
[0118] Obtain current coal market data, including data on fluctuations due to energy policy impacts, downstream industry demand fluctuations, and seasonal supply and demand fluctuations;
[0119] The influencing factor of coal reserves is obtained by calculation based on the energy policy impact fluctuation data, downstream industry demand fluctuation data and seasonal supply and demand fluctuation data.
[0120] In one embodiment, the method further comprises:
[0121] Obtain current coal supply data, including coal order volume data, coal price data and coal storage volume data;
[0122] Inputting the coal order quantity data, coal price data, coal inventory data and the coal reserve influencing factor into a preset coal supply and demand forecasting model for processing to obtain reserve forecasting data;
[0123] Coal reserve adjustments are made based on the reserve forecast data.
[0124] In one embodiment, a memory and a processor are included, wherein the memory stores a program of a method for managing port coal transportation and marketing data information based on intelligent analysis, and when the method for managing port coal transportation and marketing data information based on intelligent analysis is executed by the processor, the following steps are implemented:
[0125] Obtain coal yard monitoring data, including coal storage monitoring data, loading and unloading operation monitoring data, and yard environment monitoring data;
[0126] Calculate based on the coal storage monitoring data and the loading and unloading operation monitoring data to obtain a storage space utilization evaluation coefficient, and calculate based on the loading and unloading operation monitoring data to obtain a loading and unloading time efficiency evaluation coefficient;
[0127] Calculate based on the coal storage monitoring data, loading and unloading operation monitoring data, loading and unloading time efficiency evaluation coefficient, and storage space utilization evaluation coefficient to obtain a storage yard operation efficiency evaluation index;
[0128] Processing the yard environment monitoring data to obtain a storage safety evaluation index, and processing the coal historical transportation record data to obtain a transportation efficiency evaluation index;
[0129] The comprehensive coal transportation and marketing evaluation index is calculated based on the yard operation efficiency evaluation index, storage safety evaluation index and transportation efficiency evaluation index, and the corresponding coal transportation and marketing adjustment plan is matched based on the comprehensive coal transportation and marketing evaluation index.
[0130] In one embodiment, the coal yard monitoring data, including coal storage monitoring data, loading and unloading operation monitoring data and yard environment monitoring data, includes:
[0131] The coal stockpile monitoring data includes stack distribution data, coal type spatial arrangement data, stockpile mode monitoring data, coal yard inventory data and coal stockpile duration data;
[0132] The loading and unloading operation monitoring data includes material taking time data, loading and unloading machinery configuration data, loading and unloading personnel configuration data, loading and unloading process setting data, loading and unloading time data and loading and unloading vessel berthing time data;
[0133] The storage yard environment monitoring data includes natural environment monitoring data, temperature and humidity monitoring data, abnormal gas monitoring data and electrical equipment operation monitoring data.
[0134] According to an embodiment of the present invention, the acquisition of coal yard monitoring data, including coal storage monitoring data, loading and unloading operation monitoring data and yard environment monitoring data, includes:
[0135] The coal stockpile monitoring data includes stack distribution data, coal type spatial arrangement data, stockpile mode monitoring data, coal yard inventory data and coal stockpile duration data;
[0136] The loading and unloading operation monitoring data includes material taking time data, loading and unloading machinery configuration data, loading and unloading personnel configuration data, loading and unloading process setting data, loading and unloading time data and loading and unloading vessel berthing time data;
[0137] The storage yard environment monitoring data includes natural environment monitoring data, temperature and humidity monitoring data, abnormal gas monitoring data and electrical equipment operation monitoring data.
[0138] It should be noted that the port should make scientific use of the existing sites and stacks, and scientifically arrange the distribution of stacks for various types of coal in the yard, striving to meet the needs of the best loading and unloading process to the greatest extent possible. For example, coal with large transportation volume and fast turnover can be stored in large stacks and arranged at the front end of the yard longitudinal direction (the direction of movement of the stacker and reclaimer), and stacks can be arranged for each operation line; coal with slightly smaller transportation volume and slower turnover can be stored in small stacks, and the coal types close to the front end can be arranged in sequence backwards. Such an arrangement of coal types can not only meet the needs of loading operations, so that each loading line can retrieve materials, but also reduce the movement time of the stacker and reclaimer, thereby achieving the purpose of compressing the auxiliary operation time. The storage method also needs to be considered during storage. Coal from different mines and different types should not be stored together to prevent quality issues. Try to avoid storing lump coal and fine coal together. If lump coal and fine coal must be stored together, be careful not to pile the lump coal underneath and the fine coal on top. The short-term storage methods for power coal and coking coal are also different. Therefore, when evaluating the utilization of the storage space in the yard, it is necessary to monitor the distribution of coal type stacks and the storage method to obtain coal type stack distribution data and storage method monitoring data.
[0139] Please refer to Figure 5 , Figure 5 The present invention is a flowchart of obtaining a storage space utilization evaluation coefficient and a loading and unloading time efficiency evaluation coefficient of a port coal transportation and marketing data information management method based on intelligent analysis in some embodiments of the present application. According to an embodiment of the present invention, the calculation based on the coal storage monitoring data and the loading and unloading operation monitoring data to obtain the storage space utilization evaluation coefficient, and the calculation based on the loading and unloading operation monitoring data to obtain the loading and unloading time efficiency evaluation coefficient include:
[0140] S21, calculating according to the coal type stack position distribution data, the stacking mode monitoring data and the material taking time data to obtain a stacking space utilization evaluation coefficient;
[0141] S22, performing calculations based on the loading and unloading machinery configuration data, loading and unloading personnel configuration data, loading and unloading process setting data, and loading and unloading time data to obtain a loading and unloading time efficiency evaluation coefficient.
[0142] It should be noted that the storage space utilization evaluation coefficient is obtained by calculating according to the coal type stack distribution data, the storage mode monitoring data and the material taking time data, and the loading and unloading time efficiency evaluation coefficient is obtained by calculating according to the loading and unloading machinery configuration data, the loading and unloading personnel configuration data, the loading and unloading process setting data and the loading and unloading time data;
[0143] The calculation formula of the storage space utilization evaluation coefficient is:
[0144]
[0145] Among them, s c is the storage space utilization assessment coefficient, f a is the distribution data of coal stacks, d s is the monitoring data of the stockpile method, t p is the material collection time data, α, β and γ are the preset characteristic coefficients (which can be obtained by querying the preset port coal transportation and marketing digital monitoring platform database);
[0146] The calculation formula of the loading and unloading time evaluation coefficient is:
[0147]
[0148] Among them, l m is the loading and unloading time evaluation coefficient, m p Configuration data for loading and unloading machinery, p e Configure data for loading and unloading personnel, k l Set up data for loading and unloading processes, t m is the loading and unloading time data, and χ, ε, δ, κ and μ are the preset characteristic coefficients (which can be obtained by querying the preset port coal transportation and sales digital monitoring platform database).
[0149] According to an embodiment of the present invention, the calculation based on the coal storage monitoring data, the loading and unloading operation monitoring data, the loading and unloading time efficiency evaluation coefficient, and the storage space utilization evaluation coefficient to obtain the yard operation efficiency evaluation index includes:
[0150] The yard operation efficiency evaluation index is obtained by calculating according to the coal yard inventory data, coal storage time data, loading and unloading ship berthing time data, loading and unloading time evaluation coefficient and the storage space utilization evaluation coefficient;
[0151] The calculation formula of the yard operation efficiency evaluation index is:
[0152]
[0153] Among them, R c is the yard operation efficiency evaluation index, ch is the coal yard inventory data, t c is the coal storage time data, t z is the berthing time data of the loading and unloading ship, l m is the loading and unloading time evaluation coefficient, s c are the storage space utilization assessment coefficients, ψ, η, φ and It is the preset characteristic coefficient (which can be obtained by querying the preset port coal transportation and sales digital monitoring platform database).
[0154] It should be noted that a comprehensive calculation is performed based on the coal storage monitoring data, loading and unloading operation monitoring data, loading and unloading time efficiency assessment coefficient, and storage space utilization assessment coefficient to obtain a comprehensive assessment of the yard operation efficiency.
[0155] Please refer to Figure 6 , Figure 6 The present invention is a flowchart of obtaining a storage safety evaluation index and a transportation efficiency evaluation index of a port coal transportation and marketing data information management method based on intelligent analysis in some embodiments of the present application. According to an embodiment of the present invention, the storage safety evaluation index is obtained by processing the yard environment monitoring data, and the transportation efficiency evaluation index is obtained by processing the coal historical transportation record data, including:
[0156] S31, inputting the natural environment monitoring data, temperature and humidity monitoring data, abnormal gas monitoring data and electrical equipment operation monitoring data into a preset coal storage safety assessment model for processing to obtain a storage safety assessment index;
[0157] S32, obtaining historical coal transportation record data, and extracting transportation cost data, transportation time data, cargo damage rate data, punctuality rate data, loading rate data, and loading rate data according to the historical coal transportation record data;
[0158] S33, processing the transportation cost data, transportation time data, cargo damage rate data, punctuality rate data, load factor data and loading rate data to obtain a transportation efficiency evaluation index;
[0159] The calculation formula of the transport efficiency evaluation index is:
[0160]
[0161] Among them, F y is the transport efficiency evaluation index, x r is the transportation cost data, t w is the transportation time data, h a is the cargo damage rate data, t g is the punctuality data, q w is the load factor data, z ais the loading rate data, σ1, σ2, σ3, λ1, λ2, λ3 and It is the preset characteristic coefficient (which can be obtained by querying the preset port coal transportation and sales digital monitoring platform database).
[0162] It should be noted that the loading rate refers to the ratio of the tonnage of coal loaded on the ship to the maximum deadweight tonnage of the ship. A high loading rate means that the ship has high loading efficiency and can make better use of its transportation capacity. The loading rate refers to the ratio of the space actually allocated to coal to its total available space. In the process of coal water transportation, the loading rate represents the distribution of coal in the ship's cabin, ensuring that the coal is evenly distributed to maintain the stability and navigation safety of the ship. The loading rate is directly related to the ship's operating efficiency and the transportation safety of coal. Therefore, it is necessary to collect loading rate data and loading rate data when evaluating the efficiency of coal transportation.
[0163] Please refer to Figure 7 , Figure 7 The present invention is a flowchart of obtaining a coal transportation and marketing adjustment plan of a port coal transportation and marketing data information management method based on intelligent analysis in some embodiments of the present application. According to an embodiment of the present invention, the calculation is performed based on the yard operation efficiency evaluation index, the storage safety evaluation index and the transportation efficiency evaluation index to obtain a comprehensive evaluation index for coal transportation and marketing, and the corresponding coal transportation and marketing adjustment plan is matched according to the comprehensive evaluation index for coal transportation and marketing, including:
[0164] S41, performing weighted average calculation on the yard operation efficiency evaluation index, storage safety evaluation index and transportation efficiency evaluation index according to a preset weighting coefficient to obtain a comprehensive evaluation index for coal transportation and marketing;
[0165] S42, comparing the coal transportation and marketing comprehensive evaluation index with a preset coal transportation and marketing comprehensive evaluation index threshold, and determining the coal transportation and marketing comprehensive evaluation level according to the range level to which the threshold comparison result belongs;
[0166] S43. Input the comprehensive assessment level of coal transportation and marketing into the coal transportation and marketing adjustment plan database in the preset port coal transportation and marketing digital monitoring platform for matching, and obtain the coal transportation and marketing adjustment plan.
[0167] It should be noted that the comprehensive evaluation index of coal transportation and marketing is compared with the preset threshold of the comprehensive evaluation index of coal transportation and marketing, and the comprehensive evaluation level of coal transportation and marketing is determined according to the range level to which the threshold comparison result belongs. In this embodiment, the preset threshold range of the threshold comparison result is set to four levels, namely, level Ⅰ, level Ⅱ, level Ⅲ, and level Ⅳ, among which the threshold range of level Ⅰ is (0, 0.3], the threshold range of level Ⅱ is (0.3, 0.6], the threshold range of level Ⅲ is (0.6, 0.8], and the threshold range of level Ⅳ is (0.8, 1]; if the threshold comparison test result of the comprehensive evaluation index of coal transportation and marketing is 0.5, the corresponding comprehensive evaluation level of coal transportation and marketing is level Ⅱ.
[0168] According to an embodiment of the present invention, it also includes:
[0169] Obtain current coal market data, including data on fluctuations due to energy policy impacts, downstream industry demand fluctuations, and seasonal supply and demand fluctuations;
[0170] The influencing factor of coal reserves is obtained by calculation based on the energy policy impact fluctuation data, downstream industry demand fluctuation data and seasonal supply and demand fluctuation data.
[0171] It should be noted that the coal reserve impact factor is obtained by calculating based on the energy policy impact fluctuation data, downstream industry demand fluctuation data and seasonal supply and demand fluctuation data;
[0172] The calculation formula of the coal reserve influencing factor is:
[0173]
[0174] Among them, r s is the influencing factor of coal reserves, e p is the volatility data of energy policy impact, n x is the fluctuation data of demand in downstream industries, a e Seasonal supply and demand fluctuation data, θ and ξ are preset characteristic coefficients (which can be obtained by querying the preset port coal transportation and sales digital monitoring platform database).
[0175] According to an embodiment of the present invention, it also includes:
[0176] Obtain current coal supply data, including coal order volume data, coal price data and coal storage volume data;
[0177] Inputting the coal order quantity data, coal price data, coal inventory data and the coal reserve influencing factor into a preset coal supply and demand forecasting model for processing to obtain reserve forecasting data;
[0178] Coal reserve adjustments are made based on the reserve forecast data.
[0179] It should be noted that the coal reserves are predicted based on the current coal supply data and factors affecting coal reserves. The preset coal supply and demand forecasting model is a model obtained by training with a large number of historical samples of coal order quantity data, coal price data, coal inventory data, coal reserve influencing factors and reserve forecasting data. The coal order quantity data, coal price data, coal inventory data and coal reserve influencing factors can be input into this coal supply and demand forecasting model to obtain the corresponding output reserve forecast data.
[0180] In this embodiment, firstly, the historical coal order quantity data, coal price data, coal inventory data of the port are obtained according to historical survey statistics, and the coal reserve influencing factors calculated according to the historical data and the historical reserve data are used to train the initial model to obtain a preset coal supply and demand forecasting model. This model is based on the principle of the neural network model and is used to predict future coal reserves. According to the forecasting model, the currently obtained coal order quantity data, coal price data, coal inventory data, and the calculated coal reserve influencing factors can be input into this preset model for processing to obtain the current optimal coal reserve. The purpose of the present invention is to establish an indicator evaluation and monitoring mechanism including indicators of yard operation efficiency, storage safety and transportation efficiency, monitor and evaluate the indicators regularly to obtain recorded monitoring data, and then evaluate according to the recorded monitoring data, select the corresponding management strategy in the existing transportation and marketing plan database according to the evaluation results, and obtain the final adjustment plan. For example: if the comprehensive evaluation level of coal transportation and marketing is level 2, then the transportation and marketing adjustment plan corresponding to the level 2 evaluation indicator is automatically selected from the preset coal transportation and marketing adjustment plan database, and the obtained transportation and marketing adjustment plan includes strategies for adjusting factors such as yard operation efficiency, storage safety and transportation efficiency. Among them, the coal transportation and marketing adjustment plan database and the transportation and marketing adjustment plan are preset to already exist, and the specific database construction method and the detailed construction method of the transportation and marketing adjustment plan are not the scope of the key protection of the present invention. The purpose of the present invention is to construct an evaluation indicator system, which is a technology that is still lacking in existing coal transportation and marketing patents.
[0181] Embodiment 3
[0182] In this embodiment, a system for determining a coal operation plan is provided, which includes:
[0183] A parameter acquisition module, used to acquire operating efficiency parameters, storage safety parameters and transportation efficiency parameters; wherein, the operating efficiency parameters are calculated based on a preset operating efficiency formula for space utilization parameters and loading and unloading time efficiency parameters, and the transportation efficiency parameters are calculated based on a preset transportation efficiency formula for historical transportation parameters;
[0184] A comprehensive index module, used for performing weighted averaging based on the operation efficiency parameter, the storage safety parameter and the transportation efficiency parameter to obtain an operation comprehensive index;
[0185] A scheme determination module is used to compare the operation comprehensive index with the reference comprehensive index based on the index scheme relationship to determine the coal operation scheme; wherein the index scheme relationship is established according to the corresponding relationship between a plurality of the reference comprehensive indexes and a plurality of coal operation schemes;
[0186] The equipment control module is used to control the transportation equipment to operate according to the control parameters of the coal operation plan.
[0187] In one embodiment, the parameter acquisition module includes:
[0188] An efficiency acquisition module, used to obtain the loading and unloading time efficiency parameters and the space utilization parameters of the stored coal;
[0189] The efficiency calculation module is used to calculate the operation efficiency parameter based on the preset operation efficiency calculation formula according to the loading and unloading time efficiency parameter and the space utilization parameter to obtain the operation efficiency parameter; wherein the operation efficiency parameter is positively correlated with the loading and unloading time efficiency parameter and the space utilization parameter respectively.
[0190] In one embodiment, the efficiency acquisition module includes:
[0191] The acquisition module is used to obtain the coal type distribution parameters, storage method parameters and material collection time parameters;
[0192] A calculation module is used to calculate based on a preset space utilization calculation formula according to the coal type distribution parameter, the stockpiling method parameter and the material taking time parameter to obtain the space utilization parameter; wherein the space utilization parameter is positively correlated with the coal type distribution parameter and the stockpiling method parameter, respectively, and the space utilization parameter is negatively correlated with the material taking time parameter;
[0193] and / or,
[0194] The loading and unloading acquisition module is used to obtain the loading and unloading machinery parameters, loading and unloading personnel parameters, loading and unloading process parameters and loading and unloading time parameters;
[0195] The loading and unloading calculation module is used to calculate based on a preset loading and unloading time calculation formula according to the loading and unloading machinery parameters, the loading and unloading personnel parameters, the loading and unloading process parameters and the loading and unloading time parameters to obtain the loading and unloading time parameters; wherein the loading and unloading time parameters are positively correlated with the loading and unloading machinery parameters, the loading and unloading personnel parameters and the loading and unloading process parameters, respectively, and the loading and unloading time parameters are negatively correlated with the loading and unloading time parameters.
[0196] In one embodiment, the parameter acquisition module includes:
[0197] Efficiency collection module, used to obtain the yard inventory, storage time and loading and unloading berthing time;
[0198] The efficiency calculation module is used to calculate the operation efficiency parameters based on the preset operation efficiency calculation formula according to the field inventory, the storage time and the loading and unloading berthing time; wherein the operation efficiency parameters are respectively inversely correlated with the field inventory, the storage time and the loading and unloading berthing time.
[0199] In one embodiment, the parameter acquisition module includes:
[0200] The transport collection module is used to obtain transport cost parameters, transport time parameters, cargo damage parameters, punctuality parameters, load factor parameters and loading factor parameters;
[0201] The transportation calculation module is used to calculate based on a preset transportation efficiency calculation formula according to the transportation cost parameter, the transportation time parameter, the cargo damage parameter, the punctuality parameter, the load factor parameter and the loading factor parameter to obtain the transportation efficiency parameter; wherein the transportation efficiency parameter is positively correlated with the punctuality parameter, the load factor parameter and the loading factor parameter, respectively; and the transportation efficiency parameter is negatively correlated with the transportation cost parameter, the transportation time parameter and the cargo damage parameter, respectively.
[0202] In one embodiment, the solution determination module includes:
[0203] An index comparison module, used for comparing the operation comprehensive index with a plurality of grading intervals, and determining the grading interval in which the operation comprehensive index is located; wherein the endpoint value of each grading interval is determined by the reference comprehensive index;
[0204] The grading interval module is used to determine the coal operation plan corresponding to the grading interval where the operation comprehensive index is located based on the index plan relationship; wherein each grading interval corresponds to the coal operation plan.
[0205] In one embodiment, the system further comprises:
[0206] Supply parameter module, used to obtain coal supply parameters;
[0207] The supply and demand forecasting module is used to input the coal supply parameters into the supply and demand forecasting model for forecasting to obtain a reserve forecast result; wherein the coal supply parameters include a reserve quantity influencing factor, and the reserve quantity influencing factor is calculated by a policy impact fluctuation parameter, a downstream demand fluctuation parameter and a seasonal supply and demand fluctuation parameter, wherein the reserve quantity influencing factor is positively correlated with the seasonal supply and demand fluctuation parameter and the downstream demand fluctuation parameter, respectively, and the reserve quantity influencing factor is negatively correlated with the policy impact fluctuation parameter, respectively.
[0208] The specific definition of the system for determining the coal operation plan can be found in the above-mentioned definition of the method for determining the coal operation plan, which will not be repeated here. Each unit in the above-mentioned system for determining the coal operation plan can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned units can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above-mentioned units.
[0209] Embodiment 4
[0210] In this embodiment, a system for determining a coal operation plan is provided, which includes:
[0211] Parameter acquisition module, used to obtain coal yard monitoring data, including coal storage monitoring data, loading and unloading operation monitoring data and yard environment monitoring data;
[0212] A comprehensive index module, used to calculate based on the coal storage monitoring data and the loading and unloading operation monitoring data to obtain a storage space utilization evaluation coefficient, and to calculate based on the loading and unloading operation monitoring data to obtain a loading and unloading timeliness evaluation coefficient;
[0213] Calculate based on the coal storage monitoring data, loading and unloading operation monitoring data, loading and unloading time efficiency evaluation coefficient, and storage space utilization evaluation coefficient to obtain a storage yard operation efficiency evaluation index;
[0214] Processing the yard environment monitoring data to obtain a storage safety evaluation index, and processing the coal historical transportation record data to obtain a transportation efficiency evaluation index;
[0215] The scheme determination module is used to calculate according to the yard operation efficiency evaluation index, storage safety evaluation index and transportation efficiency evaluation index to obtain the comprehensive evaluation index of coal transportation and marketing, and match the corresponding coal transportation and marketing adjustment scheme according to the comprehensive evaluation index of coal transportation and marketing.
[0216] It should be noted that the present application conducts real-time monitoring and evaluation of yard operating efficiency, storage safety and transportation efficiency, adaptively matches the corresponding coal transportation and sales adjustment plan according to the evaluation results, and predicts the coal reserves according to the current coal market and current coal supply situation, thereby achieving the purpose of real-time adjustment of the coal transportation and sales plan and prediction of the port coal reserves.
[0217] In one embodiment, the scheme determination system is further used to:
[0218] The coal stockpile monitoring data includes stack distribution data, coal type spatial arrangement data, stockpile mode monitoring data, coal yard inventory data and coal stockpile duration data;
[0219] The loading and unloading operation monitoring data includes material taking time data, loading and unloading machinery configuration data, loading and unloading personnel configuration data, loading and unloading process setting data, loading and unloading time data and loading and unloading vessel berthing time data;
[0220] The storage yard environment monitoring data includes natural environment monitoring data, temperature and humidity monitoring data, abnormal gas monitoring data and electrical equipment operation monitoring data.
[0221] It should be noted that the port should make scientific use of the existing sites and stacks, and scientifically arrange the distribution of stacks for various types of coal in the yard, striving to meet the needs of the best loading and unloading process to the greatest extent possible. For example, coal with large transportation volume and fast turnover can be stored in large stacks and arranged at the front end of the yard longitudinal direction (the direction of movement of the stacker and reclaimer), and stacks can be arranged for each operation line; coal with slightly smaller transportation volume and slower turnover can be stored in small stacks, and the coal types close to the front end can be arranged in sequence backwards. Such an arrangement of coal types can not only meet the needs of loading operations, so that each loading line can retrieve materials, but also reduce the movement time of the stacker and reclaimer, thereby achieving the purpose of compressing the auxiliary operation time. The storage method also needs to be considered during storage. Coal from different mines and different types should not be stored together to prevent quality issues. Try to avoid storing lump coal and fine coal together. If lump coal and fine coal must be stored together, be careful not to pile the lump coal underneath and the fine coal on top. The short-term storage methods for power coal and coking coal are also different. Therefore, when evaluating the utilization of the storage space in the yard, it is necessary to monitor the distribution of coal type stacks and the storage method to obtain coal type stack distribution data and storage method monitoring data.
[0222] In one embodiment, the scheme determination system is further used to:
[0223] Calculate based on the coal type stack distribution data, the storage method monitoring data and the material taking time data to obtain the storage space utilization assessment coefficient;
[0224] The loading and unloading time efficiency evaluation coefficient is obtained by performing calculations based on the loading and unloading machinery configuration data, loading and unloading personnel configuration data, loading and unloading process setting data and loading and unloading time data.
[0225] It should be noted that the storage space utilization evaluation coefficient is obtained by calculating according to the coal type stack distribution data, the storage mode monitoring data and the material taking time data, and the loading and unloading time efficiency evaluation coefficient is obtained by calculating according to the loading and unloading machinery configuration data, the loading and unloading personnel configuration data, the loading and unloading process setting data and the loading and unloading time data;
[0226] In one embodiment, the calculation formula of the storage space utilization evaluation coefficient is:
[0227]
[0228] Among them, s c is the storage space utilization assessment coefficient, f a is the distribution data of coal stacks, d s is the monitoring data of the stockpile method, t p is the material collection time data, α, β and γ are the preset characteristic coefficients (which can be obtained by querying the preset port coal transportation and marketing digital monitoring platform database);
[0229] In one embodiment, the calculation formula of the loading and unloading time evaluation coefficient is:
[0230]
[0231] Among them, l m is the loading and unloading time evaluation coefficient, m p Configuration data for loading and unloading machinery, p e Configure data for loading and unloading personnel, k l Set up data for loading and unloading processes, t m is the loading and unloading time data, and χ, ε, δ, κ and μ are the preset characteristic coefficients (which can be obtained by querying the preset port coal transportation and sales digital monitoring platform database).
[0232] In one embodiment, the scheme determination system is further used to:
[0233] The yard operation efficiency evaluation index is obtained by calculation based on the coal yard inventory data, coal storage time data, loading and unloading ship berthing time data, loading and unloading time efficiency evaluation coefficient and the storage space utilization evaluation coefficient.
[0234] In one embodiment, the calculation formula of the yard operation efficiency evaluation index is:
[0235]
[0236] Among them, Rc is the yard operation efficiency evaluation index, c h is the coal yard inventory data, t c is the coal storage time data, t z is the berthing time data of the loading and unloading ship, l m is the loading and unloading time evaluation coefficient, s c are the storage space utilization assessment coefficients, ψ, η, φ and It is the preset characteristic coefficient (which can be obtained by querying the preset port coal transportation and sales digital monitoring platform database).
[0237] It should be noted that a comprehensive calculation is performed based on the coal storage monitoring data, loading and unloading operation monitoring data, loading and unloading time efficiency assessment coefficient, and storage space utilization assessment coefficient to obtain a comprehensive assessment of the yard operation efficiency.
[0238] In one embodiment, the scheme determination system is further used to:
[0239] Inputting the natural environment monitoring data, temperature and humidity monitoring data, abnormal gas monitoring data and electrical equipment operation monitoring data into a preset coal storage safety assessment model for processing to obtain a storage safety assessment index;
[0240] Obtain historical coal transportation record data, and extract transportation cost data, transportation time data, cargo damage rate data, punctuality rate data, loading rate data, and loading rate data based on the historical coal transportation record data;
[0241] The transportation cost data, transportation time data, cargo damage rate data, punctuality rate data, load rate data and loading rate data are processed to obtain a transportation efficiency evaluation index.
[0242] In one embodiment, the calculation formula of the transport efficiency evaluation index is:
[0243]
[0244] Among them, F y is the transport efficiency evaluation index, x r is the transportation cost data, t w is the transportation time data, h a is the cargo damage rate data, t g is the punctuality data, q w is the load factor data, z a is the loading rate data, σ1, σ2, σ3, λ1, λ2, λ3 and It is the preset characteristic coefficient (which can be obtained by querying the preset port coal transportation and sales digital monitoring platform database).
[0245] It should be noted that the loading rate refers to the ratio of the tonnage of coal loaded on the ship to the maximum deadweight tonnage of the ship. A high loading rate means that the ship has high loading efficiency and can make better use of its transportation capacity. The loading rate refers to the ratio of the space actually allocated to coal to its total available space. In the process of coal water transportation, the loading rate represents the distribution of coal in the ship's cabin, ensuring that the coal is evenly distributed to maintain the stability and navigation safety of the ship. The loading rate is directly related to the ship's operating efficiency and the transportation safety of coal. Therefore, it is necessary to collect loading rate data and loading rate data when evaluating the efficiency of coal transportation.
[0246] In one embodiment, the scheme determination system is further used to:
[0247] Performing weighted average calculation on the yard operation efficiency evaluation index, storage safety evaluation index and transportation efficiency evaluation index according to preset weighting coefficients to obtain a comprehensive evaluation index for coal transportation and marketing;
[0248] Comparing the coal transportation and marketing comprehensive evaluation index with a preset coal transportation and marketing comprehensive evaluation index threshold, and determining the coal transportation and marketing comprehensive evaluation level according to the range level to which the threshold comparison result belongs;
[0249] The comprehensive assessment level of coal transportation and marketing is input into the coal transportation and marketing adjustment plan database in the preset port coal transportation and marketing digital monitoring platform for matching to obtain the coal transportation and marketing adjustment plan.
[0250] It should be noted that the comprehensive evaluation index of coal transportation and marketing is compared with the preset threshold of the comprehensive evaluation index of coal transportation and marketing, and the comprehensive evaluation level of coal transportation and marketing is determined according to the range level to which the threshold comparison result belongs. In this embodiment, the preset threshold range of the threshold comparison result is set to four levels, namely, level Ⅰ, level Ⅱ, level Ⅲ, and level Ⅳ, among which the threshold range of level Ⅰ is (0, 0.3], the threshold range of level Ⅱ is (0.3, 0.6], the threshold range of level Ⅲ is (0.6, 0.8], and the threshold range of level Ⅳ is (0.8, 1]; if the threshold comparison test result of the comprehensive evaluation index of coal transportation and marketing is 0.5, the corresponding comprehensive evaluation level of coal transportation and marketing is level Ⅱ.
[0251] In one embodiment, the scheme determination system is further used to:
[0252] Obtain current coal market data, including data on fluctuations due to energy policy impacts, downstream industry demand fluctuations, and seasonal supply and demand fluctuations;
[0253] The influencing factor of coal reserves is obtained by calculation based on the energy policy impact fluctuation data, downstream industry demand fluctuation data and seasonal supply and demand fluctuation data.
[0254] It should be noted that the coal reserve impact factor is obtained by calculation based on the energy policy impact fluctuation data, downstream industry demand fluctuation data and seasonal supply and demand fluctuation data.
[0255] In one embodiment, the calculation formula of the coal reserve influencing factor is:
[0256]
[0257] Among them, r s is the influencing factor of coal reserves, e p is the volatility data of energy policy impact, n x is the fluctuation data of demand in downstream industries, a e Seasonal supply and demand fluctuation data, θ and ξ are preset characteristic coefficients (which can be obtained by querying the preset port coal transportation and sales digital monitoring platform database).
[0258] In one embodiment, the scheme determination system is further used to:
[0259] Obtain current coal supply data, including coal order volume data, coal price data and coal storage volume data;
[0260] Inputting the coal order quantity data, coal price data, coal inventory data and the coal reserve influencing factor into a preset coal supply and demand forecasting model for processing to obtain reserve forecasting data;
[0261] Coal reserve adjustments are made based on the reserve forecast data.
[0262] It should be noted that the coal reserves are predicted based on the current coal supply data and factors affecting coal reserves. The preset coal supply and demand forecasting model is a model obtained by training with a large number of historical samples of coal order quantity data, coal price data, coal inventory data, coal reserve influencing factors and reserve forecasting data. The coal order quantity data, coal price data, coal inventory data and coal reserve influencing factors can be input into this coal supply and demand forecasting model to obtain the corresponding output reserve forecast data.
[0263] The port coal transportation and marketing data information management method and system based on intelligent analysis disclosed in the present invention can realize the purpose of real-time adjustment of coal transportation and marketing plan and prediction of port coal reserves by real-time monitoring and evaluation of yard operation efficiency, storage safety and transportation efficiency, adaptively matching corresponding coal transportation and marketing adjustment plan according to the evaluation results, and predicting coal reserves according to the current coal market and current coal supply conditions.
[0264] Embodiment 5
[0265] In this embodiment, a computer device is provided. Its internal structure diagram can be shown as follows: Figure 3 As shown. The computer device includes a processor, a memory, a network interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program, and the non-volatile storage medium is deployed with a database, which is used to store coal operation plans. The internal memory provides an environment for the operation of the operating system and computer programs in the non-volatile storage medium. The network interface of the computer device is used to communicate with other computer devices that deploy application software. When the computer program is executed by the processor, a method for determining a coal operation plan is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a key, trackball or touchpad set on the computer device housing, or an external keyboard, touchpad or mouse, etc.
[0266] Those skilled in the art will understand that Figure 3 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0267] In one embodiment, a computer device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the method for determining a coal operation plan described in any of the above embodiments when executing the computer program.
[0268] Embodiment 6
[0269] In this embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps of the method for determining a coal operation plan described in any of the above embodiments are implemented.
[0270] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0271] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0272] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.
Claims
1. A method for determining a coal operation plan, It is characterized in that include: Obtaining operating efficiency parameters, storage safety parameters and transportation efficiency parameters; wherein the operating efficiency parameters are calculated based on a preset operating efficiency formula for space utilization parameters and loading and unloading time efficiency parameters, and the transportation efficiency parameters are calculated based on a preset transportation efficiency formula for historical transportation parameters; Taking a weighted average based on the operation efficiency parameter, the storage safety parameter and the transportation efficiency parameter, a comprehensive operation index is obtained; Based on the index scheme relationship, the operation comprehensive index and the reference comprehensive index are compared to determine the coal operation scheme; wherein the index scheme relationship is established according to the corresponding relationship between a plurality of the reference comprehensive indices and a plurality of coal operation schemes; According to the control parameters of the coal operation plan, the transportation equipment is controlled to operate within the control parameters.
2. The method according to claim 1, It is characterized in that The steps of obtaining the operation efficiency parameter, the storage safety parameter and the transportation efficiency parameter include: Obtaining the loading and unloading time efficiency parameters and the space utilization parameters of the coal storage; Based on a preset operation efficiency calculation formula, the operation efficiency parameter is calculated according to the loading and unloading time efficiency parameter and the space utilization parameter to obtain the operation efficiency parameter; wherein the operation efficiency parameter is positively correlated with the loading and unloading time efficiency parameter and the space utilization parameter, respectively.
3. The method according to claim 2, It is characterized in that The steps of obtaining the loading and unloading time efficiency parameters and the space utilization parameters of the coal storage include: Obtain coal type distribution parameters, storage method parameters and material extraction time parameters; Based on a preset space utilization calculation formula, the space utilization parameter is calculated according to the coal type distribution parameter, the stockpiling method parameter and the material taking time parameter to obtain the space utilization parameter; wherein the space utilization parameter is positively correlated with the coal type distribution parameter and the stockpiling method parameter, respectively, and the space utilization parameter is negatively correlated with the material taking time parameter; and / or, Obtain loading and unloading machinery parameters, loading and unloading personnel parameters, loading and unloading process parameters and loading and unloading time parameters; Based on a preset loading and unloading time efficiency calculation formula, the loading and unloading time efficiency parameters are calculated according to the loading and unloading machinery parameters, the loading and unloading personnel parameters, the loading and unloading process parameters and the loading and unloading time parameters to obtain the loading and unloading time efficiency parameters; wherein the loading and unloading time efficiency parameters are positively correlated with the loading and unloading machinery parameters, the loading and unloading personnel parameters and the loading and unloading process parameters, respectively, and the loading and unloading time efficiency parameters are negatively correlated with the loading and unloading time parameters.
4. The method according to claim 1, It is characterized in that The steps of obtaining the operation efficiency parameter, the storage safety parameter and the transportation efficiency parameter include: Obtain the yard inventory, storage time and loading and unloading berthing time; Based on a preset operating efficiency calculation formula, the operating efficiency parameters are calculated according to the field inventory, the storage time and the loading and unloading berthing time; wherein the operating efficiency parameters are respectively inversely correlated with the field inventory, the storage time and the loading and unloading berthing time.
5. The method according to claim 1, It is characterized in that The steps of obtaining the operation efficiency parameter, the storage safety parameter and the transportation efficiency parameter include: Obtaining transportation cost parameters, transportation time parameters, cargo damage parameters, punctuality parameters, load factor parameters, and loading factor parameters; Based on a preset transportation efficiency calculation formula, the transportation efficiency parameter is calculated according to the transportation cost parameter, the transportation time parameter, the cargo damage parameter, the punctuality parameter, the load factor parameter and the loading factor parameter to obtain the transportation efficiency parameter; wherein the transportation efficiency parameter is positively correlated with the punctuality parameter, the load factor parameter and the loading factor parameter, respectively; the transportation efficiency parameter is negatively correlated with the transportation cost parameter, the transportation time parameter and the cargo damage parameter, respectively.
6. The method according to claim 1, It is characterized in that Based on the index scheme relationship, the operation comprehensive index and the reference comprehensive index are compared to determine the coal operation scheme, including: Comparing the operation comprehensive index with a plurality of grading intervals to determine the grading interval in which the operation comprehensive index is located; wherein the endpoint value of each grading interval is determined by the reference comprehensive index; Based on the index-scheme relationship, the coal operation scheme corresponding to the grading interval where the comprehensive operation index is located is determined; wherein each grading interval corresponds to the coal operation scheme.
7. The method according to claim 1, It is characterized in that The method further comprises: Get coal supply parameters; The coal supply parameters are input into the supply and demand forecasting model for forecasting to obtain a reserve forecast result; wherein the coal supply parameters include a reserve quantity influencing factor, and the reserve quantity influencing factor is calculated by a policy impact fluctuation parameter, a downstream demand fluctuation parameter and a seasonal supply and demand fluctuation parameter, wherein the reserve quantity influencing factor is positively correlated with the seasonal supply and demand fluctuation parameter and the downstream demand fluctuation parameter, respectively, and the reserve quantity influencing factor is negatively correlated with the policy impact fluctuation parameter, respectively.
8. A system for determining a coal operation plan, It is characterized in that include: A parameter acquisition module is used to acquire operating efficiency parameters, storage safety parameters and transportation efficiency parameters; Among them, the operation efficiency parameter is calculated based on the preset operation efficiency formula for the space utilization parameter and the loading and unloading time efficiency parameter, and the transportation efficiency parameter is calculated based on the preset transportation efficiency formula for the historical transportation parameter; A comprehensive index module, used for performing weighted averaging based on the operation efficiency parameter, the storage safety parameter and the transportation efficiency parameter to obtain an operation comprehensive index; A scheme determination module is used to compare the operation comprehensive index with the reference comprehensive index based on the index scheme relationship to determine the coal operation scheme; wherein the index scheme relationship is established according to the corresponding relationship between a plurality of the reference comprehensive indexes and a plurality of coal operation schemes; The equipment control module is used to control the transportation equipment to operate according to the control parameters of the coal operation plan.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program. It is characterized in that When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
Citation Information
Cited By
Coal transportation and sales management system and method based on artificial intelligence
CN120124983A