Wind turbine generator practical training system

Through the design of the wind turbine training system, the operation and fault treatment of wind turbines are simulated, the wind farm training problems are solved, the training efficiency and effect are improved, and the utilization rate of wind turbines is improved.

CN119068753APending Publication Date: 2024-12-03BEIJING GUODIAN SIDA TECH CO LTD

Patent Information

Application Number
CN202411142183.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Wind farm operation and maintenance training is difficult to carry out in actual environments, resulting in power generation loss and unit risks. It is difficult to effectively master wind power theory and unit operation and maintenance knowledge in traditional classroom teaching.

Method used

Design a wind turbine training system, including main control system, pitch system, wind speed and wind condition system, overspeed simulation system, yaw simulation system and converter functional testing system, simulating wind speed, wind direction, speed and yaw movement , simulates the operation and fault handling of wind turbines, and realizes the complete functional simulation of wind turbines.

Benefits of technology

It improves the training efficiency and effectiveness of operation and maintenance engineers and students, can carry out unit fault handling and performance simulation training under safe conditions, and improves the availability and economic benefits of wind turbines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119068753A_ABST
    Figure CN119068753A_ABST
Patent Text Reader

Abstract

The invention provides a wind turbine generator set practical training system, and relates to the technical field of wind turbine generator set simulation equipment, and the system comprises a main control system, and a variable pitch system, a wind speed and wind condition system, an overspeed simulation system, a yaw simulation system and a converter function test system which are electrically connected with the main control system. The wind speed and wind condition system is used for generating a wind speed signal and a wind direction signal. The overspeed simulation system is used for generating a rotating speed signal simulating the rotating speed of a fan wind wheel. The master control system is used for controlling the variable pitch system to simulate the pitch angle of the fan blade according to the wind speed signal and the wind direction signal, determining the wind alignment error according to the wind speed signal and the wind direction signal, and controlling the yaw simulation system to execute the corresponding yaw action according to the wind alignment error. And controlling the converter function test system to execute a corresponding power generation grid-connected action according to the rotating speed signal. The fan model can be controlled through the simulation control system, and the practical training efficiency and effect can be effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of wind turbine simulation equipment, and in particular to a wind turbine training system. Background Art

[0002] In recent years, the capacity of wind turbines has become larger and larger, and wind power generation technology has become more and more complex, which has undoubtedly increased the difficulty of wind farm operation and maintenance. At present, the operation and maintenance training of wind farms mainly focuses on practical operations. In practice, it is impossible to shut down wind turbines in wind farms for experiments because of training. Under the influence of the environment, natural factors, weather conditions, etc., working condition testing and fault handling and disposal not only cause the loss of wind farm power generation, but also may cause other unexpected risks of the units due to practical training. The classroom teaching method commonly used at present is actually difficult for trainee engineers or trainees to truly master the relevant knowledge of wind power generation theory and unit operation and maintenance, and the practical training cannot meet the relevant requirements. Summary of the invention

[0003] The purpose of the embodiments of the present application is to provide a wind turbine training system to solve the above problems.

[0004] In order to achieve the above-mentioned purpose, the first aspect of the present application provides a wind turbine training system, comprising: A main control system, and a pitch control system, a wind speed and wind condition system, an overspeed simulation system, a yaw simulation system and a converter function test system electrically connected to the main control system respectively; The wind speed and wind condition system is used to generate a wind speed signal and a wind direction signal, and send the wind speed signal and the wind direction signal to the main control system; the overspeed simulation system is used to generate a speed signal simulating the speed of the wind turbine rotor, and send the speed signal to the main control system; The main control system is used to control the pitch angle of the variable pitch system to simulate the wind turbine blades according to the wind speed signal and the wind direction signal, determine the wind error according to the wind speed signal and the wind direction signal, control the yaw simulation system to perform a corresponding yaw action according to the wind error, and control the converter function test system to perform a corresponding power generation and grid connection action according to the speed signal; and The main control system is also used to respond to user selection instructions to control the variable pitch system to perform pitch angle simulation operations of wind turbine blades, control the wind speed and wind condition system to perform wind speed and wind direction simulation operations of the wind turbine environment, control the overspeed simulation system to perform wind turbine rotor speed simulation operations, control the yaw simulation system to perform yaw simulation operations of the wind turbine, and control the converter function test system to perform at least one of power generation and grid-connected simulation operations of the wind turbine.

[0005] Optionally, the system further comprises: A gearbox simulation platform, the gearbox simulation platform comprising an oil pump motor, a radiator, a filter, an air cooling fan, a temperature sensor, an oil tank and a temperature control valve; The input end of the temperature control valve is connected to the output end of the oil tank, and the first output end of the temperature control valve is connected to the input end of the oil tank to form a first loop; The second output end of the temperature control valve is connected to the input end of the filter, the output end of the filter is connected to the input end of the radiator, the output end of the radiator is connected to the input end of the oil tank to form a second circuit, and the air cooling fan is used to cool the radiator; The oil pump motor is used to drive the lubricating oil to circulate in the first circuit or the second circuit; The temperature sensor is used to collect the lubricating oil temperature of the lubricating oil and send the collected lubricating oil temperature to the main control system, and the main control system is also used to control the first output end of the temperature control valve to close and the second output end to open when the lubricating oil temperature is higher than the temperature threshold, so that the lubricating oil circulates in the second circuit; and When the lubricating oil temperature is not higher than the temperature threshold, the first output end of the temperature control valve is controlled to be opened and the second output end is controlled to be closed, so that the lubricating oil circulates in the first circuit.

[0006] Optionally, the pitch control system comprises: A base, wherein a plurality of base columns are vertically arranged on the base; A bearing plate fixedly connected to the base column, wherein the bearing plate is arranged parallel to the base; A pitch motor fixedly mounted on the bearing plate, and a reducer fixedly mounted on the base, wherein an output shaft of the pitch motor is coupled to an input shaft of the reducer; A ball screw is fixedly connected to the output shaft of the reducer, a slider is provided on the ball screw, a screw nut is fixedly connected inside the slider, the slider is threadedly connected to the ball screw through the screw nut, and a scale pointer is fixedly installed on the slider; A scale is fixed on the base column, the scale is provided with a plurality of scale values, the axis of the scale is parallel to the axis of the output shaft of the reducer, and the scale pointer is used to indicate the scale values ​​on the scale.

[0007] Optionally, the pitch control system further includes: A cable trough fixedly arranged along the edge of the base, and at least one cable fixing rod fixedly connected between any adjacent base columns; The axis of the cable fixing rod is parallel to the base.

[0008] Optionally, the overspeed simulation system comprises: A control box, in which a turntable motor and an overspeed simulation controller are fixedly installed; A turntable is arranged outside the control box, the turntable is fixedly connected to the output shaft of the turntable motor, a plurality of metal test pieces are fixedly mounted on the turntable, and the plurality of metal test pieces are distributed along the circumference of the turntable; A sensor bracket is fixedly mounted on the outer wall of the control box, and an inductive sensor is fixedly mounted on the sensor bracket. The inductive sensor is used to generate a pulse signal when the metal test piece is detected. The overspeed simulation controller is used to receive the pulse signal generated by the inductive sensor, calculate the rotational speed of the turntable according to the received pulse signal, generate a corresponding rotational speed signal, and send the rotational speed signal to the main control system.

[0009] Optionally, the wind speed and wind condition system comprises: A plurality of fixed columns vertically fixed to the control box; A plurality of supporting links corresponding to the fixed columns one by one, wherein the first end of each supporting link is fixedly connected to the corresponding fixed column, the other end of each supporting link is fixedly connected to the other end of any other supporting link, and the axis of each supporting link is perpendicular to the axis of the corresponding fixed column; A drag motor and a bearing bracket fixedly connected to any supporting connecting rod, the bearing bracket is fixedly mounted with an anemometer, and the output shaft of the drag motor is fixedly mounted with a drag gear; A first circular ring member fixedly connected to a plurality of fixed columns, wherein a radial cross section of the first circular ring member is perpendicular to the plurality of fixed columns, and a second circular ring member slidably connected to the first circular ring member, wherein the second circular ring member is inscribed in the inner wall of the first circular ring member, wherein a plurality of gear teeth are arranged on the inner wall of the second circular ring member, and the dragging gear is meshed with the gear teeth of the second circular ring member; An air outlet device is installed on the second circular ring, and the air outlet device is correspondingly arranged with the anemometer and wind vane, and is used to execute corresponding air outlet operations in response to the instructions of the main control system or the user, so that the anemometer and wind vane generates corresponding wind speed signals and wind direction signals. Optionally, the wind speed and wind condition system further includes: Multiple limit blocks; The limit block is provided with a sliding groove matching the first circular ring member. and is slidably connected to the first circular ring member via the slide groove; The limiting block is also provided with a limiting groove matching the second circular ring member, and the second circular ring member is fixedly connected to the limiting block through the limiting groove; The air outlet device is fixedly mounted on any limiting block.

[0010] Optionally, controlling the yaw simulation system to perform a corresponding yaw action according to the wind error includes: If the wind error is greater than the wind error threshold, sending a yaw control instruction to the yaw simulation system to control the yaw simulation system to perform a corresponding yaw action; The yaw simulation system comprises: Slewing bearing, supporting platform, yaw motor, reducer, hydraulic station, yaw brake caliper and yaw controller; The output shaft of the yaw motor is connected to the input shaft of the reducer, the output shaft of the reducer is meshed with the outer gear ring of the slewing bearing through a driving gear, and the slewing bearing is used to drive the support platform to rotate; The hydraulic station is used to pressurize or release the yaw brake caliper to control the yaw brake caliper to apply braking force or release braking force to the slewing bearing; The yaw controller is used to respond to the yaw control command of the main control system, control the hydraulic station to relieve pressure on the yaw brake caliper, and control the yaw motor to drive the reducer, and drive the slewing support bearing through the reducer to drive the support platform to rotate until the rotation angle of the support bearing meets the yaw control command, control the hydraulic station to pressurize the yaw brake caliper, and control the yaw motor to stop driving the reducer.

[0011] Optionally, the converter function test system comprises: Converters, frequency converters, transformers, tow motors and double-fed generators; The frequency converter is connected to an external power source via a first circuit breaker and a first contactor; The low-voltage side of the transformer is connected to the external power supply and the frequency converter through the second circuit breaker and the second contactor, and the high-voltage side of the transformer is connected to the converter, the double-fed generator and the tow motor in sequence; The frequency converter is connected to the pair of motors via a third circuit breaker.

[0012] Optionally, controlling the converter function test system to perform a corresponding power generation and grid-connection action according to the speed signal includes: Generate a frequency converter control instruction according to the speed signal, so as to control the frequency converter to control the pair of motors to rotate at a speed corresponding to the speed signal, and drive the double-fed generator to rotate through the pair of motors; and A target power generation is determined, a grid connection control instruction is generated based on the target power generation, and the grid connection control instruction is sent to the converter, so as to control the doubly-fed generator through the converter to perform power generation and grid connection action.

[0013] The embodiments provided in this application have the following beneficial effects: The training system provided in this application can control the wind turbine model through a simulation control system, and can also conduct practical training on handling methods such as unit triggering faults and fault recovery. At the same time, it has relevant functions for wind turbine performance simulation, which has very obvious guiding significance for improving the efficiency and effectiveness of practical training for operation and maintenance engineers and professional students.

[0014] Other features and advantages of the embodiments or implementations of the present application will be described in detail in the subsequent specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The accompanying drawings are used to provide a further understanding of the embodiments of the present application and constitute a part of the specification. Together with the following specific implementations, they are used to explain the embodiments of the present application, but do not constitute a limitation on the embodiments of the present application. In the accompanying drawings: Figure 1 The structure diagram of the wind turbine training system according to the embodiment of the present application is schematically shown; Figure 2 The schematic diagram of the structure of the pitch system of the embodiment of the present application is shown schematically; Figure 3 The schematic diagram of the structure of the overspeed simulation system of the embodiment of the present application is shown schematically; Figure 4 A side view of a wind speed and wind condition system according to an embodiment of the present application is schematically shown; Figure 5 A top view of a wind speed and wind condition system according to an embodiment of the present application is schematically shown; Figure 6 The schematic diagram of the limit block structure of the embodiment of the present application is schematically shown; Figure 7 The schematic diagram shows the structure of the converter function test system according to the embodiment of the present application.

[0016] Description of Reference Numerals 1-pitch motor, 2-pitch reducer, 3-ball screw, 4-scale, 5-scale pointer, 6-slider, 7-cable fixing rod, 8-wire trough, 9-bearing plate, 10-base, 101-base column, 11-air outlet device, 12-wind speed and direction instrument, 13-drag motor, 14-drag gear, 15-second circular ring, 16-first circular ring, 17-limit block, 18-fixed column, 19-support connecting rod, 20-bearing bracket, 21-control box, 22-turntable, 23-sensor bracket, 24-inductive sensor, 25-metal test piece, 171-slideway, 172-limiting groove. DETAILED DESCRIPTION

[0017] The specific implementation of the embodiment of the present application is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the embodiment of the present application, and is not used to limit the embodiment of the present application.

[0018] In order to solve the above problems, Figure 1 As shown, the first aspect of the present application provides a wind turbine training system, comprising: A main control system, and a variable pitch system, a wind speed and wind condition system, an overspeed simulation system, a yaw simulation system and a converter function test system electrically connected to the main control system; The wind speed and wind condition system is used to generate wind speed signals and wind direction signals, and send the wind speed signals and wind direction signals to the main control system. The overspeed simulation system is used to generate a speed signal simulating the speed of the wind turbine rotor, and send the speed signal to the main control system. The main control system is used to control the pitch angle of the variable pitch system to simulate the wind turbine blades according to the wind speed signal and the wind direction signal, determine the wind error according to the wind speed signal and the wind direction signal, control the yaw simulation system to perform the corresponding yaw action according to the wind error, and control the converter function test system to perform the corresponding power generation grid connection action according to the speed signal; and The main control system is also used to respond to the user's selection instructions, control the variable pitch system to perform the pitch angle simulation operation of the wind turbine blades, control the wind speed and wind condition system to perform the wind speed and wind direction simulation operation of the wind turbine environment, control the overspeed simulation system to perform the wind turbine rotor speed simulation operation, control the yaw simulation system to perform the yaw simulation operation of the wind turbine, and control the converter function test system to perform at least one of the power generation and grid-connected simulation operations of the wind turbine.

[0019] In this way, the training system provided in this application can control the wind turbine model through a simulation control system, and can also conduct practical training on handling methods such as unit triggering faults and fault recovery. At the same time, it has relevant functions for simulating wind turbine performance, which has very obvious guiding significance for improving the efficiency and effectiveness of practical training for operation and maintenance engineers and professional students.

[0020] Among them, the main control system serves as the main control substation, and is respectively connected to the variable pitch system, wind speed and wind condition system, overspeed simulation system, yaw simulation system and converter function test system. The overspeed simulation system, yaw simulation system and wind speed and wind condition system serve as the nacelle substation, the variable pitch system serves as the variable pitch substation, the overspeed simulation system is used to simulate the wind rotor speed and generate a speed simulation signal, and the converter function test system is used to simulate the traction system, the converter system and the power grid system, thereby realizing the simulation of the complete functions of the wind turbine. In this application, the main control system includes the unit's PLC, safety chain signal, power quality module, unit vibration signal, temperature sensor signal, hydraulic pressure sensor signal, overspeed module, UPS and other electrical systems.

[0021] The system of the present application also includes: a gearbox simulation platform, which includes an oil pump motor, a radiator, a filter, an air cooling fan, a temperature sensor, an oil tank and a temperature control valve; the input end of the temperature control valve is connected to the output end of the oil tank, and the first output end of the temperature control valve is connected to the input end of the oil tank to form a first circuit; the second output end of the temperature control valve is connected to the input end of the filter, the output end of the filter is connected to the input end of the radiator, and the output end of the radiator is connected to the input end of the oil tank to form a second circuit, and the air cooling fan is used to cool the radiator; the oil pump motor is used to drive the lubricating oil to circulate in the first circuit or the second circuit; the temperature sensor is used to collect the lubricating oil temperature of the lubricating oil and send the collected lubricating oil temperature to the main control system, and the main control system is also used to control the first output end of the temperature control valve to close and the second output end to open when the lubricating oil temperature is higher than the temperature threshold, so that the lubricating oil circulates in the second circuit; and when the lubricating oil temperature is not higher than the temperature threshold, the first output end of the temperature control valve is controlled to open and the second output end is closed, so that the lubricating oil circulates in the first circuit. Among them, the gearbox simulation platform is used to fully simulate various simulation quantities of the real gearbox, such as gearbox pressure and temperature, and simulate the realization of the lubrication system. Among them, the simulation of the lubrication system is to control the gearbox through the main control cabinet to execute the working state under different oil temperatures. The temperature sensor detects the oil temperature and transmits it to the main control system PLC. The PLC compares the temperature with the program set temperature. If the temperature is higher than the set temperature, the oil pump motor of the lubrication system drives the gear pump to extract the oil from the oil tank and send it to the heat sink. The oil in the heat sink is blown by the fan to achieve rapid cooling of the oil, and then returns to the oil tank at the other end of the radiator. It can be understood that in order to simulate the working conditions of the lubricating oil at different temperatures, the gearbox simulation platform can also control the temperature of the lubricating oil through the heater to simulate the different temperatures of the lubricating oil.

[0022] like Figure 2As shown, the pitch system of the present application includes: a base 10, on which a plurality of base columns 101 are vertically arranged. For example, in the present application, the base 10 is rectangular, and four base columns 101 are vertically arranged on the base 10; a bearing plate 9 fixedly connected to the base columns 101, and the bearing plate 9 is arranged parallel to the base 10; a pitch motor 1 fixedly mounted on the bearing plate 9, and a pitch reducer 2 fixedly mounted on the base 10, and the output shaft of the pitch motor 1 is connected to the pitch reducer 2. Input shaft coupling; a ball screw 3 is fixedly connected to the output shaft of the pitch reducer 2, a slider 6 is arranged on the ball screw 3, a screw nut is fixedly connected inside the slider 6, the slider 6 is threadedly connected to the ball screw 3 through the screw nut, and a scale pointer 5 is fixedly installed on the slider 6; a scale 4 is fixed on the column of the base 10, a plurality of scale values ​​are arranged on the scale 4, the axis of the scale 4 is parallel to the axis of the output shaft of the pitch reducer 2, and the scale pointer 5 is used to indicate the scale value on the scale 4. Among them, the pitch system also includes: a wire groove 8 fixedly arranged along the edge of the base 10, and at least one cable fixing rod 7 fixedly connected between any adjacent base columns 101; the axis of the cable fixing rod 7 is parallel to the base 10, for example, the wire groove 8 can be arranged along the edge of the base 10, and the cable fixing rod 7 can be arranged between two adjacent base columns 101, and arranged on the upper part of the base column 101. It can be understood that the pitch system also includes a pitch controller, which can be fixedly mounted on the base 10 or the supporting plate 9, and is communicated with the main control system to control the start and stop of the pitch motor 1 in response to the control instructions of the main control system, or directly receive the user's control instructions to control the start and stop of the pitch motor 1.

[0023] Among them, the working principle of the pitch system is: the pitch controller controls the pitch motor 1 to rotate, thereby driving the pitch reducer 2 to rotate, the pitch reducer 2 drives the screw to rotate, thereby driving the slider 6 to move in a straight line along the axis of the screw, and the slider 6 drives the pointer to move on the scale 4, wherein the scale 4 can be scaled between -10° and 100°, thereby realizing the simulation of the opening and closing process of the actual wind turbine between 0-90°.

[0024] In this application, if Figure 3 , Figure 4 and Figure 5As shown, the overspeed simulation system includes: a control box 21, in which a turntable motor and an overspeed simulation controller are fixedly installed; a circular turntable 22 is arranged outside the control box 21, the turntable 22 is fixedly connected to the output shaft of the turntable motor, a plurality of metal test pieces 25 are fixedly installed on the turntable 22, and the plurality of metal test pieces 25 are evenly distributed along the circumference of the turntable 22. In the present application, the metal test pieces 25 are 28 M10 bolts evenly distributed along the edge of the turntable 22; a sensor bracket 23 fixedly installed on the outer wall of the control box 21, an inductive sensor 24 is fixedly installed on the sensor bracket 23, the inductive sensor 24 is used to generate a pulse signal when the metal test piece 25 is detected, and the overspeed simulation controller is used to receive the pulse signal generated by the inductive sensor 24, calculate the rotation speed of the turntable 22 according to the received pulse signal, generate a corresponding rotation speed signal, and send the rotation speed signal to the main control system.

[0025] The wind speed and wind condition system comprises: a plurality of fixed columns 18 vertically fixed on a control box 21, in the present application, there are three fixed columns 18, and the angle between any two fixed columns 18 is 120°; a plurality of support links 19 corresponding to the fixed columns 18 one by one, namely three support links 19, a first end of each support link 19 being fixedly connected to the corresponding fixed column 18, the other end of each support link 19 being fixedly connected to the other end of any other support link 19, and the axis of each support link 19 being perpendicular to the axis of the corresponding fixed column 18, one end of the three support links 19 being respectively fixed to the corresponding fixed column 18, and the other ends being connected to each other, so that the three angles formed by the three support links 19 are all 120°; a dragging motor 13 and a bearing bracket 20 fixedly connected to any supporting link 19, a wind speed and wind direction meter 12 being fixedly mounted on the bearing bracket 20, a dragging gear 14 being fixedly mounted on the output shaft of the dragging motor 13, and three support The supporting connecting rod 19 constitutes the supporting base of the dragging motor 13, and the dragging motor 13 can be fixed by the bearing bracket 20 fixed on the supporting connecting rod 19; the first circular ring 16 fixedly connected to the plurality of fixed columns 18, the circular radial section of the first circular ring 16 is perpendicular to the plurality of fixed columns 18, the second circular ring 15 slidably connected to the first circular ring 16, and the second circular ring 15 is inscribed in the inner wall of the first circular ring 16, and the inner wall of the second circular ring 15 is provided with a plurality of gear teeth, and the dragging gear 14 is meshed with the gear teeth of the second circular ring 15; the air outlet device 11 installed on the second circular ring 15, and the air outlet device 11 is correspondingly arranged with the anemometer 12, for performing the corresponding air outlet operation in response to the command of the main control system or the user, so that the anemometer 12 generates the corresponding wind speed signal and wind direction signal. Among them, the air outlet device 11 and the dragging motor 13 can be remotely controlled by the main control system, or manually controlled by the user.

[0026] like Figure 6As shown, the wind speed and wind condition system also includes: a plurality of limit blocks 17, in this application, there are three limit blocks 17; the limit block 17 is provided with a slide groove 171 matching the first circular ring 16, and is slidably connected to the first circular ring 16 through the slide groove 171; the limit block 17 is also provided with a limit groove 172 matching the second circular ring 15, and the second circular ring 15 is fixedly connected to the limit block 17 through the limit groove 172, for example, a threaded interface can be provided in the limit groove 172, and the second circular ring 15 can be fixedly connected to the threaded interface of the limit groove 172 by bolts, or the second circular ring 15 can be welded in the limit groove 172, so that the second circular ring 15 is fixedly connected to the limit block 17; the air outlet device 11 is fixedly installed on any limit block 17. Among them, the diameter of the turntable 22 of the overspeed simulation system is consistent with the diameter of the second circular ring 15.

[0027] The working principle of the wind speed and wind condition system is as follows: the traction motor 13 rotates under the control of the main control system or the user, thereby driving the second circular ring member 15 to rotate through the traction gear 14 on its output shaft, thereby driving the air outlet device 11 such as a fan to rotate along the circumference of the first circular ring member 16, thereby simulating different wind directions. By controlling the air outlet speed of the air outlet device 11, different wind speeds can be simulated, and the wind speed and wind direction position are collected through the anemometer 12, and the collected wind speed and wind direction signals are transmitted to the main control system PLC.

[0028] In the present application, the yaw simulation system includes: a slewing bearing, a supporting platform, a yaw motor, a yaw reducer, a hydraulic station, a yaw brake caliper and a yaw controller; the output shaft of the yaw motor is connected to the input shaft of the yaw reducer, the output shaft of the yaw reducer is meshed with the outer gear ring of the slewing bearing through a driving gear, and the slewing bearing is used to drive the supporting platform to rotate; the hydraulic station is used to pressurize or release the yaw brake caliper to control the yaw brake caliper to apply braking force or release braking force to the slewing bearing; the yaw controller is used to respond to the yaw control command of the main control system, control the hydraulic station to release the pressure on the yaw brake caliper, and control the yaw motor to drive the yaw reducer, drive the slewing bearing through the yaw reducer to drive the supporting platform to rotate, until the rotation angle of the supporting bearing meets the yaw control command, control the hydraulic station to pressurize the yaw brake caliper, and control the yaw motor to stop driving the yaw reducer.

[0029] In the present application, the yaw simulation system is controlled to perform the corresponding yaw action according to the wind error, including: if the wind error is greater than the wind error threshold, a yaw control instruction is sent to the yaw simulation system to control the yaw simulation system to perform the corresponding yaw action. In the present application, the structure of the yaw simulation platform is composed of a slewing bearing, a platform, a support column, a ladder, a guardrail, a yaw motor and a reduction drive, a yaw brake caliper and other auxiliary parts, and its working principle is: the wind direction signal collected by the anemometer is transmitted to the main control system, the main control system calculates the wind error, compares the wind error set in the program to execute the program instruction, the instruction gives a digital quantity to the yaw electrical circuit contactor and soft start, and the yaw motor electronic brake is turned on when the instruction is given, and the hydraulic station controls the yaw brake caliper to release the pressure to a certain value, thereby allowing the yaw bearing to rotate, and the yaw power supply circuit outputs 400V AC to the yaw motor, the yaw motor drives the yaw reducer, and the yaw reducer drive teeth and the yaw bearing outer teeth move relative to each other, and yaw is achieved through the movement of the yaw bearing. The calculation of wind error is a prior art and is not limited here.

[0030] like Figure 7 As shown, the converter function test system includes: converter, frequency converter, transformer, tow motor and double-fed generator; the frequency converter is connected to the external power supply through the first circuit breaker and the first contactor; the low-voltage side of the transformer is connected to the external power supply and the frequency converter through the second circuit breaker and the second contactor, and the high-voltage side of the transformer is connected to the converter, the double-fed generator and the tow motor in sequence; the frequency converter is connected to the tow motor through the third circuit breaker. Figure 7 In the figure, QP1 is the power supply circuit breaker of the inverter in the inverter function test system; KP1 is the power supply contactor of the inverter; QP3 is the power supply circuit breaker for controlling the towing motor; M is the towing motor; G is the double-fed generator. The inverter is installed in the inverter cabinet, and the inverter is installed in the inverter cabinet; the towing motor is a three-phase asynchronous motor, which and the double-fed generator form a generator set. The inverter is used to perform frequency conversion and speed regulation on the three-phase asynchronous motor (380V / 50 kW, 88A, 1800r / min), thereby simulating the wind turbine to drive the double-fed generator to rotate. The double-fed generator has a power of 45kW and a rated speed of 1800r / min.

[0031] The working principle of the converter function test system is as follows: the QC1 circuit breaker is connected to the 380V AC power of the city power supply, which is divided into two routes: one route is controlled by QP1 and KP1 to supply power to the frequency converter cabinet, and the internal control board of the frequency converter cabinet controls QP3 to supply power to the towing motor M; the other route is controlled by QP2 and KP2 to supply power to the transformer, and the high-voltage side of the transformer outputs 690V AC power to supply power to the grid side of the converter cabinet; the converter cabinet is connected to the stator and rotor of the towing motor G. During operation, the converter cabinet controls the power generated by the double-fed generator G, and then sends it to the frequency converter cabinet to control the towing motor M.

[0032] Among them, the inverter function test system is controlled according to the speed signal to perform the corresponding power generation and grid connection action, including: generating an inverter control instruction according to the speed signal to control the inverter to control the towing motor to rotate at a speed corresponding to the speed signal, and driving the double-fed generator to rotate through the towing motor; and determining the target power generation, generating a grid connection control instruction based on the target power generation, and sending the grid connection control instruction to the inverter to control the double-fed generator to perform power generation and grid connection action through the inverter. For example, the main control system generates a speed signal simulating the speed of the wind turbine rotor by controlling the overspeed simulation system, generates a control instruction for the inverter according to the speed signal, and controls the towing motor to rotate at a corresponding speed through the inverter, thereby simulating the rotation of the wind rotor. Among them, the converter function test system can be operated independently or controlled by the main control system for linkage operation. Its working process is controlled by the frequency converter cabinet to rotate the towing motor M, provide the rotor speed to the double-fed generator G, and the encoder is connected to the tail of the double-fed generator G to transmit the collected rotor speed to the converter cabinet. The converter main control board controls the double-fed generator G to generate electricity in grid connection, and the electricity generated by the stator and rotor of the double-fed generator G is returned to the frequency converter cabinet through the transformer to control the rotation of the motor M. In this way, the electricity generated by the double-fed generator G does not need to be connected to the grid, but is consumed by the motor M, thereby realizing the simulation of power generation and grid connection action. Among them, the power of the motor M is greater than the power of the double-fed generator G.

[0033] In summary, the practical training system of this application is composed of the main control system cabinet (tower bottom and cabin cabinet), pitch system, gearbox simulation system, wind speed and overspeed simulation system, yaw simulation system and converter function test system. All systems are connected to the main control system cabinet, each system can be operated separately, and the connection between them is connected in series by the main control system; the tower bottom cabinet is the main control cabinet of the PLC, and the cabin cabinet is the slave station of the tower bottom cabinet, which is connected by optical fiber; the tower bottom cabinet and the converter are connected through CAN communication, and the pitch system and the cabin cabinet are connected through CAN communication; the acquisition and execution of instructions of the remaining components are directly controlled by the main control system. The main control system compares the collected wind speed with the program-set cut-in wind speed. If the collected wind speed is greater than the program-set cut-in wind speed, the main control system issues a start-up command, and the variable pitch system starts to open the pitch from 90° to 0°. The converter function test platform controls the operation of the towed motor, and the encoder at the tail of the generator collects the rotor speed and transmits it to the converter cabinet. The control system of the converter itself runs. When it is detected that the generator speed meets the grid-connected speed, the converter cabinet implements the grid-connected command and the generator starts to generate electricity. The remaining simulation systems work independently and transmit real-time information to the main control system.

[0034] In this way, this application, by establishing an electrical system identical to that of a real wind turbine (including a current conversion electrical system, a pitch electrical system, and a signal sensing electrical system), can impart knowledge and visualize operations to wind power service personnel from an intuitive perspective, thereby helping to improve the students' actual hands-on operational capabilities when encountering electrical faults in wind turbines; at the same time, it can allow students to more intuitively understand and become familiar with the operation and output of wind turbines under different wind conditions and working conditions, and understand the operating status of wind turbines. In addition, this application can meet the relevant needs for training and skills improvement of wind power trainees on the premise of ensuring the safety of trainees and units, and can effectively improve trainees' hands-on operations and actual fault elimination capabilities, thereby improving trainees' ability to quickly handle wind turbine faults, improving the availability of wind turbines, and effectively improving economic benefits.

[0035] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0036] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.

Claims

1. A wind turbine training system, characterized in that: include: A main control system, and a pitch control system, a wind speed and wind condition system, an overspeed simulation system, a yaw simulation system and a converter function test system electrically connected to the main control system respectively; The wind speed and wind condition system is used to generate a wind speed signal and a wind direction signal, and send the wind speed signal and the wind direction signal to the main control system; the overspeed simulation system is used to generate a speed signal simulating the speed of the wind turbine rotor, and send the speed signal to the main control system; The main control system is used to control the pitch angle of the variable pitch system to simulate the wind turbine blades according to the wind speed signal and the wind direction signal, determine the wind error according to the wind speed signal and the wind direction signal, control the yaw simulation system to perform a corresponding yaw action according to the wind error, and control the converter function test system to perform a corresponding power generation and grid connection action according to the speed signal; and The main control system is also used to respond to user selection instructions to control the variable pitch system to perform pitch angle simulation operations of wind turbine blades, control the wind speed and wind condition system to perform wind speed and wind direction simulation operations of the wind turbine environment, control the overspeed simulation system to perform wind turbine rotor speed simulation operations, control the yaw simulation system to perform yaw simulation operations of the wind turbine, and control the converter function test system to perform at least one of power generation and grid-connected simulation operations of the wind turbine.

2. The wind turbine training system according to claim 1, characterized in that: The system further comprises: A gearbox simulation platform, the gearbox simulation platform comprising an oil pump motor, a radiator, a filter, an air cooling fan, a temperature sensor, an oil tank and a temperature control valve; The input end of the temperature control valve is connected to the output end of the oil tank, and the first output end of the temperature control valve is connected to the input end of the oil tank to form a first loop; The second output end of the temperature control valve is connected to the input end of the filter, the output end of the filter is connected to the input end of the radiator, the output end of the radiator is connected to the input end of the oil tank to form a second circuit, and the air cooling fan is used to cool the radiator; The oil pump motor is used to drive the lubricating oil to circulate in the first circuit or the second circuit; The temperature sensor is used to collect the lubricating oil temperature of the lubricating oil and send the collected lubricating oil temperature to the main control system, and the main control system is also used to control the first output end of the temperature control valve to close and the second output end to open when the lubricating oil temperature is higher than the temperature threshold, so that the lubricating oil circulates in the second circuit; and When the lubricating oil temperature is not higher than the temperature threshold, the first output end of the temperature control valve is controlled to be opened and the second output end is controlled to be closed, so that the lubricating oil circulates in the first circuit.

3. The wind turbine training system according to claim 1, characterized in that: The pitch system comprises: A base, wherein a plurality of base columns are vertically arranged on the base; A bearing plate fixedly connected to the base column, wherein the bearing plate is arranged parallel to the base; A pitch motor fixedly mounted on the bearing plate, and a reducer fixedly mounted on the base, wherein an output shaft of the pitch motor is coupled to an input shaft of the reducer; A ball screw is fixedly connected to the output shaft of the reducer, a slider is provided on the ball screw, a screw nut is fixedly connected inside the slider, the slider is threadedly connected to the ball screw through the screw nut, and a scale pointer is fixedly installed on the slider; A scale is fixed on the base column, the scale is provided with a plurality of scale values, the axis of the scale is parallel to the axis of the output shaft of the reducer, and the scale pointer is used to indicate the scale values ​​on the scale.

4. The wind turbine training system according to claim 3, characterized in that: The pitch system further includes: A cable trough fixedly arranged along the edge of the base, and at least one cable fixing rod fixedly connected between any adjacent base columns; The axis of the cable fixing rod is parallel to the base.

5. The wind turbine training system according to claim 1, characterized in that: The overspeed simulation system comprises: A control box, in which a turntable motor and an overspeed simulation controller are fixedly installed; A turntable is arranged outside the control box, the turntable is fixedly connected to the output shaft of the turntable motor, a plurality of metal test pieces are fixedly mounted on the turntable, and the plurality of metal test pieces are distributed along the circumference of the turntable; A sensor bracket is fixedly mounted on the outer wall of the control box, and an inductive sensor is fixedly mounted on the sensor bracket. The inductive sensor is used to generate a pulse signal when the metal test piece is detected. The overspeed simulation controller is used to receive the pulse signal generated by the inductive sensor, calculate the rotational speed of the turntable according to the received pulse signal, generate a corresponding rotational speed signal, and send the rotational speed signal to the main control system.

6. The wind turbine training system according to claim 5, characterized in that: The wind speed and wind condition system comprises: A plurality of fixed columns vertically fixed to the control box; A plurality of supporting links corresponding to the fixed columns one by one, wherein the first end of each supporting link is fixedly connected to the corresponding fixed column, the other end of each supporting link is fixedly connected to the other end of any other supporting link, and the axis of each supporting link is perpendicular to the axis of the corresponding fixed column; A drag motor and a bearing bracket fixedly connected to any supporting connecting rod, the bearing bracket is fixedly mounted with an anemometer, and the output shaft of the drag motor is fixedly mounted with a drag gear; A first circular ring member fixedly connected to a plurality of fixed columns, wherein a radial cross section of the first circular ring member is perpendicular to the plurality of fixed columns, and a second circular ring member slidably connected to the first circular ring member, wherein the second circular ring member is inscribed in the inner wall of the first circular ring member, wherein a plurality of gear teeth are arranged on the inner wall of the second circular ring member, and the dragging gear is meshed with the gear teeth of the second circular ring member; An air outlet device is installed on the second circular ring, and the air outlet device is correspondingly arranged with the anemometer and wind vane, and is used to execute corresponding air outlet operations in response to the instructions of the main control system or the user, so that the anemometer and wind vane generates corresponding wind speed signals and wind direction signals.

7. The wind turbine training system according to claim 6, characterized in that: The wind speed and wind condition system further includes: Multiple limit blocks; The limit block is provided with a slide groove matching the first circular ring member, and is slidably connected to the first circular ring member through the slide groove; The limiting block is also provided with a limiting groove matching the second circular ring member, and the second circular ring member is fixedly connected to the limiting block through the limiting groove; The air outlet device is fixedly mounted on any limiting block.

8. The wind turbine training system according to claim 1, characterized in that: Controlling the yaw simulation system to perform a corresponding yaw action according to the wind error includes: If the wind error is greater than the wind error threshold, sending a yaw control instruction to the yaw simulation system to control the yaw simulation system to perform a corresponding yaw action; The yaw simulation system comprises: Slewing bearing, supporting platform, yaw motor, reducer, hydraulic station, yaw brake caliper and yaw controller; The output shaft of the yaw motor is connected to the input shaft of the reducer, the output shaft of the reducer is meshed with the outer gear ring of the slewing bearing through a driving gear, and the slewing bearing is used to drive the support platform to rotate; The hydraulic station is used to pressurize or release the yaw brake caliper to control the yaw brake caliper to apply braking force or release braking force to the slewing bearing; The yaw controller is used to respond to the yaw control command of the main control system, control the hydraulic station to relieve pressure on the yaw brake caliper, and control the yaw motor to drive the reducer, and drive the slewing support bearing through the reducer to drive the support platform to rotate until the rotation angle of the support bearing meets the yaw control command, control the hydraulic station to pressurize the yaw brake caliper, and control the yaw motor to stop driving the reducer.

9. The wind turbine training system according to claim 1, characterized in that: The converter function test system comprises: Converters, frequency converters, transformers, tow motors and double-fed generators; The frequency converter is connected to an external power source via a first circuit breaker and a first contactor; The low-voltage side of the transformer is connected to the external power supply and the frequency converter through the second circuit breaker and the second contactor, and the high-voltage side of the transformer is connected to the converter, the double-fed generator and the tow motor in sequence; The frequency converter is connected to the pair of motors via a third circuit breaker.

10. The wind turbine training system according to claim 9, characterized in that: Controlling the converter function test system to perform corresponding power generation and grid connection actions according to the speed signal includes: Generate a frequency converter control instruction according to the speed signal, so as to control the frequency converter to control the pair of motors to rotate at a speed corresponding to the speed signal, and drive the double-fed generator to rotate through the pair of motors; and A target power generation is determined, a grid connection control instruction is generated based on the target power generation, and the grid connection control instruction is sent to the converter, so as to control the doubly-fed generator through the converter to perform power generation and grid connection action.

Citation Information

Patent Citations

  • Large fan scaled-down model teaching training experiment table and grid-connected detection method thereof

    CN103021254A

  • Wind power generation simulation system and control method thereof

    CN108194264A

  • Small wind generating set yaw system teaching aid

    CN113299167A

  • Variable pitch function simulation test system and construction method

    CN114992064A

  • Wind turbine generator cabin operation and maintenance experiment table

    CN213540636U

Cited By

  • State switching simulation system and method of wind turbine generator

    CN120100648A