Multi-objective optimization configuration method and system based on electricity-hydrogen hybrid energy storage, configuration terminal and storage medium

By adopting multi-objective optimization model and adaptive charging and discharging strategies in the electric and hydrogen hybrid energy storage system, we coordinate hydrogen energy storage and battery energy storage, and solve the energy supply and demand balance and cost problems, improve energy efficiency and system stability, and achieve the realization of Clean transformation of the power grid.

CN119070342APending Publication Date: 2024-12-03QINGDAO PORT INT CO LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411152707.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively solve the problems of energy supply and demand balance, life cycle cost, system network loss and connection line switching power deviation, resulting in poor energy efficiency and economic benefits.

Method used

Adopting a multi-objective optimization model based on Pareto principle, combining the coordinated optimization of hydrogen energy storage system and battery energy storage system, and calculating the full life cycle cost, power loss and power quality index, and configuring an adaptive charging and discharging strategy to minimize power Loss and life cycle costs.

Benefits of technology

Achieve optimal control of the entire life cycle cost of the electric and hydrogen hybrid energy storage system, improve energy efficiency, reduce power transmission losses in the power grid, enhance system flexibility and adaptability, alleviate the intermittent impact of renewable energy, and promote the cleanliness of energy structures. Transformation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119070342A_ABST
    Figure CN119070342A_ABST
Patent Text Reader

Abstract

The invention provides a multi-objective optimization configuration method and system based on electricity-hydrogen hybrid energy storage, a configuration terminal and a storage medium, belongs to the technical field of electricity-hydrogen hybrid energy storage systems, and aims to provide a multi-objective optimization configuration method and system based on the minimum life cycle cost of electricity-hydrogen hybrid energy storage, daily line power loss in a park and exchange power deviation of connection lines. Establishing a multi-objective optimization model based on the Pareto principle; calculating the total capital cost, the maintenance cost, the operation cost, the replacement cost and the disposal and recovery cost in the full life cycle loss; calculating electric energy loss of the system; calculating an electric energy quality index; adaptive charging and discharging are configured within a constraint range based on power loss, smooth line power deviation, and lifecycle cost minimization. The method can realize optimal control of the full life cycle cost of the electricity-hydrogen hybrid energy storage system. Therefore, investors can reduce expenditure and improve economic benefits in long-term operation.
Need to check novelty before this filing date? Find Prior Art

Description

Background Art

[0002] With the rapid development of science and technology, the electric-hydrogen hybrid energy storage system has achieved the replacement of traditional fossil fuel energy, meeting the needs of modern society while reducing environmental pollution. The electric-hydrogen hybrid energy storage system involves power generation and energy storage.

[0003] Energy storage system (ESS) plays a vital role in renewable energy power generation system. It can store electrical energy and release it when needed to achieve peak load shifting, reduce voltage fluctuations in distribution networks, and improve the stability of the power grid. In renewable energy power generation systems, battery energy storage system (BESS) and hydrogen energy storage system (HESS) are two common energy storage methods.

[0004] Hydrogen energy, due to its environmental and sustainable development characteristics. Hydrogen Energy Storage Systems (HESSs) can use surplus electricity to produce hydrogen for storage or downstream industry applications. When the load increases, the stored hydrogen can be used by fuel cells (FC) and then fed back to the power grid. With the rapid development of hydrogen production and storage technology, the development of hydrogen energy storage systems will bring fundamental changes to the structure of modern energy and power systems.

[0005] At present, in order to achieve a balance between supply and demand of various energy sources, thereby improving energy efficiency, and also to minimize life cycle cost (LCC), system network loss and connection line switch power deviation, establishing a multi-objective function model to improve economic benefits is a technical problem that needs to be solved urgently. Summary of the invention

[0006] The present invention provides a multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage, which can achieve optimal control of the full life cycle cost of the electric-hydrogen hybrid energy storage system, solve the imbalance between supply and demand of various energy sources, and thus improve energy efficiency.

[0007] Methods include:

[0008] S101: Establish a multi-objective optimization model based on the Pareto principle based on the minimum life cycle cost of electric-hydrogen hybrid energy storage, the daily line power loss in the park, and the exchange power deviation of the connecting lines;

[0009] S102: Calculate the total capital cost, maintenance cost, operating cost, replacement cost, and disposal and recovery cost of the life cycle losses;

[0010] S103: Calculate the power consumption of the system;

[0011] S104: Calculate power quality index;

[0012] S105: Based on minimizing power loss, smooth line power deviation, and life cycle cost, configure adaptive charging and discharging within constraints.

[0013] It should be further explained that the multi-objective optimization model based on the Pareto principle established in step S101 is as follows:

[0014]

[0015] Among them, F(x) is composed of the objective function {F 1 ,F 2 ,F 3}, which are the minimum life cycle cost, daily network loss and connection line switching power fluctuation respectively; x represents the decision space composed of optimization variables; H(x) represents the constraints that the model needs to meet.

[0016] It should be further explained that the total capital cost in step S102 is calculated as follows:

[0017]

[0018] Among them, N BESS is the number of BESSs installed; c bat represents the cost of a single battery; c EPCD,B Represents engineering, procurement and construction fees and developer fees; I sub,B is the government subsidy for BESS; E BESS,i is the capacity of the ith BESS; μ CRF,B represents the capital recovery factor;

[0019] The maintenance cost is calculated as follows:

[0020]

[0021] Among them, c FMC,B represents the annual fixed MC; P BESS,i is the power of the i-th BESS;

[0022] Operating cost OC B The calculation method is:

[0023]

[0024] Where T represents 24 hours in a day; c pur and c sellRepresent the time-of-use price of buying and selling electricity; P cha,Bi and P dis,Bi denote the charging power and discharging power of the i-th BESS respectively;

[0025] The replacement cost is calculated as:

[0026]

[0027] Among them, n B and t represent the battery replacement time within the life cycle and replacement cycle of BESSs, respectively; α represents the annual reduction rate of battery cost;

[0028] Disposal and recovery costs are calculated as:

[0029]

[0030] Among them, γ B is the recycling factor of the battery.

[0031] It should be further explained that in step S103, the power loss of the system is calculated by means of daily power loss;

[0032] The daily power loss is expressed as follows:

[0033]

[0034] Among them, F 2 is the daily electricity loss cost; P loss (t) represents the power loss at time t; L is the total number of lines in the distribution network; R j represents the resistance on the jth line; I j (t) represents the current on the jth line at time t.

[0035] It should be further explained that the power quality index calculated in step S104 is expressed as:

[0036]

[0037] Among them, F 3 is the daily total power fluctuation of the grid-connected point; P grid (t) represents the power fluctuation at time t: Refers to the average power fluctuation during a day.

[0038] It should be further explained that step S105 also includes: defining a power balancing constraint mode;

[0039]

[0040] Among them, P i (t) and Qi (t) represent the injected active power and reactive power of the ith node in the distribution network at time t, respectively;

[0041] V i (t) is the voltage of the ith node at time t; G ij and B ij represents the admittance and inductance between the i-th node and the j-th node; θ ij (t) is the power angle between the ith node and the jth node at time t.

[0042] It should be further explained that step S105 further includes: defining inequality constraints based on the following method;

[0043] The inequality constraints for the node voltage range are:

[0044] V i min <V i <V i max

[0045] Among them, V i min and V i max represents the upper and lower limits of the voltage of the i-th node;

[0046] The inequality constraint for the power limit at the grid connection point is:

[0047]

[0048] in, and Represent the upper and lower limits of the active power and reactive power of the parallel node respectively;

[0049] The inequality constraints for the capacity ranges of BESSs and HESSs are:

[0050]

[0051] in, and represents the upper limit of energy capacity and power capacity of BESSs; It indicates the upper limit of power capacity of HESSs;

[0052] The inequality constraint for BESSs charging and discharging power limit is:

[0053]

[0054] Among them, P cha,i (t) and P dis,i(t) respectively represent the charging power and discharging power of BESSs at time t; η cha and η dis represent the charging efficiency and discharging efficiency of BESSs, respectively;

[0055] The inequality constraint for the HESSs charging and discharging power limit is:

[0056]

[0057] Among them, P cha,i (t) and P dis,i (t) respectively represent the charging power and discharging power of HESSs at time t; η cha and η dis represent the charging efficiency and discharging efficiency of HESSs, respectively;

[0058] The inequality constraint for the BESSs state of charge limit is:

[0059] SOC min <SOC(t)<SOC max

[0060] Among them, SOC min and SOC max Refers to the upper and lower limits of SOC respectively.

[0061] The present application also provides a multi-objective optimization configuration system based on electric-hydrogen hybrid energy storage, the system comprising: a multi-objective optimization model establishment module, a cost calculation module, an electric energy loss calculation module, an electric energy quality calculation module and a multi-objective optimization configuration module;

[0062] The multi-objective optimization model building module builds a multi-objective optimization model based on the Pareto principle based on the minimum life cycle cost of electric-hydrogen hybrid energy storage, the daily line power loss in the park, and the exchange power deviation of the connecting lines;

[0063] The cost calculation module is used to calculate the total capital cost, maintenance cost, operating cost, replacement cost, and disposal and recovery cost of the whole life cycle loss;

[0064] The power loss calculation module is used to calculate the power loss of the system;

[0065] The power quality calculation module is used to calculate the power quality index;

[0066] The multi-objective optimization configuration module configures adaptive charging and discharging within the constraints based on minimization of power loss, smooth line power deviation and life cycle cost.

[0067] According to another embodiment of the present application, a configuration terminal is provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage when executing the program.

[0068] According to another embodiment of the present application, a storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage are implemented.

[0069] It can be seen from the above technical solutions that the present invention has the following advantages:

[0070] The present invention combines hydrogen energy storage systems with battery energy storage systems (BESSs) for coordinated optimization, which can solve the imbalance between supply and demand of various energy sources, thereby improving energy efficiency. In order to ensure the effectiveness of the planning of hydrogen energy storage systems and battery energy storage systems, a multi-objective function model is established with the minimum life cycle cost (LCC), system network loss and connection line switch power deviation as the goal. The present invention adopts multi-objective mayfly optimization (MOMA) to solve the Pareto non-optimal solution set of the energy storage system location and size planning scheme; and adopts the entropy weight method based on grey target decision to select the best compromise solution from the Pareto non-dominated solution set.

[0071] The multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage in this application can achieve optimal control of the full life cycle cost of the electric-hydrogen hybrid energy storage system by comprehensively considering the total capital cost, maintenance cost, operating cost, replacement cost, and disposal and recovery cost. This helps investors reduce unnecessary expenses and improve economic benefits in long-term operations.

[0072] The method optimization configuration of the present application can reduce the power transmission loss in the power grid and improve the energy utilization efficiency. Reducing power loss not only means reducing energy waste, but is also directly related to the stability and reliability of power supply.

[0073] The method effectively balances the exchange power deviation of the connecting lines by optimizing the charging and discharging strategy of the electric hydrogen energy storage system, which helps to maintain the stable operation of the power grid and reduce the grid pressure and failure risks caused by power fluctuations.

[0074] The method of the present application can also optimize the operation strategy of the energy storage system by calculating the power quality index, so as to reduce voltage fluctuations, harmonics and other problems and improve the power quality of the entire power grid. High-quality electricity is of great significance for protecting electrical equipment, improving production efficiency and extending equipment life.

[0075] This application is based on an adaptive charging and discharging configuration that minimizes power loss, smooth line power deviation, and life cycle cost, so that the electric-hydrogen hybrid energy storage system can flexibly adjust its working state according to the actual needs of the power grid, enhancing the flexibility and adaptability of the system. It can also effectively alleviate the impact of the intermittent and volatile nature of renewable energy (such as wind power and photovoltaics) on the power grid. Through reasonable optimization configuration, it can promote the larger-scale consumption of renewable energy and promote the clean transformation of the energy structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0076] In order to more clearly illustrate the technical solution of the present invention, the accompanying drawings required for use in the description will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0077] Figure 1 A flow chart of the multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage;

[0078] Figure 2 Schematic diagram of the multi-objective optimization configuration system based on electric-hydrogen hybrid energy storage. DETAILED DESCRIPTION

[0079] In the following description of the multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage of the present application, specific details such as specific system structures and technologies are proposed for the purpose of explanation rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application can also be implemented in other embodiments without these specific details.

[0080] It should be understood that when used in the present specification, the term "includes" indicates the presence of the described features, integral bodies, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integral bodies, steps, operations, elements, components and / or their collections. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.

[0081] It should be understood that the "one or more" mentioned in this application refers to one, two or more than two, and the "multiple" mentioned in this application refers to two or more. In the description of this application, unless otherwise specified, " / " means or, for example, A / B can mean A or B. The "and / or" in this article is just a way to describe the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone.

[0082] In order to clearly describe the technical solution of the present application, the words "first", "second" and the like are used to distinguish the same or similar items with substantially the same functions and effects. Those skilled in the art can understand that the words "first", "second" and the like do not limit the quantity and execution order, and the words "first", "second" and the like do not necessarily limit the difference.

[0083] The phrases such as "one embodiment" or "some embodiments" described in the present application mean that the specific features, structures or characteristics described in the embodiment are included in one or more embodiments of the present application. Therefore, the phrases such as "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments" etc. that appear in different places in the present application do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways.

[0084] like Figure 1 A flowchart of a preferred embodiment of the multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage of the present application is shown. The multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage is applied to one or more configuration terminals, wherein the configuration terminal is a device that can automatically perform numerical calculations and / or information processing according to pre-set or stored instructions, and its hardware includes but is not limited to microprocessors, application specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), digital signal processors (DSP), embedded devices, etc.

[0085] Configuration terminals are intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. Electronic devices can also represent various forms of mobile devices, such as personal digital processing and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the embodiments of the present application described and / or required herein.

[0086] In embodiments of the present invention, computer program code for performing operations of the present disclosure may be written in one or more programming languages ​​or a combination thereof, including but not limited to object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a stand-alone software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or power server.

[0087] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0088] See also Figure 1 The figure is a flow chart of a multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage in a specific embodiment, the method comprising:

[0089] S101: A multi-objective optimization model based on the Pareto principle is established based on the minimum life cycle cost of electric-hydrogen hybrid energy storage, the daily line power loss within the park, and the exchange power deviation of the connecting lines.

[0090] According to the embodiments of the present application, the total life cycle cost is minimized: including total capital cost, maintenance cost, operating cost, replacement cost, and disposal and recycling cost.

[0091] In this embodiment, the minimization of daily line power loss in the park is to reduce power loss in the power grid by optimizing the charging and discharging strategy of the energy storage system. In this embodiment, the minimization of the exchange power deviation of the connecting line can ensure the stable operation of the power grid and reduce the exchange power deviation caused by power fluctuations.

[0092] The embodiment of the present application constructs a multi-objective optimization model, that is, adopts a multi-objective optimization algorithm (such as NSGA-II, MOEA / D, etc.) to simultaneously meet the above three objectives, and sets appropriate constraints, such as capacity constraints, power constraints, and charging and discharging efficiency of the energy storage system.

[0093] S102: Calculate the total capital cost, maintenance cost, operating cost, replacement cost, and disposal and recovery cost of the total life cycle losses.

[0094] For example, the total capital cost includes the initial investment cost of the battery energy storage system and the hydrogen energy storage system. The maintenance cost includes the annual maintenance cost of the battery and hydrogen energy storage system. The operating cost includes the daily operating costs of the energy storage system, such as electricity costs, labor costs, etc. The replacement cost includes the replacement cost calculated based on the expected life and replacement cycle of the energy storage system. The disposal and recovery cost includes the harmless treatment and recovery costs after the energy storage system is retired.

[0095] S103: Calculate the power consumption of the system.

[0096] In an exemplary embodiment, the power loss model is established by taking into account factors such as resistance and reactance in the power grid, as well as the charging and discharging efficiency of the energy storage system. For simulating the operating state of the system, the power loss under different operating conditions is calculated through simulation or actual operating data.

[0097] This embodiment optimizes the charging and discharging strategy of the energy storage system, thereby adjusting the charging and discharging plan of the energy storage system with the goal of reducing power loss.

[0098] S104: Calculate a power quality index.

[0099] In an exemplary embodiment, when calculating the power quality index, power quality indicators such as voltage fluctuation, frequency deviation, harmonic content, etc. can be defined first. Then, grid data is collected. Here, monitoring equipment is used to collect power quality data in the grid in real time. The power quality index is calculated based on the defined indicators and the collected data. By adjusting the operation strategy of the energy storage system, power quality problems in the grid can be reduced.

[0100] S105: Based on minimizing power loss, smooth line power deviation, and life cycle cost, configure adaptive charging and discharging within constraints.

[0101] In the embodiments of the present application, an adaptive charging and discharging strategy is formulated according to the actual demand of the power grid and the state of the energy storage system. The charging and discharging strategy is then dynamically adjusted according to the real-time data of the power grid and the state changes of the energy storage system. The charging and discharging strategy is continuously optimized using an optimization algorithm (such as a genetic algorithm, a particle swarm algorithm, etc.) to minimize power loss, smooth line power deviation, and life cycle cost.

[0102] In one embodiment of the present invention, based on the steps of the above-mentioned multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage, a possible embodiment will be given below to illustrate its specific implementation plan in a non-limiting manner.

[0103] Under the condition of uncertainty in both supply and demand, this application solves the problem of coordinated scheduling of hydrogen energy storage system / battery energy storage system and wind energy / solar energy / hydropower energy storage system. The scheduling framework involved in the system of this application consists of battery energy storage system, photovoltaic power generation unit, wind power generation unit, electrolyzer, fuel cell unit and hydrogen tank. The main function of connecting the electric hydrogen energy storage system to the power grid is to alleviate the instability of the power grid caused by connecting to renewable energy generators instead of economical generators.

[0104] Therefore, the power distribution principle of the electric hydrogen energy storage system is based on minimizing power loss, smoothing line power deviation and life cycle cost, and adaptively charging and discharging within the constraints.

[0105] In some embodiments of the present application, the control center controls the charging and discharging operations of the energy storage device by timely monitoring the operation of the power grid, thereby realizing energy exchange between the energy storage device and the power grid.

[0106] In some specific embodiments, the charging state of the energy storage device at any time is an important parameter of the charging and discharging operation, which is described by variables such as capacity, charging and discharging power, and charging and discharging efficiency. The charging state calculation formula of the battery energy storage system is as follows:

[0107]

[0108] Among them, P cha,i (t) and P dis,i (t) represents the charging and discharging power of the node in this period; η cha,i and η dis,i Indicates the charging and discharging efficiency of the node during this period.

[0109] The exchange power between the battery energy storage system and the grid can be expressed as:

[0110] P grid,i (t) = P cha,i (t)-P dis,i (t)(2)

[0111] It should be noted that charging power and simultaneous discharging power are mutually exclusive, so the power exchange between the battery energy storage system and the grid meets the following conditions:

[0112] P cha,i (t)·P dis,i (t)=0(3)

[0113] In an exemplary embodiment, the site selection and capacity planning of BESSs / HESSs include the following methods:

[0114] The site selection and capacity determination of ESSs is a high-dimensional, multi-objective, and complex constraint problem.

[0115] Based on the LCC of electric-hydrogen hybrid energy storage, the daily line power loss in the park and the exchange power deviation of the connecting lines, a multi-objective optimization model based on the Pareto principle is established as follows:

[0116]

[0117] Among them, F(x) is composed of the objective function {F 1 ,F 2 ,F 3}, which are the LCC of BESSs and HESSs, daily network loss and link exchange power fluctuation; x represents the decision space composed of optimization variables, namely the optimal layout, capacity and hourly power of BESSs and HESSs; H(x) represents the constraints that the model needs to meet.

[0118] According to the embodiments of the present application, the embodiments of the present application also configure the full life cycle loss.

[0119] In some embodiments, LCC is an important indicator for evaluating the economic feasibility of ESSs. LCC includes total capital cost (TCC), maintenance cost (MC), operation cost (OC), replacement cost (RC), and disposal and recycling cost (DRC):

[0120]

[0121] The calculation method of the BESSs investment cost in the embodiment of the present application is:

[0122]

[0123] Among them, N BESS is the number of BESSs installed; c bat represents the cost of a single battery; c EPCD,B Represents engineering, procurement and construction fees and developer fees; I sub,B is the government subsidy for BESS; E BESS,i is the capacity of the i-th BESS; μ CRF,B Represents the capital recovery factor.

[0124] In this embodiment, the calculation method of BESSs maintenance cost is:

[0125]

[0126] Among them, c FMC,B represents the annual fixed MC; P BESS,i is the power of the i-th BESS.

[0127] In some specific embodiments, the BESSs operating cost is calculated as follows:

[0128] Here, if OC is negative, BESSs are cost-effective.

[0129]

[0130] Where T represents 24 hours in a day; c pur and c sell Represent the time-of-use price of buying and selling electricity; P cha,Bi and P dis,Bi represent the charging power and discharging power of the i-th BESS respectively.

[0131] In some embodiments, the RC of the BESS is mainly generated by replaceable batteries, and the replacement cost of the BESSs is calculated as:

[0132]

[0133] Among them, n B and t represent the battery replacement time within the life cycle and replacement cycle of BESSs, respectively; α represents the annual reduction rate of battery cost.

[0134] In this example, the cost of disposing and recycling BESSs is calculated as follows:

[0135]

[0136] Among them, γ B is the recycling factor of the battery.

[0137] The total capital cost of HESSs is calculated as:

[0138]

[0139] Among them, μ CRF,H represents the capital recovery factor of hydrogen battery components; c FC and c E represent the fuel cell cost and electrolyzer cost respectively; c HT and Q HT,i represents the cost and capacity of hydrogen tank; PHESS,i Indicates the power of the i-th hydrogen battery assembly; C EPC,H Represents the total contracting cost of hydrogen battery components excluding system costs; I sub,H Represents government subsidies for hydrogen battery components.

[0140] The maintenance cost of HESSs is calculated as:

[0141]

[0142] The operating costs of HESSs are calculated as follows:

[0143]

[0144] Among them, P cha,Hi and P dis,Hi They represent the charging and discharging power of the i-th HESS respectively; Q H,i represents the total hydrogen production of the i-th HESS per day; q H Indicates the hydrogen production per kilowatt-hour of electricity; I H2 The profit of hydrogen is the qualitative price of hydrogen minus the production cost of hydrogen c H2 and transportation cost c D ;p H It represents the power generation per kilogram of hydrogen; μ and v represent the ratio of hydrogen delivery and power generation.

[0145] The replacement cost of HESSs in this embodiment is calculated as follows: The RC of HESS generated by the replaceable FC is as follows:

[0146]

[0147] Among them, n H represents the number of FC replacements; β represents the annual reduction rate.

[0148] In some embodiments, the cost of disposal and recycling of HESSs is calculated as follows:

[0149]

[0150] Among them, γ H is the recovery factor of FC.

[0151] The power loss of the system in this application takes into account the grid loss in the site selection and capacity planning of ESSs, and is expressed in terms of daily power loss as follows:

[0152]

[0153] Among them, F 2 is the daily electricity loss cost; P loss(t) represents the power loss at time t; L is the total number of lines in the distribution network; R j represents the resistance on the jth line; I j (t) represents the current on the jth line at time t. 2 The smaller it is, the greater the positive effect of deploying BESSs on reducing power loss.

[0154] In an exemplary embodiment, due to the intermittent nature of renewable energy, its integration into the grid will produce significant power fluctuations at the grid connection point, but BESSs can serve as an effective supplement to renewable energy, smoothing power fluctuations and thus improving power quality. The power quality index can be expressed as:

[0155]

[0156] Among them, F 3 is the daily total power fluctuation of the grid-connected point; P grid (t) represents the power fluctuation at time t: Refers to the average power fluctuation during a day.

[0157] According to an embodiment of the present application, adaptive charging and discharging is configured within constraints based on minimization of power loss, smooth line power deviation, and life cycle cost.

[0158] Among them, the method of setting equality constraints and inequality constraints is specifically described.

[0159] For the equality constraint method, the power balance is calculated as:

[0160]

[0161] Among them, P i (t) and Q i (t) respectively represent the injected active power and reactive power of the ith node in the distribution network at time t; V i (t) is the voltage of the ith node at time t; G ij and B ij represents the admittance and inductance between the i-th node and the j-th node; θ ij (t) is the power angle between the ith node and the jth node at time t.

[0162] In some embodiments, the inequality constraints include node voltage ranges.

[0163] V i min <V i <V i max (19)

[0164] Among them, Vi min and V i max Represents the upper and lower limits of the voltage at the i-th node.

[0165] The inequality constraints also include power limits at the grid connection point:

[0166]

[0167] in, and Represent the upper and lower limits of the active power and reactive power of the parallel node respectively.

[0168] In the inequality constraints, the capacity ranges of BESSs and HESSs are:

[0169]

[0170] in, and represents the upper limit of energy capacity and power capacity of BESSs; Indicates the upper limit of the power capacity of HESSs.

[0171] The charging and discharging power limits of the BESSs in the embodiment of the present application are:

[0172]

[0173] Among them, P cha,i (t) and P dis,i (t) respectively represent the charging power and discharging power of BESSs at time t; η cha and η dis represent the charging efficiency and discharging efficiency of BESSs, respectively.

[0174] The charging and discharging power limits of the HESSs in this embodiment are:

[0175]

[0176] Among them, P cha,i (t) and P dis,i (t) respectively represent the charging power and discharging power of HESSs at time t; η cha and η dis represent the charging efficiency and discharging efficiency of HESSs, respectively.

[0177] The charging state of the BESSs involved in this embodiment is limited to:

[0178] SOC min <SOC(t)<SOC max (twenty four)

[0179] Among them, SOC min and SOC max Refers to the upper and lower limits of SOC, namely 20% and 90% respectively.

[0180] In some embodiments, the multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage of the present application can achieve optimal control of the full life cycle cost of the electric-hydrogen hybrid energy storage system by comprehensively considering the total capital cost, maintenance cost, operating cost, replacement cost, and disposal and recovery cost. This helps investors reduce expenditures and improve economic benefits in long-term operations.

[0181] The method optimization configuration of the present application can reduce the power transmission loss in the power grid and improve the energy utilization efficiency. Reducing power loss not only means reducing energy waste, but is also directly related to the stability and reliability of power supply.

[0182] The method effectively balances the exchange power deviation of the connecting lines by optimizing the charging and discharging strategy of the electric hydrogen energy storage system, which helps to maintain the stable operation of the power grid and reduce the grid pressure and failure risks caused by power fluctuations.

[0183] The method of the present application can also optimize the operation strategy of the energy storage system by calculating the power quality index, so as to reduce voltage fluctuations, harmonics and other problems and improve the power quality of the entire power grid. High-quality electricity is of great significance for protecting electrical equipment, improving production efficiency and extending equipment life.

[0184] This application is based on an adaptive charging and discharging configuration that minimizes power loss, smooth line power deviation, and life cycle cost, so that the electric-hydrogen hybrid energy storage system can flexibly adjust its working state according to the actual needs of the power grid, enhancing the flexibility and adaptability of the system. It can also effectively alleviate the impact of the intermittent and volatile nature of renewable energy (such as wind power and photovoltaics) on the power grid. Through reasonable optimization configuration, it can promote the larger-scale consumption of renewable energy and promote the clean transformation of the energy structure.

[0185] The following is an embodiment of a multi-objective optimization configuration system based on electric-hydrogen hybrid energy storage provided by an embodiment of the present disclosure. This system and the multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage of the above-mentioned embodiments belong to the same inventive concept. For details not fully described in the embodiment of the multi-objective optimization configuration system based on electric-hydrogen hybrid energy storage, please refer to the embodiment of the multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage.

[0186] A mobile terminal implementing various embodiments of the present invention will now be described with reference to the accompanying drawings. In the subsequent description, suffixes such as "module", "component" or "unit" used to represent elements are used only to facilitate the description of the embodiments of the present invention and have no specific meaning in themselves. Therefore, "module" and "component" can be used interchangeably.

[0187] The system includes: a multi-objective optimization model building module, a cost calculation module, an electric energy loss calculation module, a power quality calculation module and a multi-objective optimization configuration module.

[0188] The multi-objective optimization model establishment module establishes a multi-objective optimization model based on the Pareto principle based on the minimum life cycle cost of electric-hydrogen hybrid energy storage, the daily line power loss in the park and the exchange power deviation of the connecting lines.

[0189] The cost calculation module is used to calculate the total capital cost, maintenance cost, operating cost, replacement cost, and disposal and recovery cost over the entire life cycle.

[0190] The power loss calculation module is used to calculate the power loss of the system.

[0191] The power quality calculation module is used to calculate the power quality index.

[0192] The multi-objective optimization configuration module configures adaptive charging and discharging within the constraints based on minimization of power loss, smooth line power deviation and life cycle cost.

[0193] The multi-objective optimization configuration system based on electric-hydrogen hybrid energy storage involved in this application is a combination of the units and algorithm steps of each example described in the embodiments disclosed herein, which can be implemented by electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in terms of function in the above description. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to exceed the scope of the present invention.

[0194] Those skilled in the art will appreciate that various aspects of the multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage can be implemented as a system, method or program product. Therefore, various aspects of the present disclosure can be specifically implemented in the following forms, namely: a complete hardware implementation, a complete software implementation (including firmware, microcode, etc.), or a combination of hardware and software, which can be collectively referred to as "circuit", "module" or "system".

[0195] In the storage medium involved in this application, a program product capable of implementing the above method of this specification is stored. In some possible implementations, various aspects of the present disclosure can also be implemented in the form of a program product, which includes a program code. When the program product is run on a terminal device, the program code is used to enable the terminal device to execute the steps according to various exemplary implementations of the present disclosure described in the above "Exemplary Method" section of this specification.

[0196] The storage medium can adopt any combination of one or more readable media. The readable medium can be a readable signal medium or a readable storage medium. The readable storage medium can be, for example, but not limited to, a system, device or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination of the above. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.

[0197] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage, characterized in that: The method includes: S101: establishing a multi-objective optimization model based on the Pareto principle based on the minimum life cycle cost of electric-hydrogen hybrid energy storage, daily line power loss in the park, and exchange power deviation of the connecting lines; S102: Calculate the total capital cost, maintenance cost, operating cost, replacement cost, and disposal and recovery cost of the life cycle losses; S103: Calculate the power consumption of the system; S104: Calculate power quality index; S105: Based on minimizing power loss, smooth line power deviation, and life cycle cost, configure adaptive charging and discharging within constraints.

2. The multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage according to claim 1 is characterized in that: The multi-objective optimization model based on the Pareto principle established in step S101 is as follows: Among them, F(x) is composed of the objective functions {F1, F2, F3}, which are the minimum life cycle cost, daily network loss and connection line switching power fluctuation respectively; x represents the decision space composed of optimization variables; H(x) represents the constraints that the model needs to meet.

3. The multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage according to claim 1 is characterized in that: The total capital cost in step S102 is calculated as follows: Among them, N BESS is the number of BESSs installed; c bat represents the cost of a single battery; c EPCD,B Represents engineering, procurement and construction fees and developer fees; I sub,B is the government subsidy for BESS; E BESS,i is the capacity of the ith BESS; μ CRF,B represents the capital recovery factor; The maintenance cost is calculated as follows: Among them, c FMC,B represents the annual fixed MC; P BESS,i is the power of the i-th BESS; Operating Cost OC B The calculation method is: Where T represents 24 hours in a day; c pur and c sell Represent the time-of-use price of buying and selling electricity; P cha,Bi and P dis,Bi denote the charging power and discharging power of the i-th BESS respectively; The replacement cost is calculated as: Among them, n B and t represent the battery replacement time within the life cycle and replacement cycle of BESSs, respectively; α represents the annual reduction rate of battery cost; Disposal and recovery costs are calculated as: Among them, γ B is the recycling factor of the battery.

4. The multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage according to claim 1 is characterized in that: In step S103, the power loss of the system is calculated by means of daily power loss; The daily power loss is expressed as follows: Among them, F2 is the daily electricity loss cost; P loss (t) represents the power loss at time t; L is the total number of lines in the distribution network; R j represents the resistance on the jth line; I j (t) represents the current on the jth line at time t.

5. The multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage according to claim 1 is characterized in that: The power quality index calculated in step S104 is expressed as: Where F3 is the daily total power fluctuation of the grid-connected point; P grid (t) represents the power fluctuation at time t: Refers to the average power fluctuation during a day.

6. The multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage according to claim 1 is characterized in that: Step S105 also includes: defining a power balancing constraint mode; Among them, P i (t) and Q i (t) represent the injected active power and reactive power of the ith node in the distribution network at time t, respectively; V i (t) is the voltage of the ith node at time t; G ij and B ij represents the admittance and inductance between the i-th node and the j-th node; θ ij (t) is the power angle between the ith node and the jth node at time t.

7. The multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage according to claim 1 is characterized in that: Step S105 also includes: defining inequality constraints based on the following method; The inequality constraints for the node voltage range are: In i min <V i <V i max Among them, V i min and V i max represents the upper and lower limits of the voltage of the i-th node; The inequality constraint for the power limit at the grid connection point is: in, and Represent the upper and lower limits of the active power and reactive power of the parallel node respectively; The inequality constraints for the capacity ranges of BESSs and HESSs are: in, and represents the upper limit of energy capacity and power capacity of BESSs; It indicates the upper limit of power capacity of HESSs; The inequality constraint for BESSs charging and discharging power limit is: Among them, P cha,i (t) and P dis,i (t) respectively represent the charging power and discharging power of BESSs at time t; η cha and η dis represent the charging efficiency and discharging efficiency of BESSs, respectively; The inequality constraint for the HESSs charging and discharging power limit is: Among them, P cha,i (t) and P dis,i (t) respectively represent the charging power and discharging power of HESSs at time t; η cha and η dis represent the charging efficiency and discharging efficiency of HESSs, respectively; The inequality constraint for the BESSs state of charge limit is: SOC min <SOC(t)<SOC max Among them, SOC min and SOC max Refers to the upper and lower limits of SOC respectively.

8. A multi-objective optimization configuration system based on electric-hydrogen hybrid energy storage, characterized in that: The system is used to execute the multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage as described in any one of claims 1 to 7; the system comprises: a multi-objective optimization model establishment module, a cost calculation module, an electric energy loss calculation module, an electric energy quality calculation module and a multi-objective optimization configuration module; The multi-objective optimization model building module builds a multi-objective optimization model based on the Pareto principle based on the minimum life cycle cost of electric-hydrogen hybrid energy storage, the daily line power loss in the park, and the exchange power deviation of the connecting lines; The cost calculation module is used to calculate the total capital cost, maintenance cost, operating cost, replacement cost, and disposal and recovery cost of the whole life cycle loss; The power loss calculation module is used to calculate the power loss of the system; The power quality calculation module is used to calculate the power quality index; The multi-objective optimization configuration module configures adaptive charging and discharging within the constraints based on minimization of power loss, smooth line power deviation and life cycle cost.

9. A configuration terminal, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the steps of the multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage are implemented as described in any one of claims 1 to 7.

10. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the multi-objective optimization configuration method based on electric-hydrogen hybrid energy storage are implemented as described in any one of claims 1 to 7.

Citation Information

Cited By

  • Planning method and system considering posterior extreme scene re-identification of energy storage system

    CN119382129A

  • Planning method and system for a posteriori extreme scenario re-identification considering energy storage system

    CN119382129B