Dust treatment device and method for construction engineering construction
By designing dust treatment devices for box, vacuuming, spraying and filtering components, the problem that dust treatment devices in the prior art cannot realize sewage recycling is solved, rapid dust reduction and sewage filtration of dust are achieved, and dust removal efficiency is improved. Water resource utilization rate.
Patent Information
- Application Number
- CN202411284972.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-12-06
AI Technical Summary
The dust treatment device constructed in the existing construction project cannot realize the recycling of filtered particles and impurities of sewage after spraying and dust removal, resulting in low dust removal efficiency and waste of water resources, and increasing the dust removal operation time.
A dust treatment device including a box, vacuum, spray and filter components is designed to suck dust in through a vacuum cleaner, spray components flush the vacuum cleaner net, filter the sewage by filtering the filtered sewage through a water pump. Recycling.
It realizes rapid dust reduction and filters particulate impurities of sewage, extends the time for dust treatment, improves dust removal efficiency, and saves water resources.
Smart Images

Figure CN119075544A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction engineering, and in particular to a dust treatment device and method for construction engineering. Background Art
[0002] Construction project construction refers to the process of turning buildings or structures from drawings into entities in accordance with design drawings and construction specifications. Many building materials such as cement, sand, lime, etc. contain a large number of tiny particles. Dry soil and gravel are prone to form dust during the processing process. During construction, excavation, drilling, cutting and other operations will generate a lot of dust.
[0003] Too much dust during construction projects can cause many kinds of harm. Long-term inhalation of dust may lead to diseases such as asthma, bronchitis, and pneumoconiosis. Dust can cause eye discomfort, redness, and vision problems, and increase the air pollution index in surrounding areas. This requires dust to be handled during construction projects. Existing dust removal equipment often uses a spraying method to reduce dust. Although it can remove dust, it wastes water resources too much, cannot increase the use time of water, and cannot collect and recycle the used water, thereby reducing the dust removal efficiency and increasing the dust removal operation time. Summary of the invention
[0004] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.
[0005] In view of the problems existing in the above-mentioned existing dust treatment devices for construction projects, the present invention is proposed.
[0006] Therefore, the purpose of the present invention is to provide a dust treatment device for construction projects, which aims to: be able to quickly reduce dust, and after spraying dust removal, be able to filter particulate impurities in sewage and recycle them, thereby increasing the time for dust treatment.
[0007] To solve the above technical problems, the present invention provides the following technical solutions: it includes a box body component, which includes a frame, two dust inlets, a partition, a water tank and a movable base, the partition is fixed to the top of the frame, the surfaces of the two dust inlets are fixedly connected to the left and right sides of the frame respectively, the bottoms of the two dust inlets are fixedly connected to the left and right sides of the top of the partition respectively, the top of the water tank is fixedly connected to the bottom of the frame, and the top of the movable base is fixedly intercepted with the bottom of the water tank; and, a dust suction component, which includes a vacuum cleaner, a first pipe, a second pipe, two large dust suction ports and two small dust suction pipes, the bottom of the vacuum cleaner is fixedly connected to the top of the frame, the left side of the vacuum cleaner is fixedly connected to the right side of the first pipe, the top of the second pipe surface is fixedly connected to the top of the frame, and the bottom of the second pipe passes through the frame and the partition in sequence and extends to the frame Inside the frame, the left side of the bottom of the first pipe is fixedly connected to the top of the second pipe, the opposite ends of the two large dust suction ports are respectively fixedly connected to the bottom of the left and right sides of the second pipe, and the tops of the two small dust suction pipes are fixedly connected to the bottom of the second pipe; and, a filtering component, which includes a connecting shell, a collecting box, a first wave filter, a second wave filter, a filter plate and a pulling plate, the bottom of the connecting shell is fixedly connected to the bottom of the inside of the frame, the front sides of the first wave filter, the second wave filter and the filter plate are fixedly connected to the rear side of the pulling plate, the surface of the collecting box is plug-connected to the inside of the connecting shell, the bottom of the inside of the connecting shell is connected to the bottom of the inside of the collecting box, the rear side of the pulling plate can be fitted with the front side of the collecting box, and the surfaces of the first wave filter, the second wave filter and the filter plate can be slidably connected to the front side of the inside of the collecting box.
[0008] As a preferred solution of the dust handling device for construction engineering construction described in the present invention, wherein: a spray component is arranged on the front side of the top of the movable base, and the spray component includes a water pump, a water outlet pipe, a plurality of inclined spray heads, a plurality of vertical spray heads and a water inlet pipe, the bottom of the water pump is fixedly connected to the front side of the top of the movable base, the rear side of the water inlet pipe is fixedly connected to the front side of the water tank, the front side of the water inlet pipe is fixedly connected to the rear side of the water pump, the bottom of the water outlet pipe is fixedly connected to the front side of the water pump, the left and right sides of the top of the water outlet pipe are respectively fixedly connected to the left and right sides inside the frame, the top of the water outlet pipe surface is fixedly connected to the left and right sides inside the partition, the sides of the plurality of inclined spray heads close to the water outlet pipe are all fixedly connected to the water outlet pipe, and the tops of the plurality of vertical spray heads are respectively fixedly connected to the bottoms of the plurality of inclined spray heads.
[0009] As a preferred solution of the dust handling device for construction engineering construction described in the present invention, a cleaning component is provided on the front side of the interior of the collection box, and the cleaning component includes multiple first scrapers, two second scrapers and multiple material collecting blocks. The front sides of the multiple first scrapers, two second scrapers and multiple material collecting blocks are fixedly connected to the front side of the interior of the collection box, and the surfaces of the multiple first scrapers are respectively fitted with the top and bottom of the first wave filter net and the second wave filter net, and the opposite ends of the two second scrapers are respectively fitted with the top and bottom of the filter plate, and the multiple material collecting blocks are respectively located at the bottom of the first wave filter net, the second wave filter net and the filter plate, and the second wave filter net is located at the bottom of the first wave filter net and at the top of the filter plate.
[0010] As a preferred solution of the dust handling device for construction engineering construction described in the present invention, positioning components are provided on the left and right sides of the front side of the frame, and the positioning components on the right side include two first sockets, a second socket, two limiting blocks, two long rods, a short rod, a handle and a latch, the rear sides of the two first sockets are respectively fixedly connected to the top and bottom of the right side of the front side of the collection box, the rear side of the second socket is fixedly connected to the right side of the front side of the pulling plate, the rear sides of the two limiting blocks are both fixedly connected to the right side of the front side of the frame, the right sides of the two long rods are respectively fixedly connected to the top and bottom of the left side of the handle, the right side of the short rod is fixedly connected to the center of the left side of the handle, the left sides of the two long rods pass through the two limiting blocks and the two first sockets in sequence, and extend to the left sides of the two first sockets, the surface of the short rod is plug-connected with the inside of the second socket, and the bottom of the latch passes through the second socket and the short rod in sequence and extends to the bottom of the second socket.
[0011] As a preferred solution of the dust handling device for construction engineering construction described in the present invention, wherein: an absorption component is provided at the bottom of the frame, and the absorption component includes a U-shaped block, two vertical plates and a plurality of dust suction nets, the top of the U-shaped block is fixedly connected to the bottom of the partition, the front and rear sides of the U-shaped block are respectively fixedly connected to the front and rear sides of the inside of the frame, the tops of the two vertical plates are respectively fixedly connected to the left and right sides of the bottom of the partition, the bottoms of the two vertical plates are respectively fixedly connected to the left and right sides of the bottom of the U-shaped block, the front and rear sides of the two vertical plates are respectively fixedly connected to the front and rear sides of the inside of the frame, the plurality of dust suction nets are respectively arranged on the left and right sides of the inside of the U-shaped block and the left and right sides of the bottom, and the left and right sides of the surface of the second pipe and the two small dust suction pipes are respectively fixedly connected to the inside of the two vertical plates.
[0012] As a preferred solution of the dust handling device for construction engineering construction described in the present invention, guide components are arranged on the left and right sides of the U-shaped block, and the guide components include two guide blocks, two inclined blocks and two liquid outlet blocks, the opposite ends of the two guide blocks are respectively fixedly connected to the left and right sides of the U-shaped block, the tops of the two inclined blocks are respectively fixedly connected to the bottoms of the two guide blocks, the tops of the two liquid outlet blocks are respectively fixedly connected to the bottoms of the two inclined blocks, the opposite sides of the two liquid outlet blocks are respectively fixedly connected to the left and right sides inside the frame, and the opposite ends of the tops of the two liquid outlet blocks are respectively fixedly connected to the left and right sides of the bottom of the U-shaped block.
[0013] As a preferred solution of the dust treatment device for construction engineering of the present invention, a first water leakage hole is opened at the center of the first wave filter net, and second water leakage holes are opened on both sides of the second wave filter net.
[0014] As a preferred solution of the dust handling device for construction engineering construction described in the present invention, a partition block is fixedly connected to the left side inside the water tank to form two spaces, a flow pipe is fixedly connected to the left side of the front side of the water tank, the right side of the flow pipe is fixedly connected to the left side of the water inlet pipe, and the right side of the water tank is fixedly connected to a sewage pipe.
[0015] The beneficial effects of the present invention are as follows: after the dust is sucked into the interior of the frame by the dust suction component, the dust can be absorbed by the absorption component, and under the action of the spray component, the dust absorbed by the multiple dust suction nets can be flushed, and the sewage will flow downward through the guide component, and then be quickly filtered by the filtering component, so that the filtered sewage will enter the right side of the water tank. With the continuous use of the spray component, the water pump can pump out the filtered sewage, and with the continuous operation of the vacuum cleaner, the multiple dust suction nets will be flushed, thereby increasing the dust removal efficiency. After the dust removal is completed, the valve of the water inlet pipe is closed, and the valve of the flow pipe is opened, so that the water pump can pump out clean water from the left side of the water tank to flush the interior of the frame, thereby achieving a cleaning effect. By opening the valve of the sewage pipe, the sewage on the right side of the water tank can be discharged, and valves are arranged on the tops of the water inlet pipe, the flow pipe and the sewage pipe.
[0016] In view of the problems existing in the above-mentioned existing dust treatment devices for construction projects, the present invention is proposed.
[0017] Therefore, the purpose of the present invention is to provide a dust treatment device and method for construction engineering, the purpose of which is to: be able to quickly reduce dust, and after spraying dust removal, be able to filter particulate impurities in sewage and recycle them, thereby increasing the time for dust treatment.
[0018] In order to solve the above technical problems, the present invention provides the following technical solutions: when dust removal is needed, by running the vacuum cleaner, the dust suction component sucks the dust into the interior of the frame through two dust inlets; then the water pump is run to pump out the water on the right side of the water tank, and the water will enter the multiple inclined spray heads and the multiple vertical spray heads through the water outlet pipe, and the multiple inclined spray heads and the multiple vertical spray heads will spray the multiple dust suction nets to wash the dust on the surfaces of the multiple dust suction nets and flow downward; the sewage flowing downward enters the interior of the filter component through the two liquid outlet blocks, and the sewage will pass through the first wave filter net, the second wave filter net and the filter plate in turn. The sewage after filtering the particulate impurities will enter the right side of the water tank and be continuously sprayed by the operation of the water pump.
[0019] As a preferred scheme of the dust handling device and method for construction engineering construction described in the present invention, wherein: the set box component can handle dust inside the frame, the set dust suction component can suck dust into the interior of the box component, the set absorption component can absorb dust entering the interior of the frame, the set spray component can flush multiple dust suction nets, the set filter component can filter particulate impurities from sewage generated by flushing multiple dust suction nets, the set cleaning component facilitates cleaning of particulate impurities from the top and bottom of the first wave filter net, the second wave filter net and the filter plate, the set positioning component can limit the filter component to avoid shaking of the filter component inside the frame, and the set guide component can control the flow direction of dust and sewage.
[0020] The beneficial effects of the present invention are as follows: the two vertical plates of the absorption component can limit the absorption range of the two large suction ports and the two small suction pipes; the two guide blocks and the two inclined blocks of the guide component can control the flow direction of the dust and the flow direction of the sewage entering the box body; the sewage will first fall to the left and right sides of the top of the first wave filter; the sewage after the filtered particle impurities will flow downward; as the sewage enters, the left and right sides of the top of the first wave filter will intercept the particles; when blocked, due to the shape of the first wave filter, the sewage will gather at the center of the first wave filter, thereby increasing the filtering time of the sewage; the sewage flowing to the center of the first wave filter will flow downward through the first leakage hole, and then fall to the top of the second wave filter; under the shape of the second wave filter, when the center of the second wave filter is blocked, the sewage will flow to both sides, and finally fall to the top of the filter plate through the two leakage holes; the sewage passing through the filter plate will enter the right side of the inside of the water tank; through the shapes of the first wave filter and the second wave filter, the time for cleaning dust can be increased, thereby improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them: Figure 1 The present invention provides an overall structural diagram.
[0022] Figure 2 This is a schematic diagram of a front side sectional stereoscopic structure of a frame provided by the present invention.
[0023] Figure 3 This is a schematic diagram of the three-dimensional structure of the spray component provided by the present invention.
[0024] Figure 4 This is a front cross-sectional stereoscopic structural schematic diagram of a local structure provided by the present invention.
[0025] Figure 5 This is a schematic diagram of the three-dimensional structure of the filter component provided by the present invention.
[0026] Figure 6 This is a schematic diagram of a detailed three-dimensional structure of a local structure provided by the present invention.
[0027] Figure 7 This is a schematic diagram of the three-dimensional structure of the cleaning component provided by the present invention.
[0028] Figure 8 A schematic diagram of the blockage flow of the first wave filter screen and the second wave filter screen provided by the present invention. DETAILED DESCRIPTION
[0029] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0030] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0031] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0032] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the embodiments of the present invention in detail, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0033] Reference Figures 1 to 8 , which is the first embodiment of the present invention, provides a dust treatment device and method for construction engineering. Through the dust treatment device and method for construction engineering, rapid dust reduction and increased dust treatment time are achieved. After spraying and dust removal, the sewage flowing downward will be filtered by the filter component 300 to remove particulate impurities. The sewage after filtering the particulate impurities will enter the right side of the water tank 104. With the continuous operation of the spray component 400, the sewage can be recycled, thereby continuously reducing dust.
[0034] When dust removal is needed, by running the vacuum cleaner 201, the vacuum cleaner 201 will use the first pipe 202 and the second pipe 203 to make the two large dust suction ports 204 and the two small dust suction tubes 205 to suction dust, and the dust outside the frame 101 will enter the interior of the frame 101 through the two dust inlets 102. As the two large dust suction ports 204 and the two small dust suction tubes 205 absorb the dust, the dust will be adsorbed by multiple dust suction nets 703.
[0035] Close the valves of the flow pipe 104b and the drain pipe 104c, then open the valve of the water inlet pipe 405, and run the water pump 401. The water pump 401 pumps out the water from the right side of the water tank 104 through the water inlet pipe 405, and the water enters the multiple inclined spray heads 403 and the multiple vertical spray heads 404 through the water outlet pipe 402. The multiple inclined spray heads 403 and the multiple vertical spray heads 404 spray the multiple dust suction nets 703, thereby washing the dust on the surfaces of the multiple dust suction nets 703 and letting it flow downward.
[0036] The sewage flowing downward flows downward through the two guide blocks 801 and the two inclined blocks 802, and enters the interior of the collection box 302 through the two liquid outlet blocks 803. The sewage first falls to the top of the first wave filter 303 to filter the particle impurities. Due to the shape of the first wave filter 303, when the left and right sides of the first wave filter 303 are blocked, the sewage will gather in the middle and then fall to the top of the second wave filter 304 through the first leakage hole 303a. Due to the shape of the second wave filter 304, the sewage will flow to the first wave filter 304. The sewage flows along the left and right sides of the second wave filter 304, and finally falls to the top of the filter plate 305 through the two second leakage holes 304a. The sewage passing through the filter plate 305 will flow downward, and the sewage after filtering the particulate impurities will pass through the collecting box 302, the connecting shell 301, the frame 101 and the water tank 104 in turn and enter the right side of the water tank 104. With the operation of the water pump 401, the sewage on the right side of the water tank 104 is pumped out, so that multiple inclined spray heads 403 and multiple vertical spray heads 404 continue to spray multiple dust suction nets 703.
[0037] Reference Figures 1 to 6 and Figure 8 , which is the second embodiment of the present invention, provides a dust treatment device for construction engineering, through the box component 100, the dust suction component 200, the filter component 300, the spray component 400, the absorption component 700, the guide component 800, the flow pipe 104b, the sewage pipe 104c, the first leakage hole 303a and the second leakage hole 304a, the time for treating dust is increased, and the particulate impurities in the sewage can be filtered and the sewage can be reused to rinse the dust suction net 703 that absorbs dust.
[0038] The box component 100 includes a frame 101, two dust inlets 102, a partition 103, a water tank 104 and a movable base 105. The partition 103 is fixed to the top of the frame 101. The surfaces of the two dust inlets 102 are fixedly connected to the left and right sides of the frame 101 respectively. The bottoms of the two dust inlets 102 are fixedly connected to the left and right sides of the top of the partition 103 respectively. The top of the water tank 104 is fixedly connected to the bottom of the frame 101. The top of the movable base 105 is fixedly intercepted with the bottom of the water tank 104; and, The dust collecting component 200 includes a dust collecting machine 201, a first pipe 202, a second pipe 203, two large dust collecting ports 204 and two small dust collecting pipes 205. The bottom of the dust collecting machine 201 is fixedly connected to the top of the frame 101, the left side of the dust collecting machine 201 is fixedly connected to the right side of the first pipe 202, the top of the surface of the second pipe 203 is fixedly connected to the top inside the frame 101, the bottom of the second pipe 203 passes through the frame 101 and the partition 103 in sequence and extends to the inside of the frame 101, the left side of the bottom of the first pipe 202 is fixedly connected to the top of the second pipe 203, the opposite ends of the two large dust collecting ports 204 are fixedly connected to the bottom of the left and right sides of the second pipe 203, and the tops of the two small dust collecting pipes 205 are fixedly connected to the bottom of the second pipe 203; and, The filtering component 300 includes a connecting shell 301, a collecting box 302, a first wave filter 303, a second wave filter 304, a filter plate 305 and a pulling plate 306. The bottom of the connecting shell 301 is fixedly connected to the bottom of the interior of the frame 101, and the front sides of the first wave filter 303, the second wave filter 304 and the filter plate 305 are fixedly connected to the rear side of the pulling plate 306. The surface of the collecting box 302 is plug-connected to the interior of the connecting shell 301, and the bottom of the interior of the connecting shell 301 is connected to the bottom of the interior of the collecting box 302. The rear side of the pulling plate 306 can be fitted with the front side of the collecting box 302. The surfaces of the first wave filter 303, the second wave filter 304 and the filter plate 305 can be slidably connected to the front side of the interior of the collecting box 302.
[0039] A spray component 400 is provided on the front side of the top of the mobile base 105, and the spray component 400 includes a water pump 401, a water outlet pipe 402, a plurality of inclined spray heads 403, a plurality of vertical spray heads 404 and a water inlet pipe 405. The bottom of the water pump 401 is fixedly connected to the front side of the top of the mobile base 105, the rear side of the water inlet pipe 405 is fixedly communicated with the front side of the water tank 104, the front side of the water inlet pipe 405 is fixedly communicated with the rear side of the water pump 401, the bottom of the water outlet pipe 402 is fixedly communicated with the front side of the water pump 401, the left and right sides of the top of the water outlet pipe 402 are respectively fixedly connected to the left and right sides inside the frame 101, the top of the surface of the water outlet pipe 402 is fixedly connected to the left and right sides inside the partition 103, the multiple inclined spray heads 403 are fixedly communicated with the water outlet pipe 402 on one side close to the water outlet pipe 402, and the tops of the multiple vertical spray heads 404 are fixedly communicated with the bottoms of the multiple inclined spray heads 403, respectively.
[0040] An absorption component 700 is provided at the bottom of the frame 101, and the absorption component 700 includes a U-shaped block 701, two vertical plates 702 and a plurality of dust suction nets 703. The top of the U-shaped block 701 is fixedly connected to the bottom of the partition 103, and the front and rear sides of the U-shaped block 701 are respectively fixedly connected to the front and rear sides of the inside of the frame 101, the tops of the two vertical plates 702 are respectively fixedly connected to the left and right sides of the bottom of the partition 103, and the bottoms of the two vertical plates 702 are respectively fixedly connected to the left and right sides of the bottom of the U-shaped block 701, and the front and rear sides of the two vertical plates 702 are respectively fixedly connected to the front and rear sides of the inside of the frame 101, and the plurality of dust suction nets 703 are respectively arranged on the left and right sides of the inside of the U-shaped block 701 and the left and right sides of the bottom, and the left and right sides of the surface of the second pipe 203 and the two small dust suction pipes 205 are respectively fixedly connected to the inside of the two vertical plates 702.
[0041] A guide component 800 is provided on the left and right sides of the U-shaped block 701, and the guide component 800 includes two guide blocks 801, two inclined blocks 802 and two liquid outlet blocks 803. The opposite ends of the two guide blocks 801 are fixedly connected to the left and right sides of the U-shaped block 701, respectively, the tops of the two inclined blocks 802 are fixedly connected to the bottoms of the two guide blocks 801, respectively, the tops of the two liquid outlet blocks 803 are fixedly connected to the bottoms of the two inclined blocks 802, respectively, the opposite sides of the two liquid outlet blocks 803 are fixedly connected to the left and right sides inside the frame 101, respectively, and the opposite ends of the tops of the two liquid outlet blocks 803 are fixedly connected to the left and right sides of the bottom of the U-shaped block 701, respectively.
[0042] A first water leakage hole 303 a is formed at the center of the first wave filter net 303 , and second water leakage holes 304 a are formed on both left and right sides of the second wave filter net 304 .
[0043] A partition block 104a is fixedly connected to the left side inside the water tank 104 to form two spaces. A flow pipe 104b is fixedly connected to the left side of the front side of the water tank 104. The right side of the flow pipe 104b is fixedly connected to the left side of the water inlet pipe 405. A sewage pipe 104c is fixedly connected to the right side of the water tank 104.
[0044] Specifically, the two inclined spray heads 403 will flush the two top dust suction nets 703, the two large dust suction ports 204 will vacuum the two top dust suction nets 703, the tops of the two vertical spray heads 404 will flush the two bottom dust suction nets 703, and the two small dust suction tubes 205 will vacuum the two bottom dust suction nets 703. The interior of the water tank 104 forms two spaces through the dividing block 104a, and the right space is larger than the left space. The two guide blocks 801 and the two inclined blocks 802 all play a guiding role, which are used to control the flow direction of dust and sewage. When the top of the first wave filter net 303 is blocked, water will flow downward through the first leakage hole 303a. When the top of the second wave filter net 304 is blocked, water will flow downward through the two second leakage holes 304a.
[0045] Furthermore, by running the vacuum cleaner 201, the vacuum cleaner 201 will use the first pipe 202 and the second pipe 203 to allow the two large vacuum ports 204 and the two small vacuum tubes 205 to vacuum, so that the dust enters the interior of the frame 101 through the two dust inlets 102. The dust entering the interior of the frame 101 will be adsorbed by multiple dust suction nets 703.
[0046] Run the water pump 401, and the water pump 401 pumps out the water on the right side of the water tank 104 through the water inlet pipe 405. The pumped water will enter the multiple inclined spray heads 403 and the multiple vertical spray heads 404 through the water outlet pipe 402, so that the multiple inclined spray heads 403 and the multiple vertical spray heads 404 spray water, and the multiple inclined spray heads 403 and the multiple vertical spray heads 404 will spray the multiple dust suction nets 703, so that the dust on the surface of the multiple dust suction nets 703 will be washed and flow downwards. As the vacuum cleaner 201 runs, the dust will continue to absorb the multiple dust suction nets 703, and the multiple inclined spray heads 403 and the multiple vertical spray heads 404 will continue to wash the multiple dust suction nets 703.
[0047] When the flushed sewage flows downward, the downward-flowing sewage flows downward through the shape of two guide blocks 801 and two inclined blocks 802. The sewage passing through the two liquid outlet blocks 803 will first fall to the top of the first wave filter 303 to filter particulate impurities. The sewage passing through the first wave filter 303 will pass through the second wave filter 304. The sewage passing through the second wave filter 304 will fall to the top of the filter plate 305. The sewage passing through the filter plate 305 will fall to the right side of the water tank 104 and enter the sewage on the right side of the water tank 104. Under the operation of the water pump 401, the sewage on the right side of the water tank 104 will be pumped out, so that multiple inclined spray heads 403 and multiple vertical spray heads 404 continue to spray multiple dust suction nets 703.
[0048] Reference Figure 1 , 5~8, which is the third embodiment of the present invention, provides a dust treatment device for construction engineering. Through the positioning component 600 and the cleaning component 500, when the filter component 300 is removed, the particulate impurities on the top and bottom of the first wave filter 303, the second wave filter 304 and the filter plate 305 can be cleaned and collected.
[0049] A cleaning component 500 is provided on the front side of the interior of the collecting box 302, and the cleaning component 500 includes multiple first scrapers 501, two second scrapers 502 and multiple material collecting blocks 503. The front sides of the multiple scrapers, the two second scrapers 502 and the multiple material collecting blocks 503 are fixedly connected to the front side of the interior of the collecting box 302, and the surfaces of the multiple scrapers are respectively fitted with the top and bottom of the first wave filter mesh 303 and the second wave filter mesh 304, and the opposite ends of the two second scrapers 502 are respectively fitted with the top and bottom of the filter plate 305. The multiple material collecting blocks 503 are respectively located at the bottom of the first wave filter mesh 303, the second wave filter mesh 304 and the filter plate 305, and the second wave filter mesh 304 is located at the bottom of the first wave filter mesh 303 and at the top of the filter plate 305.
[0050] The left and right sides of the front side of the frame 101 are provided with positioning components 600. The right positioning component 600 includes two first sockets 601, a second socket 602, two limiting blocks 603, two long rods 604, a short rod 605, a handle 606 and a latch 607. The rear sides of the two first sockets 601 are respectively fixedly connected to the top and bottom of the right side of the front side of the collection box 302, the rear side of the second socket 602 is fixedly connected to the right side of the front side of the pulling plate 306, and the rear sides of the two limiting blocks 603 are fixedly connected to the right side of the front side of the frame 101. The right sides of the two long rods 604 are fixedly connected to the top and bottom of the left side of the handle 606 respectively, and the right side of the short rod 605 is fixedly connected to the center of the left side of the handle 606. The left sides of the two long rods 604 pass through the two limiting blocks 603 and the two first sockets 601 in sequence, and extend to the left sides of the two first sockets 601. The surface of the short rod 605 is plug-connected with the inside of the second socket 602. The bottom of the pin 607 passes through the second socket 602 and the short rod 605 in sequence and extends to the bottom of the second socket 602.
[0051] Specifically, the interiors of the multiple material receiving blocks 503 are all mesh-shaped, and the first leakage hole 303a and the two second leakage holes 304a are all located on the rear side of the multiple material receiving blocks 503 to prevent particulate impurities from falling into the interior of the multiple material receiving blocks 503 during the process of filtering sewage. Since the interiors of the multiple material receiving blocks 503 are mesh-shaped, during the process of filtering sewage, the sewage can flow downward through the multiple material receiving blocks 503. The interiors of the multiple material receiving blocks 503 are used to collect impurity particles after scraping off the first wave filter 303, the second wave filter 304 and the filter plate 305. The lengths of the two long rods 604 are both greater than the length of the short rod 605. The surface of the pin 607 can fit with the interiors of the second socket 602 and the short rod 605, and the surfaces of the two long rods 604 can fit with the interiors of the two limiting blocks 603 and the two first sockets 601.
[0052] Further, the latch 607 is first pulled out from the second socket 602 and the short rod 605, and then the handle 606 is pulled to drive the two long rods 604 and the short rod 605 to move to the right. When the short rod 605 is moved out from the second socket 602, the pulling plate 306 is moved forward and drives the first wave filter 303, the second wave filter 304 and the filter plate 305 to move forward. In the process of the first wave filter 303, the second wave filter 304 and the filter plate 305 moving forward, a plurality of The first scraper 501 and the two second scrapers 502 will scrape off the particulate impurities on the top and bottom of the first wave filter 303, the second wave filter 304 and the filter plate 305. When the first wave filter 303, the second wave filter 304 and the filter plate 305 are pulled out from the interior of the collection box 302, the scraped particulate impurities will fall into the interior of the multiple material receiving blocks 503, thereby reducing the time the user takes to clean the first wave filter 303, the second wave filter 304 and the filter plate 305.
[0053] Then pull the handle 606 to drive the two long rods 604 and the short rod 605 to move to the right, so that the two long rods 604 are moved out from the inside of the two first sockets 601. At this time, you can pull the collecting box 302 forward to move the collecting box 302 out from the inside of the connecting shell 301, so that the multiple first scrapers 501, the two second scrapers 502 and the multiple collecting blocks 503 can be cleaned.
[0054] It should be noted that the material of the latch 607 is a heavier material, which prevents the material receiving block 503, the first wave filter screen 303, the second wave filter screen 304, the filter plate 305 and the pulling plate 306 from shaking inside the connecting shell 301, and plays an auxiliary fixing role.
[0055] The remaining structure is the same as that of Example 2.
[0056] Reference Figures 1 to 8, which is the fourth embodiment of the present invention. This embodiment is different from the third embodiment in that: this embodiment provides a dust treatment device and method for construction engineering.
[0057] When dust removal is needed, the vacuum cleaner 201 is operated, and the two large suction ports 204 and the two small suction tubes 205 will suction dust through the second pipe 203 and the first pipe 202, and the dust will enter the interior of the frame 101 through the two dust inlets 102, and the dust will be adsorbed by the multiple dust suction nets 703.
[0058] Close the valves of the flow pipe 104b and the sewage pipe 104c, open the valve of the water inlet pipe 405, and run the water pump 401 to make the water pump 401 pump out the water on the right side of the water tank 104 through the water inlet pipe 405. The pumped water will be sprayed from the multiple inclined spray heads 403 and the multiple vertical spray heads 404 through the water outlet pipe 402. The multiple inclined spray heads 403 and the multiple vertical spray heads 404 will spray water on the multiple dust suction nets 703, thereby flushing the multiple dust suction nets 703. The sewage will flow to both sides, flow downward through the two guide blocks 801 and the two inclined blocks 802, and enter the interior of the collection box 302 through the two liquid outlet blocks 803. The sewage falling into the collection box 302 will first fall to the left and right sides of the top of the first wave filter net 303. Due to the shape of the first wave filter net 303 When the left and right sides of the first wave filter 303 are blocked, the sewage will gather in the middle and then fall to the top of the second wave filter 304 through the first leakage hole 303a. Due to the shape of the second wave filter 304, the sewage falling to the center of the top of the second wave filter 304 will flow to both sides and finally fall to the top of the filter plate 305 through the two second leakage holes 304a. The sewage passing through the filter plate 305 will flow downward, and the sewage after filtering the particulate impurities will pass through the collecting box 302, the connecting shell 301, the frame 101 and the water tank 104 in turn and enter the right side of the water tank 104. As the water pump 401 runs, the sewage on the right side of the water tank 104 is pumped out, so that multiple inclined spray heads 403 and multiple vertical spray heads 404 continue to spray multiple dust suction nets 703.
[0059] After the dust removal operation is completed, by closing the valve of the water inlet pipe 405 and opening the valve of the flow pipe 104b, as the water pump 401 runs, the clean water on the left side of the water tank 104 will be pumped out through the flow pipe 104b, and the pumped water will be sprayed from the multiple inclined spray heads 403 and the multiple vertical spray heads 404 through the water outlet pipe 402. The multiple inclined spray heads 403 and the multiple vertical spray heads 404 will spray water on the multiple dust suction nets 703. The clean water will rinse and clean the water outlet pipe 402, the multiple inclined spray heads 403, the multiple vertical spray heads 404 and the interior of the frame 101, thereby reducing the cleaning work of the user. After the flushing is completed, the valve of the sewage pipe 104c is opened so that the sewage on the right side of the water tank 104 can be discharged.
[0060] When the first wave filter 303, the second wave filter 304 and the filter plate 305 need to be pulled out for cleaning, the latch 607 is first pulled out from the second socket 602 and the inside of the short rod 605. After the latch 607 is pulled out from the inside of the second socket 602 and the short rod 605, the handle 606 is pulled to drive the two long rods 604 and the short rod 605 to move to the right. When the short rod 605 is moved out from the inside of the second socket 602, the pulling plate 306 can be moved forward and drive the first wave filter 303, the second wave filter 304 and the filter plate 305 to move forward. As the first wave filter 303, the second wave filter 304 and the filter plate 305 continue to move forward, the multiple first scrapers 501 and the two second scrapers 502 will clean the first wave filter The particulate impurities on the top and bottom of the filter 303, the second wave filter 304 and the filter plate 305 are scraped off. When the first wave filter 303, the second wave filter 304 and the filter plate 305 are pulled out from the interior of the collection box 302, the scraped particulate impurities will fall into the interior of the multiple collecting blocks 503, so that the multiple collecting blocks 503 collect the scraped particulate impurities, thereby reducing the time for the user to clean the first wave filter 303, the second wave filter 304 and the filter plate 305, and then pull the handle 606 to drive the two long rods 604 to move out from the interior of the two first sockets 601 and the two limiting blocks 603. At this time, the collection box 302 can be moved forward and pulled out from the interior of the connecting shell 301, so that the interior of the collection box 302 can be cleaned.
[0061] In summary, dust can be sucked into the interior of the frame 101 through the dust suction component 200, so that the multiple dust suction nets 703 of the absorption component 700 can absorb and intercept the dust inside the frame 101, and the multiple dust suction nets 703 can be rinsed through the spray component 400, and the sewage will flow to both sides and fall into the interior of the filter component 300. The particulate impurities in the sewage can be intercepted and collected through the filter component 300. Due to the shapes of the first wave filter net 303 and the second wave filter net 304, the efficiency and duration of filtering sewage can be increased, thereby increasing the time of dust removal operation. The filtered sewage will fall to the right side of the water tank 104. Through the operation of the water pump 401, the sewage can be pumped out and recycled. By pumping out clean water on the left side of the water tank 104, the interior of the spray component 400 and the interior of the frame 101 can be rinsed and cleaned, thereby reducing the cleaning time of the user.
[0062] Importantly, it should be noted that the construction and arrangement of the present application shown in a number of different exemplary embodiments are only exemplary. Although only a few embodiments are described in detail in this disclosure, it should be readily understood by those who refer to this disclosure that many modifications are possible, for example, the size, scale, structure, shape and proportion of various elements, and parameter values such as temperature, pressure, etc., mounting arrangements, use of materials, color, directional changes, etc., without substantially departing from the novel angles and advantages of the subject matter described in the application. For example, the element shown as integrally formed can be composed of multiple parts or elements, the position of the element can be inverted or otherwise changed, and the nature or number or position of the discrete element can be changed or changed. Therefore, all such modifications are intended to be included in the scope of the present invention. The order or sequence of any process or method steps can be changed or reordered according to alternative embodiments. In the claims, any "device plus function" clause is intended to cover the structure of the execution function described herein, and is not only structurally equivalent but also equivalent structure. Without departing from the scope of the present invention, other replacements, modifications, changes and omissions can be made in the design, operating conditions and arrangement of the exemplary embodiments. Therefore, the invention is not limited to a specific embodiment, but extends to numerous modifications still falling within the scope of the appended claims.
[0063] Furthermore, in order to provide a concise description of exemplary embodiments, all features of an actual embodiment may not be described, i.e., those features that are not relevant to the best mode presently contemplated for carrying out the invention or those features that are not relevant to implementing the invention.
[0064] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A dust treatment device for construction engineering, characterized in that: A box component (100), comprising a frame (101), two dust inlets (102), a partition (103), a water tank (104) and a movable base (105), wherein the partition (103) is fixed to the top of the frame (101), the surfaces of the two dust inlets (102) are respectively fixedly connected to the left and right sides of the frame (101), the bottoms of the two dust inlets (102) are respectively fixedly connected to the left and right sides of the top of the partition (103), the top of the water tank (104) is fixedly connected to the bottom of the frame (101), and the top of the movable base (105) is fixedly intercepted with the bottom of the water tank (104); A dust suction component (200), comprising a dust collector (201), a first pipe (202), a second pipe (203), two large dust suction ports (204) and two small dust suction pipes (205), wherein the bottom of the dust collector (201) is fixedly connected to the top of the frame (101), the left side of the dust collector (201) is fixedly connected to the right side of the first pipe (202), the top of the surface of the second pipe (203) is fixedly connected to the top of the inside of the frame (101), the bottom of the second pipe (203) sequentially penetrates the frame (101) and the partition (103) and extends to the inside of the frame (101), the left side of the bottom of the first pipe (202) is fixedly connected to the top of the second pipe (203), the opposite ends of the two large dust suction ports (204) are respectively fixedly connected to the bottom of the left and right sides of the second pipe (203), and the tops of the two small dust suction pipes (205) are both fixedly connected to the bottom of the second pipe (203); and, A filtering component (300) comprises a connecting shell (301), a collecting box (302), a first wave filter (303), a second wave filter (304), a filter plate (305) and a pulling plate (306); the bottom of the connecting shell (301) is fixedly connected to the bottom of the interior of the frame (101); the front sides of the first wave filter (303), the second wave filter (304) and the filter plate (305) are fixedly connected to the rear side of the pulling plate (306); the surface of the collecting box (302) is plug-connected to the interior of the connecting shell (301); the bottom of the interior of the connecting shell (301) is connected to the bottom of the interior of the collecting box (302); the rear side of the pulling plate (306) can be fitted with the front side of the collecting box (302); and the surfaces of the first wave filter (303), the second wave filter (304) and the filter plate (305) can be slidably connected to the front side of the interior of the collecting box (302).
2. The dust treatment device for construction engineering according to claim 1, characterized in that: A spray component (400) is provided on the front side of the top of the movable base (105), and the spray component (400) comprises a water pump (401), a water outlet pipe (402), a plurality of inclined spray heads (403), a plurality of vertical spray heads (404) and a water inlet pipe (405). The bottom of the water pump (401) is fixedly connected to the front side of the top of the movable base (105), the rear side of the water inlet pipe (405) is fixedly connected to the front side of the water tank (104), the front side of the water inlet pipe (405) is fixedly connected to the rear side of the water pump (401), and the The bottom of the water outlet pipe (402) is fixedly connected to the front side of the water pump (401), the left and right sides of the top of the water outlet pipe (402) are respectively fixedly connected to the left and right sides inside the frame (101), the top of the surface of the water outlet pipe (402) is fixedly connected to the left and right sides inside the partition (103), the sides of the plurality of inclined spray heads (403) close to the water outlet pipe (402) are all fixedly connected to the water outlet pipe (402), and the tops of the plurality of vertical spray heads (404) are respectively fixedly connected to the bottoms of the plurality of inclined spray heads (403).
3. The dust treatment device for construction engineering according to claim 1, characterized in that: A cleaning component (500) is provided at the front side of the interior of the collecting box (302). The cleaning component (500) comprises a plurality of first scrapers (501), two second scrapers (502) and a plurality of material collecting blocks (503). The front sides of the plurality of first scrapers (501), the two second scrapers (502) and the plurality of material collecting blocks (503) are all fixedly connected to the front side of the interior of the collecting box (302). The surfaces of the plurality of first scrapers (501) are respectively fitted with the top and bottom of the first wave filter net (303) and the second wave filter net (304). The opposite ends of the two second scrapers (502) are respectively fitted with the top and bottom of the filter plate (305). The plurality of material collecting blocks (503) are respectively located at the bottom of the first wave filter net (303), the second wave filter net (304) and the filter plate (305). The second wave filter net (304) is located at the bottom of the first wave filter net (303) and at the top of the filter plate (305).
4. The dust treatment device for construction engineering according to claim 3, characterized in that: Positioning components (600) are provided on both the left and right sides of the front side of the frame (101); the positioning component (600) on the right side comprises two first sockets (601), a second socket (602), two limiting blocks (603), two long rods (604), a short rod (605), a handle (606) and a latch (607); the rear sides of the two first sockets (601) are respectively fixedly connected to the top and bottom of the right side of the front side of the collection box (302); the rear side of the second socket (602) is fixedly connected to the right side of the front side of the pulling plate (306); the rear sides of the two limiting blocks (603) are both fixedly connected to the right side of the front side of the frame (101). The right sides of the two long rods (604) are respectively fixedly connected to the top and bottom of the left side of the handle (606), the right side of the short rod (605) is fixedly connected to the center of the left side of the handle (606), the left sides of the two long rods (604) successively penetrate the two limiting blocks (603) and the two first sockets (601), and extend to the left sides of the two first sockets (601), the surface of the short rod (605) is plug-connected with the inside of the second socket (602), and the bottom of the latch (607) successively penetrates the second socket (602) and the short rod (605) and extends to the bottom of the second socket (602).
5. The dust treatment device for construction engineering according to any one of claims 2 to 4, characterized in that: An absorption component (700) is provided at the bottom of the frame (101), and the absorption component (700) comprises a U-shaped block (701), two vertical plates (702) and a plurality of dust suction nets (703); the top of the U-shaped block (701) is fixedly connected to the bottom of the partition (103); the front and rear sides of the U-shaped block (701) are respectively fixedly connected to the front side and the rear side inside the frame (101); the tops of the two vertical plates (702) are respectively fixedly connected to the left side and the right side of the bottom of the partition (103). The bottoms of the two vertical plates (702) are respectively fixedly connected to the left and right sides of the bottom of the U-shaped block (701); the front and rear sides of the two vertical plates (702) are respectively fixedly connected to the front and rear sides of the inside of the frame (101); the plurality of dust suction nets (703) are respectively arranged on the left and right sides of the inside of the U-shaped block (701) and the left and right sides of the bottom; the left and right sides of the surfaces of the second pipe (203) and the two small dust suction pipes (205) are respectively fixedly connected to the inside of the two vertical plates (702).
6. The dust treatment device for construction engineering according to claim 5, characterized in that: Guide components (800) are provided on the left and right sides of the U-shaped block (701). The guide components (800) include two guide blocks (801), two inclined blocks (802) and two liquid outlet blocks (803). The opposite ends of the two guide blocks (801) are respectively fixedly connected to the left and right sides of the U-shaped block (701). The tops of the two inclined blocks (802) are respectively fixedly connected to the bottoms of the two guide blocks (801). The tops of the two liquid outlet blocks (803) are respectively fixedly connected to the bottoms of the two inclined blocks (802). The opposite sides of the two liquid outlet blocks (803) are respectively fixedly connected to the left and right sides inside the frame (101). The opposite ends of the tops of the two liquid outlet blocks (803) are respectively fixedly connected to the left and right sides of the bottom of the U-shaped block (701).
7. The dust treatment device for construction engineering according to claim 6, characterized in that: A first water leakage hole (303a) is provided at the center of the first wave filter net (303), and second water leakage holes (304a) are provided on both left and right sides of the second wave filter net (304).
8. The dust treatment device for construction engineering according to claim 7, characterized in that: The left side of the interior of the water tank (104) is fixedly connected to a partition block (104a) to form two spaces; the left side of the front side of the water tank (104) is fixedly connected to a flow pipe (104b); the right side of the flow pipe (104b) is fixedly connected to the left side of the water inlet pipe (405); and the right side of the water tank (104) is fixedly connected to a sewage pipe (104c).
9. A method for treating dust in construction engineering, characterized in that: A dust treatment device for construction engineering according to any one of claims 1 to 8, comprising: When dust removal is required, the dust collector (201) is operated so that the dust collecting component (200) sucks the dust into the interior of the frame (101) through the two dust inlets (102); Then, the water pump (401) is operated to pump out the water on the right side of the water tank (104), and the water enters the plurality of inclined spray heads (403) and the plurality of vertical spray heads (404) through the water outlet pipe (402). The plurality of inclined spray heads (403) and the plurality of vertical spray heads (404) spray the plurality of dust suction nets (703), flushing the dust on the surfaces of the plurality of dust suction nets (703) and causing the water to flow downward; The sewage flowing downward enters the interior of the filter component (300) through the two liquid outlet blocks (803), and passes through the first wave filter (303), the second wave filter (304) and the filter plate (305) in sequence. After filtering out the particulate impurities, the sewage enters the right side of the water tank (104) and is continuously sprayed by the operation of the water pump (401).
10. The method for treating dust in construction engineering according to claim 9, characterized in that: The box component (100) can be used to process dust inside the frame (101); the dust collecting component (200) can be used to suck dust into the box component (100); the dust entering the frame (101) can be absorbed by the absorption component (700); the plurality of dust collecting nets (703) can be rinsed by the spray component (400); the sewage generated by rinsing the plurality of dust collecting nets (703) can be filtered to remove particle impurities by the filter component (300); the cleaning component (500) can be used to clean the top and bottom of the first wave filter net (303), the second wave filter net (304) and the filter plate (305); the filtering component (300) can be used to limit the position of the filtering component (300) to prevent the filtering component (300) from shaking inside the frame (101); and the guide component (800) can be used to control the flow direction of dust and sewage.
Citation Information
Patent Citations
Corrugated filter screen
CN101579589A
Environment-friendly toilet rainwater collecting device
CN212984016U
Industrial energy conservation and emission reduction type smoke purifier
CN214972839U
Rapid purification device for waste gas treatment
CN216295635U
Water conservancy project sewage disposal device
CN216677224U